Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Producto Principal
KILOGRAMO
1,142,000
KILOGRAMO
1,095,000
Producto Principal
65
75
85
95
100
1.00
1.00
1.00
RUBRO
Subproducto
592,000
547,000
Subproducto
65 %
80 %
100 %
100 %
100 %
%
%
%
%
%
Terreno
Construccion
Maq. y Equipos
Intalacion y Montaje
Puesta en Marcha
Traslado
CAPITAL DE TRABAJO
Insumos
Mano de Obra
Insumos
TOTAL
Participacion %
11.90
5.25
5.25
0.00
100.00
0.00
PLAN DE INVERSIONES
(En Bolivares)
Aporte
APORTE
Otras
Propio
BANDES
Fuentes
500,000
0
1,200,000
0
275,000
2,040,500
0
25,000
10,000
0
0
0
250,000
150,000
250,000
2,635,000
37.46
375,000
1,582,145
377,355
4,400,000
62.54
0
0
0
0
0
0
0
0
0
0
0
0.00
Ao 1
818,976
444,569
318,600
%
90.00 %
10.00 %
Ao 2
982,771
533,483
382,320
Ao 3
1,179,325
640,180
458,784
Ao 4
1,415,190
768,216
550,541
Ao 5
1,698,228
921,859
660,649
Cohef. Insm./Prodc.
0.0350
0.0200
0.0750
0.0550
0.0080
Ao 1
57,470
32,840
123,150
90,310
13,136
Ao 2
68,964
39,408
147,780
108,372
15,763
Ao 3
82,757
47,290
177,336
130,046
18,916
Ao 4
99,308
56,748
212,803
156,055
22,699
Ao 1
122,846
Ao 2
122,846
Ao 4
122,846
Ao 5
122,846
Ao 3
122,846
ACTIVOS FIJOS
Monto Crdito:
Plazo:
Inters
Periodode Gracia:
Intereses diferidos:
2,065,500
10
15
3
0
RUBRO
Terreno
Construccion
Maq. y Equipos
Intalacion y Montaje
Puesta en Marcha
Traslado
CAPITAL DE TRABAJO
Insumos
Mano de Obra
Insumos
Ao 5
119,170
68,098
255,364
187,266
27,239 TOTAL
Participacion %
Inversion
Total(Bs.)
1,200,000
2,315,500
25,000
10,000
0
625,000
1,732,145
627,355
6,535,000
Vida
ACTIVOS CIRCULANTES
Monto Crdito:
Bs.
Plazo:
(aos)
Inters
%
Perio.de Grac.:
(aos)
Int. diferidos:
aos de diferim. de Comisin Financ.
2,334,500
10
11
1
0
9
PGINA N 2 DE 48
Comisin Financ.
9 % no diferida
ESTRUCTURA DE COSTOS
INSTALACION
(En Bolvares)
AO 1
COSTO PRIMO
Materia Prima
Otros Materiales Directos
Mano Obra Directa
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
5,608,713
3,736,688
889,688
818,976
6,510,524
4,311,563
1,026,563
982,771
7,446,077
4,886,438
1,163,438
1,179,325
8,422,120
5,461,313
1,300,313
1,415,190
9,080,200
5,748,750
1,368,750
1,698,228
9,080,200
5,748,750
1,368,750
1,698,228
9,080,200
5,748,750
1,368,750
1,698,228
9,080,200
5,748,750
1,368,750
1,698,228
9,080,200
5,748,750
1,368,750
1,698,228
GASTOS DE FABRICACIN
Mano Obra Indirecta
Materiales Indirectos
Combustible
Electricidad
Repuestos - Mantenimiento
Otros Gastos de Fab.
Amortizacin
Depreciacin
925,997
444,569
82,381
47,075
176,531
129,456
18,830
1
183
1,104,630
533,483
97,708
55,833
209,374
153,541
22,333
1
183
1,314,633
640,180
115,333
65,905
247,142
181,237
26,362
1
183
1,562,285
768,216
135,717
77,553
290,822
213,269
31,021
1
183
1,687,545
921,859
135,717
77,553
290,822
181,237
31,021
1
183
1,687,545
921,859
135,717
77,553
290,822
181,237
31,021
1
183
1,687,545
921,859
135,717
77,553
290,822
181,237
31,021
1
183
1,687,545
921,859
135,717
77,553
290,822
181,237
31,021
1
183
1,687,545
921,859
135,717
77,553
290,822
181,237
31,021
1
183
454,843
318,600
149
122,846
520,474
382,320
149
122,846
599,232
458,784
149
122,846
693,742
550,541
149
122,846
807,153
660,649
149
122,846
807,153
660,649
149
122,846
807,153
660,649
149
122,846
807,153
660,649
149
122,846
807,153
660,649
149
122,846
GASTOS FINANCIEROS
Intereses Foncrei
Intereses dif.
Interes Cap. Trab.
