ESTACION DE TRANSFERENCIA
Ubicacin
CHIHUAHUA CHIH.
NOTAS:
Elabor:
Ing.
Revis:
DLA
Fecha:
Julio del 2006
Aprob:
Rev.
No. de Doc:
Ubicacin de Doc:
PROYECTO
FECHA
ING. DLA
Jun-06
NDICE GENERAL
1.- Introduccin
PROYECTO
FECHA
ING. DLA
Jul-06
INTRODUCCIN :
SE REALIZA EL ANLISIS Y DISEO DE MUROS DE CONTENCION, ASI COMO EL
DE LA CASETA Y MIEMBROS DE NAVE DE DESCARGA
LA ESTRUCTURA HA SIDO PROPUESTA PARA COMPACTAR Y TRANSPORTAR
TODO TIPO DE DESPERDICIO, GENERADO POR EL MUNICIPIO
PROYECTO
FECHA
ING. DLA
Jun-06
PLANTA
VISTA SUPERIOR EN 3D
PROYECTO
FECHA
ING. DLA
Jun-06
MURO EJE 1
PROYECTO
FECHA
ING. DLA
Jun-06
MURO EJE A
PROYECTO
FECHA
ING. DLA
May-06
CARGAS DE VIENTO
PROYECTO
FECHA
ING. DLA
Jul-06
H' =
H=
m
m
5.5
6
km/hr
0.95
tabla I.3 FACTOR DE TAMAO
= Altura gradiente
315
0.131
0.392
273 +
Altitud (msnm)
es la presin baromtrica, en mm de Hg
es la temperatura ambiental, en C
clase
de
estructura
si, Z <= 10
si, 10 < Z <
si, Z >=
Altitud
1423
641.2
18.7
0.862
A
B
C
Fc
1
0.95
0.9
m
Categoria del
terreno
1
2
3
4
Clase de la estructura
A
B
C
0.099
0.101
0.105
0.128
0.131
0.138
0.156
0.160
0.171
0.170
0.177
0.193
(m)
245
315
390
455
PROYECTO
FECHA
ING. DLA
Jul-06
Anlisis estatico
Los empujes medios que se evaluan con este procedimiento
son aplicables al diseo de las estructuras pertenecientes
al tipo 1
Limitaciones:
El metodo estatico solo puede utilizarce para disear estructuras o
elementos estructurales poco sensibles a la accion turbulenta del
viento, esta condicion se satisface cuando:
a).- la relacion H/D <5, en donde H es la altura de la construccion y D es la
dimension minima de la base
b).- el periodo fundamental de la estructura es menor o igual que un segundo
Para el caso de construcciones cerradas, techos aislados y toldos y cubiertas
adyacentes, no es necesario calcular su periodo fundamental, cuando
se cumplan las siguientes condiciones:
a).- la altura total de la construccion H es menor o igual que 15.00 mt.
b).- la planta de la estructura es rectangular o formada por una combinacion de rectangulos
c).- la relacion H/D es menor que cuatro para construcciones cerradas y
menor que uno para techos aislados; para toldos y cubiertas adyacentes en
voladizo, el claro no debe ser mayor que 5.00 mt.
d).- para construcciones cerradas y techos aislados, la pendiente de sus techos inclinados
o a dos aguas no debe exceder los 20 y en techos de claros multiples debera ser menor que 60
para toldos y cubiertas adyacentes, la pendiente no sera mayor que 5.
Sustituyendo valores
H=
D=
6
40
H/D=
0.15
MT
MT
< 5 OK
por tanto se cumplen todas las condiciones para aplicar el metodo estatico.
calculo de la velocidad de diseo
para z= 10 MT
para z>10 mt
VD = FT F VR
166.3673511
169.4413953
F = fc Frz
0.943125573
0.960552127
Frz = 1.56(10/)
Frz = 1.56(Z/)
Frz = 1.56
donde :
si, Z <= 10
si, 10 < Z <
si, Z >=
0.99276
1.01111
z = altura de la estructura
Presiones exteriores
Pe = Cpe Ka Kl qz
Donde :
1
1
=0.0048 G VD
114.47 K/MT
118.74 K/MT
PROYECTO
FECHA
ING. DLA
Jul-06
Presiones interiores
P1 = Cp1 qz
Donde :
d/b
inclinacion del
techo
cualquiera
<1
=2
>4
sotavento
-0.5
< 10
-0.2
-0.3
= 20
> 25
-0.4
cualquiera
-0.5
-0.5
=2
>4
cualquiera
-0.3
-0.2
-0.3
10 < y < 15
<1
Cpe
0.30 o^ 0.00
-0.1
0.3
0.5
0.6
0.8
-0.5
c) en un muro lateral:
d) en el techo:
-0.3 o^0.0
segn lo que
produzca la
combinacion
de carga mas
desfaborable
-0.65
-0.5
-0.3
-0.2
PROYECTO
FECHA
May-06
MARCO EJE 1
Pe = 0.8 x 115 =
92 kg/mt
Pe =- 0.5 x 115 =
- 58 kg/mt
Pt = Pe - Pi
Pi =- 0.2 x 115 =
23 kg/mt
- 23 kg/mt
P total =
115 kg/mt
P total =
donde :
35 kg/mt
Pe = presion exterior
Pi = presion interior
Pt = presion total
MARCO EJE H Y A
para h = 6.00 mt
para h entre 6.00 y 12.00 mt
para h entre 12.00 y 18.00 mt
para h mayor a 18.00 mt
Pe =- 0.65 x 115 =
Pe =- -0.50 x 115 =
Pe =- 0.30 x 115 =
Pe =- 0.20 x 115 =
-74 kg/mt
-58 kg/mt
-35 kg/mt
-23 kg/mt
Pi =- 0.20 x 115 =
Pi =- -0.20 x 115 =
Pi =- 0.20 x 115 =
Pe =- 0.20 x 115 =
-23 kg/mt
-23 kg/mt
-23 kg/mt
-23 kg/mt
PRESION TOTAL
para h = 6.00 mt
para h entre 6.00 y 12.00 mt
para h entre 12.00 y 18.00 mt
para h mayor a 18.00 mt
MURO EJES 1
Pt =
Pt =
Pt =
Pt =
-48 kg/mt
-35 kg/mt
-12 kg/mt
-0 kg/mt
MURO EJES A
PROYECTO
FECHA
ING. HSJL
Jul-06
PROYECTO
FECHA
ING. HSJL
May-06
REVISIN DE DESPLAZAMIENTOS
PROYECTO
FECHA
ING. HSJL
May-06
REVISIN DE DESPLAZAMIENTOS :
DESPLAZAMIENTO PERMISIBLE :
0.012 x H =
7.2
cm
EN NAVE
0.012 x H =
14.4
cm
EN TOLVAS
H = 600 cm
PARA TOLVAS
H= 1200 cm
DESPLAZAMIENTO ACTUANTE :
NODO
LOAD
actuante
135
5.71
EN NAVE
42
3.05
EN TOLVAS
PROJECT : INCREMI
LOCATION : CHIHUAHUA
DATE : 06-24-2006
JOB NO. : TRANSFERENCIA
SPAN : 40.00m
HEIGHT : 10.00m
RADIUS : 25.00
DEAD LOAD = 10 kg/m2
WIND LOAD = 75 kg/m2
LIVE LOAD = 59 kg/m2
ARCH CENTRAL ANGLE : 106.26 deg
ARCH LENGTH : 46.37 m
0.13
0.16
0.03
0.14
0.16
0.26
0.57
0.01
0.58
0.57
0.60
0.92
0.09
0.95
0.90
****************************************************
*
*
*
STAAD.Pro
*
*
Version 2004
Bld 1004.US
*
*
Proprietary Program of
*
*
Research Engineers, Intl.
*
*
Date=
AUG 18, 2006
*
*
Time=
12:13:22
*
*
*
*
USER ID: WFI DE MEXICO
*
****************************************************
Page 1 of 38
-- PAGE NO.
168 18 -4.4 5.4; 169 18 -3.3 5.4; 170 18 -2.2 5.4; 171 18 -1.1 5.4
172 47.3 -1.1 -22.55; 173 47.3 -2.2 -22.55; 174 47.3 -3.3 -22.55
175 47.3 -4.4 -22.55; 176 47.3 -1.1 -18.45; 177 47.3 -2.2 -18.45
178 47.3 -3.3 -18.45; 179 47.3 -4.4 -18.45; 180 47.3 -1.1 -14.35
181 47.3 -2.2 -14.35; 182 47.3 -3.3 -14.35; 183 47.3 -4.4 -14.35
184 47.3 -1.1 -10.25; 185 47.3 -2.2 -10.25; 186 47.3 -3.3 -10.25
187 47.3 -4.4 -10.25; 188 47.3 -1.1 -6.15; 189 47.3 -2.2 -6.15
190 47.3 -3.3 -6.15; 191 47.3 -4.4 -6.15; 192 47.3 -1.1 -4.1
193 47.3 -2.2 -4.1; 194 47.3 -3.3 -4.1; 195 47.3 -4.4 -4.1; 196 42 6 -6.15
197 42 6 -10.25; 198 42 6 -14.35; 199 42 6 -18.45; 200 0 -5.5 0; 201 6 -5.5 0
202 12 -5.5 0; 203 18 -5.5 0; 204 24 -5.5 0; 205 30 -5.5 0; 206 36 -5.5 0
207 42 -5.5 0; 208 47.3 3 -4.1; 209 47.3 3 -6.15; 210 47.3 3 -10.25
211 47.3 3 -14.35; 212 47.3 3 -18.45; 213 47.3 3 -22.55; 214 47.3 1 -4.1
215 47.3 1 -6.15; 216 47.3 1 -10.25; 217 47.3 1 -14.35; 218 47.3 1 -18.45
219 47.3 1 -22.55; 220 6 3 5.4; 221 12 3 5.4; 222 18 1 5.4; 223 18 2 5.4
224 18 3 5.4; 225 6 1 5.4; 226 12 1 5.4; 227 6 3 0; 228 18 3 0; 229 18 2 0
230 42 3 -22.55; 231 42 2 -22.55; 232 42 3 -4.1; 233 42 2 -4.1; 234 3 6 0
235 39 6 0
MEMBER INCIDENCES
1 25 45; 2 26 46; 3 27 47; 4 28 48; 5 29 49; 6 30 50; 7 31 51; 8 32 125
9 17 150; 10 18 89; 11 19 90; 12 20 121; 13 21 57; 14 22 58; 15 23 59
16 39 101; 17 40 103; 18 41 105; 19 42 107; 20 43 109; 21 44 111; 22 24 60
23 39 40; 24 40 41; 25 41 42; 26 42 43; 27 43 44; 28 25 26; 29 26 27; 30 27 28
31 28 29; 32 29 30; 33 30 31; 34 31 32; 35 17 234; 36 18 19; 37 19 20
38 20 21; 39 21 22; 40 22 23; 41 23 235; 42 45 61; 43 46 62; 44 47 63
45 48 64; 46 49 65; 47 50 66; 48 51 67; 49 52 124; 50 45 46; 51 46 47
52 47 48; 53 48 49; 54 49 50; 55 50 51; 56 51 52; 57 53 151; 58 54 227
59 55 88; 60 56 228; 61 57 73; 62 58 74; 63 59 75; 64 60 76; 65 53 54
66 56 57; 67 57 58; 68 58 59; 69 59 60; 70 61 9; 71 62 10; 72 63 11; 73 64 12
74 65 13; 75 66 14; 76 67 15; 77 68 16; 78 69 1; 79 70 2; 80 71 3; 81 72 4
82 73 5; 83 74 6; 84 75 7; 85 76 8; 86 74 75; 87 75 76; 88 72 73; 89 73 74
90 69 70; 91 61 62; 92 62 63; 93 63 64; 94 64 65; 95 65 66; 96 66 67; 97 67 68
98 79 83; 99 80 85; 100 79 80; 101 79 18; 102 81 160; 103 82 164; 104 81 82
105 2 81; 106 83 220; 107 84 225; 108 85 221; 109 86 226; 110 83 85; 111 87 70
112 88 71; 113 89 54; 114 90 55; 115 89 83; 116 94 115; 117 93 113; 118 44 94
119 39 93; 120 94 93; 121 93 24; 122 95 192; 123 96 188; 124 97 184
125 98 180; 126 99 176; 127 100 172; 128 95 96; 129 96 97; 130 97 98
131 98 99; 132 99 100; 133 101 208; 134 102 214; 135 103 209; 136 104 215
137 105 210; 138 106 216; 139 107 211; 140 108 217; 141 109 212; 142 110 218
143 111 213; 144 112 219; 145 113 122; 146 114 91; 147 115 123; 148 116 92
149 113 101; 150 101 103; 151 103 105; 152 105 107; 153 107 109; 154 109 111
155 111 115; 156 117 168; 157 118 222; 158 119 120; 159 120 20; 160 121 56
161 119 121; 162 118 4; 163 80 120; 164 85 119; 165 82 118; 166 76 114
167 122 232; 168 60 122; 169 123 230; 170 124 68; 171 125 52; 172 126 148
173 127 146; 174 128 144; 175 129 142; 176 130 140; 177 131 138; 178 138 139
179 139 137; 180 140 141; 181 141 136; 182 142 143; 183 143 135; 184 144 145
185 145 134; 186 146 147; 187 147 133; 188 148 149; 189 149 132; 190 139 141
191 141 143; 192 143 145; 193 147 149; 194 138 140; 195 140 142; 196 142 144
197 146 148; 198 150 53; 199 151 69; 200 149 53; 201 148 69; 202 45 139
203 61 138; 204 152 156; 205 153 158; 206 156 157; 207 157 154; 208 158 159
209 159 155; 210 160 161; 211 161 162; 212 162 163; 213 163 77; 214 164 165
215 165 166; 216 166 167; 217 167 78; 218 168 169; 219 169 170; 220 170 171
221 171 118; 222 220 221; 223 221 224; 224 84 86; 225 86 223; 226 225 226
227 226 222; 228 172 173; 229 173 174; 230 174 175; 231 175 37; 232 176 177
233 177 178; 234 178 179; 235 179 36; 236 180 181; 237 181 182; 238 182 183
239 183 35; 240 184 185; 241 185 186; 242 186 187; 243 187 34; 244 188 189
Page 2 of 38
-- PAGE NO.
245 189 190; 246 190 191; 247 191 33; 248 192 193; 249 193 194; 250 194 195
251 195 38; 252 208 209; 253 209 210; 254 210 211; 255 211 212; 256 212 213
257 102 104; 258 104 106; 259 106 108; 260 108 110; 261 110 112; 262 214 215
263 215 216; 264 216 217; 265 217 218; 266 218 219; 267 25 137; 268 137 136
269 136 135; 270 135 134; 271 133 132; 272 132 17; 273 32 155; 274 155 154
275 154 94; 276 52 159; 277 159 157; 278 157 123; 279 68 158; 280 158 156
281 156 116; 282 134 133; 283 19 80; 284 196 40; 285 197 41; 286 198 42
287 199 43; 288 116 114; 289 91 95; 290 100 92; 291 144 146; 292 70 71
293 71 72; 294 1 200; 295 2 201; 296 4 203; 297 5 204; 298 6 205; 299 7 206
300 8 207; 301 3 202; 302 3 82; 303 208 102; 304 209 104; 305 210 106
306 211 108; 307 212 110; 308 213 112; 309 214 95; 310 215 96; 311 216 97
312 217 98; 313 218 99; 314 219 100; 315 220 84; 316 221 86; 317 222 223
318 223 224; 319 224 119; 320 225 81; 321 226 82; 322 227 87; 323 225 70
324 87 84; 325 227 220; 326 228 229; 327 229 72; 328 222 72; 329 223 229
330 224 228; 331 230 231; 332 231 116; 333 219 116; 334 112 231; 335 213 230
336 232 233; 337 233 114; 338 114 214; 339 233 102; 340 232 208; 341 234 18
342 235 24
DEFINE MATERIAL START
ISOTROPIC MATERIAL1
E 2.09042E+007
POISSON 0.3
DENSITY 7.85181
ISOTROPIC MATERIAL2
E 2.54929E+006
POISSON 0.17
DENSITY 2.44732
ISOTROPIC CONCRETE
E 2.21467E+006
POISSON 0.17
DENSITY 2.40262
ALPHA 1E-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL MATERIAL1 MEMB 1 TO 85 98 TO 165 167 TO 193 198 TO 200 202 204 TO 278 282 TO 287 289 290 302 TO 342
MATERIAL MATERIAL2 MEMB 86 TO 97 166 194 TO 197 201 203 279 TO 281 288 291 292 TO 293
MATERIAL CONCRETE MEMB 294 TO 301
*COLUMNAS DE ACERO DE NAVE
MEMBER PROPERTY AMERICAN
1 TO 15 22 42 TO 49 57 TO 64 70 TO 85 111 TO 114 160 170 171 198 199 322 326 327 TABLE ST TUBE TH 0.016 WT 1 DT 0.4
*COLUMNAS METALICAS DE FACHADAS LATERALES
MEMBER PROPERTY AMERICAN
116 117 145 TO 148 167 169 172 TO 189 204 TO 209 331 332 336 337 TABLE ST HSST12X12X0.5
*LARGUEROS PARA RECIBIR MULTYPANEL
MEMBER PROPERTY AMERICAN
50 TO 56 65 TO 69 110 115 149 TO 155 161 164 168 190 TO 193 200 202 222 TO 227 252 TO 266 276 TO 278 323 TO 325 328 TO 330 333 TO 335 338 TO 340 TABLE ST TUBE TH 0.004 WT 0.2 DT 0.1
*MURO DE CONCRETO DE NAVE
MEMBER PROPERTY AMERICAN
86 TO 97 166 194 TO 197 201 203 279 TO 281 288 291 TO 293 PRIS YD 0.45 ZD 0.2
*TRABES PRINCIPALES PARA RECIBIR ARCOTECHO Y COLUMNAS DE TOLVAS
Page 3 of 38
-- PAGE NO.
