RESUMEN GENERAL DEL PRESUPUESTO ANALÍTICO
“REPINTADO DE LA LOSA MULTIDEPORTIVA DE LA INSTITUCION EDUCATIVA No 50150 MAXIMO SAN ROMAN DEL DISTRITO DE
ACTIVIDAD: CALCA, PROVINCIA DE CALCA - CUSCO”
GASTOS GENERALES
04 HERRAMIENTAS S/ 116.00
DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL
PILAS DURACELL AA PAR 6.00 6.00 36.00
DISTANCIOMETRO DIGITAL UND 0.00 300.00 0.00
WINCHA 5 MT UND 2.00 20.00 40.00
LINTERNAS DOS PILAS UND 0.00 35.00 0.00
GPS NAVEGADOR UND 0.00 1,800.00 0.00
WINCHA DE 50 MT UND 0.00 70.00 0.00
FOCOS DE LINTERNA UND 0.00 3.00 0.00
FOCOS AHORRADORES UND 0.00 12.00 0.00
TARJETAS TELEFONICAS UND 0.00 10.00 0.00
CANDADOS UND 2.00 20.00 40.00
TOTAL 116.00
COSTO DIRECTO
TOTAL 20,141.88
TOTAL #NAME?
TOTAL 1,535.57
GASTOS DE SUPERVISION
TOTAL 1,375.00
Precio S/.
Personal Unidad Cantidad Parcial S/. Presupuestado S/.
DIARIO
20,417.77
RELACION DE INSUMOS
“REPINTADO DE LA LOSA MULTIDEPORTIVA DE LA INSTITUCION EDUCATIVA No 50150 MAXIMO SAN ROMAN DEL
DISTRITO DE CALCA, PROVINCIA DE CALCA - CUSCO”
8,845.00
#NAME?
METRADO
RESPONSABLE :
:
D
“REPINTADO DE LA LOSA MULTIDEPORTIVA DE LA INSTITUCION EDUCATIVA No 50150
A
ID
MAXIMO SAN ROMAN DEL DISTRITO DE CALCA, PROVINCIA DE CALCA - CUSCO”
V
TI
…………………………..
C
A
DIMENSIONES METRADO
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCION DE PARTIDA Total
Largo Ancho Alto Long. Area Vol. Kg. Gbl Und. Dia Pto Caja Pza Mes
01.02 ESTRUCTURAS
01.02.01.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 1.00 5.00 2.59 0.20 2.59
2.59
01.02.02.04 CONCRETO VEREDAS f¨c=175 kg/cm2 m3 1.00 5.00 2.59 0.19 2.50
2.50
01.03.05 SUMINISTRO E INSTALACION DE GRAS SINTETICO PARA PISO m2 1.00 7.00 3.00 21.00
21.00
01.04.01.01 CONCRETO CICLOPEO PARA CIMENTACIONES MEZCLA 1:12 + 30% P.M. m3 1.00 4.95 0.30 0.30 0.45
0.45
01.04.02.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUNTA 1.5 cm. MORT m2 1.00 4.60 1.31 6.00
6.00
01.04.04 COBERTURAS
01.04.05.01 REPOSICION DE INODORO PARA NIÑOS (incl. accesorios) glb 1.00 1.00 1.00
1.00
01.04.06 REVESTIMIENTOS
01.04.07.01 REPOSICION DE PUERTA DE MADERA (incl. cerradura) und 1.00 1.00 1.00
1.00
:
D
“REPINTADO DE LA LOSA MULTIDEPORTIVA DE LA INSTITUCION EDUCATIVA No 50150
A
ID
MAXIMO SAN ROMAN DEL DISTRITO DE CALCA, PROVINCIA DE CALCA - CUSCO”
V
TI
…………………………..
C
A
DIMENSIONES METRADO
Veces
Elem.
Nº de
Simil.
