ADELANTO DE MATERIALES

MEJORAMIENTO DEL CAMINO VECINAL TRAMO: RIO BLANCO – TUCNA – ANAYPAMPA – USHARUMI – ESTANCIA PATA CHARACC DEL DISTRITO DE SAN RAFAEL - AMBO -
OBRA :
HUANUCO
CONTRATISTA : CONSORCIO VIAL RIO BLANCO MONTO REFERENCIAL S/. 7,317,471.64
SUPERVISOR : CONSORCIO SANTA ROSA MONTO CONTRATADO S/. 7,317,471.64
RESIDENTE : Ing. Luis Alberto Caldas Alvarado FACTOR RELACION 1.00
MES SOLICITADO: May-18

1 2 3 4 5 6 7 8 9
Imo Ima

SALDO BRUTO Indice de Reajuste MONTO MÁXIMO


I.U. MATERIAL SOLICITADO COEFICIENTE % INCIDENCIA F.R VALORIZAR BASE (SIN MONTO SOLICITADO
IGV) Apr-17 Mar-18 (K) CON REAJUSTE

MEJORAMIENTO DEL CAMINO VECINAL


30 DÓLAR 0.146 100% 1 S/. 5,392,388.82 461.46 471.87 1.023 S/. - S/. -
MANO DE OBRA (INCLUIDO LEYES
47 SOCIALES) 0.155 100% 1 S/. 5,392,388.82 563.25 582.52 1.034 S/. - S/. -
5 AGREGADO GRUESO 0.072 100% 1 S/. 5,392,388.82 411.28 422.53 1.027 S/. 398,734.80 S/. 327,415.03
3 ACERO DE CONSTRUCCIÓN CORRUGADO 0.627 100% 1 S/. 5,392,388.82 431.87 506.47 1.173 S/. 3,965,945.60 S/. 836,289.08
1 SUB TOTAL: S/. 4,364,680.40 S/. 1,163,704.11

CONCEPTOS GENERALES (SIN IGV) MONTO


(*) El monto solicitado por el contratista no debe
superar el 40 % del Monto del Contrato MONTO MAXIMO CON REAJUSTE DE F.P. 4,364,680.40
MONTO MAXIMO PERMITIDO SEGÚN CONTRATO (20%) SIN IGV 1,240,249.43 20.00%
El adelanto parcial [8], solicitado por el MONTO SOLICITADO POR CONTRATISTA (*) 1,163,704.11 18.77%
(**) contratista no debe superar el monto máximo IGV 209,466.73
permitido, indicado en la columna [7]
MONTO SOLICITADO CON IGV 1,373,170.84

MONTO DEL CONTRATO


MODULO I S/. 6,201,247.15 Sin IGV
MONTO DEL CONTRATO
PRINCIPAL S/. 7,317,471.64 Con IGV
ADELANTO ESPECIFICO DE MATERIALES - APE

COEFICIENTE
UNIFICADO MATERIAL SOLICITADO
1

=Hoja1!B22 AGREGADO GRUESO 0.072

MONOMIO
AGREGADO GRUESO INCIDENCIA ACUMULADA

I.U MATERIAL
=Hoja1!B22 AGREGADO GRUESO
ADELANTO Y METRADO SOLICITADO

MATERIALES UND

PIEDRA MEDIANA m3
PIEDRA GRANDE m3
ARENA GRUESA (PUESTA EN OBRA) m3
MATERIAL PARA AFIRMADO m3
PIEDRA CHANCADA (PUESTA EN OBRA) m3
MATERIAL GRANULAR PARA RELLENO m3
HORMIGOS DE RIO (PUESTO EN OBRA) m3
MADERA TORNILLO p2
MADERA CORRIENTE DE 2" x 3" CORREA p2
MADERA CORRIENTE DE 1" x 10" (TABIQUERIA) p2
MADERA ROLLIZO DE 6" x 3.50 MTS und
ESTACA DE MADERA TORNILLO p2
TRIPLAY DE 12 mm pl
MADERA CORRIENTE INC CORTE P/ENCOFRADO p2