Page 4 of 38
-- PAGE NO.
Page 5 of 38
-- PAGE NO.
P R O B L E M
S T A T I S T I C S
----------------------------------NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS =
235/
342/
ORIGINAL/FINAL BAND-WIDTH=
217/
19/
108 DOF
TOTAL PRIMARY LOAD CASES =
4, TOTAL DEGREES OF FREEDOM =
SIZE OF STIFFNESS MATRIX =
130 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE =
14.0/ 26562.0 MB
35
1200
Page 6 of 38
-- PAGE NO.
10
11
12
13
14
15
16
33
34
35
36
37
38
77
78
LOAD
FORCE-X
FORCE-Y
FORCE-Z
MOM-X
MOM-Y
MOM Z
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
0.42
0.19
-0.44
0.20
-0.10
-0.74
0.10
-0.04
-0.74
0.03
-0.01
-0.77
-0.02
-0.01
-0.80
-0.10
0.01
-0.87
-0.20
0.07
-1.01
-0.42
-0.22
-1.15
-0.05
-0.05
0.03
-0.06
-0.08
-0.51
-0.06
-0.08
-0.63
-0.04
-0.01
-0.18
-0.02
0.02
0.35
-0.05
-0.01
0.21
0.12
0.10
-0.03
0.03
0.01
-0.16
6.95
1.76
6.54
10.30
-0.05
10.36
10.25
-0.03
10.27
10.25
-0.03
10.27
10.25
-0.03
10.26
10.25
-0.03
10.25
10.30
-0.05
10.27
7.00
1.79
7.27
1.38
0.81
1.34
3.12
3.11
3.09
4.63
4.63
4.61
3.13
3.18
3.21
1.24
1.15
3.53
0.98
2.15
2.74
6.32
4.29
5.06
9.13
7.20
8.12
0.15
-1.41
0.54
9.36
-3.93
6.90
9.68
-3.80
5.94
9.64
-3.80
5.35
9.64
-3.80
5.16
9.68
-3.79
5.19
9.36
-3.98
4.81
-0.26
-2.71
-0.01
-0.01
-0.23
-0.06
-0.05
-0.27
-0.10
-0.01
-0.22
-0.05
0.04
-0.17
-0.01
0.00
-0.18
-0.04
-0.01
-0.21
-0.05
-0.24
-0.10
-0.18
-0.34
-0.16
-0.27
2.71
-4.62
1.40
55.80
-13.09
34.94
58.06
-12.44
31.46
57.85
-12.44
29.53
57.85
-12.44
28.89
58.06
-12.42
29.02
55.77
-13.35
26.73
1.82
-8.55
1.32
-0.03
-0.68
-0.18
-0.11
-0.75
-0.26
-0.02
-0.66
-0.17
0.07
-0.57
-0.08
-0.01
-0.59
-0.13
-0.03
-0.65
-0.17
-0.88
-0.26
-0.61
-1.11
-0.34
-0.74
-4.25
3.67
-9.76
-0.83
-0.13
0.41
0.04
0.00
0.35
0.00
0.00
0.17
0.00
0.00
0.00
-0.04
0.00
-0.02
0.84
0.22
0.70
4.30
-3.84
-0.87
-0.01
0.04
0.50
0.00
0.00
0.34
0.01
-0.01
-0.09
0.00
-0.03
-0.50
0.00
0.02
-0.26
0.00
0.07
0.28
0.01
0.01
-0.03
0.01
0.00
-0.01
-0.36
0.07
3.15
-0.18
-0.07
2.88
-0.05
-0.07
2.80
-0.01
-0.01
2.70
0.00
0.07
2.63
0.04
0.14
2.64
0.17
0.15
2.82
0.35
0.02
3.22
0.09
0.16
0.49
0.09
0.26
2.61
0.11
0.24
3.15
0.08
0.08
1.56
0.04
-0.03
-0.63
0.09
0.02
-0.37
-0.27
-0.20
0.28
-0.09
-0.02
0.52
Page 7 of 38
-- PAGE NO.
91
92
117
126
127
128
129
130
131
152
153
200
201
202
203
204
LOAD
FORCE-X
FORCE-Y
FORCE-Z
MOM-X
MOM-Y
MOM Z
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
0.62
0.09
-3.92
0.10
-0.40
-5.85
-0.08
-0.09
-0.23
-0.27
-0.06
-3.29
-0.07
-0.02
-3.75
0.00
0.03
-4.44
0.00
0.35
-5.38
-0.03
0.96
-5.16
-0.14
1.16
-3.78
0.05
-1.03
-2.38
0.13
-1.35
-1.89
0.08
0.10
-0.69
0.05
0.00
-0.86
0.04
-0.01
-0.95
-0.02
0.00
-1.00
-0.04
0.03
-1.00
4.91
4.67
3.62
4.97
4.78
2.48
6.51
4.30
5.58
1.76
1.83
1.82
2.63
2.69
2.69
2.87
2.91
2.87
2.05
2.09
2.07
2.15
2.18
2.17
2.12
2.20
2.15
2.00
2.01
2.01
2.31
2.39
2.34
21.25
16.12
20.52
24.12
15.79
25.11
25.30
16.95
26.33
23.79
15.76
25.08
24.52
14.25
24.53
-3.78
-4.61
-2.55
2.94
2.35
2.59
-0.26
-0.11
-0.17
-0.67
-0.59
-0.51
-1.21
-1.28
-1.18
0.54
0.56
0.60
-0.21
-0.33
-0.20
-0.03
-0.21
-0.04
0.04
-0.23
0.02
-0.74
-1.26
-0.68
-0.16
-0.64
-0.14
0.70
0.12
0.27
-8.55
-1.72
-5.58
-9.07
-1.16
-4.55
-9.72
-1.90
-4.76
-9.45
-2.91
-5.01
-0.77
-1.24
-0.16
0.08
-0.51
0.17
-0.98
-0.27
-0.56
-0.56
-0.46
-0.42
-0.49
-0.45
-0.40
-0.05
-0.13
-0.03
-0.09
-0.24
-0.10
0.00
-0.20
-0.02
0.06
-0.20
0.03
-0.34
-0.84
-0.31
-0.08
-0.55
-0.08
0.10
-0.92
-0.53
-88.81
-13.97
-55.23
-97.59
-10.87
-50.22
-100.62
-15.76
-49.51
-108.66
-24.47
-55.56
0.10
0.92
-0.57
0.01
1.68
1.49
0.01
-0.01
-0.03
-0.10
-0.03
1.26
-0.06
-0.01
0.67
-0.01
-0.10
0.42
0.01
-0.27
-0.13
0.04
-0.23
-0.57
0.05
0.25
-1.61
-0.02
0.35
0.02
-0.06
-0.23
-0.66
5.59
1.41
9.05
2.18
-0.74
-0.93
0.23
0.03
-0.56
0.60
1.18
-0.36
0.54
0.22
0.38
-1.07
-0.03
5.72
-0.21
0.80
10.00
0.10
0.17
0.65
0.92
0.13
10.50
0.47
0.05
16.44
0.05
-0.42
20.94
0.06
-1.59
21.59
0.23
-3.32
19.64
0.57
-3.29
12.49
-0.29
3.39
8.06
-0.58
3.90
5.94
-0.32
-0.23
6.43
-0.16
-0.02
6.88
-0.06
-0.04
7.09
0.14
-0.11
7.19
0.28
-0.21
7.19
Page 8 of 38
-- PAGE NO.
205
206
207
LOAD
FORCE-X
FORCE-Y
FORCE-Z
MOM-X
MOM-Y
MOM Z
5
6
7
5
6
7
5
6
7
-0.08
0.05
-1.03
-0.10
0.06
-1.04
-0.13
-0.07
-0.92
24.53
14.25
24.53
24.57
14.24
24.54
20.73
15.64
20.98
-9.68
-2.99
-5.17
-8.49
-2.83
-4.40
1.17
0.67
0.67
-111.11
-25.37
-57.27
-97.73
-23.62
-48.69
1.81
0.06
2.06
-0.11
-0.01
-0.08
-3.23
-0.45
-1.92
-5.92
-1.74
-0.99
0.44
-0.28
7.28
0.57
-0.34
7.35
0.71
-0.08
7.14
Page 9 of 38
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
LOAD
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
X-TRANS
0.0162
-0.0104
0.3039
0.0132
-0.0086
0.2890
0.0109
-0.0074
0.2762
0.0089
-0.0063
0.2666
0.0073
-0.0055
0.2591
0.0056
-0.0048
0.2547
0.0038
-0.0039
0.2529
0.0011
-0.0026
0.2533
0.0092
-0.0186
0.1486
0.0058
-0.0122
0.1326
0.0032
-0.0066
0.1209
0.0009
-0.0013
0.1123
-0.0013
0.0039
0.1066
-0.0036
0.0093
0.1034
-0.0062
0.0150
0.1025
-0.0097
0.0216
0.1035
-- PAGE NO.
RADIANS)
Y-TRANS
-0.0064
-0.0019
-0.0060
-0.0085
-0.0006
-0.0091
-0.0087
-0.0009
-0.0094
-0.0083
-0.0006
-0.0091
-0.0093
-0.0002
-0.0093
-0.0093
-0.0002
-0.0093
-0.0093
-0.0002
-0.0093
-0.0062
-0.0017
-0.0063
-0.0032
0.0002
-0.0030
-0.0053
0.0015
-0.0054
-0.0053
0.0014
-0.0053
-0.0053
0.0014
-0.0053
-0.0053
0.0014
-0.0053
-0.0053
0.0014
-0.0053
-0.0053
0.0015
-0.0053
-0.0032
0.0002
-0.0033
10
Z-TRANS
0.0783
0.0340
0.0434
1.3415
0.1537
0.7983
1.4947
0.1292
0.7660
1.5173
0.1800
0.7414
1.7488
0.2957
0.8725
1.7872
0.3101
0.8990
1.5752
0.2829
0.7641
0.0820
0.0659
0.0207
-0.0389
0.0350
-0.0144
-0.6012
0.1126
-0.3598
-0.6265
0.1060
-0.3281
-0.6244
0.1060
-0.3116
-0.6244
0.1060
-0.3062
-0.6265
0.1059
-0.3075
-0.6010
0.1155
-0.2827
-0.0332
0.0679
-0.0220
X-ROTAN
0.0002
0.0001
0.0001
0.0020
0.0002
0.0011
0.0022
0.0002
0.0011
0.0022
0.0002
0.0011
0.0027
0.0004
0.0013
0.0028
0.0004
0.0014
0.0025
0.0004
0.0012
0.0002
0.0001
0.0001
-0.0001
0.0001
0.0000
-0.0014
0.0002
-0.0009
-0.0015
0.0002
-0.0008
-0.0015
0.0002
-0.0007
-0.0015
0.0002
-0.0007
-0.0015
0.0002
-0.0007
-0.0014
0.0003
-0.0007
-0.0001
0.0001
-0.0001
Y-ROTAN
-0.0015
-0.0002
-0.0022
-0.0005
0.0001
0.0001
0.0000
0.0000
0.0001
-0.0001
-0.0002
0.0000
-0.0001
-0.0001
-0.0001
0.0000
0.0000
0.0000
0.0008
0.0001
0.0005
0.0015
0.0003
0.0002
0.0010
-0.0006
0.0019
0.0002
0.0000
-0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
-0.0002
0.0000
-0.0002
-0.0010
0.0006
0.0001
Z-ROTAN
-0.0002
0.0001
-0.0007
0.0000
0.0000
-0.0004
0.0000
0.0000
-0.0004
0.0000
0.0000
-0.0003
0.0000
0.0000
-0.0003
0.0000
0.0000
-0.0003
0.0000
0.0000
-0.0003
0.0002
-0.0001
-0.0002
-0.0002
0.0001
-0.0005
0.0000
0.0000
-0.0003
0.0000
0.0000
-0.0002
0.0000
0.0000
-0.0002
0.0000
0.0000
-0.0002
0.0000
0.0000
-0.0002
0.0000
0.0000
-0.0002
0.0002
-0.0001
-0.0001
Page 10 of 38
39
40
41
42
43
44
80
93
94
132
133
134
135
136
137
LOAD
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
5
6
7
X-TRANS
-0.2232
-0.0512
0.8512
-0.2928
-0.0567
1.2720
-0.4198
-0.1505
2.5048
-0.4154
-0.1692
2.9985
-0.2596
-0.0459
2.4062
-0.0708
0.1158
1.6186
-0.0672
-0.0164
0.3828
-0.2229
-0.0500
0.8518
-0.0701
0.1174
1.6228
0.2396
0.0248
2.5054
0.1453
0.0104
4.5030
0.0203
-0.1435
5.8861
0.0218
-0.4410
5.7145
0.0703
-0.8212
5.0678
0.1559
-0.7242
3.0086
-- PAGE NO.
RADIANS)
Y-TRANS
-0.0040
-0.0098
-0.0156
-0.0075
-0.0051
-0.0074
-0.0145
-0.0145
-0.0144
-0.0201
-0.0201
-0.0200
-0.0146
-0.0149
-0.0151
-0.0059
-0.0062
-0.0219
-0.0424
-0.0301
-0.0360
-0.0041
-0.0037
-0.0020
-0.0041
-0.0037
-0.0001
-0.0014
-0.0015
-0.0015
-0.0021
-0.0021
-0.0022
-0.0023
-0.0023
-0.0023
-0.0017
-0.0017
-0.0017
-0.0018
-0.0018
-0.0018
-0.0017
-0.0018
-0.0018
11
Z-TRANS
0.0144
0.3241
0.1202
0.0144
0.3243
0.1187
0.0147
0.3251
0.1160
0.0151
0.3261
0.1137
0.0155
0.3272
0.1115
0.0159
0.3285
0.1095
1.4906
0.1293
0.7642
0.0692
0.0665
0.0139
0.0175
0.0708
0.0023
0.0644
0.0336
0.0364
0.0508
0.0333
0.0297
0.0214
0.0335
0.0152
0.0062
0.0335
0.0077
-0.0087
0.0337
0.0003
-0.0237
0.0342
-0.0070
X-ROTAN
0.0000
0.0001
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0001
0.0001
0.0007
0.0000
0.0004
-0.0001
-0.0001
-0.0002
0.0003
0.0003
0.0002
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0001
0.0001
0.0001
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Y-ROTAN
0.0003
-0.0002
-0.0011
0.0004
0.0001
-0.0028
0.0002
0.0002
-0.0025
-0.0002
-0.0001
0.0002
-0.0005
-0.0004
0.0022
-0.0002
-0.0002
0.0009
-0.0002
0.0000
0.0001
0.0000
-0.0002
-0.0018
0.0000
-0.0010
0.0003
0.0001
0.0000
-0.0049
0.0002
0.0000
-0.0036
0.0000
0.0003
0.0004
0.0000
0.0007
0.0005
-0.0001
0.0005
0.0021
-0.0001
-0.0009
0.0053
Z-ROTAN
0.0003
0.0002
-0.0007
0.0010
0.0006
-0.0008
0.0014
0.0011
-0.0010
0.0014
0.0011
-0.0013
0.0010
0.0007
-0.0016
0.0002
0.0000
-0.0015
0.0000
0.0000
-0.0001
0.0003
0.0000
-0.0010
0.0001
-0.0002
-0.0021
-0.0005
0.0000
-0.0057
-0.0004
0.0000
-0.0106
-0.0001
0.0004
-0.0141
-0.0001
0.0011
-0.0135
-0.0002
0.0018
-0.0117
-0.0004
0.0015
-0.0068
Page 11 of 38
-- PAGE NO.