616,965
598,995
0
0
616,965
598,995
0
0
616,965
598,995
0
0
616,965
598,995
0
0
580,781
563,865
0
0
534,103
518,547
0
0
473,889
460,086
0
0
396,213
384,673
0
0
296,011
287,389
0
0
7,606,518
7,500 cap. util. %
1,095,000
65%
1.00
711,750
1.00
12
355,550.0
5
1.00
1.0000
1.00
0.0000
1.00
0.9000
0.1000
8,752,593
9,976,907
11,295,112
12,155,679
12,109,001
12,048,787
11,971,111
11,870,909
75%
821,250
12
437,600.0
5
1.0000
1.00000
85%
930,750
12
547,000.0
5
95%
1,040,250
12
547,000.0
5
100%
1,095,000
12
547,000.0
5
1,095,000
12
547,000.0
5
1,095,000
12
547,000.0
5
1,095,000
12
547,000.0
5
1,095,000
12
547,000.0
5
1.03
PGINA N 3 DE 48
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
INGRESOS
VENTAS
0.98
10,112,375
11,802,140
13,625,920
14,913,640
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
COSTO PRIMO
GASTOS DE FABRIC.
GSTOS ADMON.Y VENTAS
GASTOS FINANCIEROS
5,608,713
925,997
454,843
616,965
6,510,524
1,104,630
520,474
616,965
7,446,077
1,314,633
599,232
616,965
8,422,120
1,562,285
693,742
616,965
9,080,200
1,687,545
807,153
580,781
9,080,200
1,687,545
807,153
534,103
9,080,200
1,687,545
807,153
473,889
9,080,200
1,687,545
807,153
396,213
9,080,200
1,687,545
807,153
296,011
7,606,518
8,752,593
9,976,907
11,295,112
12,155,679
12,109,001
12,048,787
11,971,111
11,870,909
UTILIDAD BRUTA
2,505,857
3,049,547
3,649,013
3,618,528
3,401,821
3,448,499
3,508,713
3,586,389
3,686,591
ISLR
1,252,929
1,524,774
1,824,507
1,809,264
1,700,911
1,724,250
1,754,357
1,793,195
1,843,296
UTILIDAD NETA
1,252,928
1,524,773
1,824,506
1,809,264
1,700,910
1,724,249
1,754,356
1,793,194
1,843,295
EGRESOS
CAPACIDAD DE PAGO
INSTALACION
(En Bolvares)
AO 1
FUENTES
Ingresos por Ventas
Depreciacin y Amortizacin
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
10,112,375
11,802,140
13,625,920
14,913,640
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
333
333
333
333
333
333
333
333
333
TOTAL
USOS
10,112,708
11,802,473
13,626,253
14,913,973
15,557,833
15,557,833
15,557,833
15,557,833
15,557,833
7,606,518
8,752,593
9,976,907
11,295,112
12,155,679
12,109,001
12,048,787
11,971,111
11,870,909
1,252,929
1,524,774
1,824,507
1,809,264
1,700,911
1,724,250
1,754,357
1,793,195
1,843,296
8,859,447
10,277,367
11,801,414
13,104,376
13,856,590
13,833,251
13,803,144
13,764,306
13,714,205
1,253,261
1,525,106
1,824,839
1,809,597
1,701,243
1,724,582
1,754,689
1,793,527
1,843,628
0
0
0
0
0
0
121,139
0
156,269
0
201,587
0
260,048
0
335,461
0
432,745
0
TOTAL
Disponi. P/Amort.
Amort. Foncrei
Amort. Cap. Trab.
PGINA N 4 DE 48
Disponible AO
1,253,261
1,525,106
1,824,839
1,688,458
1,544,974
1,522,995
1,494,641
1,458,066
1,410,883
AO 0
TERRENO
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
500,000
CONSTRUCCIONES
1,200,000
MAQUINARIA Y EQUIPO
4,672,645
Import.CIF Planta
2,315,500
Nacional
2,357,145
637,355
25,000
CAPITAL DE TRABAJO
Efectivo(1 Mes)
MateriaPrima Nacional
4,765,167
5,498,270
6,231,372
6,964,475
7,331,025
7,331,025
7,331,025
7,331,025
MateriaPrima Importada
1,466,648
1,759,978
2,111,974
2,534,369
3,041,242
3,041,242
3,041,242
3,041,242
162,961
195,553
234,664
281,597
337,916
337,916
337,916
337,916
Comb.
48,487
57,508
67,882
79,880
79,880
79,880
79,880
79,880
Electricidad
181,827
215,655
254,556
299,547
299,547
299,547
299,547
299,547
Repues. p/Mant.