ADELANTO PROCEDE(ACTUALIZADO A MAYO 2018)


MONTO
MATERIAL PROCEDE
PIEDRA MEDIANA S/. 25,062.36
PIEDRA GRANDE S/. 55,434.08
ARENA GRUESA (PUESTA EN OBRA) S/. 60,677.24
MATERIAL PARA AFIRMADO S/. 16,577.95
PIEDRA CHANCADA (PUESTA EN OBRA) S/. 5,471.19
MATERIAL GRANULAR PARA RELLENO S/. 842.40
HORMIGOS DE RIO (PUESTO EN OBRA) S/. 92,951.34
MADERA TORNILLO S/. 33,163.20
MADERA CORRIENTE DE 2" x 3" CORREA S/. 244.15
MADERA CORRIENTE DE 1" x 10" (TABIQUERIA) S/. 899.50
MADERA ROLLIZO DE 6" x 3.50 MTS S/. 554.76
ESTACA DE MADERA TORNILLO S/. 2,067.27
TRIPLAY DE 12 mm S/. 12,348.16
MADERA CORRIENTE INC CORTE P/ENCOFRADO S/. 21,121.43
S/. 327,415.03
CIFICO DE MATERIALES - APERTURA DE TROCHA

MONTO
% SALDO BRUTO lmo
FACTOR DE MAXIMO
INCIDENCIA VALORIZAR Ima Mar - 18
RELACION
BASE (SIN IGV)
Mar - 17 A OTORGAR
3 6 7=[1*2*3*4)*(6/
2 4 5
5]
100.00% 1.00000 6,201,247.15 411.28 422.53 434,601.86

NCIA ACUMULADA

MONTO (S/.)
METRADO P.U. P.U. ACT
MONTO (S/.) ACTUAL
SOLICITADO S/. S/. SOLICITADO
208.853 120 S/. 25,062.36 120.00 S/. 25,062.36
899.32 60 S/. 53,959.20 61.64 S/. 55,434.08
549.4136 107.5 S/. 59,061.96 110.44 S/. 60,677.24
19055.1125 0.85 S/. 16,196.85 0.87 S/. 16,577.95
29.5868 180 S/. 5,325.62 184.92 S/. 5,471.19
18.72 45 S/. 842.40 45.00 S/. 842.40
875.5778 103.33 S/. 90,473.45 106.16 S/. 92,951.34
10080 3.2 S/. 32,256.00 3.29 S/. 33,163.20
95 2.5 S/. 237.50 2.57 S/. 244.15
350 2.5 S/. 875.00 2.57 S/. 899.50
36 15 S/. 540.00 15.41 S/. 554.76
544.01727 3.8 S/. 2,067.27 3.80 S/. 2,067.27
143.5833 85 S/. 12,204.58 86.00 S/. 12,348.16
5415.75 3.8 S/. 20,579.85 3.90 S/. 21,121.43

S/. 319,682.04 S/. 327,415.03


MONTO
SOLICITADO
8
(**)

