CONSTRUCCIN
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
PRELIMINARES
CAMPAMENTO 18 M2
CAMPAMENTO 9 M2
CERCA EN ALAMBRE DE PUA 4 HILOS
CERCA EN ALAMBRE DE PUA 5 HILOS
CERCA EN ALAMBRE DE PUA 6 HILOS
CERCA EN TABLA H=2.30 M
CERCA EN TEJA DE ZINC H=1.80 M
CERCA EN TELA VERDE H = 2.10 M
DEMOLICIN ESCALERAS EN CONCRETO
DEMOLICIN BALDOSA DE PISO H=0.02 M
DEMOLICIN BALDOSA DE PISO H=0.04 M
DEMOLICIN ENCHAPE MURO
DEMOLICIN PAETE MURO
DEMOLICIN CIELO RASO FALSO
DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m
DEMOLICIN MUROS EN MAMPOSTERA 0.15 M
DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M
DEMOLICIN PLACA ALIGERADA 0.30 M
DEMOLICIN PLACA ALIGERADA 0.40 M
DEMOLICIN PLACA ALIGERADA 0.50 M
DEMOLICIN PLACA MACIZA 0.15 M
DEMOLICIN PLACA MACIZA 0.20 M
DEMOLICIN PLACA MACIZA 0.25 M
DEMOLICIN PLACA MACIZA 0.30 M
DEMOLICIN PLACA PISO 0.05 M
DEMOLICIN PLACA PISO 0.10 M
DEMOLICIN PLACA PISO 0.15 M
DEMOLICIN PLACA PISO 0.20 M
DEMOLICIN VIGAS Y COLUMNAS
DESCAPOTE A MAQUINA E=0.20 M
DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M
DESMONTE APARATOS SANITARIOS
DESMONTE DE CUBIERTAS (TEJA DE BARRO)
DESMONTE DE CUBIERTAS (ASBESTO CEMENTO)
DESMONTE DE CUBIERTAS (TERMOACSTICA)
DESMONTE DE CUBIERTAS (TEJA DE ZINC)
DESMONTE MUROS SECOS
DESMONTE MARCOS Y PUERTAS
DESMONTE VENTANAS
LETRINA DE 2.0x1.0
LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
PRESICIN
REPLANTEO MANUAL DE CIMIENTOS
RED ELCTRICA PROVISIONAL L=50M
RED TELEFNICA PROVISIONAL
UN
UN
ML
ML
ML
ML
ML
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M3
M2
M2
UN
M2
M2
M2
M2
M2
UN
M2
UN
1,524,675
885,939
10,216
11,505
13,377
49,236
35,525
15,944
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
625,875
1,547,111
897,157
10,216
11,505
13,377
49,236
35,780
16,199
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
631,410
1,508,337
877,770
10,216
11,505
13,377
49,236
35,351
15,771
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
624,239
1,519,232
883,217
10,216
11,505
13,377
49,236
35,459
15,879
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
627,307
1,533,346
890,274
10,216
11,505
13,377
49,236
35,594
16,014
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
627,961
1,519,533
883,368
10,216
11,505
13,377
49,236
35,478
15,898
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
626,407
1,540,466
893,834
10,216
11,505
13,377
49,236
35,682
16,102
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
629,842
1,507,365
877,284
10,216
11,505
13,377
49,236
35,322
15,742
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
624,548
1,522,001
884,602
10,216
11,505
13,377
49,236
35,494
15,914
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
624,673
1,546,003
896,603
10,216
11,505
13,377
49,236
35,738
16,157
60,715
4,753
6,733
5,157
5,587
6,747
6,731
10,093
13,754
20,501
29,856
36,962
30,891
43,389
51,374
62,963
6,867
11,090
16,890
27,721
154,736
1,169
4,383
15,645
8,539
8,453
7,822
7,307
11,647
9,972
8,539
630,495
M2
7,315
7,315
7,315
7,315
7,315
7,315
7,315
7,315
7,315
7,315
M2
UN
UN
2,319
1,154,019
164,636
2,319
1,154,019
164,636
2,319
1,154,019
164,636
2,319
1,154,019
164,636
2,319
1,154,019
164,636
2,319
1,154,019
164,636
2,319
1,154,019
164,636
2,319
1,154,019
164,636
2,319
1,154,019
164,636
2,319
1,154,019
164,636
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
1.45
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
CIMIENTOS
BASE AGREGADO PTREO (MATERIAL DE AFIRMADO)
BASE ARENA CEMENTO 1:20
DEMOLICIN CABEZAS DE PILOTES
DEMOLICIN CIMIENTO ENTERRADO
IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX
SOBRECIMIENTOS CONCRETO 3000 PSI 25x25
VIGA DE AMARRE EN CONCRETO 3500 PSI
ZAPATAS EN CONCRETO 3500 PSI
PILOTE DE MADERA D=20 CM
PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)
PILOTE HINCADO 25X25
PILOTE HINCADO 30X30
DADOS EN CONCRETO 3500PSI
MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
MENOR DE 5 KM)
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
UNIDAD
M3
Arbelaz
Cabrera
Fusagasug
CONSTRUCCIN
6,825
6,825
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
6,825
6,825
6,825
6,825
6,825
6,825
6,825
6,825
M3
M3
M3
M3
M2
M3
M3
M3
ML
58,181
185,044
192,434
131,040
4,615
537,415
551,957
516,453
36,378
96,986
201,158
192,434
131,040
4,615
562,111
578,047
540,883
36,378
54,508
162,911
192,434
131,040
4,615
520,275
534,374
499,990
36,378
80,378
168,118
192,434
131,040
4,615
531,168
545,198
510,125
36,378
76,290
160,797
192,434
131,040
4,615
544,949
558,667
522,736
36,378
66,150
174,629
192,434
131,040
4,615
532,599
547,393
512,180
36,378
89,225
180,327
192,434
131,040
4,615
553,315
567,832
531,318
36,378
62,269
145,985
192,434
131,040
4,615
517,986
531,198
497,015
36,378
48,041
169,420
192,434
131,040
4,615
534,464
548,834
513,529
36,378
90,518
180,327
192,434
131,040
4,615
558,891
573,402
536,534
36,378
ML
110,984
110,984
110,984
110,984
110,984
110,984
110,984
110,984
110,984
110,984
ML
134,065
134,065
134,065
134,065
134,065
134,065
134,065
134,065
134,065
134,065
ML
161,976
161,976
161,976
161,976
161,976
161,976
161,976
161,976
161,976
161,976
ML
199,550
199,550
199,550
199,550
199,550
199,550
199,550
199,550
199,550
199,550
ML
ML
M3
92,352
112,976
505,677
94,179
115,624
530,106
91,172
111,265
489,213
91,864
112,268
499,349
92,703
113,484
511,960
92,083
112,586
501,403
93,376
114,459
520,542
90,877
110,837
486,239
92,133
112,659
502,753
93,735
114,980
525,758
ML
119,239
119,239
119,239
119,239
119,239
119,239
119,239
119,239
119,239
119,239
UN
UN
UN
UN
UN
UN
ML
UN
ML
ML
ML
ML
ML
ML
ML
28,368
144,878
361,130
181,654
205,052
274,285
75,207
960,793
87,430
50,591
21,281
31,974
43,885
59,440
81,334
28,468
144,979
393,995
186,379
212,593
284,788
75,506
963,778
88,536
51,175
21,633
32,326
44,378
60,003
81,827
28,230
144,741
353,998
179,225
200,960
267,247
75,217
960,891
85,911
49,790
20,951
31,645
43,423
58,913
80,873
28,263
144,773
374,605
182,105
205,447
273,327
75,416
962,881
86,268
49,978
21,218
31,911
43,796
59,339
81,246
28,217
144,728
372,124
183,160
206,741
276,015
75,347
962,186
85,765
49,713
21,591
32,285
44,319
59,937
81,769
28,303
144,814
366,039
181,291
204,343
272,307
75,307
961,786
86,715
50,214
21,127
31,821
43,669
59,194
81,119
28,338
144,849
384,915
185,037
210,054
280,904
75,446
963,181
87,106
50,421
21,657
32,351
44,411
60,042
81,861
28,125
144,636
356,713
179,309
200,697
266,309
75,277
961,488
84,749
49,177
21,042
31,735
43,550
59,058
81,000
28,271
144,781
350,593
180,251
202,542
270,684
75,118
959,896
86,357
50,026
21,240
31,933
43,827
59,374
81,277
28,338
144,849
387,388
185,763
211,119
282,625
75,456
963,281
87,106
50,421
21,789
32,482
44,596
60,253
82,046
UN
747,092
752,725
741,818
746,080
752,057
744,631
753,112
743,267
746,431
755,221
UN
1,067,752
1,079,017
1,057,204
1,065,726
1,077,681
1,062,830
1,079,790
1,060,101
1,066,430
1,084,010
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
3.18
4
4.1
4.2
4.3
4.4
4.5
4.6
DESCRIPCIN
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
FILTRANTE)
ESTRUCTURAS EN CONCRETO
CASETN DE LONA 0.8 X 0.35
CASETN DE LONA 0.80X0.70
COLUMNAS 3500 PSI
CONCRETO CICLPEO 2000 PSI, 40% RAJN
ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA
DE REFUERZO, CONCRETO DE 3500 PSI
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA
DE REFUERZO, CONCRETO DE 3500 PSI
UNIDAD
UN
Arbelaz
Cabrera
Fusagasug
CONSTRUCCIN
1,415,174
1,437,704
Granada
Pandi
Pasca
1,394,078
1,411,123
1,435,032
1,405,329
Silvania
Tibacuy
Venecia
1,439,251
1,399,872
1,412,529
1,447,689
San_Bernardo
M2
M2
M3
M3
27,959
36,763
659,223
240,582
27,959
36,763
683,653
262,276
27,959
36,763
642,760
228,723
27,959
36,763
652,895
235,832
27,959
36,763
665,506
252,494
27,959
36,763
654,950
236,257
27,959
36,763
674,088
258,520
27,959
36,763
639,785
226,597
27,959
36,763
656,299
238,104
27,959
36,763
679,304
264,771
M2
79,095
81,467
77,497
78,481
79,705
78,680
80,539
77,208
78,811
81,045
M2
93,261
96,108
91,343
92,524
93,993
92,764
94,993
90,997
92,921
95,601
4.7
M2
105,880
109,675
103,323
104,897
106,856
105,216
108,189
102,861
105,426
108,999
4.8
M2
111,806
115,839
109,089
110,762
112,843
111,101
114,260
108,598
111,324
115,121
4.9
M2
129,156
134,137
125,800
127,866
130,437
128,285
132,187
125,193
128,560
133,250
4.10
M2
144,121
149,814
140,285
142,647
145,585
143,126
147,585
139,592
143,440
148,800
4.11
M2
160,301
166,705
155,985
158,642
161,948
159,181
164,198
155,205
159,534
165,565
4.12
4.13
4.14
4.15
4.16
4.17
4.18
M2
M3
M2
M2
M2
M2
M3
74,458
767,632
70,016
64,726
73,691
86,766
594,226
74,807
792,061
70,450
67,169
76,680
90,513
618,656
74,142
751,168
69,817
63,080
71,677
84,241
577,763
74,283
761,303
69,875
64,094
72,917
85,795
587,898
74,368
773,915
69,905
65,355
74,460
87,730
600,509
74,341
763,358
70,034
64,299
73,169
86,110
589,953
74,581
782,497
70,116
66,213
75,510
89,046
609,091
74,006
748,193
69,629
62,783
71,314
83,784
574,788
74,324
764,707
69,963
64,434
73,334
86,317
591,302
74,635
787,712
70,151
66,734
76,148
89,846
614,307
4.19
UN
39,135
39,907
38,635
38,928
39,283
39,021
39,567
38,510
39,042
