Está en la página 1de 36

RESUMEN

DE METRADOS

PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA
DEL DISTRITO DE LA PERLA - PROVINCIA DE CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

ITEM DESCRIPCIÓN Und. Metrado Precio (S/.) Parcial (S/.)

TOTAL DE OBRA: 0

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES 0

01.01 OBRAS PROVISIONALES 0

01.01.01 CARTEL DE IDENTIFICACION DE OBRA 4.80M X 3.60M. und 1.00 0

01.01.02 ALQUILER DE OFICINA, ALMACEN, CASETA DE GUARDIANIA mes 7.00 0

01.01.04 BAÑO PORTATIL PARA PERSONAL DE OBRA mes 7.00 0

01.02 TRABAJOS PRELIMINARES 0

01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 0

01.02.02 MANTENIMIENTO DE TRÁNSITO - SEÑALIZACIÓN GLB 1.00 0

01.02.03 TRAZO, NIVELES Y REPLANTEO EN OBRA m2 115,474.63 0

01.02.04 ENERGIA ELECTRICA PROVISIONAL, CONSUMO Y MANTENIMIENTO mes 7.00 0

01.03 DEMOLICION Y DESMONTAJE 0

01.03.01 DEMOLICIONES EN PAVIMENTO RIGIDO 0

01.03.01.01 ESCARIFICADO DE PAVIMENTO RIGIDO m2 45,455.05 0

01.03.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 1,443.20 0

01.03.02 DEMOLICIONES EN PAVIMENTO FLEXIBLE 0

01.03.02.01 DEMOLICION DE PAVIMENTO ASFALTICO (E=1") C/EQUIPO (FRESADO) m2 21,863.96 0

01.03.02.02 DEMOLICION DE PAVIMENTO ASFALTICO (E=2") BERMAS LATERALES C/EQUIPO (FREASADO) m2 4.00 0

01.03.02.03 DEMOLICION DE PAVIMENTO 3 cm PARA RECAPEO (FRESADO) m2 46,893.08 0

01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 1,758.49 0

01.03.03 DEMOLICIONES EN VEREDAS, RAMPAS Y MARTILLOS 0

01.03.03.01 DEMOLICION DE VEREDAS DE CONCRETO C/EQUIPO e=0.10m m2 46,004.00 0

01.03.03.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 5,980.52 0

01.03.04 DEMOLICION DE SARDINELES 0

01.03.04.01 DEMOLICION DE SARDINEL PERALTADO C/EQUIPO m 605.39 0

01.03.04.02 DEMOLICION DE SARDINEL SUMERGIDO C/EQUIPO m 383.57 0

01.03.04.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 56.28 0

01.03.05 DEMOLICION DE MACETEROS DE CONCRETO 0

01.03.05.01 DEMOLICION DE MACETEROS DE CONCRETO m3 1.29 0

01.03.05.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 1.67 0

01.03.06 DEMOLICION DE CAMELLON 0

01.03.06.01 DEMOLICION DE CAMELLON m3 424.27 0

01.03.06.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 2,929.30

01.03.07 EXTRACCION DE GRASS EXISTENTE 0

01.03.07.01 EXTRACCION DE GRASS EXISTENTE Y ELIMINACION m2 341.87 0

01.04 SEGURIDAD, SALUD EN EL TRABAJO 0

01.04.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO GLB 1.00 0

01.04.02 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00 0

01.04.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 0

01.04.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 0


RESUMEN
DE METRADOS

PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA
DEL DISTRITO DE LA PERLA - PROVINCIA DE CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

ITEM DESCRIPCIÓN Und. Metrado Precio (S/.) Parcial (S/.)

01.04.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00 0

01.04.06 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO GLB 1.00 0

01.05 PLAN DE DESVIO VEHICULAR 0

01.05.01 SEÑALIZACION DE DESVIO DE TRANSITO EN PERIODO DE CONSTRUCCION und 1.00 0

02 PAVIMENTO RIGIDO 0

02.01 BASE 0

02.01.01 REPARACION DE FISURAS DE PAVIMENTO RIGIDO m2 21,863.96 0

02.01.02 RIEGO DE LIGA m2 187,572.32 0

02.01.03 TENDIDO DE GEOMALLA m2 46,893.08 0

02.01.04 CARPETA ASFALTICA EN CALIENTE DE 3" m2 46,893.08 0

03 PAVIMENTO FLEXIBLE 0

03.01 MOVIMIENTO DE TIERRAS 0

03.01.01 PERFILADO Y COMPACTADO DE SUBRASANTE C/EQUIPO m2 21,863.96 0

03.01.02 EXCAVACION MANUAL A NIVEL DE RASANTE m3 6,559.19 0

03.01.03 BASE DE AFIRMADO DE 30 CM m2 0.00 0

03.02 PAVIMENTO FLEXIBLE 0

03.02.01 IMPRIMACION ASFALTICA CON RC-250 m2 21,863.96 0

03.02.02 TENDIDO DE GEOMALLA m2 21,863.96 0

03.02.03 IMPRIMACION ASFALTICA CON RC-250 m2 43,210.64 0

03.02.04 CARPETA ASFALTICA EN CALIENTE 4" m2 21,863.96 0


RESUMEN
DE METRADOS

PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA
DEL DISTRITO DE LA PERLA - PROVINCIA DE CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

ITEM DESCRIPCIÓN Und. Metrado Precio (S/.) Parcial (S/.)

04 FRESADO - BACHEO PAVIMENTO FLEXIBLE 0

04.01 MOVIMIENTO DE TIERRAS 0

04.01.01 CORTE DE PAVIMENTO CON C/EQUIPO DISCO, DEMOLICION Y ELIMINACION DE LA CARPETA ASFALTICA DAÑADA m2 481.58 0

04.01.02 EXCAVACION MANUAL A NIVEL DE RASANTE m3 144.47 0

04.01.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10Km m3 180.59 0

04.01.04 CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO DE BASE EXISTENTE m2 481.58 0

04.01.05 BASE DE AFIRMADO DE 20 CM m2 96.32 0

04.02 BASE 0

04.02.01 IMPRIMACION ASFALTICA CON RC-250 m2 481.58 0

04.02.02 CARPETA ASFALTICA EN CALIENTE 2" m2 481.58 0

05 RECAPEO 0

5.01 RIEGO DE LIGA m2 46,893.08 0

5.02 CARPETA ASFALTICA EN CALIENTE 3 CM m2 46,893.08 0

06 VEREDA, RAMPAS Y MARTILLOS 0

06.01 MOVIMIENTO DE TIERRAS 0

06.01.01 CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO PARA VEREDAS m2 46,861.62 0

06.01.02 EXCAVACION MANUAL A NIVEL DE RASANTE m3 9,372.32 0

06.01.03 BASE AFIRMADO PARA VEREDAS ESTAMPADA, E=0.10M m2 8,019.48 0

06.01.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10Km m3 11,715.40 0

06.02 VEREDAS 0

06.02.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDA m2 1,472.60 0

06.02.02 CONCRETO PREMEZCLADO F'C=175KG/CM2 PARA VEREDAS E=10CM, INC. ACABADO Y SEMIPULIDO m2 1,667.22 0

06.02.03 CONCRETO PREMEZCLADO F'C= 175KG/CM2 PARA VEREDAS E=10 CM INC. ACABADO,SEMIPULIDO Y ESTAMPADO m2 1,556.31 0

06.02.04 CONCRETO PREMEZCLADO F'C=175KG/CM2 P/UÑAS m3 72.30 0

06.02.05 CURADO DE CONCRETO m2 542.24 0

06.02.06 JUNTAS ASFÀLTICAS E = 1" m 3,614.92 0

06.03 RAMPAS 0

06.03.01 CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO PARA RAMPAS m2 857.62 0

06.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA RAMPA m2 142.87 0

06.03.03 CONCRETO PREMEZCLADO F'C=175KG/CM2 PARA RAMPAS E=10CM, INC. ACABADO Y SEMIPULIDO m2 128.64 0

06.04 ESCALONES 0

06.04.01 CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO PARA ESCALONES m2 4.00 0

06.04.02 ENCOFRADO Y DESENCOFRADO NORMAL DE CONTRAPASO m2 1.00 0

06.04.03 CONCRETO PREMEZCLADO F'C=175KG/CM2 PARA ESCALONES GARGANTE H=20CM m2 1.00 0

07 CAMELLON 0

07.01 MOVIMIENTO DE TIERRAS 0

07.01.01 EXCAVACION MANUAL A NIVEL DE RASANTE m3 91.00 0

07.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 91.00 0

07.01.03 BASE DE AFIRMADO DE 20 CM m2 0.00 0

07.01.04 PERFILADO DE SUBRASANTE MANUAL m2 92.00 0


RESUMEN
DE METRADOS

PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA
DEL DISTRITO DE LA PERLA - PROVINCIA DE CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

ITEM DESCRIPCIÓN Und. Metrado Precio (S/.) Parcial (S/.)

07.01.05 CAMA DE ARENA DE E=0.05m P/PISO ADOQUIN m2 92.00 0

07.02 PISO ADOQUIN 0

07.02.01 ACERO DE REFUERZO FY=4200 kg/cm2 - SARDINEL PERALTADO kg 82.00 0

07.02.02 PISO DE ADOQUINES DE 10X20X6 cm - COLOR SEGUN DISEÑO m2 91.00 0

08 PISO ADOQUINADO 0

08.01 MOVIMIENTO DE TIERRAS 0

08.01.01 PERFILADO DE SUBRASANTE MANUAL m2 126.00 0

08.01.02 CAMA DE ARENA DE E=0.05m P/PISO ADOQUIN m2 8.00 0

08.02 PISO ADOQUIN 0

08.02.01 PISO DE ADOQUINES DE 10X20X6 cm - COLOR SEGUN DISEÑO m2 82.00 0

09 SARDINEL PERALTADO PREFABRICADO 0

09.01 MOVIMIENTO DE TIERRAS 0

09.01.01 EXCAVACION MANUAL A NIVEL DE RASANTE m3 91.00 0

09.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 91.00 0

09.02 CONCRETO ARMADO 0

09.02.01 SARDINEL PREFABRICADO 1.00 x 0.15 x 0.35 F'C=210 KG/CM2 m 92.00 0

09.02.02 CURADO DE CONCRETO m2 92.00 0

09.02.03 JUNTA ASFALTICA E=1" m2 92.00 0


RESUMEN
DE METRADOS

PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA
DEL DISTRITO DE LA PERLA - PROVINCIA DE CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

ITEM DESCRIPCIÓN Und. Metrado Precio (S/.) Parcial (S/.)

10 SARDINEL PERALTADO 0

10.01 MOVIMIENTO DE TIERRAS 0

10.01.01 EXCAVACION A NIVEL DE RASANTE C/EQUIPO m3 10.00 0

10.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 10.00 0

10.02 CONCRETO ARMADO 0

10.02.01 ACERO DE REFUERZO FY=4200 kg/cm2 - SARDINEL PERALTADO kg 10.20 0

10.02.02 ENCOFRADO Y DESENCOFRADO P/SARDINEL PERALTADO m2 10.20 0

10.02.03 CONCRETO PREMEZCLADO f'c=210kg/cm2 PARA SARDINEL PERALTADO m3 10.20 0

10.02.04 CURADO DE CONCRETO m2 10.20 0

10.02.05 JUNTA ASFALTICA E=1" m2 10.20 0

11 SARDINEL SUMERGIDO 0

11.01 MOVIMIENTO DE TIERRAS 0

11.01.01 EXCAVACION A NIVEL DE RASANTE C/EQUIPO m3 11.00 0

11.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 11.00 0

11.02 CONCRETO ARMADO 0

11.02.01 ACERO DE REFUERZO FY=4200 kg/cm2 - SARDINEL SUMERGIDO kg 11.20 0

11.02.02 ENCOFRADO Y DESENCOFRADO P/SARDINEL SUMERGIDO m2 11.20 0

11.02.03 CONCRETO PREMEZCLADO f'c=210kg/cm2 PARA SARDINEL SUMERGIDO m3 11.20 0

11.02.04 CURADO DE CONCRETO m2 11.20 0

11.02.05 JUNTA ASFALTICA E=1" m2 11.20 0

12 OBRAS COMPLEMENTARIAS 0

12.01 MOBILIARIO 0

12.01.01 INSTALACION DE MOBILIARIOS 0

12.01.01.01 SUMINISTRO E INSTALACION DE PARADEROS und 12.10 0

12.01.01.02 SUMINISTRO E INSTALACION DE DEPOSITO DE RESIDUOS DE FIBRA DE VIDRIO und 12.10 0

12.01.01.03 MANTENIMIENTO DE ESTRUCTURA FORMA DE ESTRELLA Y PEDESTAL CON MONUMENTO. GLB 12.10 0

12.01.01.04 BARANDA EN RAMPA GLB 12.10 0

12.01.02 MACETEROS DE CONCRETO 0

12.01.02.01 MOVIMIENTO DE TIERRAS 0

12.01.02.01.01 EXCAVACION A NIVEL DE RASANTE C/EQUIPO m3 12.20 0

12.01.02.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 12.20 0

12.01.02.02 CONCRETO ARMADO 0

12.01.02.02.01 ACERO DE REFUERZO FY=4200 kg/cm2 - SARDINEL SUMERGIDO kg 12.20 0

12.01.02.02.02 ENCOFRADO Y DESENCOFRADO P/SARDINEL SUMERGIDO m2 12.20 0

12.01.02.02.03 CONCRETO PREMEZCLADO F'C= 210 KG/CM2 INC ACABADO TIPO RUSTICO m3 12.20 0

12.01.02.02.04 CURADO DE CONCRETO m2 12.20 0


RESUMEN
DE METRADOS

PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA
DEL DISTRITO DE LA PERLA - PROVINCIA DE CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

ITEM DESCRIPCIÓN Und. Metrado Precio (S/.) Parcial (S/.)

12.02 PINTURA Y SEÑALIZACION 0

12.02.01 SUMINISTRO Y COLOCACION DE TACHAS INC. ACCESORIOS und 12.30 0

12.02.02 PINTURA TRAFICO EN BORDE DE VEREDAS m 12.30 0

12.02.03 PINTURA TRAFICO EN BORDE DE RAMPAS m 12.30 0

12.02.04 PINTURA SARDINEL PERALTADO PREFABRICADO m 12.30 0

12.02.05 PINTURA SARDINEL PERALTADO m 12.30 0

12.02.06 PINTURA EN SARDINEL SUMERGIDO m 12.30 0

12.02.07 PINTADO DE PAVIMENTO (LINEAS DISCONTINUAS) m 12.30 0

12.02.08 PINTADO DE PAVIMENTO (SIMBOLOS Y LETRAS) m2 12.30 0

12.02.09 SUMINISTRO E INSTALACION DE BOLARDO DE CONCRETO INC. ACCESORIOS und 12.30 0

12.02.10 SEÑAL INFORMATIVA (SEÑALES VERTICALES DE TRANSITO) und 12.30 0

12.03 JARDINERIA 0

12.03.01 MOVIMIENTO DE TIERRAS 0

12.03.01.01 EXCAVACION MANUAL PARA AREA VERDE m3 12.40 0

12.03.01.02 PREPARACION DE TERRENO PARA COLOCACION DE AREA VERDE E=0.10 m2 12.40 0

12.03.01.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 12.40 0

12.03.02 JARDINERIA 0.00 0

12.03.02.01 SUMINISTRO Y COLOCACION DE FLOR TIPO LAUREL und 12.40 0

12.03.02.02 SUMINISTRO Y COLOCACION DE ARBUSTO TIPO CROTON und 12.40 0

12.03.02.03 SUMINISTRO E INSTALACION DE GRASS NATURAL m2 12.40 0

12.03.02.04 CONSERVACION Y RIEGO DE JARDINES m2 12.40 0

12.04 MITIGACION DE IMPACTO AMBIENTAL 0

12.04.01 MITIGACION DE IMPACTO AMBIENTAL GLB 12.50 0

12.05 VARIOS 0

12.05.01 REUBICACION DE PALMERAS und 12.50 0

12.05.02 REUBICACION DE MACETAS EXISTENTES und 12.50 0

12.05.03 REUBICACION DE POSTE CON SEÑALIZACION und 12.50 0

12.05.04 REUBICACION DE SEMAFORO und 12.50 0

12.05.05 REUBICACION DE ARBUSTO und 12.50 0

12.05.06 REUBICACION DE ARBOL und 12.50 0

12.05.07 LIMPIEZA FINAL DE LA OBRA m2 12.50 0


RESUMEN
DE METRADOS

PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA
DEL DISTRITO DE LA PERLA - PROVINCIA DE CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

ITEM DESCRIPCIÓN Und. Metrado Precio (S/.) Parcial (S/.)