Und
ITEM DESCRIPCION DE PARTIDA Total
Largo Ancho Alto Long. Area Vol. Kg. Gbl Und. Dia Pto Caja Pza Mes
01.05.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1.00 54.45 54.45
54.45
01.05.01.03 CONCRETO PARA REPOSICION DE LAVATORIO m3 1.00 7.00 0.90 0.17 1.05
1.05
01.05.02 REVESTIMIENTOS
01.05.02.01 ENCHAPE CERAMICO RUSTICO 30x30 EN LAVATORIO m2 1.00 6.06 0.90 5.45
5.45
01.05.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 1.00 4.00 4.00
4.00
01.06 ARQUITECTURA
01.06.01 REVOQUES
01.06.01.01 RESANE CON YESO EN MUROS INTERIORES Y EXTERIORES m2 1.00 15.90 1.86 29.50
29.50
01.06.02 ZOCALOS
01.06.02.01 PICADO Y REPOSICION DE ZOCALO DE CEMENTO PULIDO h:0.80 m (interiores y exteriores) m 1.00 31.80 31.80
31.80
01.06.03 PINTURAS
01.06.03.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES m2 1.00 59.00 1.50 88.50
88.50
01.08.01 ESTRUCTURAS
01.08.02 ARQUITECTURA
01.08.02.01 REVOQUES
01.08.02.01.01 MANTENIMIENTO Y RESANE CON YESO EN MUROS INTERIORES Y EXTERIORES m2 1.00 8.00 4.00 32.00
32.00
01.08.02.02 ZOCALOS
01.08.02.02.01 PICADO Y REPOSICION DE ZOCALO DE CEMENTO PULIDO h:0.80 m (interiores y exteriores) m 1.00 15.00 15.00
15.00
01.08.02.03 PINTURAS
01.08.02.03.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES m2 1.00 16.00 5.12 81.94
81.94
01.08.02.05 CERRAJERIA
MATERIALES
1 LINEA DE VIDA HORIZONTAL DE 1" X 50 MT. und 1.00 15.00 15.00
ACEITE PARA MOTOR SAE-30 gal 4.75 3.80 18.07
ACEITE DE DOS TIEMPOS cjn 1.55 0.25 0.39
GASOLINA 90 OCTANOS gal 35.52 3.80 134.99
PETROLEO D-2 gal 7.95 1.00 7.95
ALAMBRE NEGRO RECOCIDO N° 8 kg 23.62 1.00 23.62
ALAMBRE NEGRO RECOCIDO N° 16 kg 48.08 1.00 48.08
ANGULAR DE FIERRO DE 1 1/2"X 1/8" m 49.44 1.00 49.44
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 857.36 1.00 857.36
CLAVOS PARA MADERA CON CABEZA DE 3" kg 14.25 1.00 14.25
CLAVOS PARA MADERA CON CABEZA DE 4" kg 14.25 1.00 14.25
MALLA ELECTROSOLDADA m2 17.30 8.00 138.43
TUBERIA PVC SAP C-10 DE 1/2" X 5 m m 77.65 1.00 77.65
CODO PVC SAP S/P 1/2" X 90° und 24.13 0.25 6.03
CODO PVC SAL 45° DE 4" und 17.60 0.25 4.40
CODO PVC SAL 90" DE 4" und 7.96 0.25 1.99
UNION SIMPLE PVC SAP C-10 DE 1/2" und 6.30 0.10 0.63
ADAPTADOR PVC-SAP S/P 1/2" und 10.00 0.10 1.00
TUBERIA PVC-SAL 2" X 3 m m 28.00 3.00 84.00
TUBERIA PVC-SAL 4" X 3 m m 39.92 6.00 239.52
CODO PVC-SAL 2" X 90° und 20.00 0.10 2.00
TEE SANITARIA PVC-SAL DE 2" und 2.00 0.20 0.40
TEE SANITARIA PVC-SAL DE 4" und 2.04 0.30 0.61
TRAMPA PVC SAL DE 4" und 2.00 0.50 1.00
YEE PVC SAL SIMPLE DE 2" und 8.00 0.20 1.60
AGUA PUESTA EN OBRA m3 110.71 5.00 553.57
CEMENTO PORTLAND TIPO I (42.5 kg) bol 350.08 42.50 14878.19
OCRE ROJO kg 16.20 1.00 16.20
FRAGUA PARA CERAMICO kg 46.03 1.00 46.03
