SISTEMA DE PESAJE DE BOMBONAS

SUMINISTRO E INSTALACION DE ESTRUCTURAS Y EQUIPOS EDIFICIO SILO N6


REPORTE DE AVANCE - CURVA S
Doc. N

FECHA:

PRODISE SRL

Contratista:
Preparado por:

7/8/2012

periodo

DE:02/07/2012

AL 08/07/2012

Fredy Escalante Surco


0

No.

Description

Peso x
WBS

Peso para Peso por


Proyecto actividad

Horas
Hombre
Base
Contrato

Horas
Hombre Peso % x
Reprogra
Horas
ma
Hombre
Aprobado

% Avance
Fsico
General
Proyecto

% Avance
Fsico de
Cada Item

10

Duracin del Proyecto


PERIODO CONTRACTUAL

Semanas
18 / June

100%
1

PROCURAS
PROCURA DE MATERIALES E INSUMOS

15%

001

10%

001

ELABORACION DE INGENIERIA
INGENIERIA BASICA Y DETALLE

002

INGENIERIA DE TALLER

FABRICACION Y MONTAJE

15.00%

100.00%

208

6.21% PROG
REAL

50.00% PROG
40.00% REAL

7.50%
6.00%

25 / June

02 / July

09 / July

16 / July

23 / July

30 / July

06 / August

13 / August

10.00%
10.00%

50.00%
40.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%
90.00%

100.00%
100.00%
25.00%
10.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

10.00%

40.00%

80.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

75.00%

100.00%

100.00%

100.00%

100.00%

30.00%

70.00%

95.00%

100.00%

100.00%

40.00%

95.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

50.00%

95.00%

100.00%

100.00%

70.00%

100.00%

100.00%

100.00%

100.00%

80.00%

100.00%

100.00%

100.00%

100.00%

40.00%

100.00%

100.00%

55.00%

100.00%

100.00%

20 / August

90%
4.88%

48.78%

160

5.12%

51.22%

168

4.77% PROG
REAL
5.01% PROG
REAL

100.00%
100.00%
25.00%
10.00%

PROG
REAL
PROG
REAL

4.88%
4.88%
1.28%
0.51%

7.16% PROG
REAL
6.92% PROG
REAL
3.10% PROG
REAL
4.06% PROG
REAL
17.66% PROG
REAL

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

PROG
REAL
PROG
REAL
PROG
REAL
PROG
REAL
PROG
REAL

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

14.08% PROG
REAL
0.95% PROG
REAL
0.95% PROG
REAL
10.26% PROG
REAL
4.53% PROG
REAL
3.82% PROG
REAL
5.25% PROG
REAL
5.25% PROG
REAL

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

PROG
REAL
PROG
REAL
PROG
REAL
PROG
REAL
PROG
REAL
PROG
REAL
PROG
REAL
PROG
REAL

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

65.00%
55.00%

80%

75%

FABRICACIONES

001
01

ELEVADOR DE CANGILONES 1131

6.39%

8.52%

240

02

DUSTOS DE DESCARGA

6.18%

8.24%

232

03

JUNTAS FLEXIBLES

2.77%

3.69%

104

04

DUCTOS DE DESPOLVORIZACION

05

ESTRUCTURAS METALICAS

3.62%

4.83%

136

15.77%

21.02%

592

70%

60%

5.00%

50%

MONTAJE
03

INSTALACION DE ESTRUCTURAS METALICAS

12.57%

16.76%

472

04

RETIRO DE DUCTOS DE DESPOLVORIZACION

0.85%

1.14%

32

05

RETIRO DE CANALETA 1134B

0.85%

1.14%

32

06

MODIFICACION DE ELEVADOR 1131

9.16%

12.22%

344

07

REUBICACION DE FILTRO 1134

4.05%

5.40%

152

08

INSTALACION DE ZARANDA 250 TMPH

3.41%

4.55%

128

09

INSTALACION DE DUCTOS DE DESCARGA

4.69%

6.25%

176

10

INSTALACION DE DUCTOS DE DESPOLVORIZACION

TOTAL

4.69%

100%

6.25%

176

3,352

PROGRAMADOS
Cantidad de Mano de Obra Directa
(HH) Mano de Obra Directa Programada
(HH) Mano de Obra Directa Programada Acumulada
% Cantidad Total de HH Programada
REAL
Cantidad de Mano de Obra Directa

(HH) Mano de Obra Directa Programada

D
E

(HH) Mano de Obra Directa Programada Acumulada


% Cantidad Total de HH Programada

30%

20%

10%

0%

100%
AVANCE
AVANCE

A
C
D
E

40%

PROG
REAL

13.66%
11.39%

104
3.10%

181
5.39%

306
9.13%

822
24.51%

1520
45.36%

2130
63.56%

2837
84.64%

3328
99.30%

3352
100.00%

88
2.63%

165
4.92%

260
7.76%

0
0.00%

0
0.00%

0
0.00%

0
0.00%

0
0.00%

0
0.00%