12
255.
256.
257.
258.
259.
260.
261.
262.
*********CONTRATRABES*************
LOAD LIST 8 TO 10
START CONCRETE DESIGN
CODE ACI
FYMAIN 42000 MEMB 86 TO 97 166 194 TO 197 201 203 279 TO 281 288
FC 2500 MEMB 86 TO 97 166 194 TO 197 201 203 279 TO 281 288
CONCRETE TAKE
DESIGN COLUMN 294 TO 301
Page 12 of 38
-- PAGE NO.
13
====================================================================
COLUMN
FY - 413.7
NO.
FC -
294
27.6 MPA,
SQ. MM
BAR CONFIGURATION
REINF PCT.
LOAD
LOCATION
PHI
---------------------------------------------------------36 - 20 MM
1.047
8
(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER
8 SPACING 320.00 MM
END
0.650
====================================================================
COLUMN
FY - 413.7
NO.
FC -
295
27.6 MPA,
SQ. MM
BAR CONFIGURATION
REINF PCT.
LOAD
LOCATION
PHI
---------------------------------------------------------36 - 20 MM
1.047
8
(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER
8 SPACING 320.00 MM
END
0.650
====================================================================
COLUMN
FY - 413.7
NO.
FC -
296
27.6 MPA,
SQ. MM
BAR CONFIGURATION
REINF PCT.
LOAD
LOCATION
PHI
---------------------------------------------------------36 - 20 MM
1.047
8
(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER
8 SPACING 320.00 MM
END
0.650
Page 13 of 38
-- PAGE NO.
14
====================================================================
COLUMN
FY - 413.7
NO.
FC -
297
27.6 MPA,
SQ. MM
BAR CONFIGURATION
REINF PCT.
LOAD
LOCATION
PHI
---------------------------------------------------------36 - 20 MM
1.047
8
(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER
8 SPACING 320.00 MM
END
0.650
====================================================================
COLUMN
FY - 413.7
NO.
FC -
298
27.6 MPA,
SQ. MM
BAR CONFIGURATION
REINF PCT.
LOAD
LOCATION
PHI
---------------------------------------------------------36 - 20 MM
1.047
8
(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER
8 SPACING 320.00 MM
END
0.650
====================================================================
COLUMN
FY - 413.7
NO.
FC -
299
27.6 MPA,
SQ. MM
BAR CONFIGURATION
REINF PCT.
LOAD
LOCATION
PHI
---------------------------------------------------------36 - 20 MM
1.047
8
(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER
8 SPACING 320.00 MM
END
0.650
Page 14 of 38
-- PAGE NO.
15
====================================================================
COLUMN
FY - 413.7
NO.
FC -
300
27.6 MPA,
SQ. MM
BAR CONFIGURATION
REINF PCT.
LOAD
LOCATION
PHI
---------------------------------------------------------36 - 20 MM
1.047
8
(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER
8 SPACING 320.00 MM
END
0.650
====================================================================
COLUMN
FY - 413.7
NO.
FC -
301
27.6 MPA,
SQ. MM
BAR CONFIGURATION
REINF PCT.
LOAD
LOCATION
PHI
---------------------------------------------------------36 - 20 MM
1.047
8
(PROVIDE EQUAL NUMBER OF BARS ON EACH FACE)
TIE BAR NUMBER
8 SPACING 320.00 MM
END
0.650
Page 15 of 38
-- PAGE NO.
16
1678.15 CU.FT
BAR SIZE
NUMBER
-------20
WEIGHT
(in lbs)
-------8593.94
-----------*** TOTAL=
8593.94
264.
265.
266.
267.
268.
269.
270.
271.
272.
273.
274.
275.
Page 16 of 38
-- PAGE NO.
17
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
TABLE
ST
TUB E
PASS
3.51 C
ST
TUB E
PASS
7.67 C
ST
TUB E
PASS
7.62 C
ST
TUB E
PASS
7.62 C
ST
TUB E
PASS
7.62 C
ST
TUB E
PASS
7.62 C
ST
TUB E
PASS
7.67 C
ST
TUB E
PASS
3.51 C
ST
TUB E
PASS
3.55 C
10
ST
TUB E
PASS
6.42 C
11
ST
TUB E
PASS
6.37 C
12
ST
TUB E
PASS
6.21 C
13
ST
TUB E
PASS
7.62 C
14
ST
TUB E
PASS
7.62 C
(AISC SECTIONS)
AISC- H1-3
0.059
0.01
-3.17
(AISC SECTIONS)
AISC- H1-3
0.141
-23.13
-0.37
(AISC SECTIONS)
AISC- H1-3
0.144
-24.18
-0.12
(AISC SECTIONS)
AISC- H1-3
0.143
-24.11
-0.03
(AISC SECTIONS)
AISC- H1-3
0.143
-24.11
0.03
(AISC SECTIONS)
AISC- H1-3
0.144
-24.18
0.12
(AISC SECTIONS)
AISC- H1-3
0.141
-23.12
0.37
(AISC SECTIONS)
AISC- H1-3
0.059
0.00
3.16
(AISC SECTIONS)
AISC- H1-3
0.059
-0.05
-3.17
(AISC SECTIONS)
AISC- H1-3
0.069
10.31
-0.36
(AISC SECTIONS)
AISC- H1-3
0.082
13.22
-0.03
(AISC SECTIONS)
AISC- H1-3
0.073
11.75
0.02
(AISC SECTIONS)
AISC- H1-3
0.140
23.59
0.02
(AISC SECTIONS)
AISC- H1-3
0.144
24.09
0.11
8
0.00
8
2.50
8
2.50
8
2.50
8
2.50
8
2.50
8
2.50
8
0.00
8
0.00
8
2.00
8
2.00
8
2.00
8
2.50
8
2.50
Page 17 of 38
-- PAGE NO.
18
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
15
16
17
18
19
20
21
22
23
24
25
26
27
28
TABLE
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.131
7.67 C
21.28
0.36
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.160
0.74 C
-0.11
1.46
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.092
0.36 C
-0.16
0.59
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.102
0.45 C
-0.02
0.78
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.105
0.41 C
-0.06
0.77
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.101
0.43 C
-0.13
0.67
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.301
1.29 C
-0.04
2.93
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.060
3.46 C
0.16
3.17
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.194
0.79 T
1.85
0.06
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.123
0.71 T
0.81
0.16
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.128
0.63 T
-1.21
-0.04
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.128
0.58 T
-1.17
0.09
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.149
0.53 T
1.42
-0.07
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.826
8
2.50
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
1.83
TUBES***
10
1.33
TUBES***
10
0.00
TUBES***
10
0.00
8
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
3.76
TUBES***
10
0.00
TUBES***
10
4.10
TUBES***
8
Page 18 of 38
-- PAGE NO.
19
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
30
31
32
33
34
35
36
37
38
39
40
41
42
43
TABLE
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.804
0.56 C
-4.82
3.39
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.803
0.54 C
-4.82
3.38
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.805
0.56 C
-4.82
3.39
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.810
0.63 C
-4.85
3.41
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.826
0.85 C
-5.28
3.12
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
FAIL
AISC- H1-3
1.050
0.73 C
6.82
3.08
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.798
0.57 C
4.71
3.43
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.819
0.47 C
4.96
3.41
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.851
0.40 C
5.35
3.36
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.797
0.40 C
4.78
3.37
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.787
0.45 C
4.65
3.39
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.517
0.65 C
1.74
3.50
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.031
5.33 C
-3.08
0.65
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.266
8.64 C
-46.50
0.01
8
6.00
TUBES***
8
0.00
TUBES***
8
0.00
TUBES***
8
0.00
TUBES***
8
6.00
TUBES***
8
0.00
TUBES***
8
6.00
TUBES***
8
6.00
TUBES***
8
0.00
TUBES***
8
0.00
TUBES***
8
0.00
TUBES***
8
0.00
8
2.50
8
2.50
Page 19 of 38
-- PAGE NO.
20
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
45
TABLE
ST
TUB E
PASS
8.59 C
46
ST
TUB E
PASS
8.59 C
47
ST
TUB E
PASS
8.59 C
48
ST
TUB E
PASS
8.64 C
49
ST
TUB E
PASS
3.87 C
50
ST
TUB E
PASS
0.10 C
51
ST
TUB E
PASS
0.08 T
52
ST
TUB E
PASS
0.12 T
53
ST
TUB E
PASS
0.13 T
54
ST
TUB E
PASS
0.12 T
55
ST
TUB E
PASS
0.08 T
56
ST
TUB E
PASS
0.09 C
57
ST
TUB E
PASS
5.02 C
58
ST
TUB E
PASS
6.80 C
59
ST
TUB E
PASS
7.06 C
(AISC SECTIONS)
AISC- H1-3
0.275
-48.21
-0.02
(AISC SECTIONS)
AISC- H1-3
0.275
-48.21
0.03
(AISC SECTIONS)
AISC- H1-3
0.276
-48.38
0.05
(AISC SECTIONS)
AISC- H1-3
0.266
-46.48
0.00
(AISC SECTIONS)
AISC- H1-3
0.025
-1.21
-1.30
(AISC SECTIONS)
AISC- H1-3
0.392
0.67
0.04
(AISC SECTIONS)
AISC- H2-1
0.383
0.65
0.04
(AISC SECTIONS)
AISC- H2-1
0.383
0.65
0.04
(AISC SECTIONS)
AISC- H2-1
0.383
0.65
0.04
(AISC SECTIONS)
AISC- H2-1
0.383
0.65
0.04
(AISC SECTIONS)
AISC- H2-1
0.384
0.65
0.04
(AISC SECTIONS)
AISC- H1-3
0.394
0.67
0.04
(AISC SECTIONS)
AISC- H1-3
0.030
3.98
-0.04
(AISC SECTIONS)
AISC- H1-3
0.116
18.71
-0.39
(AISC SECTIONS)
AISC- H1-3
0.177
30.26
-0.17
8
2.50
8
2.50
8
2.50
8
2.50
10
1.50
9
6.00
9
0.00
9
0.00
9
6.00
9
6.00
9
6.00
9
0.00
8
1.50
8
0.50
8
1.50
Page 20 of 38
-- PAGE NO.
21
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
60
TABLE
ST
TUB E
PASS
6.58 C
61
ST
TUB E
PASS
8.59 C
62
ST
TUB E
PASS
8.59 C
63
ST
TUB E
PASS
8.64 C
64
ST
TUB E
PASS
5.28 C
65
ST
TUB E
PASS
0.22 C
66
ST
TUB E
PASS
0.01 C
67
ST
TUB E
PASS
0.02 C
68
ST
TUB E
PASS
0.07 C
69
ST
TUB E
PASS
0.24 C
70
ST
TUB E
PASS
4.91 C
71
ST
TUB E
PASS
10.30 C
72
ST
TUB E
PASS
10.25 C
73
ST
TUB E
PASS
10.25 C
74
ST
TUB E
PASS
10.25 C
(AISC SECTIONS)
AISC- H1-3
0.125
21.13
-0.07
(AISC SECTIONS)
AISC- H1-3
0.270
47.25
-0.05
(AISC SECTIONS)
AISC- H1-3
0.275
48.26
0.02
(AISC SECTIONS)
AISC- H1-3
0.245
42.77
0.00
(AISC SECTIONS)
AISC- H1-3
0.045
5.56
-0.63
(AISC SECTIONS)
AISC- H1-3
0.413
0.68
0.04
(AISC SECTIONS)
AISC- H1-3
0.392
0.68
0.04
(AISC SECTIONS)
AISC- H1-3
0.392
0.67
0.04
(AISC SECTIONS)
AISC- H1-3
0.396
0.67
0.04
(AISC SECTIONS)
AISC- H1-3
0.417
0.69
0.04
(AISC SECTIONS)
AISC- H1-3
0.037
-1.05
-2.36
(AISC SECTIONS)
AISC- H1-3
0.320
-55.80
0.18
(AISC SECTIONS)
AISC- H1-3
0.331
-58.06
0.05
(AISC SECTIONS)
AISC- H1-3
0.330
-57.85
0.01
(AISC SECTIONS)
AISC- H1-3
0.329
-57.85
0.00
8
0.50
8
2.50
8
2.50
8
2.50
8
2.50
9
0.00
9
0.00
9
6.00
9
0.00
9
6.00
10
1.00
8
1.00
8
1.00
8
1.00
8
1.00
Page 21 of 38
-- PAGE NO.
22
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
75
TABLE
ST
TUB E
(AISC SECTIONS)
AISC- H1-3
0.331
-58.06
-0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.320
10.30 C
-55.77
-0.17
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.038
5.45 C
-0.99
-2.41
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.036
6.64 C
4.44
-0.21
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.245
9.13 C
42.47
-0.06
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.272
9.06 C
47.29
-0.16
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.276
8.89 C
48.11
-0.11
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.323
10.25 C
56.67
-0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.330
10.25 C
57.90
0.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.293
10.30 C
51.06
-0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.042
6.12 C
5.77
0.14
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.334
1.55 C
-3.08
-0.20
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.292
1.71 C
-2.73
-0.10
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.044
0.05 T
0.25
0.19
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.439
1.73 C
0.57
-3.58
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
PASS
10.25 C
76
77
78
79
80
81
82
83
84
85
98
99
100
101
8
1.00
8
1.00
10
1.00
8
0.00
8
1.00
8
1.00
8
1.00
8
1.00
8
1.00
8
1.00
8
0.00
TUBES***
8
0.00
TUBES***
8
0.00
TUBES***
8
0.00
TUBES***
8
5.40
TUBES***
Page 22 of 38
-- PAGE NO.
23
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
TABLE
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.141
6.02 C
-0.44
-0.41
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.168
8.83 C
-0.77
-0.07
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.165
0.39 T
-0.08
1.58
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.283
1.24 T
0.01
2.78
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.098
1.89 C
0.64
0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.149
2.34 C
1.06
0.24
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.103
1.93 C
-0.71
-0.03
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.217
2.31 C
1.95
0.05
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.078
0.04 T
0.09
0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.205
7.47 C
35.42
-0.14
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.224
7.40 C
38.78
-0.24
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.094
6.57 C
14.46
-0.52
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.105
6.54 C
17.48
-0.07
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.245
1.48 T
0.03
0.24
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H2-1
0.176
0.50 T
0.76
2.85
8
0.00
TUBES***
8
0.00
TUBES***
10
6.00
TUBES***
8
5.40
TUBES***
8
1.00
TUBES***
8
1.00
TUBES***
8
0.08
TUBES***
8
1.00
9
6.00
8
1.00
8
1.00
8
0.50
8
0.50
8
5.40
TUBES***
10
0.00
Page 23 of 38
-- PAGE NO.
24
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
117
118
119
120
121
122
123
124
125
126
127
128
129
130
TABLE
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.115
0.09 C
-0.79
1.60
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.451
0.86 C
1.58
2.96
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.380
0.11 C
2.43
-1.47
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.425
0.69 T
-3.18
1.12
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.264
1.81 T
-2.54
0.01
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.100
1.83 C
-0.10
-0.58
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.078
0.78 C
-0.11
-0.48
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.102
2.11 C
-0.53
0.14
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.097
3.25 C
-0.40
0.13
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.099
2.22 C
0.04
-0.58
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.123
2.43 C
-0.06
-0.97
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.143
0.27 T
1.32
0.12
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.092
0.24 T
-0.66
0.08
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
10
0.00
TUBES***
10
0.00
TUBES***
10
5.30
TUBES***
10
0.00
TUBES***
10
4.10
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
9
0.00
TUBES***
9
0.00
TUBES***
10
1.10
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
4.10
TUBES***
Page 24 of 38
-- PAGE NO.
25
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
132
133
134
135
136
137
138
139
140
141
142
143
144
145
TABLE
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.168
0.36 T
1.52
-0.17
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.046
0.94 C
-0.04
0.35
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.124
1.29 C
0.09
-1.06
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.050
0.48 C
-0.05
0.43
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.040
0.66 C
0.10
-0.25
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.104
0.52 C
-0.04
0.80
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.087
0.71 C
0.00
0.64
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.107
0.50 C
-0.05
0.86
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.094
0.69 C
0.01
0.69
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.091
0.57 C
-0.05
0.65
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.036
0.98 C
0.02
0.26
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.086
1.52 C
-0.05
0.52
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.218
1.94 C
0.02
-2.03
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
10
4.10
TUBES***
10
0.00
TUBES***
10
1.00
TUBES***
10
0.00
TUBES***
10
1.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
8
0.00
TUBES***
10
0.00
TUBES***
10
1.00
TUBES***
Page 25 of 38
-- PAGE NO.
