11 al 17 de mayo 2020 01 al 17 may 2020 Mayo BDGT y FCST 01 ene al 30 abr 2020
mts mts/hr DISP UEDB Disp Real UEBD Real Disp BD UEBD BD Disp Real YTD UEBD Real YTD
pf02
pf03 469 38.4 93.0% 9.7% 95.8% 26.4% 77.6% 25.2% 85.7% 31.7%
pf07 4,725 54.0 96.6% 69.8% 78.7% 46.7% 91.0% 34.1%
pf21 1,423 63.7 84.1% 28.8% 65.2% 21.2% 72.1% 52.1% 81.2% 36.3%
pf22 786 45.8 85.5% 17.8% 82.1% 36.3% 48.7% 53.0% 89.0% 29.4%
pf23 2,938 76.6 93.6% 57.6% 96.2% 30.0% 73.5% 33.3% 91.3% 34.7%
pf24 1,341 26.1 98.1% 45.2% 96.7% 50.7% 69.2% 30.1% 93.6% 32.7%
pf25 1,975 76.8 42.5% 50.8% 74.7% 45.5% 67.0% 65.3% 90.9% 27.4%
pf26 662 28.7 92.9% 34.1% 92.9% 34.1% 70.5% 38.6% 78.8% 45.7%
pf27 72.1% 50.1% 45.3% 39.9%
Sub-Total 14319 58.0 85.4% 39.3% 84.5% 36.8% 68.8% 42.7% 86.7% 33.0%
COMPROMISOS FORO ANTERIOR
COMPROMISOS
Fecha de
Ítem Responsable Estado Cumplimiento
Banco 3305
Tramo de 40 m
UGT 2 sin diseño de
precorte
Tramo de 64 m con
UGT 2
precorte diseñados sin
UGT 12 cargar (pozos 72-105
Malla 09)
UGT 6
UGT 12
B1 cargas desacopladas
(144-150)
B1 carga de fondo
(151-156) UGT 3
UGT 6
Resultados pruebas sin precorte – F10
Precortes no cargados
UGT 12 UGT 2
Cumplimiento berma 0% Offset = 2.5 m Cumplimiento berma 30%
B1 = 4.5 x 5.5 ; 7 7/8”
B2 = 5 x 6 ; 7 7/8”
Offset = 2.5 m
Carga P1 = 6 x 8 ; 10 5/8”
B1 = 4 x 4 ; 7 7/8”
P2 = 10 x 12 ; 12 ¼”
desacoplada B2 = 6 x 6; 10 5/8”
Px = 14 x 14 ; 12 ¼”
en B1 P1 = 7 x 8 ; 10 5/8”
Px = 10 x 11 ; 12 ¼”
Cumplimiento berma 5% Prueba de precortes
no cargados entre
Offset = 3 m
pozos 1-17
Carga B1 = 4.5 x 5.5 ; 7 7/8”
de fondo B2 = 5.5 x 6 ; 7 7/8”
en B1 P1 = 8 x 10 ; 10 5/8”
Px = 14 x 14 ; 12 ¼”
Cumplimiento berma 75% Cumplimiento berma 57% *
Offset = 3 m
B1 = 4 x 4.5 ; 6 1/2”
B2 = 5 x 5.5 ; 6 1/2”
P1 = 6 x 7 ; 7 7/8”
Px = 13 x 14 ; 12 ¼”
Diseño sin precorte Offset = 2.5 m
Cumplimiento berma 45% * B1 = 4 x 4 ; 7 7/8”
B2 = 6 x 6; 10 5/8”
Offset = 2.5 m P1 = 7 x 8 ; 10 5/8”
B1 = 4 x 4.5 ; 6 1/2” Px = 11.5 x 13.5 ; 12 ¼”
B2 = 5 x 5.5 ; 6 1/2”
P1 = 6 x 7 ; 7 7/8”
P2 = 9 x 10 ; 10 5/8”
Px = 11.5 x 13.5 ; 12 ¼”
