Está en la página 1de 47

EDUARDO ORTIZ TAPIA

ING. SUELOS Y ESTRUCTURAS.


_________________________________________________________________________________________________.

MEMORIAS CLCULO ESTRUCTURAL


PROYECTO:
CERRAMIENTO PARQUE EMPRESARIAL
NORMANDA
LOCALIZACION
CALLE 63 SUR No 74 B-42

CALCULO:

ING. EDUARDO ORTIZ TAPIA

BOGOTA

MARZO DE 2016

_________________________________________________________________________________________________
BOGOTA D.C.

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

INDICE

1.
2.
3.
4.
5.
6.
7.
8.
9.

INTRODUCCION
MEMORIAL DE RESPONSABILIDAD
AVALUO DE CARGAS
ANALISIS SISMICO FH
ELEMENTOS NO ESTRUCTURALES
ENTRADA DE DATOS
CALCULO DE DERIVAS
DISEO DE ELEMENTOS COLUMNAS Y VIGAS
DISEO DE CIMENTACION

_________________________________________________________________________________________________
BOGOTA D.C.

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

1. INTRODUCCIN:
El presente estudio resume los datos ms importantes de la valoracin
estructural realizada al proyecto de RECONSTRUCCIN PRTICO DE
CERRAMIENTO COSTADO SUR PARQUE EMPRESARIAL NORMANDA BODEGAS
DEL BLOQUE 7 A 19 de, situado en la Calle 63 #74 B 42, de Bogota D.C..
2. DESCRIPCION DEL PROYECTO :
TIPO DE OBRA: Reconstruccin
LOCALIACION: Bogota D.C. Calle 63 #74 B 42
USO
: Cerramiento bodega uso industrial
ALTURA
: 2 PISOS
SISTEMA ESTRUCTURAL: PORTICO EN CONCRETO RESISTENTES A MOMENTOS
CUBIERTA: EN CANALETA 90 DE FIBROCEMENTO
CIMENTACION : ZAPATAS APOYADAS EN PILOTES Y VIGAS DE DE AMARRE
3. DISEO ESTRUCTURAL:
La edificacin tiene las siguientes caractersticas:
Capacidad de Disipacin de energa: Moderado (DMO)
Sistema estructural original: Prtico en concreto
Coeficiente de capacidad de modificacin de respuesta:
R= 5.0 (Prticos concreto sin diagonales)
Analisis de Viento segn Norma ASCE 7-95 de la cual se deriva la NSR-10
Zona de riesgo ssmico: Intermedia
Grupo de uso: I (estructuras de ocupacin normal)
Coeficiente de importancia: 1.00
Perfil de suelo: E ; ZONA MICROZONIFICACION : LACUSTRE A : LACUSTRE 300
Parmetros ssmicos:
Aa = 0.15 ; Av =0.20 ; Fa = 1.05 ; Fv = 2,90 ; Tc = 0.48 ; Tl = 5,00
Grado de desempeo de la mampostera no estructural : Bajo
Capacidad portante del suelo : 4,3 Ton /m2
de acuerdo con el apndice A-3 de NSR - 10, y lo establecido en el
Reglamento Colombiano de Construccin Sismo Resistente. (ley 400 de 1997,
decreto 926 de 2010) NSR 10.

_________________________________________________________________________________________________
BOGOTA D.C.

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

4.

METODO DE ANALISIS:

Fuerza horizontal equivalente, mtodo esfuerzos de trabajo , anlisis de


diseo deformacin unitaria .
La estructura se diseo con ayuda del programa espacial para el diseo de
edificaciones en concreto EngSoultions RCB v 8.5.5 este programa cumple
en su totalidad con las exigencias del ttulo C de la NSR-10 y de hojas
electrnicas en EXCEL.

5. MATERIALES Y CARGAS :
Carga muerta ml = 1200 kg/ml
Carga viva ml = 200 kg/ml
Carga viento cubierta =40 kg/m2
Acero de refuerzo principal = 60000 psi.(4200 kg/cm2)
Acero de estribos
= 60000 psi.(4200 kg/cm2)
Concreto de 3000 psi (21.1 MPa) para todos los elementos principales.

Ing. EDUARDO ORTIZ TAPIA


Mat. No. 25202 119942 cnd.

_________________________________________________________________________________________________
BOGOTA D.C.

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

MEMORIAL DE RESPONSABILIDAD.

_________________________________________________________________________________________________
BOGOTA D.C.

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

MEMORIAL DE RESPONSABILIDAD ESTRUCTURAL


Bogot D.C., MARZO de 2016
Seores
CURADURIA URBANA.
La ciudad.
Apreciados seores;
Por la presente, YO EDUARDO ORTIZ TAPIA, ingeniero civil consultor calculista, identificado como aparece
al pie de mi firma, certifico que el proyecto CERRAMIENTO PARQUE EMPRESARIAL NORMANDA, situado en
la Calle 63 No 74 B-42 de Bogota D.C. CUMPLE con lo establecido en el Reglamento colombiano de
construcciones sismo resistente.

El sistema estructural utilizado ser el de prticos, compuesto por un prtico espacial


resistente a momentos esencialmente completo sin diagonales, resistente a todas las
cargas verticales y fuerzas horizontales de acuerdo con lo establecido en el Reglamento
Colombiano de Construccin Sismo Resistente. (Ley 400 de 1997, decreto 926 de 2010)
NSR 10.
Por lo tanto se exonera a la Curadura Urbana por los perjuicios que el desarrollo de la obra
pueda causar y me hago responsable por la estabilidad de la obra, siempre y cuando esta
se construya siguiendo exactamente los planos y especificaciones de materiales y
procedimientos indicados en ellos y presentados ante ustedes.
Agradeciendo de antemano su atencin, me suscribo cordialmente,

ING. EDUARDO ORTIZ TAPIA


MAT. No. 25202 62032 CND.

_________________________________________________________________________________________________
BOGOTA D.C.

CERTIFICADO DE VIGENCIA Y ANTECEDENTES DISCIPLINARIOS


N E2016WEB00018552
REPBLICA DE COLOMBIA
CONSEJO PROFESIONAL NACIONAL DE
INGENIERA
COPNIA
EL DIRECTOR GENERAL
CERTIFICA:

Documento firmado por: CONSEJO PROFESIONAL NACIONAL DE INGENIERA - COPNIA, N de serie: 52908192428853033756032804156936605191.
Emisor del certificado: AC TESTINTE CERTICAMARA S.A., Fecha de emisin de la firma: 01/02/2016 16:21:13.
Cdigo Seguro de Verificacin [http://gdocumental.copnia.gov.co/invesiteCSV]: Y4kXbUaCr9i1oDCXCaAT http://www.copnia.gov.co
Pgina 1 de un total de 1 pgina(s).

1. Que ORTIZ TAPIA EDUARDO identificado (a) con Cdula de Ciudadana N 11188075, se encuentra inscrito(a) en el
Registro Profesional Nacional que lleva esta entidad, como INGENIERO CIVIL con Matrcula Profesional N 25202-119942
CND desde el (los) dieciseis (16) da(s) del mes de junio del ao dos mil cinco (2005).

2. Que la (el) Matrcula Profesional es la autorizacin que expide el Estado para que el titular ejerza su profesin en todo el
territorio de la Repblica de Colombia, de conformidad con lo dispuesto en la Ley 842 de 2003.
3. Que la (el) referida (o) Matrcula Profesional se encuentra vigente, por lo cual el profesional certificado actualmente NO
est impedido para ejercer la profesin.
4. Que el profesional NO tiene antecedentes disciplinarios tico-profesionales.
5. Que la presente certificacin tiene una validez de seis (6) meses y se expide en Bogot, D.C., a los uno (1) das del mes
(febrero) del ao dos mil dieciseis (2016).

__________________________
Firma del titular (*)
(*) Con el fin de verificar que el titular autoriza su participacin en procesos estatales de seleccin de contratistas. La falta de firma del titular no invalida el
Certificado.
El presente es un documento pblico expedido electrnicamente con firma digital que garantiza su plena validez jurdica y probatoria segn lo establecido en
la Ley 527 de 1999.
Para verificar la integridad e inalterabilidad del presente documento consulte en el sitio web http://gdocumental.copnia.gov.co/invesiteCSV indicado el cdigo
que se encuentra en el costado izquierdo de este documento
Calle 78 N 9 57 Piso 13 Bogot D.C. Pbx: 3220102 Correo-e: info@copnia.gov.co
www.copnia.gov.co

__________________________

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

AVALUO DE CARGAS
Y MODELO DE PRTICO

_________________________________________________________________________________________________
BOGOTA D.C.

VER-2

EDO
PROYECTO: PARQUE EMPRESARIAL NORMANDA
EVALUACION CARGA POR METRO LNEAL PORTICO

Nombre del Piso

CARGA MUERTA
PISO 1

espesor "m"

Long "m"

h muro en "m"

peso (Kg)
muro /m2

09/03/2016

rea
muro /m2

peso muros
peso muros
por piso Kg/m2 por piso Kg/ml

GEOMETRIA DEL MURO


0.12
28.64

2.65

180

75.896

13661.28

477

PISO 2

0.12

28.64

2.55

180

73.032

13145.76

459

ANTEPECHO CUB
TOTAL

0.12

28.64

1.47

180

42.0053333

7560.96

264
1200

CARGA VIVA
CARGA GRANIZO
CARGA MANTENIMIENTO

CARGA VIVA
Kg/ml
100
100
200

DIAGRAMA DE MOMENTOS

DIAGRAMA DE CORTANTE

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

ANLISIS SISMICO F H

_________________________________________________________________________________________________
BOGOTA D.C.

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:44:30 AM 09/03/2016
=================================================================================================
SEISMIC

DESIGN

C O D E : COL BOGOTA-10

==============================================================
S E I S M I C
B A S E
L E V E L :
==============================================================
S E I S M I C