434,601.86

327,415.03
ADELANTO ESPECIFICO DE MATERIALES - APER

%
COEFICIENTE
INCIDENCIA
UNIFICADO MATERIAL SOLICITADO
1
2
3 ACERO DE CONSTRUCCIÓN CORRUGADO 0.627 100.00%

MONOMIO
ACERO DE CONSTRUCCION CORRUGADO INCIDENCIA ACUMULADA

I.U MATERIAL
3 ACERO DE CONSTRUCCIÓN CORRUGADO
ADELANTO Y METRADO SOLICITADO
METRADO
MATERIALES UND SOLICITADO

ALAMBRE NEGRO N° 16 kg 582.661


ALAMBRE NEGRO N° 8 kg 670.747
CLAVOS PARA MADERA CON CABEZA DE 2" kg 448.4665
CLAVOS PARA MADERA CON CABEZA DE 5" kg 94.5
FIERRO DE ANCLAJE DE 1/4 X 2 1/2" pza 100
TUBERIA METALICA D= 2" m 665.6
CLAVOS PARA CALAMINA kg 10.9
CLAVOS PARA MADERA kg 505.072
PERNO DE 3/8" X 4" pza 112
PERNO DE 5/8" X 14" pza 112
ACERO CORRUGADO Fý= 4200 KG/CM2 kg 12375.491
ALCANTARILLA TMC D=48" m 5.775
ALCANTARILLA TMC D=24" m 73.29
CEMENTO PORTLAND TIPO I (42.5 kg) bls 10725.8194
ANGULO DE 1" x 1" x 3/16" m 220.2
PLATINA DE 1" x 1/8" m 32.5
TOPE DE 1/2" x 3/8" m 36
PLATINA DE ACERO DE 4.5" x 3" x 3/8" SEGÚN DISEÑO pza 112
PERFIL ALMINADO DE 4" x 4" x 1/4 " m 72
PLATINA DE FIERRO DE 8" x 1/4". m 36
PLATINA DE ACERO DE 4" x 1/4" m 61.6
PLATINA DE ACERO DE 6" x 6" x 1/2" pza 28
PLANCHA DE ACERO 5/4" x 8" x 8" und 35
PLANCHA DE ACERO ( A-36) DE 0.30 x 0.30 und 16
CALAMINA GALVANIZADO DE 1.50 x 0.53 m x 0.22 mm pl 100
TUBO DE FIERRO GALVANIZADO DE 3" x 2.00 mm x 6.40 M. m 116.48
TUBO DE FIERRO GALVANIZADO DE 2" x 2.00 mm x 6.40 M. m 109.76
ESTABILIZADOR QUIMICO EN POLVO kg 152.4429
MECHA O GUIA NARANJA m 14351.5
FULMINANTE und 3174.3
DINAMITA kg 2190.725
ADELANTO PROCEDE(ACTUALIZADO A MAYO 2018)
MONTO
MATERIAL PROCEDE
ALAMBRE NEGRO N° 16 S/. 2,616.15
ALAMBRE NEGRO N° 8 S/. 3,011.65
CLAVOS PARA MADERA CON CABEZA DE 2" S/. 2,013.61
CLAVOS PARA MADERA CON CABEZA DE 5" S/. 359.10
FIERRO DE ANCLAJE DE 1/4 X 2 1/2" S/. 250.00
TUBERIA METALICA D= 2" S/. 20,280.83
CLAVOS PARA CALAMINA S/. 59.95
CLAVOS PARA MADERA S/. 1,919.27
PERNO DE 3/8" X 4" S/. 280.00
PERNO DE 5/8" X 14" S/. 889.28
ACERO CORRUGADO Fý= 4200 KG/CM2 S/. 55,194.69
ALCANTARILLA TMC D=48" S/. 3,270.96
ALCANTARILLA TMC D=24" S/. 16,744.57
CEMENTO PORTLAND TIPO I (42.5 kg) S/. 230,068.83
ANGULO DE 1" x 1" x 3/16" S/. 9,039.21
PLATINA DE 1" x 1/8" S/. 455.00
TOPE DE 1/2" x 3/8" S/. 142.20
PLATINA DE ACERO DE 4.5" x 3" x 3/8" SEGÚN DISEÑO S/. 2,717.12
PERFIL ALMINADO DE 4" x 4" x 1/4 " S/. 3,773.52
PLATINA DE FIERRO DE 8" x 1/4". S/. 1,674.00
PLATINA DE ACERO DE 4" x 1/4" S/. 1,848.62
PLATINA DE ACERO DE 6" x 6" x 1/2" S/. 854.56
PLANCHA DE ACERO 5/4" x 8" x 8" S/. 1,960.35
PLANCHA DE ACERO ( A-36) DE 0.30 x 0.30 S/. 1,019.68
CALAMINA GALVANIZADO DE 1.50 x 0.53 m x 0.22 mm S/. 1,400.00
TUBO DE FIERRO GALVANIZADO DE 3" x 2.00 mm x 6.40 M. S/. 6,083.75
TUBO DE FIERRO GALVANIZADO DE 2" x 2.00 mm x 6.40 M. S/. 3,344.39
ESTABILIZADOR QUIMICO EN POLVO S/. 419,428.35
MECHA O GUIA NARANJA S/. 17,221.80
FULMINANTE S/. 3,174.30
DINAMITA S/. 25,193.34