26
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
TABLE
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H2-1
0.065
0.39 T
0.21
1.09
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.394
2.02 C
-0.14
-7.85
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.249
0.22 T
0.22
0.16
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.143
0.07 T
0.25
0.02
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.099
0.07 T
0.13
0.03
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.094
0.10 T
-0.15
-0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.074
0.10 T
-0.14
-0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.131
0.10 T
0.25
0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.341
0.45 T
0.21
0.28
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.176
6.51 C
0.98
0.10
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.353
2.69 C
2.61
0.75
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.362
1.68 C
-3.49
-0.07
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.426
1.99 C
-0.08
-4.08
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.098
6.35 C
16.35
0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.266
1.68 T
0.02
0.27
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
10
0.00
TUBES***
10
1.00
10
5.30
10
0.00
10
0.00
10
2.39
10
1.71
10
4.10
10
0.00
TUBES***
8
0.00
TUBES***
8
0.00
TUBES***
8
2.00
TUBES***
8
5.40
8
0.50
8
0.00
TUBES***
Page 26 of 38
-- PAGE NO.
27
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
162
163
164
165
167
168
169
170
171
172
173
174
175
176
177
TABLE
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.312
1.36 T
0.05
3.03
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.043
0.05 C
-0.10
0.33
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.081
0.04 T
0.09
0.04
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.178
0.58 T
-0.05
1.72
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.033
1.41 C
0.31
0.23
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.192
0.40 T
0.33
0.03
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H2-1
0.036
0.28 T
-0.21
-0.51
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.036
4.13 C
-1.47
-2.17
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.027
4.20 C
-1.61
1.19
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.399
1.36 C
0.31
7.87
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.616
2.02 C
0.30
12.33
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.765
2.16 C
0.02
15.70
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.788
1.55 C
0.08
16.19
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.715
1.62 C
0.02
14.73
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
8
0.00
TUBES***
10
6.00
9
0.00
TUBES***
8
0.00
TUBES***
8
0.50
10
0.00
TUBES***
10
0.50
10
1.00
8
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
Page 27 of 38
-- PAGE NO.
28
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
178
179
180
181
182
183
184
185
186
187
188
189
190
191
TABLE
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.324
0.67 C
-0.03
6.66
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.085
0.40 C
-0.01
1.72
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.532
0.68 C
-0.01
11.01
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.177
0.41 C
0.01
3.64
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.590
0.66 C
0.01
12.23
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.215
0.39 C
0.04
4.41
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.614
0.77 C
-0.28
12.45
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.258
0.54 C
0.11
5.21
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.488
0.73 C
0.44
9.67
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.189
0.50 C
-0.09
3.79
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.271
0.60 C
0.10
5.49
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.070
0.34 C
0.00
1.43
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.329
0.22 T
-0.56
0.03
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.330
0.20 T
-0.56
0.03
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
10
5.25
10
5.25
Page 28 of 38
-- PAGE NO.
29
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
193
TABLE
ST
TUB E
(AISC SECTIONS)
AISC- H2-1
0.251
-0.44
0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.030
4.23 C
2.11
-1.24
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.040
5.37 C
4.87
0.49
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.272
0.15 T
-0.46
0.03
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.406
0.21 T
-0.70
0.03
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.308
1.51 C
0.23
6.04
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.225
1.75 C
0.06
4.45
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.210
0.65 C
0.03
4.28
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.054
0.37 C
-0.04
1.04
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.156
0.71 C
-0.05
3.12
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.035
0.43 C
-0.04
0.65
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.121
6.08 C
-0.17
-0.28
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.106
6.17 C
0.22
-0.07
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.141
6.26 C
0.62
0.13
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
0.14 T
198
199
200
202
204
205
206
207
208
209
210
211
212
213
10
0.00
8
0.00
8
1.00
10
4.50
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
8
0.00
TUBES***
8
0.55
TUBES***
8
1.10
TUBES***
Page 29 of 38
-- PAGE NO.
30
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
TABLE
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.129
8.89 C
-0.39
-0.03
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.126
9.01 C
0.36
0.03
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.165
9.07 C
0.73
0.06
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.205
9.13 C
1.11
0.09
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.136
6.45 C
0.69
0.02
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.114
6.37 C
0.33
-0.09
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.120
6.27 C
-0.18
-0.23
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.141
6.21 C
-0.47
-0.32
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.085
0.02 C
0.10
0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.087
0.02 C
0.10
0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.096
0.15 C
0.10
0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.098
0.15 C
0.10
0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.109
0.30 C
0.10
0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.111
0.30 C
0.10
0.04
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.103
2.47 C
-0.03
-0.68
8
0.00
TUBES***
8
1.10
TUBES***
8
1.10
TUBES***
8
1.10
TUBES***
8
0.00
TUBES***
8
0.28
TUBES***
8
1.10
TUBES***
8
1.10
9
6.00
9
0.00
9
6.00
9
0.00
9
6.00
9
0.00
TUBES***
10
0.00
Page 30 of 38
-- PAGE NO.
31
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
229
230
231
232
233
234
235
236
237
238
239
240
241
244
TABLE
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.076
2.52 C
0.01
-0.39
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.049
2.61 C
0.07
0.18
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.096
2.65 C
0.10
0.47
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.106
2.27 C
0.04
-0.73
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.112
2.31 C
0.05
-0.88
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.127
2.36 C
0.05
-1.02
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.142
2.41 C
0.06
-1.17
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.111
3.32 C
-0.01
-0.80
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.165
3.37 C
0.04
-1.32
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.220
3.42 C
0.08
-1.84
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.275
3.46 C
0.12
-2.36
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.106
2.19 C
-0.06
-0.70
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.132
2.23 C
0.02
-1.12
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
10
0.00
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
10
1.10
TUBES***
Page 31 of 38
-- PAGE NO.
32
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
TABLE
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.055
0.96 C
0.09
-0.39
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.081
0.61 C
0.51
-0.12
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.075
1.87 C
-0.05
-0.41
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.042
1.92 C
-0.01
-0.23
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.046
1.56 C
0.31
0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.078
1.61 C
0.49
-0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.158
0.06 T
0.28
0.02
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.092
0.05 T
0.12
0.03
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.089
0.05 T
-0.15
-0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.073
0.05 T
-0.14
-0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.145
0.04 T
0.29
0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.162
0.07 T
0.30
0.02
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.084
0.07 T
0.11
0.03
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.083
0.01 T
-0.14
-0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.070
0.00 T
-0.13
-0.01
10
1.10
TUBES***
9
1.10
TUBES***
10
0.00
TUBES***
10
0.00
TUBES***
9
1.10
TUBES***
9
1.10
10
0.00
10
0.00
10
2.39
10
1.71
10
4.10
10
0.00
10
0.00
10
2.39
10
1.71
Page 32 of 38
-- PAGE NO.
33
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
261
TABLE
ST
TUB E
(AISC SECTIONS)
AISC- H2-1
0.170
0.31
0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.146
0.13 T
0.27
0.02
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.078
0.20 T
0.09
0.03
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.080
0.06 C
-0.13
-0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.070
0.06 C
-0.12
-0.01
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.169
0.15 T
0.30
0.01
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.529
1.54 T
-5.15
0.13
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.155
1.53 T
1.41
-0.04
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.134
1.53 T
0.93
-0.05
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.154
1.57 T
-1.04
0.20
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.118
1.64 T
0.82
0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.451
1.68 T
-4.29
0.19
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.301
1.56 T
-2.76
0.18
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.126
1.50 T
0.85
-0.06
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.193
PASS
0.04 T
262
263
264
265
266
267
268
269
270
271
272
273
274
275
10
4.10
10
0.00
10
0.00
10
2.39
10
2.05
10
4.10
TUBES***
10
0.00
TUBES***
10
3.06
TUBES***
10
2.63
TUBES***
10
5.25
TUBES***
10
1.88
TUBES***
10
4.50
TUBES***
10
0.00
TUBES***
10
2.90
TUBES***
10
Page 33 of 38
-- PAGE NO.
34
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
276
TABLE
ST
TUB E
(AISC SECTIONS)
AISC- H2-1
0.268
-0.43
0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.196
0.32 T
-0.30
0.04
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.227
0.36 T
-0.35
0.04
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.194
1.58 T
1.65
-0.19
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.392
1.10 C
0.13
-3.77
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.096
0.00 T
0.00
0.77
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.096
0.00 T
0.00
0.77
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.096
0.00 T
0.00
0.77
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.096
0.00 T
0.00
0.77
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.213
0.58 T
1.27
0.67
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.254
0.57 T
1.49
1.07
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H2-1
0.369
0.55 T
-0.04
3.71
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.104
1.14 C
0.06
-0.70
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.032
0.72 C
-0.02
0.24
PASS
0.27 T
277
278
282
283
284
285
286
287
289
290
302
303
304
10
0.00
10
5.80
10
0.00
TUBES***
10
5.00
TUBES***
8
0.00
TUBES***
8
5.30
TUBES***
8
5.30
TUBES***
8
5.30
TUBES***
8
5.30
TUBES***
10
5.30
TUBES***
10
0.00
TUBES***
8
5.40
TUBES***
10
1.00
TUBES***
8
0.00
Page 34 of 38
-- PAGE NO.
35
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
306
307
308
309
310
311
312
313
314
315
316
317
318
319
TABLE
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.104
0.59 C
-0.02
0.85
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.070
0.67 C
-0.02
0.49
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.153
1.76 C
0.01
-1.39
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.114
1.38 C
0.06
-0.97
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.081
0.74 C
0.08
-0.53
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.100
0.85 C
0.63
0.13
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.052
0.83 C
0.31
0.15
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.109
0.90 C
-0.17
-0.67
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.204
2.05 C
0.03
-1.87
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.099
2.12 C
0.62
0.02
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.125
2.14 C
1.06
0.02
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.155
2.48 C
1.18
0.16
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.102
2.26 C
0.70
-0.02
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR
ST
HSST12X12X0.25
(AISC SECTIONS)
10
0.00
TUBES***
10
0.00
TUBES***
10
1.00
TUBES***
10
0.00
TUBES***
10
1.00
TUBES***
9
1.00
TUBES***
9
1.00
TUBES***
10
1.00
TUBES***
10
0.00
TUBES***
8
1.00
TUBES***
8
1.00
TUBES***
8
0.00
TUBES***
8
0.00
TUBES***
Page 35 of 38
-- PAGE NO.
36
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
TABLE
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.312
8
2.47 C
2.86
0.10
1.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.161
8
7.13 C
27.27
-0.26
1.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.193
8
0.84 C
-0.01
0.17
0.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.195
8
0.44 C
0.02
0.20
5.40
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.191
8
0.16 T
0.02
0.22
5.40
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.178
8
6.89 C
30.71
-0.11
1.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.228
8
7.22 C
39.83
-0.14
1.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.210
8
0.91 C
0.01
0.19
0.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H1-3
0.211
8
0.49 C
0.01
0.22
0.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.207
8
0.18 T
0.02
0.25
0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H2-1
0.138
10
0.25 T
-0.73
-2.12
1.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H2-1
0.260
10
0.22 T
-1.19
-4.21
1.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.305
10
1.34 T
0.20
0.17
0.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.315
10
0.45 T
0.20
0.25
0.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.332
10
0.08 T
0.20
0.28
0.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
Page 36 of 38
-- PAGE NO.
37
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
336
337
338
339
340
341
342
TABLE
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.088
10
0.40 C
0.77
-1.02
1.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
ST
HSST12X12X0.5
(AISC SECTIONS)
PASS
AISC- H1-3
0.171
10
0.47 C
1.26
-2.26
1.00
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.235
10
0.87 T
0.18
0.11
5.30
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.229
10
0.34 T
0.20
0.15
5.30
ST
TUB E
(AISC SECTIONS)
PASS
AISC- H2-1
0.242
10
0.09 T
0.21
0.16
5.30
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
ST
HSST12X12X0.25
(AISC SECTIONS)
PASS
AISC- H1-3
0.563
8
0.73 C
2.15
3.56
3.00
***NOTE: DESIGN IN ACCORDANCE WITH ASD PROVISIONS FOR TUBES***
ST
HSST12X12X0.25
(AISC SECTIONS)
FAIL
AISC- H1-3
1.125
8
0.65 C
7.34
3.14
3.00
276. STEEL TAKE OFF LIST 1 TO 85 98 TO 165 167 TO 193 198 TO 200 202 204 TO 241 -
Page 37 of 38
-- PAGE NO.
38
STEEL TAKE-OFF
-------------PROFILE
LENGTH(METE)
WEIGHT(MTON)
278. FINISH
************************************************************
*
For questions on STAAD.Pro, please contact
*
*
Research Engineers Offices at the following locations *
*
*
*
Telephone
Email
*
* USA:
+1 (714)974-2500
support@reiusa.com
*
* CANADA
+1 (905)632-4771
detech@odandetech.com *
* CANADA
+1 (604)629 6087
staad@dowco.com
*
* UK
+44(1454)207-000
support@reel.co.uk
*
* FRANCE
+33(0)1 64551084
support@reel.co.uk
*
* GERMANY
+49/931/40468-71
info@reig.de
*
* NORWAY
+47 67 57 21 30
STAAD@EDR.NO
*
* SINGAPORE +65 6225-6015/16
support@reiasia.net
*
* INDIA
+91(033)2357-3575 support@calcutta.reiusa.com *
* JAPAN
+81(03)5952-6500
eng-eye@crc.co.jp
*
* CHINA
+86(411)363-1983
support@reiasia.net
*
*
*
* North America
support@reiusa.com
*
* Europe
support@reel.co.uk
*
* Asia
support@reiasia.net
*
Page 38 of 38
NAVE DE DESCARGA
Software licensed to WFI DE MEXICO
Job Title
Job No
Sheet No
Rev
1
Part
Ref
By
Client
File
Date28-Jun-06
NAVE-33.std
Date/Time
Chd
18-Aug-2006 12:13
Y
X
Z
Load 1
Print Run 1 of 1
titulo :
EJECUTO:
REVISO:
REA:
ubicacion:
APROBO:
CIVIL
FECHA:
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
Jun-06
REVISION No.
1
V=1.607 Ton/mt
t
H2
Pa
z
H1
Am
he
z1
Ae
PROPIEDADES GEOMETRICAS
H1= 0.85 m
Peso EspecificoTerreno 1
1.6
Ton/m3
H2= 6.35 m
Peso EspecificoTerreno 2
1.6
Ton/m3
h= 0.75 m
2.4
Ton/m3
Kg/cm2
he =
250
z= 1.8 m
b= 0.2 m
t= 3.15 m
z1= 1.8 m
4200
0.9
0.8
32
Kg/cm2
14.0
1.4
Ton/m2
Ae=
0
=
0
= 90
Am= 0.45
1 de 11
titulo :
EJECUTO:
REVISO:
APROBO:
REA:
CIVIL
FECHA:
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
Jun-06
REVISION No.
1
Para el ngulo de friccin interna () pueden tomarse los siguientes valores de acuerdo el tipo de suelo,
en su caso el valor proporcionado por el estudio de mecnica de suelos.
Arena seca suelta con granos redondos
Arena seca densa con granos redondos
Arena seca suelta con granos angulosos
Arena seca densa con granos angulosos
Limo seco y suelto
Limo seco y denso
=28.5
=35
=34
=46
=27 a 30
=30 a 35
DETERMINACION DE SOBRECARGA
Altura de talud
H2 tan( )
2 tan()
Ht=
Ht=
0m
Presin de sobrecarga
Sc=
Ton/m2
He=Sc/2
He= 0.625 m
hs = Ht + He=
CALCULO DE PRESIONES EJERCIDAS POR EL TERRENO
0.625
Presin activa
Ka =
1 - sen()
1+sen()
Ka= 0.307
Pa = Ka 2 (H2 + hs)=
3.060
Ton/m2
4.426
Ton/m2
Presin pasiva
Kp =
1 + sen()
1 - sen()
Kp= 3.255
Pp = Kp 1 H1 =
2 de 11
titulo :
EJECUTO:
REVISO:
REA:
ubicacion:
APROBO:
CIVIL
FECHA:
CHIHUAHUA CHIH.
VERIFICO:
Jun-06
REVISION No.
ING. DLA
+V
1.12
2.688
m2
Ton
0.7
1.68
m2
Ton
Area de zarpa=
(z + Am + t) x h =
Peso de zarpa = 1m x Azarpa x c =
4.05
9.72
m2
Ton
0.7
1.12
m2
Ton
17.64
28.22
m
Ton
0.29
Ton
43.72 Ton
3 de 11
titulo :
EJECUTO:
REVISO:
APROBO:
REA:
CIVIL
FECHA:
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
Jun-06
REVISION No.