13 INSTALACIONES ELECTRICAS

13.01 OBRAS PRELIMINARES

13.01.01 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR glb 1.00

13.02 MOVIMIENTOS DE TIERRA

13.02.01 EXCAVACION DE HOYO PARA POSTES m3 10.00

13.02.02 EXCAVACION DE ZANJA PARA CABLES SUBTERRANEOS 0.60m PROFUNDIDAD ml 3,200.00

13.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 460.00

13.02.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 460.00

13.03 SUMINISTRO E INSTALACION DE CABLES SUBTERRANEOS

13.03.01 CABLE ELECTRICO N2XOH 3-1x6mm2 m 3,500.00

13.03.05 CABLE ELECTRICO NH80 LINEA A TIERRA 1-1x6mm2 m 3,500.00

13.04 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS

13.04.01 KIT DE DERIVACION 6MM und 1.00

13.05 TABLERO ELECTRICO DE PROTECCION Y CONTROL

13.05.01 MURETE DE 175kg/cm2 CON BASE PRISMATICA PARA MEDIDOR Y TABLERO und 3.00

12.05.04 TABLERO DE DISTRIBUCION DE 40 POLOS, IP 65 und 3.00

12.05.05 INTERRUPTOR TERMOMAGNETICO 3X32A 10kA CAJA MOLDEADA und 3.00

12.05.06 INTERRUPTOR TERMOMAGNETICO RIEL DIN 3x16A 6kA und 5.00

12.05.07 INTERRUPTOR DIFERENCIAL RIEL DIN 4X25A, 30mA und 5.00

12.05.08 CONTACTOR RIEL DIN 3x25 A und 5.00

12.05.09 INTERRUPTOR HORARIO 16 A und 5.00

12.06 SUMINISTRO E INSTALACION DE LUMINARIAS Y POSTES

12.06.01 CONCRETO FC=175 KG/CM2 PARA BASE DE POSTE CON 5CM SOBRE EL NPT m3 12.00

12.06.02 POSTE METALICO CONICO DE 5.00m, CON BASE PLANA PARA LUMINARIA und 50.00

12.06.03 LUMINARIA TIPO ALUMBRADO PUBLICO LED 10000lm,100W,CRI>80,6500K,IP65 und 50.00

LUMINARIA SPOT PARA PISO EXTERIOR LED 6000lm,30W,CRI>70,3000K,IP66 und 4.00

12.07 SISTEMA DE PUESTA A TIERRA

12.07.01 SISTEMA DE PUESTA A TIERRA 25 OHM und 3.00

12.08 ENSAYOS ELECTRICOS Y OTROS


PRUEBAS ELECTRICAS
12.08.01 glb 1.00

12.08.02 SUMINISTRO FACTIBILIDAD DE ENERGIA ELECTRICA und 3.00


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES

01.01 OBRAS PROVISIONALES 0.00

01.01.01 CARTEL DE IDENTIFICACION DE OBRA 4.80M X 3.60M. und 1.00 1.00 1.00 1.00

01.01.02 ALQUILER DE OFICINA, ALMACEN, CASETA DE GUARDIANIA mes 7.00 1.00 7.00 7.00

01.01.03 BAÑO PORTATIL PARA PERSONAL DE OBRA mes 7.00 1.00 7.00 7.00

01.02 TRABAJOS PRELIMINARES

01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 1.00 1.00 1.00

01.02.02 MANTENIMIENTO DE TRÁNSITO - SEÑALIZACIÓN GLB 1.00 1.00 1.00 1.00

01.02.03 TRAZO, NIVELES Y REPLANTEO EN OBRA m2 115,474.63

VEREDAS TRAMO I : (PROG. 0+000 - 0+540) m2 ÁREA 3,985.10

VD1-TR1 TRAMO I m2 1.00 1.00 585.37 585.37

VD2-TR1 TRAMO I m2 1.00 1.00 66.30 66.30

VD3-TR1 TRAMO I m2 1.00 1.00 20.77 20.77

VD4-TR1 TRAMO I m2 1.00 1.00 97.97 97.97

VD5-TR1 TRAMO I m2 1.00 1.00 38.46 38.46

VD6-TR1 TRAMO I m2 1.00 1.00 17.69 17.69

VD7-TR1 TRAMO I m2 1.00 1.00 675.21 675.21

VD8-TR1 TRAMO I m2 1.00 1.00 41.84 41.84

VD9-TR1 TRAMO I m2 1.00 1.00 223.07 223.07

VD10-TR1 TRAMO I m2 1.00 1.00 130.26 130.26

VD11-TR1 TRAMO I m2 1.00 1.00 176.67 176.67

VD12-TR1 TRAMO I m2 1.00 1.00 226.33 226.33

VD13-TR1 TRAMO I m2 1.00 1.00 137.14 137.14

VD14-TR1 TRAMO I m2 1.00 1.00 84.22 84.22

VD15-TR1 TRAMO I m2 1.00 1.00 62.76 62.76

VD16-TR1 TRAMO I m2 1.00 1.00 45.35 45.35

VD17-TR1 TRAMO I m2 1.00 1.00 93.45 93.45

VD18-TR1 TRAMO I m2 1.00 1.00 14.43 14.43

VD19-TR1 TRAMO I m2 1.00 1.00 53.17 53.17

VD20-TR1 TRAMO I m2 1.00 1.00 170.46 170.46

VD21-TR1 TRAMO I m2 1.00 1.00 128.15 128.15

VD22-TR1 TRAMO I m2 1.00 1.00 24.37 24.37

VD23-TR1 TRAMO I m2 1.00 1.00 16.10 16.10

VD24-TR1 TRAMO I m2 1.00 1.00 44.49 44.49

VD25-TR1 TRAMO I m2 1.00 1.00 16.50 16.50

VD26-TR1 TRAMO I m2 1.00 1.00 13.18 13.18

VD27-TR1 TRAMO I m2 1.00 1.00 47.51 47.51

VD28-TR1 TRAMO I m2 1.00 1.00 17.01 17.01

VD29-TR1 TRAMO I m2 1.00 1.00 34.72 34.72

VD30-TR1 TRAMO I m2 1.00 1.00 80.80 80.80

VD31-TR1 TRAMO I m2 1.00 1.00 10.38 10.38

VD32-TR1 TRAMO I m2 1.00 1.00 121.27 121.27

VD33-TR1 TRAMO I m2 1.00 1.00 6.98 6.98

VD34-TR1 TRAMO I m2 1.00 1.00 13.96 13.96

VD35-TR1 TRAMO I m2 1.00 1.00 67.71 67.71

VD36-TR1 TRAMO I m2 1.00 1.00 32.77 32.77

VD37-TR1 TRAMO I m2 1.00 1.00 44.83 44.83

VD38-TR1 TRAMO I m2 1.00 1.00 28.48 28.48

VD39-TR1 TRAMO I m2 1.00 1.00 24.64 24.64

VD40-TR1 TRAMO I m2 1.00 1.00 26.81 26.81

VD41-TR1 TRAMO I m2 1.00 1.00 18.23 18.23

VD42-TR1 TRAMO I m2 1.00 1.00 66.64 66.64

VD43-TR1 TRAMO I m2 1.00 1.00 13.80 13.80

VD44-TR1 TRAMO I m2 1.00 1.00 16.88 16.88

VD45-TR1 TRAMO I m2 1.00 1.00 40.82 40.82

VD46-TR1 TRAMO I m2 1.00 1.00 67.15 67.15

VEREDAS TRAMO I I : (PROG. 0+540 - 1+030) m2 ÁREA 3,741.54

VD1-TR2 TRAMO II m2 1.00 1.00 36.68 36.68

VD2-TR2 TRAMO II m2 1.00 1.00 27.51 27.51

VD3-TR2 TRAMO II m2 1.00 1.00 24.53 24.53

VD4-TR2 TRAMO II m2 1.00 1.00 39.57 39.57

VD5-TR2 TRAMO II m2 1.00 1.00 25.50 25.50

VD6-TR2 TRAMO II m2 1.00 1.00 64.85 64.85

VD7-TR2 TRAMO II m2 1.00 1.00 36.23 36.23

VD8-TR2 TRAMO II m2 1.00 1.00 63.80 63.80


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

VD9-TR2 TRAMO II m2 1.00 1.00 15.48 15.48

VD10-TR2 TRAMO II m2 1.00 1.00 86.34 86.34

VD11-TR2 TRAMO II m2 1.00 1.00 41.42 41.42

VD12-TR2 TRAMO II m2 1.00 1.00 24.02 24.02

VD13-TR2 TRAMO II m2 1.00 1.00 73.93 73.93

VD14-TR2 TRAMO II m2 1.00 1.00 96.87 96.87

VD15-TR2 TRAMO II m2 1.00 1.00 52.97 52.97

VD16-TR2 TRAMO II m2 1.00 1.00 93.62 93.62

VD17-TR2 TRAMO II m2 1.00 1.00 66.17 66.17

VD18-TR2 TRAMO II m2 1.00 1.00 8.21 8.21

VD19-TR2 TRAMO II m2 1.00 1.00 53.54 53.54

VD20-TR2 TRAMO II m2 1.00 1.00 8.68 8.68

VD21-TR2 TRAMO II m2 1.00 1.00 28.06 28.06

VD22-TR2 TRAMO II m2 1.00 1.00 147.35 147.35

VD23-TR2 TRAMO II m2 1.00 1.00 143.95 143.95

VD24-TR2 TRAMO II m2 1.00 1.00 12.08 12.08

VD25-TR2 TRAMO II m2 1.00 1.00 199.96 199.96

VD26-TR2 TRAMO II m2 1.00 1.00 157.84 157.84

VD27-TR2 TRAMO II m2 1.00 1.00 5.21 5.21

VD28-TR2 TRAMO II m2 1.00 1.00 20.94 20.94

VD29-TR2 TRAMO II m2 1.00 1.00 1.88 1.88

VD30-TR2 TRAMO II m2 1.00 1.00 11.73 11.73

VD31-TR2 TRAMO II m2 1.00 1.00 29.87 29.87

VD32-TR2 TRAMO II m2 1.00 1.00 19.44 19.44

VD33-TR2 TRAMO II m2 1.00 1.00 140.67 140.67

VD34-TR2 TRAMO II m2 1.00 1.00 116.30 116.30

VD35-TR2 TRAMO II m2 1.00 1.00 235.05 235.05

VD36-TR2 TRAMO II m2 1.00 1.00 48.39 48.39

VD37-TR2 TRAMO II m2 1.00 1.00 213.50 213.50

VD38-TR2 TRAMO II m2 1.00 1.00 14.50 14.50

VD39-TR2 TRAMO II m2 1.00 1.00 218.58 218.58

VD40-TR2 TRAMO II m2 1.00 1.00 19.70 19.70

VD41-TR2 TRAMO II m2 1.00 1.00 7.72 7.72

VD42-TR2 TRAMO II m2 1.00 1.00 218.58 218.58

VD43-TR2 TRAMO II m2 1.00 1.00 281.68 281.68

VD44-TR2 TRAMO II m2 1.00 1.00 196.69 196.69

VD45-TR2 TRAMO II m2 1.00 1.00 245.55 245.55

VD46-TR2 TRAMO II m2 1.00 1.00 55.93 55.93

VD46-TR2 TRAMO II m2 1.00 1.00 10.47 10.47

VEREDAS TRAMO III : (PROG. 1+030- 1+660) m2 ÁREA 3,587.16

DV-01-TR3 TRAMO III m2 1.00 1.00 319.46 319.46

DV-02-TR3 TRAMO III m2 1.00 1.00 162.55 162.55

DV-03-TR3 TRAMO III m2 1.00 1.00 19.17 19.17

DV-04-TR3 TRAMO III m2 1.00 1.00 241.73 241.73

DV-05-TR3 TRAMO III m2 1.00 1.00 21.59 21.59

DV-06-TR3 TRAMO III m2 1.00 1.00 15.04 15.04

DV-07-TR3 TRAMO III m2 1.00 1.00 197.56 197.56

DV-08-TR3 TRAMO III m2 1.00 1.00 32.43 32.43

DV-09-TR3 TRAMO III m2 1.00 1.00 209.51 209.51

DV-10-TR3 TRAMO III m2 1.00 1.00 40.00 40.00

DV-11-TR3 TRAMO III m2 1.00 1.00 972.75 972.75

DV-12-TR3 TRAMO III m2 1.00 1.00 48.03 48.03

DV-13-TR3 TRAMO III m2 1.00 1.00 22.32 22.32

DV-14-TR3 TRAMO III m2 1.00 1.00 41.73 41.73

DV-15-TR3 TRAMO III m2 1.00 1.00 22.05 22.05

DV-16-TR3 TRAMO III m2 1.00 1.00 27.01 27.01

DV-17-TR3 TRAMO III m2 1.00 1.00 22.12 22.12

DV-18-TR3 TRAMO III m2 1.00 1.00 16.90 16.90

DV-19-TR3 TRAMO III m2 1.00 1.00 14.17 14.17

DV-20-TR3 TRAMO III m2 1.00 1.00 11.91 11.91

DV-21-TR3 TRAMO III m2 1.00 1.00 39.48 39.48

DV-22-TR3 TRAMO III m2 1.00 1.00 47.76 47.76

DV-23-TR3 TRAMO III m2 1.00 1.00 12.73 12.73

DV-24-TR3 TRAMO III m2 1.00 1.00 10.18 10.18


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

DV-25-TR3 TRAMO III m2 1.00 1.00 10.48 10.48

DV-26-TR3 TRAMO III m2 1.00 1.00 54.92 54.92

DV-27-TR3 TRAMO III m2 1.00 1.00 22.94 22.94

DV-28-TR3 TRAMO III m2 1.00 1.00 147.90 147.90

DV-29-TR3 TRAMO III m2 1.00 1.00 718.33 718.33

DV-30-TR3 TRAMO III m2 1.00 1.00 19.37 19.37

DV-31-TR3 TRAMO III m2 1.00 1.00 39.07 39.07

DV-32-TR3 TRAMO III m2 1.00 1.00 5.97 5.97

VEREDAS TRAMO IV : (PROG. 1+660- 2+140) m2 ÁREA 1,988.14

VD1-TR4 TRAMO IV m2 1.00 1.00 29.75 29.75

VD2-TR4 TRAMO IV m2 1.00 1.00 40.23 40.23

VD3-TR4 TRAMO IV m2 1.00 1.00 125.85 125.85

VD4-TR4 TRAMO IV m2 1.00 1.00 316.55 316.55

VD5-TR4 TRAMO IV m2 1.00 1.00 122.03 122.03

VD6-TR4 TRAMO IV m2 1.00 1.00 151.81 151.81

VD7-TR4 TRAMO IV m2 1.00 1.00 33.02 33.02

VD8-TR4 TRAMO IV m2 1.00 1.00 96.48 96.48

VD9-TR4 TRAMO IV m2 1.00 1.00 126.09 126.09

VD10-TR4 TRAMO IV m2 1.00 1.00 36.84 36.84

VD11-TR4 TRAMO IV m2 1.00 1.00 87.73 87.73

VD12-TR4 TRAMO IV m2 1.00 1.00 122.91 122.91

VD13-TR4 TRAMO IV m2 1.00 1.00 115.60 115.60

VD14-TR4 TRAMO IV m2 1.00 1.00 460.69 460.69

VD15-TR4 TRAMO IV m2 1.00 1.00 82.68 82.68

VD16-TR4 TRAMO IV m2 1.00 1.00 39.88 39.88

VEREDAS TRAMO V : (PROG. 2+140- 2+650) m2 ÁREA 2,147.89

DMV1-TR5 TRAMO V m2 1.00 1.00 29.80 29.80

DMV2-TR5 TRAMO V m2 1.00 1.00 78.58 78.58

DMV3-TR5 TRAMO V m2 1.00 1.00 34.92 34.92

DMV4-TR5 TRAMO V m2 1.00 1.00 143.29 143.29

DMV5-TR5 TRAMO V m2 1.00 1.00 254.24 254.24

DMV6-TR5 TRAMO V m2 1.00 1.00 52.92 52.92

DMV7-TR5 TRAMO V m2 1.00 1.00 29.62 29.62

DMV8-TR5 TRAMO V m2 1.00 1.00 25.81 25.81

DMV9-TR5 TRAMO V m2 1.00 1.00 246.23 246.23

DMV10-TR5 TRAMO V m2 1.00 1.00 31.17 31.17

DMV11-TR5 TRAMO V m2 1.00 1.00 49.09 49.09

DMV12-TR5 TRAMO V m2 1.00 1.00 13.65 13.65

DMV13-TR5 TRAMO V m2 1.00 1.00 14.33 14.33

DMV14-TR5 TRAMO V m2 1.00 1.00 22.02 22.02

DMV15-TR5 TRAMO V m2 1.00 1.00 19.40 19.40

DMV16-TR5 TRAMO V m2 1.00 1.00 19.03 19.03

DMV17-TR5 TRAMO V m2 1.00 1.00 11.56 11.56

DMV18-TR5 TRAMO V m2 1.00 1.00 9.04 9.04

DMV19-TR5 TRAMO V m2 1.00 1.00 18.81 18.81

DMV20-TR5 TRAMO V m2 1.00 1.00 16.05 16.05

DMV21-TR5 TRAMO V m2 1.00 1.00 39.17 39.17

DMV22-TR5 TRAMO V m2 1.00 1.00 74.11 74.11

DMV23-TR5 TRAMO V m2 1.00 1.00 26.29 26.29

DMV24-TR5 TRAMO V m2 1.00 1.00 324.75 324.75

DMV25-TR5 TRAMO V m2 1.00 1.00 31.03 31.03

DMV26-TR5 TRAMO V m2 1.00 1.00 269.15 269.15

DMV27-TR5 TRAMO V m2 1.00 1.00 160.08 160.08

