Documentos de Académico
Documentos de Profesional
Documentos de Cultura
MARAON, REGION
LORETO
ESTRUCTURAS DE LOS COSTOS
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01.11
01.12
01.13
2
3
4
5
Unidad de
medida
Meta total
Costo unitario
GLB
UND
UND
UND
ML
UND
ML
UND
UND
UND
UND
GLB
GLB
1
1
1
1
300
1
2510
45
3
6
3
1
1
21,139.34
31,246.57
10,475.49
226,110.17
85.85
81,477.52
55.30
1,088.09
2,672.71
698.51
3,814.28
58,106.94
295,222.84
Costo directo
21,139.34
31,246.57
10,475.49
226,110.17
25,753.81
81,477.52
138,790.50
48,964.06
8,018.13
4,191.04
11,442.85
58,106.94
295,222.84
960,939.26
25551.76
10140.00
91940.80
14253.80
Obra Saneamiento
1,102,825.63
Unidad de
medida
Meta total
Costo unitario
UND
UND
GLB
45
45
1
10,889.70
8,348.48
83,132.72
Costo directo
1.04
490,036.55
375,681.43
83,132.72
948,850.70
2
3
4
5
25230.32
8540.00
90784.20
14074.49
1.01
1.02
1.03
UBS
BIODIGESTOR Y POZOS DE PERCOLACION
FLETE PARA TRANSPORTE DE MATERIALES
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
2
4
5
1,087,479.71
Unidad de
medida
Meta total
Costo unitario
GLB
Taller
Taller
Taller
Taller
Taller
Taller
Taller
Taller
GLB
GLB
GLB
GLB
1
2
2
2
2
2
4
4
4
1
1
1
1
3,623.08
267.93
415.93
793.86
1,307.93
566.41
378.41
463.41
458.58
566.82
526.40
2,735.63
41,625.00
3,623.08
535.86
831.86
1,587.71
2,615.86
1,132.82
1,513.64
1,853.64
1,834.32
566.82
526.40
2,735.63
41,625.00
60,982.62
1784.18
20560.26
995.29
Gestion de Servicio
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.15
2
4
5
Costo directo
84,322.35
Unidad de
medida
Meta total
Costo unitario
GLB
Taller
Taller
Taller
Taller
Taller
Taller
Taller
Taller
Taller
Taller
Taller
Taller
GLB
GLB
GLB
1
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
3,623.08
128.86
66.93
205.78
96.86
96.86
66.93
377.33
590.74
81.73
104.33
66.93
111.28
114.40
303.79
41,625.00
Costo directo
3,623.08
257.71
133.86
411.57
193.71
193.71
133.86
754.66
1,181.48
163.46
208.66
133.86
222.57
114.40
303.79
41,625.00
49,655.35
1452.77
16741.28
810.42
68,659.82
GASTOS
GENERALES
(9.4430034%)
UTILIDAD (10%)
IMPUESTOS (18%)
1,996.19
2,950.61
989.20
21,351.59
2,431.93
7,693.92
13,105.99
4,623.68
757.15
395.76
1,080.55
5,487.04
27,877.90
2,113.93
3,124.66
1,047.55
22,611.02
2,575.38
8,147.75
13,879.05
4,896.41
801.81
419.10
1,144.29
5,810.69
29,522.28
4,544.90
6,717.93
2,252.20
48,613.10
5,537.00
17,517.46
29,839.60
10,527.15
1,723.88
901.06
2,460.18
12,492.84
63,472.14
90,741.53
96,093.93
206,599.45
90,741.53
96,093.93
206,599.45
UTILIDAD (10%)
IMPUESTOS (18%)
GASTOS
GENERALES
(9.4430034%)
46,274.17
35,475.61
7,850.23
49,003.66
37,568.14
8,313.27
105,356.59
80,770.53
17,873.32
89,600.00
94,885.07
204,000.44
89,600.00
94,885.07
204,000.44
UTILIDAD (10%)
IMPUESTOS (18%)
GASTOS
GENERALES
(21.421912%)
776.13
114.79
178.20
340.12
560.37
242.67
324.25
397.09
392.95
121.42
112.76
586.02
8,916.87
362.31
53.59
83.19
158.77
261.59
113.28
151.36
185.36
183.43
56.68
52.64
273.56
4,162.50
857.07
126.76
196.78
375.59
618.81
267.98
358.07
438.50
433.93
134.09
124.52
647.14
9,846.79
13,063.64
6,098.26
14,426.01
13,063.64
6,098.26
14,426.01
UTILIDAD (10%)
IMPUESTOS (18%)
GASTOS
GENERALES
(21.421912%)
776.13
55.21
28.67
88.17
41.50
41.50
28.67
161.66
253.09
35.02
44.70
28.67
47.68
24.51
65.08
8,916.87
362.31
25.77
13.39
41.16
19.37
19.37
13.39
75.47
118.15
16.35
20.87
13.39
22.26
11.44
30.38
4,162.50
857.07
60.96
31.66
97.36
45.82
45.82
31.66
178.52
279.49
38.67
49.36
31.66
52.65
27.06
71.86
9,846.79
10,637.13
4,965.54
11,746.44
10,637.13
4,965.54
11,746.44
RESUMEN TOTAL
COMPONENTE ABASTECIMIENTO DE AGUA POTABLE
COMPONENTE DISPOSICION SANITARIA DE EXCRETAS
COMPONENTE EDUCACION SANITARIA Y COMUNICACIN
COMPONENTE GESTION DE SERVICIO
COSTO DIRECTO
ESTUDIOS DEFINITIVOS (1.8866101%)
SUPERVISION DE ESTUDIOS DEFINITIVOS (0.6523974%)
SUPERVISION DE OBRA (6.79%)
SUPERVISION DE CAPACITACION (21.7406611%)
GESTION DE PROYECTO EN LA FASE DE INVERSION (1.0524274%)
960,939.26
948,850.70
60,982.62
49,655.35
2,020,427.93
54,019.03
18,680.00
182,725.00
37,301.54
30,134.00
2,343,287.50
90,741.53
89,600.00
13,063.64
10,637.13
204,042.30
204,042.30
96,093.93
94,885.07
6,098.26
4,965.54
202,042.79
202,042.79
206,599.45
204,000.44
14,426.01
11,746.44
436,772.34
436,772.34
EL MARAON, REGION
total a precios
privados
29,794.37
44,039.77
14,764.44
318,685.88
36,298.13
114,836.65
195,615.14
69,011.29
11,300.97
5,906.97
16,127.87
81,897.52
416,095.17
1,354,374.16
25,551.76
10,140.00
91,940.80
14,253.80
1,496,260.53
total a precios
privados
690,670.96
529,495.72
117,169.54
1,337,336.21
25,230.32
8,540.00
90,784.20
14,074.49
1,475,965.22
total a precios
privados
5,618.59
830.99
1,290.02
2,462.19
4,056.61
1,756.75
2,347.32
2,874.59
2,844.62
879.01
816.33
4,242.35
64,551.16
94,570.54
1,784.18
20,560.26
995.29
117,910.27
total a precios
privados
5,618.59
399.65
207.58
638.25
300.40
300.40
207.58
1,170.30
1,832.21
253.48
323.58
207.58
345.15
177.41
471.11
64,551.16
77,004.45
1,452.77
16,741.28
810.42
96,008.92
1,354,374.16
1,337,336.21
94,570.54
77,004.45
2,863,285.37
54,019.03
18,680.00
182,725.00
37,301.54
30,134.00
3,186,144.94
Item
01.01
01.02
01.02.09
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01
01.01.01
01.01.01.01
01.01.01.02
01.01.02
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.03.02
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.04
01.01.04.05
01.01.04.06
01.01.05
01.01.05.01
01.01.05.02
01.01.05.03
01.01.06
01.01.06.01
01.01.06.02
01.01.07
01.01.07.01
01.01.08
01.01.08.01
01.01.08.02
01.01.09
01.01.09.01
01.01.10
01.01.10.01
01.01.11
01.01.11.01
01.01.11.01.01
01.01.11.01.02
01.01.11.02
01.01.11.02.01
01.01.11.02.02
01.01.11.03
01.01.11.03.01
01.01.11.04
01.01.11.04.01
01.01.11.05
01.01.11.05.01
01.01.11.05.02
01.02.01
01.02.01.01
01.02.02
01.02.02.01
01.02.02.02
01.02.03
01.02.03.01
01.02.04
01.02.04.01
01.02.04.02
01.02.04.03
01.02.04.04
01.02.04.05
01.02.04.06
01.02.04.07
01.02.04.08
01.02.04.09
01.02.05
01.02.05.01
01.02.05.02
01.02.05.03
01.02.06
01.02.06.01
01.02.06.02
01.02.06.03
01.02.07
01.02.07.01
01.02.08
01.02.08.01
01.02.08.01.01
01.02.08.01.02
01.02.08.02
01.02.08.02.01
01.02.08.02.02
01.02.08.03
01.02.08.03.01
01.02.08.04
01.02.08.04.01
01.02.08.05
01.02.08.05.01
01.02.08.05.02
01.02.09.01
01.02.09.01.01
01.02.09.01.02
01.02.09.02
01.02.09.02.01
01.02.09.02.02
01.02.09.03
01.02.09.03.01
01.02.09.04
01.02.09.04.01
01.02.09.04.02
01.02.09.04.03
01.02.09.04.04
01.02.09.04.05
01.02.09.04.06
01.02.09.04.07
01.02.09.04.08
01.02.09.04.09
01.02.09.05
01.02.09.05.01
01.02.09.05.02
01.02.09.06
01.02.09.06.01
01.02.09.07
01.02.09.07.01
01.02.09.07.02
01.02.09.08
01.02.09.08.01
01.02.09.09
01.02.09.09.01
01.02.09.10
01.02.09.10.01
01.03.01
01.03.01.01
01.03.01.01.01
01.03.01.01.02
01.03.01.02
01.03.01.02.01
01.03.01.02.02
01.03.01.02.03
01.03.01.02.04
01.03.01.03
01.03.01.03.01
01.03.01.04
01.03.01.04.01
01.03.01.04.02
01.03.01.04.03
01.03.01.04.04
01.03.01.05
01.03.01.05.01
01.03.01.05.02
01.03.01.06
01.03.01.06.01
01.03.01.07
01.03.01.07.01
01.03.01.07.02
01.03.01.07.03
01.03.02
01.03.02.01
01.03.02.01.01
01.03.02.01.02
01.03.02.02
01.03.02.02.01
01.03.02.02.02
01.03.02.02.03
01.03.02.02.04
01.03.02.02.05
01.03.02.03
01.03.02.03.01
01.03.02.04
01.03.02.04.01
01.03.02.04.02
01.03.02.04.03
01.03.02.04.04
01.03.02.04.05
01.03.02.04.06
01.03.02.04.07