1
Resistencia a deslizamiento:
Resistencia por friccin
F1 = Pcim x f =
f=
19.674
0.45
Ton
F2= Hp+F1
21.555
Ton
Empuje Horizontal
EH= Ha - Hp =
11.685
Ton
> 1.50'
OK
Facor de seguridad
Fs2 = F2 / Ha =
1.59
42.714
Ton-m
Momento resistente
Momento resistente en muro
Mrm= Pmuro x (z + b/2)=
5.11
Ton-m
Ton-m
26.244
Ton-m
145.768
0.533
107.957
Ton-m
Ton-m
Ton-m
3.41
> 2.0
4 de 11
titulo :
EJECUTO:
REVISO:
APROBO:
REA:
CIVIL
FECHA:
CHIHUAHUA CHIH.
VERIFICO:
Jun-06
REVISION No.
ING. DLA
A= 5.4 m
Mv= 42.714 Ton-m
S=1 x(z + Am + t)2/6 =
4.860
xi =Mr/Pcim =
R = Pcim + Ea=
= Pcim / Ea =
z=xi x Pcim-Mv/R=
3.33411847
45.7762554
72.7614384
2.25124742
a =z / sen =
2.35713184
m3
f1=
Pcim/L x 4L - 6a
fa1=
11.18
Ton/m2
menor que qa OK
f2=
Pcim/L - 6a-2L
fa2=
5.01
Ton/m2
5.01
Ton/m2
11.18 Ton/m
DISEO DE MURO.
f''c
4800
170
x
=
x
fy 6000 + fy
4200
b=
mx= 0.75b=
mn=
0.01905
0.014286
0.7
f'c
fy
mn=
4800
816000
=
10200
42840000
11.0679718
4200
0.002635
5 de 11
titulo :
EJECUTO:
REVISO:
APROBO:
REA:
CIVIL
FECHA:
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
Jun-06
REVISION No.
1
H=
5.60
ps
Pa
Pa H22
6
ps H2
2
16
4.817816
V=
Q=
Q=
Ton
8.569
170
100.0 x
1764
26989200
MR
FRf''c bd2
2913815.1
26989200
0.108
CALCULO DE q
q= 1 =
1-2Q
0.11452
q f''c
fy
=
Se debera usar
p=
0.004635
6 de 11
titulo :
REVISO:
APROBO:
VERIFICO:
0.004635
x 100 x
= 19.4683
42
S=
Jun-06
REVISION No.
ING. DLA
As = pbd =
CIVIL
FECHA:
CHIHUAHUA CHIH.
ubicacion:
EJECUTO:
REA:
100 Av
As
es igual a
S=
14.640
cm
2.850
cm
cm
15
cm
V=
8.569
Ton
23.758788 Ton
RELASION L/h =
12.4
NO MENOR DE 5
p= 0.004635
Si p<0.01
Si p>0.01
VCR=0.5 FR b d
f*c
16.11
Ton
23.76
Ton
3.5 -2.5 M
Vd
VCR=
176.54 Ton
Si p>0.01
VCR=
260.34 Ton
f*c
71.28
>1=
11.0
Ton
16.11
Ton
11.996
Ton
mayor que Vu
7 de 11
titulo :
EJECUTO:
REVISO:
REA:
APROBO:
CIVIL
FECHA:
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
Jun-06
REVISION No.
1
DISEO DE ZAPATA
REVISION A FLEXION
pie
Taln
0.75
W=
w=
2
11.18 Ton/m
5.01
Ton/m
W2
W1
1.8
3.6
Valor de W1 a
3.15m
3.598
Ton/m2
W1 =
Valor de W2 a
W2 =
2.776
DISEO DE TALN
W1
Mf=
w l2
2
W1x l2
6
Mf= 24.87
5.01
Ton/m2
3.15
5.951 =
30.816
Ton-m
170
100.0 x
5184
Mu=
43.1427182
V= 15.55 Ton
FRf''c bd2 = 0.90 x
Q=
Q=
79315200
MR
FRf''c bd2
4314271.8
79315200
Q=
0.05439
CALCULO DE q
q= 1 -
1-2Q
0.05596
q f''c
fy
=
Se debera usar
p=
0.002600
8 de 11
titulo :
REVISO:
APROBO:
VERIFICO:
0.002600
x 100 x
= 18.7200
72
S=
Jun-06
REVISION No.
ING. DLA
As = pbd =
CIVIL
FECHA:
CHIHUAHUA CHIH.
ubicacion:
EJECUTO:
REA:
es igual a
100 Av
As
S=
15.226
cm
2.850
cm
cm
15
cm
V=
1.4
Relasin M/vd=
40.73
15.552
Ton
Ton
menor que 4
RELASION L/h =
4.2
L/h ENTRE 4 Y 5
p= 0.002600
Si p<0.01
Si p>0.01
VCR=0.5 FR b d
f*c
22.65
Ton
40.73
Ton
3.5 -2.5 M
Vd
VCR=
76.55 Ton
Si p>0.01
VCR=
137.68 Ton
f*c
122.19
>1=
3.4
Ton
22.65
Ton
21.772
Ton
mayor que Vu
DISEO DE PIE
W=
11.18
MURO DE CONTENCION Z-1
W3
2
4.11253662 Ton/m
titulo :
REVISO:
APROBO:
CIVIL
FECHA:
CHIHUAHUA CHIH.
ubicacion:
EJECUTO:
REA:
VERIFICO:
Jun-06
REVISION No.
ING. DLA
Ton/m
W3=( W -w) x L/ l =
2
W3 =
4.11253662 Ton/m
1.8
EL MURO CUENTA CON PIE
2
Mf=
(w+W3) x L
2
Mf= 14.782 +
2.221
Mf=
17.002 Ton-m
Mu=
Q=
Q=
170
4.94 Ton/m
23.80329
W4 =
Vu=
100.0 x
5184
15.97
Ton
79315200
MR
FRf''c bd2
2380328.6
79315200
Q=
0.03001
CALCULO DE q
q= 1 -
1-2Q
0.03048
q f''c
fy
=
Se debera usar
As = pbd =
p=
0.002635
0.002635
x 100 x
70
S=
100 Av
As
= 18.4466
es igual a
S=
15.451
6
cm2
2.850
cm2
cm
@
15
cm
10 de 11
titulo :
EJECUTO:
REVISO:
APROBO:
REA:
CIVIL
FECHA:
CHIHUAHUA CHIH.
VERIFICO:
Jun-06
REVISION No.
ING. DLA
V=
1.4
Relasin M/vd=
40.729
11.409
Ton
Ton
menor que 4
RELASION L/h =
2.4
MENOR QUE 4
p= 0.002635
Si p<0.01
Si p>0.01
VCR=0.5 FR b d
f*c
22.73
Ton
40.73
Ton
3.5 -2.5 M
Vd
VCR=
41.43 Ton
Si p>0.01
VCR=
74.22 Ton
f*c
122.19
>1=
1.8
Ton
41.43
Ton
15.972
Ton
mayor que Vu
11 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
t
H2
Pa
z
H1
Am
he
z1
Ae
PROPIEDADES GEOMETRICAS
H1=
0.8
Peso EspecificoTerreno 1
1.6
Ton/m3
H2=
3.5
Peso EspecificoTerreno 2
1.6
Ton/m3
h=
0.3
2.4
he=
250
Ton/m3
Kg/cm2
z= 0.75 m
b= 0.2 m
t= 1.25 m
z1= 0.75 m
4200
0.9
0.8
32
Kg/cm2
14.0
1.4
Ton/m2
Ae=
=
=
Am=
0
0
90
0.2
1 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
Para el ngulo de friccin interna () pueden tomarse los siguientes valores de acuerdo el tipo de suelo,
en su caso el valor proporcionado por el estudio de mecnica de suelos.
Arena seca suelta con granos redondos
Arena seca densa con granos redondos
Arena seca suelta con granos angulosos
Arena seca densa con granos angulosos
Limo seco y suelto
Limo seco y denso
=28.5
=35
=34
=46
=27 a 30
=30 a 35
DETERMINACION DE SOBRECARGA
Altura de talud
H2 tan( )
2 tan()
Ht=
Ht=
0m
Presin de sobrecarga
Sc=
Ton/m2
He=Sc/2
He=
0
m
hs = Ht + He=
CALCULO DE PRESIONES EJERCIDAS POR EL TERRENO
0.000
Presin activa
Ka =
1 - sen()
1+sen()
Ka= 0.307
Pa = Ka 2 (H2 + hs)=
1.573
Ton/m2
4.166
Ton/m2
Presin pasiva
Kp =
1 + sen()
1 - sen()
Kp= 3.255
Pp = Kp 1 H1 =
2 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
+V
0.64
1.536
m2
Ton
0
0
m2
Ton
Area de zarpa=
(z + Am + t) x h =
Peso de zarpa = 1m x Azarpa x c =
0.66
1.584
m2
Ton
0
0
m2
Ton
4
6.40
m
Ton
0.60
Ton
10.12 Ton
3 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
Resistencia a deslizamiento:
Resistencia por friccin
F1 = Pcim x f =
f=
4.554
0.45
Ton
F2= Hp+F1
6.220
Ton
Empuje Horizontal
EH= Ha - Hp =
1.345
Ton
> 1.50'
OK
Facor de seguridad
Fs2 = F2 / Ha =
2.07
3.513
Ton-m
Momento resistente
Momento resistente en muro
Mrm= Pmuro x (z + b/2)=
1.31
Ton-m
Ton-m
1.7424
Ton-m
13.572
0.444
Ton-m
10.080
Ton-m
Ton-m
Ton-m
3.86
> 2.0
4 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
A= 2.2 m
Mv= 3.513 Ton-m
S=1 x(z + Am + t)2/6 =
0.807
xi =Mr/Pcim =
R = Pcim + Ea=
= Pcim / Ea =
z=xi x Pcim-Mv/R=
1.34114225
10.5584721
73.429766
0.95272959
a =z / sen =
0.99400996
m3
f1=
Pcim/L x 4L - 6a
fa1=
5.93
Ton/m2
menor que qa OK
f2=
Pcim/L - 6a-2L
fa2=
3.27
Ton/m2
3.27
Ton/m2
5.93 Ton/m
DISEO DE MURO.
f''c
4800
170
x
=
x
fy 6000 + fy
4200
b=
mx= 0.75b=
mn=
0.01905
0.014286
0.7
f'c
fy
mn=
4800
816000
=
10200
42840000
11.0679718
4200
0.002635
5 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
H=
3.20
ps
Pa
ps = Ka w hs =
Pa H22
6
Mf= 2.685
Mf=
ps H2
2
V=
Q=
Q=
Ton
2.517
170
100.0 x
289
4421700
MR
FRf''c bd2
375881.4
4421700
0.085
CALCULO DE q
q= 1 =
1-2Q
0.08897
q f''c
fy
=
Se debera usar
0.003601
6 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
VERIFICO:
REVISION No.
ING. DLA
As = pbd =
0.003601
x 100 x
17
S=
Jun-06
CHIHUAHUA CHIH.
100 Av
As
6.1217
es igual a
S=
20.693
cm
1.267
cm
cm
15
cm
V=
2.517
Ton
9.6166522 Ton
NO MENOR DE 5
p= 0.003601
Si p<0.01
Si p>0.01
VCR=0.5 FR b d
f*c
5.92
Ton
9.62
Ton
3.5 -2.5 M
Vd
VCR=
72.20 Ton
Si p>0.01
VCR=
117.19 Ton
f*c
28.85
>1=
12.2
Ton
5.92
Ton
3.524
Ton
mayor que Vu
7 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
DISEO DE ZAPATA
REVISION A FLEXION
pie
Taln
0.3
W=
5.93
w=
2
Ton/m
3.27
Ton/m
W2
W1
0.75
1.45
Valor de W1 a
W1 =
1.25m
1.511
Ton/m2
Valor de W2 a
W2 =
1.185
DISEO DE TALN
W1
Mf=
w l2
2
W1x l2
6
Mf= 2.555
3.27
Ton/m2
1.25
.393 =
2.948
170
100.0 x
Ton-m
Mu=
4.12778894
V= 3.785 Ton
FRf''c bd2 = 0.90 x
Q=
Q=
729
11153700
MR
FRf''c bd2
412778.9
11153700
Q=
0.03701
CALCULO DE q
q= 1 -
1-2Q
0.03772
q f''c
fy
=
Se debera usar
0.002600
8 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
As = pbd =
0.002600
x 100 x
27
S=
Jun-06
7.0200
es igual a
100 Av
As
S=
18.045
cm
1.267
cm
cm
15
cm
V=
3.7
Relasin M/vd=
RELASION L/h =
15.27
3.785
Ton
Ton
menor que 4
L/h ENTRE 4 Y 5
p= 0.002600
Si p<0.01
Si p>0.01
VCR=0.5 FR b d
f*c
8.49
Ton
15.27
Ton
3.5 -2.5 M
Vd
VCR=
31.52 Ton
Si p>0.01
VCR=
56.70 Ton
f*c
45.82
>1=
3.7
Ton
8.49
Ton
5.300
Ton
mayor que Vu
DISEO DE PIE
W=
5.93
W3
2
1.75277741 Ton/m
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
Ton/m
W3=( W -w) x L/ l =
W3 =
1.75277741 Ton/m
0.75
EL MURO CUENTA CON PIE
2
Mf=
(w+W3) x L
2
+
Mf= 1.413
0.170
Mf=
1.583 Ton-m
Vu=
3.79
170
Q=
Q=
W4 =
2.08 Ton/m
Ton
100.0 x
729
11153700
MR
FRf''c bd2
158273.2
11153700
Q=
0.01419
CALCULO DE q
q= 1 -
1-2Q
0.01429
q f''c
fy
=
Se debera usar
As = pbd =
0.002635
0.002635
x 100 x
27
S=
100 Av
As
es igual a
S=
7.1151
17.804
4
cm2
1.267
cm2
cm
@
20
cm
10 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
V=
3.7
Relasin M/vd=
RELASION L/h =
15.274
2.707
Ton
Ton
menor que 4
MENOR QUE 4
p= 0.002635
Si p<0.01
Si p>0.01
VCR=0.5 FR b d
f*c
8.52
Ton
15.27
Ton
3.5 -2.5 M
Vd
VCR=
16.31 Ton
Si p>0.01
VCR=
29.23 Ton
f*c
45.82
>1=
1.9
Ton
16.31
Ton
3.790
Ton
mayor que Vu
11 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
t
H2
Pa
z
H1
Am
he
z1
Ae
PROPIEDADES GEOMETRICAS
H1= 0.85 m
Peso EspecificoTerreno 1
1.6
Ton/m3
H2=
3.5
Peso EspecificoTerreno 2
1.6
Ton/m3
h=
0.3
2.4
he=
250
Ton/m3
Kg/cm2
z= 0.75 m
b= 0.2 m
t= 1.45 m
z1= 0.75 m
4200
0.9
0.8
32
Kg/cm2
14.0
1.4
Ton/m2
Ae=
=
=
Am=
0
0
90
0.2
1 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
Para el ngulo de friccin interna () pueden tomarse los siguientes valores de acuerdo el tipo de suelo,
en su caso el valor proporcionado por el estudio de mecnica de suelos.
Arena seca suelta con granos redondos
Arena seca densa con granos redondos
Arena seca suelta con granos angulosos
Arena seca densa con granos angulosos
Limo seco y suelto
Limo seco y denso
=28.5
=35
=34
=46
=27 a 30
=30 a 35
DETERMINACION DE SOBRECARGA
Altura de talud
H2 tan( )
2 tan()
Ht=
Ht=
0m
Presin de sobrecarga
Sc=
Ton/m2
He=Sc/2
He=
0
m
hs = Ht + He=
CALCULO DE PRESIONES EJERCIDAS POR EL TERRENO
0.000
Presin activa
Ka =
1 - sen()
1+sen()
Ka= 0.307
Pa = Ka 2 (H2 + hs)=
1.573
Ton/m2
4.426
Ton/m2
Presin pasiva
Kp =
1 + sen()
1 - sen()
Kp= 3.255
Pp = Kp 1 H1 =
2 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
+V
0.64
1.536
m2
Ton
0
0
m2
Ton
Area de zarpa=
(z + Am + t) x h =
Peso de zarpa = 1m x Azarpa x c =
0.72
1.728
m2
Ton
0
0
m2
Ton
4.64
7.42
m
Ton
0.66
Ton
11.35 Ton
3 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
Resistencia a deslizamiento:
Resistencia por friccin
F1 = Pcim x f =
f=
5.107
0.45
Ton
F2= Hp+F1
6.988
Ton
Empuje Horizontal
EH= Ha - Hp =
1.130
Ton
> 1.50'
OK
Facor de seguridad
Fs2 = F2 / Ha =
2.32
3.513
Ton-m
Momento resistente
Momento resistente en muro
Mrm= Pmuro x (z + b/2)=
1.31
Ton-m
Ton-m
2.0736
Ton-m
16.347
0.533
Ton-m
12.435
Ton-m
Ton-m
Ton-m
4.65
> 2.0
4 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
A= 2.4 m
Mv= 3.513 Ton-m
S=1 x(z + Am + t)2/6 =
0.960
xi =Mr/Pcim =
R = Pcim + Ea=
= Pcim / Ea =
z=xi x Pcim-Mv/R=
1.44055277
11.7407001
75.1390696
1.09315475
a =z / sen =
1.13098485
m3
f1=
Pcim/L x 4L - 6a
fa1=
5.54
Ton/m2
menor que qa OK
f2=
Pcim/L - 6a-2L
fa2=
3.91
Ton/m2
3.91
Ton/m2
5.54 Ton/m
DISEO DE MURO.
f''c
4800
170
x
=
x
fy 6000 + fy
4200
b=
mx= 0.75b=
mn=
0.01905
0.014286
0.7
f'c
fy
mn=
4800
816000
=
10200
42840000
11.0679718
4200
0.002635
5 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
H=
3.20
ps
Pa
ps = Ka w hs =
Pa H22
6
Mf= 2.685
Mf=
ps H2
2
V=
Q=
Q=
Ton
2.517
170
100.0 x
289
4421700
MR
FRf''c bd2
375881.4
4421700
0.085
CALCULO DE q
q= 1 =
1-2Q
0.08897
q f''c
fy
=
Se debera usar
0.003601
6 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
VERIFICO:
REVISION No.