DMV28-TR5 TRAMO V m2 1.00 1.00 43.75 43.75

DMV29-TR5 TRAMO V m2 1.00 1.00 34.00 34.00

DMV30-TR5 TRAMO V m2 1.00 1.00 26.00 26.00

VEREDAS ESTAMPADAS TRAMO I : (PROG. 0+000 - 0+540) m2 ÁREA 1,414.65

VE1-TR1 TRAMO I m2 1.00 1.00 253.34 253.34

VE2-TR1 TRAMO I m2 1.00 1.00 37.36 37.36

VE3-TR1 TRAMO I m2 1.00 1.00 45.18 45.18

VE4-TR1 TRAMO I m2 1.00 1.00 2.34 2.34

VE5-TR1 TRAMO I m2 1.00 1.00 2.39 2.39

VE6-TR1 TRAMO I m2 1.00 1.00 11.11 11.11

VE7-TR1 TRAMO I m2 1.00 1.00 7.82 7.82


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

VE8-TR1 TRAMO I m2 1.00 1.00 54.20 54.20

VE9-TR1 TRAMO I m2 1.00 1.00 16.87 16.87

VE10-TR1 TRAMO I m2 1.00 1.00 46.97 46.97

VE11-TR1 TRAMO I m2 1.00 1.00 10.10 10.10

VE12-TR1 TRAMO I m2 1.00 1.00 7.80 7.80

VE13-TR1 TRAMO I m2 1.00 1.00 8.02 8.02

VE14-TR1 TRAMO I m2 1.00 1.00 6.70 6.70

VE15-TR1 TRAMO I m2 1.00 1.00 8.16 8.16

VE16-TR1 TRAMO I m2 1.00 1.00 6.56 6.56

VE17-TR1 TRAMO I m2 1.00 1.00 6.39 6.39

VE18-TR1 TRAMO I m2 1.00 1.00 52.55 52.55

VE19-TR1 TRAMO I m2 1.00 1.00 48.91 48.91

VE20-TR1 TRAMO I m2 1.00 1.00 49.08 49.08

VE21-TR1 TRAMO I m2 1.00 1.00 6.65 6.65

VE22-TR1 TRAMO I m2 1.00 1.00 10.40 10.40

VE23-TR1 TRAMO I m2 1.00 1.00 7.22 7.22

VE24-TR1 TRAMO I m2 1.00 1.00 11.50 11.50

VE25-TR1 TRAMO I m2 1.00 1.00 38.83 38.83

VE26-TR1 TRAMO I m2 1.00 1.00 54.90 54.90

VE27-TR1 TRAMO I m2 1.00 1.00 32.48 32.48

VE28-TR1 TRAMO I m2 1.00 1.00 16.58 16.58

VE29-TR1 TRAMO I m2 1.00 1.00 8.94 8.94

VE30-TR1 TRAMO I m2 1.00 1.00 6.75 6.75

VE31-TR1 TRAMO I m2 1.00 1.00 5.43 5.43

VE32-TR1 TRAMO I m2 1.00 1.00 74.78 74.78

VE33-TR1 TRAMO I m2 1.00 1.00 135.61 135.61

VE34-TR1 TRAMO I m2 1.00 1.00 141.38 141.38

VE35-TR1 TRAMO I m2 1.00 1.00 80.70 80.70

VE36-TR1 TRAMO I m2 1.00 1.00 100.65 100.65

VEREDAS ESTAMPADAS TRAMO II: (PROG. 0+540 - 1+030) m2 ÁREA 1,501.00

VE1-TR2 TRAMO II m2 1.00 1.00 358.06 358.06

VE2-TR2 TRAMO II m2 1.00 1.00 369.37 369.37

VE3-TR2 TRAMO II m2 1.00 1.00 100.39 100.39

VE4-TR2 TRAMO II m2 1.00 1.00 158.42 158.42

VE5-TR2 TRAMO II m2 1.00 1.00 42.10 42.10

VE6-TR2 TRAMO II m2 1.00 1.00 18.99 18.99

VE7-TR2 TRAMO II m2 1.00 1.00 18.74 18.74

VE8-TR2 TRAMO II m2 1.00 1.00 3.71 3.71

VE9-TR2 TRAMO II m2 1.00 1.00 78.63 78.63

VE10-TR2 TRAMO II m2 1.00 1.00 25.03 25.03

VE11-TR2 TRAMO II m2 1.00 1.00 4.85 4.85

VE12-TR2 TRAMO II m2 1.00 1.00 19.47 19.47

VE13-TR2 TRAMO II m2 1.00 1.00 1.76 1.76

VE14-TR2 TRAMO II m2 1.00 1.00 10.94 10.94

VE15-TR2 TRAMO II m2 1.00 1.00 18.19 18.19

VE16-TR2 TRAMO II m2 1.00 1.00 70.21 70.21

VE17-TR2 TRAMO II m2 1.00 1.00 31.46 31.46

VE18-TR2 TRAMO II m2 1.00 1.00 14.71 14.71

VE19-TR2 TRAMO II m2 1.00 1.00 11.82 11.82

VE20-TR2 TRAMO II m2 1.00 1.00 102.13 102.13

VE21-TR2 TRAMO II m2 1.00 1.00 17.93 17.93

VE22-TR2 TRAMO II m2 1.00 1.00 24.10 24.10

VEREDAS ESTAMPADAS TRAMO III : (PROG. 1+030- 1+660) m2 ÁREA 1,517.23

VE1-TR3 TRAMO III m2 1.00 1.00 142.91 142.91

VE2-TR3 TRAMO III m2 1.00 1.00 27.34 27.34

VE3-TR3 TRAMO III m2 1.00 1.00 132.18 132.18

VE4-TR3 TRAMO III m2 1.00 1.00 44.38 44.38

VE5-TR3 TRAMO III m2 1.00 1.00 10.90 10.90

VE6-TR3 TRAMO III m2 1.00 1.00 12.79 12.79

VE7-TR3 TRAMO III m2 1.00 1.00 24.24 24.24

VE8-TR3 TRAMO III m2 1.00 1.00 15.95 15.95

VE9-TR3 TRAMO III m2 1.00 1.00 26.53 26.53

VE10-TR3 TRAMO III m2 1.00 1.00 11.39 11.39

VE11-TR3 TRAMO III m2 1.00 1.00 18.87 18.87


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

VE12-TR3 TRAMO III m2 1.00 1.00 3.84 3.84

VE13-TR3 TRAMO III m2 1.00 1.00 119.88 119.88

VE14-TR3 TRAMO III m2 1.00 1.00 4.66 4.66

VE15-TR3 TRAMO III m2 1.00 1.00 16.80 16.80

VE16-TR3 TRAMO III m2 1.00 1.00 17.16 17.16

VE17-TR3 TRAMO III m2 1.00 1.00 16.87 16.87

VE18-TR3 TRAMO III m2 1.00 1.00 66.20 66.20

VE19-TR3 TRAMO III m2 1.00 1.00 14.76 14.76

VE20-TR3 TRAMO III m2 1.00 1.00 48.15 48.15

VE21-TR3 TRAMO III m2 1.00 1.00 53.96 53.96

VE22-TR3 TRAMO III m2 1.00 1.00 118.89 118.89

VE23-TR3 TRAMO III m2 1.00 1.00 5.32 5.32

VE24-TR3 TRAMO III m2 1.00 1.00 11.38 11.38

VE25-TR3 TRAMO III m2 1.00 1.00 39.05 39.05

VE26-TR3 TRAMO III m2 1.00 1.00 64.56 64.56

VE27-TR3 TRAMO III m2 1.00 1.00 30.37 30.37

VE28-TR3 TRAMO III m2 1.00 1.00 8.49 8.49

VE29-TR3 TRAMO III m2 1.00 1.00 2.30 2.30

VE30-TR3 TRAMO III m2 1.00 1.00 58.22 58.22

VE31-TR3 TRAMO III m2 1.00 1.00 88.57 88.57

VE32-TR3 TRAMO III m2 1.00 1.00 143.99 143.99

VE33-TR3 TRAMO III m2 1.00 1.00 116.33 116.33

VEREDAS ESTAMPADAS TRAMO IV : (PROG. 1+660- 2+140) m2 ÁREA 1,975.11

VE1-TR4 TRAMO IV m2 1.00 1.00 41.42 41.42

VE2-TR4 TRAMO IV m2 1.00 1.00 14.65 14.65

VE3-TR4 TRAMO IV m2 1.00 1.00 103.28 103.28

VE4-TR4 TRAMO IV m2 1.00 1.00 23.74 23.74

VE5-TR4 TRAMO IV m2 1.00 1.00 374.06 374.06

VE6-TR4 TRAMO IV m2 1.00 1.00 159.52 159.52

VE7-TR4 TRAMO IV m2 1.00 1.00 139.73 139.73

VE8-TR4 TRAMO IV m2 1.00 1.00 173.88 173.88

VE9-TR4 TRAMO IV m2 1.00 1.00 125.46 125.46

VE10-TR4 TRAMO IV m2 1.00 1.00 141.22 141.22

VE11-TR4 TRAMO IV m2 1.00 1.00 567.58 567.58

VE12-TR4 TRAMO IV m2 1.00 1.00 110.57 110.57

VEREDAS ESTAMPADAS TRAMO V : (PROG. 2+140 - 2+650) m2 ÁREA 1,611.49

VE1-TR5 TRAMO V m2 1.00 1.00 39.13 39.13

VE2-TR5 TRAMO V m2 1.00 1.00 370.19 370.19

VE3-TR5 TRAMO V m2 1.00 1.00 103.28 103.28

VE4-TR5 TRAMO V m2 1.00 1.00 36.14 36.14

VE5-TR5 TRAMO V m2 1.00 1.00 725.80 725.80

VE6-TR5 TRAMO V m2 1.00 1.00 86.47 86.47

VE7-TR5 TRAMO V m2 1.00 1.00 250.48 250.48

ADOQUIN TRAMO I : (PROG. 0+000 - 0+540) m2 ÁREA 1,170.21

AD1-TR1 TRAMO I m2 1.00 1.00 17.44 17.44

AD2-TR1 TRAMO I m2 1.00 1.00 73.31 73.31

AD3-TR1 TRAMO I m2 1.00 1.00 17.50 17.50

AD4-TR1 TRAMO I m2 1.00 1.00 15.82 15.82

AD5-TR1 TRAMO I m2 1.00 1.00 34.31 34.31

AD6-TR1 TRAMO I m2 1.00 1.00 68.55 68.55

AD7-TR1 TRAMO I m2 1.00 1.00 19.55 19.55

AD8-TR1 TRAMO I m2 1.00 1.00 21.92 21.92

AD9-TR1 TRAMO I m2 1.00 1.00 47.49 47.49

AD10-TR1 TRAMO I m2 1.00 1.00 16.40 16.40

AD11-TR1 TRAMO I m2 1.00 1.00 24.40 24.40

AD12-TR1 TRAMO I m2 1.00 1.00 20.99 20.99

AD13-TR1 TRAMO I m2 1.00 1.00 23.44 23.44

AD14-TR1 TRAMO I m2 1.00 1.00 17.39 17.39

AD15-TR1 TRAMO I m2 1.00 1.00 22.71 22.71

AD16-TR1 TRAMO I m2 1.00 1.00 14.36 14.36

AD17-TR1 TRAMO I m2 1.00 1.00 46.32 46.32

AD18-TR1 TRAMO I m2 1.00 1.00 24.66 24.66

AD19-TR1 TRAMO I m2 1.00 1.00 16.90 16.90

AD20-TR1 TRAMO I m2 1.00 1.00 13.85 13.85


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

AD21-TR1 TRAMO I m2 1.00 1.00 20.05 20.05

AD22-TR1 TRAMO I m2 1.00 1.00 13.97 13.97

AD23-TR1 TRAMO I m2 1.00 1.00 23.66 23.66

AD24-TR1 TRAMO I m2 1.00 1.00 11.96 11.96

AD25-TR1 TRAMO I m2 1.00 1.00 42.58 42.58

AD26-TR1 TRAMO I m2 1.00 1.00 12.70 12.70

AD27-TR1 TRAMO I m2 1.00 1.00 30.42 30.42

AD28-TR1 TRAMO I m2 1.00 1.00 12.23 12.23

AD29-TR1 TRAMO I m2 1.00 1.00 13.54 13.54

AD30-TR1 TRAMO I m2 1.00 1.00 27.67 27.67

AD31-TR1 TRAMO I m2 1.00 1.00 36.70 36.70

AD32-TR1 TRAMO I m2 1.00 1.00 14.13 14.13

AD33-TR1 TRAMO I m2 1.00 1.00 45.91 45.91

AD34-TR1 TRAMO I m2 1.00 1.00 42.45 42.45

AD35-TR1 TRAMO I m2 1.00 1.00 37.79 37.79

AD36-TR1 TRAMO I m2 1.00 1.00 14.33 14.33

AD37-TR1 TRAMO I m2 1.00 1.00 42.88 42.88

AD38-TR1 TRAMO I m2 1.00 1.00 16.60 16.60

AD39-TR1 TRAMO I m2 1.00 1.00 18.76 18.76

AD40-TR1 TRAMO I m2 1.00 1.00 12.87 12.87

AD41-TR1 TRAMO I m2 1.00 1.00 13.22 13.22

AD42-TR1 TRAMO I m2 1.00 1.00 7.20 7.20

AD43-TR1 TRAMO I m2 1.00 1.00 79.64 79.64

AD44-TR1 TRAMO I m2 1.00 1.00 21.64 21.64

ADOQUIN TRAMO II : (PROG. 0+540 - 1+030) m2 ÁREA 943.54

AD1-TR2 TRAMO II m2 1.00 1.00 24.28 24.28

AD2-TR2 TRAMO II m2 1.00 1.00 34.41 34.41

AD3-TR2 TRAMO II m2 1.00 1.00 20.24 20.24

AD4-TR2 TRAMO II m2 1.00 1.00 20.16 20.16

AD5-TR2 TRAMO II m2 1.00 1.00 33.94 33.94

AD6-TR2 TRAMO II m2 1.00 1.00 17.16 17.16

AD7-TR2 TRAMO II m2 1.00 1.00 9.27 9.27

AD8-TR2 TRAMO II m2 1.00 1.00 16.46 16.46

AD9-TR2 TRAMO II m2 1.00 1.00 27.25 27.25

AD10-TR2 TRAMO II m2 1.00 1.00 19.22 19.22

AD11-TR2 TRAMO II m2 1.00 1.00 21.71 21.71

AD12-TR2 TRAMO II m2 1.00 1.00 52.18 52.18

AD13-TR2 TRAMO II m2 1.00 1.00 45.91 45.91

AD14-TR2 TRAMO II m2 1.00 1.00 8.60 8.60

AD15-TR2 TRAMO II m2 1.00 1.00 32.80 32.80

AD16-TR2 TRAMO II m2 1.00 1.00 4.13 4.13

AD17-TR2 TRAMO II m2 1.00 1.00 10.07 10.07

AD18-TR2 TRAMO II m2 1.00 1.00 17.54 17.54

AD19-TR2 TRAMO II m2 1.00 1.00 11.40 11.40

AD20-TR2 TRAMO II m2 1.00 1.00 18.24 18.24

AD21-TR2 TRAMO II m2 1.00 1.00 40.21 40.21

AD22-TR2 TRAMO II m2 1.00 1.00 7.25 7.25

AD23-TR2 TRAMO II m2 1.00 1.00 13.60 13.60

AD24-TR2 TRAMO II m2 1.00 1.00 6.24 6.24

AD25-TR2 TRAMO II m2 1.00 1.00 9.22 9.22

AD26-TR2 TRAMO II m2 1.00 1.00 3.29 3.29

AD27-TR2 TRAMO II m2 1.00 1.00 77.11 77.11

AD28-TR2 TRAMO II m2 1.00 1.00 14.22 14.22

AD29-TR2 TRAMO II m2 1.00 1.00 13.10 13.10

AD30-TR2 TRAMO II m2 1.00 1.00 57.95 57.95

AD31-TR2 TRAMO II m2 1.00 1.00 27.71 27.71

AD32-TR2 TRAMO II m2 1.00 1.00 9.90 9.90

AD33-TR2 TRAMO II m2 1.00 1.00 3.41 3.41

AD34-TR2 TRAMO II m2 1.00 1.00 6.33 6.33

AD35-TR2 TRAMO II m2 1.00 1.00 6.21 6.21

AD36-TR2 TRAMO II m2 1.00 1.00 8.19 8.19

AD37-TR2 TRAMO II m2 1.00 1.00 10.90 10.90

AD38-TR2 TRAMO II m2 1.00 1.00 5.26 5.26

AD39-TR2 TRAMO II m2 1.00 1.00 32.26 32.26


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

AD40-TR2 TRAMO II m2 1.00 1.00 6.98 6.98

AD41-TR2 TRAMO II m2 1.00 1.00 5.30 5.30

AD42-TR2 TRAMO II m2 1.00 1.00 12.67 12.67

AD43-TR2 TRAMO II m2 1.00 1.00 14.44 14.44

AD44-TR2 TRAMO II m2 1.00 1.00 7.12 7.12

AD45-TR2 TRAMO II m2 1.00 1.00 33.70 33.70

AD46-TR2 TRAMO II m2 1.00 1.00 36.92 36.92

AD47-TR2 TRAMO II m2 1.00 1.00 12.39 12.39

AD48-TR2 TRAMO II m2 1.00 1.00 4.34 4.34

AD49-TR2 TRAMO II m2 1.00 1.00 12.35 12.35

ADOQUIN TRAMO III : (PROG. 1+030- 1+660) m2 ÁREA 633.71

AD1-TR3 TRAMO III m2 1.00 1.00 9.40 9.40

AD2-TR3 TRAMO III m2 1.00 1.00 3.24 3.24

AD3-TR3 TRAMO III m2 1.00 1.00 11.17 11.17

AD4-TR3 TRAMO III m2 1.00 1.00 12.11 12.11

AD5-TR3 TRAMO III m2 1.00 1.00 6.32 6.32

AD6-TR3 TRAMO III m2 1.00 1.00 11.71 11.71

AD7-TR3 TRAMO III m2 1.00 1.00 11.22 11.22

AD8-TR3 TRAMO III m2 1.00 1.00 14.31 14.31

AD9-TR3 TRAMO III m2 1.00 1.00 10.03 10.03

AD10-TR3 TRAMO III m2 1.00 1.00 26.64 26.64

AD11-TR3 TRAMO III m2 1.00 1.00 22.10 22.10

AD12-TR3 TRAMO III m2 1.00 1.00 14.00 14.00