39,719
4.20
4.21
4.22
4.23
4.24
4.25
4.26
4.27
4.28
4.29
M2
KG
KG
KG
M3
M3
M3
M3
M3
M3
236,942
3,160
3,282
4,519
697,705
650,007
697,650
682,311
841,422
295,398
247,853
3,160
3,282
4,519
722,135
676,731
722,080
706,741
865,852
321,075
229,590
3,160
3,282
4,519
681,241
631,983
681,187
665,848
824,959
276,700
234,116
3,160
3,282
4,519
691,377
643,089
691,322
675,983
835,094
289,169
239,748
3,160
3,282
4,519
703,988
656,914
703,933
688,594
847,705
305,321
235,034
3,160
3,282
4,519
693,432
645,318
693,377
678,038
837,149
289,514
243,581
3,160
3,282
4,519
712,570
666,293
712,515
697,176
856,287
313,470
228,261
3,160
3,282
4,519
678,267
628,750
678,212
662,873
821,984
275,588
235,636
3,160
3,282
4,519
694,781
646,809
694,726
679,387
838,498
292,338
245,910
3,160
3,282
4,519
717,786
672,007
717,731
702,392
861,503
319,807
5
5.1
5.2
MAMPOSTERA
ALFAJAS CONCRETO 2500 PSI E= 0.15 M
ALFAJAS CONCRETO 2500 PSI E= 0.25 M
ML
ML
23,760
39,319
24,375
39,935
23,290
38,849
23,517
39,076
23,708
39,267
23,620
39,179
24,019
39,579
23,101
38,661
23,601
39,160
24,121
39,680
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
24,942
25,042
CONSTRUCCIN
120,212
120,412
35,123
35,896
20,062
20,496
67,876
68,277
73,606
76,181
53,710
53,710
32,889
32,889
52,043
52,043
32,056
32,056
65,260
65,260
39,671
39,671
66,812
66,812
40,447
40,447
27,550
27,751
17,060
17,161
38,179
38,313
23,187
23,254
44,968
45,102
27,094
27,161
81,947
82,617
47,888
48,223
25,333
25,467
15,698
15,765
48,593
48,862
30,132
30,266
65,100
65,534
39,662
39,879
122,842
123,781
75,430
75,899
60,323
60,777
37,274
37,501
36,291
36,591
22,028
22,179
25,924
26,058
15,784
15,852
39,307
39,576
24,056
24,191
75,133
75,535
45,752
45,954
54,882
55,150
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
5.13
5.14
5.15
5.16
5.17
5.18
5.19
5.20
5.21
5.22
5.23
5.24
5.25
5.26
5.27
5.28
5.29
5.30
5.31
5.32
5.33
5.34
5.35
5.36
5.37
5.38
5.39
5.40
5.41
5.42
5.43
5.44
ML
33,082
33,216
32,898
32,941
32,880
32,995
33,043
32,757
32,952
33,043
5.45
M2
117,183
118,122
115,894
116,197
115,771
116,577
116,909
114,908
116,273
116,909
5.46
ML
70,994
71,463
70,349
70,501
70,288
70,690
70,856
69,856
70,539
70,856
5.47
ML
21,985
22,085
21,847
21,879
21,834
21,920
21,955
21,742
21,888
21,955
ML
ML
ML
ML
M2
M2
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
24,805
119,937
34,624
19,863
67,326
71,941
53,710
32,889
52,043
32,056
65,260
39,671
66,812
40,447
27,273
16,922
37,995
23,094
44,784
27,002
81,026
47,428
25,148
15,606
48,225
29,947
64,901
39,563
121,552
74,785
59,700
36,962
35,878
21,822
25,740
15,692
38,939
23,872
74,580
45,476
54,514
24,837
120,001
34,917
19,922
67,456
72,917
53,710
32,889
52,043
32,056
65,260
39,671
66,812
40,447
27,338
16,955
38,038
23,116
44,827
27,024
81,242
47,536
25,192
15,628
48,312
29,991
64,959
39,592
121,856
74,937
59,846
37,036
35,975
21,871
25,783
15,714
39,026
23,916
74,710
45,541
54,600
24,791
119,910
35,271
19,951
67,274
74,099
53,710
32,889
52,043
32,056
65,260
39,671
66,812
40,447
27,247
16,909
37,977
23,086
44,767
26,993
80,938
47,384
25,131
15,597
48,190
29,930
64,989
39,607
121,429
74,724
59,640
36,932
35,839
21,803
25,722
15,684
38,904
23,855
74,528
45,450
54,479
24,877
120,082
35,009
20,080
67,618
73,226
53,710
32,889
52,043
32,056
65,260
39,671
66,812
40,447
27,420
16,995
38,093
23,143
44,882
27,051
81,513
47,671
25,246
15,655
48,420
30,045
65,118
39,671
122,235
75,127
60,030
37,127
36,096
21,931
25,838
15,741
39,134
23,970
74,873
45,622
54,709
24,913
120,153
35,556
20,162
67,759
75,049
53,710
32,889
52,043
32,056
65,260
39,671
66,812
40,447
27,491
17,031
38,140
23,167
44,929
27,074
81,750
47,790
25,293
15,679
48,515
30,092
65,200
39,712
122,567
75,293
60,190
37,207
36,203
21,984
25,885
15,765
39,229
24,017
75,015
45,694
54,804
24,699
119,726
34,499
19,675
66,906
71,525
53,710
32,889
52,043
32,056
65,260
39,671
66,812
40,447
27,062
16,816
37,854
23,024
44,643
26,931
80,321
47,075
25,008
15,536
47,943
29,806
64,713
39,469
120,566
74,292
59,223
36,724
35,563
21,665
25,599
15,622
38,657
23,731
74,158
45,265
54,232
24,845
120,018
35,031
20,009
67,488
73,297
53,710
32,889
52,043
32,056
65,260
39,671
66,812
40,447
27,355
16,963
38,049
23,122
44,838
27,029
81,296
47,563
25,203
15,633
48,333
30,002
65,047
39,636
121,932
74,975
59,883
37,054
35,999
21,883
25,794
15,719
39,047
23,926
74,743
45,557
54,622
24,913
120,153
35,708
20,197
67,759
75,555
53,710
32,889
52,043
32,056
65,260
39,671
66,812
40,447
27,491
17,031
38,140
23,167
44,929
27,074
81,750
47,790
25,293
15,679
48,515
30,092
65,235
39,730
122,567
75,293
60,190
37,207
36,203
21,984
25,885
15,765
39,229
24,017
75,015
45,694
54,804
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
5.48
5.49
5.50
5.51
5.52
5.53
5.54
5.55
5.56
5.57
ML
ML
M2
ML
ML
UN
UN
UN
UN
UN
28,152
28,478
CONSTRUCCIN
47,284
47,719
4,007
4,007
39,489
40,104
7,621
7,621
10,118
10,118
13,241
13,241
18,494
18,494
27,618
27,618
4,162
4,341
27,703
46,686
4,007
39,019
7,621
10,118
13,241
18,494
27,618
4,038
27,809
46,827
4,007
39,246
7,621
10,118
13,241
18,494
27,618
4,117
27,661
46,629
4,007
39,437
7,621
10,118
13,241
18,494
27,618
4,217
27,941
47,002
4,007
39,348
7,621
10,118
13,241
18,494
27,618
4,127
28,056
47,156
4,007
39,748
7,621
10,118
13,241
18,494
27,618
4,278
27,361
46,229
4,007
38,830
7,621
10,118
13,241
18,494
27,618
4,021
27,835
46,862
4,007
39,330
7,621
10,118
13,241
18,494
27,618
4,141
28,056
47,156
4,007
39,850
7,621
10,118
13,241
18,494
27,618
4,318
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
6.26
6.27
6.28
M2
ML
ML
ML
M2
M2
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
M2
ML
11,827
4,684
5,587
6,687
4,348
10,340
19,673
11,812
17,319
10,399
16,710
10,094
17,319
10,399
16,768
10,123
14,324
8,682
13,860
8,450
17,911
10,680
17,302
10,375
14,325
8,669
17,980
11,022
11,827
4,784
5,687
6,787
4,348
10,340
19,991
11,971
17,600
10,540
17,027
10,253
17,600
10,540
16,994
10,236
14,539
8,789
14,102
8,571
18,193
10,821
17,620
10,534
14,567
8,790
18,297
11,181
11,827
4,547
5,450
6,550
4,348
10,340
19,237
11,594
16,932
10,205
16,273
9,876
16,932
10,205
16,457
9,967
14,029
8,534
13,528
8,284
17,524
10,486
16,866
10,157
13,993
8,502
17,544
10,804
11,827
4,579
5,482
6,582
4,348
10,340
19,340
11,645
17,023
10,251
16,376
9,927
17,023
10,251
16,530
10,004
14,099
8,569
13,606
8,323
17,615
10,532
16,969
10,209
14,071
8,542
17,646
10,855
11,827
4,534
5,437
6,536
4,348
10,340
19,195
11,573
16,895
10,187
16,232
9,855
16,895
10,187
16,428
9,952
14,001
8,520
13,496
8,268
17,488
10,468
16,825
10,136
13,961
8,487
17,502
10,783
11,827
4,620
5,523
6,622
4,348
10,340
19,468
11,710
17,137
10,308
16,504
9,992
17,137
10,308
16,622
10,049
14,185
8,612
13,704
8,372
17,729
10,589
17,097
10,273
14,169
8,590
17,774
10,919
11,827
4,655
5,558
6,658
4,348
10,340
19,580
11,766
17,236
10,358
16,617
10,048
17,236
10,358
16,702
10,089
14,261
8,650
13,789
8,414
17,829
10,639
17,209
10,329
14,254
8,633
17,887
10,975
11,827
4,442
5,345
6,444
4,348
10,340
18,903
11,427
16,636
10,057
15,940
9,709
16,636
10,057
16,220
9,848
13,804
8,422
13,274
8,157
17,229
10,339
16,533
9,990
13,738
8,375
17,210
10,637
11,827
4,587
5,490
6,590
4,348
10,340
19,365
11,658
17,046
10,262
16,402
9,940
17,046
10,262
16,549
10,013
14,116
8,578
13,626
8,332
17,638
10,543
16,994
10,221
14,090
8,551
17,672
10,868
11,827
4,655
5,558
6,658
4,348
10,340
19,580
11,766
17,236
10,358
16,617
10,048
17,236
10,358
16,702
10,089
14,261
8,650
13,789
8,414
17,829
10,639
17,209
10,329
14,254
8,633
17,887
10,975
7
7.1
CUBIERTAS
AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M
AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO
(INCLUYE TELA IMPERMEABLE)
BAJANTE PVC (AMAZONAS, RAINGO)
BAJANTE PVC AGUAS LLUVIAS D=3"
M2
22,201
22,603
21,648
21,778
21,595
21,941
22,083
21,226
21,811
22,083
M2
66,565
67,853
65,732
66,221
66,812
66,375
67,286
65,524
66,410
67,539
ML
ML
40,121
16,295
40,121
16,295
40,121
16,295
40,121
16,295
40,121
16,295
40,121
16,295
40,121
16,295
40,121
16,295
40,121
16,295
40,121
16,295
7.2
7.3
7.4
UNIDAD
Arbelaz
Cabrera
Fusagasug
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
M2
M2
M2
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
7.28
M2
109,625
7.29
7.30
7.31
M2
M2
M2
49,318
31,786
25,098
M2
7.33
7.34
7.35
7.36
7.37
7.38
7.39
7.40
7.41
7.42
ML
ML
M2
M2
ML
ML
M2
M2
M2
M2
8
8.1
8.2
8.3
8.4
8.5
MORTEROS Y CONCRETOS
CONCRETO 4000 PSI
CONCRETO 3500 PSI
CONCRETO 3000 PSI
CONCRETO 2500 PSI
CONCRETO 2000 PSI
M3
M3
M3
M3
M3
7.32
Cabrera
Fusagasug
25,569
25,569
CONSTRUCCIN
59,724
59,724
42,776
42,776
25,716
25,716
58,129
58,129
75,047
75,047
97,620
97,620
42,883
42,883
62,161
62,161
54,923
54,923
87,251
87,251
50,438
50,438
41,422
41,422
23,721
23,721
47,050
47,550
34,520
34,520
31,676
31,676
26,861
26,861
26,085
26,085
26,842
26,842
37,235
37,235
32,816
32,816
60,260
60,260
7.5
7.6
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17
7.18
7.19
7.20
7.21
7.22
7.23
7.24
7.25
7.26
7.27
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
25,569
59,724
42,776
25,716
58,129
75,047
97,620
42,883
62,161
