CALCULO:
BOGOTA
MARZO DE 2016
_________________________________________________________________________________________________
BOGOTA D.C.
INDICE
1.
2.
3.
4.
5.
6.
7.
8.
9.
INTRODUCCION
MEMORIAL DE RESPONSABILIDAD
AVALUO DE CARGAS
ANALISIS SISMICO FH
ELEMENTOS NO ESTRUCTURALES
ENTRADA DE DATOS
CALCULO DE DERIVAS
DISEO DE ELEMENTOS COLUMNAS Y VIGAS
DISEO DE CIMENTACION
_________________________________________________________________________________________________
BOGOTA D.C.
1. INTRODUCCIN:
El presente estudio resume los datos ms importantes de la valoracin
estructural realizada al proyecto de RECONSTRUCCIN PRTICO DE
CERRAMIENTO COSTADO SUR PARQUE EMPRESARIAL NORMANDA BODEGAS
DEL BLOQUE 7 A 19 de, situado en la Calle 63 #74 B 42, de Bogota D.C..
2. DESCRIPCION DEL PROYECTO :
TIPO DE OBRA: Reconstruccin
LOCALIACION: Bogota D.C. Calle 63 #74 B 42
USO
: Cerramiento bodega uso industrial
ALTURA
: 2 PISOS
SISTEMA ESTRUCTURAL: PORTICO EN CONCRETO RESISTENTES A MOMENTOS
CUBIERTA: EN CANALETA 90 DE FIBROCEMENTO
CIMENTACION : ZAPATAS APOYADAS EN PILOTES Y VIGAS DE DE AMARRE
3. DISEO ESTRUCTURAL:
La edificacin tiene las siguientes caractersticas:
Capacidad de Disipacin de energa: Moderado (DMO)
Sistema estructural original: Prtico en concreto
Coeficiente de capacidad de modificacin de respuesta:
R= 5.0 (Prticos concreto sin diagonales)
Analisis de Viento segn Norma ASCE 7-95 de la cual se deriva la NSR-10
Zona de riesgo ssmico: Intermedia
Grupo de uso: I (estructuras de ocupacin normal)
Coeficiente de importancia: 1.00
Perfil de suelo: E ; ZONA MICROZONIFICACION : LACUSTRE A : LACUSTRE 300
Parmetros ssmicos:
Aa = 0.15 ; Av =0.20 ; Fa = 1.05 ; Fv = 2,90 ; Tc = 0.48 ; Tl = 5,00
Grado de desempeo de la mampostera no estructural : Bajo
Capacidad portante del suelo : 4,3 Ton /m2
de acuerdo con el apndice A-3 de NSR - 10, y lo establecido en el
Reglamento Colombiano de Construccin Sismo Resistente. (ley 400 de 1997,
decreto 926 de 2010) NSR 10.
_________________________________________________________________________________________________
BOGOTA D.C.
4.
METODO DE ANALISIS:
5. MATERIALES Y CARGAS :
Carga muerta ml = 1200 kg/ml
Carga viva ml = 200 kg/ml
Carga viento cubierta =40 kg/m2
Acero de refuerzo principal = 60000 psi.(4200 kg/cm2)
Acero de estribos
= 60000 psi.(4200 kg/cm2)
Concreto de 3000 psi (21.1 MPa) para todos los elementos principales.
_________________________________________________________________________________________________
BOGOTA D.C.
MEMORIAL DE RESPONSABILIDAD.
_________________________________________________________________________________________________
BOGOTA D.C.
_________________________________________________________________________________________________
BOGOTA D.C.
Documento firmado por: CONSEJO PROFESIONAL NACIONAL DE INGENIERA - COPNIA, N de serie: 52908192428853033756032804156936605191.
Emisor del certificado: AC TESTINTE CERTICAMARA S.A., Fecha de emisin de la firma: 01/02/2016 16:21:13.
Cdigo Seguro de Verificacin [http://gdocumental.copnia.gov.co/invesiteCSV]: Y4kXbUaCr9i1oDCXCaAT http://www.copnia.gov.co
Pgina 1 de un total de 1 pgina(s).
1. Que ORTIZ TAPIA EDUARDO identificado (a) con Cdula de Ciudadana N 11188075, se encuentra inscrito(a) en el
Registro Profesional Nacional que lleva esta entidad, como INGENIERO CIVIL con Matrcula Profesional N 25202-119942
CND desde el (los) dieciseis (16) da(s) del mes de junio del ao dos mil cinco (2005).
2. Que la (el) Matrcula Profesional es la autorizacin que expide el Estado para que el titular ejerza su profesin en todo el
territorio de la Repblica de Colombia, de conformidad con lo dispuesto en la Ley 842 de 2003.
3. Que la (el) referida (o) Matrcula Profesional se encuentra vigente, por lo cual el profesional certificado actualmente NO
est impedido para ejercer la profesin.
4. Que el profesional NO tiene antecedentes disciplinarios tico-profesionales.
5. Que la presente certificacin tiene una validez de seis (6) meses y se expide en Bogot, D.C., a los uno (1) das del mes
(febrero) del ao dos mil dieciseis (2016).
__________________________
Firma del titular (*)
(*) Con el fin de verificar que el titular autoriza su participacin en procesos estatales de seleccin de contratistas. La falta de firma del titular no invalida el
Certificado.
El presente es un documento pblico expedido electrnicamente con firma digital que garantiza su plena validez jurdica y probatoria segn lo establecido en
la Ley 527 de 1999.
Para verificar la integridad e inalterabilidad del presente documento consulte en el sitio web http://gdocumental.copnia.gov.co/invesiteCSV indicado el cdigo
que se encuentra en el costado izquierdo de este documento
Calle 78 N 9 57 Piso 13 Bogot D.C. Pbx: 3220102 Correo-e: info@copnia.gov.co
www.copnia.gov.co
__________________________
AVALUO DE CARGAS
Y MODELO DE PRTICO
_________________________________________________________________________________________________
BOGOTA D.C.
VER-2
EDO
PROYECTO: PARQUE EMPRESARIAL NORMANDA
EVALUACION CARGA POR METRO LNEAL PORTICO
CARGA MUERTA
PISO 1
espesor "m"
Long "m"
h muro en "m"
peso (Kg)
muro /m2
09/03/2016
rea
muro /m2
peso muros
peso muros
por piso Kg/m2 por piso Kg/ml
2.65
180
75.896
13661.28
477
PISO 2
0.12
28.64
2.55
180
73.032
13145.76
459
ANTEPECHO CUB
TOTAL
0.12
28.64
1.47
180
42.0053333
7560.96
264
1200
CARGA VIVA
CARGA GRANIZO
CARGA MANTENIMIENTO
CARGA VIVA
Kg/ml
100
100
200
DIAGRAMA DE MOMENTOS
DIAGRAMA DE CORTANTE
ANLISIS SISMICO F H
_________________________________________________________________________________________________
BOGOTA D.C.
Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:44:30 AM 09/03/2016
=================================================================================================
SEISMIC
DESIGN
C O D E : COL BOGOTA-10
==============================================================
S E I S M I C
B A S E
L E V E L :
==============================================================
S E I S M I C
F O R C E
System X-Direction:
R E S I S T I N G
S Y S T E M
C: Moment Res.Frame
S E I S M I C
P A R A M E T E R S
.15
1.0
Av =
GROUP
IV - Essential facilities
III- Public assistance facilities
II - Especial occupancy buildings
I - Normal occupancy buildings
Seismic zone No. ............... =
.20
COEFFICIENT
1.50
1.25
1.10
1.00
8
B O G O T A, D. C. - S E I S M I C Z O N E S
1: CERROS
9: LACUSTRE-500
2: PIEDEMONTE A
10: LACUSTRE ALUVIAL-200
3: PIEDEMONTE B
11: LACUSTRE ALUVIAL-300
4: PIEDEMONTE C
12: ALUVIAL-50
5: LACUSTRE-50
13: ALUVIAL-100
6: LACUSTRE-100
14: ALUVIAL-200
7: LACUSTRE-200
15: ALUVIAL-300
8: LACUSTRE-300
16: DEPOSITO LADERA
Seismic Force-resisting system
= C: Moment
Energy Dissipation Coefficient, Ro =
5
T = 0.1 N ............. = .3
Ta = Ct (Hn)^x ......... = 0.047 H^0.9
= .24
*Tmax: 1.7 Ta .......... = .41 0
*Tmax = Cu Ta
Cu = 1.75 - 1.2 Av Fv >= 1.2
Fundamental period, T ............ =
.24
______________________________________________________________________
Page No. 2
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:44:30 AM 09/03/2016
=================================================================================================
DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS
Short Periods
------------Effect. peak acceleration & velc., Aa = 0.15
Site coefficients (Tables below), Fa = 1.05
Design response parameters,
Aa Fa =
0.16
5.00
SEISMIC ZONE
1: Cerros
2: Piedemonte A
3: Piedemonte B
4: Piedemonte C
5: Lacustre-50
6: Lacustre-100
7: Lacustre-200
8: Lacustre-300
9: Lacustre-500
10: Lacustre Aluvial-200
11: Lacustre Aluvial-300
12: Aluvial-50
13: Aluvial-100
14: Aluvial-200
15: Aluvial-300
16: Deposito ladera
Fa
1.35
1.65
1.95
1.80
1.40
1.30
1.20
1.05
0.95
1.10
1.00
1.35
1.20
1.05
0.95
1.65
Fv
1.30
2.00
1.70
1.70
2.90
3.20
3.50
2.90
2.70
2.80
2.50
1.80
2.10
2.10
2.10
1.70
Long Periods
---------------Av = 0.20
Fv = 2.90
Av Fv=
0.58
Tl
3.0
3.0
3.0
3.0
4.0
4.0
4.0
5.0*
5.0
4.0
5.0
3.5
3.5
3.5
3.5
3.0
______________________________________________________________________
Reduction in R for Irregularity and Lack of Redundancy:
PLAN
Type
1aP
1bP
2P
3P
4P
5P
IRREGULARITIES
Description
Torsional
Torsional Extrme
Reentrant corners
Diaph. discontin.
Plane shifting
Unparallel grid
ELEVATION IRREGULARITIES
Type Description
a
1aA Flexible
0.9
1bA Flexible Extrme 0.8
2A Mass
0.9
3A Geometrical
0.9
4A Plane shifting
0.8
5aA Weak Story
0.9
5bA Weak Story Extr 0.8
NOTE: EngSolutions RCB assumes irregular but redundant building.
For regular buildings make (p . a)= 1.0
p
0.9
0.8
0.9
0.9
0.8
0.9
X - D I R E C T I O N
--------------------Reduct. factor, (p.a) =
1
Redundancy factor, r
Y - D I R E C T I O N
--------------------1
1
R = (p a) r Ro
______________________________________________________________________
Page No. 3
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:44:30 AM 09/03/2016
=================================================================================================
T O T A L
B A S E
S H E A R
83.34
=
=
=
=
=
=
=
=
=
=
.16
.58
1.74
1
LACUSTRE-300
5
.24
2.9
.4
.4
33.34
______________________________________________________________________
Page No. 4
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:44:30 AM 09/03/2016
=================================================================================================
Equivalent Forces
Fi = (Wi Hi^n /SWj Hj^n)
V =SFi
V = Sa W
E Q U I V A L E N T
F O R C E S
Floor
i
-----
Height
Hi
(m)
-----
Weigth
Wi
(ton)
-------
Wi Hi^n
Force
-----Fi
|SWj Hj^n
(ton)
------------
3
2
----|S
5.98
3.06
31.07
52.27
-----83.34
0.537
0.463
n =
17.903
15.435
------33.340
Shear
Vi
(ton)
------17.90
33.340
______________________________________________________________________
_________________________________________________________________________________________________
BOGOTA D.C.
Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:29:05 AM 09/03/2016
=================================================================================================
STORY INFORMATION
Number of Stories . . . . = 2
Total Frame Height . . . . = 5.99 m
Story
----------1 - 2
2 - 3
-----------
Height
---------3.07
2.92
----------
* Height in (m)
BAY INFORMATION
Number of Bays . . . . . . = 9
Total Frame Width . . . . = 28.65 m
Bay
----------1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
----------* Span in (m)
Span
---------3.55
3.55
3.55
3.68
3.68
3.55
3.55
3.55
----------
MATERIALS
Number of materials =
REINFORCED CONCRETE
Mat
Name
f'c
fy
fys1
fys2
E
G
w
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/m3
___ ______________ _________ _________ _________ _________ _________ _________ _________
1 RConcrete1
210
4200
4200
4200
218540
87430
2400.0
MEMBER
DATA
COLUMN
=
=
=
=
34
18
16
0
SECTIONS
Name
Shape
Column1
Rectang
b
h
tw
tf
P1
P2
A
I2
I3
J
(cm)
(cm)
(cm)
(cm)
(cm)
(cm)
(cm2)
(cm4)
(cm4)
(cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________ _________
35.00
40.00
1400.0
186667
142917
256535
Page No. 2
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:29:05 AM 09/03/2016
=================================================================================================
COLUMNS
Column
Story
________
____
L
(m)
______
Lu
(m)
______
a
(m)
_____
c
(m)
_____
Theta
(o)
______
Sec
_____
Mat
_____
System
_____
A-9
A-9
2
1
2.92
3.07
2.47
2.85
0.23
0.00
0.23
0.23
0.0
0.0
1
1
1
1
G&L
G&L
A-8
A-8
2
1
2.92
3.07
2.47
2.85
0.23
0.00
0.23
0.23
0.0
0.0
1
1
1
1
G&L
G&L
A-7
A-7
2
1
2.92
3.07
2.47
2.85
0.23
0.00
0.23
0.23
0.0
0.0
1
1
1
1
G&L
G&L
A-6
A-6
2
1
2.92
3.07
2.47
2.85
0.23
0.00
0.23
0.23
0.0
0.0
1
1
1
1
G&L
G&L
A-5
A-5
2
1
2.92
3.07
2.47
2.85
0.23
0.00
0.23
0.23
0.0
0.0
1
1
1
1
G&L
G&L
A-4
A-4
2
1
2.92
3.07
2.47
2.85
0.23
0.00
0.23
0.23
0.0
0.0
1
1
1
1
G&L
G&L
A-3
A-3
2
1
2.92
3.07
2.47
2.85
0.23
0.00
0.23
0.23
0.0
0.0
1
1
1
1
G&L
G&L
A-2
A-2
2
1
2.92
3.07
2.47
2.85
0.23
0.00
0.23
0.23
0.0
0.0
1
1
1
1
G&L
G&L
A-1
A-1
2
1
2.92
3.07
2.47
2.85
0.23
0.00
0.23
0.23
0.0
0.0
1
1
1
1
G&L
G&L
BEAM
SECTIONS
b
h
tw
tf
P1
P2
A
I2
I3
J
(cm)
(cm)
(cm)
(cm)
(cm)
(cm)
(cm2)
(cm4)
(cm4)
(cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________ _________
1
Name
Shape
Beam1
Rectang
30.00
45.00
1350.0
BEAMS
Beam
Floor
______
L
(m)
______
Lu
(m)
______
a