F O R C E

System X-Direction:

R E S I S T I N G

S Y S T E M

C: Moment Res.Frame

-------------------------------------------------------------Energy dissip capacity: 2: Moderate-DMO


--------------------------------------------------------------

EQUIVALENT STATIC EARTHQUAKE FORCES COL BOGOTA-10


Base Shear
V = Sa W
Sa = 1.2 Av Fv I/ T, Sa = 1.2 Av Fv Tl/T for T >Tl
Sa = 2.5 Aa Fa I for T<Tc, where Tc = 0.48 AvFv/AaFa

S E I S M I C

P A R A M E T E R S

Eff. peak acceleration & veloc., Aa =

.15

Importance coefficient, I ........ =

1.0

Av =

GROUP
IV - Essential facilities
III- Public assistance facilities
II - Especial occupancy buildings
I - Normal occupancy buildings
Seismic zone No. ............... =

.20

COEFFICIENT
1.50
1.25
1.10
1.00
8

B O G O T A, D. C. - S E I S M I C Z O N E S
1: CERROS
9: LACUSTRE-500
2: PIEDEMONTE A
10: LACUSTRE ALUVIAL-200
3: PIEDEMONTE B
11: LACUSTRE ALUVIAL-300
4: PIEDEMONTE C
12: ALUVIAL-50
5: LACUSTRE-50
13: ALUVIAL-100
6: LACUSTRE-100
14: ALUVIAL-200
7: LACUSTRE-200
15: ALUVIAL-300
8: LACUSTRE-300
16: DEPOSITO LADERA
Seismic Force-resisting system
= C: Moment
Energy Dissipation Coefficient, Ro =
5
T = 0.1 N ............. = .3
Ta = Ct (Hn)^x ......... = 0.047 H^0.9
= .24
*Tmax: 1.7 Ta .......... = .41 0
*Tmax = Cu Ta
Cu = 1.75 - 1.2 Av Fv >= 1.2
Fundamental period, T ............ =

.24

______________________________________________________________________

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 2
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:44:30 AM 09/03/2016
=================================================================================================
DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS
Short Periods
------------Effect. peak acceleration & velc., Aa = 0.15
Site coefficients (Tables below), Fa = 1.05
Design response parameters,

Aa Fa =

0.16

Long-period transition period, Tl sec =

5.00

SEISMIC ZONE
1: Cerros
2: Piedemonte A
3: Piedemonte B
4: Piedemonte C
5: Lacustre-50
6: Lacustre-100
7: Lacustre-200
8: Lacustre-300
9: Lacustre-500
10: Lacustre Aluvial-200
11: Lacustre Aluvial-300
12: Aluvial-50
13: Aluvial-100
14: Aluvial-200
15: Aluvial-300
16: Deposito ladera

Fa
1.35
1.65
1.95
1.80
1.40
1.30
1.20
1.05
0.95
1.10
1.00
1.35
1.20
1.05
0.95
1.65

Fv
1.30
2.00
1.70
1.70
2.90
3.20
3.50
2.90
2.70
2.80
2.50
1.80
2.10
2.10
2.10
1.70

Long Periods
---------------Av = 0.20
Fv = 2.90
Av Fv=

0.58

Tl
3.0
3.0
3.0
3.0
4.0
4.0
4.0
5.0*
5.0
4.0
5.0
3.5
3.5
3.5
3.5
3.0

______________________________________________________________________
Reduction in R for Irregularity and Lack of Redundancy:
PLAN
Type
1aP
1bP
2P
3P
4P
5P

IRREGULARITIES
Description
Torsional
Torsional Extrme
Reentrant corners
Diaph. discontin.
Plane shifting
Unparallel grid

ELEVATION IRREGULARITIES
Type Description
a
1aA Flexible
0.9
1bA Flexible Extrme 0.8
2A Mass
0.9
3A Geometrical
0.9
4A Plane shifting
0.8
5aA Weak Story
0.9
5bA Weak Story Extr 0.8
NOTE: EngSolutions RCB assumes irregular but redundant building.
For regular buildings make (p . a)= 1.0
p
0.9
0.8
0.9
0.9
0.8
0.9

X - D I R E C T I O N
--------------------Reduct. factor, (p.a) =
1
Redundancy factor, r

Y - D I R E C T I O N
--------------------1
1

R = (p a) r Ro
______________________________________________________________________

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 3
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:44:30 AM 09/03/2016
=================================================================================================
T O T A L

B A S E

S H E A R

Building Weight, W, (ton) =

83.34

Peak Acceleration Coeffi., Fa Aa


Peak Velocity coefficient, Fv Av
Transition period, Tc . . . . .
Importance factor, I . . . . . .
Seizmic Zone, . . . . . . . . .
Energ-disspat coeff, R
Period, T, (sec) . . .
1.2 Av Fv I / T
2.5 Aa Fa I
Sa

=
=
=
=
=

Total Base Shear, V, (ton) =

=
=
=
=
=

.16
.58
1.74
1
LACUSTRE-300

5
.24
2.9
.4
.4
33.34

______________________________________________________________________

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 4
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:44:30 AM 09/03/2016
=================================================================================================

Equivalent Forces
Fi = (Wi Hi^n /SWj Hj^n)
V =SFi
V = Sa W

E Q U I V A L E N T

F O R C E S

Floor
i
-----

Height
Hi
(m)
-----

Weigth
Wi
(ton)
-------

Wi Hi^n
Force
-----Fi
|SWj Hj^n
(ton)
------------

3
2
----|S

5.98
3.06

31.07
52.27
-----83.34

0.537
0.463

n =

17.903
15.435
------33.340

Shear
Vi
(ton)
------17.90
33.340

______________________________________________________________________

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

ENTRADA DE DATOS, CARGAS


Y
ANLISIS DIMENSIONAL

_________________________________________________________________________________________________
BOGOTA D.C.

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:29:05 AM 09/03/2016
=================================================================================================

GENERAL INPUT DATA


Structure type: Rectangular Plane Frame

STORY INFORMATION
Number of Stories . . . . = 2
Total Frame Height . . . . = 5.99 m
Story
----------1 - 2
2 - 3
-----------

Height
---------3.07
2.92
----------

* Height in (m)

BAY INFORMATION
Number of Bays . . . . . . = 9
Total Frame Width . . . . = 28.65 m
Bay
----------1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
----------* Span in (m)

Span
---------3.55
3.55
3.55
3.68
3.68
3.55
3.55
3.55
----------

MATERIALS
Number of materials =

REINFORCED CONCRETE
Mat

Name

f'c
fy
fys1
fys2
E
G
w
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/m3
___ ______________ _________ _________ _________ _________ _________ _________ _________
1 RConcrete1
210
4200
4200
4200
218540
87430
2400.0

MEMBER

DATA

Total number of members.....


Number of columns...........
Number of beams ............
Number of braces ...........

COLUMN

=
=
=
=

34
18
16
0

SECTIONS

Number of prismatic sections =


Sec

Name

Shape

Column1

Rectang

b
h
tw
tf
P1
P2
A
I2
I3
J
(cm)
(cm)
(cm)
(cm)
(cm)
(cm)
(cm2)
(cm4)
(cm4)
(cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________ _________
35.00

40.00

1400.0

186667

142917

256535

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 2
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:29:05 AM 09/03/2016
=================================================================================================
COLUMNS
Column

Story

________

____

L
(m)
______

Lu
(m)
______

a
(m)
_____

c
(m)
_____

Theta
(o)
______

Sec
_____

Mat
_____

System
_____

A-9
A-9

2
1

2.92
3.07

2.47
2.85

0.23
0.00

0.23
0.23

0.0
0.0

1
1

1
1

G&L
G&L

A-8
A-8

2
1

2.92
3.07

2.47
2.85

0.23
0.00

0.23
0.23

0.0
0.0

1
1

1
1

G&L
G&L

A-7
A-7

2
1

2.92
3.07

2.47
2.85

0.23
0.00

0.23
0.23

0.0
0.0

1
1

1
1

G&L
G&L

A-6
A-6

2
1

2.92
3.07

2.47
2.85

0.23
0.00

0.23
0.23

0.0
0.0

1
1

1
1

G&L
G&L

A-5
A-5

2
1

2.92
3.07

2.47
2.85

0.23
0.00

0.23
0.23

0.0
0.0

1
1

1
1

G&L
G&L

A-4
A-4

2
1

2.92
3.07

2.47
2.85

0.23
0.00

0.23
0.23

0.0
0.0

1
1

1
1

G&L
G&L

A-3
A-3

2
1

2.92
3.07

2.47
2.85

0.23
0.00

0.23
0.23

0.0
0.0

1
1

1
1

G&L
G&L

A-2
A-2

2
1

2.92
3.07

2.47
2.85

0.23
0.00

0.23
0.23

0.0
0.0

1
1

1
1

G&L
G&L

A-1
A-1

2
1

2.92
3.07

2.47
2.85

0.23
0.00

0.23
0.23

0.0
0.0

1
1

1
1

G&L
G&L

BEAM

SECTIONS

Number of prismatic sections =


Sec

b
h
tw
tf
P1
P2
A
I2
I3
J
(cm)
(cm)
(cm)
(cm)
(cm)
(cm)
(cm2)
(cm4)
(cm4)
(cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________ _________
1

Name

Shape

Beam1

Rectang

30.00

45.00

1350.0

BEAMS
Beam

Floor
______

L
(m)
______

Lu
(m)
______

a
(m)
_____

c
(m)
_____

Sec
_____

Mat
_____

_________

System
_____

A(1-2)
A(2-3)
A(3-4)
A(4-5)
A(5-6)
A(6-7)
A(7-8)
A(8-9)