54,923
87,251
50,438
41,422
23,721
46,362
34,520
31,676
26,861
26,085
26,842
37,235
32,816
60,260
25,569
59,724
42,776
25,716
58,129
75,047
97,620
42,883
62,161
54,923
87,251
50,438
41,422
23,721
46,524
34,520
31,676
26,861
26,085
26,842
37,235
32,816
60,260
25,569
59,724
42,776
25,716
58,129
75,047
97,620
42,883
62,161
54,923
87,251
50,438
41,422
23,721
46,297
34,520
31,676
26,861
26,085
26,842
37,235
32,816
60,260
25,569
59,724
42,776
25,716
58,129
75,047
97,620
42,883
62,161
54,923
87,251
50,438
41,422
23,721
46,726
34,520
31,676
26,861
26,085
26,842
37,235
32,816
60,260
25,569
59,724
42,776
25,716
58,129
75,047
97,620
42,883
62,161
54,923
87,251
50,438
41,422
23,721
46,903
34,520
31,676
26,861
26,085
26,842
37,235
32,816
60,260
25,569
59,724
42,776
25,716
58,129
75,047
97,620
42,883
62,161
54,923
87,251
50,438
41,422
23,721
45,837
34,520
31,676
26,861
26,085
26,842
37,235
32,816
60,260
25,569
59,724
42,776
25,716
58,129
75,047
97,620
42,883
62,161
54,923
87,251
50,438
41,422
23,721
46,564
34,520
31,676
26,861
26,085
26,842
37,235
32,816
60,260
25,569
59,724
42,776
25,716
58,129
75,047
97,620
42,883
62,161
54,923
87,251
50,438
41,422
23,721
46,903
34,520
31,676
26,861
26,085
26,842
37,235
32,816
60,260
109,625
109,625
109,625
109,625
109,625
109,625
109,625
109,625
109,625
49,318
31,786
25,098
49,318
31,786
25,098
49,318
31,786
25,098
49,318
31,786
25,098
49,318
31,786
25,098
49,318
31,786
25,098
49,318
31,786
25,098
49,318
31,786
25,098
49,318
31,786
25,098
40,304
40,304
40,304
40,304
40,304
40,304
40,304
40,304
40,304
40,304
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
14,841
17,770
20,213
26,018
16,269
38,168
224,186
287,556
182,970
263,613
411,361
359,954
354,808
319,462
300,019
437,835
383,672
378,785
345,221
325,515
394,250
343,970
338,167
302,813
282,683
404,284
353,810
348,743
312,576
293,462
416,435
366,054
362,123
324,399
306,945
407,458
355,805
350,132
315,665
295,404
426,192
374,386
370,245
333,892
315,806
389,973
341,082
335,945
298,652
279,802
408,186
357,115
351,943
316,373
296,969
431,396
379,450
375,659
338,955
321,343
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
8.6
8.7
8.8
8.9
8.10
8.11
M3
M3
M3
M3
M3
M3
275,286
300,215
CONSTRUCCIN
221,081
234,893
401,347
414,759
372,349
387,471
425,576
439,719
554,096
568,239
257,132
202,110
382,926
351,578
406,151
534,671
269,238
206,573
387,260
356,465
410,721
539,241
284,920
200,298
381,167
349,595
404,295
532,815
269,573
212,153
392,679
362,574
416,435
544,955
292,831
217,037
397,421
367,922
421,436
549,956
256,053
187,602
368,839
335,695
391,295
519,815
272,315
207,689
388,344
357,687
411,864
540,384
298,984
217,037
397,421
367,922
421,436
549,956
9
9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
9.10
9.11
9.12
9.13
9.14
9.15
9.16
9.17
9.18
9.19
9.20
9.21
9.22
9.23
9.24
9.25
9.26
9.27
9.28
9.29
9.30
9.31
9.32
CARPINTERA EN MADERA
BARANDA EN MADERA CEDRO MACHO
CHAZOS PARA CARPINTERA EN MADERA
DIFUSORES MARCO PARA VIDRIO H= 0.15M
DIFUSORES MARCO PARA VIDRIO H= 0.20 M
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M
HOJA PUERTA FORTEC 0.81
HOJA PUERTA FORTEC 0.91
HOJA PUERTA FORTEC 1.50
HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10
HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M
HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M
HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M
PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M
PIRLANES DE MADERA CEDRO MACHO 0.10 M
VENTANERA EN MADERA CEDRO MACHO
CERRADURA DE ENTRADA PRINCIPAL
SUMINISTRO E INSTALACIN CERROJO DOBLE
SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA
SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA
SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO
ESPEJO INCOLORO 3 MM SIN BISELAR
ESPEJO BISELADO INCOLORO 4 MM
VIDRIO ESMERILADO INCOLORO 4 MM
VIDRIO ESMERILADO INCOLORO 5 MM
VIDRIO TEMPLADO PULIDO 10 MM
VIDRIO TEMPLADO PULIDO 8 MM
VIDRIO TRANSPARENTE 3 MM
VIDRIO TRANSPARENTE 4 MM
VIDRIO TRANSPARENTE 5 MM
VIDRIO TRANSPARENTE 6 MM
ML
UN
M2
M2
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
ML
ML
M2
UN
UN
UN
UN
UN
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
89,623
3,052
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
89,623
3,152
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
89,623
2,915
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
89,623
2,947
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
89,623
2,902
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
89,623
2,988
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
89,623
3,023
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
89,623
2,810
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
89,623
2,955
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
89,623
3,023
100,948
123,056
170,007
189,847
209,712
148,717
164,262
243,533
92,173
122,330
135,490
344,399
30,506
19,425
71,080
88,298
68,668
21,513
21,513
20,416
75,791
97,943
44,778
53,639
215,963
193,812
48,101
55,854
62,499
66,487
10
10.1
10.2
CARPINTERA METLICA
CAJA CONTADOR DE AGUA
CELOSA ALUMINIO 100CM X 60 CM
ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"
(INCLUYE ANTICORROSIVO)
MARCO PARA PUERTA EN LMINA CAL 18 -0.8
UN
M2
55,987
162,592
55,987
162,592
55,987
162,592
55,987
162,592
55,987
162,592
55,987
162,592
55,987
162,592
55,987
162,592
55,987
162,592
55,987
162,592
10.3
10.4
ML
81,579
81,579
81,579
81,579
81,579
81,579
81,579
81,579
81,579
81,579
UN
106,404
106,404
106,404
106,404
106,404
106,404
106,404
106,404
106,404
106,404
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
10.5
10.6
10.7
10.8
10.9
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
101,625
101,625
CONSTRUCCIN
70,935
70,935
150,949
150,949
80,778
80,778
4,863
4,863
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
101,625
70,935
150,949
80,778
4,863
101,625
70,935
150,949
80,778
4,863
101,625
70,935
150,949
80,778
4,863
101,625
70,935
150,949
80,778
4,863
101,625
70,935
150,949
80,778
4,863
101,625
70,935
150,949
80,778
4,863
101,625
70,935
150,949
80,778
4,863
101,625
70,935
150,949
80,778
4,863
74,359
74,359
74,359
74,359
74,359
74,359
74,359
74,359
74,359
31,154
31,154
31,154
31,154
31,154
31,154
31,154
31,154
31,154
31,154
M2
392,925
392,925
392,925
392,925
392,925
392,925
392,925
392,925
392,925
392,925
M2
141,967
141,967
141,967
141,967
141,967
141,967
141,967
141,967
141,967
141,967
10.14
M2
156,613
156,613
156,613
156,613
156,613
156,613
156,613
156,613
156,613
156,613
10.15
M2
358,895
358,895
358,895
358,895
358,895
358,895
358,895
358,895
358,895
358,895
10.16
M2
94,704
94,704
94,704
94,704
94,704
94,704
94,704
94,704
94,704
94,704
10.17
M2
286,282
286,282
286,282
286,282
286,282
286,282
286,282
286,282
286,282
286,282
10.18
ML
4,523
4,523
4,523
4,523
4,523
4,523
4,523
4,523
4,523
4,523
10.19
10.20
10.21
10.22
M2
M2
M2
UN
202,040
90,510
64,085
65,695
202,040
90,510
64,085
65,695
202,040
90,510
64,085
65,695
202,040
90,510
64,085
65,695
202,040
90,510
64,085
65,695
202,040
90,510
64,085
65,695
202,040
90,510
64,085
65,695
202,040
90,510
64,085
65,695
202,040
90,510
64,085
65,695
202,040
90,510
64,085
65,695
KG
7,494
7,494
7,494
7,494
7,494
7,494
7,494
7,494
7,494
7,494
UN
M2
M2
M2
KG
M2
74,359
10.11
ML
10.12
10.13
10.10
10.23
10.24
KG
8,319
8,319
8,319
8,319
8,319
8,319
8,319
8,319
8,319
8,319
10.25
KG
6,522
6,522
6,522
6,522
6,522
6,522
6,522
6,522
6,522
6,522
11
11.1
11.2
11.3
11.4
11.5
11.6
11.7
UN
UN
ML
ML
ML
ML
ML
167,566
199,611
16,295
25,569
24,730
31,596
64,832
167,566
199,611
16,295
25,569
24,730
31,596
64,832
167,566
199,611
16,295
25,569
24,730
31,596
64,832
167,566
199,611
16,295
25,569
24,730
31,596
64,832
167,566
199,611
16,295
25,569
24,730
31,596
64,832
167,566
199,611
16,295
25,569
24,730
31,596
64,832
167,566
199,611
16,295
25,569
24,730
31,596
64,832
167,566
199,611
16,295
25,569
24,730
31,596
64,832
167,566
199,611
16,295
25,569
24,730
31,596
64,832
167,566
199,611
16,295
25,569
24,730
31,596
64,832
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
11.8
11.9
11.10
11.11
11.12
11.13
11.14
11.15
11.16
11.17
11.18
11.19
11.20
11.21
11.22
11.23
11.24
11.25
11.26
11.27
11.28
11.29
11.30
11.31
11.32
11.33
11.34
11.35
11.36
11.37
11.38
11.39
11.40
11.41
11.42
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
UN
UN
UN
UN
UN
UN
ML
ML
167,600
167,600
CONSTRUCCIN
33,396
33,396
469,405
469,405
966,422
966,422
23,670
23,670
50,357
50,357
75,247
75,247
62,702
62,702
45,953
45,953
48,734
48,734
61,528
61,528
48,889
48,889
60,820
60,820
64,979
64,979
54,384
54,384
9,222
9,222
12,918
12,918
16,605
16,605
10,294
10,294
6,197
6,197
41,844
41,844
24,037
24,037
7,733
7,733
18,272
18,272
25,327
25,327
34,276
34,276
63,990
63,990
83,524
83,524
47,820
47,820
58,581
58,581
109,011
109,011
281,316
281,316
209,694
209,694
12,767
12,767
16,117
16,117
167,600
33,396
469,405
966,422
23,670
50,357
75,247
62,702
45,953
48,734
61,528
48,889
60,820
64,979
54,384
9,222
12,918
16,605
10,294
6,197
41,844
24,037
7,733
18,272
25,327
34,276
63,990
83,524
47,820
58,581
109,011
281,316
209,694