S/. 836,289.08
E MATERIALES - APERTURA DE TROCHA

SALDO BRUTO lmo MONTO MONTO


FACTOR DE
VALORIZAR Ima Mar - 18 MAXIMO SOLICITADO
RELACION
BASE (SIN IGV)
Mar - 17 A OTORGAR 8
3 6
4 5 7=[1*2*3*4)*(6/5] (**)
1.00000 6,201,247.15 431.87 506.47 3,315,476.03 3,315,476.03

836,289.08

MONTO (S/.)
P.U. P.U. ACT
MONTO (S/.) ACTUAL
S/. S/. SOLICITADO
3.8 2,214.11 4.49 S/. 2,616.15
3.8 2,548.84 4.49 S/. 3,011.65
3.8 1,704.17 4.49 S/. 2,013.61
3.8 359.10 3.80 S/. 359.10
2.5 250.00 2.50 S/. 250.00
26.58 17,691.65 30.47 S/. 20,280.83
5.5 59.95 5.50 S/. 59.95
3.8 1,919.27 3.80 S/. 1,919.27
2.5 280.00 2.50 S/. 280.00
7.94 889.28 7.94 S/. 889.28
3.8 47,026.87 4.46 S/. 55,194.69
566.4 3,270.96 566.40 S/. 3,270.96
224.2 16,431.62 228.47 S/. 16,744.57
20.34 218,163.17 21.45 S/. 230,068.83
35 7,707.00 41.05 S/. 9,039.21
14 455.00 14.00 S/. 455.00
3.95 142.20 3.95 S/. 142.20
24.26 2,717.12 24.26 S/. 2,717.12
44.69 3,217.68 52.41 S/. 3,773.52
39.65 1,427.40 46.50 S/. 1,674.00
25.59 1,576.34 30.01 S/. 1,848.62
30.52 854.56 30.52 S/. 854.56
56.01 1,960.35 56.01 S/. 1,960.35
63.73 1,019.68 63.73 S/. 1,019.68
14 1,400.00 14.00 S/. 1,400.00
45.56 5,306.83 52.23 S/. 6,083.75
26.58 2,917.42 30.47 S/. 3,344.39
2690.68 410,175.06 2,751.38 S/. 419,428.35
1.2 17,221.80 1.20 S/. 17,221.80
1 3,174.30 1.00 S/. 3,174.30
11.5 25,193.34 11.50 S/. 25,193.34
S/. 799,275.07 S/. 836,289.08
01.- INSUMOS DE CONSTRCCUCCION Y OTROS
OPERADOE DE EQUIPO LIVIANO hh 349.51
TOPOGRAFO hh 668.22
OPERARIO hh 5,543.74
OFICIAL hh 12,504.34
PEON hh 39,983.52
CONTROLADOR OFICIAL hh 706.40
PERFORISTA OFICIAL hh 24.32
ALAMBRE NEGRO N° 16 kg 582.66
ALAMBRE NEGRO N° 8 kg 670.75
CLAVOS PARA MADERA CON CABEZA DE 2" kg 448.47
CLAVOS PARA MADERA CON CABEZA DE 5" kg 94.50
FIERRO DE ANCLAJE DE 1/4 X 2 1/2" pza 100.00
TUBERIA METALICA D= 2" m 665.60
CLAVOS PARA CALAMINA kg 10.90
CLAVOS PARA MADERA kg 505.07
PERNO DE 3/8" X 4" pza 112.00
PERNO DE 5/8" X 14" pza 112.00
ACERO CORRUGADO Fý= 4200 KG/CM2 kg 12,375.49
LAMINA REFLECTIVA ALTA INTENSIDAD p2 414.84
PIEDRA MEDIANA m3 208.85
PIEDRA GRANDE m3 899.32
ARENA GRUESA (PUESTA EN OBRA) m3 549.41
MATERIAL PARA AFIRMADO m3 19,055.11
