CLIENTE: LIMAGAS S.

A
PROYECTO: CERCO PERIMETRICO H=3.40 m
CALLAO Tarjeta Página :
S10 CCCEIC CERCO PERIMETRICO H=3.40 - LIMAGAS

1.0 TRABAJOS PRELIMINARES UNIDAD METRADO P.U PARCIAL


1.1 LIMPIEZA DE TERRENO MANUAL M2 1,276.96 2.70 3,447.79
1.2 TRAZO Y REPLANTEO CON EQUIPO M2 1,276.96 2.53 3,230.71
1.3 EXCAVACION MANUAL DE CIMIENTO M3 456.51 43.00 19,629.93
1.4 RELLENO COMPACTADO CON MATERIAL PROPIO M3 249.01 20.74 5,164.47
1.6 NIVELACION Y APISONADO CON MAQUINA M2 415.01 3.28 1,361.23
2.0 CONCRETO SIMPLE
2.1 CIMIENTOS CONCRETO CICLOPEO 1:10+30% PG M3 207.51 196.45 40,765.34
2.12 ACERO EN CIMIENTO CORRIDO Fy=4200 KG/CM2 KG 1,431.71 4.73 6,771.99
2.3 CONCRETO LIQUIDO EN SOBRECIMIENTO FC=175 KG/CM2 M3 60.49 332.79 20,130.47
2.4 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO M2 630.08 28.58 18,007.69
3.0 CONCRETO ARMADO
3.1 ACERO GRADO 60 EN SOBRECIMIENTO DE BLOQUE DE CONCRETO KG 1,838.07 4.73 8,694.07
3.2 ACERO GRADO 60 EN MURO DE BLOQUE DE CONCRETO KG 4,195.02 4.73 19,842.44
3.3 MURO DE BLOQUE DE CONCRETO 14x39x19 M2 2,134.06 59.03 125,973.56
3.4 CONCRETO LIQUIDO EN MUROS, MEZC C:A:P 1:2 1/2: 1 1/2, SLUMP=10", F'C= 175 kg/cm2
M3 53.56 332.79 17,824.23
3.5 CONCRETO PARA BASE DE PUERTA f´c= 175 Kg/cm2 M3 2.10 223.34 469.01
3.6 SOLAQUEO DE SOBRECIMIENTO M2 2,134.06 14.10 30,090.25
3.7 COLUMNAS DE CONCRETO PARA PUERTA
3.7.1 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 2.20 401.78 883.92
3.7.2 ACERO GRADO 60 EN COLUMNAS KG 321.41 4.81 1,545.98
3.7.3 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2 28.60 41.95 1,199.77
3.7.4 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA M2 28.60 31.13 890.32
5.0.0 PUERTA METALICA H=5.00m
5.1.0 PINTURA EN PUERTAS METALICAS M2 8.40 22.74 191.02
5.2.0 DESMONTAJE DE PUERTA METALICA GLB 1.00 4,500.00 4,500.00
5.3.0 MONTAJE DE PUERTA METALICA H=5.00m GLB 1.00 1,200.00 1,200.00

COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
=======
SUBTOTAL
IGV
=======
TOTAL PRESUPUESTO 1

COSTO DE CERCO H=3.40m POR METRO LINEAL (LONTITUD=638.48 m) S/.705.02


Costo al

SUBTOTAL

32,834.13

288,569.05

4,519.99

5,891.02

331,814.18
23,226.99
23,226.99
===========
378,268.17
71,870.95
===========
###
CLIENTE: LIMAGAS S.A
PROYECTO: CERCO PERIMETRICO H=3.40 m
CALLAO Tarjeta Página :
S10 CCCEIC CERCO PERIMETRICO H=3.40 - LIMAGAS

GASTOS GENERALES
UND P.U PARCIAL
GASTOS DE OBRA Y PERSONAL TECNICO GLB 22,226.99
GASTOS POR TRAMITE DE LICENCIA DE CONSTRUCCION GLB 1000

COSTO DIRECTO DE G.G 23,226.99


Costo al
CLIENTE: LIMAGAS S.A
PROYECTO: EXPLANACION DE TERRENOSUPERFICIALMENTE + TRASLADO DE PUERTA METALICA

S10 CCCEIC CALLAO Tarjeta


CERCO PERIMETRICO H=3.40 -Página :
LIMAGAS
6.0.0 EXPLANACION
6.1.0 CORTE SUPERFICIAL CON MAQUINARIA M3 32,650.55 1.03 33,630.07
6.3.0 NIVELACION INTERIOR APISONADO MANUAL M2 46,643.64 1.49 69,499.02

COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
=========
SUBTOTAL
IGV
=========
TOTAL PRESUPUESTO 1 46643.64

COSTO DE EXPLANACION POR METRO CUADRADO (AREA=46,643.64 m2) S/.3.00

3
Costo al 1
p.u
1.03
103,129.09 1.61

103,129.09
7,219.04
7,219.04
===========
117,567.16
22,337.76
===========
139,904.92

antes 147498.14
despues 139,904.92
7593.21
CLIENTE: LIMAGAS S.A
PROYECTO: CERCO PERIMETRICO H=3.40m

RESUMEN DE METRADOS

Descripción METRADO

1.0 TRABAJOS PRELIMINARES


1.1 LIMPIEZA DE TERRENO MANUAL 1276.96
1.2 TRAZO Y REPLANTEO CON EQUIPO 1276.96
1.3 EXCAVACION MANUAL DE CIMIENTO 456.51
1.4 RELLENO COMPACTADO CON MATERIAL PROPIO 249.01
1.6 NIVELACION Y APISONADO CON MAQUINA 415.01
2.0 CONCRETO SIMPLE
2.1 CIMIENTOS CONCRETO CICLOPEO 1:10+30% PG 207.51
2.2 ACERO EN CIMIENTO CORRIDO Fy=4200 KG/CM2 1431.71
2.3 CONCRETO LIQUIDO EN SOBRECIMIENTO FC=175 KG/CM2 60.49
2.4 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO 630.08
3.0 CONCRETO ARMADO
3.1 ACERO GRADO 60 EN SOBRECIMIENTO DE BLOQUE DE CONCRETO 1838.07
3.2 ACERO GRADO 60 EN MURO DE BLOQUE DE CONCRETO 4195.92
3.3 MURO DE BLOQUE DE CONCRETO 14x39x19 2134.06
3.4 CONCRETO LIQUIDO EN MUROS, MEZC C:A:P 1:2 1/2: 1 1/2, SLUMP=10", F'C= 175 kg/cm2 53.56
3.5 CONCRETO PARA BASE DE PUERTA f´c= 175 Kg/cm2 2.10
3.6 SOLAQUEO DE SOBRECIMIENTO 2134.06
3.7 COLUMNAS DE CONCRETO PARA PUERTA
3.7.1 CONCRETO EN COLUMNAS F´C=210 KG/CM2 2.20
3.7.2 ACERO EN COLUMNAS FY=4200 KG/CM2 321.41
3.7.3 ENCOFRADO EN COLUMNAS 28.60
3.7.4 TARRAJEO EN COLUMNAS 28.60
5.0 PUERTA METALICA H=5.00m
5.1 PINTURA EN PUERTAS METALICAS 8.40
5.2 DESMONTAJE DE PUERTA METALICA 1.00
5.3 MONTAJE DE PUERTA METALICA 1.00
UNIDAD

M2
M2
M3
M3
M2

M3
KG
M3
M2

KG
KG
M2
M3
M3
M2

M3
kg
M2
M2

M2
GLB
GLB
CLIENTE: LIMAGAS S.A
PROYECTO: CERCO PERIMETRICO H=3.40 m

DETALLE DE METRADOS

Descripción CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL

1.0 TRABAJOS PRELIMINARES


1.1 LIMPIEZA DE TERRENO MANUAL 1276.96
1 194.52 2 389.04
1 375.11 2 750.22
1 68.85 2 137.7

1.2 TRAZO Y REPLANTEO CON EQUIPO 1276.96


1 194.52 2 389.04
1 375.11 2 750.22
1 68.85 2 137.7

1.3 EXCAVACION MANUAL DE CIMIENTO 456.51


1 194.52 0.65 1.1 139.08
1 375.11 0.65 1.1 268.2
1 68.85 0.65 1.1 49.23

1.4 RELLENO COMPACTADO CON MATERIAL PROPIO 249.01


1 194.52 0.65 0.6 75.86
1 375.11 0.65 0.6 146.29
1 68.85 0.65 0.6 26.85

1.5 ELIMINACION MASIVA DE MATERIAL EXCEDENTE


1.6 NIVELACION Y APISONADO CON MAQUINA 415.01
1 194.52 0.65 126.44
1 375.11 0.65 243.82
1 68.85 0.65 44.75

2.0 CONCRETO SIMPLE


2.1 CIMIENTOS CONCRETO CICLOPEO 1:10+30% PG 207.51
1 194.52 0.65 0.5 63.22
1 375.11 0.65 0.5 121.91
1 68.85 0.65 0.5 22.38
Descripción CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL

2.2 ACERO EN CIMIENTO CORRIDO Fy=4200 KG/CM2 1431.71


ESTRIBOS DE 1/4" 1597.2 0.75 1197.9
PESO DE VARILLA DE 1/4" (KG/ML) 0.25 1197.9
299.48

ACERO DE 3/8" 3 638.48 1915.44


TRASLAPES DE 0.50 PARA ACERO DE 3/8" 3 0.5 70.94 106.41
PESO DE VARILLA DE 3/8" (KG/ML) 0.56 2021.85
1132.24

2.3 CONCRETO LIQUIDO EN SOBRECIMIENTO FC=175 KG/CM2 60.49


1 630.08 0.12 0.8 60.49

2.4 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO 630.08


POR AMBOS LADOS 2 630.08 0.5 630.08

3.0 CONCRETO ARMADO


3.1 ACERO GRADO 60 EN SOBRECIMIENTO DE BLOQUE DE CONCRETO 1838.07
ACERO VERTICAL CADA 0.60 M CON ACERO DE 12MM (H=3.40) 1015.93 2.13 2158.86
ACERO VERTICAL CADA 0.60 M CON ACERO DE 12MM (H=5.00) 22.2 3.73 82.7

PESO DE VARILLA DE 12 mm (KG/ML) 0.82 2241.55


1838.07

3.2 ACERO GRADO 60 EN MURO DE BLOQUE DE CONCRETO 4195.92


ACERO VERTICAL CADA 0.60 M CON ACERO DE 12MM (H=3.40) 1015.93 3.17 3220.51
ACERO VERTICAL CADA 0.60 M CON ACERO DE 12MM (H=5.00) 22.2 4.77 105.89

PESO DE VARILLA DE 12 mm (KG/ML) 0.82 3326.4


2727.65

ACERO HORIZONTAL CADA 1.00 M CON ACERO DE 3/8" 4.25 608.96 2588.08
TRASLAPES DE 0.50 PARA ACERO DE 3/8" 67.66 0.5 33.83

PESO DE VARILLA DE 3/8" mm (KG/ML) 0.56 2621.91


1468.27

Descripción CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL

3.3 MURO DE BLOQUE DE CONCRETO 14x39x19 2134.06


muros de H=3.40M 608.96 3.4 2070.46
muros de H=5.00M 12.72 5 63.60

3.4 CONCRETO LIQUIDO EN MUROS, MEZC C:A:P 1:2 1/2: 1 1/2, SLUMP=10", F'C= 175 kg/cm2 53.56
aberturas a llenar
muros de H=3.40M 1015.93 0.16 0.09 3.4 48.50
muros de H=5.00M 22.2 0.16 0.09 5 1.56
%DESPERDICIO 1.07 50.06

3.5 CONCRETO PARA BASE DE PUERTA f´c= 175 Kg/cm2 2.10


puerta 1 8.4 0.5 0.5 2.1

3.6 SOLAQUEO DE SOBRECIMIENTO 2134.06


muros de H=3.40M 1 608.96 3.4 2070.46
muros de H=5.00M 1 12.72 5 63.6

3.7 COLUMNAS DE CONCRETO PARA PUERTA

3.7.1 CONCRETO EN COLUMNAS F´C=210 KG/CM2 2.20


4 0.25 0.4 5.5 2.2

3.7.2 ACERO EN COLUMNAS FY=4200 KG/CM2 321.41


acero de 1/2"
6 4 6 144

PESO DE VARILLA DE 3/8" (KG/ML) 1 144


144
estribos de 3/8"
36 4 1.3 187.2
36 4 0.9 129.6

PESO DE VARILLA DE 3/8" (KG/ML) 0.56 316.8


177.41
Descripción CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL

3.7.3 ENCOFRADO EN COLUMNAS 28.60


4 1.3 5.5 28.6

3.7.4 TARRAJEO EN COLUMNAS 28.60


4 1.3 5.5 28.6

5.0 PUERTA METALICA H=5.00m


5.1 PINTURA EN PUERTAS METALICAS 8.40

5.2 DESMONTAJE DE PUERTA METALICA 1.00


INCLUYE: TRABAJO DE DESMONTAJE, TRASLADO DE PERSONAL IDA Y 1 1
VUELTA, VIATICOS, MOVILIZACION DE PUERTA

5.2 DESMONTAJE DE PUERTA METALICA 1.00


1 1
Unidad

M3

M2

M3

M3

M3
M2

M3
Unidad

KG

M3

M2

KG

KG
Unidad

M2

M3

M3

M2

M3

kg
Unidad

M2

M2

M2

GLB

GLB