ID ID
Mecanismo
Tipo
Dip/DipDir Factor
Se propone no cargar precorte en un tramo de 64 m
Mecanism Tipo Dip/DipDi Factor Mecanismo Tipo Estructura
o Mecanismo Tipo Estructura r Segurida Inestabilida
Inestabilidad
[°] Seguridad entre los pozos 146-179 y modificar carga en la fila
d
Inestabilid Inestabilidad
ad
[°] d
9 Falla Plana Joint (“J”) 49 / 130 0.72 B1 entre los pozos 109-122.
10 Falla Plana Joint (“J”) 59 / 125 0.59
1 Falla Plana Joint (“J”) 57 / 121 0.61
11 Falla Plana Joint (“J”) 57 / 128 0.61
2 Falla Plana Joint (“J”) 55 / 125 0.74
3 Falla Plana Joint (“J”) 53 / 119 0.66
12 Falla Plana Joint (“J”) 73 / 124 0.56 Malla 3305-10
13 Falla Plana Joint (“J”) 51 / 118 0.77
4 Falla Plana Joint (“J”) 56 / 117 0.62 14 Falla Plana Joint (“J”) 53 / 121 0.66
5 Falla Plana Joint (“J”) 56 / 130 0.61
B1 Carga Aire Taco
15 Falla Plana Joint (“J”) 57 / 124 0.74
6 Falla Plana Joint (“J”) 60 / 140 0.56 16 Falla Plana Joint (“J”) 56 / 140 0.61 109-122 4m 6m 5m
7 Falla Plana Joint (“J”) 62 / 136 0.56
8 Falla Plana Joint (“J”) 62 / 137 0.56
INDICADORES DE RENDIMIENTO
INFORMACIÓN SEMANAL
Rendimientos Pala 03
Tph
Rendimientos Pala 04
Tph
Rendimientos Pala 05
Tph
Rendimientos Pala 07
Rendimientos Pala 10
Rendimientos Pala 11
Ta s a I n s t a n t á n e a d e E x c a v a c i ó n ( t / h )
2
P80 (”)
Anual Anual
P80 (”) Semana
(2020) (2019)
Global 4.69 4.70 4.58
Primario 5.46 5.50 5.51
3
Secundario 4.50 4.51 4.35
4
Plano de la prueba de Vibraciones
UGT3 F10N-3305-07-09-10-A
N
G1
Distancia collar Precorte (m) 3
Distancia en la pata (m) 0.9
26
Peak Precorte (mm/s) 391.3
Modelo Antes de Filtro
27
Registro Después de Filtro
G1
Filtro: 33%
29
Plano de la prueba de Vibraciones
UGT5 F10N-3335-07-09-A
N
G1
Distancia collar Precorte (m) 2.62
Distancia en la pata (m) 4
31
Peak Precorte (mm/s) 510.00
Modelo Antes de Filtro
32
Medición VOD PEM
RESULTADOS DE TRONADURAS
Revisión de Tronaduras de la Semana – Plan PyT
Resumen Semanal de Tronaduras
COSTO
10.6 31.2 19.5 17.9
(cUsd/ton)
Fase Enero Febrero Marzo Abril Mayo Junio Julio Agosto Septiembre Octubre Noviembre Diciembre
FC Target 227 215 224 217 222 219 211 233 217 202 199 194
Tronadura F11W-3710-02-05-A
Fecha: 14-05-2020
Datos relevantes
Material Lastre
Tonelaje [ton] 526.641
N° de Pozos 182
FC Global [g/t] 167 UGT_6
DATOS MAPEO
Diámetro [pul] 12 ¼” RMR: 41-64
RQD: 5-92%
N
Parámetros de Secuencia
Tiempo entre pozos [ms] 2
Tiempo entre filas [ms] 146
Total de Pozos 444
Pozo de inicio aux1
Tiempo de inicio [ms] 1782
Teórico vs Real
* Pozos cortos de menor longitud que en carga teórica, reducción del consumo de explosivo.
Registro Visual
Tronadura F10N-3305-07-09-10-A
Fecha: 16-05-2020
Datos relevantes
Material Mineral
Tonelaje [ton] 837.886
N° de Pozos 328
UGT_3
DATOS MODELO
RMR: 48-74
FC Global [g/t] 319
RQD: 46-100%
UCS: 70-100 Mpa
Ei: 36 GPa
Diámetro [pul] 12 ¼
BxE [m] 9x9
Secuencia de Detonación N
Parámetros de Secuencia
Tiempo entre pozos [ms] 6
Tiempo entre filas [ms] 126
Total de Pozos 328
Pozo de inicio 613
Tiempo de inicio [ms] 1000
Teórico vs Real