(m)
_____
c
(m)
_____
Sec
_____
Mat
_____
_________
System
_____
A(1-2)
A(2-3)
A(3-4)
A(4-5)
A(5-6)
A(6-7)
A(7-8)
A(8-9)
2
2
2
2
2
2
2
2
3.55
3.55
3.55
3.68
3.68
3.55
3.55
3.55
3.20
3.20
3.20
3.33
3.33
3.20
3.20
3.20
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
G&L
G&L
G&L
G&L
G&L
G&L
G&L
G&L
A(1-2)
A(2-3)
A(3-4)
A(4-5)
A(5-6)
A(6-7)
A(7-8)
A(8-9)
3
3
3
3
3
3
3
3
3.55
3.55
3.55
3.68
3.68
3.55
3.55
3.55
3.20
3.20
3.20
3.33
3.33
3.20
3.20
3.20
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
G&L
G&L
G&L
G&L
G&L
G&L
G&L
G&L
227812
101250
234900
Page No. 3
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:29:05 AM 09/03/2016
=================================================================================================
GROUND
SUPPORT
DATA
Support
________
Floor
_____
A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9
Type
_____
1
1
1
1
1
1
1
1
1
SUMMARY
OF
Spring constant(ton/cm)
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
C
C
C
C
C
C
C
C
C
TOTAL
C
C
C
C
C
C
C
C
C
FLOOR
C
C
C
C
C
C
C
C
C
LOADS
Floor
______
Force (ton)
________________________
Px
Py
Pz
______
______
______
Moment (ton-m)
________________________
Mx
My
Mz
______
______
______
3
2
1
______
Total
0.00
0.00
0.00
______
0.00
0.0
0.0
0.0
______
0.0
0.00
0.00
0.00
______
0.00
16.75
17.89
0.00
______
34.64
0.0
0.0
0.0
______
0.0
0.0
0.0
0.0
______
0.0
Floor
______
Force (ton)
________________________
Px
Py
Pz
______
______
______
3
2
1
______
Total
17.90
15.44
0.00
______
33.34
0.0
0.0
0.0
______
0.0
0.00
0.00
0.00
______
0.00
0.00
0.00
0.00
______
0.00
0.0
0.0
0.0
______
0.0
0.0
0.0
0.0
______
0.0
Floor
______
Force (ton)
________________________
Px
Py
Pz
______
______
______
3
2
1
______
Total
17.90
15.44
0.00
______
33.34
0.0
0.0
0.0
______
0.0
0.00
0.00
0.00
______
0.00
0.00
0.00
0.00
______
0.00
0.0
0.0
0.0
______
0.0
0.0
0.0
0.0
______
0.0
Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:28:05 AM 09/03/2016
=================================================================================================
P-Delta Analysis- Column End Forces
Units:
Column
________
Stry Load
____ ____
BOTTOM
_______________________________________________
Axial Shear2 Shear3 Torque
Mom-2
Mom-3
_____ ______ ______ _____ _______ _______
ton, ton-m
TOP
______________________________________________
Axial Shear2 Shear3 Torque
Mom-2
Mom-3
_____ ______ ______ _____ _______ _______
A-9
D0
DL
LL
EQ
EQ1
1.4
0.8
0.5
-1.2
-1.2
0.1
0.3
0.2
-1.2
-1.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.5
0.2
-0.9
-0.9
1.4
0.8
0.5
-1.2
-1.2
0.1
0.3
0.2
-1.2
-1.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.2
-0.4
-0.2
1.9
1.9
A-9
D0
DL
LL
EQ
EQ1
2.9
2.8
1.5
-4.2
-4.2
0.0
0.2
0.1
-3.2
-3.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.2
0.1
-5.3
-5.3
2.9
2.8
1.5
-4.2
-4.2
0.0
0.2
0.1
-3.2
-3.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.1
-0.4
-0.2
3.9
3.9
A-8
D0
DL
LL
EQ
EQ1
2.0
1.8
1.1
0.2
0.2
0.0
0.0
0.0
-2.3
-2.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.1
0.0
-2.6
-2.6
2.0
1.8
1.1
0.2
0.2
0.0
0.0
0.0
-2.3
-2.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.2
3.2
A-8
D0
DL
LL
EQ
EQ1
4.2
6.2
3.3
0.8
0.8
0.0
0.0
0.0
-3.9
-3.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-6.0
-6.0
4.2
6.2
3.3
0.8
0.8
0.0
0.0
0.0
-3.9
-3.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.2
5.2
A-7
D0
DL
LL
EQ
EQ1
2.0
1.8
1.1
0.0
0.0
0.0
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-2.4
-2.4
2.0
1.8
1.1
0.0
0.0
0.0
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.0
3.0
A-7
D0
DL
LL
EQ
EQ1
4.1
6.0
3.2
-0.1
-0.1
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-5.9
-5.9
4.1
6.0
3.2
-0.1
-0.1
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
A-6
D0
DL
LL
EQ
EQ1
2.0
1.8
1.1
0.1
0.1
0.0
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-2.4
-2.4
2.0
1.8
1.1
0.1
0.1
0.0
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.0
3.0
A-6
D0
DL
LL
EQ
EQ1
4.1
6.1
3.3
0.2
0.2
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-5.9
-5.9
4.1
6.1
3.3
0.2
0.2
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
A-5
D0
DL
LL
EQ
EQ1
2.0
1.8
1.1
0.0
0.0
0.0
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-2.3
-2.3
2.0
1.8
1.1
0.0
0.0
0.0
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.0
3.0
A-5
D0
DL
LL
EQ
EQ1
4.2
6.3
3.3
0.0
0.0
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-5.9
-5.9
4.2
6.3
3.3
0.0
0.0
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
A-4
D0
DL
LL
EQ
EQ1
2.0
1.8
1.1
-0.1
-0.1
0.0
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-2.4
-2.4
2.0
1.8
1.1
-0.1
-0.1
0.0
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.0
3.0
A-4
D0
DL
LL
EQ
EQ1
4.1
6.1
3.3
-0.2
-0.2
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-5.9
-5.9
4.1
6.1
3.3
-0.2
-0.2
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
A-3
D0
DL
LL
2.0
1.8
1.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.0
1.8
1.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
EQ
EQ1
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
-2.4
-2.4
0.0
0.0
-2.2
-2.2
0.0
0.0
0.0
0.0
0.0
0.0
3.0
3.0
Page No. 2
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:28:05 AM 09/03/2016
=================================================================================================
Column
________
Stry Load
____ ____
Axial
_____
Shear2
______
Shear3
______
Torque
Mom-2
_____ _______
Mom-3
_______
Axial
_____
Shear2
______
Shear3
______
Torque
Mom-2
_____ _______
Mom-3
_______
A-3
D0
DL
LL
EQ
EQ1
4.1
6.0
3.2
0.1
0.1
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-5.9
-5.9
4.1
6.0
3.2
0.1
0.1
0.0
0.0
0.0
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0
A-2
D0
DL
LL
EQ
EQ1
2.0
1.8
1.1
-0.2
-0.2
0.0
0.0
0.0
-2.3
-2.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.0
-2.6
-2.6
2.0
1.8
1.1
-0.2
-0.2
0.0
0.0
0.0
-2.3
-2.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.2
3.2
A-2
D0
DL
LL
EQ
EQ1
4.2
6.2
3.3
-0.8
-0.8
0.0
0.0
0.0
-3.9
-3.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-6.0
-6.0
4.2
6.2
3.3
-0.8
-0.8
0.0
0.0
0.0
-3.9
-3.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.2
5.2
A-1
D0
DL
LL
EQ
EQ1
1.4
0.8
0.5
1.2
1.2
-0.1
-0.3
-0.2
-1.2
-1.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.2
-0.5
-0.2
-0.9
-0.9
1.4
0.8
0.5
1.2
1.2
-0.1
-0.3
-0.2
-1.2
-1.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.4
0.2
1.9
1.9
A-1
D0
DL
LL
EQ
EQ1
2.9
2.8
1.5
4.2
4.2
0.0
-0.2
-0.1
-3.2
-3.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.1
-0.2
-0.1
-5.3
-5.3
2.9
2.8
1.5
4.2
4.2
0.0
-0.2
-0.1
-3.2
-3.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.4