01.03.02.04.08
01.03.02.04.09
01.03.02.04.10
01.03.02.04.11
01.03.02.04.12
01.03.02.04.13
01.03.02.04.14
01.03.02.04.15
01.03.02.05
01.03.02.05.01
01.03.02.05.02
01.03.02.06
01.03.02.06.01
01.03.02.06.02
01.03.02.06.03
01.03.02.06.04
01.03.03
01.03.03.01
01.03.03.01.01
01.03.03.01.02
01.03.03.02
01.03.03.02.01
01.03.03.02.02
01.03.03.02.03
01.03.03.02.04
01.03.03.03
01.03.03.03.01
01.03.03.03.02
01.03.03.03.03
01.03.04
01.03.04.01
01.03.04.01.01
01.03.04.01.02
01.03.04.02
01.03.04.02.01
01.03.04.02.02
01.03.04.02.03
01.03.04.02.04
01.03.04.02.05
01.03.04.02.06
01.03.04.03
01.03.04.03.01
01.03.04.03.02
01.03.04.03.03
01.03.04.03.04
01.03.04.03.05
01.03.04.04
01.03.04.04.01
01.03.04.04.02
01.03.04.04.03
01.03.04.04.04
01.03.04.04.05
01.03.04.04.06
01.03.04.04.07
01.03.04.04.08
01.03.04.04.09
01.03.04.04.10
01.03.04.04.11
01.03.04.04.12
01.03.04.04.13
01.03.04.04.14
01.03.04.04.15
01.03.04.04.16
01.03.04.04.17
01.03.04.04.18
01.03.04.04.19
01.03.04.04.20
01.03.04.04.21
01.03.04.04.22
01.03.04.04.23
01.03.04.04.24
01.03.04.04.25
01.03.04.04.26
01.03.04.04.27
01.03.04.04.28
01.03.04.04.29
01.03.04.04.30
01.03.04.04.31
01.03.04.05
01.03.04.05.01
01.03.04.05.02
01.03.04.05.03
01.03.04.05.04
01.03.04.06
01.03.04.06.01
01.03.04.07
01.03.04.07.01
01.03.04.07.02
01.03.04.07.03
01.03.04.07.04
01.03.04.07.05
01.03.04.07.06
01.03.04.07.07
01.03.04.08
01.03.04.08.01
01.03.04.09
01.03.04.09.01
01.03.04.09.02
01.03.04.09.03
01.03.04.09.04
01.03.04.10
01.03.04.10.01
01.03.04.10.02
01.03.04.10.03
01.03.04.11
01.03.04.11.01
01.03.04.12
01.03.04.12.01
01.03.04.12.02
01.03.04.13
01.03.04.13.01
01.03.04.13.02
01.03.04.13.03
01.03.04.14
01.03.04.14.01
01.03.04.14.02
01.03.04.14.03
01.03.04.14.04
01.03.04.14.05
01.03.04.14.06
01.03.04.14.07
01.03.04.15
01.03.04.15.01
01.03.04.15.02
01.03.04.15.03
01.03.04.15.04
01.03.04.15.05
01.03.04.15.06
01.03.04.16
01.03.04.16.01
01.03.04.16.02
01.03.04.17
01.03.04.17.01
01.03.04.17.02
01.03.04.17.03
01.03.04.17.04
01.03.04.18
01.03.04.18.01
01.03.04.18.02
01.03.04.18.03
01.03.04.18.04
01.03.04.18.05
01.03.04.18.06
01.03.04.18.07
01.03.04.18.08
01.03.04.19
01.03.04.19.01
01.03.04.19.02
01.03.04.19.03
01.03.04.20
01.03.04.20.01
01.03.04.20.02
01.03.04.20.03
01.03.04.20.04
01.03.04.21
01.03.04.21.01
01.03.04.21.02
01.03.05
01.03.05.01
01.03.05.01.01
01.03.05.01.02
01.03.05.02
01.03.05.02.01
01.03.05.02.02
01.03.05.02.03
01.03.05.03
01.03.05.03.01
01.03.05.03.02
01.03.05.03.03
01.03.05.03.04
01.03.05.04
01.03.05.04.01
01.03.05.04.02
01.03.05.05
01.03.05.05.01
01.03.06
01.03.06.01
01.03.06.01.01
01.03.06.01.01.01
01.03.06.01.01.02
01.03.06.01.01.03
01.03.06.01.01.04
01.03.06.01.01.05
01.03.06.01.01.06
01.03.06.01.02
01.03.06.01.02.01
01.03.06.01.03
01.03.06.01.03.01
01.03.06.01.03.02
01.03.06.01.04
01.03.06.01.04.01
01.03.06.01.05
01.03.06.01.05.01
01.03.06.02
01.03.06.02.01
01.03.06.02.01.01
01.03.06.02.01.02
01.03.06.02.01.03
01.03.06.02.01.04
01.03.06.02.01.05
01.03.06.02.01.06
01.03.06.02.02
01.03.06.02.02.01
01.03.06.02.03
01.03.06.02.03.01
01.03.06.02.03.02
01.03.06.02.04
01.03.06.02.04.01
01.03.07
01.03.07.01
01.03.07.01.01
01.03.07.01.02
01.03.07.01.03
01.03.07.01.04
01.03.07.01.05
01.03.07.01.06
01.03.07.01.07
01.03.07.01.08
01.03.07.01.09
01.03.07.01.10
01.03.07.01.11
01.03.07.01.12
01.03.07.01.13
01.03.07.02
01.03.07.02.01
01.03.07.02.02
01.03.07.02.03
01.03.07.02.04
01.03.07.02.05
01.03.07.02.06
01.03.07.02.07
01.03.07.02.08
01.03.07.02.09
01.03.07.02.10
01.03.07.03
01.03.07.03.01
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.02.04
01.04.03
01.04.03.01
01.04.03.02
01.04.04
01.04.04.01
01.05.01
01.05.01.01
01.05.01.02
01.05.01.03
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.02.04
01.05.02.05
01.05.03
01.05.03.01
01.05.04
01.05.04.01
01.05.04.01.01
01.05.04.01.02
01.05.04.01.03
01.05.04.01.04
01.05.04.02
01.05.04.02.01
01.05.04.02.02
01.05.04.02.03
01.05.04.02.04
01.05.04.03
01.05.04.03.01
01.05.04.03.02
01.05.04.03.03
01.05.04.03.04
01.05.04.04
01.05.04.04.01
01.05.04.04.02
01.05.04.04.03
01.05.04.04.04
01.05.04.05
01.05.04.05.01
01.05.04.05.02
01.05.04.05.03
01.05.04.05.04
01.05.04.05.05
01.05.04.05.06
01.05.05
01.05.05.01
01.05.05.02
01.05.05.03
01.05.06
01.05.06.01
01.05.06.02
01.05.07
01.05.07.01
01.05.07.02
01.05.08
01.05.08.01
01.05.08.02
01.05.08.03
01.05.08.04
01.05.09
01.05.09.01
01.05.09.02
01.05.09.03
01.05.10
01.05.10.01
01.05.11
01.05.11.01
01.05.11.01.01
01.05.11.01.02
01.05.11.01.03
01.05.11.01.04
01.05.11.02
01.05.11.02.01
01.05.11.02.02
01.05.11.02.03
01.05.11.02.04
01.05.11.02.05
01.05.11.02.06
01.06.01
01.06.01.01
01.06.01.02
01.06.02
01.06.02.01
01.06.02.02
01.06.02.03
01.06.02.04
01.06.03
01.06.03.01
01.06.03.02
01.06.03.03
01.06.04
01.06.04.01
01.07.01
01.07.02
01.07.03
01.07.04
01.07.05
01.07.06
01.07.07
01.07.08
01.07.08.01
01.07.08.02
01.07.09
01.07.09.01
01.07.10
01.07.10.01
Descripcin
CAPTACION TIPO LADERA
CISTERNA DE 10M3
CASETA DE BOMBEO
PLANTA DE TRATAMIENTO DE AGUA
LINEA DE IMPULSION
TANQUE ELEVADO DE 15 M3
LINEA DE DISTRIBUCION
INSTALACION DOMICILIARIA
VALVULA DE CONTROL
VALVULA DE PURGA
VALVULA DE AIRE T-II (01 UND) LINEA DE CONDUCC.
MITIGACION AMBIENTAL
FLETE PARA TRANSPORTE DE MATERIALES
PRESUPUESTOS DE ABASTECIMIENTO DE AGUA POTABLE
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, REPLANTEO Y CONTROL DE NIVELES
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE A 100M. DE LA OBRA c/carretilla, Inc. 15% Esponjamiento
OBRAS DE CONCRETO SIMPLE
CONCRETOf`c = 140 kg/cm2
REVESTIMIENTO DE PIEDRA ASENTADA EN CONCRETO F'C=100 KG/CM2
OBRAS DE CONCRETO ARMADO
CONCRETOf`c = 210 kg/cm2 - P/LOSA DE FONDO-PISO
ENCOFRADO Y DESENCOFRADO P/LOSA DE FONDO
ACERO fy=4200 kg/cm2
CONCRETOf`c = 210 kg/cm2 - P/MUROS REFORZADOS
ENCOFRADO Y DESENCOFRADO P/MUROS RECTOS
ACERO fy=4200 kg/cm2
REVOQUES Y ENLUCIDOS
TARRAJEO MUROS INTERIOR C/MORT. 1:5X1.5 CM.
TARRAJEO MUROS EXTERIOR FROTACHADO C/MORT. 1:5X1.5 CM.
TARRAJEO C/IMPERMEABILIZANTE M=1:3 C:A E=2CM
CARPINTERIA METALICA
MARCO Y TAPA PLANCHA LAC 1/8" C/MECAN. DE SEGUR. S/DISEO T1
MARCO Y TAPA PLANCHA LAC 1/8" C/MECAN. DE SEGUR. S/DISEO T2
PINTURA
PINTURA DE MUROS CON ESMALTE
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA P.V.C. CLASE A-7.5 SP 1"
TUBERIA P.V.C. CLASE A-10 SP 1 1/2"
SUMINISTRO Y COLOCACION DE VALVULA Y ACCESORIOS
ACCESORIOS CAPTACION
SUMINISTRO E INSTALACION DE VALVULAS
VALVULA COMPUERTA DE BRONCE 1 1/2"
CERCO PERIMETRICO
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
ACARREO DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
DADO DE CONCRETO fc=140 kg/cm2
CARPINTERIA DE MADERA
COLUMNA DE MADERA DURA O SIMILAR DE 4" X 4"
CARPINTERIA METALICA
PUERTA METALICA PARA CERCO PERIMETRICO
ALAMBRE DE PUAS
OBRAS PRELIMINARES
TRAZO, REPLANTEO Y CONTROL DE NIVELES
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE A 100M. DE LA OBRA c/carretilla, Inc. 15% Esponjamiento
OBRAS DE CONCRETO SIMPLE
CONCRETOf`c = 140 kg/cm2
OBRAS DE CONCRETO ARMADO
CONCRETOf`c = 210 kg/cm2 - P/LOSA DE FONDO-PISO
ENCOFRADO Y DESENCOFRADO P/LOSA DE FONDO
ACERO fy=4200 kg/cm2
CONCRETOf`c = 210 kg/cm2 - P/MUROS REFORZADOS
ENCOFRADO Y DESENCOFRADO P/MUROS RECTOS
ACERO fy=4200 kg/cm2
CONCRETOf`c = 210 kg/cm2 - P/LOSAS MACISAS
ENCOFRADO Y DESENCOFRADO P/LOSAS MACISAS
ACERO fy=4200 kg/cm2
REVOQUES Y ENLUCIDOS
TARRAJEO MUROS INTERIOR C/MORT. 1:5X1.5 CM.