133,340
158,147
186,674
219,667
186,674
186,674
186,674
186,674
19,395
23,003
27,153
31,952
31,952
31,952
31,952
31,952
126,531
126,531
126,531
126,531
126,531
126,531
126,531
126,531
7,035,000
6,904,356
8,034,645
9,240,806
10,538,018
11,434,767
11,434,767
11,434,767
11,434,767
10,112,375
11,802,140
13,625,920
14,913,640
15,557,500
15,557,500
15,557,500
15,557,500
3,208,019
3,767,495
4,385,114
4,375,622
4,122,733
4,122,733
4,122,733
4,122,733
ACTIVOS INTANGIBLES
INSTALACIN Y MONTAJE
COSTOS OPERATIVOS
TOTAL EGRESOS
INGRESOS
SALDO
(7,035,000)
PGINA N 5 DE 48
TIR Financiero:
53.72%
AO 0
TERRENO
AO 1
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
500,000
1,200,000
675,000
Import.CIF Planta
275,000
Nacional
400,000
260,000
INSTALACIN Y MONTAJE
CAPITAL DE TRABAJO
Efectivo(1 Mes)
4,765,167
5,498,270
6,231,372
6,964,475
7,331,025
7,331,025
7,331,025
7,331,025
1,466,648
1,759,978
2,111,974
2,534,369
3,041,242
3,041,242
3,041,242
3,041,242
162,961
195,553
234,664
281,597
337,916
337,916
337,916
337,916
Combustible
48,487
57,508
67,882
79,880
79,880
79,880
79,880
79,880
Electricidad
181,827
215,655
254,556
299,547
299,547
299,547
299,547
299,547
133,340
158,147
186,674
219,667
186,674
186,674
186,674
186,674
19,395
23,003
27,153
31,952
31,952
31,952
31,952
31,952
126,531
126,531
126,531
126,531
126,531
126,531
126,531
126,531
Gastos Financieros
616,965
616,965
616,965
616,965
580,781
534,103
473,889
396,213
ISLR
1,252,929
1,524,774
1,824,507
1,809,264
1,700,911
1,724,250
1,754,357
1,793,195
Amortizacin
121,139
156,269
201,587
260,048
335,461
CONSTRUCCIONES
MAQUINARIA Y EQUIPO
ACTIVOS INTANGIBLES
COSTOS OPERATIVOS
PGINA N 6 DE 48
TOTAL EGRESOS
2,635,000
8,774,250
10,176,384
11,682,278
13,085,386
13,872,728
13,894,707
13,923,061
13,959,636
10,112,375
11,802,140
13,625,920
14,913,640
15,557,500
15,557,500
15,557,500
15,557,500
1,338,125
1,625,756
1,943,642
1,828,254
1,684,772
1,662,793
1,634,439
1,597,864
INGRESOS
SALDO
(2,635,000)
TIR Inversionista:
PUNTO DE EQUILIBRIO
(En Bolivares)
CONCEPTO
Costos Fijos
Costos Variables
Ventas
C V / Ventas
1 - C V / Ventas
Pto. de Equilibrio (En Unidades)
Pto. de Equilibrio (En Bolvares)
Pto. de Equilibrio (En %)
Costos Total
CAPITAL DE TRABAJO NECESARIO
Efectivo(1 Mes)
Inv. de M.P.(1 Mes)
Inv.de P.T.(1 Mes)
Ctas por cobrar(15 Dias)
Ctas por pagar(15 Dias)
60.28%
AO 1
17%
29%
46%
23%
-14%
AO 2
AO 3
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
1,811,767
5,794,751
2,017,405
6,735,188
2,261,849
7,715,058
2,552,858
8,742,254
2,790,654
9,365,025
2,742,576
9,366,425
2,680,555
9,368,232
2,600,549
9,370,562
2,497,341
9,373,568
10,112,375
11,802,140
13,625,920
14,913,640
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
0.57
0.43
1,300
4,213,412
41.67
7,606,518
1,386,071
236,751
397,097
633,848
316,924
(198,549)
0.57
0.43
1,431
4,691,640
39.75
8,752,593
1,594,290
271,165
458,189
729,354
364,677
(229,095)
0.57
0.43
1,575
5,260,114
38.60
9,976,907
1,818,809
312,099
519,281
831,380
415,690
(259,641)
0.59
0.41
1,904
6,226,483
41.75
11,295,112
2,062,891
360,858
580,373
941,231
470,616
(290,187)
0.60
0.40
2,152
6,976,635
44.84
12,155,679
2,226,903
402,026
610,919
1,012,945
506,473
(305,460)
0.60
0.40
2,115
6,856,440
44.07
12,109,001
2,217,178
398,136
610,919
1,009,055
504,528
(305,460)
0.60
0.40
2,067
6,701,388
43.07
12,048,787
2,204,633
393,118
610,919
1,004,037
502,019
(305,460)
0.60
0.40
2,006
6,501,373
41.79
11,971,111
2,188,450
386,645
610,919
997,564
498,782
(305,460)
0.60
0.40
1,926
6,243,353
40.13
11,870,909
2,167,575
378,295
610,919
989,214
494,607
(305,460)
53.72
56.72
59.72
ANALISIS DE SENSIBILIDAD
CRITERIOS DE DECISION
- RENTABILIDAD
- TIEMPO DE RECUPERACIN DE LA INVERSIN
- VALOR ACTUAL NETO
- TASA BENEFICIO-COSTO
- TIR Financiero
- TIR Inversionista
- Cap de pago (Bs.)
- Pto. de equlibrio %
Inflacion de costos
Decremento de Ingresos
TASAS DE DESCUENTO (EJE DE X)
Situacion Proyecto
25.67%
3.90 Aos
23,360,241 (Bs.)
1.32
53.72%
60.28%
1,253,261
41.670
3.35 %
1.87 %
3
35.72
Inflacion costos:(10%)
16.80%
5.95 Aos
1,296,239 (Bs.)
1.15
16.83%
44.68%
29.69%
209,338
43.076
38.72
41.72
Decremento Ingresos:(10%)
14.05%
7.11 Aos
1,112,857 (Bs.)