AD13-TR3 TRAMO III m2 1.00 1.00 12.32 12.32

AD14-TR3 TRAMO III m2 1.00 1.00 46.18 46.18

AD15-TR3 TRAMO III m2 1.00 1.00 10.48 10.48

AD16-TR3 TRAMO III m2 1.00 1.00 12.23 12.23

AD17-TR3 TRAMO III m2 1.00 1.00 17.46 17.46

AD18-TR3 TRAMO III m2 1.00 1.00 4.85 4.85

AD19-TR3 TRAMO III m2 1.00 1.00 22.05 22.05

AD20-TR3 TRAMO III m2 1.00 1.00 25.14 25.14

AD1-TR3 TRAMO III m2 1.00 1.00 13.81 13.81

AD2-TR3 TRAMO III m2 1.00 1.00 12.07 12.07

AD3-TR3 TRAMO III m2 1.00 1.00 19.55 19.55

AD4-TR3 TRAMO III m2 1.00 1.00 17.84 17.84

AD5-TR3 TRAMO III m2 1.00 1.00 17.42 17.42

AD6-TR3 TRAMO III m2 1.00 1.00 15.95 15.95

AD7-TR3 TRAMO III m2 1.00 1.00 18.52 18.52

AD8-TR3 TRAMO III m2 1.00 1.00 17.76 17.76

AD9-TR3 TRAMO III m2 1.00 1.00 14.86 14.86

AD10-TR3 TRAMO III m2 1.00 1.00 15.60 15.60

AD11-TR3 TRAMO III m2 1.00 1.00 30.78 30.78

AD12-TR3 TRAMO III m2 1.00 1.00 16.47 16.47

AD13-TR3 TRAMO III m2 1.00 1.00 12.68 12.68

AD14-TR3 TRAMO III m2 1.00 1.00 14.24 14.24

AD15-TR3 TRAMO III m2 1.00 1.00 15.97 15.97

AD16-TR3 TRAMO III m2 1.00 1.00 8.26 8.26

AD17-TR3 TRAMO III m2 1.00 1.00 7.86 7.86

AD18-TR3 TRAMO III m2 1.00 1.00 42.23 42.23

AD19-TR3 TRAMO III m2 1.00 1.00 6.84 6.84

AD20-TR3 TRAMO III m2 1.00 1.00 12.04 12.04

ADOQUIN TRAMO IV : (PROG. 1+660- 2+140) ÁREA 1,035.02

AD1-TR4 TRAMO IV m2 1.00 1.00 32.04 32.04

AD2-TR4 TRAMO IV m2 1.00 1.00 20.35 20.35

AD3-TR4 TRAMO IV m2 1.00 1.00 161.05 161.05

AD4-TR4 TRAMO IV m2 1.00 1.00 27.48 27.48

AD5-TR4 TRAMO IV m2 1.00 1.00 25.88 25.88

AD6-TR4 TRAMO IV m2 1.00 1.00 21.27 21.27

AD7-TR4 TRAMO IV m2 1.00 1.00 33.02 33.02

AD8-TR4 TRAMO IV m2 1.00 1.00 36.92 36.92

AD9-TR4 TRAMO IV m2 1.00 1.00 17.39 17.39

AD10-TR4 TRAMO IV m2 1.00 1.00 68.46 68.46

AD11-TR4 TRAMO IV m2 1.00 1.00 22.54 22.54

AD12-TR4 TRAMO IV m2 1.00 1.00 28.12 28.12


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

AD13-TR4 TRAMO IV m2 1.00 1.00 36.84 36.84

AD14-TR4 TRAMO IV m2 1.00 1.00 27.50 27.50

AD15-TR4 TRAMO IV m2 1.00 1.00 30.81 30.81

AD16-TR4 TRAMO IV m2 1.00 1.00 275.91 275.91

AD17-TR4 TRAMO IV m2 1.00 1.00 35.28 35.28

AD18-TR4 TRAMO IV m2 1.00 1.00 57.09 57.09

AD19-TR4 TRAMO IV m2 1.00 1.00 49.59 49.59

AD20-TR4 TRAMO IV m2 1.00 1.00 27.48 27.48

ADOQUIN TRAMO V: (PROG. 2+140- 2+650) m2 ÁREA 590.18

AD1-TR5 TRAMO V m2 1.00 1.00 12.84 12.84

AD2-TR5 TRAMO V m2 1.00 1.00 30.09 30.09

AD3-TR5 TRAMO V m2 1.00 1.00 112.51 112.51

AD4-TR5 TRAMO V m2 1.00 1.00 33.85 33.85

AD5-TR5 TRAMO V m2 1.00 1.00 12.23 12.23

AD6-TR5 TRAMO V m2 1.00 1.00 21.40 21.40

AD7-TR5 TRAMO V m2 1.00 1.00 11.33 11.33

AD8-TR5 TRAMO V m2 1.00 1.00 12.27 12.27

AD9-TR5 TRAMO V m2 1.00 1.00 24.25 24.25

AD10-TR5 TRAMO V m2 1.00 1.00 13.46 13.46

AD11-TR5 TRAMO V m2 1.00 1.00 16.83 16.83

AD12-TR5 TRAMO V m2 1.00 1.00 12.05 12.05

AD13-TR5 TRAMO V m2 1.00 1.00 12.10 12.10

AD14-TR5 TRAMO V m2 1.00 1.00 14.29 14.29

AD15-TR5 TRAMO V m2 1.00 1.00 10.55 10.55

AD16-TR5 TRAMO V m2 1.00 1.00 5.22 5.22

AD17-TR5 TRAMO V m2 1.00 1.00 12.79 12.79

AD18-TR5 TRAMO V m2 1.00 1.00 32.19 32.19

AD19-TR5 TRAMO V m2 1.00 1.00 10.52 10.52

AD20-TR5 TRAMO V m2 1.00 1.00 13.19 13.19

AD21-TR5 TRAMO V m2 1.00 1.00 9.66 9.66

AD22-TR5 TRAMO V m2 1.00 1.00 14.29 14.29

AD23-TR5 TRAMO V m2 1.00 1.00 27.17 27.17

AD24-TR5 TRAMO V m2 1.00 1.00 22.90 22.90

AD25-TR5 TRAMO V m2 1.00 1.00 11.03 11.03

AD26-TR5 TRAMO V m2 1.00 1.00 29.52 29.52

AD27-TR5 TRAMO V m2 1.00 1.00 34.39 34.39

AD28-TR5 TRAMO V m2 1.00 1.00 17.26 17.26

RAMPAS TRAMO I: (PROG. 0+000 HASTA 0+540) m2 ÁREA 204.03

R-64-TR1 TRAMO I m2 1.00 1.00 1.68 1.68

R-65-TR1 TRAMO I m2 1.00 1.00 2.40 2.40

R-66-TR1 TRAMO I m2 1.00 1.00 1.45 1.45

R-67-TR1 TRAMO I m2 1.00 1.00 15.42 15.42

R-68-TR1 TRAMO I m2 1.00 1.00 1.41 1.41

R-69-TR1 TRAMO I m2 1.00 1.00 13.80 13.80

R-70-TR1 TRAMO I m2 1.00 1.00 18.67 18.67

R-71-TR1 TRAMO I m2 1.00 1.00 1.30 1.30

R-72-TR1 TRAMO I m2 1.00 1.00 12.60 12.60

R-73-TR1 TRAMO I m2 1.00 1.00 1.45 1.45

R-74-TR1 TRAMO I m2 1.00 1.00 1.46 1.46

R-75-TR1 TRAMO I m2 1.00 1.00 19.22 19.22

R-76-TR1 TRAMO I m2 1.00 1.00 20.24 20.24

R-77-TR1 TRAMO I m2 1.00 1.00 1.45 1.45

R-78-TR1 TRAMO I m2 1.00 1.00 2.06 2.06

R-79-TR1 TRAMO I m2 1.00 1.00 1.80 1.80

R-80-TR1 TRAMO I m2 1.00 1.00 1.40 1.40

R-81-TR1 TRAMO I m2 1.00 1.00 1.42 1.42

R-82-TR1 TRAMO I m2 1.00 1.00 1.48 1.48

R-83-TR1 TRAMO I m2 1.00 1.00 1.55 1.55

R-84-TR1 TRAMO I m2 1.00 1.00 1.45 1.45

R-85-TR1 TRAMO I m2 1.00 1.00 1.42 1.42

R-86-TR1 TRAMO I m2 1.00 1.00 1.44 1.44

R-87-TR1 TRAMO I m2 1.00 1.00 3.41 3.41

R-88-TR1 TRAMO I m2 1.00 1.00 1.45 1.45

R-89-TR1 TRAMO I m2 1.00 1.00 18.87 18.87


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

R-90-TR1 TRAMO I m2 1.00 1.00 14.80 14.80

R-91-TR1 TRAMO I m2 1.00 1.00 1.30 1.30

R-92-TR1 TRAMO I m2 1.00 1.00 1.45 1.45

R-93-TR1 TRAMO I m2 1.00 1.00 9.60 9.60

R-94-TR1 TRAMO I m2 1.00 1.00 1.53 1.53

R-95-TR1 TRAMO I m2 1.00 1.00 1.52 1.52

R-96-TR1 TRAMO I m2 1.00 1.00 1.44 1.44

R-97-TR1 TRAMO I m2 1.00 1.00 1.35 1.35

R-98-TR1 TRAMO I m2 1.00 1.00 1.48 1.48

R-99-TR1 TRAMO I m2 1.00 1.00 1.44 1.44

R-100-TR1 TRAMO I m2 1.00 1.00 1.46 1.46

R-101-TR1 TRAMO I m2 1.00 1.00 1.45 1.45

R-102-TR1 TRAMO I m2 1.00 1.00 13.55 13.55

R-103-TR1 TRAMO I m2 1.00 1.00 1.36 1.36

RAMPAS TRAMO II: (PROG. 0+540 HASTA 1+030) m2 ÁREA 104.26

R-48-TR2 TRAMO II m2 1.00 1.00 14.64 14.64

R-49-TR2 TRAMO II m2 1.00 1.00 1.45 1.45

R-50-TR2 TRAMO II m2 1.00 1.00 1.33 1.33

R-51-TR2 TRAMO II m2 1.00 1.00 1.45 1.45

R-52-TR2 TRAMO II m2 1.00 1.00 1.45 1.45

R-53-TR2 TRAMO II m2 1.00 1.00 1.83 1.83

R-54-TR2 TRAMO II m2 1.00 1.00 1.46 1.46

R-55-TR2 TRAMO II m2 1.00 1.00 1.80 1.80

R-56-TR2 TRAMO II m2 1.00 1.00 2.16 2.16

R-57-TR2 TRAMO II m2 1.00 1.00 2.68 2.68

R-58-TR2 TRAMO II m2 1.00 1.00 1.87 1.87

R-59-TR2 TRAMO II m2 1.00 1.00 1.45 1.45

R-60-TR2 TRAMO II m2 1.00 1.00 1.45 1.45

R-61-TR2 TRAMO II m2 1.00 1.00 8.14 8.14

R-62-TR2 TRAMO II m2 1.00 1.00 1.75 1.75

R-63-TR2 TRAMO II m2 1.00 1.00 1.45 1.45

R-104-TR2 TRAMO II m2 1.00 1.00 1.64 1.64

R-105-TR2 TRAMO II m2 1.00 1.00 1.71 1.71

R-106-TR2 TRAMO II m2 1.00 1.00 13.62 13.62

R-107-TR2 TRAMO II m2 1.00 1.00 1.45 1.45

R-108-TR2 TRAMO II m2 1.00 1.00 1.80 1.80

R-109-TR2 TRAMO II m2 1.00 1.00 1.86 1.86

R-110-TR2 TRAMO II m2 1.00 1.00 2.49 2.49

R-111-TR2 TRAMO II m2 1.00 1.00 2.06 2.06

R-112-TR2 TRAMO II m2 1.00 1.00 1.42 1.42

R-113-TR2 TRAMO II m2 1.00 1.00 1.42 1.42

R-114-TR2 TRAMO II m2 1.00 1.00 1.42 1.42

R-115-TR2 TRAMO II m2 1.00 1.00 1.45 1.45

R-116-TR2 TRAMO II m2 1.00 1.00 7.84 7.84

R-117-TR2 TRAMO II m2 1.00 1.00 1.44 1.44

R-118-TR2 TRAMO II m2 1.00 1.00 16.28 16.28

RAMPAS TRAMO III: (PROG. 1+030 HASTA 1+660) m2 ÁREA 183.71

R-31-TR3 TRAMO III m2 1.00 1.00 9.30 9.30

R-32-TR3 TRAMO III m2 1.00 1.00 6.73 6.73

R-33-TR3 TRAMO III m2 1.00 1.00 1.42 1.42

R-34-TR3 TRAMO III m2 1.00 1.00 2.35 2.35

R-35-TR3 TRAMO III m2 1.00 1.00 1.38 1.38

R-36-TR3 TRAMO III m2 1.00 1.00 1.48 1.48

R-37-TR3 TRAMO III m2 1.00 1.00 14.68 14.68

R-38-TR3 TRAMO III m2 1.00 1.00 1.40 1.40

R-39-TR3 TRAMO III m2 1.00 1.00 11.79 11.79

R-40-TR3 TRAMO III m2 1.00 1.00 16.20 16.20

R-41-TR3 TRAMO III m2 1.00 1.00 1.53 1.53

R-42-TR3 TRAMO III m2 1.00 1.00 7.27 7.27

R-43-TR3 TRAMO III m2 1.00 1.00 10.66 10.66

R-44-TR3 TRAMO III m2 1.00 1.00 1.27 1.27

R-45-TR3 TRAMO III m2 1.00 1.00 1.60 1.60

R-46-TR3 TRAMO III m2 1.00 1.00 8.82 8.82

R-47-TR3 TRAMO III m2 1.00 1.00 12.77 12.77


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

R-119-TR3 TRAMO III m2 1.00 1.00 21.44 21.44

R-120-TR3 TRAMO III m2 1.00 1.00 1.87 1.87

R-121-TR3 TRAMO III m2 1.00 1.00 1.42 1.42

R-122-TR3 TRAMO III m2 1.00 1.00 1.41 1.41

R-123-TR3 TRAMO III m2 1.00 1.00 16.33 16.33

R-124-TR3 TRAMO III m2 1.00 1.00 15.75 15.75

R-125-TR3 TRAMO III m2 1.00 1.00 1.43 1.43

R-126-TR3 TRAMO III m2 1.00 1.00 1.42 1.42

R-127-TR3 TRAMO III m2 1.00 1.00 1.41 1.41

R-128-TR3 TRAMO III m2 1.00 1.00 1.41 1.41

R-129-TR3 TRAMO III m2 1.00 1.00 9.17 9.17

RAMPAS TRAMO IV: (PROG. 1+660 HASTA 2+140) m2 ÁREA 177.03

R-13-TR4 TRAMO IV m2 1.00 1.00 14.55 14.55

R-14-TR4 TRAMO IV m2 1.00 1.00 1.41 1.41

R-15-TR4 TRAMO IV m2 1.00 1.00 1.46 1.46

R-16-TR4 TRAMO IV m2 1.00 1.00 1.45 1.45

R-17-TR4 TRAMO IV m2 1.00 1.00 11.02 11.02

R-18-TR4 TRAMO IV m2 1.00 1.00 1.65 1.65

R-19-TR4 TRAMO IV m2 1.00 1.00 13.99 13.99

R-20-TR4 TRAMO IV m2 1.00 1.00 1.73 1.73

R-21-TR4 TRAMO IV m2 1.00 1.00 1.42 1.42

R-22-TR4 TRAMO IV m2 1.00 1.00 1.41 1.41

R-23-TR4 TRAMO IV m2 1.00 1.00 7.40 7.40

R-24-TR4 TRAMO IV m2 1.00 1.00 7.60 7.60

R-25-TR4 TRAMO IV m2 1.00 1.00 1.41 1.41

R-26-TR4 TRAMO IV m2 1.00 1.00 1.72 1.72

R-27-TR4 TRAMO IV m2 1.00 1.00 2.35 2.35

R-28-TR4 TRAMO IV m2 1.00 1.00 1.46 1.46

R-29-TR4 TRAMO IV m2 1.00 1.00 1.41 1.41

R-30-TR4 TRAMO IV m2 1.00 1.00 1.40 1.40

R-31-TR4 TRAMO IV m2 1.00 1.00 7.88 7.88

R-130-TR4 TRAMO IV m2 1.00 1.00 1.42 1.42

R-131-TR4 TRAMO IV m2 1.00 1.00 1.96 1.96

R-132-TR4 TRAMO IV m2 1.00 1.00 2.49 2.49

R-133-TR4 TRAMO IV m2 1.00 1.00 6.11 6.11

R-134-TR4 TRAMO IV m2 1.00 1.00 10.70 10.70

R-135-TR4 TRAMO IV m2 1.00 1.00 1.92 1.92

R-136-TR4 TRAMO IV m2 1.00 1.00 21.44 21.44

R-137-TR4 TRAMO IV m2 1.00 1.00 1.42 1.42

R-138-TR4 TRAMO IV m2 1.00 1.00 16.40 16.40

R-139-TR4 TRAMO IV m2 1.00 1.00 1.29 1.29

R-140-TR4 TRAMO IV m2 1.00 1.00 14.69 14.69

R-141-TR4 TRAMO IV m2 1.00 1.00 13.06 13.06

R-142-TR4 TRAMO IV m2 1.00 1.00 1.41 1.41

RAMPAS TRAMO V: (PROG. 2+140 HASTA 2+635) m2 ÁREA 188.59

R-1-TR5 TRAMO V m2 1.00 1.00 11.70 11.70

R-2-TR5 TRAMO V m2 1.00 1.00 1.66 1.66

R-3-TR5 TRAMO V m2 1.00 1.00 1.95 1.95

R-4-TR5 TRAMO V m2 1.00 1.00 12.00 12.00

R-5-TR5 TRAMO V m2 1.00 1.00 14.30 14.30

R-6-TR5 TRAMO V m2 1.00 1.00 1.53 1.53

R-7-TR5 TRAMO V m2 1.00 1.00 15.00 15.00

R-8-TR5 TRAMO V m2 1.00 1.00 15.07 15.07

R-9-TR5 TRAMO V m2 1.00 1.00 17.39 17.39

R-10-TR5 TRAMO V m2 1.00 1.00 1.50 1.50

R-11-TR5 TRAMO V m2 1.00 1.00 14.48 14.48

R-12-TR5 TRAMO V m2 1.00 1.00 1.35 1.35

R-142-TR5 TRAMO V m2 1.00 1.00 1.41 1.41

R-143-TR5 TRAMO V m2 1.00 1.00 1.54 1.54

R-144-TR5 TRAMO V m2 1.00 1.00 13.58 13.58

R-145-TR5 TRAMO V m2 1.00 1.00 15.16 15.16

R-146-TR5 TRAMO V m2 1.00 1.00 13.27 13.27

R-147-TR5 TRAMO V m2 1.00 1.00 1.41 1.41