2
2
2
2
2
2
2
2

3.55
3.55
3.55
3.68
3.68
3.55
3.55
3.55

3.20
3.20
3.20
3.33
3.33
3.20
3.20
3.20

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

G&L
G&L
G&L
G&L
G&L
G&L
G&L
G&L

A(1-2)
A(2-3)
A(3-4)
A(4-5)
A(5-6)
A(6-7)
A(7-8)
A(8-9)

3
3
3
3
3
3
3
3

3.55
3.55
3.55
3.68
3.68
3.55
3.55
3.55

3.20
3.20
3.20
3.33
3.33
3.20
3.20
3.20

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

G&L
G&L
G&L
G&L
G&L
G&L
G&L
G&L

227812

101250

234900

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 3
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:29:05 AM 09/03/2016
=================================================================================================
GROUND

SUPPORT

DATA

Total number of ground supports =

Support
________

Floor
_____

A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9

Type
_____

1
1
1
1
1
1
1
1
1

SUMMARY

OF

Spring constant(ton/cm)

Characteristics for All Degrees of Freedom


Value = K
Dash = free
C = constrained
Ux
Uz
TetX
_____
_____
_____

Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed

C
C
C
C
C
C
C
C
C

TOTAL

C
C
C
C
C
C
C
C
C

FLOOR

C
C
C
C
C
C
C
C
C

LOADS

LOAD CASE 1 : SELFW (D0)

Floor
______

Force (ton)
________________________
Px
Py
Pz
______
______
______

Moment (ton-m)
________________________
Mx
My
Mz
______
______
______

3
2
1
______
Total

0.00
0.00
0.00
______
0.00

0.0
0.0
0.0
______
0.0

0.00
0.00
0.00
______
0.00

16.75
17.89
0.00
______
34.64

0.0
0.0
0.0
______
0.0

0.0
0.0
0.0
______
0.0

LOAD CASE 4 : EQUAKE (EQ) - TYPE : EQUIVALENT STATIC

Floor
______

Force (ton)
________________________
Px
Py
Pz
______
______
______

Acc. Tors. Mom. (ton-m)


________________________
Mx
My
Mz
______
______
______

3
2
1
______
Total

17.90
15.44
0.00
______
33.34

0.0
0.0
0.0
______
0.0

0.00
0.00
0.00
______
0.00

0.00
0.00
0.00
______
0.00

0.0
0.0
0.0
______
0.0

0.0
0.0
0.0
______
0.0

LOAD CASE 5 : EQUAKE 1 (EQ1) - TYPE : EQUIVALENT STATIC

Floor
______

Force (ton)
________________________
Px
Py
Pz
______
______
______

Acc. Tors. Mom. (ton-m)


________________________
Mx
My
Mz
______
______
______

3
2
1
______
Total

17.90
15.44
0.00
______
33.34

0.0
0.0
0.0
______
0.0

0.00
0.00
0.00
______
0.00

0.00
0.00
0.00
______
0.00

0.0
0.0
0.0
______
0.0

0.0
0.0
0.0
______
0.0

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:28:05 AM 09/03/2016
=================================================================================================
P-Delta Analysis- Column End Forces
Units:

Column
________

Stry Load
____ ____

BOTTOM
_______________________________________________
Axial Shear2 Shear3 Torque
Mom-2
Mom-3
_____ ______ ______ _____ _______ _______

ton, ton-m

TOP
______________________________________________
Axial Shear2 Shear3 Torque
Mom-2
Mom-3
_____ ______ ______ _____ _______ _______

A-9

D0
DL
LL
EQ
EQ1

1.4
0.8
0.5
-1.2
-1.2

0.1
0.3
0.2
-1.2
-1.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.2
0.5
0.2
-0.9
-0.9

1.4
0.8
0.5
-1.2
-1.2

0.1
0.3
0.2
-1.2
-1.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

-0.2
-0.4
-0.2
1.9
1.9

A-9

D0
DL
LL
EQ
EQ1

2.9
2.8
1.5
-4.2
-4.2

0.0
0.2
0.1
-3.2
-3.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.1
0.2
0.1
-5.3
-5.3

2.9
2.8
1.5
-4.2
-4.2

0.0
0.2
0.1
-3.2
-3.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

-0.1
-0.4
-0.2
3.9
3.9

A-8

D0
DL
LL
EQ
EQ1

2.0
1.8
1.1
0.2
0.2

0.0
0.0
0.0
-2.3
-2.3

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
-0.1
0.0
-2.6
-2.6

2.0
1.8
1.1
0.2
0.2

0.0
0.0
0.0
-2.3
-2.3

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
3.2
3.2

A-8

D0
DL
LL
EQ
EQ1

4.2
6.2
3.3
0.8
0.8

0.0
0.0
0.0
-3.9
-3.9

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-6.0
-6.0

4.2
6.2
3.3
0.8
0.8

0.0
0.0
0.0
-3.9
-3.9

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
5.2
5.2

A-7

D0
DL
LL
EQ
EQ1

2.0
1.8
1.1
0.0
0.0

0.0
0.0
0.0
-2.2
-2.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-2.4
-2.4

2.0
1.8
1.1
0.0
0.0

0.0
0.0
0.0
-2.2
-2.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
3.0
3.0

A-7

D0
DL
LL
EQ
EQ1

4.1
6.0
3.2
-0.1
-0.1

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-5.9
-5.9

4.1
6.0
3.2
-0.1
-0.1

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
5.0
5.0

A-6

D0
DL
LL
EQ
EQ1

2.0
1.8
1.1
0.1
0.1

0.0
0.0
0.0
-2.2
-2.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-2.4
-2.4

2.0
1.8
1.1
0.1
0.1

0.0
0.0
0.0
-2.2
-2.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
3.0
3.0

A-6

D0
DL
LL
EQ
EQ1

4.1
6.1
3.3
0.2
0.2

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-5.9
-5.9

4.1
6.1
3.3
0.2
0.2

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
5.0
5.0

A-5

D0
DL
LL
EQ
EQ1

2.0
1.8
1.1
0.0
0.0

0.0
0.0
0.0
-2.2
-2.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-2.3
-2.3

2.0
1.8
1.1
0.0
0.0

0.0
0.0
0.0
-2.2
-2.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
3.0
3.0

A-5

D0
DL
LL
EQ
EQ1

4.2
6.3
3.3
0.0
0.0

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-5.9
-5.9

4.2
6.3
3.3
0.0
0.0

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
5.0
5.0

A-4

D0
DL
LL
EQ
EQ1

2.0
1.8
1.1
-0.1
-0.1

0.0
0.0
0.0
-2.2
-2.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-2.4
-2.4

2.0
1.8
1.1
-0.1
-0.1

0.0
0.0
0.0
-2.2
-2.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
3.0
3.0

A-4

D0
DL
LL
EQ
EQ1

4.1
6.1
3.3
-0.2
-0.2

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-5.9
-5.9

4.1
6.1
3.3
-0.2
-0.2

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
5.0
5.0

A-3

D0
DL
LL

2.0
1.8
1.1

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

2.0
1.8
1.1

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

EQ
EQ1

0.0
0.0

-2.2
-2.2

0.0
0.0

0.0
0.0

0.0
0.0

-2.4
-2.4

0.0
0.0

-2.2
-2.2

0.0
0.0

0.0
0.0

0.0
0.0

3.0
3.0

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 2
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:28:05 AM 09/03/2016
=================================================================================================
Column
________

Stry Load
____ ____

Axial
_____

Shear2
______

Shear3
______

Torque
Mom-2
_____ _______

Mom-3
_______

Axial
_____

Shear2
______

Shear3
______

Torque
Mom-2
_____ _______

Mom-3
_______

A-3

D0
DL
LL
EQ
EQ1

4.1
6.0
3.2
0.1
0.1

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-5.9
-5.9

4.1
6.0
3.2
0.1
0.1

0.0
0.0
0.0
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
5.0
5.0

A-2

D0
DL
LL
EQ
EQ1

2.0
1.8
1.1
-0.2
-0.2

0.0
0.0
0.0
-2.3
-2.3

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.1
0.0
-2.6
-2.6

2.0
1.8
1.1
-0.2
-0.2

0.0
0.0
0.0
-2.3
-2.3

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
3.2
3.2

A-2

D0
DL
LL
EQ
EQ1

4.2
6.2
3.3
-0.8
-0.8

0.0
0.0
0.0
-3.9
-3.9

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
-6.0
-6.0

4.2
6.2
3.3
-0.8
-0.8

0.0
0.0
0.0
-3.9
-3.9

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
5.2
5.2

A-1

D0
DL
LL
EQ
EQ1

1.4
0.8
0.5
1.2
1.2

-0.1
-0.3
-0.2
-1.2
-1.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

-0.2
-0.5
-0.2
-0.9
-0.9

1.4
0.8
0.5
1.2
1.2

-0.1
-0.3
-0.2
-1.2
-1.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.2
0.4
0.2
1.9
1.9

A-1

D0
DL
LL
EQ
EQ1

2.9
2.8
1.5
4.2
4.2

0.0
-0.2
-0.1
-3.2
-3.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

-0.1
-0.2
-0.1
-5.3
-5.3

2.9
2.8
1.5
4.2
4.2

0.0
-0.2
-0.1
-3.2
-3.2

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.1
0.4
0.2
3.9
3.9

P-Delta Analysis- Beam End Forces


Units:

Beam
Floor Load
________ ____ ____

END I
X/L = 0.0
________________________________________
Axl
Shr2
Shr3 Torque
M2
M3
___ _____
_____ ______ ______ _____

M2(+)max
__________
M2
X/L
_____ ___

ton, ton-m

END J
X/L = 1.0
________________________________________
Axl
Shr2
Shr3 Torque
M2
M3
___ _____
_____ ______ ______ _____

A(1-2)