1.14
28.54%
38.39%
24.62%
184,510
44.377
44.72
47.72
50.72
PGINA N 7 DE 48
VALORES ACTUAL NETO (EJE DE Y)
Situacion del Proyecto ( X )
(Y) A
Inflacion de costos
(Y) B
Decremento de Ingresos
(Y) C
2,413,182
55
1,824,988
58
1,324,520
896,744
64
529,580
213,252
(60,206)
73
(297,321)
(503,477)
114,414
88,311
65,472
45,427
27,783
12,211
(1,566)
(13,780)
(24,630)
55
58
61
64
67
70
73
76
79
53,956
55
14,790
32,464
58
(4,012)
13,725
61
(20,332)
(2,660)
64
(34,535)
(17,024)
67
(46,924)
(29,643)
70
(57,750)
(40,754)
73
(67,226)
(50,553)
76
(75,533)
(59,208)
PUNTO DE EQUILIBRIO
(En Bolivares)
(Segun capacidad Utilizada)
(D)
0%
13%
25%
38%
50%
63%
75%
88%
100%
2,261,849
2,261,849
2,261,849
2,261,849
2,261,849
2,261,849
2,261,849
2,261,849
2,261,849
8.56
8.56
8.56
8.56
8.56
8.56
8.56
8.56
8.56
(C)
1,171,650
2,343,300
3,514,950
4,686,600
5,858,250
7,029,900
8,201,550
9,373,200
(B)
2,261,849
3,433,499
4,605,149
5,776,799
6,948,449
8,120,099
9,291,749
10,463,399
11,635,049
Ingresos
(A)
1,642,500
3,285,000
4,927,500
6,570,000
8,212,500
9,855,000
11,497,500
13,140,000
136,875
273,750
410,625
547,500
684,375
821,250
958,125
1,095,000
13%
25%
38%
50%
63%
75%
88%
100%
136,875
Capacidad Utilizada
(X)
0%
PUNTO DE EQUILIBRIO =
Inversion
Total(Bs.)
Participacin
Porcentaje
Vida Util
No. Aos
Promedio
Vida Util(Aos)
Construccin
1,200,000
18.36%
50
9.18
Maq. y Equipos
2,315,500
35.43%
20
7.09
Intalacion y Montaje
25,000
0.38%
15
0.06
Puesta en Marcha
10,000
0.15%
10
0.02
0.00%
10
0.00
Traslado
Capital de Trabajo
190,071.34 Kg de Ventas
26.70%
PGINA N 8 DE 48
Materiales de transportacin
Equipos de Oficina
Otros Activos
625,000
9.56%
15
1.43
1,732,145
26.51%
20
5.30
627,355
9.60%
10
0.96
6,535,000
99.99%
24.04 (Aos)
13%
24.04
0.09
(0.25)
9.62
11.82
AOS
AOS
711,750 KILOGRAMO
24.04 AOS
3,017,968 Unidades/ao
99.75%
TOTAL
IMPORTADO
NACIONAL
---------------------- ---------------------- ---------------------3,736,688
0
3,736,688
1,263,545
0
1,263,545
184
0
184
1,343,961
1,343,961
6,344,378
0
6,344,378
6,344,378
0
6,344,378
454,843
0
454,843
616,965
0
616,965
7,416,186
0
7,416,186
9,922,043
10,112,375
2,505,857
100%
PGINA N 9 DE 48
Pago al Cap. Nac.
Total Pago a Fact. Nac.
% de Valor Agregado Nacional
2,505,857
2,505,857
9,922,043
100.00%
PGINA N 10 DE 48
Inversion
Total
500,000
1,200,000
2,315,500
25,000
10,000
0
0
625,000
1,732,145
627,355
7,035,000
100.00
Inversion
Ejecutada
500,000
1,200,000
275,000
0
0
0
0
0
0
0
1,975,000
28.07
20
Vida Util
N. Aos
18.36%
35.43%
0.38%
0.15%
0.00%
9.56%
26.51%
9.60%
Promed. Vida
Util(Aos)
50
20
15
10
10
15
20
10
Depreciacion
y/o amortiz.
9.18
7.09
0.06
0.02
0.00
1.43
5.30
0.96
99.99%
Vida Util del Proyecto :
Bs.
aos
%
aos
(aos) de diferim. de int.
% no diferida
23.08 Aos
24,000
115,775
1,667
1,000
0
41,667
86,607
62,736
24,000
PGINA N 11 DE 48
RUBRO
AO 10
AO 11
AO 12
AO 13
AO 14
AO 15
9,080,200
5,748,750
1,368,750
1,698,228
9,080,200
5,748,750
1,368,750
1,698,228
9,080,200
5,748,750
1,368,750
1,698,228
9,080,200
5,748,750
1,368,750
1,698,228
9,080,200
5,748,750
1,368,750
1,698,228
9,080,200
5,748,750
1,368,750
1,698,228
1,687,545
921,859
135,717
77,553
290,822
181,237
31,021
1
183
1,687,544
921,859
135,717
77,553
290,822
181,237
31,021
0
183
1,687,544
921,859
135,717
77,553
290,822
181,237
31,021
0
183
1,687,544
921,859
135,717
77,553
290,822
181,237
31,021
0
183
1,687,544
921,859
135,717
77,553
290,822
181,237
31,021
0
183
1,687,544
921,859
135,717
77,553
290,822
181,237
31,021
0
183
Terreno
Construccin
Maq. y Equipos
Intalacion y Montaje
Puesta en Marcha
Traslado
Capital de Trabajo
Materiales de transportacin
Equipos de Oficina
Otros Activos
TOTAL
Participacion %
Aporte
Propio
500,000
1,200,000
275,000
0
10,000
0
0
250,000
150,000
250,000
APORTE
SOLICITADO
2,635,000
37.46
0
0
2,040,500
25,000
0
0
0
375,000
1,582,145
377,355
Inversion
Total
500,000
1,200,000
2,315,500
25,000
10,000
0
0
625,000
1,732,145
627,355
4,400,000
62.54
7,035,000
100.00
SERVICIO DE LA DEUDA
ACTIVOS FIJOS
(En miles de Bs.)