LADRILLO KK 18 HUECOS 9X13X24 cm mll 6.51 3.80 24.72
PERNO HEXAGONAL und 10.00 12.00 120.00
TUBERIA ESTRUCTURAL LAC DE 4"X 2" X 2.5mm m 212.40 5.00 1062.00
TUBERIA ESTRUCTURAL LAC DE 2"X 2" X 2.5mm m 150.00 3.00 450.00
PEGAMENTO PARA PVC gal 2.68 3.80 10.20
PEGAMENTO PARA CERAMICO 25 KG bol 46.03 25.00 1150.75
SILICONA TRANSPARENTE PEGAFAN 310 ml und 0.09 0.10 0.01
ADITIVO DESMOLDEADOR DE ENCOFRADOS gal 12.16 3.80 46.21
CERAMICO PARA PARED DE 40 X 40 XM m2 76.69 4.00 306.75
CERAMICO PARA PISO DE 40 X 40 XM m2 120.32 6.00 721.93
TEJA ANDINA COLOR VERDE pln 9.74 10.00 97.44
MADERA MISA 2"X3"X10` pza 4.00 12.00 48.00
MADERA TORNILLO p2 561.46 1.00 561.46
TRIPLAY LUPUNA 4 x 8 x 19 mm pln 4.13 10.00 41.33
MADERA ROLLIZA DE 4" x 3.00 m. pza 2.00 15.00 30.00
MADERA ROLLIZA DE 2" x 3.00 m. pza 2.00 12.00 24.00
CERRADURA TIPO BOLA PARA BAÑO und 2.00 1.00 2.00
CERRADURA PARA PUERTA PRINCIPAL und 1.00 0.50 0.50
TIRAFON DE 1/4" X 5", INCL. ARANDELA Y CAPUCHUN PVC und 69.60 0.30 20.88
LIJA DE FIERRO #80 plg 5.80 0.05 0.29
LIJA DE FIERRO #100 plg 5.80 0.05 0.29
LIJA PARA PARED plg 48.40 0.05 2.42
PINTURA LATEX LAVABLE gal 4.09 3.80 15.55
PINTURA ESMALTE gal 0.70 3.80 2.64
PINTURA ESMALTE NEGRO gal 0.79 3.80 3.01
PINTURA ESMALTE gal 0.46 3.80 1.75
PINTURA SATINADA gal 12.03 3.80 45.73
PINTURA ANTICORROSIVA GRIS gal 0.70 3.80 2.64
THINNER gal 2.18 3.80 8.30
IMPRIMANTE gal 7.74 3.80 29.42
CINTA TEFLON und 1.00 0.10 0.10
SUMIDERO DE BRONCE DE 4" und 2.00 0.20 0.40
CODO FIERRO GALVANIZADO DE 1/2" X 90° und 5.25 0.10 0.53
NIPLE DE FIERRO GALVANIZADO DE 1/2" x 2" und 10.00 0.10 1.00
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" und 5.00 0.50 2.50
TAPON MACHO DE FIERRO GALVANIZADO DE 3/4" und 5.25 0.05 0.26
VALVULA COMPUERTA DE 1/2" und 5.15 1.00 5.15
TABLERO METALICO CON PUERTA Y CHAPA PARA EMPOTRAR TIPO ENGRAMPE und 1.00 8.00 8.00
3 TERMINALES, RIEL DIN, 8 POLOS
GIGANTOGRAFIA DE OBRA DE 3.60 x 2.40 und 1.00 5.00 5.00
CILINDRO DE PLASTIICO DE 50 GLN. und 6.00 2.00 12.00
SOLDADURA ELECTRICA CELLOCORD P 3/16" kg 7.25 1.00 7.25
GRIFERIA PARA LAVADERO und 5.00 0.30 1.50
FLUORESCENTE 40 W und 4.00 1.00 4.00
FLUORESCENTE CIRCULAR 40 W und 2.00 1.00 2.00
BASTIDOR CON FIERRO RECTANDULAR DE 1 1/2" X 1/2" X 1.5MM und 1.00 15.00 15.00
INTERRUPTOR TERMOMAGNETICO 2 X32 A X 220 V und 4.00 0.10 0.40
INTERRUPTOR DOBLE PLANO BAKELITA und 9.00 0.10 0.90
TOMACORRIENTE BIPOLAR DOBLE BAKELITA und 6.00 0.10 0.60
CRUCETAS PVC 4mm cto 0.51 0.10 0.05
REDLINE ESPONJA PROF DOBLE und 2.14 0.50 1.07
CASCO TIPO JOCKEY BLANCO und 1.00 0.50 0.50
CASCO TIPO JOCKEY AZUL und 5.00 0.50 2.50
CASCO TIPO JOCKEY NARANJA und 8.00 0.50 4.00
CASCO TIPO JOCKEY AMARILLO und 2.00 0.50 1.00