12,767
16,117
167,600
33,396
469,405
966,422
23,670
50,357
75,247
62,702
45,953
48,734
61,528
48,889
60,820
64,979
54,384
9,222
12,918
16,605
10,294
6,197
41,844
24,037
7,733
18,272
25,327
34,276
63,990
83,524
47,820
58,581
109,011
281,316
209,694
12,767
16,117
167,600
33,396
469,405
966,422
23,670
50,357
75,247
62,702
45,953
48,734
61,528
48,889
60,820
64,979
54,384
9,222
12,918
16,605
10,294
6,197
41,844
24,037
7,733
18,272
25,327
34,276
63,990
83,524
47,820
58,581
109,011
281,316
209,694
12,767
16,117
167,600
33,396
469,405
966,422
23,670
50,357
75,247
62,702
45,953
48,734
61,528
48,889
60,820
64,979
54,384
9,222
12,918
16,605
10,294
6,197
41,844
24,037
7,733
18,272
25,327
34,276
63,990
83,524
47,820
58,581
109,011
281,316
209,694
12,767
16,117
167,600
33,396
469,405
966,422
23,670
50,357
75,247
62,702
45,953
48,734
61,528
48,889
60,820
64,979
54,384
9,222
12,918
16,605
10,294
6,197
41,844
24,037
7,733
18,272
25,327
34,276
63,990
83,524
47,820
58,581
109,011
281,316
209,694
12,767
16,117
167,600
33,396
469,405
966,422
23,670
50,357
75,247
62,702
45,953
48,734
61,528
48,889
60,820
64,979
54,384
9,222
12,918
16,605
10,294
6,197
41,844
24,037
7,733
18,272
25,327
34,276
63,990
83,524
47,820
58,581
109,011
281,316
209,694
12,767
16,117
167,600
33,396
469,405
966,422
23,670
50,357
75,247
62,702
45,953
48,734
61,528
48,889
60,820
64,979
54,384
9,222
12,918
16,605
10,294
6,197
41,844
24,037
7,733
18,272
25,327
34,276
63,990
83,524
47,820
58,581
109,011
281,316
209,694
12,767
16,117
167,600
33,396
469,405
966,422
23,670
50,357
75,247
62,702
45,953
48,734
61,528
48,889
60,820
64,979
54,384
9,222
12,918
16,605
10,294
6,197
41,844
24,037
7,733
18,272
25,327
34,276
63,990
83,524
47,820
58,581
109,011
281,316
209,694
12,767
16,117
11.43
UN
127,707
127,707
127,707
127,707
127,707
127,707
127,707
127,707
127,707
127,707
11.44
UN
207,196
207,196
207,196
207,196
207,196
207,196
207,196
207,196
207,196
207,196
11.45
UN
340,952
340,952
340,952
340,952
340,952
340,952
340,952
340,952
340,952
340,952
11.46
ML
35,481
35,481
35,481
35,481
35,481
35,481
35,481
35,481
35,481
35,481
11.47
ML
41,051
41,051
41,051
41,051
41,051
41,051
41,051
41,051
41,051
41,051
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
ML
CONSTRUCCIN
67,342
67,342
67,342
67,342
67,342
67,342
67,342
67,342
67,342
67,342
ML
52,778
52,778
52,778
52,778
52,778
52,778
52,778
52,778
52,778
52,778
11.50
ML
75,008
75,008
75,008
75,008
75,008
75,008
75,008
75,008
75,008
75,008
11.51
ML
78,611
78,611
78,611
78,611
78,611
78,611
78,611
78,611
78,611
78,611
11.52
ML
181,477
181,477
181,477
181,477
181,477
181,477
181,477
181,477
181,477
181,477
11.53
11.54
11.55
11.56
UN
UN
UN
UN
35,756
35,898
28,958
32,772
35,756
35,898
28,958
32,772
35,756
35,898
28,958
32,772
35,756
35,898
28,958
32,772
35,756
35,898
28,958
32,772
35,756
35,898
28,958
32,772
35,756
35,898
28,958
32,772
35,756
35,898
28,958
32,772
35,756
35,898
28,958
32,772
35,756
35,898
28,958
32,772
11.57
ML
2,965
2,965
2,965
2,965
2,965
2,965
2,965
2,965
2,965
2,965
11.58
ML
4,607
4,607
4,607
4,607
4,607
4,607
4,607
4,607
4,607
4,607
11.59
11.60
11.61
11.62
11.63
11.64
11.65
UN
UN
UN
UN
UN
UN
UN
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
1,029,186
812,271
1,284,132
1,226,887
665,922
760,145
327,097
12
12.1
12.2
12.3
12.4
12.5
12.6
12.7
12.8
12.9
12.10
12.11
12.12
12.13
12.14
12.15
12.16
12.17
12.18
12.19
INSTALACIONES ELCTRICAS
ACOMETIDA AREA 10 M. PVC
SALIDA LMPARA TOMA PVC COMPLETA
SALIDA LMPARA TOMA EMT COMPLETA
SALIDA LMPARA. CONMUTABLE PVC COMPLETA
SALIDA LMPARA CONMUTABLE EMT COMPLETA
SALIDA TELFONO PVC COMPLETA
SALIDA TIMBRE PVC COMPLETA
STRIP TELEFNICO 10 PARES
SALIDA TOMA DOBLE PVC COMPLETA
SALIDA TRIFSICA PVC COMPLETA
SALIDA T.V PVC COMPLETA.
SALIDA BIFSICA C.N.
TABLERO PARCIAL 4 CIRCUITOS
TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A)
TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A)
TUBERA PVC CONDUIT 1/2"
TUBERA PVC CONDUIT 3/4"
TUBERA PVC CONDUIT 1"
TUBERA PVC CONDUIT 1 1/2"
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
ML
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
227,803
33,115
40,807
44,338
54,111
36,146
36,174
108,728
31,305
73,634
48,509
28,480
81,933
337,616
454,302
2,642
3,439
5,290
9,502
11.48
11.49
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Granada
Pandi
Silvania
Tibacuy
Venecia
182,788
57,885
78,239
27,925
1,053,133
779,488
976,096
443,676
76,744
196,555
231,647
1,248,768
919,776
182,788
57,885
78,239
27,925
1,053,133
779,488
976,096
443,676
76,744
196,555
231,647
1,248,768
919,776
182,788
57,885
78,239
27,925
1,053,133
779,488
976,096
443,676
76,744
196,555
231,647
1,248,768
919,776
182,788
57,885
78,239
27,925
1,053,133
779,488
976,096
443,676
76,744
196,555
231,647
1,248,768
919,776
182,788
57,885
78,239
27,925
1,053,133
779,488
976,096
443,676
76,744
196,555
231,647
1,248,768
919,776
182,788
57,885
78,239
27,925
1,053,133
779,488
976,096
443,676
76,744
196,555
231,647
1,248,768
919,776
182,788
57,885
78,239
27,925
1,053,133
779,488
976,096
443,676
76,744
196,555
231,647
1,248,768
919,776
34,404
29,358
11,272
23,503
62,092
20,964
47,606
66,613
22,466
19,268
20,037
39,034
45,884
66,847
86,113
85,946
34,580
29,534
11,307
23,854
62,443
21,179
48,582
68,175
22,466
19,268
20,037
39,913
46,958
68,507
97,085
103,280
34,333
29,287
11,258
23,360
61,949
21,449
49,765
70,067
22,466
19,268
20,037
40,977
48,258
70,517
112,476
113,652
34,800
29,754
11,351
24,294
62,883
21,218
48,891
68,670
22,466
19,268
20,037
40,191
47,297
69,032
93,356
95,716
34,992
29,946
11,390
24,679
63,267
21,626
50,714
71,586
22,466
19,268
20,037
41,831
49,302
72,131
115,193
119,953
33,833
28,787
11,158
22,360
60,949
20,906
47,190
65,948
22,466
19,268
20,037
38,660
45,426
66,140
89,842
91,520
34,624
29,578
11,316
23,942
62,531
21,250
48,962
68,783
22,466
19,268
20,037
40,254
47,375
69,152
97,991
92,114
34,992
29,946
11,390
24,679
63,267
21,737
51,220
72,396
22,466
19,268
20,037
42,287
49,859
72,991
120,625
124,992
37,836
37,319
37,390
37,291
37,478
37,555
37,091
37,407
37,555
23,127
23,236
22,978
23,013
22,963
23,057
23,095
22,863
23,022
23,095
49,737
59,087
48,667
50,281
59,631
49,211
48,990
58,340
47,920
49,166
58,516
48,096
48,919
58,269
47,848
49,386
58,736
48,315
49,578
58,928
48,508
48,419
57,769
47,348
49,210
58,560
48,140
49,578
58,928
48,508
M2
52,557
52,774
52,258
52,328
52,229
52,416
52,493
52,029
52,346
52,493
ML
29,475
29,734
29,184
29,333
29,444
29,338
29,604
29,109
29,351
29,660
M2
107,494
108,473
106,149
106,465
106,020
106,861
107,207
105,120
106,544
107,207
M2
ML
ML
37,394
29,694
8,440
38,022
29,694
8,699
36,663
29,694
8,149
36,997
29,694
8,298
37,168
29,694
8,409
37,051
29,694
8,303
37,620
29,694
8,569
36,398
29,694
8,074
37,042
29,694
8,316
37,733
29,694
8,625
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
13
13.1
13.2
13.3
13.4
13.5
13.6
13.7
13.8
13.9
13.10
13.11
13.12
13.13
13.14
13.15
13.16
PISOS BASES
ALISTADO ENDURECIDO 1:3, E=0.04
ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04
ALISTADO PARA LISTN
ALISTADO PISOS 1:3, E=0.04
ALISTADO TERRAZAS 1:3, E= 0.08
CAUELA CONCRETO 2000 PSI 0.20X0.12
CONCRETO BASE GRADAS 2500 PSI
CONCRETO ESTRIADO RAMPAS 2500 PSI
MANTO FIBERGLASS 600X1
PEGANTE MORTERO-CONCRETO
PERMA PLY 2 CAPAS
PLACA BASE CONCRETO 0.08 2500 PSI
PLACA BASE CONCRETO 0.10 2500 PSI
PLACA BASE CONCRETO 0.15 2500 PSI
TRITURADO FINO 1/2
TRITURADO GRUESO 3/4
M2
M2
M2
M2
M2
ML
M2
M2
M2
M2
M2
M2
M2
M2
M3
M3
35,152
30,105
11,422
24,997
63,586
21,311
49,271
69,277
22,466
19,268
20,037
40,532
47,715
69,678
99,693
97,158
35,696
30,649
11,531
26,085
64,674
21,821
51,847
73,399
22,466
19,268
20,037
42,851
50,549
74,057
114,197
121,490
14
14.1
PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA
M2
37,618
14.2
ML
14.3
14.4
14.5
M2
M2
M2
14.7
14.8
14.9
14.10
14.11
14.6
Fusagasug
182,788
182,788
182,788
CONSTRUCCIN
57,885
57,885
57,885
78,239
78,239
78,239
27,925
27,925
27,925
1,053,133 1,053,133
1,053,133
779,488
779,488
779,488
976,096
976,096
976,096
443,676
443,676
443,676
76,744
76,744
76,744
196,555
196,555
196,555
231,647
231,647
231,647
1,248,768 1,248,768
1,248,768
919,776
919,776
919,776
12.20
12.21
12.22
12.23
12.24
12.25
12.26
12.27
12.28
12.29
12.30
12.31
12.32
Pasca
San_Bernardo
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
7,329
7,329
CONSTRUCCIN
14.12
14.13
14.14
14.15
14.16
14.17
14.18
14.19
14.20
14.21
14.22
14.23
14.24
14.25
14.26
ML
ML
ML
ML
ML
ML
M2
ML
ML
ML
M2
M2
M2
M2
M2
9,286
7,764
7,752
12,266
6,868
54,872
82,527
5,763
25,025
31,411
41,979
41,615
37,384
38,062
14.27
ML
14.28
14.29
14.31
14.32
14.33
14.34
14.35
14.36
14.37
14.38
14.39
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
9,286
7,764
7,752
12,266
6,868
54,872
83,289
5,763
25,225
31,411
41,979
41,615
37,601
38,279
7,329
9,286
7,764
7,752
12,266
6,868
54,872
81,481
5,763
24,750
31,411
41,979
41,615
37,085
37,763
7,329
9,286
7,764
7,752
12,266
6,868
54,872
81,727
5,763
24,815
31,411
41,979
41,615
37,155
37,833
7,329
9,286
7,764
7,752
12,266
6,868
54,872
81,381
5,763
24,724
31,411