D0
DL
LL
EQ
EQ1

-0.1
-0.1
-0.1
1.0
1.0

0.0
0.0
0.0
0.0
0.0

-0.5
-1.8
-0.9
-3.0
-3.0

0.0
0.0
0.0
0.0
0.0

-0.2
-0.6
-0.3
-5.3
-5.3

0.0
0.0
0.0
0.0
0.0

0.2
0.7
0.3
4.4
4.4

.45
.45
.45
1.0
1.0

-0.1
-0.1
-0.1
1.0
1.0

0.0
0.0
0.0
0.0
0.0

0.5
2.1
1.0
-3.0
-3.0

0.0
0.0
0.0
0.0
0.0

-0.3
-1.1
-0.6
4.4
4.4

0.0
0.0
0.0
0.0
0.0

A(2-3)

D0
DL
LL
EQ
EQ1

-0.1
-0.1
-0.1
0.7
0.7

0.0
0.0
0.0
0.0
0.0

-0.5
-1.9
-1.0
-2.4
-2.4

0.0
0.0
0.0
0.0
0.0

-0.3
-1.1
-0.5
-3.8
-3.8

0.0
0.0
0.0
0.0
0.0

0.1
0.5
0.3
3.9
3.9

.5
.5
.5
1.0
1.0

-0.1
-0.1
-0.1
0.7
0.7

0.0
0.0
0.0
0.0
0.0

0.5
1.9
1.0
-2.4
-2.4

0.0
0.0
0.0
0.0
0.0

-0.3
-1.0
-0.5
3.9
3.9

0.0
0.0
0.0
0.0
0.0

A(3-4)

D0
DL
LL
EQ
EQ1

-0.1
-0.1
-0.1
0.4
0.4

0.0
0.0
0.0
0.0
0.0

-0.5
-1.9
-1.0
-2.5
-2.5

0.0
0.0
0.0
0.0
0.0

-0.3
-1.0
-0.5
-4.0
-4.0

0.0
0.0
0.0
0.0
0.0

0.1
0.5
0.3
4.0
4.0

.5
.5
.5
1.0
1.0

-0.1
-0.1
-0.1
0.4
0.4

0.0
0.0
0.0
0.0
0.0

0.5
1.9
1.0
-2.5
-2.5

0.0
0.0
0.0
0.0
0.0

-0.3
-1.1
-0.5
4.0
4.0

0.0
0.0
0.0
0.0
0.0

A(4-5)

D0
DL
LL
EQ
EQ1

-0.1
-0.1
-0.1
0.1
0.1

0.0
0.0
0.0
0.0
0.0

-0.5
-2.0
-1.0
-2.3
-2.3

0.0
0.0
0.0
0.0
0.0

-0.3
-1.1
-0.5
-3.9
-3.9

0.0
0.0
0.0
0.0
0.0

0.2
0.6
0.3
3.9
3.9

.5
.5
.5
1.0
1.0

-0.1
-0.1
-0.1
0.1
0.1

0.0
0.0
0.0
0.0
0.0

0.5
2.0
1.0
-2.3
-2.3

0.0
0.0
0.0
0.0
0.0

-0.3
-1.1
-0.6
3.9
3.9

0.0
0.0
0.0
0.0
0.0

A(5-6)

D0
DL
LL
EQ
EQ1

-0.1
-0.1
-0.1
-0.1
-0.1

0.0
0.0
0.0
0.0
0.0

-0.5
-2.0
-1.0
-2.3
-2.3

0.0
0.0
0.0
0.0
0.0

-0.3
-1.1
-0.6
-3.9
-3.9

0.0
0.0
0.0
0.0
0.0

0.2
0.6
0.3
3.9
3.9

.5
.5
.5
1.0
1.0

-0.1
-0.1
-0.1
-0.1
-0.1

0.0
0.0
0.0
0.0
0.0

0.5
2.0
1.0
-2.3
-2.3

0.0
0.0
0.0
0.0
0.0

-0.3
-1.1
-0.5
3.9
3.9

0.0
0.0
0.0
0.0
0.0

A(6-7)

D0
DL
LL
EQ
EQ1

-0.1
-0.1
-0.1
-0.4
-0.4

0.0
0.0
0.0
0.0
0.0

-0.5
-1.9
-1.0
-2.5
-2.5

0.0
0.0
0.0
0.0
0.0

-0.3
-1.1
-0.5
-4.0
-4.0

0.0
0.0
0.0
0.0
0.0

0.1
0.5
0.3
4.0
4.0

.5
.5
.5
1.0
1.0

-0.1
-0.1
-0.1
-0.4
-0.4

0.0
0.0
0.0
0.0
0.0

0.5
1.9
1.0
-2.5
-2.5

0.0
0.0
0.0
0.0
0.0

-0.3
-1.0
-0.5
4.0
4.0

0.0
0.0
0.0
0.0
0.0

A(7-8)

D0
DL
LL
EQ

-0.1
-0.1
-0.1
-0.7

0.0
0.0
0.0
0.0

-0.5
-1.9
-1.0
-2.4

0.0
0.0
0.0
0.0

-0.3
-1.0
-0.5
-3.9

0.0
0.0
0.0
0.0

0.1
0.5
0.3
3.8

.5
.5
.5
1.0

-0.1
-0.1
-0.1
-0.7

0.0
0.0
0.0
0.0

0.5
1.9
1.0
-2.4

0.0
0.0
0.0
0.0

-0.3
-1.1
-0.5
3.8

0.0
0.0
0.0
0.0

EQ1

-0.7

0.0

-2.4

0.0

-3.9

0.0

3.8

1.0

-0.7

0.0

-2.4

0.0

3.8

0.0

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 3
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:28:05 AM 09/03/2016
=================================================================================================
Beam
Floor Load
________ ____ ____

Axl
___

Shr2
_____

Shr3
_____

Torque
M2
______ ______

M3
_____

M2
_____

X/L
___

Axl
___

Shr2
_____

Shr3
_____

Torque
M2
______ ______

M3
_____

A(8-9)

D0
DL
LL
EQ
EQ1

-0.1
-0.1
-0.1
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

-0.5
-2.1
-1.0
-3.0
-3.0

0.0
0.0
0.0
0.0
0.0

-0.3
-1.1
-0.6
-4.4
-4.4

0.0
0.0
0.0
0.0
0.0

0.2
0.7
0.3
5.3
5.3

.55
.55
.55
1.0
1.0

-0.1
-0.1
-0.1
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

0.5
1.8
0.9
-3.0
-3.0

0.0
0.0
0.0
0.0
0.0

-0.2
-0.6
-0.3
5.3
5.3

0.0
0.0
0.0
0.0
0.0

A(1-2)

D0
DL
LL
EQ
EQ1

0.1
0.3
0.2
-0.2
-0.2

0.0
0.0
0.0
0.0
0.0

-0.5
-0.8
-0.4
-1.2
-1.2

0.0
0.0
0.0
0.0
0.0

-0.1
-0.3
-0.2
-2.0
-2.0

0.0
0.0
0.0
0.0
0.0

0.2
0.3
0.2
1.7
1.7

.45
.45
.45
1.0
1.0

0.1
0.3
0.2
-0.2
-0.2

0.0
0.0
0.0
0.0
0.0

0.6
0.8
0.5
-1.2
-1.2

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
1.7
1.7

0.0
0.0
0.0
0.0
0.0

A(2-3)

D0
DL
LL
EQ
EQ1

0.1
0.3
0.2
0.0
0.0

0.0
0.0
0.0
0.0
0.0

-0.5
-0.8
-0.5
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.2
-1.6
-1.6

0.0
0.0
0.0
0.0
0.0

0.1
0.2
0.1
1.6
1.6

.5
.5
.5
1.0
1.0

0.1
0.3
0.2
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.5
0.8
0.5
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
1.6
1.6

0.0
0.0
0.0
0.0
0.0

A(3-4)

D0
DL
LL
EQ
EQ1

0.1
0.3
0.1
0.1
0.1

0.0
0.0
0.0
0.0
0.0

-0.5
-0.8
-0.5
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
-1.6
-1.6

0.0
0.0
0.0
0.0
0.0

0.1
0.2
0.1
1.6
1.6

.5
.5
.5
1.0
1.0

0.1
0.3
0.1
0.1
0.1

0.0
0.0
0.0
0.0
0.0

0.5
0.8
0.5
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
1.6
1.6

0.0
0.0
0.0
0.0
0.0

A(4-5)

D0
DL
LL
EQ
EQ1

0.1
0.3
0.2
0.0
0.0

0.0
0.0
0.0
0.0
0.0

-0.5
-0.8
-0.5
-0.9
-0.9

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
-1.6
-1.6

0.0
0.0
0.0
0.0
0.0

0.2
0.2
0.1
1.6
1.6

.5
.5
.5
1.0
1.0

0.1
0.3
0.2
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.5
0.8
0.5
-0.9
-0.9

0.0
0.0
0.0
0.0
0.0

-0.3
-0.5
-0.3
1.6
1.6

0.0
0.0
0.0
0.0
0.0

A(5-6)

D0
DL
LL
EQ
EQ1

0.1
0.3
0.2
0.0
0.0

0.0
0.0
0.0
0.0
0.0

-0.5
-0.8
-0.5
-0.9
-0.9

0.0
0.0
0.0
0.0
0.0

-0.3
-0.5
-0.3
-1.6
-1.6

0.0
0.0
0.0
0.0
0.0

0.2
0.2
0.1
1.6
1.6

.5
.5
.5
1.0
1.0

0.1
0.3
0.2
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.5
0.8
0.5
-0.9
-0.9

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
1.6
1.6

0.0
0.0
0.0
0.0
0.0

A(6-7)

D0
DL
LL
EQ
EQ1

0.1
0.3
0.1
-0.1
-0.1

0.0
0.0
0.0
0.0
0.0

-0.5
-0.8
-0.5
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
-1.6
-1.6

0.0
0.0
0.0
0.0
0.0

0.1
0.2
0.1
1.6
1.6

.5
.5
.5
1.0
1.0

0.1
0.3
0.1
-0.1
-0.1

0.0
0.0
0.0
0.0
0.0

0.5
0.8
0.5
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
1.6
1.6

0.0
0.0
0.0
0.0
0.0

A(7-8)