807,153
660,649
149
122,846
807,089
660,649
87
122,846
807,089
660,649
87
122,846
807,089
660,649
87
122,846
807,089
660,649
87
122,846
807,089
660,649
87
122,846
166,750
161,893
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
11,741,648
11,574,833
11,574,833
11,574,833
11,574,833
11,574,833
1,095,000
12
547,000.0
5
1,095,000
12
547,000.0
5
1,095,000
12
547,000.0
5
1,095,000
12
547,000.0
5
1,095,000
12
547,000.0
5
1,095,000
12
547,000.0
5
Monto Crdito:
Plazo:
Inters
Periodo de Gracia:
Int. diferidos:
Comisin Financ.
Anualidad:
Aos
2,065,500
10
29
3
0
10
720,134
Capital
1
2
3
4
5
6
7
8
9
10
0
0
0
0
0
2,065,500.00
2,065,500.00
2,065,500.00
2,065,500.00
1,944,361.00
1,788,091.69
1,586,504.28
1,326,457
990,996.00
558,250.84
0.00
0.00
0.00
0.00
0.00
Intereses
598,995.00
598,995.00
598,995.00
598,995.00
563,864.69
518,546.59
460,086.24
384,673
287,388.84
161,892.74
0.00
0.00
0.00
0.00
0.00
(miles de Bs.)
(aos)
%
(aos)
(aos) de diferimiento de intereses
% no diferida
(miles de Bs.)
Amortizacion
0.00
0.00
0.00
121,139.00
156,269.31
201,587.41
260,047.76
335,461
432,745.16
558,241.26
0.00
0.00
0.00
0.00
0.00
Cuota
598,995.00
598,995.00
598,995.00
720,134.00
720,134.00
720,134.00
720,134.00
720,134
720,134.00
720,134.00
0.00
0.00
0.00
0.00
0.00
PGINA N 12 DE 48
TOTAL:
DAS
4,772,432.10
0.00
6,837,923.00
SERVICIO DE LA DEUDA
ACTIVOS CIRCULANTE
(En miles de Bs.)
AO 10
AO 11
AO 12
AO 13
AO 14
AO 15
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
9,080,200
1,687,545
807,153
166,750
9,080,200
1,687,544
807,089
0
9,080,200
1,687,544
807,089
0
9,080,200
1,687,544
807,089
0
9,080,200
1,687,544
807,089
0
9,080,200
1,687,544
807,089
0
11,741,648
11,574,833
11,574,833
11,574,833
11,574,833
11,574,833
3,815,852
3,982,667
3,982,667
3,982,667
3,982,667
3,982,667
1,907,926
1,991,334
1,991,334
1,991,334
1,991,334
1,991,334
1,907,926
1,991,333
1,991,333
1,991,333
1,991,333
1,991,333
Monto Crdito:
0
Plazo:
10
Inters
29
Perido deGracia
1
Int. diferidos:
0
Comisin Financ.
8
Anualidad:
0
_______ _____________ _______________
_______ _____________ _______________
Aos
Capital
1
2
3
4
5
6
7
8
9
10
0
0
0
0
0
Intereses
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL:
AO 10
AO 11
AO 12
AO 13
AO 14
AO 15
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
333
270
270
270
270
270
15,557,833
15,557,770
15,557,770
15,557,770
15,557,770
15,557,770
11,741,648
11,574,833
11,574,833
11,574,833
11,574,833
11,574,833
1,907,926
1,991,334
1,991,334
1,991,334
1,991,334
1,991,334
13,649,574
13,566,167
13,566,167
13,566,167
13,566,167
13,566,167
1,908,259
1,991,603
1,991,603
1,991,603
1,991,603
1,991,603
558,241
0
0
0
0
0
0
0
0
0
0
0
(miles de Bs.)
(aos)
%
(aos)
(aos) de diferimiento de intereses
% no diferida
(miles de Bs.)