41,979
41,615
37,057
37,734
7,329
9,286
7,764
7,752
12,266
6,868
54,872
82,035
5,763
24,896
31,411
41,979
41,615
37,243
37,921
7,329
9,286
7,764
7,752
12,266
6,868
54,872
82,304
5,763
24,967
31,411
41,979
41,615
37,320
37,998
7,329
9,286
7,764
7,752
12,266
6,868
54,872
80,681
5,763
24,540
31,411
41,979
41,615
36,857
37,534
7,329
9,286
7,764
7,752
12,266
6,868
54,872
81,789
5,763
24,831
31,411
41,979
41,615
37,173
37,851
7,329
9,286
7,764
7,752
12,266
6,868
54,872
82,304
5,763
24,967
31,411
41,979
41,615
37,320
37,998
8,137
8,137
8,137
8,137
8,137
8,137
8,137
8,137
8,137
8,137
M2
UN
34,769
14,293
35,069
14,293
34,357
14,293
34,454
14,293
34,317
14,293
34,575
14,293
34,681
14,293
34,041
14,293
34,478
14,293
34,681
14,293
UN
99,271
99,271
99,271
99,271
99,271
99,271
99,271
99,271
99,271
99,271
UN
UN
UN
UN
ML
ML
UN
UN
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
7,659
15,765
10,602
10,092
6,412
6,522
14,769
13,015
M2
14,366
14,366
14,366
14,366
14,366
14,366
14,366
14,366
14,366
14,366
14.40
M2
16,669
16,669
16,669
16,669
16,669
16,669
16,669
16,669
16,669
16,669
14.41
14.42
14.43
14.44
14.45
14.46
M2
ML
M2
M2
M2
M2
48,028
57,676
26,247
10,415
11,885
83,198
48,246
57,676
26,247
10,415
11,885
83,198
47,729
57,676
26,247
10,415
11,885
83,198
47,799
57,676
26,247
10,415
11,885
83,198
47,701
57,676
26,247
10,415
11,885
83,198
47,887
57,676
26,247
10,415
11,885
83,198
47,964
57,676
26,247
10,415
11,885
83,198
47,501
57,676
26,247
10,415
11,885
83,198
47,817
57,676
26,247
10,415
11,885
83,198
47,964
57,676
26,247
10,415
11,885
83,198
15
15.1
15.2
15.3
15.4
15.5
15.6
CIELO RASO
APLIQUE YESO
ARMADURA MADERA Y MALLA
CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA)
CIELO RASO DURACUSTIC
CIELO RASO PLANO DRYWALL (INCLUYE PINTURA)
CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO)
ML
M2
M2
M2
M2
M2
57,322
26,749
51,948
51,286
47,458
67,404
57,322
26,749
51,948
51,286
47,458
67,404
57,322
26,749
51,948
51,286
47,458
67,404
57,322
26,749
51,948
51,286
47,458
67,404
57,322
26,749
51,948
51,286
47,458
67,404
57,322
26,749
51,948
51,286
47,458
67,404
57,322
26,749
51,948
51,286
47,458
67,404
57,322
26,749
51,948
51,286
47,458
67,404
57,322
26,749
51,948
51,286
47,458
67,404
57,322
26,749
51,948
51,286
47,458
67,404
14.30
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
15.7
15.8
15.9
CORNISAS YESO
LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO)
MALLA CON VENA
16
16.1
EXCAVACIONES Y RELLENOS
EXPLANACIN Y EXTENDIDA
EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)
EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M
16.2
16.3
UNIDAD
ML
M2
M2
Arbelaz
Cabrera
Fusagasug
35,843
35,843
CONSTRUCCIN
74,990
74,990
10,287
10,287
35,843
74,990
10,287
Granada
35,843
74,990
10,287
Pandi
35,843
74,990
10,287
Pasca
35,843
74,990
10,287
San_Bernardo
35,843
74,990
10,287
Silvania
35,843
74,990
10,287
Tibacuy
35,843
74,990
10,287
Venecia
35,843
74,990
10,287
M3
4,120
4,120
4,120
4,120
4,120
4,120
4,120
4,120
4,120
4,120
M3
17,449
17,449
17,449
17,449
17,449
17,449
17,449
17,449
17,449
17,449
M3
19,730
19,730
19,730
19,730
19,730
19,730
19,730
19,730
19,730
19,730
16.4
M3
34,829
34,829
34,829
34,829
34,829
34,829
34,829
34,829
34,829
34,829
16.5
M3
39,613
39,613
39,613
39,613
39,613
39,613
39,613
39,613
39,613
39,613
16.6
M3
59,704
59,704
59,704
59,704
59,704
59,704
59,704
59,704
59,704
59,704
16.7
M3
10,592
10,592
10,592
10,592
10,592
10,592
10,592
10,592
10,592
10,592
16.8
16.9
M3
M3
45,831
111,536
84,636
128,109
47,098
96,018
72,968
108,556
63,940
126,144
58,740
104,294
76,875
129,247
54,859
100,279
34,163
109,590
78,168
135,455
M3
132,872
178,145
132,872
117,350
176,851
145,807
171,677
128,992
152,275
178,145
M3
M3
M3
53,781
125,622
133,513
92,586
170,895
178,786
50,109
125,622
133,513
75,979
110,100
117,991
71,890
169,601
177,492
61,750
138,557
146,448
84,825
164,427
172,318
57,870
121,742
129,633
43,641
145,025
152,916
86,119
170,895
178,786
16.10
16.11
16.12
16.13
17
APARATOS SANITARIOS
17.1
UN
219,425
219,425
219,425
219,425
219,425
219,425
219,425
219,425
219,425
219,425
17.2
UN
693,262
693,262
693,262
693,262
693,262
693,262
693,262
693,262
693,262
693,262
17.3
UN
391,651
391,651
391,651
391,651
391,651
391,651
391,651
391,651
391,651
391,651
17.4
UN
125,611
125,611
125,611
125,611
125,611
125,611
125,611
125,611
125,611
125,611
UN
155,828
155,828
155,828
155,828
155,828
155,828
155,828
155,828
155,828
155,828
UN
184,468
184,468
184,468
184,468
184,468
184,468
184,468
184,468
184,468
184,468
17.5
17.6
17.7
UN
285,276
285,276
285,276
285,276
285,276
285,276
285,276
285,276
285,276
285,276
17.8
UN
749,760
749,760
749,760
749,760
749,760
749,760
749,760
749,760
749,760
749,760
17.9
UN
233,762
233,762
233,762
233,762
233,762
233,762
233,762
233,762
233,762
233,762
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
17.10
17.11
DESCRIPCIN
SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A
BAERA
SUMINISTRO E INSTALACIN DUCHA SENCILLA
UNIDAD
Arbelaz
Fusagasug
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
112,067
112,067
112,067
112,067
112,067
112,067
112,067
112,067
63,454
63,454
63,454
63,454
63,454
63,454
63,454
63,454
63,454
186,113
186,113
186,113
186,113
186,113
186,113
186,113
186,113
186,113
186,113
UN
297,860
297,860
297,860
297,860
297,860
297,860
297,860
297,860
297,860
297,860
UN
UN
63,454
17.12
UN
17.13
18
Cabrera
CONSTRUCCIN
112,067
112,067
PINTURAS
18.1
M2
4,478
4,478
4,478
4,478
4,478
4,478
4,478
4,478
4,478
4,478
18.2
18.3
18.4
18.5
18.6
18.7
18.8
18.9
18.10
18.11
18.12
18.13
18.14
18.15
18.16
18.17
18.18
18.19
18.20
18.21
18.22
18.23
18.24
18.25
18.26
18.27
ML
M2
M2
M2
M2
ML
ML
M2
ML
M2
M2
M2
M2
ML
M2
ML
M2
ML
M2
ML
M2
M2
M2
M2
ML
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
2,235
8,419
32,127
4,334
10,669
2,697
1,940
10,059
3,020
11,172
3,959
4,719
5,893
3,628
12,317
7,589
18,109
2,086
8,822
2,571
9,802
5,373
3,387
16,469
10,132
6,215
19
19.1
UN
3,768,939
3,768,939
3,768,939
3,768,939
3,768,939
3,768,939
3,768,939
3,768,939
3,768,939
3,768,939
UN
6,615,770
6,615,770
6,615,770
6,615,770
6,615,770
6,615,770
6,615,770
6,615,770
6,615,770
6,615,770
19.3
DOTACIONES DEPORTIVAS
CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR)
CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON
RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)
CANCHA PARA MICROFTBOL (PAR)
UN
1,984,608
1,984,608
1,984,608
1,984,608
1,984,608
1,984,608
1,984,608
1,984,608
1,984,608
1,984,608
19.4
UN
5,562,136
5,562,136
5,562,136
5,562,136
5,562,136
5,562,136
5,562,136
5,562,136
5,562,136
5,562,136
19.5
UN
5,537,648
5,537,648
5,537,648
5,537,648
5,537,648
5,537,648
5,537,648
5,537,648
5,537,648
5,537,648
19.2
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
Granada
Pandi
Silvania
Tibacuy
Venecia
1,980,050
63,495
1,117,215
583,489
2,086
1,980,050
63,495
1,116,779
573,335
2,086
1,980,050
63,495
1,116,879
575,979
2,086
1,980,050
63,495
1,117,001
579,324
2,086
1,980,050
63,495
1,116,911
576,326
2,086
1,980,050
63,495
1,117,098
581,354
2,086
1,980,050
63,495
1,116,736
572,779
2,086
1,980,050
63,495
1,116,918
576,779
2,086
1,980,050
63,495
1,117,150
582,708
23,244
34,452
42,549
23,244
34,452
42,549
23,244
34,452
42,549
23,244
34,452
42,549
23,244
34,452
42,549
23,244
34,452
42,549
23,244
34,452
42,549
23,244
34,452
42,549
23,244
34,452
42,549
23,244
34,452
42,549
ML
25,544
25,544
25,544
25,544
25,544
25,544
25,544
25,544
25,544
25,544
ML
29,210
29,210
29,210
29,210
29,210
29,210
29,210
29,210
29,210
29,210
20.6
ML
42,767
42,767
42,767
42,767
42,767
42,767
42,767
42,767
42,767
42,767
20.7
20.8
20.9
20.10
20.11
20.12
20.13
20.14
20.15
20.16
ML
ML
ML
UN
UN
UN
UN
UN
UN
ML
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
19,828
20,913
25,885
11,765
18,362
27,499
163,550
168,210
272,558
225,126
21.1
21.1
21.2
21.3
21.4
21.5
21.6
21.7
21.8
21.9
21.10
21.11
21.12
21.13
21.14
21.15
21.16
UN
ML
UN
UN
UN
UN
UN
ML
UN
UN
ML
UN
ML
ML
ML
ML
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
99,360
24,786
70,241
204,876
40,030
432,095
1,071,194
32,761
171,265
33,911
2,621
4,226
14,222
18,719
25,780
95,532
21.17
ML
25,118
25,118
25,118
25,118
25,118
25,118
25,118
25,118
25,118
25,118
2,086
2,086
CONSTRUCCIN
19.6
19.7
19.8
19.9
19.10
ML
UN
UN
UN
ML
1,980,050
63,495
1,116,950
577,495
20
20.1
20.2
20.3
ML
ML
ML
20.4
20.5
Pasca
San_Bernardo
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
82,312
82,312
CONSTRUCCIN
131,617
131,617
160,129
160,129
252,804
252,804
327,375
327,375
371,139
371,139
222,657
222,657
53,919
53,919
5,601
5,601
14,230
14,230
2,609
2,609
26,187
26,187
27,339
27,339
27,914
27,914
15,520
15,520
17,377
17,377
17,306
17,306
27,745
27,745
375,070
375,070
237,162
237,162
63,067
63,067
1,361
1,361
6,599
6,599
8,838
8,838
12,319
12,319
1,672
1,672
16,053
16,053
24,699
24,699
13,269
13,269
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
21.18
21.19
21.20
21.21
21.22
21.23
21.24
21.25
21.26
21.27
21.28
21.29
21.30
21.31
21.32
21.33
21.34
21.35
21.36
21.37
21.38
21.39
21.40
21.41
21.42
21.43
21.44
21.45
21.46