BARBIQUEJO und 10.00 0.05 0.50
LENTES DE POLICARBONATO LUNA CLARA und 10.00 0.20 2.00
LENTES DE POLICARBONATO LUNA OSCURA und 10.00 0.20 2.00
OREJERAS PARA CASCO TIPO COPA und 2.00 0.05 0.10
PROTECTOR DE OIDOS TIPO TAPON und 10.00 0.05 0.50
FILTRO PARA GASES und 2.00 0.50 1.00
MASCARILLA DESECHABLE CONTRA POLVO und 20.00 0.50 10.00
GUANTES DE CUERO AMARILLO 9 1/2" FLEXIBLE par 10.00 0.20 2.00
GUANTES DE NITRILO par 10.00 0.20 2.00
GUANTES DE BADANA PARA OPERADOR EQUIPO LIVIANO par 10.00 0.20 2.00
CAMISA MANGA LARGA DRILL "AZUL" und 10.00 4.00 40.00
PANTALON DRILL AZUL und 10.00 6.00 60.00
POLO DE ALGODON COLOR AZUL CON LOGOTIPO INSTITUCIONAL und 10.00 5.00 50.00
PONCHO DE PVC PROTECTOR DE LLUVIA und 10.00 4.00 40.00
BOTAS DE CAUCHO DIFERENTES TALLAS par 10.00 6.00 60.00
ZAPATOS DE CUERO PUNTA DE ACERO par 10.00 6.00 60.00
CINTA DE SEÑALIZACION und 1.00 5.00 5.00
CONO DE SEÑALIZACION NARANJA DE 28" DE ALTURA und 3.00 3.00 9.00
SACOS DE POLITILENO 50 KG und 150.00 0.05 7.50
MALLA DE SEÑALIZACION COLOR NARANJA und 1.00 5.00 5.00
CAJA RECTANGULAR PVC DE 4" X 2" und 3.00 10.00 30.00
CAJA DE REGISTRO CONCRETO PREFABRICADO 12" x 24" MARCO Y TAPA und 2.00 8.00 16.00
CAJA DE REGISTRO CONCRETO PREFABRICADO 10" x 20" MARCO Y TAPA und 1.00 8.00 8.00
CAJA DE REGISTRO CONCRETO PREFABRICADO 10" x 20" MARCO Y TAPA und 1.00 10.00 10.00
ESCUADRA LASER ANGULOS 45ª - 90ª CERAMICA O AZULEJOS und 0.16 0.20 0.03
REGLA DE ALUMINIO 1" X 4" X 8" und 0.18 2.00 0.37
REGLA DE ALUMINIO 1½" X 4" X 10" und 1.64 2.00 3.27
COMPACTADORA VIBRATORIA TIPO PLANCHA 4 HP hm 4.59 5.00 22.93
PIONGER hm 41.33 15.00 620.01
MAQUINA DE SOLDAR 295 A día 7.25 25.00 181.25
VIBRADOR DE CONCRETO 4 HP 1.25" hm 14.53 15.00 217.90
MEZCLADORA DE TROMPO 9 P3 (8 HP) hm 32.11 20.00 642.28
CORTADORA DE PORCELANATO MANUAL hm 56.23 2.00 112.45
LLANA DENTADA PLASTICA PARA COLOCAR CERAMICA und 0.16 1.00 0.16
AMOLADORA ANGULAR DE 9" hm 5.06 3.00 15.18
ANDAMIO METALICO día 1.27 0.05 0.06
CORDEL rll 4.60 5.00 22.97
24,741.35
tiempo
PRESPUESTO 6 SEMANAS
ITEM DESCRIPCION programado TOTAL
UN. METRADO P.U. (S/.) PRES.(S/.) Total SEMANAS SEM 1 SEM 2 SEM 3 SEM 4 SEM 5 SEM 6
01 MANTENIMIENTO DE LA INFRAESTRUCTURA DE LA I.E.I SAWASIRAY 37,478.69 -
01.01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 3,533.16 -
01.01.01 CONSTRUCCIONES PROVISIONALES 650.00 -
01.01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 2.40X2.40 und 1.00 650.00 650.00 1.00 650.00 650.00
01.01.02 OBRAS PRELIMINARES 129.00 -
01.01.02.01 TRAZO Y REPLANTEO m2 100.00 1.29 129.00 1.00 129.00 129.00
01.01.03 SEGURIDAD Y SALUD EN EL TRABAJO 2,754.16 -
01.01.03.01 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 105.16 105.16 1.00 105.16 105.16
