002 CIMIENTOS
EXCAVACION VIGA CIMENTACION 0.20x(0.60-0.80) ml 5,085.00 5,594.00
EXCAVACION VIGA CIMENTACION 0.25x(0.60-0.80) ml 6,357.00 6,993.00
EXCAVACION VIGA CIMENTACION 0.30x(0.60-0.80) ml 7,628.00 8,391.00
EXCAVACION VIGA CIMENTACION 0.35x(0.60-0.80) ml 8,645.00 9,510.00
EXCAVACION VIGA CIMENTACION 0.40x(0.60-0.80) ml 9,917.00 10,909.00
EXCAVACION VIGA CIMENTACION 0.45x(0.60-0.80) ml 11,188.00 12,307.00
EXCAVACION VIGA CIMENTACION 0.50x(0.60-0.80) ml 12,205.00 13,426.00
EXCAVACION MATERIAL COMUN CIMIENTOS m3 31,529.00 34,682.00
EXCAVACION MATERIAL COMUN ZAPATAS m3 30,512.00 33,563.00
SOLADO CONCRETO 1:3:4 E=0.05 m2 8,899.00 36,899.00
SOLADO CONCRETO 1:3:4 E=0.10 m2 8,899.00 56,728.00
CONCRETO 2.500 PSI VIGA CIMENTACION 20x20 ml 12,714.00 34,419.00
CONCRETO 2.500 PSI VIGA CIMENTACION 20x25 ml 12,714.00 38,385.00
CONCRETO 2.500 PSI VIGA CIMENTACION 25x25 ml 12,714.00 43,333.00
CONCRETO 2.500 PSI VIGA CIMENTACION 25x30 ml 12,714.00 48,318.00
CONCRETO 2.500 PSI VIGA CIMENTACION 25x35 ml 13,985.00 54,665.00
CONCRETO 2.500 PSI VIGA CIMENTACION 25x40 ml 13,985.00 59,613.00
CONCRETO 2.500 PSI VIGA CIMENTACION 30x30 ml 13,985.00 55,647.00
CONCRETO 2.500 PSI VIGA CIMENTACION 30x35 ml 13,985.00 61,615.00
CONCRETO 2.500 PSI VIGA CIMENTACION 30x40 ml 15,256.00 68,943.00
CONCRETO 2.500 PSI VIGA CIMENTACION 35x45 ml 15,256.00 83,824.00
CONCRETO 2.500 PSI VIGA CIMENTACION 35x50 ml 15,256.00 90,773.00
CONCRETO 2.500 PSI VIGA CIMENTACION m3 152,562.00 605,948.00
CONCRETO 3.000 PSI VIGA CIMENTACION m3 177,989.00 663,836.00
VIGA CIMIENTO 20x20 3.000 PSI REFORZADA ml 20,342.00 66,651.00
VIGA CIMIENTO 20x30 3.000 PSI REFORZADA ml 20,342.00 77,054.00
VIGA CIMIENTO 25x30 3.000 PSI REFORZADA ml 20,342.00 84,810.00
VIGA CIMIENTO 30x30 3.000 PSI REFORZADA ml 20,342.00 91,722.00
VIGA CIMIENTO 30x40 3.000 PSI REFORZADA ml 20,342.00 106,390.00
VIGA CIMIENTO 30x50 3.000 PSI REFORZADA ml 25,427.00 126,652.00
CONCRETO 3000 PSI ZAPATA m3 152,562.00 640,021.00
CONCRETO 3500 PSI ZAPATA m3 152,562.00 707,486.00
ZAPATA CONCRETO 3000 PSI SECCION 0.60x0.60x0.25 un 25,427.00 82,975.00
ZAPATA CONCRETO 3000 PSI SECCION 0.80x0.80x0.25 un 30,512.00 118,423.00
ZAPATA CONCRETO 3000 PSI SECCION 1.00x1.00x0.30 un 38,141.00 186,525.00
ANALISIS RESUMIDOS POR CAPITULO Fecha : 02/06/10
004 MAMPOSTERÍA
LEVANTE BLOQUE 0.09 (5 MPA) 9 x 19 x 39 m2 12,714.00 45,542.00