0.2
3.9
3.9
Beam
Floor Load
________ ____ ____
END I
X/L = 0.0
________________________________________
Axl
Shr2
Shr3 Torque
M2
M3
___ _____
_____ ______ ______ _____
M2(+)max
__________
M2
X/L
_____ ___
ton, ton-m
END J
X/L = 1.0
________________________________________
Axl
Shr2
Shr3 Torque
M2
M3
___ _____
_____ ______ ______ _____
A(1-2)
D0
DL
LL
EQ
EQ1
-0.1
-0.1
-0.1
1.0
1.0
0.0
0.0
0.0
0.0
0.0
-0.5
-1.8
-0.9
-3.0
-3.0
0.0
0.0
0.0
0.0
0.0
-0.2
-0.6
-0.3
-5.3
-5.3
0.0
0.0
0.0
0.0
0.0
0.2
0.7
0.3
4.4
4.4
.45
.45
.45
1.0
1.0
-0.1
-0.1
-0.1
1.0
1.0
0.0
0.0
0.0
0.0
0.0
0.5
2.1
1.0
-3.0
-3.0
0.0
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.6
4.4
4.4
0.0
0.0
0.0
0.0
0.0
A(2-3)
D0
DL
LL
EQ
EQ1
-0.1
-0.1
-0.1
0.7
0.7
0.0
0.0
0.0
0.0
0.0
-0.5
-1.9
-1.0
-2.4
-2.4
0.0
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.5
-3.8
-3.8
0.0
0.0
0.0
0.0
0.0
0.1
0.5
0.3
3.9
3.9
.5
.5
.5
1.0
1.0
-0.1
-0.1
-0.1
0.7
0.7
0.0
0.0
0.0
0.0
0.0
0.5
1.9
1.0
-2.4
-2.4
0.0
0.0
0.0
0.0
0.0
-0.3
-1.0
-0.5
3.9
3.9
0.0
0.0
0.0
0.0
0.0
A(3-4)
D0
DL
LL
EQ
EQ1
-0.1
-0.1
-0.1
0.4
0.4
0.0
0.0
0.0
0.0
0.0
-0.5
-1.9
-1.0
-2.5
-2.5
0.0
0.0
0.0
0.0
0.0
-0.3
-1.0
-0.5
-4.0
-4.0
0.0
0.0
0.0
0.0
0.0
0.1
0.5
0.3
4.0
4.0
.5
.5
.5
1.0
1.0
-0.1
-0.1
-0.1
0.4
0.4
0.0
0.0
0.0
0.0
0.0
0.5
1.9
1.0
-2.5
-2.5
0.0
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.5
4.0
4.0
0.0
0.0
0.0
0.0
0.0
A(4-5)
D0
DL
LL
EQ
EQ1
-0.1
-0.1
-0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
-0.5
-2.0
-1.0
-2.3
-2.3
0.0
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.5
-3.9
-3.9
0.0
0.0
0.0
0.0
0.0
0.2
0.6
0.3
3.9
3.9
.5
.5
.5
1.0
1.0
-0.1
-0.1
-0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.5
2.0
1.0
-2.3
-2.3
0.0
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.6
3.9
3.9
0.0
0.0
0.0
0.0
0.0
A(5-6)
D0
DL
LL
EQ
EQ1
-0.1
-0.1
-0.1
-0.1
-0.1
0.0
0.0
0.0
0.0
0.0
-0.5
-2.0
-1.0
-2.3
-2.3
0.0
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.6
-3.9
-3.9
0.0
0.0
0.0
0.0
0.0
0.2
0.6
0.3
3.9
3.9
.5
.5
.5
1.0
1.0
-0.1
-0.1
-0.1
-0.1
-0.1
0.0
0.0
0.0
0.0
0.0
0.5
2.0
1.0
-2.3
-2.3
0.0
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.5
3.9
3.9
0.0
0.0
0.0
0.0
0.0
A(6-7)
D0
DL
LL
EQ
EQ1
-0.1
-0.1
-0.1
-0.4
-0.4
0.0
0.0
0.0
0.0
0.0
-0.5
-1.9
-1.0
-2.5
-2.5
0.0
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.5
-4.0
-4.0
0.0
0.0
0.0
0.0
0.0
0.1
0.5
0.3
4.0
4.0
.5
.5
.5
1.0
1.0
-0.1
-0.1
-0.1
-0.4
-0.4
0.0
0.0
0.0
0.0
0.0
0.5
1.9
1.0
-2.5
-2.5
0.0
0.0
0.0
0.0
0.0
-0.3
-1.0
-0.5
4.0
4.0
0.0
0.0
0.0
0.0
0.0
A(7-8)
D0
DL
LL
EQ
-0.1
-0.1
-0.1
-0.7
0.0
0.0
0.0
0.0
-0.5
-1.9
-1.0
-2.4
0.0
0.0
0.0
0.0
-0.3
-1.0
-0.5
-3.9
0.0
0.0
0.0
0.0
0.1
0.5
0.3
3.8
.5
.5
.5
1.0
-0.1
-0.1
-0.1
-0.7
0.0
0.0
0.0
0.0
0.5
1.9
1.0
-2.4
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.5
3.8
0.0
0.0
0.0
0.0
EQ1
-0.7
0.0
-2.4
0.0
-3.9
0.0
3.8
1.0
-0.7
0.0
-2.4
0.0
3.8
0.0
Page No. 3
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:28:05 AM 09/03/2016
=================================================================================================
Beam
Floor Load
________ ____ ____
Axl
___
Shr2
_____
Shr3
_____
Torque
M2
______ ______
M3
_____
M2
_____
X/L
___
Axl
___
Shr2
_____
Shr3
_____
Torque
M2
______ ______
M3
_____
A(8-9)
D0
DL
LL
EQ
EQ1
-0.1
-0.1
-0.1
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
-0.5
-2.1
-1.0
-3.0
-3.0
0.0
0.0
0.0
0.0
0.0
-0.3
-1.1
-0.6
-4.4
-4.4
0.0
0.0
0.0
0.0
0.0
0.2
0.7
0.3
5.3
5.3
.55
.55
.55
1.0
1.0
-0.1
-0.1
-0.1
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
0.5
1.8
0.9
-3.0
-3.0
0.0
0.0
0.0
0.0
0.0
-0.2
-0.6
-0.3
5.3
5.3
0.0
0.0
0.0
0.0
0.0
A(1-2)
D0
DL
LL
EQ
EQ1
0.1
0.3
0.2
-0.2
-0.2
0.0
0.0
0.0
0.0
0.0
-0.5
-0.8
-0.4
-1.2
-1.2
0.0
0.0
0.0
0.0
0.0
-0.1
-0.3
-0.2
-2.0
-2.0
0.0
0.0
0.0
0.0
0.0
0.2
0.3
0.2
1.7
1.7
.45
.45
.45
1.0
1.0
0.1
0.3
0.2
-0.2
-0.2
0.0
0.0
0.0
0.0
0.0
0.6
0.8
0.5
-1.2
-1.2
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
1.7
1.7
0.0
0.0
0.0
0.0
0.0
A(2-3)
D0
DL
LL
EQ
EQ1
0.1
0.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.5
-0.8
-0.5
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.2
-1.6
-1.6
0.0
0.0
0.0
0.0
0.0
0.1
0.2
0.1
1.6
1.6
.5
.5
.5
1.0
1.0
0.1
0.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.5
0.8
0.5
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
1.6
1.6
0.0
0.0
0.0
0.0
0.0
A(3-4)
D0
DL
LL
EQ
EQ1
0.1
0.3
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
-0.5
-0.8
-0.5
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
-1.6
-1.6
0.0
0.0
0.0
0.0
0.0
0.1
0.2
0.1
1.6
1.6
.5
.5
.5
1.0
1.0
0.1
0.3
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.5
0.8
0.5
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
1.6
1.6
0.0
0.0
0.0
0.0
0.0
A(4-5)
D0
DL
LL
EQ
EQ1
0.1
0.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.5
-0.8
-0.5
-0.9
-0.9
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
-1.6
-1.6
0.0
0.0
0.0
0.0
0.0
0.2
0.2
0.1
1.6
1.6
.5
.5
.5
1.0
1.0
0.1
0.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.5
0.8
0.5
-0.9
-0.9
0.0
0.0
0.0
0.0
0.0
-0.3
-0.5
-0.3
1.6
1.6
0.0
0.0
0.0
0.0
0.0
A(5-6)
D0
DL
LL
EQ
EQ1
0.1
0.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.5
-0.8
-0.5
-0.9
-0.9
0.0
0.0
0.0
0.0
0.0
-0.3
-0.5
-0.3
-1.6
-1.6
0.0
0.0
0.0
0.0
0.0
0.2
0.2
0.1
1.6
1.6
.5
.5
.5
1.0
1.0
0.1
0.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.5
0.8
0.5
-0.9
-0.9
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
1.6
1.6
0.0
0.0
0.0
0.0
0.0
A(6-7)
D0
DL
LL
EQ
EQ1
0.1
0.3
0.1
-0.1
-0.1
0.0
0.0
0.0
0.0
0.0
-0.5
-0.8
-0.5
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
-1.6
-1.6
0.0
0.0
0.0
0.0
0.0
0.1
0.2
0.1
1.6
1.6
.5
.5
.5
1.0
1.0
0.1
0.3
0.1
-0.1
-0.1
0.0
0.0
0.0
0.0
0.0
0.5
0.8
0.5
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
1.6
1.6
0.0
0.0
0.0
0.0
0.0
A(7-8)
D0
DL
LL
EQ
EQ1
0.1
0.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
-0.5
-0.8
-0.5
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
-1.6
-1.6
0.0
0.0
0.0
0.0
0.0
0.1
0.2
0.1
1.6
1.6
.5
.5
.5
1.0
1.0
0.1
0.3
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.5
0.8
0.5
-1.0
-1.0
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.2
1.6
1.6
0.0
0.0
0.0
0.0
0.0
A(8-9)
D0
DL
LL
EQ
EQ1
0.1
0.3
0.2
0.2
0.2
0.0
0.0
0.0
0.0
0.0
-0.6
-0.8
-0.5
-1.2
-1.2
0.0
0.0
0.0
0.0
0.0
-0.3
-0.4
-0.3
-1.7
-1.7
0.0
0.0
0.0
0.0
0.0
0.2
0.3
0.2
2.0
2.0
.55
.55
.55
1.0
1.0
0.1
0.3
0.2
0.2
0.2
0.0
0.0
0.0
0.0
0.0
0.5
0.8
0.4
-1.2
-1.2
0.0
0.0
0.0
0.0
0.0
-0.1
-0.3
-0.2
2.0
2.0
0.0
0.0
0.0
0.0
0.0
CALCULO DE DERIVAS
_________________________________________________________________________________________________
BOGOTA D.C.
Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:04 AM 09/03/2016
=================================================================================================
P-DELTA ANALYSIS - SUMMARY MAXIMUM STORY DRIFT RATIO, D/h
Story
______
2
0.0006
1
0.0010
______ _________
Maxima 0.0010
______ _________
0.0000
0.0000
_________
0.0000
_________
0.0006
0.0010
_________
0.0010
_________
0.0000
0.0000
_________
0.0000
_________
DriftX = (Dx/h)max
DriftY = (Dy/h)max
DriftR = ([(Dx/h) + (Dy/h)])max
ColAxis
________
(dx/h)max
________
A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0006
0.0010
_________
0.0010
_________
DISEO DE COLUMNAS
Y VIGAS
_________________________________________________________________________________________________
BOGOTA D.C.
Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
LOAD COMBINATIONS
No
______
1
2
3
4
5
6
7
8
9
10
Load combination
____________________________
1.4D0 + 1.4DL
1.2D0 + 1.2DL
1.2D0 + 1.2DL
1.2D0 + 1.2DL
1.2D0 + 1.2DL
1.2D0 + 1.2DL
.9D0 + .9DL +
.9D0 + .9DL .9D0 + .9DL +
.9D0 + .9DL -
+ 1.6LL
+ LL + EQ
+ LL - EQ
+ LL + EQ1
+ LL - EQ1
EQ
EQ
EQ1
EQ1
MATERIALS
Number of materials =
REINFORCED CONCRETE
Mat
Name
f'c
fy
fys1
fys2
E
G
w
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/m3
___ ______________ _________ _________ _________ _________ _________ _________ _________
1 RConcrete1
210
4200
4200
4200
218540
87430
2400.0
COLUMN
SECTIONS
Name
Shape
Column1
Rectang
b
h
tw
tf
P1
P2
A
I2
I3
J
(cm)
(cm)
(cm)
(cm)
(cm)
(cm)
(cm2)
(cm4)
(cm4)
(cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________ _________
35.00
Column
Story
____
2
L
(m)
____
2.92
Lu
(m)
____
2.47
_______
A-9
A-9
3.07
2.85
A-8
2.92
2.47
A-8
3.07
2.85
A-7
2.92
2.47
A-7
3.07
2.85
A-6
2.92
2.47
A-6
3.07
2.85
40.00
1400.0
186667
142917
256535
(DMO)
Sec
bxh
Mat
(cm)
___ ______
1
35x40
1
1
35x40
1
1
1
1
1
35x40
1
1
1
1
35x40
1
1
1
1
35x40
35x40
35x40
35x40
TRANSVERSE REINFORCEMENT
------------------------TIES
XTIES
__________________
5 #3 @ 11 cm (end)
7 #3 @ 22 cm (ctr)
5 #3 @ 11 cm (end)
8 #3 @ 22 cm (ctr)
_____
1 (b)
1 (h)
1 (b)
1 (h)
LONGITUDINAL REINFORCEMENT
--------------------------------------------------Sec LdCmb
Pu
Mu2
Mu3
RHO
As
critc (ton) (ton-m) (ton-m)
(cm2)
___ ____ ______
______
______ ______ ______
Top
1
3.07
0.08
0.78 0.0100
14.00
Bot
1
3.07
0.08
0.89 0.0100
14.00
Top
1
7.93
0.22
0.65 0.0100
14.00
Bot
1
7.93
0.22
0.36 0.0100
14.00
5
7
5
8
#3
#3
#3
#3
@
@
@
@
11
22
11
22
cm
cm
cm
cm
(end)
(ctr)
(end)
(ctr)
1
1
1
1
(b)
(h)
(b)
(h)
Top
Bot
Top
Bot
1
1
1
1
5.38
5.38
14.58
14.58
0.15
0.15
0.40
0.40
0.11
0.13
0.03
0.01
0.0100
0.0100
0.0100
0.0100
14.00
14.00
14.00
14.00
5
7
5
8
#3
#3
#3
#3
@
@
@
@
11
22
11
22
cm
cm
cm
cm
(end)
(ctr)
(end)
(ctr)
1
1
1
1
(b)
(h)
(b)
(h)
Top
Bot
Top
Bot
1
1
1
1
5.26
5.26
14.13
14.13
0.14
0.14
0.38
0.38
0.04
0.03
0.02
0.01
0.0100
0.0100
0.0100
0.0100
14.00
14.00
14.00
14.00
5
7
5
8
#3
#3
#3
#3
@
@
@
@
11
22
11
22
cm
cm
cm
cm
(end)
(ctr)
(end)
(ctr)
1
1
1
1
(b)
(h)
(b)
(h)
Top
Bot
Top
Bot
1
1
1
1
5.33
5.33
14.39
14.39
0.15
0.15
0.39
0.39
0.03
0.03
0.04
0.02
0.0100
0.0100
0.0100
0.0100
14.00
14.00
14.00
14.00
Page No. 2
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
Column
_______
Story
L
____ ____
Lu
____
Sec
bxh
___ ______
TIES
__________________
XTIES
_____
Sec
___
1
1
1
1
35x40
5
7
5
8
#3
#3
#3
#3
@
@
@
@
11
22
11
22
cm
cm
cm
cm
(end)
(ctr)
(end)
(ctr)
1
1
1
1
(b)
(h)
(b)
(h)
Top
Bot
Top
Bot
1
1
1
1
1
1
1
1
35x40
5
7
5
8
#3
#3
#3
#3
@
@
@
@
11
22
11
22
cm
cm
cm
cm
(end)
(ctr)
(end)
(ctr)
1
1
1
1
(b)
(h)
(b)
(h)
Top
Bot
Top
Bot
1
1
1
1
35x40
5
7
5
8
#3
#3
#3
#3
@
@
@
@
11
22
11
22
cm
cm
cm
cm
(end)
(ctr)
(end)
(ctr)
1
1
1
1
(b)
(h)
(b)
(h)
1
1
1
1
35x40
5
7
5
8
#3
#3
#3
#3
@
@
@
@
11
22
11
22
cm
cm
cm
cm
(end)
(ctr)
(end)
(ctr)
1
1
1
1
1
1
1
1
35x40
5
7
5
8
#3
#3
#3
#3
@
@
@
@
11
22
11
22
cm
cm
cm
cm
(end)
(ctr)
(end)
(ctr)
1
1
1
1
A-5
2.92
2.47
A-5
3.07
2.85
A-4
2.92
2.47
A-4
3.07
2.85
A-3
2.92
2.47
A-3
3.07
2.85
A-2
2.92
2.47
A-2
3.07
2.85
A-1
2.92
2.47
A-1
3.07
2.85
BEAM
35x40
35x40
35x40
35x40
35x40
Mu2
______
Mu3
______
RHO
______
As
______
5.42
5.42
14.63
14.63
0.15
0.15
0.40
0.40
0.00
0.00
0.00
0.00
0.0100
0.0100
0.0100
0.0100
14.00
14.00
14.00
14.00
1
1
1
1
5.33
5.33
14.39
14.39
0.15
0.15
0.39
0.39
0.03
0.03
0.04
0.02
0.0100
0.0100
0.0100
0.0100
14.00
14.00
14.00
14.00
Top
Bot
Top
Bot
1
1
1
1
5.26
5.26
14.13
14.13
0.14
0.14
0.38
0.38
0.04
0.03
0.02
0.01
0.0100
0.0100
0.0100
0.0100
14.00
14.00
14.00
14.00
(b)
(h)
(b)
(h)
Top
Bot
Top
Bot
1
1
1
1
5.38
5.38
14.58
14.58
0.15
0.15
0.40
0.40
0.11
0.13
0.03
0.01
0.0100
0.0100
0.0100
0.0100
14.00
14.00
14.00
14.00
(b)
(h)
(b)
(h)
Top
Bot
Top
Bot
1
1
1
1
3.07
3.07
7.93
7.93
0.08
0.08
0.22
0.22
0.78
0.89
0.65
0.36
0.0100
0.0100
0.0100
0.0100
14.00
14.00
14.00
14.00
SECTIONS
LdCmb
Pu
____ ______
b
h
tw
tf
P1
P2
A
I2
I3
J
(cm)
(cm)
(cm)
(cm)
(cm)
(cm)
(cm2)
(cm4)
(cm4)
(cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________ _________
1
Name
Beam1
Shape
Rectang
30.00
45.00
1350.0
227812
101250
234900
(DMO)
Page No. 3
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(2-3) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-5.99
-4.10
-2.49
-1.23
-1.21
-1.21
-1.21
-1.32
-2.56
-4.15
-6.03
Mu(+), ton-m:
2.57
2.43
2.20
1.95
1.60
1.21
1.71
2.08
2.34
2.57
2.72
As(-), cm2:
4.13
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.15
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.67
5.67
5.15
4.45
3.75
3.05
3.70
4.40
5.10
5.63
5.63
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-2
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-3
BEAM: A(3-4) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-6.09