01.01.03.02 EQUIPO DE PROTECCION INDIVIDUAL und 12.00 183.25 2,199.00 1.00 2199.00 2,199.00
01.01.03.03 EQUIPO DE PROTECCION COLECTIVA und 1.00 450.00 450.00 1.00 450.00 450.00
01.02 ESTRUCTURAS 3,390.88 -
01.02.01 MOVIMIENTO DE TIERRAS 443.07 -
01.02.01.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 2.59 52.10 134.94 1.00 134.94 134.94
01.02.01.02 NIVELADO Y APISONADO MANUAL m2 12.95 18.30 236.98 1.00 236.98 236.98
01.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1.00 71.15 71.15 1.00 71.15 71.15
01.02.02 PISOS Y PAVIMENTOS 2,947.80 -
01.02.02.01 PICADO DE CONCRETO EN VEREDA m2 12.95 34.23 443.28 1.00 443.28 443.28
01.02.02.02 CARGUIO Y TRANSPORTE DE DESMONTE m3 4.00 84.73 338.92 1.00 338.92 338.92
01.02.02.03 ENCOFRADO VEREDAS h=0.10 m. m2 5.63 51.82 291.75 1.00 291.75 291.75
01.02.02.04 EMPEDRADO E=0.15 CM m2 12.95 32.02 414.66 1.00 414.66 414.66
01.02.02.05 CONCRETO VEREDAS f¨c=175 kg/cm2 m3 2.50 583.68 1,459.20 1.00 1459.20 1,459.20
01.03 MANTENIMIENTO Y REPOSICION DE PISO (gras sintetico) 5,507.98 -
01.03.01 EXCAVACION Y RELLENO MANUAL PARA TUBERIA m 10.00 35.57 355.70 1.00 355.70 355.70
01.03.02 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 2" m 12.00 29.28 351.36 1.00 351.36 351.36
01.03.03 NIVELACION INTERIOR Y APISONADO m2 21.00 2.28 47.88 1.00 47.88 47.88
01.03.04 CONCRETO FALSO PISO e=4" m2 21.00 103.24 2,168.04 1.00 2168.04 2,168.04
01.03.05 SUMINISTRO E INSTALACION DE GRAS SINTETICO PARA PISO m2 21.00 85.00 1,785.00 1.00 1785.00 1,785.00
01.03.06 REPOSICION DE JUEGOS RECREATIVOS PARA NIÑOS 800.00 -
01.03.06.01 REPOSICION DE JUEGOS RECREATIVOS glb 1.00 800.00 800.00 1.00 800.00 800.00
01.04 MANTENIMIENTO DE SS.HH DE NIÑOS Y NIÑAS 6,158.14 -
01.04.01 CIMIENTO CORRIDO 300.95 -
01.04.01.01 CONCRETO CICLOPEO PARA CIMENTACIONES MEZCLA 1:12 + 30% P.M. m3 0.45 668.77 300.95 1.00 300.95 300.95
01.04.02 MUROS Y TABIQUES 870.54 -
01.04.02.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA JUNTA 1.5 cm m2 6.00 145.09 870.54 1.00 870.54 870.54
01.04.03 TARRAJEO EN MUROS 708.12 -
01.04.03.01 TARRAJEO MUROS INTERIORES Y EXTERIORES m2 12.00 59.01 708.12 1.00 708.12 708.12
01.04.04 COBERTURAS 480.00 -
01.04.04.01 SUMINISTRO Y COLOCACION DE COBERTURA DE TEJA glb 1.00 480.00 480.00 1.00 480.00 480.00
01.04.05 INSTALACIONES SANITARIAS 1,003.92 -
01.04.05.01 REPOSICION DE INODORO PARA NIÑOS (incl. accesorios) glb 1.00 1,003.92 1,003.92 1.00 1003.92 1,003.92
01.04.06 REVESTIMIENTOS 255.92 -
01.04.06.01 ENCHAPE CERAMICO RUSTICO EN SS.HH m2 2.08 123.04 255.92 1.00 255.92 255.92
01.04.07 REPOSICION DE PUERTA DE MADERA 800.00 -
