Documentos de Académico
Documentos de Profesional
Documentos de Cultura
COSTOS
DESCRIPCION
POTENCIA
CAPACIDAD
PESO (KG)
COSTO DE
POSESION
(S/.) (A)
COSTO DE
OPERACIN
(S/.) (B)
COSTO DE
HORARIO
(S/.) (A+B)
OBSERV.
76 HP
125-175 PCM
2,000
6.56
57.62
COMPRENSORAN NEUMATICAS
87 HP
250-330 PCM
2,300
10.71
66.94
77.65
COMPRENSORAN NEUMATICAS
93 HP
335-375 PCM
2,500
15.97
89.53
105.50
COMPRENSORAN NEUMATICAS
150 HP
380-590 PCM
3,500
17.97
106.60
124.57
COMPRENSORAN NEUMATICAS
196 HP
600-690 PCM
5,000
21.63
150.80
172.43
COMPRENSORAN NEUMATICAS
240 HP
700-800 PCM
6,500
24.96
181.34
206.30
21-24 KG
24
3.65
0.96
4.61
(**)
25-29 KG
29
3.09
0.82
3.91
(**)
185 CC
26
5.81
4.24
10.05
660-690 PCM
6,000
45.64
31.03
76.67
110-135 HP
2.0-2.25 Yd3
16.275
74.93
129.52
204.45
150-180 HP
2.5-275 Yd
18.387
83.74
171.1
254.84
190-225 HP
3.2-375 Yd3
25.173
107.03
203.96
310.99
245 HP
28.000
131.6
222.71
354.31
MARTILLOS NEUMATICOS
MARTILLOS NEUMATICOS
MOTOPERFORADORA
1400 RPM
64.18
(**)
4.0-6.0Yd
80-95 HP
1.5-1.75 Yd
9.031
46.33
86.94
133.27
100-115 HP
2.0-2.35 Yd3
10.308
49.91
99.61
149.52
100-125 HP
11.500
51.69
100.82
152.51
16.584
57.06
119.49
176.55
18.585
64.11
141.92
206.03
20.826
74.71
163.52
238.24
2.50 Yd
125-155 HP
3.0 Yd
160-195 HP
3.5 Yd
200-250 HP
4.0-4.1 Yd
200-260 HP
22.000
106.19
166.52
272.71
260-300 HP
5.0-5.50 Yd3
31.105
140.75
199.08
339.83
375 HP
49.738
161.75
259.56
421.31
276.12
4.6 Yd
8.0 Yd
MOTOTRAILLAS AUTOCARGABLES
140-210 HP
11.0 Yd
14.200
124.86
151.26
MOTOTRAILLAS AUTOCARGABLES
210-300 HP
16.0 Yd3
20.600
114.67
212.43
327.1
MOTOTRAILLAS AUTOCARGABLES
310-350 HP
23.0 Yd
32.800
105.91
250.54
356.45
MOTOTRAILLAS CARGABLES
310-400 HP
14-20 Yd3
20.000
110.00
271.78
381.78
MOTOTRAILLAS CARGABLES
405-480 HP
21-31 Yd3
15.500
150.86
320.8
471.66
58 HP
9.000
30.26
69.25
99.51
120.31
8.000
32.03
88.28
80-110 HP
0.50-1.3 Yd3
17.300
52.21
102.49
154.7
115-165 HP
0.75-1.60 Yd
24.300
83.67
132.54
216.21
170-250 HP
1.10-2.75 Yd3
33.800
120.85
193.08
313.93
325 HP
2.0-3.8 Yd3
61.600
169.84
255.13
424.97
330 HP
65.000
150.47
258.98
409.45
385 HP
3.5 Yd
70.000
207.38
250.34
459.72
70 HP
0.5 Yd3
2.600
17.63
49.31
66.94
62 HP
1 Yd
1 Yd
2.5 Yd
(*)