_______________ _____________
_______________ _____________
Amortizacion
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Cuota
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PGINA N 13 DE 48
1,350,018
1,991,603
1,991,603
1,991,603
1,991,603
1,991,603
NANCIERO
ON
AO 9
AO 10
AO 11
AO 12
AO 13
AO 14
AO 15
7,331,025
7,331,025
7,331,025
7,331,025
7,331,025
7,331,025
7,331,025
3,041,242
3,041,242
3,041,242
3,041,242
3,041,242
3,041,242
3,041,242
337,916
337,916
337,916
337,916
337,916
337,916
337,916
79,880
79,880
79,880
79,880
79,880
79,880
79,880
299,547
299,547
299,547
299,547
299,547
299,547
299,547
186,674
186,674
186,674
186,674
186,674
186,674
186,674
31,952
31,952
31,952
31,952
31,952
31,952
31,952
126,531
126,531
126,531
126,531
126,531
126,531
126,531
11,434,767
11,434,767
11,434,767
11,434,767
11,434,767
11,434,767
11,434,767
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
4,122,733
4,122,733
4,122,733
4,122,733
4,122,733
4,122,733
4,122,733
PGINA N 14 DE 48
NVERSIONISTA
ON
AO 9
AO 10
AO 11
AO 12
AO 13
AO 14
AO 15
7,331,025
7,331,025
7,331,025
7,331,025
7,331,025
7,331,025
7,331,025
3,041,242
3,041,242
3,041,242
3,041,242
3,041,242
3,041,242
3,041,242
337,916
337,916
337,916
337,916
337,916
337,916
337,916
79,880
79,880
79,880
79,880
79,880
79,880
79,880
299,547
299,547
299,547
299,547
299,547
299,547
299,547
186,674
186,674
186,674
186,674
186,674
186,674
186,674
31,952
31,952
31,952
31,952
31,952
31,952
31,952
126,531
126,531
126,531
126,531
126,531
126,531
126,531
296,011
166,750
1,843,296
1,907,926
1,991,334
1,991,334
1,991,334
1,991,334
1,991,334
432,745
558,241
PGINA N 15 DE 48
14,006,819
14,067,684
13,426,101
13,426,101
13,426,101
13,426,101
13,426,101
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
1,550,681
1,489,816
2,131,399
2,131,399
2,131,399
2,131,399
2,131,399
AO 10
AO 11
AO 12
AO 13
AO 14
AO 15
2,364,202
9,377,446
2,192,383
9,382,450
2,192,383
9,382,450
2,192,383
9,382,450
2,192,383
9,382,450
2,192,383
9,382,450
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
15,557,500
0.60
0.40
1,824
5,910,505
37.99
11,741,648
2,140,645
367,523
610,919
978,442
489,221
(305,460)
0.60
0.40
1,691
5,480,958
35.23
11,574,833
2,105,905
353,627
610,919
964,546
482,273
(305,460)
0.60
0.40
1,691
5,480,958
35.23
11,574,833
2,105,905
353,627
610,919
964,546
482,273
(305,460)
0.60
0.40
1,691
5,480,958
35.23
11,574,833
2,105,905
353,627
610,919
964,546
482,273
(305,460)
0.60
0.40
1,691
5,480,958
35.23
11,574,833
2,105,905
353,627
610,919
964,546
482,273
(305,460)
0.60
0.40
1,691
5,480,958
35.23
11,574,833
2,105,905
353,627
610,919
964,546
482,273
(305,460)
62.72
65.72
68.72
71.72
PGINA N 16 DE 48
(683,142)
(840,037)
(977,286)
(1,097,518)
91
(34,286)
(42,893)
(50,574)
(57,438)
82
(66,863)
PGINA N 17 DE 48
PGINA N 18 DE 48
PGINA N 19 DE 48
PGINA N 20 DE 48
Inversion
Ejecutada
60,000,000
1,200,000
275,000
0
0
0
0
0
150,000
0
61,625,000
875.98
FONCREI
Intereses
Diferidos
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PGINA N 21 DE 48
0.00
BANDES
_______________
Intereses
Diferidos
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PGINA N 22 DE 48
PGINA N 23 DE 48
PGINA N 24 DE 48
PGINA N 25 DE 48
PGINA N 26 DE 48
PGINA N 27 DE 48
Igualmente, la capacidad instalada diaria queda definida en: 600 metros de mangueras = , 400 metros = , 300 metr
Estas tuberas y mangueras de aguas blancas, son altamente apropiadas para colocar en sistemas de casas y hogares, riego
Nota: el peso utilizado para el estudio del clculo de la Demanda es de 1,40g/cm3 (aunque ciertas muestras pu
de 110mm pesa aproximadamente 340 kg.
Como se le comento el da de ayer por va telefnica, se requiere pase con urgencia la siguiente in
- Con respecto a las mangueras, de la cantidad total a fabricar (Kg. 1.095.504), desglosar y/o indi
- Igualmente se requiere la misma informacin para las Tuberas (kg 260. 210,64).
DIAM
X
X
X
X
U
U
%
15%
15%
O 10%
O 10%
10%
10%
10%
O 10%
10%
mm
16
20
25
32
50
63
75
90
110
0.060
0.080
0.150
0.360
0.480
0.760
1.060
1.800
3.800
%
15%
15%
10%
10%
10%
10%
10%
10%
10%
DIAM
mm
16
20
25
32
50
63
75
90
110
s = , 400 metros = , 300 metros = 1, 200 metros = 1 , 400 metros = 2 y, para el caso de tubera azul de aguas blancas
r en sistemas de casas y hogares, riego de haciendas y granjas. Dado su rpida y fcil manejo y colocacin, se hace fuertemente competit
g/cm3 (aunque ciertas muestras pueden variar entre 1.37 a 1.40 gr/cm3); lo que es equivalente con unos 1.400 kg/m3. Lo
(Kg. 1.095.504), desglosar y/o indicar el porcentaje a fabricar por tipo de resistencia para cada dimetro.