ING. DLA
As = pbd =
0.003601
x 100 x
17
S=
Jun-06
CHIHUAHUA CHIH.
100 Av
As
6.1217
es igual a
S=
20.693
cm
1.267
cm
cm
20
cm
V=
2.517
Ton
9.6166522 Ton
NO MENOR DE 5
p= 0.003601
Si p<0.01
Si p>0.01
VCR=0.5 FR b d
f*c
5.92
Ton
9.62
Ton
3.5 -2.5 M
Vd
VCR=
72.20 Ton
Si p>0.01
VCR=
117.19 Ton
f*c
28.85
>1=
12.2
Ton
5.92
Ton
3.524
Ton
mayor que Vu
7 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
ING. DLA
REVISION No.
1
DISEO DE ZAPATA
REVISION A FLEXION
pie
Taln
0.3
W=
5.54
w=
2
Ton/m
3.91
Ton/m
W2
W1
0.75
1.65
Valor de W1 a
W1 =
1.45m
0.986
Ton/m2
Valor de W2 a
W2 =
0.802
DISEO DE TALN
W1
Mf=
w l2
2
W1x l2
6
Mf= 4.113
3.91
Ton/m2
1.45
.345 =
4.458
170
100.0 x
Ton-m
Mu=
6.24185292
V= 5.09 Ton
FRf''c bd2 = 0.90 x
Q=
Q=
729
11153700
MR
FRf''c bd2
624185.3
11153700
Q=
0.05596
CALCULO DE q
q= 1 -
1-2Q
0.05762
q f''c
fy
=
Se debera usar
0.002600
8 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
As = pbd =
0.002600
x 100 x
27
S=
Jun-06
7.0200
es igual a
100 Av
As
S=
18.045
cm
1.267
cm
cm
20
cm
V=
3.7
Relasin M/vd=
RELASION L/h =
15.27
5.090
Ton
Ton
menor que 4
L/h ENTRE 4 Y 5
p= 0.002600
Si p<0.01
Si p>0.01
VCR=0.5 FR b d
f*c
8.49
Ton
15.27
Ton
3.5 -2.5 M
Vd
VCR=
39.15 Ton
Si p>0.01
VCR=
70.42 Ton
f*c
45.82
>1=
4.6
Ton
8.49
Ton
7.126
Ton
mayor que Vu
DISEO DE PIE
W=
5.54
W3
2
1.12174787 Ton/m
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
Ton/m
W3=( W -w) x L/ l =
W3 =
1.12174787 Ton/m
0.75
EL MURO CUENTA CON PIE
2
Mf=
(w+W3) x L
2
+
Mf= 1.416
0.096
Mf=
1.511 Ton-m
Vu=
3.62
170
Q=
Q=
W4 =
1.31 Ton/m
Ton
100.0 x
729
11153700
MR
FRf''c bd2
151149.0
11153700
Q=
0.01355
CALCULO DE q
q= 1 -
1-2Q
0.01364
q f''c
fy
=
Se debera usar
As = pbd =
0.002635
0.002635
x 100 x
27
S=
100 Av
As
es igual a
S=
7.1151
17.804
4
cm2
1.267
cm2
cm
@
20
cm
10 de 11
titulo :
REA:
CIVIL
FECHA:
obra: ESTACION DE TRANSFERENCIA
EJECUTO:
REVISO:
ubicacin:
APROBO:
Jun-06
CHIHUAHUA CHIH.
VERIFICO:
REVISION No.
ING. DLA
V=
3.7
Relasin M/vd=
RELASION L/h =
15.274
2.583
Ton
Ton
menor que 4
MENOR QUE 4
p= 0.002635
Si p<0.01
Si p>0.01
VCR=0.5 FR b d
f*c
8.52
Ton
15.27
Ton
3.5 -2.5 M
Vd
VCR=
16.35 Ton
Si p>0.01
VCR=
29.30 Ton
f*c
45.82
>1=
1.9
Ton
16.35
Ton
3.616
Ton
mayor que Vu
11 de 11
calculo:
reviso:
fecha:
ING. DLA
31/07/2006
proyecto:
NAVE DE DESCARGA
ubicacin:
CHIHUAHUA; CHIH.
15
P
w
seccion del
perfil
a
W=
6 n As ( a + w )
B
DONDE :
M=
5806000
P=
10250
e =M/P
566.4390244
f c =
250
H=
130
B=
75
f c =
FR f*c =
f *c =
FR fc =
FR =
0.8
FR aplasta.
0.7
H/3 =
43.33333333
As =
6.8
No. De anc
6
As total =
40.8
H1=
100
B1=
40
como "e" es mayor que H/3 ;
la placa es de la clase III
KG-CM
KG
cm
KG/CM2
cm
cm
160
200
cm
cm
cm
cm
cm
19320.32422
As = area de anclas
n = Es / Ec
9.48685168
KG/CM2
KG/CM2
2100000
221359
122.5
501.439024
P
M
fs=T/As
x=
nfc
Wa=
x
a
a-x
x3 + 3 w x + W x = W a
2360714.487
T=P( x + 3 w )
3a-x
39315.54003
KG
39.57328546
KG/CM
fp=
2(P+T)
Bx
OBTENCION DE ESFUERZOS :
fp =
donde
P
A
M
S
A =B H
S = B H2/6
9750
211250
CM2
CM3
33.4
2366739.72
cm
kg/cm2
kg/cm2
cm
cm
fp =
28.5353057
KG/CM2
fp1 =
-27.435503
kg/cm
H3= 15
columna
si fp+fp1 ? X
fp
fp2
fp ? H2
fp1
despejando H2
H2
H2 =
66.2772226
cm
obtencion de fp2
si fp1 ? H2
fp2 ? H2-H3
fp2 =
22.0771355
M =fp2 x (H3)2
2
kg/cm
(fp-fp2) x (H3)2
=
3
2968.04051 kg/cm
6M
Fb
3.06351242
CM
donde Fb = 0.75 Fy =
1897.5
kg/cm
Fb = 1.30 x 1897.5 =
2466.75
kg/cm
calculo:
reviso:
fecha:
ING. DLA
31/07/2006
proyecto:
NAVE DE DESCARGA
ubicacin:
CHIHUAHUA; CHIH.
12.5
P
w
seccion del
perfil
a
W=
6 n As ( a + w )
B
DONDE :
M=
2159000
P=
2070
e =M/P
1042.995169
f c =
250
H=
55
B=
55
f c =
FR f*c =
f *c =
FR fc =
FR =
0.8
FR aplasta.
0.7
H/3 =
18.33333333
As =
6.8
No. De anc
5
As total =
34
H1=
30
B1=
30
como "e" es mayor que H/3 ;
la placa es de la clase III
KG-CM
KG
cm
KG/CM2
cm
cm
160
200
cm
cm
cm
cm
cm
40043.31347
As = area de anclas
n = Es / Ec
9.48685168
KG/CM2
KG/CM2
2100000
221359
122.5
1015.49517
P
M
fs=T/As
x=
nfc
Wa=
x
a
a-x
x3 + 3 w x + W x = W a
4922513.904
T=P( x + 3 w )
3a-x
15881.95517
KG
19.19995205
KG/CM
fp=
2(P+T)
Bx
OBTENCION DE ESFUERZOS :
fp =
donde
P
A
M
S
A =B H
S = B H2/6
3025
27729.1667
CM2
CM3
34
4905305.9
cm
kg/cm2
kg/cm2
cm
cm
fp =
78.544553
KG/CM2
fp1 =
-77.785605
kg/cm
H3= 12.5
columna
si fp+fp1 ? X
fp1
fp2
fp1 ? H2
fp
despejando H2
H2
H2 =
27.6335064
cm
55
obtencion de fp2
si fp1 ? H2
fp2 ? H2-H3
fp2 =
43.0149717
M =fp2 x (H3)2
2
kg/cm
(fp-fp2) x (H3)2
=
3
5211.04369 kg/cm
6M
Fb
3.51983009
CM
donde Fb = 0.75 Fy =
1897.5
kg/cm
Fb = 1.33 x 1897.5 =
2523.67
kg/cm
calculo:
reviso:
fecha:
ING. DLA
31/07/2006
proyecto:
TOLVA PRINCIPAL
ubicacin:
CHIHUAHUA; CHIH.
12.5
P
w
seccion del
perfil
a
W=
6 n As ( a + w )
B
DONDE :
M=
320000
P=
4610
e =M/P
69.4143167
f c =
250
H=
55
B=
55
f c =
FR f*c =
f *c =
FR fc =
FR =
0.8
FR aplasta.
0.7
H/3 =
18.33333333
As =
2.01
No. De anc
3
As total =
6.03
H1=
30
B1=
30
como "e" es mayor que H/3 ;
la placa es de la clase III
KG-CM
KG
cm
KG/CM2
cm
cm
160
200
cm
cm
cm
cm
cm
1026.047852
As = area de anclas
n = Es / Ec
9.48685168
KG/CM2
KG/CM2
2100000
221359
122.5
41.9143167
P
M
fs=T/As
x=
nfc
Wa=
x
a
a-x
x3 + 3 w x + W x = W a
125450.9408
T=P( x + 3 w )
3a-x
1774.843551
KG
9.069380044
KG/CM
fp=
2(P+T)
Bx
OBTENCION DE ESFUERZOS :
fp =
donde
P
A
M
S
A =B H
S = B H2/6
3025
27729.1667
CM2
CM3
25.6
125690.862
cm
kg/cm2
kg/cm2
cm
cm
fp =
13.0641623
KG/CM2
fp1 =
-11.373944
kg/cm
H3= 12.5
columna
si fp+fp1 ? X
fp1
fp2
fp1 ? H2
fp
despejando H2
H2
H2 =
29.4019882
cm
55
obtencion de fp2
si fp1 ? H2
fp2 ? H2-H3
fp2 =
7.51004713
M =fp2 x (H3)2
2
kg/cm
(fp-fp2) x (H3)2
=
3
875.999263 kg/cm
6M
Fb
1.44314913
CM
donde Fb = 0.75 Fy =
1897.5
kg/cm
Fb = 1.33 x 1897.5 =
2523.67
kg/cm
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
ZAPATA Z - 2
CONDICION DE CARGA 05, CARGA VERTICAL ( VER RESULTADOS DE CORRIDA
NODOS 9 AL 16 )
Revisin de Esfuerzos en el Terreno
a ) Materiales
kg/cm2
Acero de ref
fy:
4200
Concreto
f`c:
250
kg/cm
c:
2.40
ton/m
Terreno
r:
1.60
ton/m
qa:
18.00
ton/m
b ) Dimensiones de zapata
Zapata
Fvx =
Fvz =
2 o.k
2 o.k
qo =
6.17
Lx:
3.00
Lz:
42.80
z:
1.50
Me:Pe
m
m
m
hf:
h:
hr:
bx:
bz:
3.00
0.30
2.70
0.80
1.35
m
m
m
m
m
ht =
2.70
Prof de desplante
Peralte de zapata
Altura de relleno
Dados
Altura de dado
43.47
=
=
=
=
c)
Contr
Dado
Zapata
Ton
Ton
Ton
Ton
Ton
75.60
57.51
0.00
348.97
43.47
Ton-mt
Pt
Vxt
Vzt
Mxt
=
=
=
=
105.84
80.51
0.00
488.56
Ton
Ton
Ton
Ton
Peso de cimentacin
Ad
Pd
Pd
Ad
Pd
Pd
Az
Pz
Pz
=
=
=
=
=
=
=
=
=
=
0.20
=
7.280
12.23
ton
bx bz
=
0.80
8*(Ad ht c) =
1.080
55.99
ton
Lz Lx
=
42.80
Az h c
=
128.400
92.45
ton
bx bz
long b h c)
x
x
36.40
0.70
=
x
7.280
1.00
x
x
1.35
2.70
=
x
1.080
2.40
x
x
3.00
0.30
=
x
128.400
2.40
m
*
8.00
m
1/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
Relleno
Ar = Az -(Ad-Ac)
Pr =
Ar hr r
Pr =
485.91
Pcim = Pd+Pz+Pr
=
68.22
75.60
Po = P1+P2+P3... =
= 128.400
=
112.480
ton
+
92.45
ton
722.18
P total =
Momento resistente
Mx =
15.920
2.70
=
x
112.480
1.60
485.91
564.97
ton-m
1.92
646.58
ton
ton
Rt* z
Momento Volteo
Mxo =
1083.27
ton-m
Vx*h +M x
f
P
Vx
hf
Fvx
Mrx
Mvx
1083.27
564.97
<
NoPasa
P cim
ht=hf +f
Pt = P + Pcim
P
Plastificacin total
total
Meli Piralla
Cap. 7.3.2
Lx
Mx
Lz
X
Lx:
Lz:
A:
3.00
42.80
128.4
q0
( Lz - 2 ez )
( Lx - 2 ex )
Mz
q0 =
qo cim=
Z
Pt
---------------------------------( Lx - 2 ex ) * ( Lz - 2 ez )
4.50
ex
ez
Lx - 2 ex
Lz - 2 ez
=
=
=
=
Mvx / Pt
Mvz / Pt
3.00
0.00
=
=
-
564.97
0.00
2
0
722.18
---------------------------------( 1.44 ) * ( 42.80 )
Como
q0 < qa
Se aceptan las dimensiones de la zapata
q0 =
/
/
x
x
722.18
0.00
0.78
0.00
11.76
=
=
=
=
0.78
0.00
1.44
0.00
m
m
m
m
ton/m
OK
2/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
d ) PRESIONES DE DISEO
(No se consideran el peso propio ni el peso del relleno)
Pu
Muz
Mux
ex
ez
Lx - 2 ex
Lz - 2 ez
q0=
q0
Pt
( Lx - 2 ex )*( Lz - 2 ez )
Elementos
Mec de diseo
= 1.4 * ( Po + Pcim )
= 1.4 * (Mzo+(Vx)*ht+h)
= 1.4 * (Mxo+(Vz)*ht+h)
=
Mux / Pu =
790.96
=
Muz / Pu =
0.00
=
3.00
2
=
0.00
0
1011.05
=
---------------------------------( 1.44 ) * ( 42.80 )
qmax
=
16.46
Pu
=
1011.05
Mux
=
790.96
Muz
=
0.00
=
=
=
/
/
x
105.84
0.00
790.96
1011.05
0.00
0.78
0.00
16.46
+
+
+
=
=
=
=
905.21
0.00
0.00
0.78
0.00
1.44
0.00
ton/m
=
=
=
1011.05
0.00
790.96
m
m
m
m
OK
ton/m
ton
ton-m
ton-m
0.30
d = 0.25
0.825
Planta
L1x = (Lx-bx)/2 L1x =
0.58
f"c =
d=
pmin =
170
25
=
m
( 0.83
0.25 )
0.58
kg/cm
cm
0.0027
3/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
b)
1.00
m de ancho
qo. = qmax -q cim
qcim. =
6.31
ton/m
qo
(Lx*Lz)
Lx
( 0.83
Mmx
Mmx
Mmx
FR f"c b d
=
=
=
=
qo Lx / 2
10.15
345,464
0.90
FR f"c b d =
9562500
Q=
0.85 f'c b d
( 0.83 )
kg-cm
x
170.00
Mr
=
FR f"c b d
345,464
9562500
qo. =
10.15
ton/m
ton-m
3.455
100.00
625.00
= 0.036126979
calculo de q
q = 1 - (1 - 2 Q)=
=
Cuantia de acero
7.12.2
q f"c / fy
0.03680426
0.0368
como
170
---------------- =
4,200
< mn
x
Usar
=
As =
bd
=
0.00270
x
As =
6.75 cm
se propone usar varillas #
4
Av =
S ?
usar varillas del #
100 Av
As
4
0.00270
100.00
1.27
S=
18.77
20
0.001490
OK
x
25.00
cm2
cm
cm
f*c
4/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
vu < vcr
OK
vu < vcr
OK
f*c
d/2
Cx
Cz
d
r
b)
c)
vx=
1 -
Cx =
bx + d
=
0.80
Cz =
bz + d
=
1.35
bo = 2 (Cx + Cz) =
2
bo =
5.30
m
bo d
Ac =
=
530.00
Cortante actuante
Vu = Pu - qo( Cx Cz )
Vu = 14,364.00 10.15
Vu = 14,346.946
ton
Transmisin de momento direccin x
Fraccin de momento transmitido
1 + (2/3)(Cx/Cz)
vx =
+
+
(
=
x
(
=
qo
Cx
Cz
0.25
=
1.05
m
0.25
=
1.60
m
1.05
+
1.60
)
400.00 cm
25.00
=
13,250.00 cm
1.05
14,346,946
1.60
( 1.05
kg
1
---------------------------------------------------------1.66666667
0.26
1.60 )
5/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
d)
vz=
1 -
vz =
1 + (2/3)(Cz/Cx)
=
=
x
+
/
28,940,625
1,640,625
( 105.00 ) =
22,050,000 =
2
=
cm4
cm4
4
44,100,000 cm
4
27,146,875 cm
52.50 cm
1
---------------------------------------------------------1.66666667
( 1.60
0.51
1.05 )
e)
f)
d Cz =
0.00
x ( 160.00 )
Cz d =
160.00
x
( 0.00 )
d Cx Cz =
0.00
x
105.00
Jcz =
0+
0
Czz =
Cz / 2
=
160.00
Esfuerzo actuante
Vu
vx Mzu Cxx
vu = --------------- + --------------Ac
Jcx
Vu =
1.08
+
0.99
Esfuerzo resistente
vcr1 = Fr* ( 0.5 + ) (f*c)^(1/2)
c =
bx
/
bz
vcr1 =
10.82
kg/cm
=
=
x
+
/
( 160.00 )
0
2
g)
vz Mxu Czz
--------------Jcz
+
#DIV/0!