60-70 HP
6.711
43.26
85.59
128.85
75-100 HP
9.090
49.34
107.8
157.14
105-135 HP
12.300
95.11
128.25
223.36
140-160 HP
14.900
95.11
153.84
248.95
160-180 HP
14.900
114.41
175.83
290.24
180-190 HP
14.900
120.85
187.16
308.01
190-240 HP
20.520
132.22
208.66
340.88
270-295 HP
21.863
159.7
249
408.7
300-330 HP
31.980
171.39
259.61
431
335-410 HP
37.170
200.56
356.03
556.59
415-470 HP
52.007
220.37
395.84
616.21
510HP
54.760
231.25
439.91
668.16
650 HP
70.320
342.8
523.14
865.94
200-250 HP
20.500
133.77
165.32
299.09
300-350 HP
30.380
210.6
230.38
440.98
400-500 HP
46.355
325.39
311.68
637.07
EQUIPOS DE COMPACTACION
VIBRADOR DE CONCRETO
4 HP
1.25 Plg.
1.49
3.66
5.15
(*)
VIBRADOR DE CONCRETO
4 HP
1.50 Plg.
1.53
3.75
5.28
(*)
VIBRADOR DE CONCRETO
4 HP
2.4 Plg.
1.62
3.83
5.45
(*)
4 HP
95
1.83
20.4
22.23
5.8 HP
145
2.1
21.75
23.85
7 HP
160
3.51
23.29
26.8
800
5.19
25.53
30.72
96.78
10.8 HP
0.8-1.1 Tn.
70-100 HP
7-9 Tn.
7,300
18.4
78.38
101-135 HP
10-12 Tn.
11,100
40.2
108.9
149.1
136-170 HP
15-17 Tn.
13,700
53.23
134.29
187.52
210 HP
19-23 Tn.
19,600
56.8
156.8
213.6
50-80 HP
4-5.5 Tn.
5,500
6.76
42.13
48.89
60-80 HP
3.0-5.0 Tn.
3,700
34.55
53.48
88.03
81-100B HP
5.5-20 Tn.
5,500
47.11
64.62
111.73
127 HP
8.24 Tn.
8,000
49
79.41
128.41
135 HP
9.00 Tn.
8,000
50.11
83.26
133.37
84 HP
8.1 Tn.
8,200
11.27
67.8
79.07
100-135 HP
11-13 Tn.
11,300
41.55
109.21
150.76
136-180 HP
15-17 Tn.
15,300
57.92
128.67
186.59
210 HP
20-22 Tn.
21,500
62.64
157.57
220.21
30-57 HP
3.5 Tn.
3,700
5.09
40.93
46.02
58-70 HP
5.8 Tn.
5,800
7.26
52.74
60
70-100 HP
8.14 Tn.
8,800
12.16
66.67
78.83
130 HP
11,900
10.17
178.87
189.04
133HP
11,500
10.29
192.1
202.39
80 HP
5,000
11.08
64.32
75.4
115 HP
6,500
12.86
83.17
96.03
158 HP
7,000
20.25
109.56
129.81
19,000
27.86
22.37
50.23
(**)
21,000
128.29
57.68
185.97
(**)
M.E 30 HP
M.E 150 HP
46-70 Tn/Hr.
M.E 30 HP
46-70 Tn/Hr.
22,000
45.73
20.81
66.54
(**)
M.E 75 HP
46-70 Tn/Hr.
23,000
51.47
23.37
74.84
(**)
66.37
30.03
96.4
(**)
39,000
144.36
64.77
209.13
(***)
M.E 200 HP
M.E 200 HP
M.E 40 HP
7,000
20.58
29.47
50.05
M.E 3 HP
150.00 Tn/Hr.
4,000
3.52
2.1
5.62
(*)
M.E 3 HP
150.00 Tn/Hr.
4,000
3.52
2.1
5.62
(*)
M.E 5 HP
550.00 Tn/Hr.
7,800
5.13
3.12
8.25
(*)
M.E 5 HP
550.00 Tn/Hr.
12,000
5.13
3.12
8.25
(*)
M.E 7.5 HP
800.00 Tn/Hr.
2,700
5.49
3.08
8.57
(*)
DOSIFICADORA DE CONCRETO
M.E 40 HP
50 M3/Hr.
17,000
26.46
53.84
80.3
(***)
DOSIFICADORA DE CONCRETO
M.E 45 HP
50-90 M3/Hr.