ESPESOR
PESO POR ML
mm
1.10
1.20
1.70
3.30
3.30
3.50
3.50
5.70
10.00
KG/ML
0.0623
0.0858
0.1506
0.3600
0.5858
0.7916
0.9513
1.8266
3.8013
PRODUCCION
DIARIA POR ML
PRODUCCION
ANUAL EN KG
1,840.00
1,150.00
1,040.00
1,150.00
736.00
437.00
230.00
138.00
69.00
27,511.68
23,680.80
37,589.76
99,360.00
103,475.71
83,023.01
52,511.76
60,496.99
62,949.53
550,599.24
DIAM
ESPESOR
mm
84.40
60 PSI
mm
16
20
25
32
50
63
75
90
110
2.2
2.7
2.9
3.8
3.8
4.8
5.9
6.7
11.4
16.00
20.00
25.00
32.00
50.00
63.00
75.00
90.00
110.00
DIAM
CANTIDAD DE
RROLLOS DIARIOS
ESPESOR
EN MM
VOLMEN
PVC POR
ROLLO (M3)
80.00
50.00
40.00
50.00
32.00
19.00
10.00
6.00
6.00
2.00
2.00
3.00
4.00
3.00
5.00
6.00
9.00
10.00
2.00
2.00
3.00
4.00
3.00
5.00
6.00
9.00
10.00
CANTIDAD DE
RROLLOS DIARIOS
ESPESOR
EN MM
70.00
40.00
30.00
40.00
20.00
15.00
8.00
4.00
4.00
3.00
3.00
4.00
7.00
6.00
10.00
11.00
12.00
13.00
CANTIDAD DE
RROLLOS DIARIOS
ESPESOR
EN MM
mm
16
20
25
32
50
63
75
90
110
6.00
8.00
15.00
36.00
48.00
76.00
106.00
180.00
90 PSI
DIAM
16.00
20.00
25.00
32.00
50.00
63.00
75.00
90.00
110.00
-
150 PSI
DIAM
16.00
20.00
25.00
32.00
50.00
63.00
75.00
90.00
110.00
60.00
30.00
20.00
35.00
15.00
13.00
6.00
3.00
3.00
4.00
4.00
5.00
8.00
9.00
###
12.00
14.00
16.00
era azul de aguas blancas, una produccin diaria de 600 metros = , 600 metros de = , 300 y metros = 1, lo que indica que la
hace fuertemente competitivo, inclusive preferencial, comparado con las del Hierro galvanizado, las cuales distan mucho en cuanto a com
n unos 1.400 kg/m3. Lo que indica aproximadamente que 01 metro cbico de PVC mixto puede producir 425 ml de mang
PESO POR
PRODUCCIN
PRODUCCIN
PESO POR
90 PSI
DIAM
ESPESOR
ML
DIARIA POR ML
ANUAL EN KG
ML
KG
30%
mm
mm
KG
0.119
49,297.68
952.00
27,189.12
16
2.6
0.142
0.183
49,297.68
544.00
23,892.48
20
3.0
0.208
0.252
32,865.12
408.00
24,675.84
25
3.5
0.307
0.421
32,865.12
544.00
54,965.76
32
4.0
0.457
0.689
32,865.12
272.00
44,977.92
50
4.0
0.751
1.097
32,865.12
204.00
53,709.12
63
5.1
1.206
1.601
32,865.12
108.80
41,805.31
75
6.0
1.691
2.192
32,865.12
54.40
28,618.75
90
6.8
2.311
4.414
32,865.12
27.20
28,814.59
110
12.0
4.803
328,651.20
328,648.89
0.12
1.0000
0.18
16.00
0.14
0.25
20.00
0.20
0.42
25.00
0.30
0.60
32.00
0.52
1.10
50.00
0.70
1.60
63.00
1.20
2.20
75.00
1.70
4.40
90.00
2.30
DENSIDAD
(KG/M3)
110.00
-
2.00
2.00
3.00
4.00
3.00
5.00
6.00
9.00
10.00
260,210.64
90 PSI
30%
11,709.48
11,709.48
7,806.32
7,806.32
7,806.32
7,806.32
7,806.32
7,806.32
7,806.32
4.80
78,063.19
= 1, lo que indica que la empresa producir dos tipos de tubera y tres clases de calidad, para cada una de ellas.
n mucho en cuanto a competitividad por precios (no as de calidad industrial).
oducir 425 ml de manguera para riego de = 110mm. Y 100 metros lineales de manguera de riego
1.40 G/CM3
1,400.00 KG/M3
SI
1,095,504.00
150 PSI
20%
32,865.12
32,865.12
21,910.08
21,910.08
21,910.08
21,910.08
21,910.08
21,910.08
21,910.08
219,100.80
1.00 M3 =
PRODUCCIN
DIARIA POR ML
564.00
282.00
188.00
329.00
141.00
122.20
56.40
28.80
28.80
PRODUCCIN
ANUAL EN KG
19,221.12
14,077.44
13,851.84
36,084.72
25,413.84
35,369.57
22,889.38
15,973.63
33,198.34
216,079.88
1,095,328.01
1,095,504.00
X
X=
782.50
PRODUCCION ANUAL =
260,210.64
150 PSI
20%
7,806.32
7,806.32
5,204.21
5,204.21
5,204.21
5,204.21
5,204.21
5,204.21
5,204.21
130,381.31
52,042.13
una de ellas.