-4.20
-2.58
-1.32
-1.24
-1.24
-1.24
-1.34
-2.63
-4.27
-6.18
Mu(+), ton-m:
2.82
2.64
2.38
2.10
1.70
1.24
1.69
2.07
2.35
2.60
2.77
As(-), cm2:
4.20
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.27
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.73
5.73
5.20
4.50
3.80
3.15
3.85
4.55
5.25
5.78
5.78
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-3
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-4
BEAM: A(4-5) FLOOR: 2
=================================================================================================================
Length:
L = 3.68 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.33 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.51
0.84
1.17
1.51
1.84
2.17
2.50
2.84
3.17
3.50
Mu(-), ton-m:
-6.15
-4.18
-2.51
-1.25
-1.25
-1.25
-1.25
-1.27
-2.57
-4.25
-6.23
Mu(+), ton-m:
2.62
2.51
2.32
2.11
1.76
1.30
1.77
2.11
2.32
2.51
2.61
As(-), cm2:
4.24
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.30
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.71
5.71
5.13
4.40
3.67
2.98
3.71
4.44
5.17
5.75
5.75
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-4
10 #3@ 10 6 #3@ 20 10 #3@ 10
A-5
Page No. 4
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(5-6) FLOOR: 2
=================================================================================================================
Length:
L = 3.68 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.33 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.51
0.84
1.17
1.51
1.84
2.17
2.50
2.84
3.17
3.50
Mu(-), ton-m:
-6.23
-4.25
-2.57
-1.27
-1.25
-1.25
-1.25
-1.25
-2.51
-4.18
-6.15
Mu(+), ton-m:
2.61
2.51
2.32
2.11
1.77
1.30
1.76
2.11
2.32
2.51
2.62
As(-), cm2:
4.30
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.24
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.75
5.75
5.17
4.44
3.71
2.98
3.67
4.40
5.13
5.71
5.71
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-5
10 #3@ 10 6 #3@ 20 10 #3@ 10
A-6
BEAM: A(6-7) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.41
2.73
3.05
3.37
Mu(-), ton-m:
-6.18
-4.27
-2.63
-1.34
-1.24
-1.24
-1.24
-1.32
-2.58
-4.20
-6.09
Mu(+), ton-m:
2.77
2.60
2.35
2.07
1.69
1.24
1.70
2.10
2.38
2.64
2.82
As(-), cm2:
4.27
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.20
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.78
5.78
5.25
4.55
3.85
3.15
3.80
4.50
5.20
5.73
5.73
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-6
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-7
BEAM: A(7-8) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-6.03
-4.15
-2.56
-1.32
-1.21
-1.21
-1.21
-1.23
-2.49
-4.10
-5.99
Mu(+), ton-m:
2.72
2.57
2.34
2.08
1.71
1.21
1.60
1.95
2.20
2.43
2.57
As(-), cm2:
4.15
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.13
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.63
5.63
5.10
4.40
3.70
3.05
3.75
4.45
5.15
5.67
5.67
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-7
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-8
Page No. 5
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(8-9) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.41
2.73
3.05
3.37
Mu(-), ton-m:
-6.78
-4.61
-2.72
-1.36
-1.36
-1.36
-1.36
-1.82
-3.09
-4.71
-6.65
Mu(+), ton-m:
3.10
2.81
2.45
2.08
1.68
1.70
2.62
3.29
3.72
4.11
4.47
As(-), cm2:
4.70
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.61
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
6.83
6.83
6.31
5.61
4.91
4.21
4.31
5.01
5.71
6.23
6.23
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-8
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-9
BEAM: A(1-2) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-2.71
-1.82
-1.11
-0.59
-0.59
-0.59
-0.59
-0.59
-1.07
-1.92
-2.93
Mu(+), ton-m:
1.57
1.53
1.47
1.39
1.18
0.84
0.84
0.92
0.97
1.01
1.01
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.80
2.80
2.52
2.15
1.78
1.72
2.09
2.46
2.83
3.11
3.11
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-1
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-2
BEAM: A(2-3) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-2.71
-1.80
-1.05
-0.55
-0.55
-0.55
-0.55
-0.55
-1.08
-1.84
-2.76
Mu(+), ton-m:
0.96
0.98
0.95
0.91
0.80
0.63
0.79
0.89
0.94
0.96
0.94
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.67
2.67
2.39
2.02
1.65
1.31
1.68
2.05
2.42
2.70
2.70
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-2
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-3
Page No. 6
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(3-4) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-2.69
-1.79
-1.04
-0.55
-0.55
-0.55
-0.55
-0.55
-1.08
-1.85
-2.76
Mu(+), ton-m:
0.94
0.96
0.94
0.90
0.79
0.62
0.79
0.89
0.93
0.95
0.93
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.66
2.66
2.38
2.01
1.64
1.30
1.67
2.04
2.42
2.69
2.69
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-3
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-4
BEAM: A(4-5) FLOOR: 3
=================================================================================================================
Length:
L = 3.68 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.33 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.51
0.84
1.17
1.51
1.84
2.17
2.50
2.84
3.17
3.50
Mu(-), ton-m:
-2.75
-1.81
-1.03
-0.56
-0.56
-0.56
-0.56
-0.56
-1.05
-1.84
-2.79
Mu(+), ton-m:
0.92
0.93
0.93
0.93
0.84
0.69
0.84
0.91
0.92
0.91
0.93
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.70
2.70
2.39
2.00
1.62
1.25
1.64
2.03
2.41
2.72
2.72
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-4
10 #3@ 10 6 #3@ 20 10 #3@ 10
A-5
BEAM: A(5-6) FLOOR: 3
=================================================================================================================