D0
DL
LL
EQ
EQ1

0.1
0.3
0.2
0.0
0.0

0.0
0.0
0.0
0.0
0.0

-0.5
-0.8
-0.5
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
-1.6
-1.6

0.0
0.0
0.0
0.0
0.0

0.1
0.2
0.1
1.6
1.6

.5
.5
.5
1.0
1.0

0.1
0.3
0.2
0.0
0.0

0.0
0.0
0.0
0.0
0.0

0.5
0.8
0.5
-1.0
-1.0

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.2
1.6
1.6

0.0
0.0
0.0
0.0
0.0

A(8-9)

D0
DL
LL
EQ
EQ1

0.1
0.3
0.2
0.2
0.2

0.0
0.0
0.0
0.0
0.0

-0.6
-0.8
-0.5
-1.2
-1.2

0.0
0.0
0.0
0.0
0.0

-0.3
-0.4
-0.3
-1.7
-1.7

0.0
0.0
0.0
0.0
0.0

0.2
0.3
0.2
2.0
2.0

.55
.55
.55
1.0
1.0

0.1
0.3
0.2
0.2
0.2

0.0
0.0
0.0
0.0
0.0

0.5
0.8
0.4
-1.2
-1.2

0.0
0.0
0.0
0.0
0.0

-0.1
-0.3
-0.2
2.0
2.0

0.0
0.0
0.0
0.0
0.0

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

CALCULO DE DERIVAS

_________________________________________________________________________________________________
BOGOTA D.C.

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:04 AM 09/03/2016
=================================================================================================
P-DELTA ANALYSIS - SUMMARY MAXIMUM STORY DRIFT RATIO, D/h

Story
______

Drift-Ratio at CENTER OF MASS


------------------------------DriftX
DriftY
DriftR
_________ _________ _________

2
0.0006
1
0.0010
______ _________
Maxima 0.0010
______ _________

0.0000
0.0000
_________
0.0000
_________

0.0006
0.0010
_________
0.0010
_________

MAXIMUM Corner Story-Drift-Ratio


-------------------------------DriftX
DriftY
DriftR
_________ _________ _________
0.0006
0.0010
_________
0.0010
_________

0.0000
0.0000
_________
0.0000
_________

DriftX = (Dx/h)max
DriftY = (Dy/h)max
DriftR = ([(Dx/h) + (Dy/h)])max

P-DELTA ANALYSIS - DETAILED MAXIMUM STORY DRIFT RATIO, d/h


Story
______

ColAxis
________

(dx/h)max
________

(dy/h)max ([(dx/h) + (dy/h)])max


________
____________________

A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9

0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006
0.0006

A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9

0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010
0.0010

Note: Drift amplification factor, D:


MAXIMUM DRIFT: (d/h)x =0.0010

0.0006
0.0010
_________
0.0010
_________

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

DISEO DE COLUMNAS
Y VIGAS

_________________________________________________________________________________________________
BOGOTA D.C.

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
LOAD COMBINATIONS
No
______
1
2
3
4
5
6
7
8
9
10

Load combination
____________________________
1.4D0 + 1.4DL
1.2D0 + 1.2DL
1.2D0 + 1.2DL
1.2D0 + 1.2DL
1.2D0 + 1.2DL
1.2D0 + 1.2DL
.9D0 + .9DL +
.9D0 + .9DL .9D0 + .9DL +
.9D0 + .9DL -

+ 1.6LL
+ LL + EQ
+ LL - EQ
+ LL + EQ1
+ LL - EQ1
EQ
EQ
EQ1
EQ1

MATERIALS
Number of materials =

REINFORCED CONCRETE
Mat

Name

f'c
fy
fys1
fys2
E
G
w
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/cm2
Kg/m3
___ ______________ _________ _________ _________ _________ _________ _________ _________
1 RConcrete1
210
4200
4200
4200
218540
87430
2400.0

COLUMN

SECTIONS

Number of prismatic sections =


Sec

Name

Shape

Column1

Rectang

b
h
tw
tf
P1
P2
A
I2
I3
J
(cm)
(cm)
(cm)
(cm)
(cm)
(cm)
(cm2)
(cm4)
(cm4)
(cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________ _________
35.00

Design Results - Columns

Column

Story
____
2

L
(m)
____
2.92

Lu
(m)
____
2.47

_______
A-9
A-9

3.07

2.85

A-8

2.92

2.47

A-8

3.07

2.85

A-7

2.92

2.47

A-7

3.07

2.85

A-6

2.92

2.47

A-6

3.07

2.85

40.00

1400.0

186667

142917

256535

(DMO)

Sec
bxh
Mat
(cm)
___ ______
1
35x40
1
1
35x40
1
1
1
1
1

35x40

1
1
1
1

35x40

1
1
1
1

35x40

35x40

35x40

35x40

TRANSVERSE REINFORCEMENT
------------------------TIES
XTIES
__________________
5 #3 @ 11 cm (end)
7 #3 @ 22 cm (ctr)
5 #3 @ 11 cm (end)
8 #3 @ 22 cm (ctr)

_____
1 (b)
1 (h)
1 (b)
1 (h)

LONGITUDINAL REINFORCEMENT
--------------------------------------------------Sec LdCmb
Pu
Mu2
Mu3
RHO
As
critc (ton) (ton-m) (ton-m)
(cm2)
___ ____ ______
______
______ ______ ______
Top
1
3.07
0.08
0.78 0.0100
14.00
Bot
1
3.07
0.08
0.89 0.0100
14.00
Top
1
7.93
0.22
0.65 0.0100
14.00
Bot
1
7.93
0.22
0.36 0.0100
14.00

5
7
5
8

#3
#3
#3
#3

@
@
@
@

11
22
11
22

cm
cm
cm
cm

(end)
(ctr)
(end)
(ctr)

1
1
1
1

(b)
(h)
(b)
(h)

Top
Bot
Top
Bot

1
1
1
1

5.38
5.38
14.58
14.58

0.15
0.15
0.40
0.40

0.11
0.13
0.03
0.01

0.0100
0.0100
0.0100
0.0100

14.00
14.00
14.00
14.00

5
7
5
8

#3
#3
#3
#3

@
@
@
@

11
22
11
22

cm
cm
cm
cm

(end)
(ctr)
(end)
(ctr)

1
1
1
1

(b)
(h)
(b)
(h)

Top
Bot
Top
Bot

1
1
1
1

5.26
5.26
14.13
14.13

0.14
0.14
0.38
0.38

0.04
0.03
0.02
0.01

0.0100
0.0100
0.0100
0.0100

14.00
14.00
14.00
14.00

5
7
5
8

#3
#3
#3
#3

@
@
@
@

11
22
11
22

cm
cm
cm
cm

(end)
(ctr)
(end)
(ctr)

1
1
1
1

(b)
(h)
(b)
(h)

Top
Bot
Top
Bot

1
1
1
1

5.33
5.33
14.39
14.39

0.15
0.15
0.39
0.39

0.03
0.03
0.04
0.02

0.0100
0.0100
0.0100
0.0100

14.00
14.00
14.00
14.00

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 2
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
Column
_______

Story
L
____ ____

Lu
____

Sec
bxh
___ ______

TIES
__________________

XTIES
_____

Sec
___

1
1
1
1

35x40

5
7
5
8

#3
#3
#3
#3

@
@
@
@

11
22
11
22

cm
cm
cm
cm

(end)
(ctr)
(end)
(ctr)

1
1
1
1

(b)
(h)
(b)
(h)

Top
Bot
Top
Bot

1
1
1
1

1
1
1
1

35x40

5
7
5
8

#3
#3
#3
#3

@
@
@
@

11
22
11
22

cm
cm
cm
cm

(end)
(ctr)
(end)
(ctr)

1
1
1
1

(b)
(h)
(b)
(h)

Top
Bot
Top
Bot

1
1
1
1

35x40

5
7
5
8

#3
#3
#3
#3

@
@
@
@

11
22
11
22

cm
cm
cm
cm

(end)
(ctr)
(end)
(ctr)

1
1
1
1

(b)
(h)
(b)
(h)

1
1
1
1

35x40

5
7
5
8

#3
#3
#3
#3

@
@
@
@

11
22
11
22

cm
cm
cm
cm

(end)
(ctr)
(end)
(ctr)

1
1
1
1

1
1
1
1

35x40

5
7
5
8

#3
#3
#3
#3

@
@
@
@

11
22
11
22

cm
cm
cm
cm

(end)
(ctr)
(end)
(ctr)

1
1
1
1

A-5

2.92

2.47

A-5

3.07

2.85

A-4

2.92

2.47

A-4

3.07

2.85

A-3

2.92

2.47

A-3

3.07

2.85

A-2

2.92

2.47

A-2

3.07

2.85

A-1

2.92

2.47

A-1

3.07

2.85

BEAM

35x40

35x40

35x40

35x40

35x40

Mu2
______

Mu3
______

RHO
______

As
______

5.42
5.42
14.63
14.63

0.15
0.15
0.40
0.40

0.00
0.00
0.00
0.00

0.0100
0.0100
0.0100
0.0100

14.00
14.00
14.00
14.00

1
1
1
1

5.33
5.33
14.39
14.39

0.15
0.15
0.39
0.39

0.03
0.03
0.04
0.02

0.0100
0.0100
0.0100
0.0100

14.00
14.00
14.00
14.00

Top
Bot
Top
Bot

1
1
1
1

5.26
5.26
14.13
14.13

0.14
0.14
0.38
0.38

0.04
0.03
0.02
0.01

0.0100
0.0100
0.0100
0.0100

14.00
14.00
14.00
14.00

(b)
(h)
(b)
(h)