LEVANTE BLOQUE 0.15 (5 MPA) 14 x 19 x 39 m2 15,256.00 61,535.00
LEVANTE BLOQUE 0.20 (5 MPA) 19x19x30 m2 17,799.00 84,061.00
LEVANTE BLOQUE 0.14 SPLIT O ABUZARDADO 5MPA m2 15,256.00 34,462.00
LEVANTE BLOQUE 0.15 SPLIT O ABUSARDADO m2 17,799.00 43,359.00
LEVANTE BLOQUE 0.20 SPLIT O ABUSARDADO m2 20,342.00 96,468.00
LEVANTE BLOQUE 0.12 (10 MPA) 12 * 19 *39 m2 15,765.00 61,149.00
LEVANTE BLOQUE 0.15 (10 MPA) 14x19x39 m2 17,799.00 67,156.00
LEVANTE BLOQUE 0.20 (10 MPA) 19x19x39 m2 20,342.00 51,788.00
LEVANTE BLOQUE 0.09 (5 MP) 1 HILADA. ml 8,899.00 15,592.00
LEVANTE BLOQUE 0.09 (5MPA) 2 HILADA ml 10,171.00 22,742.00
LEVANTE BLOQUE 0.09 (5 MPA) 3 HILADAS. ml 11,442.00 29,942.00
LEVANTE BLOQUE 0.09 (5MPA) 4 HILADAS. ml 12,714.00 37,094.00
LEVANTE BLOQUE 0.15 (5MPA) 1 HILADA. ml 11,442.00 20,362.00
LEVANTE BLOQUE 0.15 (5 MPA) 2 HILADAS. ml 12,714.00 29,482.00
LEVANTE BLOQUE 0.15 (5MPA) 3 HILADAS. ml 13,985.00 38,656.00
LEVANTE BLOQUE 0.15 (5MPA) 4 HILADAS. ml 15,256.00 47,810.00
LEVANTE BLOQUE 0.20 (5MPA) 1 HILADA. m2 13,985.00 26,955.00
ANALISIS RESUMIDOS POR CAPITULO Fecha : 02/06/10
005 PAÑETES-REVOQUES-REPELLOS
PAÑETE ALLANADO 1:6 E=0.02 M. m2 10,171.00 22,020.00
PAÑETE ALLANADO 1:8 E=0.02 M. m2 10,171.00 21,003.00
PAÑETE ALLANADO 1:10 E=0.02 M. m2 10,171.00 20,421.00
PAÑETE LINEAL 1:4 ml 10,171.00 19,747.00
PAÑETE ALLANADO 1:6 E=0.025 M. m2 11,442.00 24,969.00
PAÑETE ALLANADO 1:8 E=0.025 M. m2 11,442.00 23,695.00
PAÑETE ALLANADO 1:10 E=0.025 M. m2 11,442.00 22,967.00
PAÑETE ALLANADO 1:4 E=0.015 M. m2 8,899.00 20,033.00
PAÑETE ALLANADO 1:6 E=0.015 M. m2 8,899.00 19,099.00
PAÑETE ALLANADO 1:8 E=0.015 M. m2 8,899.00 18,334.00
PAÑETE ALLANADO 1:10 E=0.015 M. m2 8,899.00 17,896.00
PAÑETE PULIDO CON CAL 1:4 m2 11,442.00 28,424.00
PAÑETE PULIDO CON CAL 1:6 m2 11,442.00 26,870.00
PAÑETE PULIDO CON CAL 1:8 m2 11,442.00 25,596.00
PAÑETE PULIDO CON CAL 1:10 m2 11,442.00 24,868.00
PAÑETE IMPERMEABILIZADO 1:4 m2 11,442.00 29,036.00
PAÑETE IMPERMEABILIZADO 1:6 m2 11,442.00 26,991.00
PAÑETE LINEAL 1:6 ml 10,171.00 18,506.00
PAÑETE LINEAL 1:8 ml 10,171.00 17,489.00
PAÑETE LINEAL 1:10 ml 10,171.00 16,907.00
PAÑETE ALLANADO 1:4 e=0.025 M. m2 11,442.00 26,523.00
PAÑETE BAJO PLACA 1:4 m2 17,799.00 33,516.00
PANETE BAJO PLACA 1:6 m2 17,799.00 31,962.00
PAÑETE TABLERO m2 22,884.00 35,498.00
JUNTA DILATACION ml 5,085.00 8,102.00
FILOS Y DILATACIONES ml 4,679.00 7,028.00