R-148-TR5 TRAMO V m2 1.00 1.00 1.32 1.32


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

R-149-TR5 TRAMO V m2 1.00 1.00 1.50 1.50

R-150-TR5 TRAMO V m2 1.00 1.00 14.35 14.35

R-151-TR5 TRAMO V m2 1.00 1.00 8.49 8.49

R-152-TR5 TRAMO V m2 1.00 1.00 1.25 1.25

R-153-TR5 TRAMO V m2 1.00 1.00 5.99 5.99

R-154-TR5 TRAMO V m2 1.00 1.00 1.39 1.39

AREAS VERDES TRAMO I : (PROG. 0+000 - 0+540) m2 ÁREA 5,635.77

AVE1-TR1 TRAMO I m2 1.00 1.00 18.79 18.79

AVE2-TR1 TRAMO I m2 1.00 1.00 54.8 54.80

AVE3-TR1 TRAMO I m2 1.00 1.00 9.4 9.40

AVE4-TR1 TRAMO I m2 1.00 1.00 10.55 10.55

AVE5-TR1 TRAMO I m2 1.00 1.00 9.49 9.49

AVE6-TR1 TRAMO I m2 1.00 1.00 5.31 5.31

AVE7-TR1 TRAMO I m2 1.00 1.00 94.34 94.34

AVE8-TR1 TRAMO I m2 1.00 1.00 195.12 195.12

AVE9-TR1 TRAMO I m2 1.00 1.00 4614 4,614.00

AVE10-TR1 TRAMO I m2 1.00 1.00 8.82 8.82

AVE11-TR1 TRAMO I m2 1.00 1.00 21.51 21.51

AVE12-TR1 TRAMO I m2 1.00 1.00 28.3 28.30

AVE13-TR1 TRAMO I m2 1.00 1.00 36.28 36.28

AVE14-TR1 TRAMO I m2 1.00 1.00 48.17 48.17

AVE15-TR1 TRAMO I m2 1.00 1.00 2.83 2.83

AVE16-TR1 TRAMO I m2 1.00 1.00 21.12 21.12

AVE17-TR1 TRAMO I m2 1.00 1.00 67.68 67.68

AVE18-TR1 TRAMO I m2 1.00 1.00 11.53 11.53

AVE19-TR1 TRAMO I m2 1.00 1.00 21.45 21.45

AVE20-TR1 TRAMO I m2 1.00 1.00 25.43 25.43

AVE21-TR1 TRAMO I m2 1.00 1.00 38.85 38.85

AVE22-TR1 TRAMO I m2 1.00 1.00 10.62 10.62

AVE23-TR1 TRAMO I m2 1.00 1.00 22.69 22.69

AVE24-TR1 TRAMO I m2 1.00 1.00 9.27 9.27

AVE25-TR1 TRAMO I m2 1.00 1.00 14.84 14.84

AVE26-TR1 TRAMO I m2 1.00 1.00 13.05 13.05

AVE27-TR1 TRAMO I m2 1.00 1.00 9.96 9.96

AVE28-TR1 TRAMO I m2 1.00 1.00 25.39 25.39

AVE29-TR1 TRAMO I m2 1.00 1.00 5.56 5.56

AVE30-TR1 TRAMO I m2 1.00 1.00 27.91 27.91

AVE31-TR1 TRAMO I m2 1.00 1.00 28.16 28.16

AVE32-TR1 TRAMO I m2 1.00 1.00 22.81 22.81

AVE33-TR1 TRAMO I m2 1.00 1.00 9.95 9.95

AVE34-TR1 TRAMO I m2 1.00 1.00 20.89 20.89

AVE35-TR1 TRAMO I m2 1.00 1.00 39.59 39.59

AVE36-TR1 TRAMO I m2 1.00 1.00 15.74 15.74

AVE37-TR1 TRAMO I m2 1.00 1.00 15.57 15.57

AREAS VERDES TRAMO II : (PROG. 0+540 HASTA 1+030) m2 ÁREA 3,389.55

AVE1-TR2 TRAMO II m2 1.00 1.00 809.61 809.61

AVE2-TR2 TRAMO II m2 1.00 1.00 17 17.00

AVE3-TR2 TRAMO II m2 1.00 1.00 26.6 26.60

AVE4-TR2 TRAMO II m2 1.00 1.00 30.76 30.76

AVE5-TR2 TRAMO II m2 1.00 1.00 15.74 15.74

AVE6-TR2 TRAMO II m2 1.00 1.00 479.36 479.36

AVE7-TR2 TRAMO II m2 1.00 1.00 16.59 16.59

AVE8-TR2 TRAMO II m2 1.00 1.00 14.48 14.48

AVE9-TR2 TRAMO II m2 1.00 1.00 61.62 61.62

AVE10-TR2 TRAMO II m2 1.00 1.00 134.84 134.84

AVE11-TR2 TRAMO II m2 1.00 1.00 377.8 377.80

AVE12-TR2 TRAMO II m2 1.00 1.00 13.69 13.69

AVE13-TR2 TRAMO II m2 1.00 1.00 3.01 3.01

AVE14-TR2 TRAMO II m2 1.00 1.00 13.16 13.16

AVE15-TR2 TRAMO II m2 1.00 1.00 8.6 8.60

AVE16-TR2 TRAMO II m2 1.00 1.00 502.84 502.84

AVE17-TR2 TRAMO II m2 1.00 1.00 18.62 18.62

AVE18-TR2 TRAMO II m2 1.00 1.00 4.77 4.77

AVE19-TR2 TRAMO II m2 1.00 1.00 4.38 4.38


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

AVE20-TR2 TRAMO II m2 1.00 1.00 5.42 5.42

AVE21-TR2 TRAMO II m2 1.00 1.00 119.98 119.98

AVE22-TR2 TRAMO II m2 1.00 1.00 43.24 43.24

AVE23-TR2 TRAMO II m2 1.00 1.00 76.49 76.49

AVE24-TR2 TRAMO II m2 1.00 1.00 23.2 23.20

AVE25-TR2 TRAMO II m2 1.00 1.00 179.83 179.83

AVE26-TR2 TRAMO II m2 1.00 1.00 6.33 6.33

AVE27-TR2 TRAMO II m2 1.00 1.00 93.39 93.39

AVE28-TR2 TRAMO II m2 1.00 1.00 10.83 10.83

AVE29-TR2 TRAMO II m2 1.00 1.00 11.9 11.90

AVE30-TR2 TRAMO II m2 1.00 1.00 12.5 12.50

AVE31-TR2 TRAMO II m2 1.00 1.00 209.42 209.42

AVE32-TR2 TRAMO II m2 1.00 1.00 9.58 9.58

AVE33-TR2 TRAMO II m2 1.00 1.00 13.54 13.54

AVE34-TR2 TRAMO II m2 1.00 1.00 20.43 20.43

AREAS VERDES TRAMO III : (PROG. 1+030 HASTA 1+660) 1.00 1.00 ÁREA 4,099.36

AVE1-TR3 TRAMO III m2 1.00 1.00 418.68 418.68

AVE2-TR3 TRAMO III m2 1.00 1.00 17.76 17.76

AVE3-TR3 TRAMO III m2 1.00 1.00 41.68 41.68

AVE4-TR3 TRAMO III m2 1.00 1.00 12.98 12.98

AVE5-TR3 TRAMO III m2 1.00 1.00 39.37 39.37

AVE6-TR3 TRAMO III m2 1.00 1.00 15.82 15.82

AVE7-TR3 TRAMO III m2 1.00 1.00 15.2 15.20

AVE8-TR3 TRAMO III m2 1.00 1.00 31.58 31.58

AVE9-TR3 TRAMO III m2 1.00 1.00 59.75 59.75

AVE10-TR3 TRAMO III m2 1.00 1.00 24.18 24.18

AVE11-TR3 TRAMO III m2 1.00 1.00 16.65 16.65

AVE12-TR3 TRAMO III m2 1.00 1.00 26.67 26.67

AVE13-TR3 TRAMO III m2 1.00 1.00 57.59 57.59

AVE14-TR3 TRAMO III m2 1.00 1.00 10.26 10.26

AVE15-TR3 TRAMO III m2 1.00 1.00 9 9.00

AVE16-TR3 TRAMO III m2 1.00 1.00 8.06 8.06

AVE17-TR3 TRAMO III m2 1.00 1.00 18.71 18.71

AVE18-TR3 TRAMO III m2 1.00 1.00 6.69 6.69

AVE19-TR3 TRAMO III m2 1.00 1.00 12.42 12.42

AVE20-TR3 TRAMO III m2 1.00 1.00 10.76 10.76

AVE21-TR3 TRAMO III m2 1.00 1.00 124.03 124.03

AVE22-TR3 TRAMO III m2 1.00 1.00 35.05 35.05

AVE23-TR3 TRAMO III m2 1.00 1.00 120.195 120.20

AVE24-TR3 TRAMO III m2 1.00 1.00 29.08 29.08

AVE25-TR3 TRAMO III m2 1.00 1.00 567.67 567.67

AVE26-TR3 TRAMO III m2 1.00 1.00 318.62 318.62

AVE27-TR3 TRAMO III m2 1.00 1.00 128.27 128.27

AVE28-TR3 TRAMO III m2 1.00 1.00 456.13 456.13

AVE29-TR3 TRAMO III m2 1.00 1.00 1.07 1.07

AVE30-TR3 TRAMO III m2 1.00 1.00 4.57 4.57

AVE31-TR3 TRAMO III m2 1.00 1.00 4.22 4.22

AVE32-TR3 TRAMO III m2 1.00 1.00 505.81 505.81

AVE33-TR3 TRAMO III m2 1.00 1.00 450.9 450.90

AVE34-TR3 TRAMO III m2 1.00 1.00 499.93 499.93

AREAS VERDES TRAMO IV : (PROG. 1+660HASTA 2+140) m2 ÁREA 2,086.11

AVE1-TR4 TRAMO IV m2 1.00 1.00 54.94 54.94

AVE1-TR4 TRAMO IV m2 1.00 1.00 61.59 61.59

AVE1-TR4 TRAMO IV m2 1.00 1.00 13.45 13.45

AVE1-TR4 TRAMO IV m2 1.00 1.00 455.13 455.13

AVE1-TR4 TRAMO IV m2 1.00 1.00 161.21 161.21

AVE1-TR4 TRAMO IV m2 1.00 1.00 221.36 221.36

AVE1-TR4 TRAMO IV m2 1.00 1.00 325.61 325.61

AVE1-TR4 TRAMO IV m2 1.00 1.00 390.24 390.24

AVE1-TR4 TRAMO IV m2 1.00 1.00 14.21 14.21

AVE1-TR4 TRAMO IV m2 1.00 1.00 346.54 346.54

AVE1-TR4 TRAMO IV m2 1.00 1.00 41.83 41.83

AREAS VERDES TRAMO V : (PROG. 2+140 HASTA 2+650) m2 ÁREA 2,304.49

AVE1-TR5 TRAMO V m2 1.00 1.00 107.9 107.90


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

AVE2-TR5 TRAMO V m2 1.00 1.00 854.341 854.34

AVE3-TR5 TRAMO V m2 1.00 1.00 289.482 289.48

AVE4-TR5 TRAMO V m2 1.00 1.00 496.48 496.48

AVE5-TR5 TRAMO V m2 1.00 1.00 64.67 64.67

AVE6-TR5 TRAMO V m2 1.00 1.00 7.322 7.32

AVE7-TR5 TRAMO V m2 1.00 1.00 285.812 285.81

AVE8-TR5 TRAMO V m2 1.00 1.00 9.145 9.15

AVE9-TR5 TRAMO V m2 1.00 1.00 9.823 9.82

AVE10-TR5 TRAMO V m2 1.00 1.00 10.686 10.69

AVE11-TR5 TRAMO V m2 1.00 1.00 20.243 20.24

AVE12-TR5 TRAMO V m2 1.00 1.00 16.71 16.71

AVE13-TR5 TRAMO V m2 1.00 1.00 21.163 21.16

AVE14-TR5 TRAMO V m2 1.00 1.00 15.219 15.22

AVE15-TR5 TRAMO V m2 1.00 1.00 11.91 11.91

AVE16-TR5 TRAMO V m2 1.00 1.00 21.769 21.77

AVE17-TR5 TRAMO V m2 1.00 1.00 22.103 22.10

AVE18-TR5 TRAMO V m2 1.00 1.00 28.189 28.19

AVE19-TR5 TRAMO V m2 1.00 1.00 11.524 11.52

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2 ÁREA 15,076.50

DPF1-TR1 TRAMO I- FLEXIBLE m2 1.00 1.00 732.8 732.80

DPR1-TR1 TRAMO I- RIGIDO m2 1.00 1.00 14343.7 14,343.70

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2 ÁREA 17,025.91

DPR1-TR2 TRAMO II- RIGIDO m2 1.00 1.00 7,297.91 7,297.91

DPR2-TR2 TRAMO II- RIGIDO m2 1.00 1.00 244.67 244.67

PF1-TR2 TRAMO II- FLEXIBLE m2 1.00 1.00 8.33 8.33

PF2-TR2 TRAMO II- FLEXIBLE m2 1.00 1.00 79.02 79.02

PF3-TR2 TRAMO II- FLEXIBLE m2 1.00 1.00 70.82 70.82

PF4-TR2 TRAMO II- FLEXIBLE m2 1.00 1.00 55.9 55.90

PF5-TR2 TRAMO II- FLEXIBLE m2 1.00 1.00 23.55 23.55

PF6-TR2 TRAMO II- FLEXIBLE m2 1.00 1.00 65.82 65.82

PF7-TR2 TRAMO II- FLEXIBLE m2 1.00 1.00 80.16 80.16

PF8-TR2 TRAMO II- FLEXIBLE m2 1.00 1.00 9099.73 9,099.73

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660) m2 ÁREA 14,641.98

DPF1-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 3042.75 3,042.75

DPF1-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 2858.17 2,858.17

DPF1-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 3079.69 3,079.69

DPR1-TR3 TRAMO III - RIGIDO m2 1.00 1.00 4257.99 4,257.99

DPR1-TR3 TRAMO III - RIGIDO m2 1.00 1.00 1403.38 1,403.38

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140) m2 ÁREA 12,642.11

DPF1-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 1336.62 1,336.62

DPF2-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 528.63 528.63

DPF3-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 65.16 65.16

DPF4-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 131.33 131.33

DPF5-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 112.69 112.69

DPF6-TR3 TRAMO IV - RIGIDO m2 1.00 1.00 10467.68 10,467.68

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650) m2 ÁREA 9,873.26

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 2120.86 2,120.86

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 54.04 54.04

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 258.64 258.64

DPR1-TR3 TRAMO V - RIGIDO m2 1.00 1.00 4078.41 4,078.41

DPR1-TR3 TRAMO V - RIGIDO m2 1.00 1.00 3361.31 3,361.31

01.02.04 ENERGIA ELECTRICA PROVISIONAL, CONSUMO Y MANTENIMIENTO OFICINA DE OBRA Y ALMACEN mes 7.00 1.00 7.00 7.00

01.03 DEMOLICION Y DESMONTAJE

01.03.01 DEMOLICIONES EN PAVIMENTO RIGIDO

01.03.01.01 ESCARIFICADO DE PAVIMENTO RIGIDO m2 ÁREA 45,455.05

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPR1-TR1 TRAMO I- RIGIDO m2 1.00 1.00 14,343.70 14,343.70

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPR1-TR2 TRAMO II- RIGIDO m3 1.00 1.00 7,297.91 7,297.91

DPR2-TR2 TRAMO II- RIGIDO m4 1.00 1.00 244.67 244.67

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660) m2

DPR1-TR3 TRAMO III - RIGIDO m2 1.00 1.00 4257.99 4,257.99

DPR1-TR3 TRAMO III - RIGIDO m2 1.00 1.00 1403.38 1,403.38

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140) m2


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

DPF6-TR3 TRAMO IV - RIGIDO m2 1.00 1.00 10467.68 10,467.68

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650) m2

DPR1-TR3 TRAMO V - RIGIDO m2 1.00 1.00 4078.41 4,078.41

DPR1-TR3 TRAMO V - RIGIDO m2 1.00 1.00 3361.31 3,361.31

01.03.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 1,443.20

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km PAVIMENTO RIGIDO m3 1.00 1.00 45,455.05 0.0254 1.250 1,443.20