TARRAJEO MUROS EXTERIOR FROTACHADO C/MORT. 1:5X1.5 CM.
TARRAJEO C/IMPERMEABILIZANTE M=1:3 C:A E=2CM
CARPINTERIA METALICA
ESCALIN DE FIERRO CORRUGADO 3/4" @ 0.30
MARCO Y TAPA PLANCHA LAC 1/8" 0.60X0.60 M. C/MECAN. DE SEGUR. S/DISEO
VENTILACION C/TUBERIA DE ACERO S/DISEO DE 2"
PINTURA
PINTURA DE MUROS CON ESMALTE
CERCO PERIMETRICO
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
Und. Metrado
m2
5.00
1.11
5.55
m2
5.00
1.49
7.45
242.54
m3
3.32
29.13
96.71
m3
6.14
23.75
145.83
555.02
m3
0.89
480.07
427.26
m3
0.50
255.51
127.76
m3
0.20
459.38
91.88
m2
1.62
30.98
50.19
kg
4.93
5.20
25.64
m3
0.20
459.38
91.88
m2
15.29
30.98
473.68
kg
37.27
5.20
193.80
927.07
438.60
m2
0.96
41.36
39.71
m2
6.62
41.36
273.80
m2
3.29
38.02
125.09
und
1.00
995.63
995.63
und
1.00
1,145.63
1,145.63
m2
6.62
16.26
1.50
4.84
7.26
4.00
4.63
18.52
GLB
1.00
462.52
2,141.26
107.64
107.64
25.78
462.52
462.52
347.30
und
1.00
347.30
347.30
15,878.61
113.04
m2
36.00
2.03
73.08
m2
36.00
1.11
39.96
35.80
m3
0.56
32.97
18.46
m3
0.73
23.75
17.34
207.24
m3
0.56
370.08
207.24
321.52
und
8.00
40.19
321.52
und
4.86
530.15
2,576.53
132.00
95.64
12,624.48
15,201.01
62.95
m2
42.25
1.49
62.95
m3
6.85
29.13
199.54
m3
8.85
23.75
210.19
m3
1.37
480.07
409.73
657.70
657.70
6,389.55
m3
2.74
459.38
1,258.70
m2
2.96
30.98
91.70
kg
12.71
5.20
66.09
m3
3.72
459.38
1,708.89
m2
37.20
30.98
1,152.46
kg
190.06
5.20
988.31
m3
1.22
459.38
560.44
m2
1.61
30.98
49.88
kg
98.67
5.20
513.08
438.60
m2
0.96
41.36
39.71
m2
6.62
41.36
273.80
m2
3.29
38.02
125.09
und
1.00
203.90
203.90
und
1.00
995.63
995.63
und
1.00
530.15
530.15
1,729.68
570.56
m2
35.09
16.26
570.56
20,987.80
254.34
m2
81.00
2.03
164.43
m2
81.00
1.11
89.91
60.15
m3
0.96
32.97
31.65
m3
1.20
23.75
28.50
355.28
m3
0.96
370.08
355.28
und
13.00
40.19
und
1.62
530.15
858.84
198.00
95.64
18,936.72
m2
3.20
1.49
4.77
m2
3.20
1.11
3.55
m3
0.64
29.13
m3
0.64
23.75
522.47
522.47
19,795.56
8.32
33.84
18.64
15.20
153.62
m3
0.32
480.07
153.62
m3
0.48
459.38
220.50
m2
0.78
30.98
24.16
kg
19.15
5.20
99.58
m3
1.13
459.38
519.10
m2
17.64
30.98
546.49
kg
78.71
5.20
409.29
m3
0.40
459.38
183.75
m2
4.45
30.98
137.86
kg
17.42
5.20
90.58
2,231.31
837.13
m2
10.08
41.36
416.91
m2
10.16
41.36
420.22
530.15
und
1.00
530.15
530.15
3,604.72
und
2.00
1,618.24
3,236.48
und
1.00
368.24
368.24
329.10
m2
20.24
16.26
329.10
1,373.65
GLB
1.00
1,373.65
GLB
1.00
1,373.65
1,373.65
1,373.65
1,373.65
1,810.26
3.40
m2
1.31
1.11
m2
1.31
1.49
1.45
1.95
28.84
m3
0.51
29.13
14.86
0.85
2.52
2.14
m3
0.17
22.13
3.76
m3
0.34
23.75
8.08
17.13
m2
0.85
20.15
17.13
1,018.41
m3
0.91
490.98
446.79
kg
58.50
5.26
307.71
kg
4.11
7.00
28.77
m2
7.59
30.98
235.14
576.64
m2
7.59
41.36
313.92
m2
6.91
38.02
262.72
73.17
m2
4.50
16.26
73.17
92.67
2.00
5.16
10.32
und
1.00
29.13
29.13
und
1.00
53.22
53.22
48,889.49
91.99
m2
42.79
1.11
47.50
m2
29.86
1.49
44.49
m3
88.08
32.97
29.86
2.52
75.25
m2
70.19
17.87
1,254.30
5.03
21.10
106.13
m3
95.50
23.75
2,268.13
6,607.81
2,904.00
188.55
m2
9.61
19.62
188.55
m3
4.43
496.43
2,199.18
38,380.14
kg
928.99
5.26
4,886.49
m3
4.43
496.43
2,199.18
m2
29.86
52.52
1,568.25
kg
469.91
5.26
2,471.73
m3
0.91
490.79
446.62
m2
5.96
38.50
229.46
kg
67.11
5.26
353.00
kg
17.93
7.00
125.51
kg
14.37
5.49
78.89
kg
7.86
7.28
57.22
m3
14.99
494.02
7,405.36
m2
140.92
30.18
4,252.97
kg
2,193.91
5.26
11,539.97
kg
109.75
5.16
566.31
2,997.55
m2
107.77
19.65
2,117.68
m2
33.14
26.55
879.87
623.45
und
2.00
218.12
436.24
2.00
27.65
55.30
und
2.00
45.39
90.78
und
1.00
41.13
41.13
10,052.06
250.49
m2
96.34
1.11
106.94
m2
96.34
1.49
143.55
m3
14.45
29.13
420.93
96.34
2.52
242.78
96.34
9.41
906.56
m3
18.06
23.75
428.93
m2
56.35
135.06
7,610.63
m2
6.05
22.75
137.64
29.40
1.84
1,999.20
7,802.37
54.10
91,268.25
226.80
m2
87.23
1.11
96.83
m2
87.23
1.49
129.97
m3
13.50
33.29
449.42
m3
8.21
29.13
239.16
m3
6.83
29.13
198.96
m3
9.91
22.13
219.31
m3
6.83
66.59
454.81
m3
24.34
23.75
2,139.74
578.08
6,584.34
m2
9.00
19.62
176.58
m3
8.60
267.96
2,304.46
m3
1.88
339.42
638.11
m2
25.07
30.91
774.91
m2
93.64
28.73
2,690.28
26,825.79
m3
4.50
445.79
2,006.06
kg
65.04
5.58
362.92
m3
4.22
445.81
1,881.32
m2
17.45
32.49
566.95
kg
274.79
5.26
1,445.40
kg
433.55
5.58
2,419.21
m3
4.57
478.83
2,188.25
m2
26.55
28.83
765.44
kg
254.80
5.26
1,340.25
kg
91.58
6.49
594.35
m3
1.15
450.01
517.51
m2
17.38
38.50
669.13
kg
81.90
5.58
457.00
kg
45.60
7.00
319.20
m3
0.71
447.07
317.42
m2
9.06
30.98
280.68
kg
48.26
5.26
253.85
kg
17.60
6.49
114.22
m3
3.23
447.06
1,444.00
m2
36.66
32.40
1,187.78
kg
104.45
5.26
549.41
kg
59.39
5.58
331.40
kg
46.01
6.49
298.60
m3
2.02
448.41
905.79
m2
12.23
30.18
369.10
kg
222.16
5.26
1,168.56
kg
41.76
5.58
233.02
m2
49.98
1.23
61.48
m3
3.53
447.42
1,579.39
m2
30.90
30.98
957.28
kg
222.37
5.58
1,240.82
und
1.00
489.80
489.80
m2
84.88
46.16
3,918.06
17.50
32.07
561.23
8.75
6.83
59.76
132.97
45.65
5,028.85
6,070.08
m2
6,070.08
11,735.18
m2
265.94
21.16
5,627.29
m2
70.44
37.96
2,673.90
m2
36.66
37.96
1,391.61
m2
8.15
37.96
309.37
m2
4.80
37.96
182.21
9.10
21.44
195.10
107.17
12.65
1,355.70
m2
m
2,629.28
m2
64.38
40.84
2,629.28
6,752.64
m2
91.10
33.47
3,049.12
m2
2.54
680.47
1,728.39
m2
32.78
55.07
1,805.19
m2
7.47
22.75
169.94
3,340.87
und
1.00
649.14
649.14
m2
6.84
78.89
539.61
m2
27.28
78.89
2,152.12
1,072.35
m2
20.65
51.93
und
2.00
108.73
PAR
2.00
19.66
1,072.35
256.78
217.46
39.32
1,416.34
65.93
9.84
648.75
21.81
15.58
339.80
m2
9.10
47.01
427.79
6,162.96
m2
265.94
12.37
3,289.68
m2
70.44
13.06
919.95
m2
64.38
8.58
552.38
m2
13.19
11.84
156.17
m2
2.94
10.03
29.49
m2
84.88
13.44
1,140.79
m2
5.25
14.19
74.50
1,378.34
und
1.00
129.56
129.56
und
1.00
89.56
89.56
und
1.00
84.56
84.56
und
1.00
98.64
98.64
und
1.00
75.56
75.56
und
2.00
450.23
900.46
244.56
pto
3.00
40.76
pto
3.00
40.76
122.28
122.28
2,388.42
30.00
58.42
1,752.60
pto
2.00
100.97
201.94
pto
2.00
97.97
195.94
50.95
4.67
237.94
2,117.75
pto
24.00
28.01
672.24
und
14.00
22.39
313.46
und
14.00
16.49
230.86
und
8.00
16.49
131.92
und
2.00
16.49
32.98
und
1.00
133.05
133.05
und
2.00
249.97
499.94
und
5.00
20.66
103.30
2,036.13
und
1.00
425.63
425.63
und
2.00
397.52
795.04
und
3.00
271.82
815.46
0.00
und
1.00
0.00
0.00
und
1.00
0.00
0.00
und
1.00
0.00
0.00
und
1.00
0.00
0.00
2,861.05
und
1.00
1,587.98
1,587.98
und
1.00
1,273.07
1,273.07
28,730.18
1,530.60
m3
24.90
32.97
820.95
m3
29.88
23.75
709.65
m3
24.90
267.96
6,672.20
m3
11.41
339.42
3,872.78
m2
91.30
30.91
2,822.08
13,367.06
9,600.36
m3
7.30
424.24
3,096.95
m2
96.00
23.97
2,301.12
kg
567.94
5.26
2,987.36
kg
187.20
6.49
1,214.93
2,400.48
m2
159.60
11.91
und
1.00
499.64
1,900.84
499.64
1,831.68
m2