Length:
L = 3.68 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.33 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.51
0.84
1.17
1.51
1.84
2.17
2.50
2.84
3.17
3.50
Mu(-), ton-m:
-2.79
-1.84
-1.05
-0.56
-0.56
-0.56
-0.56
-0.56
-1.03
-1.81
-2.75
Mu(+), ton-m:
0.93
0.91
0.92
0.91
0.84
0.69
0.84
0.93
0.93
0.93
0.92
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.72
2.72
2.41
2.03
1.64
1.25
1.62
2.00
2.39
2.70
2.70
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-5
10 #3@ 10 6 #3@ 20 10 #3@ 10
A-6
Page No. 7
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(6-7) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.41
2.73
3.05
3.37
Mu(-), ton-m:
-2.76
-1.85
-1.08
-0.55
-0.55
-0.55
-0.55
-0.55
-1.04
-1.79
-2.69
Mu(+), ton-m:
0.93
0.95
0.93
0.89
0.79
0.62
0.79
0.90
0.94
0.96
0.94
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.69
2.69
2.42
2.04
1.67
1.30
1.64
2.01
2.38
2.66
2.66
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-6
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-7
BEAM: A(7-8) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-2.76
-1.84
-1.08
-0.55
-0.55
-0.55
-0.55
-0.55
-1.05
-1.80
-2.71
Mu(+), ton-m:
0.94
0.96
0.94
0.89
0.79
0.63
0.80
0.91
0.95
0.98
0.96
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.70
2.70
2.42
2.05
1.68
1.31
1.65
2.02
2.39
2.67
2.67
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-7
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-8
BEAM: A(8-9) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.41
2.73
3.05
3.37
Mu(-), ton-m:
-2.93
-1.92
-1.07
-0.59
-0.59
-0.59
-0.59
-0.59
-1.11
-1.82
-2.71
Mu(+), ton-m:
1.01
1.01
0.97
0.92
0.84
0.84
1.18
1.39
1.47
1.53
1.57
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
3.11
3.11
2.83
2.46
2.09
1.72
1.78
2.15
2.52
2.80
2.80
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-8
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-9
DISEO DE LA CIMENTACION
_________________________________________________________________________________________________
BOGOTA D.C.
Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:31:41 AM 09/03/2016
=================================================================================================
P-Delta Analysis- Support Reactions
Support
_______________
Axis
Floor
________ _____
Load
______
LdCase
______
Force (ton)
__________________________
Fx
Fy
Fz
______
______
______
Moment (ton-m)
__________________________
Mx
My
Mz
______
______
______
A-1
D0
DL
LL
EQ
EQ1
0.05
0.20
0.10
3.21
3.21
0.00
0.00
0.00
0.00
0.00
2.85
2.81
1.49
4.18
4.18
0.00
0.00
0.00
0.00
0.00
0.05
0.21
0.10
5.28
5.28
0.00
0.00
0.00
0.00
0.00
A-2
D0
DL
LL
EQ
EQ1
0.00
-0.01
-0.01
3.90
3.90
0.00
0.00
0.00
0.00
0.00
4.17
6.24
3.31
-0.77
-0.77
0.00
0.00
0.00
0.00
0.00
0.00
-0.01
0.00
5.98
5.98
0.00
0.00
0.00
0.00
0.00
A-3
D0
DL
LL
EQ
EQ1
0.00
0.01
0.00
3.82
3.82
0.00
0.00
0.00
0.00
0.00
4.08
6.01
3.18
0.08
0.08
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
5.91
5.91
0.00
0.00
0.00
0.00
0.00
A-4
D0
DL
LL
EQ
EQ1
0.00
0.01
0.01
3.83
3.83
0.00
0.00
0.00
0.00
0.00
4.13
6.15
3.25
-0.20
-0.20
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
5.91
5.91
0.00
0.00
0.00
0.00
0.00
A-5
D0
DL
LL
EQ
EQ1
0.00
0.00
0.00
3.81
3.81
0.00
0.00
0.00
0.00
0.00
4.18
6.28
3.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.90
5.90
0.00
0.00
0.00
0.00
0.00
A-6
D0
DL
LL
EQ
EQ1
0.00
-0.01
-0.01
3.83
3.83
0.00
0.00
0.00
0.00
0.00
4.13
6.15
3.25
0.20
0.20
0.00
0.00
0.00
0.00
0.00
0.00
-0.01
-0.01
5.91
5.91
0.00
0.00
0.00
0.00
0.00
A-7
D0
DL
LL
EQ
EQ1
0.00
-0.01
0.00
3.82
3.82
0.00
0.00
0.00
0.00
0.00
4.08
6.01
3.18
-0.08
-0.08
0.00
0.00
0.00
0.00
0.00
0.00
-0.01
0.00
5.91
5.91
0.00
0.00
0.00
0.00
0.00
A-8
D0
DL
LL
EQ
EQ1
0.00
0.01
0.01
3.90
3.90
0.00
0.00
0.00
0.00
0.00
4.17
6.24
3.31
0.77
0.77
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
5.98
5.98
0.00
0.00
0.00
0.00
0.00
A-9
D0
DL
LL
EQ
EQ1
-0.05
-0.20
-0.10
3.21
3.21
0.00
0.00
0.00
0.00
0.00
2.85
2.81
1.49
-4.18
-4.18
0.00
0.00
0.00
0.00
0.00
-0.05
-0.21
-0.10
5.28
5.28
0.00
0.00
0.00
0.00
0.00
2 Pilotes =
0.25
carga del pilote =
Recubrimiento =
0.07
Los pilotes asumen el
PREAL =
10
Ppara Calculo =
Pu = 10.00
DADO TIPO 2
Cant. = 4
L=
18
12
tn
cantidad de pilotes
1.17
m
100% de la carga
Ton ( carga de la columna)
10.00
( carga por columna)
x
1.4 =
14 Ton
B
DISEO POR EL METODO DE LAS BIELAS :
Pu ( 2 e a )
8 f y d
As inf =
A
e
donde :
e=
2.5
pilote
= 0.63
( segn estudio de suelos )
a=
0.35
fy =
Detalle de Refuerzo:
( dimensin columna )
4200 Kg/cm
=
1
0.9
d min. =
e*.50
d=
H=
Entonces :
As inf =
As min =
0.63
0.70
m
m
0.66
4.91
cm
cm
As sup =
6.39
cm
As Suministrado
5#5
por c/lado
0.31 m
(definitivo)
( altura dado )
9.95
cm
H (m) ld + 0.15
H
5 FL # 3 c/.40
0.10
4#5
CORTE 1 - 1
Lado A= e+2*p
1.13
mts
Lado B= 2*p
0.50
mts
CJR
09/03/2016
PROYECTO:
CERRAMIENTO PEN
SEGN C.15.11.1
TABLA
EXIGIDO
17.5 Mpa
PROPUESTO
21.1 Mpa
0.0050
0.01314
# 3 para pilote<75 cm
# 4 para pilote>75 cm
en los 1.20m
superiores del pilote
7.5 cm
7.5 cm
CANTIDAD
20.6 cm
4.0 cm
20.00m
2.45 cm2
#4
1.29 cm2
16
20.0 cm
90
4.0 cm
FLEJES
FLEJES
23.90 Tn
6.45 cm2
OK
Gancho
h de Descabece
210Kg/cm2
25.00cms
40.00cms
4.00cms
Recubrimiento
60.00cms
12.00cms
63cms
10.80cms
Long. Fleje
VC
PROYECTO:
CERRAMIENTO PEN
Las dimensiones de las vigas de amarre se han establecido en funcin de las solicitaciones que las afectan,
dentro de las cuales se cuentan: la resistencia a fuerzas axiales por razones ssmicas, la rigidez y las
caractersticas para efectos de diferencias de carga vertical sobre los elementos de cimentacin y la
posibilidad de ocurrencia de asentamientos totales y diferenciales.