01.03.02 DEMOLICIONES EN PAVIMENTO FLEXIBLE

01.03.02.01 DEMOLICION DE PAVIMENTO ASFALTICO (E=1") C/EQUIPO (FRESADO) m2 ÁREA 21,863.96

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPF1-TR1 TRAMO I- FLEXIBLE m2 1.00 1.00 732.8 732.80

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPR1-TR2 TRAMO II- RIGIDO m3 1.00 1.00 7,297.91 7,297.91

DPR2-TR2 TRAMO II- RIGIDO m4 1.00 1.00 244.67 244.67

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660)

DPF1-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 3042.75 3,042.75

DPF2-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 2858.17 2,858.17

DPF3-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 3079.69 3,079.69

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140)

DPF1-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 1336.62 1,336.62

DPF2-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 528.63 528.63

DPF3-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 65.16 65.16

DPF4-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 131.33 131.33

DPF5-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 112.69 112.69

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650)

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 2120.86 2,120.86

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 54.04 54.04

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 258.64 258.64

01.03.02.02 DEMOLICION DE PAVIMENTO ASFALTICO (E=2") BERMAS LATERALES C/EQUIPO (FREASADO) m2 4.00 1.00 4.00 4.00

01.03.02.03 DEMOLICION DE PAVIMENTO 3 cm PARA RECAPEO (FRESADO) m2 ÁREA 0.00 46,893.08

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPR1-TR1 TRAMO I- m2 1.00 1.00 14343.7 14,343.70

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPF1-TR3 TRAMO III - m2 1.00 1.00 3042.75 3,042.75

DPF1-TR3 TRAMO III - m2 1.00 1.00 2858.17 2,858.17

DPF1-TR3 TRAMO III - m2 1.00 1.00 3079.69 3,079.69

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660) m2

DPR1-TR3 TRAMO III - m2 1.00 1.00 4257.99 4,257.99

DPR1-TR3 TRAMO III - m2 1.00 1.00 1403.38 1,403.38

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140) m2

DPF6-TR3 TRAMO IV - m2 1.00 1.00 10467.68 10,467.68

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650) m2

DPR1-TR3 TRAMO V - m2 1.00 1.00 4078.41 4,078.41

DPR1-TR3 TRAMO V - m2 1.00 1.00 3361.31 3,361.31

01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 1.00 1.00 46,893.08 0.03 1.250 1,758.49 1,758.49

01.03.03 DEMOLICIONES EN VEREDAS, RAMPAS Y MARTILLOS

01.03.03.01 DEMOLICION DE VEREDAS DE CONCRETO C/EQUIPO e=0.10m m2 46,004.00

VEREDAS TRAMO I : (PROG. 0+000 - 0+540) m2 ÁREA

TRAMO I m2 1.00 1.00 3,985.10 3,985.10

VEREDAS TRAMO I I : (PROG. 0+540 - 1+030) m2 ÁREA 0.00

TRAMO II m2 1.00 1.00 39.57 39.57

VEREDAS TRAMO III : (PROG. 1+030- 1+660) m2 ÁREA 0.00

TRAMO III m2 1.00 1.00 3,587.16 21,422.53

VEREDAS TRAMO IV : (PROG. 1+660- 2+140) m2 ÁREA 0.00

TRAMO IV m2 1.00 1.00 1,988.14 1,988.14

VEREDAS TRAMO V : (PROG. 2+140- 2+650) m2 ÁREA 0.00

TRAMO V m2 1.00 1.00 2,147.89 2,147.89

VEREDASESTAMPADAS TRAMO I : (PROG. 0+000 - 0+540) m2 ÁREA 0.00

TRAMO I m2 1.00 1.00 1,414.65 1,414.65

VEREDASESTAMPADAS TRAMO I I : (PROG. 0+540 - 1+030) m2 ÁREA 0.00

TRAMO II m2 1.00 1.00 1,501.00 1,501.00

VEREDASESTAMPADAS TRAMO III : (PROG. 1+030- 1+660) m2 ÁREA 0.00

TRAMO III m2 1.00 1.00 1,517.23 9,060.90

VEREDASESTAMPADAS TRAMO IV : (PROG. 1+660- 2+140) m2 ÁREA 0.00

TRAMO IV m2 1.00 1.00 1,975.11 1,975.11


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

VEREDASESTAMPADAS TRAMO V : (PROG. 2+140- 2+650) m2 ÁREA 0.00

TRAMO V m2 1.00 1.00 1,611.49 1,611.49

RAMPAS TRAMO I: (PROG. 0+000 HASTA 0+540) m2 ÁREA 0.00

TRAMO I 204.03 204.03

RAMPASTRAMO II: (PROG. 0+540 HASTA 1+030) m2 ÁREA 0.00

TRAMO II m2 1.00 1.00 104.26 104.26

RAMPASTRAMO III: (PROG. 1+030 HASTA 1+660) m2 ÁREA 0.00

TRAMO III m2 1.00 1.00 183.71 183.71

RAMPAS TRAMO IV: (PROG. 1+660 HASTA 2+140) m2 ÁREA 0.00

TRAMO IV m2 1.00 1.00 177.03 177.03

RAMPAS TRAMO V: (PROG. 2+140 HASTA 2+635) m2 ÁREA 0.00

TRAMO V m2 1.00 1.00 188.59 188.59

01.03.03.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 AREA 5,980.52

ELIMINACION m3 1.00 1.00 46,004.00 0.10 1.300 5,980.52

01.03.04 DEMOLICION DE SARDINELES

01.03.04.01 DEMOLICION DE SARDINEL PERALTADO C/EQUIPO m 605.39

SARDINEL PERALTADO TRAMO I m 1.00 1.00 3,997.58 0.15 0.35 1.300 272.83

SARDINEL PERALTADO TRAMO I I m 1.00 1.00 1,302.11 0.15 0.35 1.300 88.87

SARDINEL PERALTADO TRAMO I II m 1.00 1.00 1,428.83 0.15 0.35 1.300 97.52

SARDINEL PERALTADO TRAMO IV m 1.00 1.00 1,134.94 0.15 0.35 1.300 77.46

SARDINEL PERALTADO TRAMO V m 1.00 1.00 1,006.77 0.15 0.35 1.300 68.71

01.03.04.02 DEMOLICION DE SARDINEL SUMERGIDO C/EQUIPO m 383.57

SARDINEL SUMERGIDO TRAMO I m 1.00 1.00 1,473.55 0.15 0.20 44.21

SARDINEL SUMERGIDO TRAMO I I m 1.00 1.00 3,454.72 0.15 0.20 103.64

SARDINEL SUMERGIDO TRAMO I II m 1.00 1.00 3,730.32 0.15 0.20 111.91

SARDINEL SUMERGIDO TRAMO IV m 1.00 1.00 3,100.68 0.15 0.20 93.02

SARDINEL SUMERGIDO TRAMO V m 1.00 1.00 1,026.41 0.15 0.20 30.79

01.03.04.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 56.28

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km SARDINELES PERALTADOS m3 1.00 1.00 605.39 0.15 0.35 1.300 41.32

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km SARDINELES SUMERGIDOS m3 1.00 1.00 383.57 0.15 0.20 1.300 14.96

01.03.05 DEMOLICION DE MACETEROS DE CONCRETO

01.03.05.01 DEMOLICION DE MACETEROS DE CONCRETO m3 1.29

DEMOLICION DE MACETEROS DE CONCRETO m3 1.00 6.00 4.08 0.15 0.35 1.29

01.03.05.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 1.67

DE MACETEROS DE CONCRETO m3 1.00 6.00 4.08 0.15 0.35 1.300 1.67

01.03.06 DEMOLICION DE CAMELLON

01.03.06.01 DEMOLICION DE CAMELLON m3 1.00 1.00 326.36 1.300 424.27 424.27

01.03.06.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=22Km m3 1.00 1.00 2,253.31 1.300 2,929.30 2,929.30

01.03.07 EXTRACCION DE GRASS EXISTENTE

01.03.07.01 EXTRACCION DE GRASS EXISTENTE Y ELIMINACION m2 1.00 1.00 284.89 1.200 341.87 341.87

01.04 SEGURIDAD, SALUD EN EL TRABAJO


ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD
01.04.01 GLB 1.00 1.00 1.00 1.00
EN EL TRABAJO
01.04.02 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00 1.00 1.00 1.00

01.04.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 1.00 1.00 1.00

01.04.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 1.00 1.00 1.00

01.04.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00 1.00 1.00 1.00


RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE
01.04.06 GLB 1.00 1.00 1.00 1.00
EL TRABAJO
01.05 PLAN DE DESVIO VEHICULAR

01.05.01 SEÑALIZACION DE DESVIO DE TRANSITO EN PERIODO DE CONSTRUCCION und 1.00 1.00 1.00 1.00

SEÑAL PC-01: " ZONA DE TRABAJO" UND 1.00 5.00 5.00 5.00

SEÑAL IC-03: " DESVIO A 100m" UND 1.00 3.00 3.00 3.00

SEÑAL IC-01: " INICIO DE ZONA DE TRABAJO" UND 1.00 2.00 2.00 2.00

SEÑAL IC-04: " DESVIO " UND 1.00 20.00 20.00 20.00

SEÑAL IC-05: " FIN DESVIO " UND 1.00 2.00 2.00 2.00

SEÑAL:" MANTENGA SU DERECHA " UND 1.00 16.00 16.00 16.00

SEÑAL:" DISMINUIR VELOCIDAD " UND 1.00 13.00 13.00 13.00

SEÑAL:" DESPACIO OBRAS " UND 1.00 23.00 23.00 23.00

02 PAVIMENTO RIGIDO

02.01 BASE

02.01.01 REPARACION DE FISURAS DE PAVIMENTO RIGIDO m2 AREA 21,863.96

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPF1-TR1 TRAMO I- m2 1.00 1.00 732.8 732.80

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPR1-TR2 TRAMO II- m3 1.00 1.00 7,297.91 7,297.91

DPR2-TR2 TRAMO II- m4 1.00 1.00 244.67 244.67

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660)

DPF1-TR3 TRAMO III - m2 1.00 1.00 3042.75 3,042.75

DPF2-TR3 TRAMO III - m2 1.00 1.00 2858.17 2,858.17

DPF3-TR3 TRAMO III - m2 1.00 1.00 3079.69 3,079.69


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140)

DPF1-TR3 TRAMO IV - m2 1.00 1.00 1336.62 1,336.62

DPF2-TR3 TRAMO IV - m2 1.00 1.00 528.63 528.63

DPF3-TR3 TRAMO IV - m2 1.00 1.00 65.16 65.16

DPF4-TR3 TRAMO IV - m2 1.00 1.00 131.33 131.33

DPF5-TR3 TRAMO IV - m2 1.00 1.00 112.69 112.69

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650)

DPF1-TR3 TRAMO V - m2 1.00 1.00 2120.86 2,120.86

DPF1-TR3 TRAMO V - m2 1.00 1.00 54.04 54.04

DPF1-TR3 TRAMO V - m2 1.00 1.00 258.64 258.64

02.01.02 RIEGO DE LIGA m2 AREA 0.00 187,572.32

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPR1-TR1 TRAMO I- m2 2.00 2.00 14343.7 57,374.80

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2 2.00

DPF1-TR3 TRAMO III - m2 2.00 2.00 3042.75 12,171.00

DPF1-TR3 TRAMO III - m2 2.00 2.00 2858.17 11,432.68

DPF1-TR3 TRAMO III - m2 2.00 2.00 3079.69 12,318.76

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660) m2 2.00

DPR1-TR3 TRAMO III - m2 2.00 2.00 4257.99 17,031.96

DPR1-TR3 TRAMO III - m2 2.00 2.00 1403.38 5,613.52

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140) m2 2.00

DPF6-TR3 TRAMO IV - m2 2.00 2.00 10467.68 41,870.72

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650) m2 2.00

DPR1-TR3 TRAMO V - m2 2.00 2.00 4078.41 16,313.64

DPR1-TR3 TRAMO V - m2 2.00 2.00 3361.31 13,445.24

02.01.03 TENDIDO DE GEOMALLA m2 AREA 46,893.08

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPR1-TR1 TRAMO I- m2 1.00 1.00 14343.7 14,343.70

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPF1-TR3 TRAMO III - m2 1.00 1.00 3042.75 3,042.75

DPF1-TR3 TRAMO III - m2 1.00 1.00 2858.17 2,858.17

DPF1-TR3 TRAMO III - m2 1.00 1.00 3079.69 3,079.69

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660) m2

DPR1-TR3 TRAMO III - m2 1.00 1.00 4257.99 4,257.99

DPR1-TR3 TRAMO III - m2 1.00 1.00 1403.38 1,403.38

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140) m2

DPF6-TR3 TRAMO IV - m2 1.00 1.00 10467.68 10,467.68

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650) m2

DPR1-TR3 TRAMO V - m2 1.00 1.00 4078.41 4,078.41

DPR1-TR3 TRAMO V - m2 1.00 1.00 3361.31 3,361.31

02.01.04 CARPETA ASFALTICA EN CALIENTE DE 3" m2 AREA 46,893.08

ÁREA DE TENDIDO DE MALLA m2 1.00 1.00 46,893.08 46,893.08

03 PAVIMENTO FLEXIBLE

03.01 MOVIMIENTO DE TIERRAS

03.01.01 PERFILADO Y COMPACTADO DE SUBRASANTE C/EQUIPO m2 AREA 0.00 21,863.96

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPF1-TR1 TRAMO I- FLEXIBLE m2 1.00 1.00 732.8 732.80

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPR1-TR2 TRAMO II- RIGIDO m3 1.00 1.00 7,297.91 7,297.91

DPR2-TR2 TRAMO II- RIGIDO m4 1.00 1.00 244.67 244.67

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660)

DPF1-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 3042.75 3,042.75

DPF2-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 2858.17 2,858.17

DPF3-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 3079.69 3,079.69

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140)

DPF1-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 1336.62 1,336.62

DPF2-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 528.63 528.63

DPF3-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 65.16 65.16

DPF4-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 131.33 131.33

DPF5-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 112.69 112.69

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650)

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 2120.86 2,120.86

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 54.04 54.04

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 258.64 258.64


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

03.01.02 EXCAVACION MANUAL A NIVEL DE RASANTE m3 AREA 6,559.19

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m3

DPF1-TR1 TRAMO I- FLEXIBLE m3 1.00 1.00 732.8 0.30 219.84

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m3

DPR1-TR2 TRAMO II- RIGIDO m3 1.00 1.00 7,297.91 0.30 2,189.37

DPR2-TR2 TRAMO II- RIGIDO m3 1.00 1.00 244.67 0.30 73.40

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660) m3

DPF1-TR3 TRAMO III - FLEXIBLE m3 1.00 1.00 3042.75 0.30 912.82

DPF2-TR3 TRAMO III - FLEXIBLE m3 1.00 1.00 2858.17 0.30 857.45

DPF3-TR3 TRAMO III - FLEXIBLE m3 1.00 1.00 3079.69 0.30 923.91

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140) m3

DPF1-TR3 TRAMO IV - FLEXIBLE m3 1.00 1.00 1336.62 0.30 400.99

DPF2-TR3 TRAMO IV - FLEXIBLE m3 1.00 1.00 528.63 0.30 158.59

DPF3-TR3 TRAMO IV - FLEXIBLE m3 1.00 1.00 65.16 0.30 19.55

DPF4-TR3 TRAMO IV - FLEXIBLE m3 1.00 1.00 131.33 0.30 39.40

DPF5-TR3 TRAMO IV - FLEXIBLE m3 1.00 1.00 112.69 0.30 33.81

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650) m3

DPF1-TR3 TRAMO V - FLEXIBLE m3 1.00 1.00 2120.86 0.30 636.26

DPF1-TR3 TRAMO V - FLEXIBLE m3 1.00 1.00 54.04 0.30 16.21

DPF1-TR3 TRAMO V - FLEXIBLE m3 1.00 1.00 258.64 0.30 77.59

03.01.03 BASE DE AFIRMADO DE 30 CM m2 AREA

1.00 1.00 21,863.96 0.30 1.250 8,198.98

03.02.01 IMPRIMACION ASFALTICA CON RC-250 m2 AREA 21,863.96

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPF1-TR1 TRAMO I- FLEXIBLE m2 1.00 1.00 732.8 732.80

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPR1-TR2 TRAMO II- RIGIDO m3 1.00 1.00 7,297.91 7,297.91

DPR2-TR2 TRAMO II- RIGIDO m4 1.00 1.00 244.67 244.67

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660)

DPF1-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 3042.75 3,042.75

DPF2-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 2858.17 2,858.17

DPF3-TR3 TRAMO III - FLEXIBLE m2 1.00 1.00 3079.69 3,079.69

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140)

DPF1-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 1336.62 1,336.62

DPF2-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 528.63 528.63

DPF3-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 65.16 65.16

DPF4-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 131.33 131.33

DPF5-TR3 TRAMO IV - FLEXIBLE m2 1.00 1.00 112.69 112.69

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650)

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 2120.86 2,120.86

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 54.04 54.04

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 1.00 258.64 258.64

03.02.02 TENDIDO DE GEOMALLA m2 AREA 21,863.96

ÁREA DE TENDIDO DE MALLA 1.00 1.00 21,863.96 21,863.96

03.02.03 RIEGO DE LIGA m2 AREA 0.00 43,210.64

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPF1-TR1 TRAMO I- FLEXIBLE m2 1.00 2.00 732.8 1,465.60