96.00
19.08
1,831.68
18,253.52
16,766.31
4,600.98
m3
48.77
29.13
1,420.67
48.77
2.52
122.90
48.77
9.41
458.93
m3
19.51
71.50
1,394.97
m3
29.26
22.13
647.52
m3
23.41
23.75
555.99
2,276.12
75.07
30.32
2,276.12
7,531.84
und
4.00
1,774.98
7,099.92
und
4.00
107.98
431.92
406.00
100.00
4.06
406.00
1,951.37
und
1.00
1,951.37
1,951.37
1,487.21
1,075.82
m3
10.91
29.13
317.81
12.12
2.52
30.54
12.12
9.41
114.05
m3
4.85
71.50
346.78
m3
6.06
22.13
134.11
m3
5.58
23.75
132.53
245.63
20.20
12.16
245.63
124.75
und
1.00
8.52
8.52
und
1.00
116.23
116.23
41.01
20.20
2.03
41.01
27,106.41
4,941.18
m2
28.98
1.49
43.18
m3
26.08
29.13
759.71
und
3.26
23.07
75.21
28.98
2.52
73.03
28.98
9.41
272.70
m3
11.59
70.63
818.60
m3
14.49
22.13
320.66
m3
17.83
23.75
423.46
48.30
21.44
1,035.55
und
3.00
153.94
461.82
und
3.00
133.05
399.15
und
1.00
133.05
133.05
und
1.00
125.06
125.06
17,981.73
und
8.00
133.05
1,064.40
KM
0.30
247.26
74.18
und
8.00
1,951.37
15,610.96
und
8.00
23.07
184.56
und
3.00
66.53
199.59
und
1.00
66.53
66.53
jgo
4.00
24.20
96.80
300.00
0.99
297.00
und
2.00
127.33
254.66
und
1.00
133.05
133.05
4,183.50
und
2.00
2,091.75
4,183.50
477.00
300.00
1.12
336.00
300.00
0.47
141.00
13,255.81
m3
71.82
46.60
3,346.81
300.00
2.52
756.00
300.00
9.41
2,823.00
300.00
21.10
6,330.00
11,871.00
m
300.00
38.23
11,469.00
300.00
1.34
402.00
1.00
150.00
m2
40.41
1.11
44.86
m2
28.51
1.49
42.48
und
1.00
8,076.43
8,076.43
150.00
150.00
8,163.77
1,813.29
m3
19.09
38.46
734.20
m3
9.31
38.46
358.06
11.64
2.52
29.33
m3
16.82
22.33
375.59
m3
13.31
23.75
316.11
234.55
m2
11.64
20.15
234.55
39,106.25
13,053.32
m3
7.45
478.30
3,563.34
kg
1,415.77
5.26
7,446.95
kg
1,053.96
1.50
1,580.94
21.10
21.90
m2
462.09
1,627.99
m3
1.74
478.30
832.24
kg
71.42
1.50
107.13
kg
106.47
5.58
594.10
4.39
21.53
m2
94.52
9,233.77
m3
9.52
510.49
4,859.86
kg
662.37
1.50
993.56
kg
213.10
5.16
1,099.60
m2
95.15
23.97
2,280.75
3,687.92
m3
3.10
510.49
1,582.52
kg
138.57
1.50
207.86
kg
116.34
5.58
649.18
m2
52.08
23.97
1,248.36
m3
6.65
510.49
3,394.76
11,503.25
m3
2.28
510.62
1,164.21
kg
306.81
1.50
460.22
kg
493.55
5.16
2,546.72
kg
199.98
5.58
1,115.89
m2
108.06
26.11
2,821.45
5,718.49
m2
48.50
22.40
1,086.40
m2
59.56
22.40
1,334.14
m2
147.23
22.40
3,297.95
868.20
und
1.00
712.92
712.92
und
1.00
155.28
155.28
m2
323.34
15.25
4,930.94
m2
92.94
18.08
1,680.36
22.50
69.92
1,573.20
27.00
67.24
1,815.48
18.50
62.63
1,158.66
19.00
65.81
1,250.39
und
3.00
84.20
252.60
und
3.00
107.98
323.94
und
1.00
95.68
6,611.30
5,797.73
672.22
95.68
9,196.80
und
16.00
574.80
9,196.80
3,294.92
531.15
m3
0.48
32.97
15.83
42.12
2.52
106.14
42.12
9.41
396.35
m3
0.54
23.75
12.83
2,763.77
m2
42.12
56.85
2,394.52
m2
1.70
22.75
38.68
m2
42.12
1.37
57.70
9.31
5.17
48.13
26.90
2.48
66.71
63.72
2.48
158.03
2,510.00
1.12
2,811.20
2,510.00
0.47
1,179.70
602.22
46.60
28,063.45
2,510.00
2.52
6,325.20
2,510.00
9.41
23,619.10
2,510.00
21.10
52,961.00
277.00
7.36
2,038.72
2,233.00
8.20
18,310.60
2,510.00
1.34
3,363.40
3,990.90
110,968.75
m3
23,712.72
118.13
gln
1.00
118.13
118.13
946.00
1.12
1,059.52
m3
206.40
46.60
9,618.24
860.00
2.52
2,167.20
860.00
9.41
8,092.60
860.00
21.10
18,146.00
8,264.60
860.00
8.27
7,112.20
860.00
1.34
1,152.40
1,482.89
GLB
1.00
1,482.89
GLB
1.00
133.01
m2
2.16
1.49
1,482.89
133.01
133.01
3.22
3.22
34.37
m3
1.18
29.13
34.37
705.98
m3
0.60
557.03
334.22
m2
12.00
30.98
371.76
100.37
m2
2.64
38.02
100.37
und
4.80
248.24
1,191.55
und
6.00
995.63
5,973.78
m3
0.10
88.60
8.86
7,174.19
1.61
m2
1.08
1.49
1.61
17.19
m3
0.59
29.13
17.19
m3
0.38
557.03
211.67
m2
7.08
30.98
219.34
431.01
50.19
m2
1.32
38.02
50.19
und
3.00
233.24
699.72
und
3.00
995.63
2,986.89
m3
0.05
88.60
4.43
3,691.04
1.61
m2
1.08
1.49
1.61
17.19
m3
0.59
29.13
17.19
m3
0.39
557.03
217.24
m2
7.08
30.98
219.34
436.58
141.43
m2
3.72
38.02
141.43
10,846.04
und
3.00
2,618.24
7,854.72
und
3.00
995.63
2,986.89
m3
0.05
88.60
4.43
GLB
1.00
58,106.94
58,106.94
GLB
1.00
295,222.84
295,222.84
Item
02.01
02.02
02
02.01.01
02.01.01.01
02.01.01.01.01
02.01.01.01.02
02.01.01.02
02.01.01.02.01
02.01.01.02.02
02.01.01.02.03
02.01.01.03
02.01.01.03.01
02.01.01.03.02
02.01.01.03.03
02.01.01.03.04
02.01.01.03.05
02.01.01.03.06
02.01.01.03.07
02.01.01.03.08
02.01.01.03.09
02.01.01.03.10
02.01.01.04
02.01.01.04.01
02.01.01.04.02
02.01.02
02.01.02.01
02.01.02.01.01
02.01.02.02
02.01.02.02.01
02.01.02.02.02
02.01.02.03
02.01.02.03.01
02.01.02.04
02.01.02.04.01
02.01.02.04.02
02.01.02.05
02.01.02.05.01
02.01.02.05.02
02.01.02.06
02.01.02.06.01
02.01.02.06.02
02.01.03
02.01.03.01
02.01.03.01.01
02.01.03.01.02
02.01.03.01.03
02.01.03.01.04
02.01.03.01.05
02.01.03.01.06
02.01.03.01.07
02.01.03.02
02.01.03.02.01
02.01.03.02.02
02.01.03.02.03
02.01.03.02.04
02.01.03.02.05
02.01.03.02.06
02.01.03.03
02.01.03.03.01
02.01.03.03.02
02.01.03.03.03
02.01.03.03.04
02.01.03.03.05
02.02.01
02.02.01.01
02.02.01.02
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.03
02.02.03.01
02.02.04
02.02.04.01
02.02.04.01.01
02.02.04.01.02
02.02.04.02
02.02.04.02.01
02.02.04.02.02
02.02.04.02.03
02.02.04.02.04
02.02.04.03
02.02.04.03.01
02.02.04.03.02
02.02.04.03.03
02.02.04.03.04
02.02.04.04
02.02.04.04.01
02.02.04.04.02
02.02.04.04.03
02.02.04.04.04
02.02.05
02.02.05.01
02.02.06
02.02.06.01
02.02.07
02.02.07.01
Descripcin
UBS
BIODIGESTOR Y POZOS DE PERCOLACION
FLETE PARA TRANSPORTE DE MATERIALES
PRESUPUESTO DE DISPOSICION SANITARIA DE EXCRETAS
CASETA
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, REPLANTEO Y CONTROL DE NIVELES
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA PARA ESTRUCTURAS
RELLENO CON MATERIAL PROPIO (MANUAL)
ELIMINACION DE MATERIAL EXCEDENTE A 100M. DE LA OBRA c/carretilla, Inc. 15% Esponjamiento
ESTRUCTURA DE MADERA
COLUMNA DE MADERA DURA 6"X6"
VIGA PRINCIPAL DE MADERA DURA 2"X6"
VIGUETA DE PISO 2"X4"
PISO DE MADERA CON TABLAS 2"X10"
ENTRAMADO DE MADERA 2"X2"
PARED DE MADERA CON TABLAS 1"X10"
VIGA SOLERA 2"X4", PARA AMARRE EN PARTE SUPERIOR
TIJERAL DE MADERA L=4.60M, H=1.00M
CORREA DE MADERA 2"X3", PARA TECHO
ARRIOSTRE CON MADERA 2"X4", ENTRE TIJERALES
COBERTURA
COBERTURA DE CALAMINA CORRUGADA BG-33 3' x 6'
CUMBRERA DE PLANCHA GALVANIZADA DE ZINC LISO 26 mm ( 3' x 6' )
ARQUITECTURA
REVOQUES Y ENLUCIDOS
TARRAJEO RAYADO, MEZCLA 1:5; E=1.5CM CON IMPERMEABILIZANTE, INC. MALLA TIPO GALLINERO
PISOS
CONTRAPISO CON MORTERO C:A, 1:3, E=3 cm IMPERMEABILIZADO, INCL. MALLA TIPO GALLINERO
PISO DE CERAMICO ANTIDESLIZANTE 30 X30 CM, DE TRANSITO MEDIO
ZOCALOS Y CONTRAZOCALOS
ZOCALO DE MAYOLICA BLANCA DE 0.20X0.20 m. de primera
CARPINTERIA DE MADERA
PUERTA DE MADERA APANELADA 0.70 x 2.10 m.