Top
Bot
Top
Bot

1
1
1
1

5.38
5.38
14.58
14.58

0.15
0.15
0.40
0.40

0.11
0.13
0.03
0.01

0.0100
0.0100
0.0100
0.0100

14.00
14.00
14.00
14.00

(b)
(h)
(b)
(h)

Top
Bot
Top
Bot

1
1
1
1

3.07
3.07
7.93
7.93

0.08
0.08
0.22
0.22

0.78
0.89
0.65
0.36

0.0100
0.0100
0.0100
0.0100

14.00
14.00
14.00
14.00

SECTIONS

Number of prismatic sections =


Sec

LdCmb
Pu
____ ______

b
h
tw
tf
P1
P2
A
I2
I3
J
(cm)
(cm)
(cm)
(cm)
(cm)
(cm)
(cm2)
(cm4)
(cm4)
(cm4)
___ ____________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________ _________
1

Name

Beam1

Shape

Rectang

Design Results - Beams

30.00

45.00

1350.0

227812

101250

234900

(DMO)

BEAM: A(1-2) FLOOR: 2


=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-6.65
-4.71
-3.09
-1.82
-1.36
-1.36
-1.36
-1.36
-2.72
-4.61
-6.78
Mu(+), ton-m:
4.47
4.11
3.72
3.29
2.62
1.70
1.68
2.08
2.45
2.81
3.10
As(-), cm2:
4.61
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.70
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
6.23
6.23
5.71
5.01
4.31
4.21
4.91
5.61
6.31
6.83
6.83
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-1
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-2

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 3
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(2-3) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-5.99
-4.10
-2.49
-1.23
-1.21
-1.21
-1.21
-1.32
-2.56
-4.15
-6.03
Mu(+), ton-m:
2.57
2.43
2.20
1.95
1.60
1.21
1.71
2.08
2.34
2.57
2.72
As(-), cm2:
4.13
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.15
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.67
5.67
5.15
4.45
3.75
3.05
3.70
4.40
5.10
5.63
5.63
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-2
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-3
BEAM: A(3-4) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-6.09
-4.20
-2.58
-1.32
-1.24
-1.24
-1.24
-1.34
-2.63
-4.27
-6.18
Mu(+), ton-m:
2.82
2.64
2.38
2.10
1.70
1.24
1.69
2.07
2.35
2.60
2.77
As(-), cm2:
4.20
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.27
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.73
5.73
5.20
4.50
3.80
3.15
3.85
4.55
5.25
5.78
5.78
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-3
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-4
BEAM: A(4-5) FLOOR: 2
=================================================================================================================
Length:
L = 3.68 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.33 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.51
0.84
1.17
1.51
1.84
2.17
2.50
2.84
3.17
3.50
Mu(-), ton-m:
-6.15
-4.18
-2.51
-1.25
-1.25
-1.25
-1.25
-1.27
-2.57
-4.25
-6.23
Mu(+), ton-m:
2.62
2.51
2.32
2.11
1.76
1.30
1.77
2.11
2.32
2.51
2.61
As(-), cm2:
4.24
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.30
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.71
5.71
5.13
4.40
3.67
2.98
3.71
4.44
5.17
5.75
5.75
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-4
10 #3@ 10 6 #3@ 20 10 #3@ 10
A-5

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 4
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(5-6) FLOOR: 2
=================================================================================================================
Length:
L = 3.68 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.33 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.51
0.84
1.17
1.51
1.84
2.17
2.50
2.84
3.17
3.50
Mu(-), ton-m:
-6.23
-4.25
-2.57
-1.27
-1.25
-1.25
-1.25
-1.25
-2.51
-4.18
-6.15
Mu(+), ton-m:
2.61
2.51
2.32
2.11
1.77
1.30
1.76
2.11
2.32
2.51
2.62
As(-), cm2:
4.30
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.24
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.75
5.75
5.17
4.44
3.71
2.98
3.67
4.40
5.13
5.71
5.71
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-5
10 #3@ 10 6 #3@ 20 10 #3@ 10
A-6
BEAM: A(6-7) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.41
2.73
3.05
3.37
Mu(-), ton-m:
-6.18
-4.27
-2.63
-1.34
-1.24
-1.24
-1.24
-1.32
-2.58
-4.20
-6.09
Mu(+), ton-m:
2.77
2.60
2.35
2.07
1.69
1.24
1.70
2.10
2.38
2.64
2.82
As(-), cm2:
4.27
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.20
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.78
5.78
5.25
4.55
3.85
3.15
3.80
4.50
5.20
5.73
5.73
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-6
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-7
BEAM: A(7-8) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-6.03
-4.15
-2.56
-1.32
-1.21
-1.21
-1.21
-1.23
-2.49
-4.10
-5.99
Mu(+), ton-m:
2.72
2.57
2.34
2.08
1.71
1.21
1.60
1.95
2.20
2.43
2.57
As(-), cm2:
4.15
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.13
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
5.63
5.63
5.10
4.40
3.70
3.05
3.75
4.45
5.15
5.67
5.67
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-7
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-8

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 5
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(8-9) FLOOR: 2
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.41
2.73
3.05
3.37
Mu(-), ton-m:
-6.78
-4.61
-2.72
-1.36
-1.36
-1.36
-1.36
-1.82
-3.09
-4.71
-6.65
Mu(+), ton-m:
3.10
2.81
2.45
2.08
1.68
1.70
2.62
3.29
3.72
4.11
4.47
As(-), cm2:
4.70
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.61
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
6.83
6.83
6.31
5.61
4.91
4.21
4.31
5.01
5.71
6.23
6.23
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-8
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-9
BEAM: A(1-2) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-2.71
-1.82
-1.11
-0.59
-0.59
-0.59
-0.59
-0.59
-1.07
-1.92
-2.93
Mu(+), ton-m:
1.57
1.53
1.47
1.39
1.18
0.84
0.84
0.92
0.97
1.01
1.01
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.80
2.80
2.52
2.15
1.78
1.72
2.09
2.46
2.83
3.11
3.11
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-1
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-2
BEAM: A(2-3) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-2.71
-1.80
-1.05
-0.55
-0.55
-0.55
-0.55
-0.55
-1.08
-1.84
-2.76
Mu(+), ton-m:
0.96
0.98
0.95
0.91
0.80
0.63
0.79
0.89
0.94
0.96
0.94
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.67
2.67
2.39
2.02
1.65
1.31
1.68
2.05
2.42
2.70
2.70
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-2
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-3

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 6
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(3-4) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-2.69
-1.79
-1.04
-0.55
-0.55
-0.55
-0.55
-0.55
-1.08
-1.85
-2.76
Mu(+), ton-m:
0.94
0.96
0.94
0.90
0.79
0.62
0.79
0.89
0.93
0.95
0.93
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.66
2.66
2.38
2.01
1.64
1.30
1.67
2.04
2.42
2.69
2.69
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-3
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-4
BEAM: A(4-5) FLOOR: 3
=================================================================================================================
Length:
L = 3.68 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.33 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.51
0.84
1.17
1.51
1.84
2.17
2.50
2.84
3.17
3.50
Mu(-), ton-m:
-2.75
-1.81
-1.03
-0.56
-0.56
-0.56
-0.56
-0.56
-1.05
-1.84
-2.79
Mu(+), ton-m:
0.92
0.93
0.93
0.93
0.84
0.69
0.84
0.91
0.92
0.91
0.93
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.70
2.70
2.39
2.00
1.62
1.25
1.64
2.03
2.41
2.72
2.72
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-4
10 #3@ 10 6 #3@ 20 10 #3@ 10
A-5
BEAM: A(5-6) FLOOR: 3
=================================================================================================================
Length:
L = 3.68 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.33 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.51
0.84
1.17
1.51
1.84
2.17
2.50
2.84
3.17
3.50
Mu(-), ton-m:
-2.79
-1.84
-1.05
-0.56
-0.56
-0.56
-0.56
-0.56
-1.03
-1.81
-2.75
Mu(+), ton-m:
0.93
0.91
0.92
0.91
0.84
0.69
0.84
0.93
0.93
0.93
0.92
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.72
2.72
2.41
2.03
1.64
1.25
1.62
2.00
2.39
2.70
2.70
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-5
10 #3@ 10 6 #3@ 20 10 #3@ 10
A-6

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 7
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:30:48 AM 09/03/2016
=================================================================================================
BEAM: A(6-7) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.41
2.73
3.05
3.37
Mu(-), ton-m:
-2.76
-1.85
-1.08
-0.55
-0.55
-0.55
-0.55
-0.55
-1.04
-1.79
-2.69
Mu(+), ton-m:
0.93
0.95
0.93
0.89
0.79
0.62
0.79
0.90
0.94
0.96
0.94
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.69
2.69
2.42
2.04
1.67
1.30
1.64
2.01
2.38
2.66
2.66
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-6
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-7
BEAM: A(7-8) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.50
0.82
1.14
1.46
1.78
2.10
2.42
2.74
3.06
3.38
Mu(-), ton-m:
-2.76
-1.84
-1.08
-0.55
-0.55
-0.55
-0.55
-0.55
-1.05
-1.80
-2.71
Mu(+), ton-m:
0.94
0.96
0.94
0.89
0.79
0.63
0.80
0.91
0.95
0.98
0.96
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
2.70
2.70
2.42
2.05
1.68
1.31
1.65
2.02
2.39
2.67
2.67
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-7
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-8
BEAM: A(8-9) FLOOR: 3
=================================================================================================================
Length:
L = 3.55 m
a = 0.18 m Section:
b = 30.0 cm
Sec:
Beam1
Lu = 3.20 m
c = 0.18 m
h = 45.0 cm
Mat:
RConcrete1
-----------------------------------------------------------------------------------------------X, m:
0.18
0.49
0.81
1.14
1.46
1.78
2.10
2.41
2.73
3.05
3.37
Mu(-), ton-m:
-2.93
-1.92
-1.07
-0.59
-0.59
-0.59
-0.59
-0.59
-1.11
-1.82
-2.71
Mu(+), ton-m:
1.01
1.01
0.97
0.92
0.84
0.84
1.18
1.39
1.47
1.53
1.57
As(-), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
As(+), cm2:
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
4.02
Vu, ton:
3.11
3.11
2.83
2.46
2.09
1.72
1.78
2.15
2.52
2.80
2.80
Tu, ton-m:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Stirrup:
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
#3
Spacing, cm:
10.00
10.00
10.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
| |______________________________________________________________________________________| |
DESIGN
|
|
|
|
| |--------------------------------------------------------------------------------------| |
A-8
10 #3@ 10 5 #3@ 20 10 #3@ 10
A-9