PAÑETE LISO PLACAS 1:4 m2 12,205.00 21,819.00
PAÑETE LISO PLACAS 1:5 m2 12,205.00 20,902.00
PAÑETE LISO PLACAS 1:6 m2 12,205.00 20,325.00
REVOQUE RUSTI CO PLACAS 1:5 m2 15,510.00 27,626.00
PAÑETE BAJO MALLA 1:4 m2 15,256.00 27,002.00
PAÑETE BAJO MALLA 1:5 m2 15,256.00 26,565.00
PAÑETE BAJO MALLA 1:6 m2 15,256.00 25,749.00
PAÑETE BAJO GUADUA 1:5 m2 22,884.00 33,856.00
PAÑETE CULATAS 1:4 m2 13,222.00 28,360.00
PAÑETE CULATAS 1:6 m2 13,222.00 35,639.00
IMPERMEABILIZACION INTEGRAL MORTERO m2 2,543.00 4,125.00
TOXEMENT
IMPERMEABILIZACIÓN INTEGRAL MORTERO SIKA m2 2,543.00 5,437.00
MALLA BAJO ENTRAMADO m2 10,171.00 15,988.00
GUADUA BAJO ENTRAMADO m2 12,714.00 18,515.00
REVOQUE BAJO GUADUA 1:5 m2 22,884.00 32,489.00
REVOQUE BAJO MALLA 1:4 m2 15,256.00 26,440.00
REVOQUE BAJO MALLA 1:6 m2 15,256.00 24,382.00
REVOQUE CULATAS 1:6 m2 13,222.00 27,946.00
REVOQUE IMP. MUROS 1:3 m2 12,205.00 30,431.00
REVOQUE LISO MUROS 1:5 m2 11,696.00 19,808.00
REVOQUE LISO PLACAS 1:4 m2 12,205.00 20,452.00
ANALISIS RESUMIDOS POR CAPITULO Fecha : 02/06/10
009 CUBIERTAS
CUBIERTA MET. SANDWICH DECK TIPOC. ESP. m2 12,714.00 106,219.00
250MM, LAM. CAL. 26
CUBIERTA LAMINA ONDULADA A.C. (INC. CABALLETE) m2 15,256.00 82,834.00
CUBIERTA LAMINA ONDULADA A.C. RURALIT (INC. m2 15,256.00 81,174.00
CABALLETE)
CUBIERTA LAMINA ONDULADA A.C COLOMBIT (INC. m2 15,256.00 82,671.00
CABALLETE)
CUBIERTA LAMINA SUPERONDA A.C.COLOR (INC. m2 15,256.00 82,839.00
CABALLETE)
INSTALACION Y SUMINISTRO TEJA ONDULADA A.C. un 30,619.00 143,304.00
INSTALACION Y SUMINISTRO TEJA ONDULADA A.C. # un 38,751.00 184,916.00
CABALLETE FIJO ASBESTO CEMENTO ml 12,714.00 64,792.00
CUBIERTA TRAPEZOIDAL CALIBRE 30 m2 18,307.00 63,175.00
CABALLETE LAMINA TRAPEZOIDAL ml 12,205.00 83,394.00
CUBIERTA LAMINA ONDULADA A.C. RURALIT (SIN m2 10,171.00 71,187.00
ESTRUCTURA SOPORT
IMPERMEABILIZACION MANTO LIDER 2.5 MM m2 10,171.00 25,014.00
CANAL CUBIERTA PLASTICA ml 15,256.00 58,349.00
BAJANTE CUBIERTA PLASTICA ml 15,256.00 47,019.00
IMPERMEABILIZACION CANAL-LOSA EDIL 3M. m2 10,423.00 17,870.00
IMPERMEABILIZACION IGASOL CUBIERTA m2 7,628.00 89,614.00
IMPERMEABILIZACION MANTO 500XT 3mm. m2 12,714.00 26,437.00
IMPERMEABILIZACION MANTO 800XT.4mm. m2 12,714.00 32,250.00
IMPERMEABILIZACION MANTO EDIL 3mm m2 10,171.00 17,593.00
IMPERMEABILIZACION MANTO 500XT-FOIL ALUMINIO m2 12,714.00 35,611.00
AISLAMIENTO TERMICO FRESCASA m2 10,423.00 23,556.00