01.04.07.01 REPOSICION DE PUERTA DE MADERA (incl. cerradura) und 1.00 800.00 800.00 1.00 800.00 800.00
01.04.08 CARPINTERIA METALICA 1,738.69 -
01.04.08.01 MANTENIMIENTO DE PUERTA PRINCIPAL und 1.00 238.69 238.69 1.00 238.69 238.69
01.04.08.02 MANTENIMIENTO DE LETRERO DE I.E.I glb 1.00 1,500.00 1,500.00 1.00 1500.00 1,500.00
01.05 MANTENIMIENTO Y REPOSICION DE LAVATORIO PARA NIÑOS 2,558.98 -
01.05.01 CONCRETO ARMADO PARA LAVATORO 1,361.93 -
01.05.01.01 ENCOFRADO Y DESENCOFRADO DE LAVATORIO m2 6.30 75.05 472.81 1.00 472.81 472.81
01.05.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 54.45 7.82 425.80 1.00 425.80 425.80
01.05.01.03 CONCRETO PARA REPOSICION DE LAVATORIO m3 1.05 441.25 463.31 1.00 463.31 463.31
01.05.02 REVESTIMIENTOS 695.18 -
01.05.02.01 ENCHAPE CERAMICO RUSTICO 30x30 EN LAVATORIO m2 5.65 123.04 695.18 1.00 695.18 695.18
01.05.03 REPOSICION E INSTALACION DE TUBERIA PARA AGUA FRIA 501.88 -
“REPINTADO DE LA LOSA MULTIDEPORTIVA DE LA INSTITUCION EDUCATIVA No 50150 MAXIMO
PROYECTO :
SAN ROMAN DEL DISTRITO DE CALCA, PROVINCIA DE CALCA - CUSCO” CRONOGRAMA DE OBRA VALORIZADO
tiempo
PRESPUESTO 6 SEMANAS
ITEM DESCRIPCION programado TOTAL
UN. METRADO P.U. (S/.) PRES.(S/.) Total SEMANAS SEM 1 SEM 2 SEM 3 SEM 4 SEM 5 SEM 6
01.05.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 4.00 125.47 501.88 1.00 501.88 501.88
01.06 ARQUITECTURA 6,188.18 -
01.06.01 REVOQUES 879.98 -
01.06.01.01 RESANE CON YESO EN MUROS INTERIORES Y EXTERIORES m2 29.50 29.83 879.98 1.00 879.98 879.98
01.06.02 ZOCALOS 1,148.93 -
01.06.02.01 PICADO Y REPOSICION DE ZOCALO DE CEMENTO PULIDO h:0.80 m (interiores y exteriores)m 31.80 36.13 1,148.93 1.00 1148.93 1,148.93
01.06.03 PINTURAS 3,563.58 -
01.06.03.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES m2 88.50 17.60 1,557.60 1.00 1557.60 1,557.60
01.06.03.02 PINTURA EN ZOCALOS INTERIORES Y EXTERIORES m2 47.20 10.72 505.98 1.00 505.98 505.98
01.06.03.03 PINTURA MURAL glb 1.00 1,500.00 1,500.00 1.00 1500.00 1,500.00
01.06.04 MANTENIMIENTO DE MURO DE COCINA 595.68 -
01.06.04.01 PINTURA IMPRIMANTE DE PAREDES m2 16.00 13.48 215.68 1.00 215.68 215.68
01.06.04.02 VENTANA DE ALUMINIO und 1.00 380.00 380.00 1.00 380.00 380.00
01.07 INSTALACIONES ELECTRICAS 1,361.03 -
01.07.01 MANTENIMIENTO DE SISTEMA ELECTRICO 1,361.03 -
01.07.01.01 MANTENIMIENTO DE SISTEMA ELECTRICO glb 1.00 1,361.03 1,361.03 1.00 1361.03 1,361.03
01.08 MANTENIMIENTO DE AULAS DE (3-4-5) AÑOS 8,780.33 -
01.08.01 ESTRUCTURAS 2,576.31 -
01.08.01.01 MANTENIMIENTO DE TECHO Y ESTRUCTURA 2,576.31 -
01.08.01.01.01 TRATADO DE TIJERALES m 120.00 7.52 902.40 1.00 902.40 902.40
01.08.01.01.02 LIMPIEZA Y REPOSICION DE COBERTURA glb 1.00 1,673.91 1,673.91 1.00 1673.91 1,673.91