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

DISEO DE LA CIMENTACION

_________________________________________________________________________________________________
BOGOTA D.C.

EngSolutions RCB Version 8.5.5 - License No: B15756-A28083

Page No. 1
=================================================================================================
Company: MARCHAR ASESORES
Engineer: EDUARDO ORTIZ TAPIA
Project: PORTICO CERRAMIENTO P.E.N.
10:31:41 AM 09/03/2016
=================================================================================================
P-Delta Analysis- Support Reactions
Support
_______________
Axis
Floor
________ _____

Load
______
LdCase
______

Force (ton)
__________________________
Fx
Fy
Fz
______
______
______

Moment (ton-m)
__________________________
Mx
My
Mz
______
______
______

A-1

D0
DL
LL
EQ
EQ1

0.05
0.20
0.10
3.21
3.21

0.00
0.00
0.00
0.00
0.00

2.85
2.81
1.49
4.18
4.18

0.00
0.00
0.00
0.00
0.00

0.05
0.21
0.10
5.28
5.28

0.00
0.00
0.00
0.00
0.00

A-2

D0
DL
LL
EQ
EQ1

0.00
-0.01
-0.01
3.90
3.90

0.00
0.00
0.00
0.00
0.00

4.17
6.24
3.31
-0.77
-0.77

0.00
0.00
0.00
0.00
0.00

0.00
-0.01
0.00
5.98
5.98

0.00
0.00
0.00
0.00
0.00

A-3

D0
DL
LL
EQ
EQ1

0.00
0.01
0.00
3.82
3.82

0.00
0.00
0.00
0.00
0.00

4.08
6.01
3.18
0.08
0.08

0.00
0.00
0.00
0.00
0.00

0.00
0.01
0.00
5.91
5.91

0.00
0.00
0.00
0.00
0.00

A-4

D0
DL
LL
EQ
EQ1

0.00
0.01
0.01
3.83
3.83

0.00
0.00
0.00
0.00
0.00

4.13
6.15
3.25
-0.20
-0.20

0.00
0.00
0.00
0.00
0.00

0.00
0.01
0.01
5.91
5.91

0.00
0.00
0.00
0.00
0.00

A-5

D0
DL
LL
EQ
EQ1

0.00
0.00
0.00
3.81
3.81

0.00
0.00
0.00
0.00
0.00

4.18
6.28
3.32
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
5.90
5.90

0.00
0.00
0.00
0.00
0.00

A-6

D0
DL
LL
EQ
EQ1

0.00
-0.01
-0.01
3.83
3.83

0.00
0.00
0.00
0.00
0.00

4.13
6.15
3.25
0.20
0.20

0.00
0.00
0.00
0.00
0.00

0.00
-0.01
-0.01
5.91
5.91

0.00
0.00
0.00
0.00
0.00

A-7

D0
DL
LL
EQ
EQ1

0.00
-0.01
0.00
3.82
3.82

0.00
0.00
0.00
0.00
0.00

4.08
6.01
3.18
-0.08
-0.08

0.00
0.00
0.00
0.00
0.00

0.00
-0.01
0.00
5.91
5.91

0.00
0.00
0.00
0.00
0.00

A-8

D0
DL
LL
EQ
EQ1

0.00
0.01
0.01
3.90
3.90

0.00
0.00
0.00
0.00
0.00

4.17
6.24
3.31
0.77
0.77

0.00
0.00
0.00
0.00
0.00

0.00
0.01
0.00
5.98
5.98

0.00
0.00
0.00
0.00
0.00

A-9

D0
DL
LL
EQ
EQ1

-0.05
-0.20
-0.10
3.21
3.21

0.00
0.00
0.00
0.00
0.00

2.85
2.81
1.49
-4.18
-4.18

0.00
0.00
0.00
0.00
0.00

-0.05
-0.21
-0.10
5.28
5.28

0.00
0.00
0.00
0.00
0.00

2 Pilotes =
0.25
carga del pilote =
Recubrimiento =
0.07
Los pilotes asumen el
PREAL =
10
Ppara Calculo =
Pu = 10.00

DADO TIPO 2
Cant. = 4

L=

18
12

tn

cantidad de pilotes
1.17

m
100% de la carga
Ton ( carga de la columna)
10.00
( carga por columna)
x
1.4 =
14 Ton

B
DISEO POR EL METODO DE LAS BIELAS :

Pu ( 2 e a )
8 f y d

As inf =
A
e

donde :
e=

2.5
pilote
= 0.63
( segn estudio de suelos )

a=

0.35

fy =

Dimensiones de la columna (pedestal):


a' (cm) = 35
b (cm) = 40
a = a ' b
Asmin = 0.0018 (pilote + 2 Recub.) H

Detalle de Refuerzo:

( dimensin columna )

4200 Kg/cm

=
1

0.9

( coeficiente de reduccin de resistencia )

d min. =

e*.50

d=
H=
Entonces :
As inf =
As min =

0.63
0.70

m
m

0.66
4.91

cm
cm

As sup =

6.39

cm

As Suministrado
5#5
por c/lado

0.31 m
(definitivo)
( altura dado )

9.95

cm

H (m) ld + 0.15
H

5 FL # 3 c/.40

0.10
4#5

CORTE 1 - 1
Lado A= e+2*p

1.13

mts

Lado B= 2*p

0.50

mts

CJR

09/03/2016
PROYECTO:

CERRAMIENTO PEN

SEGN C.15.11.1

TABLA

CALCULO REFUERZO DE PILOTES


VACIADOS EN SITIO

ESTRUCTURAS CON CAPACIDAD (DMO Y DES)

EXIGIDO
17.5 Mpa

PROPUESTO
21.1 Mpa

0.0050

0.01314

CANTIDAD MININMA DE BARRAS LONGITUDINALES

DIAMETRO BARRA ESTRIBOS

# 3 para pilote<75 cm
# 4 para pilote>75 cm

SEPARACION MAXIMA DE ESTRIBOS

en los 1.20m
superiores del pilote

7.5 cm

7.5 cm

RESISTENCIA DEL CONCRETO minima


CUANTIA MINIMA

el resto de longitud del pilote


RECUBRIMIENTO MINIMO

CANTIDAD

=16x barra long


CANTIDAD

LONGITUD DEL PILOTE SEGUN ESTUDIO DE SUELOS


CAPACIDAD DE CARGA POR PILOTE
CALCULO DE ACERO LONGITUDINAL
As= P x ^2 / 4 x 0.005
=
25.00cms
20.00cms

20.6 cm
4.0 cm
20.00m

2.45 cm2

#4
1.29 cm2

16
20.0 cm
90
4.0 cm

FLEJES
FLEJES

23.90 Tn
6.45 cm2

OK

Gancho

h de Descabece

210Kg/cm2

25.00cms

40.00cms
4.00cms

Recubrimiento

60.00cms

12.00cms
63cms

10.80cms

Long. Fleje

DISEO DE VIGA DE AMARRE

VC

PROYECTO:
CERRAMIENTO PEN
Las dimensiones de las vigas de amarre se han establecido en funcin de las solicitaciones que las afectan,
dentro de las cuales se cuentan: la resistencia a fuerzas axiales por razones ssmicas, la rigidez y las
caractersticas para efectos de diferencias de carga vertical sobre los elementos de cimentacin y la
posibilidad de ocurrencia de asentamientos totales y diferenciales.

Eleccin de la seccin transversal


b
h
d'
d

= 40
= 50
= 7.5
= 40.71 cms

=
As =
As =

0.00330
5.37
5.37

(K) Coefic. para vigas


rectang. Con ref a tracc

cm
cm
cm
Recubrimiento
cm
d=h-(rec+flej+ref/2)
(mnimo)
cm
(Refuerzo positivo)
cm
(Refuerzo negativo)

K=

0.012711678

Transmisin de la carga de la columna:


La viga de amarre debe ser capaz de resistir en tensin o compresin una fuerza no menor de 0.25 Aa veces la
carga vertical total del elemento que tenga la mayor carga entre los que interconecta.
Aa = 0.15
0.25 Aa = 0.0375
Mxima carga real que baja por la columna =
Factor de carga =
Carga ltima =

63.8
1.00
63.8

Ton
Ton

La fuerza axial que debe ser capaz de transmitir la viga de amarre a la columna adyacente (Pu) es:
Pu =
2.39
Ton
El refuerzo que necesita la viga para resistir la fuerza axial es:
fy =
4200
kg/cm
As =
0.67
cm
(Refuerzo para toda la seccin)

Solicitaciones debidas al asentamiento:


M=

6EI
L

V=

Donde :
E = mdulo de elasticidad del concreto
21.1
fc =
210
kg/cm
Ec = 4700*RAIZ(f'c)(Mpa)
Ec =
218540 kg/cm
21853991511 kg/m

12EI
L
Mpa
21581

Kg/cm2
218540
G=
87415.97

I = inercia de la seccin (la mitad para tener en cuenta la fisuracin): I = bh /12