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
ML
ML
ML
ML
ML
UN
UN
UN
ML
ML
ML
ML
ML
ML
ML
ML
21.47
ML
10,844
10,844
10,844
10,844
10,844
10,844
10,844
10,844
10,844
10,844
21.48
UN
486,148
486,148
486,148
486,148
486,148
486,148
486,148
486,148
486,148
486,148
82,312
131,617
160,129
252,804
327,375
371,139
222,657
53,919
5,601
14,230
2,609
26,187
27,339
27,914
15,520
17,377
17,306
27,745
375,070
237,162
63,067
1,361
6,599
8,838
12,319
1,672
16,053
24,699
13,269
82,312
131,617
160,129
252,804
327,375
371,139
222,657
53,919
5,601
14,230
2,609
26,187
27,339
27,914
15,520
17,377
17,306
27,745
375,070
237,162
63,067
1,361
6,599
8,838
12,319
1,672
16,053
24,699
13,269
82,312
131,617
160,129
252,804
327,375
371,139
222,657
53,919
5,601
14,230
2,609
26,187
27,339
27,914
15,520
17,377
17,306
27,745
375,070
237,162
63,067
1,361
6,599
8,838
12,319
1,672
16,053
24,699
13,269
82,312
131,617
160,129
252,804
327,375
371,139
222,657
53,919
5,601
14,230
2,609
26,187
27,339
27,914
15,520
17,377
17,306
27,745
375,070
237,162
63,067
1,361
6,599
8,838
12,319
1,672
16,053
24,699
13,269
82,312
131,617
160,129
252,804
327,375
371,139
222,657
53,919
5,601
14,230
2,609
26,187
27,339
27,914
15,520
17,377
17,306
27,745
375,070
237,162
63,067
1,361
6,599
8,838
12,319
1,672
16,053
24,699
13,269
82,312
131,617
160,129
252,804
327,375
371,139
222,657
53,919
5,601
14,230
2,609
26,187
27,339
27,914
15,520
17,377
17,306
27,745
375,070
237,162
63,067
1,361
6,599
8,838
12,319
1,672
16,053
24,699
13,269
82,312
131,617
160,129
252,804
327,375
371,139
222,657
53,919
5,601
14,230
2,609
26,187
27,339
27,914
15,520
17,377
17,306
27,745
375,070
237,162
63,067
1,361
6,599
8,838
12,319
1,672
16,053
24,699
13,269
82,312
131,617
160,129
252,804
327,375
371,139
222,657
53,919
5,601
14,230
2,609
26,187
27,339
27,914
15,520
17,377
17,306
27,745
375,070
237,162
63,067
1,361
6,599
8,838
12,319
1,672
16,053
24,699
13,269
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
CONSTRUCCIN
URBANISMO
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
ACUEDUCTO
CODO 45 PVC UNIN MECNICA 2"
CODO 45 PVC UNIN MECNICA 4"
CODO 45 PVC UNIN MECNICA 8"
CODO 45 PVC UNIN MECNICA 10"
CODO 90 PVC UNIN MECNICA 4"
CODO 90 PVC UNIN MECNICA 8"
CODO 90 PVC UNIN MECNICA 10"
COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2"
COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2"
COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2"
COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2"
COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2"
COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2"
TAPN PVC UNIN MECNICA 3"
TAPN PVC UNIN MECNICA 4"
TAPN PVC UNIN MECNICA 8"
TEE PVC UNIN MECNICA 2"
TEE PVC UNIN MECNICA 4"
TEE PVC UNIN MECNICA 8"
TEE PVC UNIN MECNICA 10"
TUBERA PVC UNIN MECNICA RDE 21 2"
TUBERA PVC UNIN MECNICA RDE 26 2"
TUBERA PVC UNIN MECNICA RDE 26 4"
TUBERA PVC UNIN MECNICA RDE 26 8"
TUBERA PVC UNIN MECNICA RDE 26 10"
TUBERA PVC UNIN MECNICA RDE 32.5 4"
TUBERA PVC UNIN MECNICA RDE 32.5 8"
TUBERA PVC UNIN MECNICA RDE 32.5 10"
UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2"
UNIN RPIDA DE CONSTRUCCIN PVC 4"
UNIN RPIDA DE CONSTRUCCIN PVC 8"
UNIN REPARACION PVC 4"
UNIN REPARACIN PVC 8"
UNIN REPARACIN UNIN Z PVC 6"
UNIN REPARACIN UNIN Z PVC 10"
VLVULA COMPUERTA ELSTICA 6"
VLVULA COMPUERTA ELSTICA 8"
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
ML
ML
ML
ML
ML
UN
UN
UN
UN
UN
UN
UN
UN
UN
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
19,694
65,511
367,555
784,386
90,129
547,459
1,177,281
9,694
11,882
14,853
16,214
19,381
19,381
76,938
89,151
275,707
103,474
170,562
753,934
868,489
10,074
8,933
21,201
85,084
126,077
20,912
71,536
105,389
21,895
45,011
180,529
52,467
209,925
126,758
358,287
1,056,503
1,561,074
2
2.1
2.2
2.3
2.4
2.5
ALCANTARILLADO - EXCAVACIONES
ENTIBADO TIPO 1 (1/7 UTILIZACIONES)
ENTIBADO TIPO 2 (1/7 UTILIZACIONES)
RELLENO CON MATERIAL DE EXCAVACIN
RELLENO TIPO 1 "GRAVILLA"
RELLENO TIPO 2 "RECEBO"
M2
M2
M3
M3
M3
8,109
18,628
10,592
99,321
42,651
8,109
18,628
10,592
115,140
81,456
8,109
18,628
10,592
84,507
43,919
8,109
18,628
10,592
96,476
69,789
8,109
18,628
10,592
113,265
60,760
8,109
18,628
10,592
92,408
55,560
8,109
18,628
10,592
116,227
73,695
8,109
18,628
10,592
88,575
51,680
8,109
18,628
10,592
97,463
30,984
8,109
18,628
10,592
122,152
74,989
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
M3
M3
M3
M3
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
3.25
3.26
3.27
3.28
3.29
3.30
3.31
3.32
3.33
ALCANTARILLADO - TUBERA
CODO 45 PVC ALCANTARILLADO 8"
CODO 45 PVC ALCANTARILLADO 16"
CODO 90 PVC ALCANTARILLADO 8"
CODO 90 PVC ALCANTARILLADO 16"
CODO 90 PVC ALCANTARILLADO 24"
SILLA TEE PVC ALCANTARILLADO 10 X 4"
SILLA TEE PVC ALCANTARILLADO 10 X 6"
SILLA TEE PVC ALCANTARILLADO 16 X 4"
SILLA TEE PVC ALCANTARILLADO 16 X 6"
SILLA TEE PVC ALCANTARILLADO 20 X 6"
SILLA YEE PVC ALCANTARILLADO 10 X 4"
SILLA YEE PVC ALCANTARILLADO 10 X 6"
SILLA YEE PVC ALCANTARILLADO 16 X 4"
SILLA YEE PVC ALCANTARILLADO 16 X 6"
SILLA YEE PVC ALCANTARILLADO 20 X 6"
TUBERA CONCRETO CLASE II REFORZADO 24"
TUBERA CONCRETO CLASE II REFORZADO 30"
TUBERA CONCRETO CLASE II REFORZADO 44"
TUBERA CONCRETO CLASE II SIN REFUERZO 10"
TUBERA CONCRETO CLASE II SIN REFUERZO 24"
TUBERA CONCRETO CLASE III REFORZADO 24"
TUBERA CONCRETO CLASE III REFORZADO 44"
TUBERA CONCRETO CLASE I SIN REFUERZO 10"
TUBERA CONCRETO CLASE I SIN REFUERZO 24"
TUBERA PVC ALCANTARILLADO 8"
TUBERA PVC ALCANTARILLADO 10"
TUBERA PVC ALCANTARILLADO 12"
TUBERA PVC ALCANTARILLADO 16"
TUBERA PVC ALCANTARILLADO REFORZADO 20"
TUBERA PVC ALCANTARILLADO REFORZADO 24"
TUBERA PVC ALCANTARILLADO REFORZADO 27"
TUBERA PVC ALCANTARILLADO REFORZADO 33"
TUBERA PVC ALCANTARILLADO REFORZADO 36"
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
43,121
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
UN
4
4.1
4.2
4.3
Cabrera
Fusagasug
55,001
93,806
CONSTRUCCIN
83,045
99,225
84,547
101,042
90,678
103,690
2.6
2.7
2.8
2.9
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
51,329
80,995
82,458
72,807
77,199
80,358
81,808
77,011
73,110
97,780
99,569
71,100
62,970
80,995
82,458
82,269
86,045
100,855
102,703
86,869
59,090
77,283
78,674
59,140
44,861
81,383
82,853
78,063
87,339
107,004
108,971
86,869
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
43,255
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
42,937
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
42,980
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
42,919
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
43,034
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
43,082
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
42,796
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
42,991
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
81,996
854,814
107,163
989,762
689,639
58,088
81,711
192,615
192,614
309,173
81,712
81,711
192,615
192,615
309,174
284,104
455,746
727,978
45,472
239,454
260,444
763,163
43,082
217,510
35,890
50,671
73,031
112,031
179,857
264,064
333,299
437,879
600,645
536,446
550,832
526,462
532,807
540,835
533,641
545,708
525,128
534,727
548,957
ML
512,650
519,580
503,132
505,371
502,222
508,171
510,621
495,852
505,931
510,621
UN
525,016
534,606
518,359
522,590
527,942
523,145
531,190
517,470
523,870
533,356
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
DESCRIPCIN
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
REFUERZO)
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE
INTERNO E=1.5CM Y CAUELA)
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON
REFUERZO (INCLUYE ARO Y TAPA HF)
SUMIDERO EN LADRILLO SL-100
SUMIDERO EN LADRILLO SL-250
SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100
SUMIDERO FUNDIDO EN SITIO SL-250
SUMIDERO PREFABRICADO SL-100
SUMIDERO PREFABRICADO SL-250
NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M,
H=0,21M(INCLUYE PAETE INTERNO Y DEMOLICIN)
UNIDAD
Arbelaz
Cabrera
Fusagasug
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
UN
CONSTRUCCIN
638,897
656,880
626,417
634,349
644,384
635,390
650,475
624,750
636,749
654,536
ML
726,831
736,590
713,428
716,581
712,147
720,524
723,974
703,177
717,370
723,974
UN
615,980
629,167
606,827
612,644
620,003
613,408
624,470
605,605
614,404
627,448
UN
UN
UN
UN
UN
UN
737,367
1,101,158
1,573,089
2,137,361
967,264
2,266,432
743,296
1,119,832
1,611,980
2,202,010
967,264
2,266,432
731,705
1,085,776
1,546,859
2,093,760
967,264
2,266,432
733,976
1,093,284
1,563,020
2,120,624
967,264
2,266,432
734,793
1,099,340
1,583,139
2,154,065
967,264
2,266,432
735,199
1,095,976
1,566,265
2,126,019
967,264
2,266,432
738,889
1,109,182
1,596,789
2,176,756
967,264
2,266,432
728,825
1,080,026
1,542,152
2,085,935
967,264
2,266,432
734,655
1,095,627
1,568,434
2,129,623
967,264
2,266,432
739,664
1,112,394
1,605,105
2,190,579
967,264
2,266,432
UN
102,750
103,033
102,362
102,453
102,325
102,568
102,668
102,065
102,476
102,668
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
ANDENES Y SARDINELES
ADOQUN DE ARCILLA 20X10X6CM
ADOQUN DE ARCILLA 20X10X8CM