=
0.80
cm4
cm4
cm
0
0
80.00
#DIV/0!
1.35
kg/cm
0.59
RIGE
vu < vcr
=
=
=
Como
cm4
cm4
0
0
#DIV/0!
as =((660(x1))/Fy(x1+100)
3.626
3
2*Av =
Sep =
39.30
cm
DEJAMOS @20CM
As =
COLOCAR :
se propone usar varillas #
No. Vars =
14.92
75.6
cm2
5.07
60.80 cm
cm2
O.K
cm.
Av =
12
1.43
6/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
ZAPATA Z - 2
CONDICION DE CARGA 06 (CARGA MUERTA + CARGA VIVA + VIENTO)
VER RESULTADOS DE CORRIDA DEL STAAD, NODOS DEL 9 AL 16
Revisin de Esfuerzos en el Terreno
a ) Materiales
kg/cm2
Acero de ref
fy:
4200
Concreto
f`c:
250
kg/cm
c:
2.40
ton/m
Terreno
r:
1.60
ton/m
qa:
18.00
ton/m
b ) Dimensiones de zapata
Zapata
Fvx =
Fvz =
2 o.k
2 o.k
qo =
6.17
Lx:
3.00
Lz:
42.80
z:
1.50
Me:Pe
m
m
m
hf:
h:
hr:
bx:
bz:
4.00
0.30
3.70
0.80
1.35
m
m
m
m
m
ht =
3.70
Prof de desplante
Peralte de zapata
Altura de relleno
Dados
Altura de dado
1.9665
=
=
=
=
c)
Contr
Dado
Zapata
Ton
Ton
Ton
Ton
Ton
3.42
26.59
0.00
87.67
1.9665
Ton-mt
=
=
=
=
3.76
29.25
0.00
96.44
Ton
Ton
Ton
Ton
Peso de cimentacin
Ad
Pd
Pd
Ad
Pd
Pd
Az
Pz
Pz
=
=
=
=
=
=
=
=
=
=
0.20
=
7.280
12.23
ton
bx bz
=
0.80
8*(Ad ht c) =
1.080
76.72
ton
Lz Lx
=
42.80
Az h c
=
128.400
92.45
ton
bx bz
long b h c)
x
x
36.40
0.70
=
x
7.280
1.00
x
x
1.35
3.70
=
x
1.080
2.40
x
x
3.00
0.30
=
x
128.400
2.40
m
*
8.00
m
1/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
Relleno
Ar = Az -(Ad-Ac)
Pr =
Ar hr r
Pr =
665.88
Pcim = Pd+Pz+Pr
=
88.95
3.42
Po = P1+P2+P3... =
= 128.400
=
112.480
ton
+
92.45
ton
850.70
P total =
Momento resistente
Mx =
15.920
3.70
=
x
112.480
1.60
665.88
196.00
ton-m
6.51
847.28
ton
ton
Rt* z
Momento Volteo
Mxo =
1276.05
ton-m
Vx*h +M x
f
P
Vx
hf
Fvx
Mrx
Mvx
1276.05
196.00
>
2 OK
P cim
ht=hf +f
Pt = P + Pcim
P
Plastificacin total
total
Meli Piralla
Cap. 7.3.2
Lx
Mx
Lz
X
Lx:
Lz:
A:
3.00
42.80
128.4
q0
( Lz - 2 ez )
( Lx - 2 ex )
Mz
q0 =
qo cim=
Z
Pt
---------------------------------( Lx - 2 ex ) * ( Lz - 2 ez )
5.91
ex
ez
Lx - 2 ex
Lz - 2 ez
=
=
=
=
Mvx / Pt
Mvz / Pt
3.00
0.00
=
=
-
196.00
0.00
2
0
850.70
---------------------------------( 2.54 ) * ( 42.80 )
Como
q0 < qa
Se aceptan las dimensiones de la zapata
q0 =
/
/
x
x
850.70
0.00
0.23
0.00
7.83
=
=
=
=
0.23
0.00
2.54
0.00
m
m
m
m
ton/m
OK
2/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
d ) PRESIONES DE DISEO
(No se consideran el peso propio ni el peso del relleno)
Pu
Muz
Mux
ex
ez
Lx - 2 ex
Lz - 2 ez
q0=
q0
Pt
( Lx - 2 ex )*( Lz - 2 ez )
Elementos
Mec de diseo
= 1.1 * ( Po + Pcim )
= 1.1 * (Mzo+(Vx)*ht+h)
= 1.1 * (Mxo+(Vz)*ht+h)
=
Mux / Pu =
215.60
=
Muz / Pu =
0.00
=
3.00
2
=
0.00
0
935.77
=
---------------------------------( 2.54 ) * ( 42.80 )
qmax
=
8.61
Pu
=
935.77
Mux
=
215.60
Muz
=
0.00
=
=
=
/
/
x
3.76
0.00
215.60
935.77
0.00
0.23
0.00
8.61
+
+
+
=
=
=
=
932.01
0.00
0.00
0.23
0.00
2.54
0.00
ton/m
=
=
=
935.77
0.00
215.60
m
m
m
m
OK
ton/m
ton
ton-m
ton-m
0.30
d = 0.25
0.825
Planta
L1x = (Lx-bx)/2 L1x =
0.58
f"c =
d=
pmin =
170
25
=
m
( 0.83
0.25 )
0.58
kg/cm
cm
0.0027
3/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
b)
Diseo a flexion
Tomando una franja de
1.00
m de ancho
qo. = qmax -q cim
qcim. =
6.50
ton/m
qo
(Lx*Lz)
Lx
( 0.83
Mmx
Mmx
Mmx
FR f"c b d
=
=
=
=
qo Lx / 2
2.11
71,939
0.90
FR f"c b d =
9562500
Q=
0.85 f'c b d
( 0.83 )
kg-cm
x
170.00
Mr
=
FR f"c b d
71,939
9562500
qo. =
2.11
ton/m
ton-m
0.719
100.00
625.00
= 0.007522985
calculo de q
q = 1 - (1 - 2 Q)=
=
Cuantia de acero
7.12.2
q f"c / fy
0.0075515
0.0076
como
170
---------------- =
4,200
< mn
x
Usar
=
As =
bd
=
0.00270
x
As =
6.75 cm
se propone usar varillas #
4
Av =
S ?
usar varillas del #
100 Av
As
4
0.00270
100.00
1.27
S=
18.77
20
0.000306
OK
x
25.00
cm2
cm
cm
f*c
4/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
vu < vcr
OK
vu < vcr
OK
f*c
d/2
Cx
Cz
d
r
b)
c)
vx=
1 -
Cx =
bx + d
=
0.80
Cz =
bz + d
=
1.35
bo = 2 (Cx + Cz) =
2
bo =
5.30
m
bo d
Ac =
=
530.00
Cortante actuante
Vu = Pu - qo( Cx Cz )
Vu =
935.77
2.11
Vu =
932.222
ton
Transmisin de momento direccin x
Fraccin de momento transmitido
1 + (2/3)(Cx/Cz)
vx =
+
+
(
=
x
(
=
qo
Cx
Cz
0.25
=
1.05
m
0.25
=
1.60
m
1.05
+
1.60
)
400.00 cm
25.00
=
13,250.00 cm
1.05
932,222
1.60
( 1.05
kg
1
---------------------------------------------------------1.66666667
0.26
1.60 )
5/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
d)
vz=
1 -
vz =
1 + (2/3)(Cz/Cx)
=
=
x
+
/
28,940,625
1,640,625
( 105.00 ) =
22,050,000 =
2
=
cm4
cm4
4
44,100,000 cm
4
27,146,875 cm
52.50 cm
1
---------------------------------------------------------1.66666667
( 1.60
0.51
1.05 )
e)
f)
d Cz =
0.00
x ( 160.00 )
Cz d =
160.00
x
( 0.00 )
d Cx Cz =
0.00
x
105.00
Jcz =
0+
0
Czz =
Cz / 2
=
160.00
Esfuerzo actuante
Vu
vx Mzu Cxx
vu = --------------- + --------------Ac
Jcx
Vu =
70.36
+
1.35
Esfuerzo resistente
vcr1 = Fr* ( 0.5 + ) (f*c)^(1/2)
c =
bx
/
bz
vcr1 =
10.82
kg/cm
=
=
x
+
/
( 160.00 )
0
2
g)
vz Mxu Czz
--------------Jcz
+
#DIV/0!
=
0.80
cm4
cm4
cm
0
0
80.00
#DIV/0!
1.35
kg/cm
0.59
RIGE
vu < vcr
=
=
=
Como
cm4
cm4
0
0
#DIV/0!
as =((660(x1))/Fy(x1+100)
3.626
3
2*Av =
Sep =
39.30
cm
DEJAMOS @20CM
As =
COLOCAR :
se propone usar varillas #
No. Vars =
14.92
75.6
cm2
5.07
60.80 cm
cm2
O.K
cm.
Av =
12
1.43
6/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
ZAPATA Z - 3
Fvx =
Fvz =
2 o.k
2 o.k
qo =
6.17
Zapata
Lx:
Lz:
z:
3.00
3.00
1.50
m
m
m
Prof de desplante
Peralte de zapata
Altura de relleno
Dados
hf:
h:
hr:
bx:
bz:
4.00
0.30
3.70
0.60
0.60
m
m
m
m
m
ht =
3.70
Altura de dado
=
=
=
=
Dado
Zapata
P1
Vx1
Vz1
Mx1
Ton
Ton
Ton
Ton
1.98
5.35
0.00
21.75
c)
Contr
2.18
5.89
0.00
23.93
Ton
Ton
Ton
Ton
Peso de cimentacin
Ad
Pd
Pd
Ad
Pd
Pd
Az
Pz
Pz
=
=
=
=
=
=
=
=
=
=
=
0.00
ton
bx bz
=
1*(Ad ht c) =
3.20
ton
Lz Lx
=
Az h c
=
6.48
ton
bx bz
long b h c)
0.00
0.000
x
x
0.00
0.00
=
x
0.000
0.00
0.60
0.360
x
x
0.60
3.70
=
x
0.360
2.40
3.00
9.000
x
x
3.00
0.30
=
x
9.000
2.40
m
*
1.00
m
1/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
Relleno
Ar = Az -(Ad-Ac)
Pr =
Ar hr r
Pr =
51.15
Pcim = Pd+Pz+Pr
=
3.20
1.98
Po = P1+P2+P3... =
=
=
ton
+
ton
62.81
P total =
Momento resistente
Mx =
0.360
3.70
=
x
8.640
1.60
6.48
51.15
60.83
43.15
ton-m
2.18
>
ton
ton
Rt* z
Momento Volteo
Mxo =
9.000
8.640
94.21
ton-m
Vx*h +M x
f
P
Vx
hf
Fvx
Mrx
Mvx
94.21
43.15
2 OK
P cim
ht=hf +f
Pt = P + Pcim
P
Plastificacin total
total
Meli Piralla
Cap. 7.3.2
Lx
Mx
Lz
X
Lx:
Lz:
A:
3.00
3.00
9
q0
( Lz - 2 ez )
( Lx - 2 ex )
Mz
q0 =
qo cim=
Z
Pt
---------------------------------( Lx - 2 ex ) * ( Lz - 2 ez )
6.40
ex
ez
Lx - 2 ex
Lz - 2 ez
=
=
=
=
Mvx / Pt
Mvz / Pt
3.00
0.00
=
=
-
43.15
0.00
2
0
62.81
---------------------------------( 1.63 ) * ( 3.00 )
Como
q0 < qa
Se aceptan las dimensiones de la zapata
q0 =
/
/
x
x
62.81
0.00
0.69
0.00
12.88
=
=
=
=
0.69
0.00
1.63
0.00
m
m
m
m
ton/m
OK
2/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
d ) PRESIONES DE DISEO
(No se consideran el peso propio ni el peso del relleno)
Pu
Muz
Mux
ex
ez
Lx - 2 ex
Lz - 2 ez
q0=
q0
Pt
( Lx - 2 ex )*( Lz - 2 ez )
Elementos
Mec de diseo
= 1.1 * ( Po + Pcim )
= 1.1 * (Mzo+(Vx)*ht+h)
= 1.1 * (Mxo+(Vz)*ht+h)
=
Mux / Pu =
47.47
=
Muz / Pu =
0.00
=
3.00
2
=
0.00
0
69.09
=
---------------------------------( 1.63 ) * ( 3.00 )
qmax
=
14.16
Pu
=
69.09
Mux
=
47.47
Muz
=
0.00
=
=
=
/
/
x
2.18
0.00
47.47
69.09
0.00
0.69
0.00
+
+
+
=
=
=
=
66.91
0.00
0.00
0.69
0.00
1.63
0.00
14.16
ton/m
=
=
=
69.09
0.00
47.47
m
m
m
m
ton/m
ton
ton-m
ton-m
0.30
d = 0.25
1.2
Planta
L1x = (Lx-bx)/2 L1x =
0.95
f"c =
d=
pmin =
170
25
=
m
( 1.20
0.25 )
0.95
kg/cm
cm
0.0027
3/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
b)
Direccin x
Tomando una franja de
1.00
m de ancho
qo. = qmax -q cim
qcim. =
7.04
ton/m
qo
(Lx*Lz)
Lx
( 1.20
Mmx
Mmx
Mmx
FR f"c b d
=
=
=
=
qo Lx / 2
7.12
512,639
0.90
FR f"c b d =
9562500
Q=
0.85 f'c b d
( 1.20 )
kg-cm
x
170.00
Mr
=
FR f"c b d
512,639
9562500
qo. =
7.12
ton/m
ton-m
5.126
100.00
625.00
= 0.053609356
calculo de q
q = 1 - (1 - 2 Q)=
Cuantia de acero
7.12.2
q f"c / fy
0.05512896
0.0551
como
170
---------------- =
4,200
< mn
x
Usar
=
As =
bd
=
0.00270
x
As =
6.75 cm
se propone usar varillas #
4
Av =
S ?
usar varillas del #
100 Av
As
4
0.00270
100.00
1.27
S=
18.77
20
0.002231
OK
x
25.00
cm2
cm
cm
f*c
4/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
vu < vcr
OK
vu < vcr
OK
f*c
d/2
Cx
Cz
d
r
b)
c)
vx=
1 -
1 + (2/3)(Cx/Cz)
Cx =
bx + d
=
0.60
Cz =
bz + d
=
0.60
bo = 2 (Cx + Cz) =
2
bo =
3.40
m
bo d
Ac =
=
340.00
Cortante actuante
Vu = Pu - qo( Cx Cz )
Vu =
0.00
7.12
Vu =
-5.144
ton
Transmisin de momento direccin x
Fraccin de momento transmitido
vx =
+
+
(
=
x
(
=
qo
Cx
Cz
0.25
=
0.85
m
0.25
=
0.85
m
0.85
+
0.85
)
400.00 cm
0.00
=
0.00 cm
0.85
-5,144
0.85
( 0.85
kg
1
---------------------------------------------------------1.66666667
0.40
0.85 )
5/6
DEPTO.:
INGENIERIA
ELABORO:
ING. DLA
REVISO:
AUTORIZO
FECHA:
31-Jul-2006
d)
vz=
1 -
vz =
1 + (2/3)(Cz/Cx)
=
=
x
+
/
cm4
cm4
0
0
( 85.00 )
=
=
=
0
0
cm4
cm4
42.50 cm
1
---------------------------------------------------------1.66666667
( 0.85
0.40
0.85 )
e)
f)
d Cz =
0.00
x ( 85.00 )
Cz d =
85.00
x
( 0.00 )
d Cx Cz =
0.00
x
85.00
Jcz =
0+
0
Czz =
Cz / 2
=
85.00
Esfuerzo actuante
Vu
vx Mzu Cxx
vu = --------------- + --------------Ac
Jcx
Vu =
#DIV/0!