VENTANA C/ MARCO DE MADERA + MALLA MOSQUITERO (2.3 x 0.50)
CERRAJERIA
CERRADURA DE 2 GOLPES PARA PUERT A EXTERIOR
BISAGRA ALUMINIZADA DE 3.1/2" X 3.1/2"
PINTURA
PINTURA BARNIZ EN PARED DE MADERA
PINTURA BARNIZ EN PUERTAS Y VENTANAS
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
INODORO TANQUE BAJO DE LOSA VITRIFICADA BLANCO (inc. Colocacion)
Und. Metrado
m2
540.00
1.11
m2
540.00
1.49
599.40
804.60
3,658.82
m3
67.50
29.13
1,966.28
m3
33.75
20.46
690.53
m3
42.19
23.75
1,002.01
1,811.25
29.57
53,558.66
675.00
13.87
9,362.25
945.00
8.13
7,682.85
m2
405.00
58.53
23,704.65
m2
869.18
6.95
6,040.80
m2
1,220.18
36.26
44,243.73
405.00
7.99
3,235.95
90.00
378.57
34,071.30
200,528.98
m
und
m
1,530.00
8.37
12,806.10
445.50
13.07
5,822.69
1,009.80
46.16
46,612.37
153.00
6.83
1,044.99
47,657.36
m2
m
149,531.46
15,125.54
m2
474.75
31.86
m2
168.75
36.14
m2
168.75
52.43
15,125.54
14,946.19
6,098.63
8,847.56
22,318.00
m2
474.75
47.01
22,318.00
und
45.00
649.14
29,211.30
und
90.00
566.79
51,011.10
und
45.00
108.73
PAR
45.00
19.66
80,222.40
5,777.55
4,892.85
884.70
11,141.78
m2
690.75
14.81
m2
68.40
13.33
10,230.01
911.77
87,255.93
46,373.85
und
45.00
129.56
5,830.20
und
45.00
89.56
4,030.20
und
45.00
84.56
3,805.20
und
45.00
98.64
4,438.80
und
45.00
75.56
3,400.20
und
45.00
450.23
20,260.35
und
90.00
51.21
4,608.90
31,793.85
pto
und
45.00
74.18
3,338.10
45.00
66.39
2,987.55
292.50
14.84
4,340.70
270.00
21.52
5,810.40
und
90.00
48.23
4,340.70
und
45.00
243.92
10,976.40
pto
45.00
19.96
898.20
237.15
12.78
3,030.78
und
45.00
11.25
506.25
und
45.00
11.84
532.80
und
90.00
45.78
4,120.20
m2
686.25
1.11
761.74
m2
686.25
1.49
1,022.51
m3
1,371.80
29.13
39,960.53
m3
1,103.82
70.63
77,962.81
m3
267.98
23.75
6,364.53
9,088.23
1,784.25
124,287.87
117,820.80
und
45.00
2,618.24
117,820.80
91,887.15
14,518.37
m3
25.92
478.30
12,397.54
kg
403.20
5.26
2,120.83
8.93
492.08
4,394.27
kg
584.64
5.58
3,262.29
kg
252.00
6.49
1,635.48
m2
135.00
23.97
3,235.95
12,527.99
m3
49,007.36
m3
32.40
510.49
16,539.88
kg
2,056.32
5.62
11,556.52
kg
810.00
6.64
5,378.40
m2
648.00
23.97
15,532.56
15,833.43
m3
8.93
510.49
4,558.68
kg
584.64
5.58
3,262.29
kg
720.00
6.67
4,802.40
m2
133.92
23.97
3,210.06
30,875.26
m2
669.60
46.11
30,875.26
3,355.20
und
45.00
74.56
3,355.20
5,670.90
und
45.00
126.02
5,670.90
GLB
1.00
83,132.72
83,132.72
INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y SANEAMIENTO PARA EL CENTRO POBLADO DE ANGAMOS, DISTRITO DE BARRANCA, PROVINCIA DE DATEM DEL MARAON, REGION LORETO
DATOS
N TALLER X
COMP.
MODULOS
13
2.00
N BENEFICIARIOS
205
2.00
N DE FAMILIAS
40
2.00
2.00
% DE ASISTENCIA A LA REUNION
100.00%
40
2.00
4.00
5.00
4.00
6.00
4.00
1.00.00
DESCRIPCIN
C.TOTAL
S/.
S/.
CANT.
5,000.00
10,000.00
Incidencia
C.UNIT.
Unidad
7.7%
47,100.00
1.01.00
Mes
1.02.00
Especialista en Comunicacin
Mes
4,000.00
8,000.00
1.03.00
Especialista en Saneamiento
Mes
1.5
6,000.00
9,000.00
1.04.00
Especialista en Ediciones
Mes
4,000.00
8,000.00
1.05.00
Tecnico en Publicidad
Mes
3,500.00
7,000.00
1.06.00
Computadoras
Mes-Equipo
300.00
1,800.00
1.07.00
Mes-Equipo
400.00
800.00
1.08.00
Toner de Impresora
Global
500.00
500.00
1.09.00
Estimado
2,000.00
2,000.00
2.00.00
META (N
TALLER)
COSTO POR
LOCALIDAD
3,623.08
535.86
2.01.00
267.93
2.01.01
Papel Sbana
Und
10
0.14
1.40
2.01.02
Und
1.50
6.00
2.01.03
Und
4.00
4.00
2.01.04
Und
10
0.26
2.60
2.01.05
Cto
0.8
2.41
1.93
2.01.06
Und
40
0.70
28.00
2.01.07
Und
2.00
4.00
2.01.08
Und
40
0.50
20.00
2.00
535.86
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
2.01.09
Refrigerios
Und
40
3.00
120.00
2.01.10
Und
40
0.50
20.00
2.01.11
Und
10.00
60.00
3.00.00
3.01.00
Und
10
0.14
1.40
3.01.02
Und
1.50
6.00
3.01.03
Und
4.00
4.00
3.01.04
Und
10
0.26
2.60
3.01.05
Cto
0.8
2.41
1.93
3.01.06
Und
40
0.70
28.00
3.01.07
Und
2.00
4.00
3.01.08
Und
40
0.50
20.00
3.01.09
Refrigerios
Und
40
3.00
120.00
3.01.10
Und
40
0.50
20.00
3.01.11
Und
10.00
Und
33.3%
15.00
10.00
3.02.02
Und
20.00
40.00
3.02.03
Und
3.00
6.00
3.02.04
Und
3.00
12.00
3.02.05
Und
40
0.50
20.00
3.02.06
Und
10.00
60.00
4.01.00
535.86
2.00
296.00
1,587.71
267.93
4.01.01
Papel Sbana
Und
10
0.14
1.40
4.01.02
Und
1.50
6.00
4.01.03
Und
4.00
4.00
4.01.04
Und
10
0.26
2.60
4.01.05
Cto
0.8
2.41
1.93
4.01.06
Und
40
0.70
28.00
4.01.07
Und
2.00
4.00
4.01.08
Und
40
0.50
20.00
4.01.09
Refrigerios
Und
40
3.00
120.00
4.01.10
Und
40
0.50
20.00
4.01.11
Und
10.00
4.02.00
2.00
60.00
148.00
3.02.01
4.00.00
COSTO POR
LOCALIDAD
831.86
267.93
3.01.01
3.02.00
META (N
TALLER)
Und
4.02.02
Jaboncillo
Und
100.0%
535.86
2.00
220.00
60.00
110.00
4.02.01
2.00
4.00
16.00
3.00
12.00
DESCRIPCIN
Unidad
CANT.
4.02.03
Toallas de mano
Und
4.02.04
Und
4.02.05
Und
40
5.00.00
5.01.00
Incidencia
100.0%
C.UNIT.
C.TOTAL
S/.
S/.
5.50
22.00
20.00
40.00
0.50
20.00
Papel Sbana
Und
10
0.14
1.40
5.01.02
Und
1.50
6.00
5.01.03
Und
4.00
4.00
5.01.04
Und
10
0.26
2.60
5.01.05
Cto
0.8
2.41
1.93
5.01.06
Und
40
0.70
28.00
5.01.07
Und
2.00
4.00
5.01.08
Und
40
0.50
20.00
5.01.09
Refrigerios
Und
40
3.00
120.00
5.01.10
Und
40
0.50
20.00
5.01.11
Und
10.00
5.02.00
Und
40
2.50
100.00
5.02.02
Escobillas
Und
40
4.00
160.00
5.02.03
Tacho de basura
Und
40
6.00
240.00
5.02.04
Escobas
Und
40
8.00
320.00
5.02.05
Und
40
0.50
20.00
5.02.06
Und
10.00
5.03.01
5.03.02
5.03.03
Valde 20 litros
5.03.04
5.03.05
5.03.06
30.00
30.00
Und
15.00
15.00
Saco 18 k
15.00
15.00
Und
40
0.50
20.00
Und
10.00
60.00
6.00.00
6.01.00
100%
535.86
2.00
1,800.00
2.00
280.00
60.00
140.00
Und
2.00
60.00
900.00
5.02.01
COSTO POR
LOCALIDAD
2,615.86
267.93
5.01.01
5.03.00
META (N
TALLER)
1,132.82
298.41
6.01.01
Papel Sbana
Und
25
0.14
3.50
6.01.02
Und
12
1.50
18.00
6.01.03
Und
4.00
8.00
6.01.04
Und
25
0.26
6.50
6.01.05
Cto
2.41
2.41
6.01.06
Und
40
0.70
28.00
2.00
596.82
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
12.00
6.01.07
Und
2.00
6.01.08
Und
40
0.50
20.00
6.01.09
Refrigerios
Und
40
3.00
120.00
6.01.10
Und
40
0.50
20.00
6.01.11
Und
10.00
6.02.00
Und
30.00
60.00
6.02.02
Basurero de 20 l
Und
20.00
80.00
6.02.03
Escobas
Und
6.00
18.00
6.02.04
Recogedos de Basura
Und
10.00
30.00
6.02.05
Und
40
0.50
20.00
6.02.06
Und
10.00
60.00
7.01.00
Und
25
0.14
3.50
7.01.02
Und
12
1.50
18.00
7.01.03
Und
4.00
8.00
7.01.04
Und
25
0.26
6.50
7.01.05
Cto
2.41
2.41
7.01.06
Und
40
0.70