ANDN CONCRETO 2500 PSI EN SITIO E=0.1M
ANDN CONCRETO 3000 PSI EN SITIO E=0.1M
ANDN CONCRETO 3500 PSI EN SITIO E=0.1M
BORDE SEPARADOR VERDE A-170
BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI
BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI
CAUELA PREFABRICADA TIPO A-120
CONTENEDOR DE RACES TIPO A B-20
LOSETA PREFABRICADA A-40
LOSETA PREFABRICADA A-60
M2
M2
M2
M2
M2
ML
ML
ML
ML
UN
M2
M2
45,094
51,906
47,914
51,625
52,165
196,430
14,743
34,358
64,487
444,020
47,479
67,656
45,794
52,606
50,618
54,143
54,656
196,713
15,068
36,264
64,638
448,213
48,126
68,303
44,132
50,944
46,165
49,878
50,487
196,041
14,533
33,126
64,279
438,918
46,590
66,767
44,358
51,170
47,191
50,988
51,520
196,133
14,656
33,849
64,328
440,926
46,799
66,976
44,040
50,852
48,432
52,393
52,806
196,004
14,805
34,724
64,259
441,304
46,505
66,682
44,641
51,453
47,515
51,134
51,730
196,247
14,695
34,077
64,389
441,624
47,061
67,238
44,889
51,701
49,429
53,246
53,681
196,347
14,925
35,426
64,443
444,843
47,290
67,466
43,396
50,208
45,729
49,644
50,184
195,744
14,481
32,818
64,120
436,483
45,910
66,087
44,415
51,227
47,589
51,324
51,867
196,156
14,704
34,130
64,340
441,237
46,852
67,028
44,889
51,701
49,960
53,814
54,212
196,347
14,989
35,801
64,443
445,407
47,290
67,466
5.13
ML
27,773
28,780
27,074
27,519
28,080
27,577
28,422
26,981
27,653
28,649
5.14
ML
45,519
47,557
44,105
45,004
46,141
45,122
46,831
43,916
45,276
47,292
5.15
5.16
ML
M2
81,102
45,456
88,219
45,848
80,895
44,918
78,556
45,044
87,641
44,867
82,995
45,203
87,028
45,341
80,139
44,507
83,941
45,076
88,023
45,341
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
MOBILIARIO URBANO
BANCA EN CONCRETO M-40
BANCA EN CONCRETO M-30
BOLARDO M-63 ALTO/HIERRO
BOLARDO M-60 CONCRETO
BOLARDO M-61 BAJO/CONCRETO
BOLARDO M-62 BAJO/HIERRO
BORDE CONTENEDOR DE RAICES A-70
BORDILLO PREFABRICADO A-80
CANECA M-120
CANECA EN ACERO INOXIDABLE TIPO BARCELONA
HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE
UN
UN
UN
UN
UN
UN
ML
ML
UN
UN
UN
115,230
481,968
174,216
112,071
113,493
157,122
46,989
53,465
241,922
632,873
2,411,142
116,429
483,646
174,471
113,509
114,932
158,652
47,525
54,066
242,056
633,592
2,411,622
114,398
480,803
174,043
111,072
112,495
156,082
46,252
52,640
241,738
632,374
2,410,809
114,927
481,543
174,151
111,707
113,129
156,729
46,425
52,834
241,781
632,691
2,411,021
115,596
482,480
174,285
112,509
113,932
157,538
46,181
52,562
241,720
633,093
2,411,288
114,996
481,641
174,170
111,790
113,212
156,845
46,642
53,077
241,835
632,733
2,411,049
116,002
483,049
174,374
112,997
114,419
158,069
46,832
53,289
241,883
633,336
2,411,451
114,287
480,648
174,014
110,939
112,361
155,909
45,688
52,010
241,597
632,307
2,410,765
115,087
481,767
174,186
111,899
113,321
156,939
46,468
52,883
241,792
632,787
2,411,085
116,273
483,428
174,429
113,322
114,744
158,402
46,832
53,289
241,883
633,499
2,411,559
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
6.12
6.13
6.14
6.15
6.16
6.17
6.18
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
SEALIZACIN
LNEAS DE DEMARCACIN CON PINTURA EN FRO
MARCA VIAL CON PINTURA EN FRO
SEAL DOBLE DE CICLORUTA
SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M)
SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M
SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M
SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M
TACHAS REFLECTIVAS
SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM
TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
SUMINISTRO E INSTALACIN)
7.10
UNIDAD
UN
UN
UN
UN
UN
UN
UN
Arbelaz
Cabrera
Fusagasug
2,839,838
2,840,318
2,839,505
CONSTRUCCIN
397,073
397,583
396,727
527,719
529,759
526,332
359,333
359,333
359,333
182,107
182,826
181,608
432,400
432,735
431,939
3,641,232 3,644,829
3,638,736
Granada
Pandi
Silvania
Tibacuy
Venecia
2,839,717
396,942
527,195
359,333
181,925
432,048
3,640,322
2,839,984
397,212
528,273
359,333
182,326
431,895
3,642,329
2,839,745
396,981
527,350
359,333
181,967
432,183
3,640,531
Pasca
2,840,147
397,389
528,982
359,333
182,570
432,302
3,643,548
2,839,461
396,669
526,102
359,333
181,541
431,587
3,638,403
2,839,781
397,012
527,475
359,333
182,021
432,075
3,640,802
2,840,255
397,500
529,425
359,333
182,732
432,302
3,644,360
San_Bernardo
ML
M2
UN
UN
UN
UN
UN
UN
UN
1,459
14,695
368,794
426,555
247,435
291,322
400,087
10,385
10,961
1,459
14,695
368,935
427,575
247,577
291,464
400,229
10,385
10,961
1,459
14,695
368,600
425,862
247,241
291,128
399,893
10,385
10,961
1,459
14,695
368,646
426,293
247,287
291,174
399,939
10,385
10,961
1,459
14,695
368,581
426,833
247,222
291,109
399,874
10,385
10,961
1,459
14,695
368,703
426,371
247,344
291,231
399,996
10,385
10,961
1,459
14,695
368,753
427,187
247,394
291,281
400,046
10,385
10,961
1,459
14,695
368,451
425,747
247,092
290,979
399,744
10,385
10,961
1,459
14,695
368,657
426,433
247,298
291,185
399,950
10,385
10,961
1,459
14,695
368,753
427,408
247,394
291,281
400,046
10,385
10,961
UN
42,411
42,411
42,411
42,411
42,411
42,411
42,411
42,411
42,411
42,411
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
DESCRIPCIN
UNIDAD
Arbelaz
Cabrera
Fusagasug
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
CONSTRUCCIN
VAS (SEGN ESPECIFICACIONES
TCNICAS INVIAS 2007)
1
1.1
1.2
1.3
1.4
1.5
1.6
2
2.1
2.2
210.2.1
2.3
210.2.2
2.4
2.5
2.6
220.1
221.1
221.2
2.7
230.1
2.8
230.2
M3
102,085
102,085
102,085
102,085
102,085
102,085
102,085
102,085
102,085
102,085
M3
33,343
33,343
33,343
33,343
33,343
33,343
33,343
33,343
33,343
33,343
HA
1,929,731
1,929,731
1,929,731
1,929,731
1,929,731
1,929,731
1,929,731
1,929,731
1,929,731
1,929,731
HA
659,656
659,656
659,656
659,656
659,656
659,656
659,656
659,656
659,656
659,656
M3
56,744
56,744
56,744
56,744
56,744
56,744
56,744
56,744
56,744
56,744
995
995
995
995
995
995
995
995
995
995
M3
7,472
7,472
7,472
7,472
7,472
7,472
7,472
7,472
7,472
7,472
M3
28,785
28,785
28,785
28,785
28,785
28,785
28,785
28,785
28,785
28,785
M3-KM
M3
6,753
6,753
6,753
6,753
6,753
6,753
6,753
6,753
6,753
6,753
M3
M3
M3
10,975
9,440
5,505
10,975
9,440
5,505
10,975
9,440
5,505
10,975
9,440
5,505
10,975
9,440
5,505
10,975
9,440
5,505
10,975
9,440
5,505
10,975
9,440
5,505
10,975
9,440
5,505
10,975
9,440
5,505
M2
341
341
341
341
341
341
341
341
341
341
M3
9,096
9,096
9,096
9,096
9,096
9,096
9,096
9,096
9,096
9,096
M3
17,449
17,449
17,449
17,449
17,449
17,449
17,449
17,449
17,449
17,449
M3
47,260
47,260
47,260
47,260
47,260
47,260
47,260
47,260
47,260
47,260
M3
58,406
58,406
58,406
58,406
58,406
58,406
58,406
58,406
58,406
58,406
M3
10,594
10,594
10,594
10,594
10,594
10,594
10,594
10,594
10,594
10,594
M3
25,966
25,966
25,966
25,966
25,966
25,966
25,966
25,966
25,966
25,966
2.9
600.1
2.10
600.2
2.11
600.3
2.12
600.4
2.13
600.4 P
2.14
600.5
M3
21,078
21,078
21,078
21,078
21,078
21,078
21,078
21,078
21,078
21,078
2.15
600.5 P
M3
36,376
36,376
36,376
36,376
36,376
36,376
36,376
36,376
36,376
36,376
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
3.1
3.2
3.3
460.1
320.1
330.1
3.4
365.1
3.5
3.6
420.1
421.1
3.7
461.1
3.8
510.1
3.9
450.1 P
3.10
450.2 P
3.11
450.9 P
3.12
450.3 P
3.13
3.14
3.15
3.16
3.17
340.1
340.2
311.1
431.1
430.1
3.18
500.1
3.19
500.1
3.20
500.1
3.21
***
3.22
***
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
DESCRIPCIN
FRESADO CONCRETO ASFLTICO (E=5-12 cm)
SUBBASE GRANULAR
BASE GRANULAR
EXCAVACIN PARA REPARACIN DEL PAVIMENTO EXISTENTE (INCLUYE
RETIRO DE ESCOMBROS CON CARGUE MENOR A 5 Km)
RIEGO DE IMPRIMACIN
RIEGO DE LIGA CON EMULSIN ASFLTICA CRR-1
PAVIMENTO RECICLADO EN FRO EN EL LUGAR CON EMULSION
ASFLTICA
PAVIMENTO DE ADOQUINES DE CONCRETO
MEZCLA DENSA EN CALIENTE TIPO MDC-1 (INCLUYE CEMENTO
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-2 (INCLUYE CEMENTO
ASFLTICO)
MEZCLA DENSA EN CALIENTE PARA BACHEO (INCLUYE CEMENTO
ASFLTICO)
MEZCLA DENSA EN CALIENTE TIPO MDC-3 (INCLUYE CEMENTO
ASFLTICO)
BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-1
BASE ESTABILIZADA CON EMULSIN ASFLTICA TIPO BEE-2
AFIRMADO
TRATAMIENTO SUPERFICIAL DOBLE CON EMULSIN CRR-2
TRATAMIENTO SUPERFICIAL SIMPLE CON EMULSIN CRR-2
CONCRETO PARA PAVIMENTO RGIDO MR-38, INCLUYE SELLADO DE
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-41, INCLUYE SELLADO DE
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
CONCRETO PARA PAVIMENTO RGIDO MR-43, INCLUYE SELLADO DE
JUNTAS Y ACERO DE TRANSFERENCIA Y UNIN
SELLADO DE JUNTAS EN PAVIMENTO DE CONCRETO RGIDO (INCLUYE
LIMPIEZA, SUMINISTRO E INSTALACIN DE FONDO Y SELLANTE)
RAJN PARA MEJORAMIENTO DE LA SUBRASANTE
UNIDAD
Arbelaz
Cabrera
Fusagasug
4,088
4,088
CONSTRUCCIN
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
170,895
178,786
4,088
125,622
133,513
4,088
110,100
117,991
4,088
169,601
177,492
4,088
138,557
146,448
4,088
164,427
172,318
4,088
121,742
129,633
4,088
145,025
152,916
4,088
170,895
178,786
72,536
72,536
72,536
72,536
72,536
72,536
72,536
72,536
72,536
72,536
2,109
1,060
2,109
1,060
2,109
1,060
2,109
1,060
2,109
1,060
2,109
1,060
2,109
1,060
2,109
1,060
2,109
1,060
2,109
1,060
M3
163,031
167,557
159,157
162,108
166,157