PIEDRA CHANCADA (PUESTA EN OBRA) m3 29.59
MATERIAL GRANULAR PARA RELLENO m3 18.72
ALCANTARILLA TMC D=48" m 5.78
ALCANTARILLA TMC D=24" m 73.29
ASFALTO RC=250 gal 116.64
CODO PCV 6"X15° und 9.70
TEE PVC DE 6" und 36.38
CEMENTO PORTLAND TIPO I (42.5 kg) bls 10,725.82
MECHA O GUIA NARANJA m 14,351.50
FULMINANTE und 3,174.30
DINAMITA kg 2,190.73
YESO DE 28 KG bls 225.73
TECNOPORT E= 1" m2 597.60
THINER gal 4.09
SOLDADURA kg 76.44
BARRENO DE 7/8 x 3.5 Y 8 PIES und 6.46
FIBRA DE VIDRIO DE 4mm ACABADO m2 38.58
PEGAMENTO PARA PVC gal 0.11
NEOPRENO SHORE DE 0.30 X 0.30 mm 3/4" DUREZA 56 und 16.00
WINCHA METALIZA DE 5.00 MTS. und 13.45
WINCHA DE FIBRA DE VIDRIO DE 50 MTS. und 14.39
TRANSPORTE DE MATERIALES A OBRA glb 1.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO glb 1.00
HORMIGOS DE RIO (PUESTO EN OBRA) m3 875.58
COLA SINTETICA gal 0.40
MADERA TORNILLO p2 10,080.00
MADERA CORRIENTE DE 2" x 3" CORREA p2 95.00
MADERA CORRIENTE DE 1" x 10" (TABIQUERIA) p2 350.00
MADERA ROLLIZO DE 6" x 3.50 MTS und 36.00
ESTACA DE MADERA TORNILLO p2 544.02
TRIPLAY DE 12 mm pl 143.58
MADERA CORRIENTE INC CORTE P/ENCOFRADO p2 5,415.75
ANGULO DE 1" x 1" x 3/16" m 220.20
PLATINA DE 1" x 1/8" m 32.50
TOPE DE 1/2" x 3/8" m 36.00
PLATINA DE ACERO DE 4.5" x 3" x 3/8" SEGÚN DISEÑO pza 112.00
PERFIL ALMINADO DE 4" x 4" x 1/4 " m 72.00
PLATINA DE FIERRO DE 8" x 1/4". m 36.00
PLATINA DE ACERO DE 4" x 1/4" m 61.60
PLATINA DE ACERO DE 6" x 6" x 1/2" pza 28.00
DISOLVENTE DILUYENTE INDUSTRIAL gal 5.60
PINTURA ESMALTE gal 64.86
PINTURA ESMALTE POLIUTERANO gal 1.96
PINTURA ANTICORROSIVA ZINC INORGANICO gal 1.40
PINTURA ESMALTE EPOXICA gal 1.40
PLANCHA DE ACERO 5/4" x 8" x 8" und 35.00
PLANCHA DE ACERO ( A-36) DE 0.30 x 0.30 und 16.00
CALAMINA GALVANIZADO DE 1.50 x 0.53 m x 0.22 mm pl 100.00
TUBO DE FIERRO GALVANIZADO DE 3" x 2.00 mm x 6.40 M. m 116.48
TUBO DE FIERRO GALVANIZADO DE 2" x 2.00 mm x 6.40 M. m 109.76
CHALECO REFLECTIVO und 12.00
BANDERINES und 6.00
TRANQUERAS und 4.00
CONO DE SEGURIDAD und 6.00
LAMPARA INTERMITENTE und 4.00
TUBERIA PVC SAP DE 3" m 31.92
TUBERIA PVC SAP DE 6" m 509.36
BANNER 13 ONZ 3.60 x 2.40 M RESOLUCION 600 und 1.00
