Gastos Generales-Flete Anra
Gastos Generales-Flete Anra
S/.
Unidad
Personas
%Particip.
Tiempo
Parcial
mes
100%
2,500.00
7,500.00
mes
100%
2,000.00
6,000.00
mes
100%
2,000.00
0.00
Subtotal
13,500.00
Descripcin
Unidad
Personas
%Particip.
Tiempo
Sueldo/Jornal
Parcial
mes
100%
2,400.00
7,200.00
17002 ALMACENERO
mes
100%
900.00
2,700.00
17003 GUARDIAN
mes
100%
800.00
2,400.00
Subtotal
12,300.00
S/.
Descripcin
Cantidad
Tiempo
1,033.76
Costo
Parcial
mes
100.00
300.00
mes
94.59
283.76
mes
50.00
150.00
18004 FOTOGRAFIAS
mes
100.00
300.00
Subtotal
1,033.76
S/.
Unidad
Descripcin
Cantidad
Tiempo
GLB
GLB
S/.
A.
S/.
ENSAYO DE LABORATORIO
Cdigo
Unidad
Descripcin
900.00
Costo
B.
25,800.00
Sueldo/Jornal
Cdigo
Descripcin
Cdigo
B.
S/.
27,733.76
Parcial
250.00
750.00
50.00
150.00
Subtotal
900.00
2,150.00
650.00
Cantidad Precio
Parcial
UND
350.00
350.00
UND
10
30.00
300.00
Subtotal
650.00
S/.
IMPREVISTOS
Cdigo
Unidad
Descripcin
1,500.00
Cantidad Precio
Parcial
8009 Imprevistos
GLB
500.00
500.00
GLB
1,000.00
1,000.00
Subtotal
1,500.00
S/.
27,733.76
COSTO DIRECTO
29,883.76
2,150.00
249,031.32
% DE GASTOS GENERALES
12.000000%
COSTO DIRECTO
GASTOS GENERALES
UTLIDAD
12.00000%
7.50000%
SUB TOTAL
IGV (18%)
18.00000%
PRESUPUESTO DE OBRA
GASTOS DE SUPERVISIN DE OBRA
GASTOS DE ELABORACIN DE EXPEDIENTE TCNICO
MITIGACION IMPACTO AMBIENTAL
Capacitacion Tecnica y productiva
PRESUPUESTO TOTAL DEL PROYECTO
SON :
TRESCIENTOS SESENTA Y NUEVE MIL SEICIENTOS CINCUENTA Y NUEVE CON
07/100 NUEVOS SOLES
249,031.32
29,883.76
18,677.35
=============
297,592.43
53,566.64
351,159.07
7,500.00
8,000.00
1,206.00
1,794.00
=============
369,659.07
1- FLETE TERRESTRE
INSUMO
UND
CANT.
PESO (KG)
UNITARIO
TOTAL
FLETE
UNITARIO
TOTAL
kg
571.7040
1.00
571.70
0.20
ADITIVO IMPERMEABILIZANTE
gal
1.7248
4.00
6.90
0.20
1.38
ALAMBRE NEGRO # 16
kg
551.0387
1.00
551.04
0.20
110.21
ASFALTO RC-250
gal
241.3152
4.00
965.26
0.20
193.05
BARRENO DE 1" X 3 p
2.1655
8.00
17.32
0.20
3.46
12.6000
0.50
6.30
0.20
1.26
CANDADO 45 mm
0.1800
0.20
0.04
0.20
0.01
bls
1,786.5054
42.50
75,926.48
0.20
15,185.30
108.0000
0.10
10.80
0.20
2.16
CLAVOS DE 3"
kg
522.9700
1.00
522.97
0.20
104.59
46.0000
5.00
230.00
0.20
46.00
kg
54.1375
1.00
54.14
0.20
10.83
ESTACA DE MADERA
p2
26.6600
2.00
53.32
0.20
10.66
FULMINANTE N8 - 45 mm.
216.5500
1.00
216.55
0.20
43.31
m2
8.6400
2.00
17.28
0.20
3.46
GRAPAS
kg
4.5000
1.00
4.50
0.20
0.90
KEROSENE
gal
27.0346
4.00
108.14
0.20
21.63
11.5200
10.00
115.20
0.20
23.04
4.0000
12.00
48.00
0.20
9.60
11.5200
15.00
172.80
0.20
34.56
MADERA TORNILLO
p2
4,838.1200
2.00
9,676.24
0.20
1,935.25
pza
5.0000
2.00
10.00
0.20
2.00
MECHA DE SEGURIDAD
259.8600
0.50
129.93
0.20
25.99
PETROLEO
gal
17.2790
4.00
69.12
0.20
13.82
PINTURA ESMALTE
gal
13.3300
4.00
53.32
0.20
10.66
3.0000
3.00
9.00
0.20
1.80
p2
17.5458
2.00
35.09
0.20
7.02
1.0000
1.00
1.00
0.20
0.20
3.0000
5.00
15.00
0.20
3.00
TUBERIA PVC NTP ISO 4435 S-25 D=8" INCLUYE ANILLO U/F RIEBER
46.2000
2.00
92.40
0.20
18.48
YESO EN BOLSAS DE 25 kg
bls
6.6650
25.00
166.63
0.20
AGREGADOS
INSUMO
UND
ARENA FINA
ARENA GRUESA
HORMIGON
m3
m3
m3
VOLUMEN TOTAL (M3)
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
COSTO POR VIAJE
FLETE TERRESTRE AGREG =
S/.
CANT.
0.2156
4.5360
205.1880
209.94
15.00
14.00
14.00
300.00
4,200.00
114.34
33.33
17,971.29
22,171.29
2- FLETE RURAL
POR KILOS
INSUMO
UND
CANT.
PESO (KG)
UNITARIO
TOTAL
kg
gal
kg
gal
u
u
u
bls
u
kg
u
kg
p2
u
m2
kg
gal
u
u
u
p2
pza
m
gal
gal
u
p2
u
u
m
571.70
1.72
551.04
241.32
2.17
12.60
0.18
1,786.51
108.00
522.97
46.00
54.14
26.66
216.55
8.64
4.50
27.03
11.52
4.00
11.52
4,838.12
5.00
259.86
17.28
13.33
3.00
17.55
1.00
3.00
46.20
1.00
4.00
1.00
4.00
8.00
0.50
0.20
42.50
0.10
1.00
5.00
1.00
2.00
1.00
2.00
1.00
4.00
10.00
12.00
15.00
2.00
2.00
0.50
4.00
4.00
3.00
2.00
1.00
5.00
2.00
YESO EN BOLSAS DE 25 kg
bls
6.67
25.00
571.70
6.90
551.04
965.26
17.32
6.30
0.04
75,926.48
10.80
522.97
230.00
54.14
53.32
216.55
17.28
4.50
108.14
115.20
48.00
172.80
9,676.24
10.00
129.93
69.12
53.32
9.00
35.09
1.00
15.00
92.40
166.63
89,856.46
NUMERO DE VIAJES =
PRECIO POR VIAJE =
2068
S/. 2.00
S/. 4,135.46
TOTAL =
POR LATAS
INSUMO
UND
ARENA FINA
ARENA GRUESA
HORMIGON
m3
m3
m3
CANT.
0.2156
4.5360
205.1880
VOLUMEN (P3)
LATAS
TOTAL
55.00
55.00
55.00
11.86
249.48
11,285.34
11,546.68
NUMERO DE VIAJES =
PRECIO POR VIAJE =
TOTAL =
11547
S/. 2.00
S/. 23,093.36
27,228.81