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPR1-TR2 TRAMO II- RIGIDO m3 1.00 2.00 7,297.91 14,595.82

DPR2-TR2 TRAMO II- RIGIDO m4 1.00 2.00 244.67 489.34

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660)

DPF1-TR3 TRAMO III - FLEXIBLE m2 1.00 2.00 3042.75 6,085.50

DPF2-TR3 TRAMO III - FLEXIBLE m2 1.00 2.00 2858.17 5,716.34

DPF3-TR3 TRAMO III - FLEXIBLE m2 1.00 2.00 3079.69 6,159.38

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140)

DPF1-TR3 TRAMO IV - FLEXIBLE m2 1.00 2.00 1336.62 2,673.24

DPF2-TR3 TRAMO IV - FLEXIBLE m2 1.00 2.00 528.63 1,057.26

DPF3-TR3 TRAMO IV - FLEXIBLE m2 1.00 2.00 65.16 130.32

DPF4-TR3 TRAMO IV - FLEXIBLE m2 1.00 2.00 131.33 262.66

DPF5-TR3 TRAMO IV - FLEXIBLE m2 1.00 2.00 112.69 225.38

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650)

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 2.00 2120.86 4,241.72

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 2.00 54.04 108.08

DPF1-TR3 TRAMO V - FLEXIBLE m2 1.00 2.00 258.64 517.28


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

03.02.04 CARPETA ASFALTICA EN CALIENTE 4" m2 AREA 21,863.96

CARPETA ASFALTICA m2 1.00 1.00 21,863.96 21,863.96

04 FRESADO - BACHEO PAVIMENTO FLEXIBLE

04.01 MOVIMIENTO DE TIERRAS


CORTE DE PAVIMENTO CON C/EQUIPO DISCO, DEMOLICION Y ELIMINACION DE LA
04.01.01 m2 AREA 481.58
CARPETA ASFALTICA DAÑADA

BC1-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC2-TR3 TRAMO III m2 1.00 1.00 15.66 15.66

BC3-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC4-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC5-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC6-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC7-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC8-TR3 TRAMO III m2 1.00 1.00 13.29 13.29

BC9-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC10-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC11-TR3 TRAMO III m2 1.00 1.00 9.99 9.99

BC12-TR3 TRAMO III m2 1.00 1.00 10.00 10.00

BC13-TR3 TRAMO III m2 1.00 1.00 10.00 10.00

BC14-TR3 TRAMO III m2 1.00 1.00 21.00 21.00

BC15-TR3 TRAMO III m2 1.00 1.00 16.48 16.48

BC16-TR3 TRAMO III m2 1.00 1.00 0.99 0.99

BC17-TR3 TRAMO III m2 1.00 1.00 16.63 16.63

BC18-TR3 TRAMO III m2 1.00 1.00 8.00 8.00

BC19-TR3 TRAMO III m2 1.00 1.00 21.50 21.50

BC20-TR3 TRAMO III m2 1.00 1.00 0.99 0.99

BC21-TR3 TRAMO III m2 1.00 1.00 120.96 120.96

BC22-TR3 TRAMO III m2 1.00 1.00 8.23 8.23

BC23-TR3 TRAMO III m2 1.00 1.00 114.54 114.54

BC24-TR3 TRAMO III m2 1.00 1.00 3.56 3.56

BC25-TR3 TRAMO III m2 1.00 1.00 8.05 8.05

BC26-TR3 TRAMO III m2 1.00 1.00 2.00 2.00

BC27-TR3 TRAMO III m2 1.00 1.00 15.00 15.00

BC28-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC29-TR3 TRAMO III m2 1.00 1.00 0.36 0.36

BC30-TR3 TRAMO III m2 1.00 1.00 4.68 4.68

BACH1-TR5 TRAMO V m2 1.00 1.00 38.65 38.65

BACH2-TR5 TRAMO V m2 1.00 1.00 1.52 1.52

BACH3-TR5 TRAMO V m2 1.00 1.00 1.39 1.39

BACH4-TR5 TRAMO V m2 1.00 1.00 14.87 14.87

04.01.02 EXCAVACION MANUAL A NIVEL DE RASANTE m3 AREA 144.47

BC1-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC2-TR3 TRAMO III m3 1.00 1.00 15.66 0.30 4.70

BC3-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC4-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC5-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC6-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC7-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC8-TR3 TRAMO III m3 1.00 1.00 13.29 0.30 3.99

BC9-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC10-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC11-TR3 TRAMO III m3 1.00 1.00 9.99 0.30 3.00

BC12-TR3 TRAMO III m3 1.00 1.00 10.00 0.30 3.00

BC13-TR3 TRAMO III m3 1.00 1.00 10.00 0.30 3.00

BC14-TR3 TRAMO III m3 1.00 1.00 21.00 0.30 6.30

BC15-TR3 TRAMO III m3 1.00 1.00 16.48 0.30 4.94

BC16-TR3 TRAMO III m3 1.00 1.00 0.99 0.30 0.30

BC17-TR3 TRAMO III m3 1.00 1.00 16.63 0.30 4.99

BC18-TR3 TRAMO III m3 1.00 1.00 8.00 0.30 2.40

BC19-TR3 TRAMO III m3 1.00 1.00 21.50 0.30 6.45

BC20-TR3 TRAMO III m3 1.00 1.00 0.99 0.30 0.30

BC21-TR3 TRAMO III m3 1.00 1.00 120.96 0.30 36.29


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

BC22-TR3 TRAMO III m3 1.00 1.00 8.23 0.30 2.47

BC23-TR3 TRAMO III m3 1.00 1.00 114.54 0.30 34.36

BC24-TR3 TRAMO III m3 1.00 1.00 3.56 0.30 1.07

BC25-TR3 TRAMO III m3 1.00 1.00 8.05 0.30 2.42

BC26-TR3 TRAMO III m3 1.00 1.00 2.00 0.30 0.60

BC27-TR3 TRAMO III m3 1.00 1.00 15.00 0.30 4.50

BC28-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC29-TR3 TRAMO III m3 1.00 1.00 0.36 0.30 0.11

BC30-TR3 TRAMO III m3 1.00 1.00 4.68 0.30 1.40

BACH1-TR5 TRAMO V m3 1.00 1.00 38.65 0.30 11.59

BACH2-TR5 TRAMO V m3 1.00 1.00 1.52 0.30 0.46

BACH3-TR5 TRAMO V m3 1.00 1.00 1.39 0.30 0.42

BACH4-TR5 TRAMO V m3 1.00 1.00 14.87 0.30 4.46

04.01.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10Km m3 AREA 180.59

ELIMINACION BACHEO m3 1.00 1.00 481.58 0.30 1.250 180.59

04.01.04 CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO DE BASE EXISTENTE m2 AREA 481.58

CONFORMACION m2 1.00 1.00 481.58 481.58

04.01.05 BASE DE AFIRMADO DE 20 CM m2 AREA 96.32

AFIRMADO m2 1.00 1.00 481.58 0.20 96.32

04.02 BASE

04.02.01 IMPRIMACION ASFALTICA CON RC-250 m2 AREA 0.00 481.58

IMPRIMACION m2 1.00 1.00 481.58 481.58

04.02.02 CARPETA ASFALTICA EN CALIENTE 2" m2 481.58

CARPERTA ASFALTICA m2 1.00 1.00 481.58 481.58

05 RECAPEO

5.01 RIEGO DE LIGA m2 AREA 0.00 46,893.08

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPR1-TR1 TRAMO I- m2 1.00 1.00 14343.7 14,343.70

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPF1-TR3 TRAMO III - m2 1.00 1.00 3042.75 3,042.75

DPF1-TR3 TRAMO III - m2 1.00 1.00 2858.17 2,858.17

DPF1-TR3 TRAMO III - m2 1.00 1.00 3079.69 3,079.69

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660) m2

DPR1-TR3 TRAMO III - m2 1.00 1.00 4257.99 4,257.99

DPR1-TR3 TRAMO III - m2 1.00 1.00 1403.38 1,403.38

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140) m2

DPF6-TR3 TRAMO IV - m2 1.00 1.00 10467.68 10,467.68

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650) m2

DPR1-TR3 TRAMO V - m2 1.00 1.00 4078.41 4,078.41

DPR1-TR3 TRAMO V - m2 1.00 1.00 3361.31 3,361.31

5.02 CARPETA ASFALTICA EN CALIENTE 3 CM m2 AREA 46,893.08

PAVIMENTO TRAMO I : (PROG. 0+000 - 0+540) m2

DPR1-TR1 TRAMO I- m2 1.00 1.00 14343.7 14,343.70

PAVIMENTO TRAMO II : (PROG. 0+540 - 1+030) m2

DPF1-TR3 TRAMO III - m2 1.00 1.00 3042.75 3,042.75

DPF1-TR3 TRAMO III - m2 1.00 1.00 2858.17 2,858.17

DPF1-TR3 TRAMO III - m2 1.00 1.00 3079.69 3,079.69

PAVIMENTO TRAMO III : (PROG. 1+030 - 1+660) m2

DPR1-TR3 TRAMO III - m2 1.00 1.00 4257.99 4,257.99

DPR1-TR3 TRAMO III - m2 1.00 1.00 1403.38 1,403.38

PAVIMENTO TRAMO IV : (PROG. 1+660 - 2+140) m2

DPF6-TR3 TRAMO IV - m2 1.00 1.00 10467.68 10,467.68

PAVIMENTO TRAMO V : (PROG. 2+140 - 2+650) m2

DPR1-TR3 TRAMO V - m2 1.00 1.00 4078.41 4,078.41

DPR1-TR3 TRAMO V - m2 1.00 1.00 3361.31 3,361.31

06 VEREDA, RAMPAS Y MARTILLOS

06.01 MOVIMIENTO DE TIERRAS

06.01.01 CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO PARA VEREDAS m2 AREA 46,861.62

VEREDEAS Y MARTILLOS DEMOLIDOS m2 1.00 1.00 46,004.00 46,004.00

RAMPAS m2 1.00 1.00 857.62 857.62

06.01.02 EXCAVACION MANUAL A NIVEL DE RASANTE m3 AREA 9,372.32

VEREDEAS Y MARTILLOS DEMOLIDOS m3 1.00 1.00 46,004.00 0.20 9,200.80

RAMPAS m3 1.00 1.00 857.62 0.20 171.52

06.01.03 BASE AFIRMADO PARA VEREDAS ESTAMPADA, E=0.10M m2 AREA 8,019.48

m3 1.00 1.00 8,019.48 8,019.48

06.01.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10Km m3 AREA 11,715.40


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

VEREDEAS Y MARTILLOS DEMOLIDOS m3 1.00 1.00 46,004.00 0.20 1.250 11,501.00

RAMPAS m3 1.00 1.00 857.62 0.20 1.250 214.41

06.02 VEREDAS

06.02.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDA m2 1,472.60

VEREDAS DEMOLIDAS TRAMO I m2 1.00 1.00 2,686.00 0.10 268.60

VEREDAS DEMOLIDAS TRAMO II m2 1.00 1.00 206.93 0.10 20.69

VEREDAS DEMOLIDAS TRAMO III m2 1.00 1.00 2,334.30 0.10 233.43

VEREDAS DEMOLIDAS TRAMO IV m2 1.00 1.00 2,244.43 0.10 224.44

VEREDAS DEMOLIDAS TRAMO V m2 1.00 1.00 1,667.50 0.10 166.75

VEREDAS ESTAMPADAS TRAMO I m2 1.00 1.00 1,174.04 0.10 117.40

VEREDAS ESTAMPADAS TRAMO II m2 1.00 1.00 1,258.26 0.10 125.83

VEREDAS ESTAMPADAS TRAMO III m2 1.00 1.00 1,456.39 0.10 145.64

VEREDAS ESTAMPADAS TRAMO IV m2 1.00 1.00 923.11 0.10 92.31

VEREDAS ESTAMPADAS TRAMO V m2 1.00 1.00 775.00 0.10 77.50


CONCRETO PREMEZCLADO F'C=175KG/CM2 PARA VEREDAS E=10CM, INC. ACABADO Y
06.02.02 m3 1.00 1.00 AREA 1,667.22
SEMIPULIDO
VEREDAS TRAMO I : (PROG. 0+000 - 0+540) m3 ÁREA

TRAMO I m4 1.00 1.00 3,985.10 0.10 398.51

VEREDAS TRAMO I I : (PROG. 0+540 - 1+030) m5 ÁREA 0.00

TRAMO II m6 1.00 1.00 39.57 0.10 3.96

VEREDAS TRAMO III : (PROG. 1+030- 1+660) m7 ÁREA 0.00

TRAMO III m8 1.00 1.00 1,517.23 0.10 906.09

VEREDAS TRAMO IV : (PROG. 1+660- 2+140) m9 ÁREA 0.00

TRAMO IV m10 1.00 1.00 1,975.11 0.10 197.51

VEREDAS TRAMO V : (PROG. 2+140- 2+650) m11 ÁREA 0.00

TRAMO V m12 1.00 1.00 1,611.49 0.10 161.15

CONCRETO PREMEZCLADO F'C= 175KG/CM2 PARA VEREDAS E=10 CM INC.


06.02.03 m3 ÁREA 1,556.31
ACABADO,SEMIPULIDO Y ESTAMPADO

VEREDASESTAMPADAS TRAMO I : (PROG. 0+000 - 0+540) m2 ÁREA 0.00

TRAMO I m2 1.00 1.00 1,414.65 0.10 141.47

VEREDASESTAMPADAS TRAMO I I : (PROG. 0+540 - 1+030) m2 ÁREA 0.00

TRAMO II m2 1.00 1.00 1,501.00 0.10 150.10

VEREDASESTAMPADAS TRAMO III : (PROG. 1+030- 1+660) m2 ÁREA 0.00

TRAMO III m2 1.00 1.00 1,517.23 0.10 906.09

VEREDASESTAMPADAS TRAMO IV : (PROG. 1+660- 2+140) m2 ÁREA 0.00

TRAMO IV m2 1.00 1.00 1,975.11 0.10 197.51

VEREDASESTAMPADAS TRAMO V : (PROG. 2+140- 2+650) m2 ÁREA 0.00

TRAMO V m2 1.00 1.00 1,611.49 0.10 161.15

06.02.04 CONCRETO PREMEZCLADO F'C=175KG/CM2 P/UÑAS m3 ÁREA SECCION 72.30

UñAS EN VEREDAS TRAMO I m3 1.00 1.00 791.41 0.02 15.83

UñAS EN VEREDAS TRAMO II m3 1.00 1.00 741.70 0.02 14.83

UñAS EN VEREDAS TRAMO III m3 1.00 1.00 911.40 0.02 18.23

UñAS EN VEREDAS TRAMO IV m3 1.00 1.00 670.63 0.02 13.41

UñAS EN VEREDAS TRAMO V m3 1.00 1.00 499.77 0.02 10.00

06.02.05 CURADO DE CONCRETO m2 542.24

UñAS EN VEREDAS TRAMO I m3 1.00 1.00 791.41 0.15 118.71

UñAS EN VEREDAS TRAMO II m3 1.00 1.00 741.70 0.15 111.26

UñAS EN VEREDAS TRAMO III m3 1.00 1.00 911.40 0.15 136.71

UñAS EN VEREDAS TRAMO IV m3 1.00 1.00 670.63 0.15 100.59

UñAS EN VEREDAS TRAMO V m3 1.00 1.00 499.77 0.15 74.97

06.02.06 JUNTAS ASFÀLTICAS E = 1" m 0.00 3,614.92

JUNTA S TRAMO I m3 1.00 1.00 791.41 791.41

JUNTA S TRAMO II m3 1.00 1.00 741.70 741.70

JUNTA S TRAMO III m3 1.00 1.00 911.40 911.40

JUNTA S TRAMO IV m3 1.00 1.00 670.63 670.63

JUNTA S TRAMO V m3 1.00 1.00 499.77 499.77

06.03 RAMPAS

06.03.01 CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO PARA RAMPAS m2 ÁREA 857.62

RAMPAS TRAMO I: (PROG. 0+000 HASTA 0+540) m2 ÁREA 0.00

TRAMO I m2 204.03 204.03

RAMPASTRAMO II: (PROG. 0+540 HASTA 1+030) m2 ÁREA 0.00

TRAMO II m2 1.00 1.00 104.26 104.26

RAMPASTRAMO III: (PROG. 1+030 HASTA 1+660) m2 ÁREA 0.00

TRAMO III m2 1.00 1.00 183.71 183.71

RAMPAS TRAMO IV: (PROG. 1+660 HASTA 2+140) m2 ÁREA 0.00

TRAMO IV m2 1.00 1.00 177.03 177.03

RAMPAS TRAMO V: (PROG. 2+140 HASTA 2+635) m2 ÁREA 0.00

TRAMO V m2 1.00 1.00 188.59 188.59

06.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA RAMPA m2 142.87

ENCOFRADO m2 1.00 1.00 952.46 0.15 142.87


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES
CONCRETO PREMEZCLADO F'C=175KG/CM2 PARA RAMPAS E=10CM, INC. ACABADO Y
06.03.03 m3 128.64
SEMIPULIDO
RAMPAS TRAMO I: (PROG. 0+000 HASTA 0+540) m2 ÁREA 0.00