ESTABILIZADOR QUIMICO EN POLVO kg 152.44
BOLETINES DE NORMAS DE COMPORTAMIENTO und 1.00
BOLETINES AMBIENTALES und 1.00
CONTENEDOR DE BASURRA + 2 RECIPIENTES PLASTICO und 4.00
MATERIAL EDUCATIVO glb 13.00
POLOS CON LOGOTIPO AMBIENTAL ESTAMPADOS und 100.00
ABONO ORGANICO kg 200.00
PLANTONES FORESTALES und 400.00
MADERA RLLIZO DE 12" X 6" X 1.80 M. und 8.00
MADERA TORNILLO DE 2" x 3" x 6.5´ pza 6.00
MADERA TORNILLO DE 2" x 2" x 10´ pza 26.00
MEDICINAS BASICAS glb 4.00
AFICHES AMBIENTALES und 150.00
YESO DE 28 KG bls 18.68
TABLAS DE MADERA TORNILLO pza 30.00
CAJA DE MADERA PARA BOTIQUIN pza 4.00
PINTURA ESMALTE gal 5.60
WINCHA METALICA DE 5.00 METROS und 7.47
1,230,034.77
17.69 6,182.90
17.76 11,867.50
17.14 95,019.69
14.18 177,311.56
13.15 525,783.32
14.18 10,016.71
14.18 344.86
3.80 2,214.11
3.80 2,548.84
3.80 1,704.17
3.80 359.10
2.50 250.00
26.58 17,691.65
5.50 59.95
3.80 1,919.27
2.50 280.00
7.94 889.28
3.80 47,026.87
17.61 7,305.33
120.00 25,062.36
60.00 53,959.20
107.50 59,061.96
0.85 16,196.85
180.00 5,325.62
45.00 842.40
566.40 3,270.96
224.20 16,431.62
18.00 2,099.52
25.00 242.55
25.00 909.56
20.34 218,163.17
1.20 17,221.80
1.00 3,174.30
11.50 25,193.34
15.50 3,498.78
18.00 10,756.80
17.00 69.53
14.00 1,070.16
545.00 3,520.70
28.70 1,107.25
82.00 8.97
1,485.00 23,760.00
16.00 215.26
55.00 791.34
16,151.00 16,151.00
10,738.01 10,738.01
103.33 90,473.45
16.00 6.40
3.20 32,256.00
2.50 237.50
2.50 875.00
15.00 540.00
3.80 2,067.27
85.00 12,204.58
3.80 20,579.85
35.00 7,707.00
14.00 455.00
3.95 142.20
24.26 2,717.12
44.69 3,217.68
39.65 1,427.40
25.59 1,576.34
30.52 854.56
37.72 211.23
38.00 2,464.83
214.84 421.09
42.00 58.80
196.80 275.52
56.01 1,960.35
63.73 1,019.68
14.00 1,400.00
45.56 5,306.83
26.58 2,917.42
35.00 420.00
13.00 78.00
70.00 280.00
50.00 300.00
170.00 680.00
12.00 383.04
20.00 10,187.10
160.00 160.00
2,690.68 410,175.06
2,500.00 2,500.00
1,000.00 1,000.00
300.00 1,200.00
100.00 1,300.00
18.64 1,864.00
1.80 360.00
1.50 600.00
15.00 120.00
25.00 150.00
15.00 390.00
400.00 1,600.00
3.94 591.00
15.50 289.56
7.00 210.00
100.00 400.00
38.00 212.80
16.00 119.52