28.00
7.01.07
Und
2.00
12.00
7.01.08
Und
40
0.50
20.00
7.01.09
Refrigerios
Und
40
3.00
120.00
7.01.10
Und
40
0.50
20.00
7.01.11
Und
10.00
60.00
80.00
7.02.05
Und
40
0.50
20.00
7.02.06
Und
10.00
60.00
8.00.00
8.01.00
2.00
536.00
1,513.64
298.41
7.01.01
7.02.00
COSTO POR
LOCALIDAD
60.00
268.00
6.02.01
7.00.00
META (N
TALLER)
4.00
1,193.64
4.00
320.00
1,853.64
298.41
8.01.01
Papel Sbana
Und
25
0.14
3.50
8.01.02
Und
12
1.50
18.00
8.01.03
Und
4.00
8.00
8.01.04
Und
25
0.26
6.50
8.01.05
Cto
2.41
2.41
8.01.06
Und
40
0.70
28.00
8.01.07
Und
2.00
12.00
8.01.08
Und
40
0.50
20.00
4.00
1,193.64
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
8.01.09
Refrigerios
Und
40
3.00
120.00
8.01.10
Und
40
0.50
20.00
8.01.11
Und
10.00
8.02.00
Und
2.50
15.00
8.02.02
Toallas
Und
7.00
42.00
8.02.03
Escoba
Und
7.00
14.00
8.02.04
Recogedos de Basura
Und
7.00
14.00
8.02.05
Und
40
0.50
20.00
8.02.06
Und
10.00
60.00
9.01.00
Und
25
0.14
3.50
9.01.02
Und
12
1.50
18.00
9.01.03
Und
4.00
8.00
9.01.04
Und
25
0.26
6.50
9.01.05
Cto
2.41
2.41
9.01.06
Und
40
0.70
28.00
9.01.07
Und
2.00
12.00
9.01.08
Und
40
0.50
20.00
9.01.09
Refrigerios
Und
40
3.00
120.00
9.01.10
Und
40
0.50
20.00
9.01.11
Und
10.00
9.02.01
Varios implementos
9.02.02
9.02.03
4.00
660.00
1,834.32
298.41
9.01.01
9.02.00
COSTO POR
LOCALIDAD
60.00
165.00
8.02.01
9.00.00
META (N
TALLER)
Und
Und
9.00.00
TEMAS TRANSVERSALES
9.01.00
1,193.64
4.00
640.68
60.00
160.17
Global
4.00
80.17
80.17
40
0.50
20.00
10.00
60.00
566.82
268.41
9.01.01
Papel Sbana
Und
10
0.14
1.40
9.01.02
Und
1.50
6.00
9.01.03
Und
4.00
4.00
9.01.04
Und
10
0.26
2.60
9.01.05
Cto
2.41
2.41
9.01.06
Und
40
0.70
28.00
9.01.07
Und
2.00
4.00
9.01.08
Und
40
0.50
20.00
9.01.09
Refrigerios
Und
40
3.00
120.00
1.00
268.41
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
20.00
9.01.10
Und
40
0.50
9.01.11
Und
10.00
9.01.00
9.01.01
Papel Sbana
Und
25
0.14
3.50
9.01.02
Und
12
1.50
18.00
9.01.03
Und
4.00
8.00
9.01.04
Und
25
0.26
6.50
9.01.05
Cto
2.41
2.41
9.01.06
Und
40
0.70
28.00
9.01.07
Und
2.00
12.00
9.01.08
Und
40
0.50
20.00
9.01.09
Refrigerios
Und
40
3.00
120.00
9.01.10
Und
40
0.50
20.00
9.01.11
Und
10.00
60.00
10.00.00
10.01.01
Und
0.50
1.00
10.01.02
Cuaderno de Control
Und
1.50
1.50
10.01.03
Und
0.70
0.70
10.02.00
10.02.01
Cuaderno de Control
Und
1.50
10.02.02
Und
0.70
10.03.00
Gastos de Viaticos
10.03.01
Gbl
60.00
240.00
10.03.02
Transporte
Gbl
50.00
200.00
11.00.00
EVALUACION
11.01.00
3.20
2.20
51.20
16.00
35.20
1.00
440.00
0.70
440.00
2,735.63
48.60
Und
30
0.50
15.00
11.01.02
Lapices
Und
0.70
1.40
11.01.03
Borradores
Und
0.50
1.00
11.01.04
Tabla de madera
Und
0.24
5.00
1.20
11.01.05
Estimado
30.00
30.00
Papel Bonn de 80 gr
Cto
2.00
Glb
40.00
11.03.00
16.00
1.50
11.01.01
11.02.02
298.41
526.40
11.02.01
1.00
MONITOREO
10.01.00
11.02.00
COSTO POR
LOCALIDAD
60.00
298.41
META (N
TALLER)
44.00
16.00
777.60
5.00
220.00
5.00
1,298.03
4.00
40.00
259.61
11.03.01
Papel Sbana
Und
10
0.14
1.40
11.03.02
Und
1.50
6.00
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
11.03.03
Und
4.00
8.00
11.03.04
Und
10
0.26
2.60
11.03.05
Cto
0.5
2.41
1.21
11.03.06
Und
32
0.70
22.40
11.03.07
Und
2.00
12.00
11.03.08
Refrigerios
Und
32
3.00
96.00
11.03.09
Und
10.00
60.00
11.03.10
Informes de resultados
Und
50
1.00
11.04.00
Gastos de Viticos
11.04.01
Gbl
60.00
240.00
11.04.02
Transporte
Gbl
50.00
200.00
12.00.00
41,625.00
12.00.01
Mes
11.00
25.00%
5,000.00
13,750.00
12.00.02
Especialista en Comunicacin
Mes
25.00%
3,000.00
2,250.00
12.00.03
Especialista en Saneamiento
Mes
25.00%
4,000.00
3,000.00
12.00.04
Alquiler de Camioneta
Mes
10.00
25.00%
6,000.00
15,000.00
12.00.05
Combustibles
Mes
10.00
25.00%
2,000.00
5,000.00
12.00.06
Material de Oficina
Mes
10.00
25.00%
300.00
750.00
12.00.07
Mes
10.00
25.00%
450.00
1,125.00
Muebles de Oficina
Mes
10.00
25.00%
300.00
750.00
12.00.08
COSTO DIRECTO
COSTO POR
LOCALIDAD
1.00
440.00
1.00
41,625.00
50.00
440.00
META (N
TALLER)
60,982.62
INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y SANEAMIENTO PARA EL CENTRO POBLADO DE ANGAMOS, DISTRITO DE BARRANCA, PROVINCIA DE DATEM DEL MARAON, REGION LORETO
DATOS
N TALLER X
COMP.
DESCRICION
13
N DE PARTICPANTES ATM
N DE PARTICPANTES JASS
10
% DE ASISTENCIA A LA REUNION
100.00%
5.00
6.00
1.00.00
DESCRIPCIN
C.UNIT.
C.TOTAL
S/.
S/.
Unidad
CANT.
5000.00
10000.00
Incidencia
7.7%
47,100.00
1.01.00
Mes
1.02.00
Especialista en Comunicacin
Mes
4000.00
8000.00
1.03.00
Especialista en Saneamiento
Mes
1.5
6000.00
9000.00
1.04.00
Especialista en Ediciones
Mes
4000.00
8000.00
1.05.00
Tecnico en Publicidad
Mes
3500.00
7000.00
1.06.00
Computadoras
Mes-Equipo
300.00
1800.00
1.07.00
Mes-Equipo
400.00
800.00
1.08.00
Toner de Impresora
Global
500.00
500.00
1.09.00
Estimado
2000.00
2000.00
2.00.00
2.01.00
2.01.01
META (N
TALLER)
COSTO POR
LOCALIDAD
3,623.08
257.71
66.93
2.01.01.01
Papel Sbana
Und
10
0.14
1.40
2.01.01.02
Und
1.50
6.00
2.01.01.03
Und
4.00
4.00
2.01.01.04
Und
10
0.26
2.60
2.01.01.05
Cto
0.8
2.41
1.93
2.00
133.86
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
2.01.01.06
Und
10
0.70
7.00
2.01.01.07
Und
2.00
4.00
2.01.01.08
Und
10
0.50
5.00
2.01.01.09
Refrigerios
Und
10
3.00
30.00
Und
10
0.50
2.01.01.10
2.01.02
Und
10
0.14
1.40
2.02.02.02
Und
1.50
6.00
2.02.02.03
Und
4.00
4.00
2.02.02.04
Und
10
0.26
2.60
2.02.02.05
Cto
0.8
2.41
1.93
2.02.02.06
Und
10
0.70
7.00
2.02.02.07
Und
2.00
4.00
2.02.02.08
Und
10
0.50
5.00
2.02.02.09
Refrigerios
Und
10
3.00
30.00
2.02.01
Und
10
0.14
1.40
2.02.01.02
Und
1.50
6.00
2.02.01.03
Und
4.00
4.00
2.02.01.04
Und
10
0.26
2.60
2.02.01.05
Cto
0.8
2.41
1.93
2.02.01.06
Und
10
0.70
7.00
2.02.01.07
Und
2.00
4.00
2.02.01.08
Und
10
0.50
5.00
2.02.01.09
Refrigerios
Und
10
3.00
30.00
2.02.01.10
Und
10
0.50
5.00
2.03.01
2.00
123.86
133.86
66.93
2.02.01.01
2.03.00
COSTO POR
LOCALIDAD
5.00
61.93
2.02.02.01
2.02.00
META (N
TALLER)
133.86
411.57
76.93
2.03.01.01
Papel Sbana
Und
10
0.14
1.40
2.03.01.02
Und
1.50
6.00
2.03.01.03
Und
4.00
4.00
2.03.01.04
Und
10
0.26
2.60
2.03.01.05
Cto
0.8
2.41
1.93
2.03.01.06
Und
10
0.70
7.00
2.03.01.07
Und
2.00
4.00
2.03.01.08
Und
10
0.50
5.00
2.03.01.09
Refrigerios
Und
10
3.00
30.00
2.03.01.10
Und
10
0.50
5.00
153.86
N
2.03.01.11
2.03.02
DESCRIPCIN
Plastico Trasparente, 2 mts
C.UNIT.
C.TOTAL
S/.
S/.
5.00
10.00
Unidad
CANT.