1,400.00 KG
1,095,504.00
782.50 M3
ESPESOR
PESO
POR ML
mm
16
mm
1.10
KG/ML
0.0623
PESO
POR
ROLLO
Kg/100m
6.23
ML
1,800.00
PRODUCCION
ANUAL POR
ROLLO
ROLLO
4,320
20
1.20
0.0858
8.58
1,100.00
2,640
25
1.70
0.1506
15.06
1,000.00
2,400
32
3.30
0.3600
36.00
1,100.00
2,640
50
3.30
0.5858
58.58
700.00
1,680
63
3.50
0.7916
79.16
400.00
960
75
3.50
0.9513
95.13
300.00
720
90
5.70
1.8266
182.66
100.00
240
110
10.00
3.8013
380.13
100.00
240
PRODUCCION
DIARIA POR ML
TOTAL KG/AO =
DENSIDAD MEDIA DEL MATERIAL UTILIZADO = 1.210,00 Kg/m3 = 1,21 g/cm3
ESPESOR
PESO
POR ML
mm
16
mm
2.20
KG/ML
0.1190
PESO
POR
ROLLO
Kg/100m
11.90
ML
800.00
PRODUCCION
ANUAL POR
ROLLO
ROLLO
1,920.00
20
2.70
0.1830
18.30
400.00
960.00
25
2.90
0.2520
25.20
300.00
720.00
32
3.80
0.4210
42.10
500.00
1,200.00
50
3.80
0.6890
68.90
200.00
480.00
63
4.80
1.0970
109.70
200.00
480.00
75
5.90
1.6010
160.10
100.00
240.00
90
6.70
2.1920
219.20
100.00
240.00
110
11.40
4.4140
441.40
100.00
240.00
PRODUCCION
DIARIA POR ML
TOTAL KG/AO =
DENSIDAD MEDIA DEL MATERIAL UTILIZADO = 1.250,00 Kg/m3 = 1,25 g/cm3
ESPESOR
PESO
POR ML
mm
16
mm
2.60
KG/ML
0.1420
PESO
POR
ROLLO
Kg/100m
14.20
ML
400.00
PRODUCCION
ANUAL POR
ROLLO
ROLLO
960.00
20
3.00
0.2080
20.80
100.00
240.00
25
3.50
0.3070
30.70
100.00
240.00
32
4.00
0.4570
45.70
100.00
240.00
50
4.00
0.7510
75.10
100.00
240.00
63
5.10
1.2060
120.60
100.00
240.00
75
6.00
1.6910
169.10
50.00
120.00
90
6.80
2.3110
231.10
25.00
60.00
110
12.00
4.8030
480.30
25.00
60.00
PRODUCCION
DIARIA POR ML
TOTAL KG/AO =
DENSIDAD MEDIA DEL MATERIAL UTILIZADO = 1.300,00 Kg/m3 = 1,30 g/cm3
PESO
POR ML
PESO
POR
TUBO /
6M)
mm
KG/ML
Kg/TUBO
ML
UND.
20
3.00
0.2243
1.3458
1,200.00
48,000.00
25
3.20
0.3068
1.8408
600.00
24,000.00
32
3.50
0.4387
2.6322
1,440.00
57,600.00
DIAM
mm
PRODUCCION
DIARIA POR ML
PRODUCCION
ANUAL POR
TUBOS DE 6M
PESO
POR ML
PESO
POR
TUBO /
6M)
mm
KG/ML
Kg/TUBO
ML
UND.
20
2.80
0.2043
1.2258
1,500.00
60,000.00
25
3.00
0.2799
1.6794
800.00
32,000.00
32
3.30
0.4017
2.4102
1,500.00
60,000.00
DIAM
mm
PRODUCCION
DIARIA POR ML
PRODUCCION
ANUAL POR
TUBOS DE 6M
AS Y TUBERAS
PRODUCCION
ANUAL EN KG
KG
26,913.60
22,651.20
36,144.00
95,040.00
98,414.40
75,993.60
68,493.60
43,838.40
91,231.20
558,720.00
m3 = 1,21 g/cm3
PRODUCCION
ANUAL EN KG
m3 = 1,25 g/cm3
KG
22,848.00
17,568.00
18,144.00
50,520.00
33,072.00
52,656.00
38,424.00
52,608.00
105,936.00
391,776.00
AS Y TUBERAS
PRODUCCION
ANUAL EN KG
KG
13,632.00
4,992.00
7,368.00
10,968.00
18,024.00
28,944.00
20,292.00
13,866.00
28,818.00
146,904.00
m3 = 1,30 g/cm3
PRECIO POR
TUBERIA
Bs/Ud
m3 = 1,40 g/cm3
55.00
75.00
94.00
AS Y TUBERAS
PRECIO POR
TUBERIA
Bs/Ud
m3 = 1,35 g/cm3
55.00
75.00
94.00