Está en la página 1de 2

1

FAENAS MINERAS EN CHILE 2011

Santa Margarita (Planta)

Mining Sites in Chile 2011

SANTA MARGARITA (PLANTA / PLANT)

Fuente / Source: MCH

Razn Social

Business Name

Minera Cerro Dominador S.A

Ubicacin
Direccin
Telfono
Fax
Email

Location
Address
Telephone
Fax
Email

20 km. De Calama
Avda. Nueva Tajamar 481 Torre Norte, of.2001Santiago
(56-2)433-5900
(56-2)433-5950
m.pozo@elbronce.cl

Propietarios

Ownership

Compaa Minera El Bronce


Compaa de Inversiones Mineras Ltda

Nmero Empleados
Personal Ejecutivo

Work force
Executive Staff

380
Gerente General / General Manager
Supte. Planta / Plant Supt.

Lautaro Manrquez Callejas


Jos Meza Toro

FAENAS MINERAS EN CHILE 2011

Santa Margarita (Planta)

Mining Sites in Chile 2011

Descripcin / Description
La Planta Santa Margarita empez a operar en marzo de 2005, se encuentra ubicada a 20 km de la ciudad de
Calama, con capacidad de produccin de 10.000 tpa de ctodos de cobre. Esta planta procesa
cristales de cobre provenientes de piscinas pertenecientes a Codelco Divisin Norte, adems minerales
propios provenientes de diversas minas ubicadas en el sector de Tuina, y en el futuro prximo, minerales
provenientes de la Pequea Minera a travs del poder de compra de Enami instalado en la ciudad de
Calama.
The Santa Margarita Plant started its operation in March 2005. It is located 20 km from the city of Calama and has a production capacity
of 10.000 tpa of copper cathodes. The plant processes both minerals from Codelcos Norte Division and own ores from several mines
located in the Tuina sector. In near future, ores from small miners will also be accepted by means of the bying power of Enami which is
installed in the city of Calama.

Caractersticas Planta / Plant Characterisics

Tipo de Operacin
rea de Planta
Inicio de Operacin
Vida til

Operation Type
Plant Area
Start up of Operation
Life of Mine

Planta / Plant
2.000 x 1.000 m, 200 Hect.
2004
20

Capacidades Productivas / Productive Capacities


Produccin

Production

10.000 tpa Cu

Procesos Planta / Plant Processes


Capacidad Chancado
Chancado Primario
Chancado Secundario
Chancado Terciario
Lixiviacin

Grinding Capacity
Primary Grinding
Secondary Grinding
Tertiary Grinding
Leaching

150 tph
1 Sandvik Jaw Master 907
1 Metso HP-300
1 Metso HP-300
Pilas dinmicas / Dynamic heaps
2
350.000 m
Duracin de 50 a 70 das / Duration 50 to 70 days

También podría gustarte