4
I = 0.0041667 m
= mximo asentamiento diferencial permitido para que no se ocasionen daos a elementos importantes.

0.0207

L/ 300

0.0207

TABLA H. 9.4-1(NSR-10)

L = Luz entre columnas


L =
6.22

Luego:
M=
Mu =

11.71
11.71

Ton - m
Ton - m

V =
Vu =

3.77
3.77

Ton
Ton

Ton - m

Mu =

22.2

Ton - m

Solicitaciones debidas a la estructura:


M=

22.15

Revisin de la seccin escogida:


Flexin:

Mu =

=
As =
Cortante:
Flejes =
# de ramas =
Separacin =
Vc =
5 Vc =

Resiste =

0.0006
1.00

22.2

cm

(Refuerzo positivo y negativo)


Vu =

3/8"
2

10.17
10.6
53.1
20.8

Ton - m

La seccin escogida es adecuada

3.77
3

Utilizar flejes #

As = 0.71
cm
Ton
Ton
Ton

vc=
5.760kg/cm2
0.75*0.53*RAIZ(f'C)

Ton
cm

Seccin por cortante OK


Cortante OK
As SUMINISTRADO =

7.92 cm2

Resumen dimensionamiento Viga de Amarre


AREA= 1.98
AREA= 1.98
b
h
fc
fy
As
Flejes
Sep mx
Sep mx
cant flej ZC

=
=
=
=
=
=
=
=

Z Conf=2*h

40
50
210
4200
5.37
3/8"
10.2 cms
20.0 cms
10.8
100.0 cms

cm
cm
kg/cm
kg/cm
cm

As=
ARRIBA
ABAJO

Cm2
Cm2

5.37 Cm 2
CANT
4
4

#
5
5
4 10

ZONA CONFIN

35

CENTRO

25
Fl#3 L=

1.40 mts

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

DISEO DE ELEMENTOS NO
ESTRUCTURALES NSR-10

_________________________________________________________________________________________________
BOGOTA D.C.

CALCULO ELEMENTOS NO ESTRUCTURALES DE FACHADA NSR-10


CERRAMIENTO PEN

OBRA:

INGENIERO: EDUARDO ORTIZ TAPIA


ax ap
Fp =

-----------------

25402 - 119942

CND

Aa I
g Mp >=

Rp

-------------

g Mp =

A.9.4-1

Firma

(Sa-As)*hx
ax =

As+-------------

hx < heq

heq

heq=0.75hi 0.750 m

A.9.4-2
ax = Sa *

hx

hx > heq

heq
LADRILLO

1.80

BLOQUE

1.30

heq : puede estimarse simplificadamente como 0.75*hn

Para manposteria no reforzada, separada lateralmente de la estructura,


apoyadas solo abajo. GRADO DE DESEMPEO DE ELEMENTOS

BAJO

DENSIDAD MATERIAL MURO


ap =

2.50

H muro =

Rp =

1.50

L mx. =

9.81 m/sg

g=
f'm =
Nivel

hx

Mp

75.00 kg/cm
Fx(Fi)

mx(Wi)

ton

ton

mts

1.30

2.65 mts

I=

1.00

0.450

Aa=

d=

0.120 0.1200

Rp=

fy=

2400 k/cm

Sa =

Mp = Tn

Hx

ax

Fp

Mto.

ton

ton-m

Tn/m3

0.15
1.5

GRUPO DE USO
K

NO DUCTIL
I
p mn

As

Refuerzo C./

Cvx

cm

1.00

0.156

17.90

31.07

0.7204

0.421

0.211

0.0015

-0.0015

0.0010

1.20

1 # 3

c/

59

cms

0.507

1.00

0.156

15.44

52.27

0.2373

0.139

0.069

0.0005

-0.0020

0.0010

1.20

1 # 3

c/

59

cms

0.281

Para manposteria no reforzada, separada lateralmente de la estructura,


apoyadas arriba y abajo.
BAJO
DENSIDAD MATERIAL MURO
ap =

1.00

H muro =

Rp =

1.50

L mx. =

9.80 m/sg

g=

Sa =

Mp = Tn
f'm =

75.00 kg/cm

hx

mts

1.30

Tn/m3

4.80 mts

heq=0.75hi 1.988 m

0.450

d=

0.120 mts

Rp=

fy=

2400 k/cm

1.5

GRUPO DE USO

NO DUCTIL
I

hx ALTURA DEL MURO


Nivel

hx

Mp

Fx(Fi)

mx(Wi)

ton

ton

ax

Fp

Mto.

ton

ton-m

p mn

As

Refuerzo C/

Cvx

cm

2.55

0.398

17.903

31.07

0.7204

0.191

0.244

0.0017

-0.0013

0.0010

1.20

1 # 3

c/

59

cms

0.507

2.65

0.413

15.435

52.27

0.2373

0.065

0.087

0.0006

-0.0019

0.0010

1.20

1 # 3

c/

59

cms

0.281

GRUPO DE USO
IV
SUPERIOR
III
SUPERIOR
II
BUENO
I
BAJO

Rp
1.5

NO DUCTIL

6.0

DUCTIL

6.0

ESPECIALES

0.5

HUMEDOS

TABLA A.9.5-1

*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*

COEF DE AMPLIFIC DINAMICA ap y tipo de anclajes o amarres requeridos.usado para


para determinar el coef de capacidad de disipacion de enrgia Rp para elem arq y acab

Elemento no Estructural
Fachadas
paneles prefabricados apoyados arriba y abajo
en vidrio apoyados arriba y abajo
lamina en yeso con costillas de acero
mampost reforz,separada lateral apoyada arri/abajo
mampost reforzada, sep lateral/apoyada solo abajo
mampost no reforz,separada lateral apoyada arri/abajo
mampost no reforzada, sep lateral/apoyada solo abajo
mampost no reforzada, confinada por la estructura
muros que cierran puntos fijos y ductos de escaleras/ascen
muros divisorios en areas publicas
muros divisorios de altura total
muros divisorios de altura parcial
aticos parapetos y chimeneas
anclaje de enchape de fachadas
altillos
cielo rasos

ap
superior
1.0
1.0
1.0
1.0
2.5
1.0
2.5
1.0
1.0
1.0
1.0
2.5
2.5
1.0
1.5
1.0

Rp
bueno

Ductiles
Ductiles
No ductiles
Ductiles
Ductiles

No ductiles
No ductiles
No dusctiles
No ductiles
No dusctiles

no permit
no permit
no permit

no permit
no permit
no permit

Ductiles
Ductiles
No ductiles
No ductiles
Ductiles
Ductiles
Ductiles
No ductiles

No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles

PROPIEDADES FISICAS DE LAS UNIDADES DE MAMPOSTERIA ESTRUCTURAL


TIPO
MPa(Kgf/cm2)
cant muestras determinacion
promedio 5 (unidades
unidad esperimental del f'm
Perforacion Horizontal
5.0 (50)
3.5(35) >10
75%
Peforacion Vertical
18 (180)
15(150) 10 y30
80%
Maciza( Ladrillo)
20 (200)
15(150) <30
85%
segn D.3.7.4 (NSR-10
PROPIEDADES FISICAS DE LAS UNIDADES DE MAMPOSTERIA NO ESTRUCTURAL
TIPO
MPa(Kgf/cm2)
promedio 5 (unidades
unidad
Perforacion Horizontal
3.0 (30)
2.0(20)
Peforacion Vertical
14(140)
10(100)
Maciza( Ladrillo)
14(140)
10(100)

f'm

NORMA ICONTEC NTC 4205

bajo
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
No ductiles
humedos
humedos
humedos
humedos
No ductiles
humedos
No ductiles
No requerido

PROYECTO:
ITEM:

CERRAMIENTO PEN
CERRAMIENTO PEN

DATOS:
Aa =

0.15

p=
I=
Cvx =

1.50
1.00
0.332

645.2
0.400
2.50
3.00
0.13
0.12
4.68

x=
Sa =
Rp =
Hm =
G=
a=
Mp =

h=0.01 m
(MUROS DIVISORIOS=1; FACHADAS=2.5)
(Coef. de Importancia)
kN

1.45
Mp (kg) =

m
tn/m3
m
Kg

(Tabla A.9.2 A.9.3) NO DUCTIL


(Altura muro)
(Dendisad mamposteria)
(Ancho muro)

ax = Cvx.Sa/mx.g =
ax > (Aa.I)/2 =
Fp =

0.206

<

2.Sa

0.2058

>

0.075

ax.ap.g.Mp/Rp
Fp =

>
>

0.58

Revisin Anclaje de =
Ab =
fc =
fs =
As =
N=

72
21
420
72
1

Hm = 2.90
Fp (kg)
0.58
4.68

Ma=

0.86

Kg.m

0.80
A-9-2

Cumple

A-9-1

Cumple

Aa.I.g.Mp/2
0.351

3/8

mm2
Mpa
MPa
mm2
cant xml

Calculo de traccin:
Pns = .Ab.fs.N =
Pnc = x0.23xAsxNx(fc)^.5 =

27216.00 N
49.33 N

=0.90
=0.65

Vns = 0.75xAbxfsxN =
22680.00 N
Vnc = 0.65x0.67xAbxNx(f`c)^0.5 =
143.69 N

=0.75
=0.65

Calculo de cortante:

Chequeo Traccin y Cortante combinados:


(C.23-13)

Vu/Vnc =

0.004

(C.23-14)

Pu/Pnc =

0.009

(C.23-15)

(Pu/Pnc)^2 + (Vu/Vnc)^2 =

0.000

(C.23-16)

(Pu/Pns)^2 + (Vu/Vns)^2 =

0.0000

<
<
<
<

Cumple

Cumple

Cumple

Cumple

EDUARDO ORTIZ TAPIA


ING. SUELOS Y ESTRUCTURAS.
_________________________________________________________________________________________________.

_________________________________________________________________________________________________
BOGOTA D.C.