= 40
= 50
= 7.5
= 40.71 cms
=
As =
As =
0.00330
5.37
5.37
cm
cm
cm
Recubrimiento
cm
d=h-(rec+flej+ref/2)
(mnimo)
cm
(Refuerzo positivo)
cm
(Refuerzo negativo)
K=
0.012711678
63.8
1.00
63.8
Ton
Ton
La fuerza axial que debe ser capaz de transmitir la viga de amarre a la columna adyacente (Pu) es:
Pu =
2.39
Ton
El refuerzo que necesita la viga para resistir la fuerza axial es:
fy =
4200
kg/cm
As =
0.67
cm
(Refuerzo para toda la seccin)
6EI
L
V=
Donde :
E = mdulo de elasticidad del concreto
21.1
fc =
210
kg/cm
Ec = 4700*RAIZ(f'c)(Mpa)
Ec =
218540 kg/cm
21853991511 kg/m
12EI
L
Mpa
21581
Kg/cm2
218540
G=
87415.97
0.0207
L/ 300
0.0207
TABLA H. 9.4-1(NSR-10)
Luego:
M=
Mu =
11.71
11.71
Ton - m
Ton - m
V =
Vu =
3.77
3.77
Ton
Ton
Ton - m
Mu =
22.2
Ton - m
22.15
Mu =
=
As =
Cortante:
Flejes =
# de ramas =
Separacin =
Vc =
5 Vc =
Resiste =
0.0006
1.00
22.2
cm
3/8"
2
10.17
10.6
53.1
20.8
Ton - m
3.77
3
Utilizar flejes #
As = 0.71
cm
Ton
Ton
Ton
vc=
5.760kg/cm2
0.75*0.53*RAIZ(f'C)
Ton
cm
7.92 cm2
=
=
=
=
=
=
=
=
Z Conf=2*h
40
50
210
4200
5.37
3/8"
10.2 cms
20.0 cms
10.8
100.0 cms
cm
cm
kg/cm
kg/cm
cm
As=
ARRIBA
ABAJO
Cm2
Cm2
5.37 Cm 2
CANT
4
4
#
5
5
4 10
ZONA CONFIN
35
CENTRO
25
Fl#3 L=
1.40 mts
DISEO DE ELEMENTOS NO
ESTRUCTURALES NSR-10
_________________________________________________________________________________________________
BOGOTA D.C.
OBRA:
-----------------
25402 - 119942
CND
Aa I
g Mp >=
Rp
-------------
g Mp =
A.9.4-1
Firma
(Sa-As)*hx
ax =
As+-------------
hx < heq
heq
heq=0.75hi 0.750 m
A.9.4-2
ax = Sa *
hx
hx > heq
heq
LADRILLO
1.80
BLOQUE
1.30
BAJO
2.50
H muro =
Rp =
1.50
L mx. =
9.81 m/sg
g=
f'm =
Nivel
hx
Mp
75.00 kg/cm
Fx(Fi)
mx(Wi)
ton
ton
mts
1.30
2.65 mts
I=
1.00
0.450
Aa=
d=
0.120 0.1200
Rp=
fy=
2400 k/cm
Sa =
Mp = Tn
Hx
ax
Fp
Mto.
ton
ton-m
Tn/m3
0.15
1.5
GRUPO DE USO
K
NO DUCTIL
I
p mn
As
Refuerzo C./
Cvx
cm
1.00
0.156
17.90
31.07
0.7204
0.421
0.211
0.0015
-0.0015
0.0010
1.20
1 # 3
c/
59
cms
0.507
1.00
0.156
15.44
52.27
0.2373
0.139
0.069
0.0005
-0.0020
0.0010
1.20
1 # 3
c/
59
cms
0.281
1.00
H muro =
Rp =
1.50
L mx. =
9.80 m/sg
g=
Sa =
Mp = Tn
f'm =
75.00 kg/cm
hx
mts
1.30
Tn/m3
4.80 mts
heq=0.75hi 1.988 m
0.450
d=
0.120 mts
Rp=
fy=
2400 k/cm
1.5
GRUPO DE USO
NO DUCTIL
I
hx
Mp
Fx(Fi)
mx(Wi)
ton
ton
ax
Fp
Mto.
ton
ton-m
p mn
As
Refuerzo C/
Cvx
cm
2.55
0.398
17.903
31.07
0.7204
0.191
0.244
0.0017
-0.0013
0.0010
1.20
1 # 3
c/
59
cms
0.507
2.65
0.413
15.435
52.27
0.2373
0.065
0.087
0.0006
-0.0019
0.0010
1.20
1 # 3
c/
59
cms
0.281
GRUPO DE USO
IV
SUPERIOR
III
SUPERIOR
II
BUENO
I
BAJO
Rp
1.5
NO DUCTIL
6.0
DUCTIL
6.0
ESPECIALES
0.5
HUMEDOS
TABLA A.9.5-1
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Elemento no Estructural
Fachadas
paneles prefabricados apoyados arriba y abajo
en vidrio apoyados arriba y abajo
lamina en yeso con costillas de acero
mampost reforz,separada lateral apoyada arri/abajo
mampost reforzada, sep lateral/apoyada solo abajo
mampost no reforz,separada lateral apoyada arri/abajo
mampost no reforzada, sep lateral/apoyada solo abajo
mampost no reforzada, confinada por la estructura
muros que cierran puntos fijos y ductos de escaleras/ascen
muros divisorios en areas publicas
muros divisorios de altura total
muros divisorios de altura parcial
aticos parapetos y chimeneas
anclaje de enchape de fachadas
altillos
cielo rasos
ap
superior
1.0
1.0
1.0
1.0
2.5
1.0
2.5
1.0
1.0
1.0
1.0
2.5
2.5
1.0
1.5
1.0
Rp
bueno
Ductiles
Ductiles
No ductiles
Ductiles
Ductiles
No ductiles
No ductiles
No dusctiles
No ductiles
No dusctiles
no permit
no permit
no permit
no permit
no permit
no permit
Ductiles
Ductiles
No ductiles
No ductiles
Ductiles
Ductiles
Ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
f'm
bajo
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
humedos
humedos
humedos
humedos
No ductiles
humedos
No ductiles
No requerido
PROYECTO:
ITEM:
CERRAMIENTO PEN
CERRAMIENTO PEN
DATOS:
Aa =
0.15
p=
I=
Cvx =
1.50
1.00
0.332
645.2
0.400
2.50
3.00
0.13
0.12
4.68
x=
Sa =
Rp =
Hm =
G=
a=
Mp =
h=0.01 m
(MUROS DIVISORIOS=1; FACHADAS=2.5)
(Coef. de Importancia)
kN
1.45
Mp (kg) =
m
tn/m3
m
Kg
ax = Cvx.Sa/mx.g =
ax > (Aa.I)/2 =
Fp =
0.206
<
2.Sa
0.2058
>
0.075
ax.ap.g.Mp/Rp
Fp =
>
>
0.58
Revisin Anclaje de =
Ab =
fc =
fs =
As =
N=
72
21
420
72
1
Hm = 2.90
Fp (kg)
0.58
4.68
Ma=
0.86
Kg.m
0.80
A-9-2
Cumple
A-9-1
Cumple
Aa.I.g.Mp/2
0.351
3/8
mm2
Mpa
MPa
mm2
cant xml
Calculo de traccin:
Pns = .Ab.fs.N =
Pnc = x0.23xAsxNx(fc)^.5 =
27216.00 N
49.33 N
=0.90
=0.65
Vns = 0.75xAbxfsxN =
22680.00 N
Vnc = 0.65x0.67xAbxNx(f`c)^0.5 =
143.69 N
=0.75
=0.65
Calculo de cortante:
Vu/Vnc =
0.004
(C.23-14)
Pu/Pnc =
0.009
(C.23-15)
(Pu/Pnc)^2 + (Vu/Vnc)^2 =
0.000
(C.23-16)
(Pu/Pns)^2 + (Vu/Vns)^2 =
0.0000
<
<
<
<
Cumple
Cumple
Cumple
Cumple
_________________________________________________________________________________________________
BOGOTA D.C.