Und
Incidencia
66.93
2.03.02.01
Papel Sbana
Und
10
0.14
1.40
2.03.02.02
Und
1.50
6.00
2.03.02.03
Und
4.00
4.00
2.03.02.04
Und
10
0.26
2.60
2.03.02.05
Cto
0.8
2.41
1.93
2.03.02.06
Und
10
0.70
7.00
2.03.02.07
Und
2.00
4.00
2.03.02.08
Und
10
0.50
5.00
2.03.02.09
Refrigerios
Und
10
3.00
30.00
Und
10
0.50
2.03.02.10
2.03.03
Und
10
0.14
1.40
2.03.03.02
Und
1.50
6.00
2.03.03.03
Und
4.00
4.00
2.03.03.04
Und
10
0.26
2.60
2.03.03.05
Cto
0.8
2.41
1.93
2.03.03.06
Und
10
0.70
7.00
2.03.03.07
Und
2.00
4.00
2.03.03.08
Und
10
0.50
5.00
Und
10
3.00
30.00
Refrigerios
2.04.00
2.04.01
Und
10
0.14
1.40
2.04.01.02
Und
1.50
6.00
2.04.01.03
Und
4.00
4.00
2.04.01.04
Und
10
0.26
2.60
2.04.01.05
Cto
0.8
2.41
1.93
2.04.01.06
Und
10
0.70
7.00
2.04.01.07
Und
2.00
4.00
2.04.01.08
Und
10
0.50
5.00
2.04.01.09
Refrigerios
Und
10
3.00
30.00
Und
10
0.50
5.00
Und
5.00
10.00
2.04.01.11
2.04.02
133.86
123.86
193.71
76.93
2.04.01.01
2.04.01.10
COSTO POR
LOCALIDAD
5.00
61.93
2.03.03.01
2.03.03.09
META (N
TALLER)
19.93
2.04.02.01
Papel Sbana
Und
10
0.14
1.40
2.04.02.02
Und
1.50
6.00
2.04.02.03
Und
4.00
4.00
2.04.02.04
Und
10
0.26
2.60
153.86
39.86
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
2.04.02.05
Cto
0.8
2.41
1.93
2.04.02.06
Und
2.00
4.00
2.05.00
2.05.01
Und
10
0.14
1.40
2.05.01.02
Und
1.50
6.00
2.05.01.03
Und
4.00
4.00
2.05.01.04
Und
10
0.26
2.60
2.05.01.05
Cto
0.8
2.41
1.93
2.05.01.06
Und
10
0.70
7.00
2.05.01.07
Und
2.00
4.00
2.05.01.08
Und
10
0.50
5.00
2.05.01.09
Refrigerios
Und
10
3.00
30.00
2.05.01.10
Und
10
0.50
5.00
2.05.01.11
Und
5.00
10.00
19.93
2.05.02.01
Papel Sbana
Und
10
0.14
1.40
2.05.02.02
Und
1.50
6.00
2.05.02.03
Und
4.00
4.00
2.05.02.04
Und
10
0.26
2.60
2.05.02.05
Cto
0.8
2.41
1.93
2.05.02.06
Und
2.00
4.00
3.00.00
3.01.00
3.01.01
Und
10
0.14
1.40
3.01.01.02
Und
1.50
6.00
3.01.01.03
Und
4.00
4.00
3.01.01.04
Und
10
0.26
2.60
3.01.01.05
Cto
0.8
2.41
1.93
3.01.01.06
Und
10
0.70
7.00
3.01.01.07
Und
2.00
4.00
3.01.01.08
Und
10
0.50
5.00
3.01.01.09
Refrigerios
Und
10
3.00
30.00
3.01.01.10
Und
10
0.50
5.00
3.02.01
3.02.01.01
Papel Sbana
153.86
39.86
133.86
66.93
3.01.01.01
3.02.00
COSTO POR
LOCALIDAD
193.71
76.93
2.05.01.01
2.05.02
META (N
TALLER)
133.86
754.66
369.93
Und
10
0.14
1.40
739.86
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
3.02.01.02
Und
1.50
6.00
3.02.01.03
Und
4.00
4.00
3.02.01.04
Und
10
0.26
2.60
3.02.01.05
Cto
0.8
2.41
1.93
3.02.01.06
Und
10
0.70
7.00
3.02.01.07
Und
2.00
4.00
3.02.01.08
Und
10
0.50
5.00
3.02.01.09
Refrigerios
Und
10
3.00
30.00
3.02.01.10
Und
10
0.50
5.00
3.02.01.11
Und
5.00
10.00
3.02.01.12
Hipoclorito de Calcio
Kg
10
19.00
190.00
3.02.01.13
Und
100.00
100.00
3.02.01.14
Und
3.00
3.00
3.02.02
Practica de Cloracion
7.40
3.02.02.01
Papel Sbana
Und
10
0.14
1.40
3.02.02.02
Und
1.50
6.00
3.03.00
3.03.01
META (N
TALLER)
COSTO POR
LOCALIDAD
14.80
1181.48
583.34
3.03.01.01
Papel Sbana
Und
10
0.14
1.40
3.03.01.02
Und
1.50
6.00
3.03.01.03
Und
4.00
4.00
3.03.01.04
Und
10
0.26
2.60
3.03.01.05
Cto
0.8
2.41
1.93
3.03.01.06
Und
10
0.70
7.00
3.03.01.07
Und
2.00
4.00
3.03.01.08
Und
10
0.50
5.00
3.03.01.09
Refrigerios
Und
10
3.00
30.00
3.03.01.10
Und
10
0.50
5.00
3.03.01.11
Und
12
10.00
120.00
3.03.01.12
Cinta Teflon
Und
12
0.80
9.60
3.03.01.13
Hoja de Sierra
Und
10
4.80
48.00
3.03.01.14
Alicate
Und
13.90
41.70
3.03.01.15
Brocha de 1"
Und
2.70
2.70
3.03.01.16
Und
41.50
83.00
3.03.01.17
Und
27.00
27.00
3.03.01.18
Rastrillo
Und
28.00
28.00
3.03.01.19
Martillo de Ua
Und
13.90
13.90
3.03.01.20
Barilejo
Und
10.00
20.00
3.03.01.21
Escobilla de Fierro
Und
2.85
11.40
3.03.01.22
Und
14.00
14.00
1166.68
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
3.03.01.23
Palana Recta
Und
25.00
50.00
3.03.01.24
Palana Cuchara
Und
25.00
25.00
3.03.01.25
Und
22.11
22.11
3.03.02
Practica de OyM
7.40
3.03.02.01
Papel Sbana
Und
10
0.14
1.40
3.03.02.02
Und
1.50
6.00
3.04.00
3.04.01
Und
10
0.14
1.40
3.04.01.02
Und
1.50
6.00
3.04.01.03
Und
4.00
4.00
3.04.01.04
Und
10
0.26
2.60
3.04.01.05
Cto
0.8
2.41
1.93
3.04.01.06
Und
10
0.70
7.00
3.04.01.07
Und
2.00
4.00
3.04.01.08
Und
10
0.50
5.00
3.04.01.09
Refrigerios
Und
10
3.00
30.00
Und
10
0.50
5.00
3.04.02
Practica de Gasfiteria
7.40
3.04.02.01
Papel Sbana
Und
10
0.14
1.40
3.04.02.02
Und
1.50
6.00
3.05.00
3.05.01
Und
10
0.14
1.40
3.05.01.02
Und
1.50
6.00
3.05.01.03
Und
4.00
4.00
3.05.01.04
Und
10
0.26
2.60
3.05.01.05
Cto
0.8
2.41
1.93
3.05.01.06
Und
10
0.70
7.00
3.05.01.07
Und
2.00
4.00
3.05.01.08
Und
10
0.50
5.00
3.05.01.09
Refrigerios
Und
10
3.00
30.00
3.05.01.10
Und
10
0.50
5.00
3.05.01.11
Und
10.00
20.00
Und
10.00
10.00
3.05.02
2.00
14.80
148.66
2.00
14.80
208.66
96.93
3.05.01.01
3.05.01.12
COSTO POR
LOCALIDAD
163.46
74.33
3.04.01.01
3.04.01.10
META (N
TALLER)
Practica de OyM
7.40
3.05.02.01
Papel Sbana
Und
10
0.14
1.40
3.05.02.02
Und
1.50
6.00
2.00
193.86
2.00
14.80
DESCRIPCIN
4.00.00
4.01.00
4.01.01
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
META (N
TALLER)
66.93
2.00
133.86
4.01.01.01
Papel Sbana
Und
10
0.14
1.40
4.01.01.02
Und
1.50
6.00
4.01.01.03
Und
4.00
4.00
4.01.01.04
Und
10
0.26
2.60
4.01.01.05
Cto
0.8
2.41
1.93
4.01.01.06
Und
10
0.70
7.00
4.01.01.07
Und
2.00
4.00
4.01.01.08
Und
10
0.50
5.00
4.01.01.09
Refrigerios
Und
10
3.00
30.00
Und
10
0.50
5.00
4.01.01.10
4.02.00
4.02.01
Und
10
0.14
1.40
4.02.01.02
Und
1.50
6.00
4.02.01.03
Und
4.00
4.00
4.02.01.04
Und
10
0.26
2.60
4.02.01.05
Cto
0.8
2.41
1.93
4.02.01.06
Und
0.70
3.50
4.02.01.07
Und
2.00
4.00
4.02.01.08
Und
0.50
2.50
4.02.01.09
Refrigerios
Und
3.00
15.00
Und
0.50
4.02.02
Und
10
0.14
1.40
4.02.02.02
Und
1.50
6.00
4.02.02.03
Und
4.00
4.00
4.02.02.04
Und
10
0.26
2.60
4.02.02.05
Cto
0.8
2.41
1.93
4.02.02.06
Und
0.70
3.50
4.02.02.07
Und
2.00
4.00
4.02.02.08
Und
0.50
2.50
4.02.02.09
Refrigerios
Und
3.00
15.00
2.00
86.86
2.00
81.86
2.00
53.86
2.50
40.93
4.02.02.01
4.02.03
133.86
222.57
43.43
4.02.01.01
4.02.01.10
COSTO POR
LOCALIDAD
26.93
4.02.03.01
Cto
0.8
2.41
1.93
4.02.03.02
Und
0.70
3.50
4.02.03.03
Und
2.00
4.00
DESCRIPCIN
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
4.02.03.04
Und
0.50
2.50
4.02.03.05
Refrigerios
Und
3.00
15.00
5.00.00
MONITOREO
5.00.01
Und
1.50
1.50
5.00.01.02
Und
0.70
0.70
5.00.02
5.00.02.01
Cuaderno de Control
Und
1.50
5.00.02.02
Und
0.70
5.00.03
Gastos de Viaticos
5.00.03.01
Gbl
60.00
60.00
5.00.03.02
Transporte
Gbl
50.00
50.00
EVALUACION
6.00.01
6.00.01.01
6.00.01.02
6.00.02
2.20
2.20
1.00
2.20
1.00
110.00
0.70
110.00
303.79
72.82
Cto
2.41
Glb
68.00
72.82
1.00
120.97
1.00
110.00
1.00
41625.00
68.00
120.97
Und
10
1.50
15.00
6.00.02.02
Und
4.00
16.00
6.00.02.03
Und
0.26
0.52
6.00.02.04
Und
10
2.41
24.10
6.00.02.05
Cto
0.5
0.70
0.35
6.00.02.06
Und
2.00
2.00
6.00.02.07
Und
0.50
3.00
6.00.02.08
Refrigerios
Und
0.00
0.00
6.00.02.09
Und
10.00
60.00
6.00.02.10
Informes de resultados
Und
50
1.00
6.00.03
Gastos de Viaticos
6.00.03.01
Gbl
60.00
Transporte
Gbl
50.00
50.00
110.00
1.00
4.82
Papel Sbana
7.00.00
1.00
1.50
6.00.02.01
6.00.03.02
COSTO POR
LOCALIDAD
114.40
2.20
5.00.01.01
6.00.00
META (N
TALLER)
60.00
50.00
41625.00
7.00.01
Mes
11.00
25.00%
5000.00
13750.00
7.00.02
Especialista en Comunicacin
Mes
25.00%
3000.00
2250.00
7.00.03
Especialista en Saneamiento
Mes
25.00%
4000.00
3000.00
7.00.04
Alquiler de Camioneta
Mes
10.00
25.00%
6000.00
15000.00
7.00.05
Combustibles
Mes
10.00
25.00%
2000.00
5000.00
7.00.06
Material de Oficina
Mes
10.00
25.00%
300.00
750.00
7.00.07
Mes
10.00
25.00%
450.00
1125.00
7.00.08
Muebles de Oficina
Mes
10.00
25.00%
300.00
750.00
DESCRIPCIN
COSTO DIRECTO
Unidad
CANT.
Incidencia
C.UNIT.
C.TOTAL
S/.
S/.