01.08.02 ARQUITECTURA 4,842.99 -
01.08.02.01 REVOQUES 954.56 -
01.08.02.01.01 MANTENIMIENTO Y RESANE CON YESO EN MUROS INTERIORES Y EXTERIORES m2 32.00 29.83 954.56 1.00 954.56 954.56
01.08.02.02 ZOCALOS 541.95 -
01.08.02.02.01 PICADO Y REPOSICION DE ZOCALO DE CEMENTO PULIDO h:0.80 m (interiores y exteriorem 15.00 36.13 541.95 1.00 541.95 541.95
01.08.02.03 PINTURAS 1,850.15 -
01.08.02.03.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES m2 81.94 17.60 1,442.14 1.00 1442.14 1,442.14
01.08.02.03.02 PINTURA EN ZOCALOS INTERIORES Y EXTERIORES m2 38.06 10.72 408.00 1.00 408.00 408.00
01.08.02.04 MANTENIMIENTO Y REPOSICION DE PUERTAS Y VENTANAS DE MADERA 1,291.35 -
01.08.02.04.01 TRATADO DE PUERTAS Y VENTANAS DE MADERA glb 1.00 491.35 491.35 1.00 491.35 491.35
01.08.02.04.02 REPOSICION DE PUERTA DE MADERA (2 hojas) und 1.00 800.00 800.00 1.00 800.00 800.00
01.08.02.05 CERRAJERIA 204.98 -
01.08.02.05.01 CERRADURA PARA PUERTA INGRESO und 2.00 102.49 204.98 1.00 204.98 204.98
01.08.03 INSTALACIONES ELECTRICAS 1,361.03 -
01.08.03.01 MANTENIMIENTO DE SISTEMA ELECTRICO EN GENERAL DE AULAS 1,361.03 -
01.08.03.01.01 MANTENIMIENTO DE SISTEMA ELECTRICO glb 1.00 1,361.03 1,361.03 1.00 1361.03 1,361.03
#NAME?
#NAME? #NAME? #NAME?
PROYECTO: “REPINTADO DE LA LOSA MULTIDEPORTIVA DE LA INSTITUCION EDUCATIVA No 50150 CRONOGRAMA DE EJECUCION
MAXIMO SAN ROMAN DEL DISTRITO DE CALCA, PROVINCIA DE CALCA - CUSCO”
tiempo
PRESPUESTO 6 SEMANAS
ITEM DESCRIPCION programado
UN. METRA. P.U. (S/.) PRES.(S/.) Total SEMANAS SEM 1 SEM 2 SEM 3 SEM 4 SEM 5 SEM 6
01 MANTENIMIENTO DE LA INFRAESTRUCTURA DE LA I.E.I SAWASIRAY 37,478.69
01.01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 2.40X2.40 und 1.00 650.00 650.00 1.00 650.00
01.01.03.01 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 105.16 105.16 1.00 105.16
01.01.03.02 EQUIPO DE PROTECCION INDIVIDUAL und 12.00 183.25 2,199.00 1.00 2,199.00
01.01.03.03 EQUIPO DE PROTECCION COLECTIVA und 1.00 450.00 450.00 1.00 450.00
01.02.01.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 2.59 52.10 134.94 1.00 134.94
01.02.02.05 CONCRETO VEREDAS f¨c=175 kg/cm2 m3 2.50 583.68 1,459.20 1.00 1,459.20
01.03.01 EXCAVACION Y RELLENO MANUAL PARA TUBERIA m 10.00 35.57 355.70 1.00 355.70
01.03.02 SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 2" m 12.00 29.28 351.36 1.00 351.36
01.03.04 CONCRETO FALSO PISO e=4" m2 21.00 103.24 2,168.04 1.00 2,168.04
01.03.05 SUMINISTRO E INSTALACION DE GRAS SINTETICO PARA PISO m2 21.00 85.00 1,785.00 1.00 1,785.00
01.03.06.01 REPOSICION DE JUEGOS RECREATIVOS glb 1.00 800.00 800.00 1.00 800.00
01.04.01.01 CONCRETO CICLOPEO PARA CIMENTACIONES MEZCLA 1:12 + 30% P.M. m3 0.45 668.77 300.95 1.00 300.95