+
#DIV/0!
Esfuerzo resistente
vcr1 = Fr* ( 0.5 + ) (f*c)^(1/2)
c =
bx
/
bz
vcr1 =
14.85
kg/cm
=
=
x
+
/
( 85.00 )
0
2
g)
vz Mxu Czz
--------------Jcz
+
#DIV/0!
=
0.60
cm4
cm4
cm
0
0
42.50
#DIV/0!
0.60
kg/cm
1.00
RIGE
vu < vcr
=
=
=
Como
cm4
cm4
0
0
#DIV/0!
as =((660(x1))/Fy(x1+100)
3.626
3
2*Av =
Sep =
39.30
cm
DEJAMOS @20CM
As =
COLOCAR :
se propone usar varillas #
No. Vars =
4.97
25.2
cm2
5.07
60.80 cm
cm2
O.K
cm.
Av =
12
1.43
6/6
****************************************************
*
*
*
STAAD.Pro
*
*
Version 2004
Bld 1004.US
*
*
Proprietary Program of
*
*
Research Engineers, Intl.
*
*
Date=
AUG 16, 2006
*
*
Time=
11:59:14
*
*
*
*
USER ID: WFI DE MEXICO
*
****************************************************
Page 1 of 3
-- PAGE NO.
P R O B L E M
S T A T I S T I C S
----------------------------------NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS =
8/
7/
ORIGINAL/FINAL BAND-WIDTH=
1/
1/
2 DOF
TOTAL PRIMARY LOAD CASES =
1, TOTAL DEGREES OF FREEDOM =
SIZE OF STIFFNESS MATRIX =
1 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE =
12.0/ 26568.6 MB
8
8
Page 2 of 3
-- PAGE NO.
1
2
3
4
5
6
7
8
LOAD
FORCE-X
FORCE-Y
FORCE-Z
MOM-X
MOM-Y
MOM Z
1
1
1
1
1
1
1
1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-35.67
-101.59
-87.22
-90.52
-90.52
-87.22
-101.59
-35.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.
33.
34.
35.
36.
37.
************************************************************
*
For questions on STAAD.Pro, please contact
*
*
Research Engineers Offices at the following locations *
*
*
*
Telephone
Email
*
* USA:
+1 (714)974-2500
support@reiusa.com
*
* CANADA
+1 (905)632-4771
detech@odandetech.com *
* CANADA
+1 (604)629 6087
staad@dowco.com
*
* UK
+44(1454)207-000
support@reel.co.uk
*
* FRANCE
+33(0)1 64551084
support@reel.co.uk
*
* GERMANY
+49/931/40468-71
info@reig.de
*
* NORWAY
+47 67 57 21 30
STAAD@EDR.NO
*
* SINGAPORE +65 6225-6015/16
support@reiasia.net
*
* INDIA
+91(033)2357-3575 support@calcutta.reiusa.com *
* JAPAN
+81(03)5952-6500
eng-eye@crc.co.jp
*
* CHINA
+86(411)363-1983
support@reiasia.net
*
*
*
* North America
support@reiusa.com
*
* Europe
support@reel.co.uk
*
* Asia
support@reiasia.net
*
Page 3 of 3
****************************************************
*
*
*
STAAD.Pro
*
*
Version 2004
Bld 1004.US
*
*
Proprietary Program of
*
*
Research Engineers, Intl.
*
*
Date=
AUG 10, 2006
*
*
Time=
11:58: 6
*
*
*
*
USER ID: WFI DE MEXICO
*
****************************************************
Page 1 of 7
-- PAGE NO.
P R O B L E M
S T A T I S T I C S
----------------------------------NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS =
22/
26/
ORIGINAL/FINAL BAND-WIDTH=
9/
4/
27 DOF
TOTAL PRIMARY LOAD CASES =
2, TOTAL DEGREES OF FREEDOM =
SIZE OF STIFFNESS MATRIX =
3 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE =
12.1/ 26698.3 MB
8
90
Page 2 of 7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
LOAD
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
X-TRANS
0.0000
0.0000
0.0000
0.0000
-0.0731
-0.0273
-0.0343
-0.0791
-0.0696
-0.0286
-0.0799
-0.0800
-0.0682
-0.0682
0.0000
0.0000
-0.0227
-0.0613
0.0000
-0.0098
0.0000
-0.0098
-- PAGE NO.
RADIANS)
Y-TRANS
0.0000
0.0000
0.0000
0.0000
-0.1534
-0.0613
-0.0773
-0.1920
-0.2079
-0.0862
-0.2019
-0.4808
-0.5047
-0.2268
0.0000
0.0000
-0.0682
-0.1670
0.0000
-0.0639
0.0000
0.0127
Z-TRANS
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
X-ROTAN
0.0000
0.0000
0.0000
0.0020
0.0024
0.0010
0.0011
0.0026
0.0027
0.0012
0.0013
0.0030
0.0030
0.0015
0.0000
0.0000
0.0011
0.0026
0.0000
0.0008
0.0000
-0.0002
Y-ROTAN
0.0000
0.0000
0.0000
-0.0013
-0.0006
-0.0005
-0.0005
-0.0003
-0.0004
-0.0004
-0.0003
0.0002
0.0003
-0.0003
0.0000
0.0000
-0.0004
-0.0006
0.0000
-0.0001
0.0000
-0.0001
Z-ROTAN
0.0009
0.0000
0.0000
0.0022
-0.0014
-0.0013
-0.0015
-0.0018
0.0018
0.0015
-0.0028
-0.0027
0.0026
0.0028
0.0000
0.0000
0.0013
0.0010
0.0000
-0.0010
0.0000
-0.0007
Page 3 of 7
-- PAGE NO.
1
4
2
3
15
16
19
21
LOAD
FORCE-X
FORCE-Y
FORCE-Z
MOM-X
MOM-Y
MOM Z
3
3
3
3
3
3
3
3
-0.04
-0.31
0.19
0.02
0.01
0.10
0.01
0.02
0.30
0.54
1.64
0.47
0.50
1.78
1.21
-0.03
0.00
0.00
0.01
0.01
0.00
-0.02
-0.02
0.02
0.00
0.00
-1.57
-0.62
-0.69
-1.74
-0.73
0.12
0.00
0.00
0.09
0.02
0.02
0.07
0.01
0.01
0.00
0.00
0.38
0.00
0.00
-0.25
0.25
0.00
45.
46.
47.
48.
49.
50.
PARAMETER
CODE AISC
RATIO 1 MEMB 1 TO 5 7 8 10 11 13 15 16 18 19 21 TO 26
MAIN 1 MEMB 1 TO 5 7 8 10 11 13 15 16 18 19 21 TO 26
BEAM 1 MEMB 1 TO 5 7 8 10 11 13 15 16 18 19 21 TO 26
CHECK CODE MEMB 1 TO 5 7 8 10 11 13 15 16 18 19 21 TO 26
Page 4 of 7
-- PAGE NO.
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
TABLE
ST
C8X13
PASS
0.00 T
ST
C8X13
PASS
0.02 C
ST
W8X15
PASS
0.02 C
ST
W8X15
PASS
0.02 T
ST
C8X13
PASS
0.17 C
ST
C8X13
PASS
0.04 C
ST
W8X15
PASS
0.00 T
10
ST
W8X15
PASS
0.00 T
11
ST
W8X15
PASS
0.02 T
13
ST
W8X15
PASS
0.01 T
15
ST
C8X13
PASS
0.00 T
16
ST
W8X15
PASS
0.01 C
18
ST
W8X15
PASS
0.01 C
19
ST
W8X15
PASS
0.01 C
(AISC SECTIONS)
SHEAR
-Y
0.001
0.00
0.00
(AISC SECTIONS)
AISC- H1-3
0.137
0.01
0.22
(AISC SECTIONS)
AISC- H1-3
0.062
0.01
-0.12
(AISC SECTIONS)
AISC- H2-1
0.246
0.01
0.73
(AISC SECTIONS)
AISC- H1-3
0.363
0.00
0.25
(AISC SECTIONS)
AISC- H1-3
0.359
0.00
-0.28
(AISC SECTIONS)
AISC- H2-1
0.245
0.02
0.69
(AISC SECTIONS)
AISC- H2-1
0.078
0.00
0.23
(AISC SECTIONS)
AISC- H2-1
0.667
0.07
1.74
(AISC SECTIONS)
AISC- H2-1
0.161
-0.03
0.32
(AISC SECTIONS)
SHEAR
-Y
0.001
0.00
0.00
(AISC SECTIONS)
AISC- H1-3
0.232
0.02
0.62
(AISC SECTIONS)
AISC- H1-3
0.069
0.00
0.20
(AISC SECTIONS)
AISC- H1-3
0.663
0.09
1.57
3
0.00
3
1.00
3
0.00
3
0.00
3
4.47
3
2.61
3
0.00
3
0.00
3
0.00
3
0.00
3
0.00
3
0.00
3
0.00
3
0.00
Page 5 of 7
-- PAGE NO.
RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
21
TABLE
ST
W8X15
PASS
0.00 C
22
ST
C8X13
PASS
0.02 C
23
ST
C8X13
PASS
0.14 T
24
ST
C8X13
PASS
0.02 C
25
ST
C8X13
PASS
0.17 T
26
ST
C8X13
PASS
0.35 C
(AISC SECTIONS)
AISC- H1-3
0.150
-0.02
0.38
(AISC SECTIONS)
AISC- H1-3
0.053
0.00
-0.10
(AISC SECTIONS)
AISC- H2-1
0.473
0.00
-0.37
(AISC SECTIONS)
AISC- H1-3
0.620
0.00
-0.50
(AISC SECTIONS)
AISC- H2-1
0.468
0.00
0.38
(AISC SECTIONS)
AISC- H1-3
0.583
0.00
-0.38
3
0.00
3
1.00
3
2.61
3
2.23
3
0.00
3
2.23
Page 6 of 7
-- PAGE NO.
STEEL TAKE-OFF
-------------PROFILE
LENGTH(METE)
ST C8X13
ST W8X15
PRISMATIC STEEL
WEIGHT(MTON)
32.81
10.60
0.00
0.670
0.238
0.000
---------------TOTAL =
0.908
52. FINISH
************************************************************
*
For questions on STAAD.Pro, please contact
*
*
Research Engineers Offices at the following locations *
*
*
*
Telephone
Email
*
* USA:
+1 (714)974-2500
support@reiusa.com
*
* CANADA
+1 (905)632-4771
detech@odandetech.com *
* CANADA
+1 (604)629 6087
staad@dowco.com
*
* UK
+44(1454)207-000
support@reel.co.uk
*
* FRANCE
+33(0)1 64551084
support@reel.co.uk
*
* GERMANY
+49/931/40468-71
info@reig.de
*
* NORWAY
+47 67 57 21 30
STAAD@EDR.NO
*
* SINGAPORE +65 6225-6015/16
support@reiasia.net
*
* INDIA
+91(033)2357-3575 support@calcutta.reiusa.com *
* JAPAN
+81(03)5952-6500
eng-eye@crc.co.jp
*
* CHINA
+86(411)363-1983
support@reiasia.net
*
*
*
* North America
support@reiusa.com
*
* Europe
support@reel.co.uk
*
* Asia
support@reiasia.net
*
Page 7 of 7
NAVE DE DESCARGA
Software licensed to WFI DE MEXICO
Job Title
Job No
Sheet No
Rev
1
Part
Ref
By
Client
File
Date27-Jul-06
ESCALERA.std
Chd
Date/Time
10-Aug-2006 11:58
Y
X
Z
Load 1
Print Run 1 of 1
LOSA
DE
BORDE
LOSA
DE :
AZOTEA
L
Claro corto ( B ) =
1.95
Claro largo ( L ) =
2.55
2.00
Espesor Total =
10.00
8.00
Recubrimiento =
MATERIALES ( EN KG Y CM ) :
Concreto con:
Acero con:
f'c = 200
fy = 4200
FACTOR DE CARGA =
1.40
1.31
Losa NO Alargada
"0.034 ( fs * W )^
1.22
Peralte efectivo ( d )
4.33
m = 0.7647
y se toma = 8.00
CLARO
Corto
Largo
Corto
Largo
Corto
Largo
MOMENTO
T-M
0.159
0.000
0.125
0.099
0.159
0.113
0.0203
0.0000
0.0159
0.0126
0.0203
0.0145
0.0205
0.0000
0.0160
0.0127
0.0205
0.0146
0.00067
0.00000
0.00052
0.00041
0.00067
0.00047
1.42857143
CM
SI
REA DE
ACERO
0.53
0.00
0.42
0.33
0.53
0.38
50
SEP.CON
VAR.# 3
133.43
#DIV/0!
170.92
216.41
133.43
187.94
CM
TRABE :
T-1
OBRA : CASETA DE VIGILANCIA
P=0.70 TON
w=0.60 t/m
Mservicio(+) = 0.00
Mservicio (-) = 2.50
V servicio = 1.87
L=1.95 m
R1=1,87 T
15.00
M=2.50 T-M
Altura =
50.00
recubrim.=
3.00
Peralte
f'c = 200
fy = 4200
Calibre = 3/8"
As p/est. = 0.71
fy = 4200
0.0000
q ltimo(+)=
0.0000
p ltimo(+) =
0.0000
As (+)
0.00
cm
As (-)
2.06
cm
1.6617
cm
++++++++++++++++++++++++++++++++++++++++++
0.0029
V resistente = 2053
Vult. - Vres. =
Separacin
Separacin
565
calculada =
mnima 2 =
SI
La Seccin pasa por Cortante
90.88
23.50
RIGE = 23.5
SI
cm
47.00
TRABE :
T-2
OBRA. CASETA DE VIGILANCIA
P
a
Long. ( a ) = 0.00
Long. ( b ) = 0.00
Long. ( L ) = 2.55
Carga ( P ) = 0.00
15.00
Altura =
50.00
Recubrim. = 3.00
Peralte
47.00
f'c = 200
fy = 4200
Calibre = 3/8"
As p/est. = 0.71
fy = 4200
0.70
0.70
0.98
Mservicio(+) en la carga P =
Mservicio(+) al centro de L =
Mservicio (-) =
0.00
0.45
0.00
Mltimo(+) en la carga P =
Mltimo(+) al centro de L =
Mltimo (-) =
0.00
0.63
0.00
TRABE :
T-2
0.0000
0.00
As(+) en la carga P =
As (-) =
0.00
0.00
As(+) al centro de L =
1.66
cm
0.0005
V resistente = 1535
Vult. - Vres. =
Separacin
Separacin
-553
calculada =
mnima
=
0.36
NO
SI
RIGE = 23.50
cm
cm
ZAPATA
ZAPATA
CORRIDA
CENTRAL:
NMERO:
Z-1
W
OBRA : CASETA DE VIGILANCIA
b
c
d
r
Long. ( a ) = 0.150
Long. ( b ) = 0.325
Long. ( c ) = 0.325
Long. ( L ) = 0.80
rea total = 0.80
12.00
Recubrimiento =
3.00
Altura
15.00
f'c = 200
fy = 4200
2.50
SI
0.51
0.72
M. de servicio =
M. ltimo
=
0.13
0.18
0.0105
Constante (q)
Porc. (p) =
0.0003
Se toma (p)
2.83
0.0105
= 0.0003
0.0024
3287