META (N
TALLER)
COSTO POR
LOCALIDAD
49,655.35
COSTO DIRECTO :
OBRA
INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y SANEAMIENTO PARA EL CENTRO POBLADO DE ANGAMOS, DISTRITO DE BARRANCA, PROVINCIA DE DATEM DEL MARAON, REGION LORETO
S/. 1,909,789.96
AGUA
SANEAMIENTO
960,939.26
948,850.70
Item
Descripcin
01.01.00
01.01.00
01.02.00
01.02.01
01.02.02
Documentos de la presentacin
Gastos de elaboracin de la propuesta
- Ing. Responsable
- Equipo y tiles de oficina
01.02.00
01.02.01
01.03.00
01.03.01
01.03.02
01.03.03
1
1
1
Cantidad
Insidencia
Tiempo
(meses)
Sub total
10.00%
400.00
40.00
1
1
10.00%
10.00%
1
1
10,000.00
350.00
1,000.00
35.00
1,000.00
1,000.00
1,000.00
10,000.00
5,500.00
400.00
1,590.00
1,000.00
550.00
40.00
10.00%
10.00%
10.00%
1
1
1
0.19%
II.
Item
Descripcin
02.01.00
02.01.01
02.01.01.01
02.01.01.02
02.01.01.03
02.01.01.04
02.01.01.05
02.01.01.06
Sueldos y beneficios
- Ingeniero residente
- Ingeniero asistente
- Especialista Ambiental
- Maestro de Obra
- Administrador
- almacenero
02.02.00
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.01.06
Alquiler de Camioneta
Combustibles
Material de Oficina
Equipos de Oficina ( 1 PC, Impresora)
Muebles de Oficina
Equipos de Seguridad (Casco, Botas de seguridad, Chaleco sealizador)
02.03.00
02.03.01
02.03.01.01
02.03.01.02
02.03.01.03
02.03.02
02.03.03
02.03.04
Sueldos y beneficios
Gerente
Contador
Secretaria
Alquileres y pagos
Oficinas principal
Servicios of principal
02.04.00
02.04.01
02.04.02
02.04.03
Parcial
1,075.00
5.00 MESES
Cantidad
Insidencia
Tiempo
(meses)
3,665.00
Parcial
Sub total
120,000.00
1
1
1
1
1
1
100.00%
100.00%
20.00%
100.00%
100.00%
100.00%
5
5
5
5
5
5
10,000.00
5,500.00
5,000.00
3,000.00
2,500.00
2,000.00
1
1
1
1
1
1
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
5
5
5
5
5
5
6,000.00
2,000.00
300.00
450.00
300.00
300.00
50,000.00
27,500.00
5,000.00
15,000.00
12,500.00
10,000.00
46,750.00
30,000.00
10,000.00
1,500.00
2,250.00
1,500.00
1,500.00
5,725.00
1
1
1
10.00%
10.00%
10.00%
5
5
5
6,000.00
2,500.00
1,500.00
3,000.00
1,250.00
750.00
1
1
10.00%
10.00%
5
5
1,000.00
450.00
500.00
225.00
3
2
1
0.20%
0.20%
0.20%
1
1
1
381.96
763.92
1,527.83
4,201.53
1,145.87
1,527.83
1,527.83
9.25%
S/. 176,676.53
9.4430034%
S/. 180,341.53
COSTO DIRECTO :
CAPACITACION
INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y SANEAMIENTO PARA EL CENTRO POBLADO DE ANGAMOS, DISTRITO DE BARRANCA, PROVINCIA DE DATEM DEL MARAON, REGION LORETO
S/. 110,637.97
EDU. SAN.
GESTION DE S
60,982.62
49,655.35
I.
Item
Descripcin
01.01.00
Gastos de Administracin
01.01.01
01.01.00.01
01.01.00.02
01.01.00.03
01.01.00.04
01.01.00.05
Sueldos y beneficios
- Gerente
- Coordinador General
- Secretaria
- Contador
- Administrador
02.02.00
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
Cantidad
Insidencia
11.00 MESES
Tiempo
Parcial
Sub total
21,576.92
1
1
1
1
1
7.69%
7.69%
7.69%
7.69%
7.69%
11
11
11
11
11
10,000.00
9,000.00
1,500.00
2,500.00
2,500.00
1
1
1
1
1
1
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
11
11
11
11
11
11
450.00
400.00
500.00
300.00
800.00
60.00
8,461.54
7,615.38
1,269.23
2,115.38
2,115.38
2,123.85
21.4219120%
380.77
338.46
423.08
253.85
676.92
50.77
S/. 23,700.77
PPTO. DE OBRA :
INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y SANEAMIENTO PARA EL CENTRO POBLADO DE ANGAMOS, DISTRITO DE BARRANCA, PROVINCIA DE DATEM DEL MARAON, REGION LORETO
S/. 2,691,710.37
AGUA
SANEAMIENTO
1,354,374.16
1,337,336.21
Item
Descripcin
01.01.00
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.01.05
01.01.01.06
Sueldos y beneficios
- Ingeniero Supervisor
- Ingeniero asistente
- Especialista Ambiental
- Ingeniero Sanitario
- Secretario
- Chofer
01.02.00
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
Alquiler de Camioneta
Combustibles
Material de Oficina
Equipos de Oficina ( 1 PC, Impresora)
Muebles de Oficina
Equipos de Seguridad (Casco, Botas de seguridad, Chaleco sealizador)
01.03.00
Alquiler de Equipos
01.03.01
01.03.02
01.03.03
01.03.04
Equipo de topografa
Equipos varios de topografa
Pc's
Impresora
01.04.00
Gastos de Oficina
01.04.01
01.04.02
01.04.03
Cantidad
Insidencia
5.00 MESES
Tiempo
(meses)
Parcial
Sub total
121,250.00
1
1
1
1
1
1
100.00%
100.00%
25.00%
100.00%
100.00%
100.00%
5
5
5
5
5
5
10,000.00
5,500.00
5,000.00
3,000.00
2,500.00
2,000.00
50,000.00
27,500.00
6,250.00
15,000.00
12,500.00
10,000.00
46,750.00
1
1
1
1
1
1
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
5
5
5
5
5
5
6,000.00
2,000.00
300.00
450.00
300.00
300.00
30,000.00
10,000.00
1,500.00
2,250.00
1,500.00
1,500.00
9,850.00
1
1
2
1
100.00%
50.00%
100.00%
50.00%
5
2
5
5
1,500.00
100.00
200.00
100.00
7,500.00
100.00
2,000.00
250.00
4,875.00
1
1
1
100.00%
50.00%
50.00%
5
5
5
6.7884347%
800.00
100.00
250.00
4,000.00
250.00
625.00
S/. 182,725.00
INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y SANEAMIENTO PARA EL CENTRO POBLADO DE ANGAMOS, DISTRITO DE BARRANCA, PROVINCIA DE DATEM DEL MARAON, REGION LORETO
PPTO. DE CAPACITACION :
S/. 171,575.00
EDU. SAN.
GESTION DE S
94,570.54
77,004.45
Item
Descripcin
01.01.00
01.01.01
01.01.00.01
01.01.00.02
01.01.00.03
Sueldos y beneficios
- Coordinador Supervisor Social MUNICIPAL
- Supervisor Social MUNICIPAL
- Especialista Sanitario
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
Camioneta 4x4
Combustible
Viaticos Sociales
Viaticos Ingenieros
Chalecos y distintivos
Computadora Personal
Seguro de Vida
01.03.00
Gastos de Oficina
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.03.08
01.03.09
01.03.10
01.03.11
Secretaria
Alquiler de Oficina
Muebles
Equipos de Computo
Impresora
Material de Oficina e impresin
Material y Limpieza de oficina
Internet, Telefono, Celular
Servicios Agua y Energia electrica
Movilidad Nacional y viaticos
Gastos de correspondencia
TOTAL GASTOS DE SUPERVISION
Cantidad
Insidencia
11.00 MESES
Tiempo
Parcial
Sub total
16,769.23
1
1
2
7.69%
7.69%
7.69%
11
11
3
9,000.00
7,000.00
7,000.00
7,615.38
5,923.08
3,230.77
16,487.69
2
2
2
2
4
2
4
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
11
11
11
3
11
11
11
6,000.00
2,000.00
1,000.00
1,000.00
60.00
150.00
100.00
10,153.85
3,384.62
1,692.31
461.54
203.08
253.85
338.46
4,044.62
1
1
1
1
1
1
1
1
1
1
1
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
11
11
11
11
11
11
11
11
11
11
11
21.7406611%
1,000.00
600.00
1,000.00
120.00
500.00
300.00
100.00
350.00
150.00
600.00
60.00
846.15
507.69
846.15
101.54
423.08
253.85
84.62
296.15
126.92
507.69
50.77
S/. 37,301.54
INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y SANEAMIENTO PARA EL CENTRO POBLADO DE ANGAMOS, DISTRITO DE BARRANCA, PROVINCIA DE DATEM DEL MARAON,
REGION LORETO
AGUA POTABLE
CARGO
Und
Cantidad
Tiempo
Parcial
Total
(mes)
1.0 Salarios del Personal
Ingeniero Jefe de Supervisin
und
0.5
1.0
8,000.00
4,000.00
und
1.0
0.2
4,000.00
800.00
und
1.0
0.2
4,000.00
800.00
und
0.0
0.20
4,000.00
und
0.0
0.20
4,000.00
Coordinador Social
und
0.5
0.5
4,000.00
1,000.00
Total 1.0
6,600.00
und
1.0
0.5
5,280.00
2,640.00
Total 2.0
2,640.00
und
0.5
1.0
300.00
150.00
Total 3.0
150.00
und
0.5
1.0
800.00
400.00
Desgaste de mobiliarios
glb
0.5
1.0
400.00
200.00
Consumibles Oficina
glb
0.5
1.0
300.00
150.00
Total 4.0
750.00
TOTAL
S/. 10,140.00
Und
Cantidad
Tiempo
Parcial
Total
(mes)
1.0 Salarios del Personal
Ingeniero Jefe de Supervisin
und
0.5
1.0
8,000.00
4,000.00
Coordinador Social
und
0.5
0.5
4,000.00
1,000.00
Total 1.0
5,000.00
und
1.0
0.5
5,280.00
2,640.00
Total 2.0
2,640.00
und
0.5
1.0
300.00
150.00
Total 3.0
150.00
und
0.5
1.0
800.00
400.00
Desgaste de mobiliarios
glb
0.5
1.0
400.00
200.00
Consumibles Oficina
glb
0.5
1.0
300.00
150.00
Total 4.0
750.00
TOTAL
TOTAL DE PRESUPUESTO SUPERVISIN DEL ESTUDIO DEFINITIVO
S/. 8,540.00
S/.18,680.00
INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y SANEAMIENTO PARA EL CENTRO POBLADO DE ANGAMOS, DISTRITO DE BARRANCA, PROVINCIA DE
DATEM DEL MARAON, REGION LORETO
Cargo / Detalle
Und
Cantidad
Tiempo
Parcial
Total
(mes)
1.0 Salarios del Personal
Monitor del Proyecto
und
1.0
3.0
6,000.00
Asistente
und
1.0
3.0
3,000.00
18,000.00
9,000.00
Total 1.0
27,000.00
und
1.0
0.3
5,280.00
1,584.00
Total 2.0
1,584.00
und
1.0
3.0
500.00
500.00
Total 3.0
500.00
und
0.5
3.0
800.00
200.00
Desgaste de mobiliarios
glb
0.5
3.0
400.00
100.00
Consumibles Oficina
glb
0.5
3.0
500.00
750.00
Total 4.0
1,050.00
TOTAL
30,134.00