01.04.02.01 MURO LADRILLO K.K.DE ARCILLA 18 H ( 0.09x0.13x0.24) AMARRE DE SOGA m2 6.00 145.09 870.54 1.00 870.54
01.04.03.01 TARRAJEO MUROS INTERIORES Y EXTERIORES m2 12.00 59.01 708.12 1.00 708.12
01.04.04.01 SUMINISTRO Y COLOCACION DE COBERTURA DE TEJA glb 1.00 480.00 480.00 1.00 480.00
01.04.05.01 REPOSICION DE INODORO PARA NIÑOS (incl. accesorios) glb 1.00 1,003.92 1,003.92 1.00 1,003.92
01.04.06.01 ENCHAPE CERAMICO RUSTICO EN SS.HH m2 2.08 123.04 255.92 1.00 255.92
01.04.07.01 REPOSICION DE PUERTA DE MADERA (incl. cerradura) und 1.00 800.00 800.00 1.00 800.00
01.04.08.01 MANTENIMIENTO DE PUERTA PRINCIPAL und 1.00 238.69 238.69 1.00 238.69
01.04.08.02 MANTENIMIENTO DE LETRERO DE I.E.I glb 1.00 1,500.00 1,500.00 1.00 1,500.00
01.05.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 54.45 7.82 425.80 1.00 425.80
PROYECTO: “REPINTADO DE LA LOSA MULTIDEPORTIVA DE LA INSTITUCION EDUCATIVA No 50150 CRONOGRAMA DE EJECUCION
MAXIMO SAN ROMAN DEL DISTRITO DE CALCA, PROVINCIA DE CALCA - CUSCO”
tiempo
PRESPUESTO 6 SEMANAS
ITEM DESCRIPCION programado
UN. METRA. P.U. (S/.) PRES.(S/.) Total SEMANAS SEM 1 SEM 2 SEM 3 SEM 4 SEM 5 SEM 6
01.05.01.03 CONCRETO PARA REPOSICION DE LAVATORIO m3 1.05 441.25 463.31 1.00 463.31
01.05.02.01 ENCHAPE CERAMICO RUSTICO 30x30 EN LAVATORIO m2 5.65 123.04 695.18 1.00 695.18
01.05.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto 4.00 125.47 501.88 1.00 501.88
01.06.01.01 RESANE CON YESO EN MUROS INTERIORES Y EXTERIORES m2 29.50 29.83 879.98 1.00 879.98
01.06.02.01 PICADO Y REPOSICION DE ZOCALO DE CEMENTO PULIDO h:0.80 m (interioresmy 31.80 36.13 1,148.93 1.00 1,148.93
01.06.03.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES m2 88.50 17.60 1,557.60 1.00 1,557.60
01.06.03.02 PINTURA EN ZOCALOS INTERIORES Y EXTERIORES m2 47.20 10.72 505.98 1.00 505.98
01.07.01.01 MANTENIMIENTO DE SISTEMA ELECTRICO glb 1.00 1,361.03 1,361.03 1.00 1,361.03
01.08.01.01.02 LIMPIEZA Y REPOSICION DE COBERTURA glb 1.00 1,673.91 1,673.91 1.00 1,673.91
01.08.02.01.01 MANTENIMIENTO Y RESANE CON YESO EN MUROS INTERIORES Y EXTER m2 32.00 29.83 954.56 1.00 954.56
01.08.02.03.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES m2 81.94 17.60 1,442.14 1.00 1,442.14
01.08.02.03.02 PINTURA EN ZOCALOS INTERIORES Y EXTERIORES m2 38.06 10.72 408.00 1.00 408.00
01.08.02.04.01 TRATADO DE PUERTAS Y VENTANAS DE MADERA glb 1.00 491.35 491.35 1.00 491.35
01.08.02.04.02 REPOSICION DE PUERTA DE MADERA (2 hojas) und 1.00 800.00 800.00 1.00 800.00
01.08.02.05.01 CERRADURA PARA PUERTA INGRESO und 2.00 102.49 204.98 1.00 204.98
01.08.03.01.01 MANTENIMIENTO DE SISTEMA ELECTRICO glb 1.00 1,361.03 1,361.03 1.00 1,361.03