"S"
OBRA :
93.00%
88.38%
RUTA
CRITICA
90.0%
PROGRAMA
DAO
80.0%
EJECUTADO
70.0%
62.49%
60.0%
62.25%
50.0%
40.0%
30.0%
24.50%
20.0%
10.0%
14.01%
0.00%
0.00%
0.0%
INICIO
AGOSTO
SETIEMBRE
OCTUBRE
NOVIEMBRE
COSTO DE OBRA368,751.26
100%
342,955.73
93.00%
NOTA: LOS MONTOS PROGRAMADOS SE HAN CONSIDERADO SEGN EL CRONOGRAMA REPROGRAMADO Y PERT CPM SEGN
NORMA.
S EN EL ANEXO DE
NIN
OCTUBRE DE 2016
S/.
368,751.27
NOVIEMBRE
80% del
Avance
Programado
Acumulado
0.00%
11.20%
49.80%
70.71%
80.00%
OBRA: INSTALACION DE L
MES 0
AGOSTO
0
90361.713
0
90361.7132
0
0.245
SETIEMBRE
112469.14
###
###
202830.851
313456.233
368751.272
0.305
0.3
0.15
OCTUBRE
NOVIEMBRE
0
0.245
0.55
0.85
1
MES 0
AGOSTO
SETIEMBRE
OCTUBRE
NOVIEMBRE
0
90361.7132
140089.26
112504.76
0
90361.7132
0
0.24504787
0
0.24504787
0
0
0
-4.787E-005