20,000
40.59
62.7
103.29
(***)
DOSIFICADORA DE CONCRETO
M.E 60 HP
120 M3/Hr.
23,000
50.22
65.87
116.09
(***)
8 HP
9 Pie3
500
1.71
1.52
3.23
(**)
18 HP
10 Pie3
1,500
4.22
3.22
7.44
(**)
18 HP
11-13 Pie3
1,500
4.93
4.65
9.58
(**)
20-35 HP
16 Pie3
2,700
8.21
18.28
26.49
(**)
125 HP
11,515
54.25
108.82
163.07
MOTONIVELADORA
130-135 HP
12,365
58.33
113.35
171.68
MOTONIVELADORA
145-150 HP
13,540
70.84
132.18
203.02
MOTONIVELADORA
180-200 HP
18,370
76.01
140.06
216.07
1.81
59.2
61.01
Gln
2,100
10-20 HP
7 Plg. Lon.
1,000
6.44
40.91
47.35
468 Pie3
5,700
11.66
6.97
18.63
(**)
SECADOR DE ARIDOS
M.E 50 HP
30-64 Tn/Hr.
8,000
18.87
12.29
31.16
(**)
SECADOR DE ARIDOS
M.E 70 HP
60-115 Tn/Hr.
8,500
28.07
18.27
46.34
(**)
150 Tn/Hr.
46,800
180.26
119.72
299.98
(****)
60 Tn/Hr.
35,350
154.18
74.74
228.92
(****)
(****)
COCINA DE ASFALTO
BARREDORA MECANICA
CALENTADOR DE ACEITE 48-S
90-120 Tn/Hr.
62,000
302.41
146.62
449.03
105 HP
10 Plg.
12,000
53.37
77.99
131.36
224 HP
10 Plg.
12,000
108.92
156.03
264.95
RECICLADORA EN FRIO
396 HP
295 Kw
22,000
317.71
316.3
634.01
(*)
FRESADORA
565 HP
421 Kw
30,000
370.11
433.2
803.31
(*)
148 HP
3 Pasajeros
2,730
9.15
78.42
87.57
170 HP
5 Pasajeros
2,730
12.95
88.92
101.87
90 HP
3 Pasajeros
1,500
9.64
51.7
61.34
118 HP
5 Pasajeros
1,450
10.24
58.84
69.08
84 HP
5 Pasajeros
1,250
6.24
50.68
56.92
CAMION IMPRIMADOR
210 HP
2000 gln
13,500
40.89
126.92
167.81
122 HP
1500 gln
9,900
35.93
100.34
136.27
145-165 HP
2000 gln
13,000
40.85
115.69
156.54
178-210 HP
3000 gln
19,000
46.32
140.84
187.16
VEHICULOS
122 HP
2000 gln
13,000
51.22
101.27
152.49
178-210 HP
2000 gln
13,000
46.85
140.52
187.37
178-210 HP
4 M3
13,000
54.34
144.5
198.84
300 HP
8 M3
26,000
73.52
196.14
269.66
330 HP
10 M3
26,000
76.26
207.37
283.63
330 HP
12 M3
26,000
80.37
209.78
290.15
145-240 HP
12 M3
25,000
70.79
126.82
197.61
145-240 HP
13 M3
25,000
73.52
128.66
202.18
178-240 HP
2000 gln
13,500
59.83
164.54
224.37
122 HP
8 Tn.
13,000
40.06
97.08
137.14
178-210 HP
12 Tn.
19,000
47.94
143.13
191.07
300 HP
19 Tn.
26,000
70.94
194.75
265.69
SEMI-TRAYLER 6x4
330 HP
35 Tn.
42,600
51.78
198.61
250.39
330 HP
40 Tn.
54,420
52.02
198.84
250.86
120-140 HP
4 M3
11,500
27.05
109.1
136.15
140-210 HP
6 M3
15,000
32.51
141.56
174.07
210-280 HP
10 M3
19,000
40.73
170.79
211.52
300 HP
10 M3
26,000
44.56
192.52
237.08
330 HP
12 M3
26,000
48.94
194.9
243.84
330 HP
15 M3
26,000
59.34
200.26
259.6
SEMI-TRAYLER 6x5
EQUIPOS DIVERSOS
GRUPO ELECTROGENO
38 HP
20 Kw
500
2.76
22.83
25.59
(*)
GRUPO ELECTROGENO
58 HP
37.5 Kw
720
3.1
63.65
66.75
(*)
GRUPO ELECTROGENO
89 HP
50 Kw
1,150
3.6
114.23
117.83
(*)
GRUPO ELECTROGENO
116 HP
75 Kw
1,500
4.09
136.18
140.27
(*)
GRUPO ELECTROGENO
140 HP
90 Kw
1,500
4.62
150.13
154.75
(*)
GRUPO ELECTROGENO
230 HP
150 Kw
1,700
6.1
166.85
172.95
(*)
GRUPO ELECTROGENO
380 HP
250 Kw
2,000
12.9
188.19
201.09
(*)
GRUPO ELECTROGENO
480 HP
300 Kw
2,700
13.54
237.49
251.03
(*)