TRAMO I 204.03 0.15 30.60

RAMPASTRAMO II: (PROG. 0+540 HASTA 1+030) m2 ÁREA 0.00

TRAMO II m2 1.00 1.00 104.26 0.15 15.64

RAMPASTRAMO III: (PROG. 1+030 HASTA 1+660) m2 ÁREA 0.00

TRAMO III m2 1.00 1.00 183.71 0.15 27.56

RAMPAS TRAMO IV: (PROG. 1+660 HASTA 2+140) m2 ÁREA 0.00

TRAMO IV m2 1.00 1.00 177.03 0.15 26.55

RAMPAS TRAMO V: (PROG. 2+140 HASTA 2+635) m2 ÁREA 0.00

TRAMO V m2 1.00 1.00 188.59 0.15 28.29

06.04 ESCALONES

06.04.01 CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO PARA ESCALONES m2 2.00 2.00 4.00 4.00

06.04.02 ENCOFRADO Y DESENCOFRADO NORMAL DE CONTRAPASO m2 1.00 1.00 1.00 1.00

06.04.03 CONCRETO PREMEZCLADO F'C=175KG/CM2 PARA ESCALONES GARGANTE H=20CM m2 1.00 1.00 1.00 1.00

07 CAMELLON

07.01 MOVIMIENTO DE TIERRAS

07.01.01 EXCAVACION MANUAL A NIVEL DE RASANTE m3 7.00 2.00 14.00 14.00

07.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 7.00 2.00 14.00 14.00

07.01.03 BASE DE AFIRMADO DE 20 CM m2 7.00 2.00 14.00 14.00

07.01.04 PERFILADO DE SUBRASANTE MANUAL m2 7.00 2.00 14.00 14.00

07.01.05 CAMA DE ARENA DE E=0.05m P/PISO ADOQUIN m2 7.00 2.00 14.00 14.00

07.02 PISO ADOQUIN

07.02.01 ACERO DE REFUERZO FY=4200 kg/cm2 - SARDINEL PERALTADO kg 7.00 3.00 21.00 21.00

07.02.02 PISO DE ADOQUINES DE 10X20X6 cm - COLOR SEGUN DISEÑO m2 7.00 3.00 21.00 21.00

08 PISO ADOQUINADO

08.01 MOVIMIENTO DE TIERRAS

08.01.01 PERFILADO DE SUBRASANTE MANUAL m2 7.00 18.00 126.00 126.00

08.01.02 CAMA DE ARENA DE E=0.05m P/PISO ADOQUIN m2 8.00 1.00 8.00 8.00

08.02 PISO ADOQUIN

08.02.01 PISO DE ADOQUINES DE 10X20X6 cm - COLOR SEGUN DISEÑO m2 82.00 1.00 82.00 82.00

09 SARDINEL PERALTADO PREFABRICADO

09.01 MOVIMIENTO DE TIERRAS

09.01.01 EXCAVACION MANUAL A NIVEL DE RASANTE m3 91.00 1.00 91.00 91.00

09.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 91.00 1.00 91.00 91.00

09.02 CONCRETO ARMADO

09.02.01 SARDINEL PREFABRICADO 1.00 x 0.15 x 0.35 F'C=210 KG/CM2 m 92.00 1.00 92.00 92.00

09.02.02 CURADO DE CONCRETO m2 92.00 1.00 92.00 92.00

09.02.03 JUNTA ASFALTICA E=1" m2 92.00 1.00 92.00 92.00

10 SARDINEL PERALTADO

10.01 MOVIMIENTO DE TIERRAS

10.01.01 EXCAVACION A NIVEL DE RASANTE C/EQUIPO m3 10.00 1.00 10.00 10.00

10.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 10.00 1.00 10.00 10.00

10.02 CONCRETO ARMADO

10.02.01 ACERO DE REFUERZO FY=4200 kg/cm2 - SARDINEL PERALTADO kg 10.20 1.00 10.20 10.20

10.02.02 ENCOFRADO Y DESENCOFRADO P/SARDINEL PERALTADO m2 10.20 1.00 10.20 10.20

10.02.03 CONCRETO PREMEZCLADO f'c=210kg/cm2 PARA SARDINEL PERALTADO m3 10.20 1.00 10.20 10.20

10.02.04 CURADO DE CONCRETO m2 10.20 1.00 10.20 10.20

10.02.05 JUNTA ASFALTICA E=1" m2 10.20 1.00 10.20 10.20

11 SARDINEL SUMERGIDO

11.01 MOVIMIENTO DE TIERRAS 2.00 1.00 435.00 870.00 892.00

11.01.01 EXCAVACION A NIVEL DE RASANTE C/EQUIPO m3 11.00 1.00 11.00 11.00

11.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 11.00 1.00 11.00 11.00

11.02 CONCRETO ARMADO 1.00 2.00 170.00 340.00 351.20

11.02.01 ACERO DE REFUERZO FY=4200 kg/cm2 - SARDINEL SUMERGIDO kg 11.20 1.00 11.20 11.20

11.02.02 ENCOFRADO Y DESENCOFRADO P/SARDINEL SUMERGIDO m2 11.20 1.00 11.20 11.20

11.02.03 CONCRETO PREMEZCLADO f'c=210kg/cm2 PARA SARDINEL SUMERGIDO m3 11.20 1.00 11.20 11.20

11.02.04 CURADO DE CONCRETO m2 11.20 1.00 11.20 11.20

11.02.05 JUNTA ASFALTICA E=1" m2 11.20 1.00 11.20 11.20

12 OBRAS COMPLEMENTARIAS

12.01 MOBILIARIO

12.01.01 INSTALACION DE MOBILIARIOS

12.01.01.01 SUMINISTRO E INSTALACION DE PARADEROS und 12.10 1.00 12.10 12.10

12.01.01.02 SUMINISTRO E INSTALACION DE DEPOSITO DE RESIDUOS DE FIBRA DE VIDRIO und 12.10 1.00 12.10 12.10
MANTENIMIENTO DE ESTRUCTURA FORMA DE ESTRELLA Y PEDESTAL CON
12.01.01.03 GLB 12.10 1.00 12.10 12.10
MONUMENTO.
12.01.01.04 BARANDA EN RAMPA GLB 12.10 1.00 12.10 12.10

12.01.02 MACETEROS DE CONCRETO

12.01.02.01 MOVIMIENTO DE TIERRAS

12.01.02.01.01 EXCAVACION A NIVEL DE RASANTE C/EQUIPO m3 12.20 1.00 12.20 12.20

12.01.02.01.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 12.20 1.00 12.20 12.20

12.01.02.02 CONCRETO ARMADO


METRADOS
PROYECTO: "MEJORAMIENTO DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL AV. VICTOR RAUL HAYA DE LA TORRE, TRAMO: AV. LA PAZ HASTA LA AV. COLONIAL, LA PERLA DEL DISTRITO DE LA PERLA - PROVINCIA DE
CALLAO - DEPARTAMENTO DE CALLA"

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DEL CALLAO


LUGAR: AV. VICTOR RAUL HAYA DE LA TORRE
FECHA: 5/13/2024

Nº DE
ITEM DESCRIPCIÓN UBICACIÓN UND EI LONG. ANCHO ALTO FACTOR SUB TOTAL TOTAL
VECES

12.01.02.02.01 ACERO DE REFUERZO FY=4200 kg/cm2 - SARDINEL SUMERGIDO kg 12.20 1.00 12.20 12.20

12.01.02.02.02 ENCOFRADO Y DESENCOFRADO P/SARDINEL SUMERGIDO m2 12.20 1.00 12.20 12.20

12.01.02.02.03 CONCRETO PREMEZCLADO F'C= 210 KG/CM2 INC ACABADO TIPO RUSTICO m3 12.20 1.00 12.20 12.20

12.01.02.02.04 CURADO DE CONCRETO m2 12.20 1.00 12.20 12.20

12.02 PINTURA Y SEÑALIZACION 1.00 1.00 110.40 1.300 143.52

12.02.01 SUMINISTRO Y COLOCACION DE TACHAS INC. ACCESORIOS und 12.30 1.00 12.30 12.30

12.02.02 PINTURA TRAFICO EN BORDE DE VEREDAS m 12.30 1.00 12.30 12.30

12.02.03 PINTURA TRAFICO EN BORDE DE RAMPAS m 12.30 1.00 12.30 12.30

12.02.04 PINTURA SARDINEL PERALTADO PREFABRICADO m 12.30 1.00 12.30 12.30

12.02.05 PINTURA SARDINEL PERALTADO m 12.30 1.00 12.30 12.30

12.02.06 PINTURA EN SARDINEL SUMERGIDO m 12.30 1.00 12.30 12.30

12.02.07 PINTADO DE PAVIMENTO (LINEAS DISCONTINUAS) m 12.30 1.00 12.30 12.30

12.02.08 PINTADO DE PAVIMENTO (SIMBOLOS Y LETRAS) m2 12.30 1.00 12.30 12.30

12.02.09 SUMINISTRO E INSTALACION DE BOLARDO DE CONCRETO INC. ACCESORIOS und 12.30 1.00 12.30 12.30

12.02.10 SEÑAL INFORMATIVA (SEÑALES VERTICALES DE TRANSITO) und 12.30 1.00 12.30 12.30

12.03 JARDINERIA

12.03.01 MOVIMIENTO DE TIERRAS

12.03.01.01 EXCAVACION MANUAL PARA AREA VERDE m3 12.40 1.00 12.40 12.40

12.03.01.02 PREPARACION DE TERRENO PARA COLOCACION DE AREA VERDE E=0.10 m2 12.40 1.00 12.40 12.40

12.03.01.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 12.40 1.00 12.40 12.40

12.03.02 JARDINERIA

12.03.02.01 SUMINISTRO Y COLOCACION DE FLOR TIPO LAUREL und 12.40 1.00 12.40 12.40

12.03.02.02 SUMINISTRO Y COLOCACION DE ARBUSTO TIPO CROTON und 12.40 1.00 12.40 12.40

12.03.02.03 SUMINISTRO E INSTALACION DE GRASS NATURAL m2 12.40 1.00 12.40 12.40

12.03.02.04 CONSERVACION Y RIEGO DE JARDINES m2 12.40 1.00 12.40 12.40

12.04 MITIGACION DE IMPACTO AMBIENTAL

12.04.01 MITIGACION DE IMPACTO AMBIENTAL GLB 12.50 1.00 12.50 12.50

12.05 VARIOS

12.05.01 REUBICACION DE PALMERAS und 12.50 1.00 12.50 12.50

12.05.02 REUBICACION DE MACETAS EXISTENTES und 12.50 1.00 12.50 12.50

12.05.03 REUBICACION DE POSTE CON SEÑALIZACION und 12.50 1.00 12.50 12.50

12.05.04 REUBICACION DE SEMAFORO und 12.50 1.00 12.50 12.50

12.05.05 REUBICACION DE ARBUSTO und 12.50 1.00 12.50 12.50

12.05.06 REUBICACION DE ARBOL und 12.50 1.00 12.50 12.50

12.05.07 LIMPIEZA FINAL DE LA OBRA m2 12.50 1.00 12.50 12.50

13 INSTALACIONES ELECTRICAS

13.01 OBRAS PRELIMINARES

13.01.01 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR glb glb 1.00 1.00 1.00 1.00

13.02 MOVIMIENTOS DE TIERRA 0.00

13.02.01 EXCAVACION DE HOYO PARA POSTES m3 m3 10.00 1.00 10.00 10.00

13.02.02 EXCAVACION DE ZANJA PARA CABLES SUBTERRANEOS 0.60m PROFUNDIDAD ml ml 1.00 1.00 3200 3,200.00 3,200.00

13.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO m3 m3 460.00 1.00 460.00 460.00

13.02.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE 10m3 D=10 Km m3 m3 460.00 1.00 460.00 460.00

13.03 SUMINISTRO E INSTALACION DE CABLES SUBTERRANEOS 0.00

13.03.01 CABLE ELECTRICO N2XOH 3-1x6mm2 m m 1.00 1.00 3500 3,500.00 3,500.00

13.03.05 CABLE ELECTRICO NH80 LINEA A TIERRA 1-1x6mm2 m m 1.00 1.00 3500 3,500.00 3,500.00

13.04 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS

13.04.01 KIT DE DERIVACION 6MM und und 1.00 1.00 1.00 1.00

13.05 TABLERO ELECTRICO DE PROTECCION Y CONTROL 1.00 1.00 1.00

13.05.01 MURETE DE 175kg/cm2 CON BASE PRISMATICA PARA MEDIDOR Y TABLERO und und 1.00 3 3.00 3.00

12.05.04 TABLERO DE DISTRIBUCION DE 40 POLOS, IP 65 und und 1.00 3 3.00 3.00

12.05.05 INTERRUPTOR TERMOMAGNETICO 3X32A 10kA CAJA MOLDEADA und und 1.00 3 3.00 3.00

12.05.06 INTERRUPTOR TERMOMAGNETICO RIEL DIN 3x16A 6kA und und 1.00 5 5.00 5.00

12.05.07 INTERRUPTOR DIFERENCIAL RIEL DIN 4X25A, 30mA und und 1.00 5 5.00 5.00

12.05.08 CONTACTOR RIEL DIN 3x25 A und und 1.00 5 5.00 5.00

12.05.09 INTERRUPTOR HORARIO 16 A und und 1.00 5 5.00 5.00

12.06 SUMINISTRO E INSTALACION DE LUMINARIAS Y POSTES 0.00

12.06.01 CONCRETO FC=175 KG/CM2 PARA BASE DE POSTE CON 5CM SOBRE EL NPT m3 m3 12.00 1.00 12.00 12.00

12.06.02 POSTE METALICO CONICO DE 5.00m, CON BASE PLANA PARA LUMINARIA und und 50 1.00 50.00 50.00

12.06.03 LUMINARIA TIPO ALUMBRADO PUBLICO LED 10000lm,100W,CRI>80,6500K,IP65 und und 50 1.00 50.00 50.00

LUMINARIA SPOT PARA PISO EXTERIOR LED 6000lm,30W,CRI>70,3000K,IP66 und und 4 1.00 4.00 4.00

12.07 SISTEMA DE PUESTA A TIERRA 1.00 1.00 1.00

12.07.01 SISTEMA DE PUESTA A TIERRA 25 OHM und und 3.00 1.00 3.00 3.00

12.08 ENSAYOS ELECTRICOS Y OTROS 1.00 1.00 1.00


PRUEBAS ELECTRICAS
12.08.01 glb glb 1.00 1.00 1.00 1.00

12.08.02 SUMINISTRO FACTIBILIDAD DE ENERGIA ELECTRICA und und 3.00 1.00 3.00 3.00
SUMERGIDO PERALTADO PREFABRICADO Uñas

1473.547 3997.578 0 791.414

55.65 63.128 791.414

5.35 92.38

7.79 56.07

10.81 163.8

2.7 89.05

1.4 127.7

5.54 17.7

7.64 96.14

4.08 53.38

4.13 83.46

2.93 9.38

4 12

7.21 7.18

17.69 7.18

3 14.32

2.96 14.32

5.6 84.28

11.11 84.28

1.36 7.18

37.18 7.18

4.6 32.38

11.39 44.97

2 46.44

8.27 71.67

4.93 60.16
39.81 18.43
33.33 19.93
3.09 3.6
7.8 2
15.6 8
0.81 16.56
2.82 5
11.9 55.3
35.32 84.07
23.67 31.01
1.75 51.2
15.4 13.15
5.81 22.89
1.72 51.2
5.29 21.78
1.39 20.28
2 43.85
2 62.21
3.58 3.59
39.04 30.14
12.67 28.69
4 7.73
11.9 6.93
35.32 6.93
24.34 14.67
9.59 4
11.13 52.6
4.24 18.75
9.8 11
30.89 5
2.46 4.24
1.86 33.49
2.82 9.96
1.9 24.68
1.96 23.6
19.92 8.5
1.54 133.93
24.34 168.59
9.68 183.21
1.46 20.48
1.36 52.04
17.21 74.8
2.14 27.93
2.05 14.59
2.83 40.32
16.35 13.54
2.42 21.89
2.02 27.13
4.51 34.69
10.26 53.46
11.78 24.52
27.35 14.52
6.9 23.25
11 77.95
2.93 293.46
2.35 30.09
1.737 18.61
20.42 30.06
1.39 48.87
21.88 18.54
7.32 18.27
44 48.07
5.35 33.32
1.39 56.88
27.05 30.1
30.59 72.68
4.77 32.55
27.79 17.23
32.47 71.32
1.4
1.4
12.37
31.35
1.6
16.86
16.06
2.15
3.81
14.32
2.04
14.15
5.49
18.55
5.54
17.63
7.93
21.91
38.34
24.74
22.13
1.54
44.06
8.94
6.1
27.6
20.6
32.05
SUMERGIDO PERALTADO PREFABRICADO UÑAS CON HAROLD

3454.72 1302.11 890.547 741.701

3454.72 1302.11 890.547 741.701


SUMERGIDO PERALTADO PREFABRICADO UÑAS CON JHAN FRANCO

3730.32 1428.832 1323.188 911.404

3730.32 1428.832 1323.188 911.404


SUMERGIDO PERALTADO PREFABRICADO UÑAS

3100.679 1134.94 709.92 670.63

3100.679 1134.94 709.92 670.63


SUMERGIDO PERALTADO PREFABRICADO UNñAS

1026.413 1006.77 675.24 499.77


25.3 73.39 100.66 499.77
24.75 125.41 265.5
193.46 34.15 99.65
74.23 86.55 170.84
129.66 38.59 38.59
23.023 25.42
25.93 21.26
16.33 20.96
2.89 14.88
43.75 20.76
45 17.93
31 20.7
9.86 141.23
20.84 10.18
21.55 9.88
9 9.67
2.15 18.74
16.66 139.01
20.99 135.45
39 26.65
16.82 6
5.22 9.96
54.71
6.29
45.86
45.84
7.15
52.35
5.3
7.5
4

También podría gustarte