161,416
167,231
159,796
162,497
168,704
M2
57,474
58,545
56,180
56,551
56,315
56,900
57,393
55,294
56,652
57,448
M3
504,829
524,729
506,073
462,542
488,660
517,267
499,854
514,779
484,929
507,317
M3
529,829
549,729
531,073
487,542
513,660
542,267
524,854
539,779
509,929
532,317
M3
554,674
574,574
555,917
512,386
538,505
567,111
549,699
564,624
534,774
557,161
M3
554,829
574,729
556,073
512,542
538,660
567,267
549,854
564,779
534,929
557,317
M3
M3
M3
M2
M2
232,204
223,580
53,781
12,170
5,080
277,476
268,853
92,586
12,471
5,231
232,204
223,580
50,109
11,888
4,939
216,682
208,058
75,979
12,116
5,053
276,183
267,559
71,890
12,435
5,213
245,139
236,515
61,750
12,038
5,014
271,009
262,385
84,825
12,492
5,241
228,323
219,700
57,870
11,965
4,978
251,606
242,983
43,641
12,134
5,062
277,476
268,853
86,119
12,605
5,298
M3
538,548
562,518
523,056
532,140
543,142
535,014
551,976
519,184
535,674
556,688
M3
567,063
592,106
550,877
560,368
571,863
563,371
581,093
546,832
564,060
586,015
M3
585,900
611,735
569,284
578,969
590,657
582,173
600,229
564,993
582,801
605,257
M2
M3
M3
125,622
133,513
M3
M2
M2
ML
5,801
5,801
5,801
5,801
5,801
5,801
5,801
5,801
5,801
5,801
M3
104,120
121,400
101,931
101,251
119,857
101,931
123,141
97,967
102,345
129,708
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
887,564
785,546
823,128
506,153
595,924
500,956
590,521
728,428
517,218
763,748
914,754
812,285
850,926
530,108
620,828
525,173
615,696
752,645
542,394
788,924
869,991
768,264
805,162
490,009
579,141
484,148
573,048
711,620
499,745
746,275
880,295
778,399
815,698
499,948
589,473
494,830
584,152
722,302
510,850
757,380
892,775
790,671
828,456
512,314
602,329
508,344
598,201
735,816
524,899
771,429
883,556
781,604
819,030
501,963
591,567
496,233
585,611
723,705
512,308
758,838
902,796
800,526
838,701
520,730
611,078
516,547
606,729
744,019
533,427
779,957
865,599
763,944
800,671
487,093
576,108
481,904
570,714
709,376
497,412
743,942
884,304
782,340
819,795
503,286
592,943
498,062
587,512
725,534
514,210
760,740
908,140
805,782
844,165
525,844
616,395
522,015
612,414
749,487
539,111
785,641
KG
8,402
8,402
8,402
8,402
8,402
8,402
8,402
8,402
8,402
8,402
KG
11,317
11,317
11,317
11,317
11,317
11,317
11,317
11,317
11,317
11,317
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
4.13
641.1
4.14
621.1
4.15
621.1 P
4.16
621.2
4.17
4.18
4.19
4.20
4.21
4.22
4.23
4.24
DESCRIPCIN
UNIDAD
ACERO DE PREESFUERZO
PILOTE PREEXCAVADO FUNDIDO EN SITIO DE DIMETRO 1.50M,
CONCRETO TREMIE 3000 PSI (INCLUYE REFUERZO Y ANILLOS)
PILOTE EN CONCRETO DE 3000 PSI, DIMETRO 1.5M. CONSTRUCCIN
MANUAL (INCLUYE EXCAVACIN EN CUALQUIER TIPO DE MATERIAL,
REFUERZO Y ANILLOS)
BASE ACAMPANADA DE PILOTES, CONCRETO 3000 PSI (INCLUYE
REFUERZO)
TON-M
642.1
632.1
632 P
***
671.1
673.1
610.1
630.6
U(DM3)
ML
ML
UN
M3
M3
M3
M3
4.25
630.7
4.26
630.7
4.27
4.28
4.29
4.30
4.31
4.32
Arbelaz
Cabrera
Fusagasug
1,244
1,244
CONSTRUCCIN
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
1,244
1,244
1,244
1,244
1,244
1,244
1,244
1,244
ML
1,966,028
1,966,028
1,966,028
1,966,028
1,966,028
1,966,028
1,966,028
1,966,028
1,966,028
1,966,028
ML
3,207,601
3,254,110
3,177,541
3,195,168
3,216,515
3,200,745
3,233,656
3,170,029
3,202,024
3,242,797
M3
1,103,493
1,127,470
1,086,852
1,097,428
1,110,808
1,098,817
1,118,930
1,084,630
1,100,628
1,124,344
70,348
268,717
302,937
12,357
401,844
91,580
39,381
337,839
70,348
271,594
302,937
12,357
452,256
108,860
75,201
363,590
70,348
266,720
302,937
12,357
382,436
89,391
40,551
320,329
70,348
267,989
302,937
12,357
408,411
88,710
64,431
331,216
70,348
269,595
302,937
12,357
418,073
107,317
56,097
344,834
70,348
268,156
302,937
12,357
402,837
89,391
51,297
333,177
70,348
270,569
302,937
12,357
435,811
110,600
68,037
353,783
70,348
266,453
302,937
12,357
382,926
85,427
47,715
317,419
70,348
268,373
302,937
12,357
392,422
89,805
28,611
334,758
70,348
271,219
302,937
12,357
441,822
117,167
69,231
359,376
M3
328,888
350,469
317,691
323,910
338,766
325,323
345,277
314,520
326,413
350,987
M3
353,530
375,111
342,332
348,552
363,408
349,965
369,919
339,162
351,054
375,629
630 P
630 P
630.5
630.5
681.1
681.1
M3
M3
M3
M3
M3
M3
340,554
365,196
460,815
548,966
172,912
179,547
362,293
386,935
486,831
576,013
189,407
196,041
329,769
354,410
443,999
531,484
170,823
177,457
335,379
360,021
453,860
541,736
170,173
176,807
349,239
373,880
465,801
554,150
187,934
194,568
337,480
362,122
456,980
544,979
170,823
177,457
356,128
380,770
475,389
564,117
191,068
197,702
325,830
350,472
439,797
527,115
167,039
173,673
338,055
362,697
457,695
545,722
171,218
177,852
361,554
386,196
480,503
569,433
197,336
203,971
4.33
672.1
ML
35,266
36,863
34,234
34,839
35,572
35,031
36,161
33,976
35,074
36,475
4.34
672.1
ML
13,983
14,782
13,467
13,770
14,136
13,865
14,431
13,338
13,887
14,587
M2
8,121
8,121
8,121
8,121
8,121
8,121
8,121
8,121
8,121
8,121
4.35
***
4.36
***
M2
11,630
11,630
11,630
11,630
11,630
11,630
11,630
11,630
11,630
11,630
4.37
***
M2
15,694
15,694
15,694
15,694
15,694
15,694
15,694
15,694
15,694
15,694
M2
18,838
18,838
18,838
18,838
18,838
18,838
18,838
18,838
18,838
18,838
M2
24,223
24,223
24,223
24,223
24,223
24,223
24,223
24,223
24,223
24,223
M2
5,587
5,587
5,587
5,587
5,587
5,587
5,587
5,587
5,587
5,587
M2
6,370
6,370
6,370
6,370
6,370
6,370
6,370
6,370
6,370
6,370
M2
6,618
6,618
6,618
6,618
6,618
6,618
6,618
6,618
6,618
6,618
M2
5,659
5,659
5,659
5,659
5,659
5,659
5,659
5,659
5,659
5,659
4.38
4.39
4.40
4.41
***
***
***
***
4.42
***
4.43
***
SUMINISTRO E INSTALACIN DE
(RESISTENCIA LTIMA 100 KN)
SUMINISTRO E INSTALACIN DE
(RESISTENCIA LTIMA 165 KN)
SUMINISTRO E INSTALACIN DE
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE
FILTRO Y SEPARACIN)
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
4.44
***
4.45
***
4.46
***
4.47
***
4.48
661.1
4.49
660.3
DESCRIPCIN
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2100 (ESTABILIZACIN,
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 1400 (ESTABILIZACIN,
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL T 2400 (ESTABILIZACIN,
FILTRO Y SEPARACIN)
SUMINISTRO E INSTALACIN DE GEOTEXTIL TR 4000 (ESTABILIZACIN,
FILTRO Y SEPARACIN)
4.50
***
4.51
680.3
4.52
640.1
4.53
***
4.54
***
4.55
4.56
4.57
***
682.1 P
***
5
5.1
5.2
5.3
5.4
5.5
5.6
6
6.1
6.2
701.1
UNIDAD
M2
Arbelaz
Cabrera
Fusagasug
CONSTRUCCIN
7,234
7,234
Granada
Pandi
Pasca
San_Bernardo
Silvania
Tibacuy
Venecia
7,234
7,234
7,234
7,234
7,234
7,234
7,234
7,234
M2
5,304
5,304
5,304
5,304
5,304
5,304
5,304
5,304
5,304
5,304
M2
7,136
7,136
7,136
7,136
7,136
7,136
7,136
7,136
7,136
7,136
M2
12,240
12,240
12,240
12,240
12,240
12,240
12,240
12,240
12,240
12,240
ML
318,686
319,125
318,486
318,544
318,574
318,704
318,787
318,296
318,633
318,823
ML
271,881
277,264
268,026
270,273
272,841
270,776
274,956
267,152
270,997
276,063
ML
628,851
628,851
628,851
628,851
628,851
628,851
628,851
628,851
628,851
628,851
M3
102,793
140,105
99,261
124,136
120,205
110,455
132,643
106,724
93,043
133,886
KG
3,282
3,282
3,282
3,282
3,282
3,282
3,282
3,282
3,282
3,282
ML
50,284
50,284
50,284
50,284
50,284
50,284
50,284
50,284
50,284
50,284
ML
80,995
80,995
80,995
80,995
80,995
80,995
80,995
80,995
80,995
80,995
M3
M3
M2
451,488
188,496
48,064
478,535
204,990
48,064
434,006
186,406
48,064
444,257
185,757
48,064
456,672
203,517
48,064
447,501
186,406
48,064
466,639
206,652
48,064
429,637
182,622
48,064
448,244
186,801
48,064
471,955
212,920
48,064
ML
M2
UN
UN
ML
1,459
14,695
68,078
68,078
175,222
1,459
14,695
68,078
68,078
176,475
1,459
14,695
68,078
68,078
174,359
1,459
14,695
68,078
68,078
174,902
1,459
14,695
68,078
68,078
175,586
1,459
14,695
68,078
68,078
174,985
1,459
14,695
68,078
68,078
176,015
1,459
14,695
68,078
68,078
174,232
1,459
14,695
68,078
68,078
175,072
1,459
14,695
68,078
68,078
176,294
UN
10,385
10,385
10,385
10,385
10,385
10,385
10,385
10,385
10,385
10,385
M2
567
567
567
567
567
567
567
567
567
567
UN
100,510
100,510
100,510
100,510
100,510
100,510
100,510
100,510
100,510
100,510
19,465
19,465
19,465
19,465
19,465
19,465
19,465
19,465
19,465
19,465
6.3
801.7
ML
6.4
211.1
REMOCIN DE DERRUMBES
M3
6,286
6,286
6,286
6,286
6,286
6,286
6,286
6,286
6,286
6,286
6.5
801.1
HA
342,240
342,240
342,240
342,240
342,240
342,240
342,240
342,240
342,240
342,240
6.6
801.4
M2
1,363
1,363
1,363
1,363
1,363
1,363
1,363
1,363
1,363
1,363
6.7
810.1
M2
12,150
12,150
12,150
12,150
12,150
12,150
12,150
12,150
12,150
12,150
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)
PROVINCIA: SUMAPAZ
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
6.8
6.9
810.3
***
DESCRIPCIN
UNIDAD
M2
M2
Arbelaz
Cabrera
Fusagasug
32,860
32,860
CONSTRUCCIN
5,945
5,945
32,860
5,945
Granada
32,860
5,945
Pandi
32,860
5,945
Pasca
32,860
5,945
San_Bernardo
32,860
5,945
Silvania
32,860
5,945
Tibacuy
32,860
5,945
NOTA: PARA BASES ESTABILIZADAS CON CEMENTO Y ADITIVO SE UTILIZAR EL APU DE BASE ESTABILIZADA CON CEMENTO, AL CUAL SE LE ADICIONAR LA PROPORCIN DEL ADITIVO SIGUIENDO LAS RECOMENDACIONES
DEL FABRICANTE, SEGN DISEO Y TIPO DE SUELO.
Venecia
32,860
5,945