MONTACARGAS
68 HP
3 Tn.
3,500
10.78
58.46
69.24
MONTACARGAS
80 HP
5 Tn.
5,200
17.84
67.5
85.34
MONTACARGAS
94 HP
7.5 Tn.
8,150
24.28
79.57
103.85
MOTOBOMBAS (Gasolina)
3.5 HP
2 Plg.
9,150
0.16
5.56
5.72
(*)
MOTOBOMBAS (Gasolina)
5 HP
3 Plg
90
0.17
7.19
7.36
(*)
MOTOBOMBAS (Gasolina)
7-10 HP
3-4 Plg
135
0.27
8.84
9.11
(*)
MOTOBOMBAS (Petrleo)
12 HP
4 Plg
135
11.35
11.33
22.68
(*)
MOTOBOMBAS (Petrleo)
17 HP
6 Plg
295
14.33
17.72
32.05
(*)
MOTOBOMBAS (Petrleo)
34 HP
8 Plg
340
28.68
34.65
63.33
(*)
AUTOHORMIGUERAS 2.5 FX
85 HP
2.5 m3
500
10.5
68.52
79.02
AUTOHORMIGUERAS 3.5 T4
85 HP
3.5 m3
5,300
12.28
70.67
82.95
AUTOHORMIGUERAS 3.5 TT
111 HP
3.5 m3
7,300
13.36
79.4
92.76
AUTOHORMIGUERAS 5.5 XL
150 HP
5.5 m3
7,350
15.86
100.55
116.41
TORRES DE ILUMINACION
4 Kw
1,590
0.85
20.99
21.84
(*)
TORRES DE ILUMINACION
5 Kw
1,590
1.21
21.73
22.94
(*)
TORRES DE ILUMINACION
6 Kw
1,590
1.21
21.73
22.94
(*)
TORRES DE ILUMINACION
8 Kw
1,950
2.21
27.28
29.46
(*)
4.17
0.00
4.17
(*)
295 A
MONOFASICO
2.55
0.00
2.55
(*)
1 7/8"
3.07
0.00
3.07
(*)
220 Vol
5.15
0.00
5.15
(*)
1.58
0.00
1.58
(*)
3.18
0.00
3.18
(*)
0.26
0.00
0.26
(*)
1.02
0.00
1.02
(*)
3.83
0.00
3.83
(*)
0.5 HP
ESMERIL DE BANCO
330 PSI
ELECTRONICO
EQUIPO DE PRECISION
GPS
9.95
0.00
9.95
(*)
12.89
0.00
12.89
(*)
NIVEL TOPOGRAFICO
7.77
0.00
7.77
(*)
MIRA TOPOGRAFICA
0.98
0.00
0.98
(*)
JALONES
0.76
0.00
0.76
(*)
TEODOLITO
ESTACION TOTAL
OBSERVACIONES
Los Precios de costo de Posesin y Operacin han sido calculados en funcin a ficha tecnica obtenidas y proporcionadas por proveedores
de Equipos y Maquinarias. Las tarifas de Precios, Hora Maquinaria u Hora Equipo (Hm, He) estan establecidos por la sumatoria de Costo de
Posesin + Costo de Operacin.
Costo de Posesin inc: Valor de Adquisicin (VA), Valor Residual (VR), Depreciacion (D), Interes (I), Seguro y Almacenaje (S).
Costo de Operacin inc: Consumo de Combustible, lubricantes, filtros, neumaticos, reparacin, mantenimiento y operacin de equipo.
Datos Adicionales
(*) Los Costos de Hm, que han sido marcado con este simbolo, No Incluye: Operador de Equipo.
(**) Los Costos de Hm, que han sido marcado con este simbolo, No Incluye: Operador de Equipo, lubricante, combus, filtro.
(***)Los Costos de Hm, que han sido marcado con este simbolo, No Incluye: Operador de Equipo, lubricante, combus, filtro, fuente de poder.
(****)Los Costos de Hm, que han sido marcado con este simbolo, No Incluye: Operador de planta, lubricante, combus, filtro, fuente de poder.