IMPERM.MANTO TECHOFIELT 3000 E=3 MM m2 11,188.00 25,839.00
SIKAPLAN 8R m2 21,613.00 68,026.00
POLIETILENO CAL. 7 m2 1,043.00 3,914.00
POLIETILENO CAL. 4 m2 121.00 954.00
SOLAPA-CINTA ADHESIVA SIKA MULTISEAL 15C ml 2,543.00 12,682.00
POLIETILENO CAL.6 m2 1,017.00 2,777.00
BAJO TEJA BT-235 ONDULINE m2 8,899.00 42,731.00
CUBIERTA CANALETA 43 DE 3.50M. m2 6,949.00 97,427.00
CUBIERTA CANALETA 43 DE 4.00M. m2 8,813.00 93,963.00
CUBIERTA CANALETA A.C. 43 DE 4.50M. m2 10,676.00 90,589.00
CUBIERTA A.C.CANALETA 43 DE 5.00M. m2 13,345.00 88,949.00
CUBIERTA A.C. CANALETA 43 DE 5.50M. m2 13,345.00 87,163.00
CUBIERTA A.C. CANALETA 43 DE 6.00M. m2 13,345.00 81,836.00
CUBIERTA A.C.CANALETA 90 DE 3.75M m2 13,345.00 65,514.00
CUBIERTA A.C. CANALETA 90 DE 4.50M m2 16,014.00 68,615.00
CUBIERTA A.C. CANALETA 90 DE 5.25M m2 16,014.00 72,235.00
CUBIERTA A.C. CANALETA 90 DE 6.00M. m2 21,352.00 74,452.00
CUBIERTA A.C CANALETA 90 DE 7.50M. m2 21,352.00 73,788.00
ANALISIS RESUMIDOS POR CAPITULO Fecha : 02/06/10
024 CERRAJERÍA
CERRADURA TIPO POMO MADERA un 29,241.00 94,250.00
SAFE BAÑO un 0.00 47,296.00
SAFE ALCOBA un 0.00 35,728.00
SAFE ENTRADA un 0.00 51,835.00
SAFE PATIOS un 0.00 43,343.00
SAFE SOBREPONER un 0.00 47,287.00
CIERRAPUERTAS HIDRAULICO un 0.00 166,459.00
ANALISIS RESUMIDOS POR CAPITULO Fecha : 02/06/10
027 027
ANALISIS RESUMIDOS POR CAPITULO Fecha : 02/06/10
050 VÍAS
EMPEDRADO PROTECCION TALUD m2 17,799.00 62,021.00
RELLENO MAT SELEC. COMPAC ESTRUCT INVIAS (INC. m3 25,427.00 85,182.00
TRANSP 12KM)
DESMONTE Y LIMPIEZA un 177,989.00 2,539,619.00
EXCAVACION MANUAL MATERIAL CONGLOMERADO m3 33,055.00 36,361.00
EXCAVACION MATERIAL COMUN EXPLANACION m3 0.00 14,770.00
CANALES Y PRESTAMOS (INCLUYE DERECHO
CANTERA)
TERRAPLENES m3 1,038.00 9,154.00
TRANSPORTE DE MATERIALES M3/KM m3/km 0.00 1,348.00
DEMOLICION DE ALCANTARILLA un 305,124.00 414,918.00
CONCRETO CLASE F 14 MPA m3 101,708.00 520,376.00
CONCRETO CLASE E 17.5 MPA m3 114,422.00 555,862.00
CONCRETO CLASE D 21 MPA m3 190,703.00 695,256.00
DEMOLICION CONCRETO REFORZADO ESTRUCTURAS m3 101,708.00 164,949.00
TUBERIA EN CONCRETO REFORZADO 90 CMS 36`` ml 16,528.00 719,903.00
BARANDA CONCRETO 3.000 PSI PUENTE ml 101,708.00 354,743.00
JUNTA DILATACION PUENTE ml 25,427.00 87,033.00
APOYO NEOPRENO PUENTE ml 7,628.00 139,078.00
GAVIONES CANASTA 1X1X1 CALIBRE 13 m3 63,568.00 231,947.00
FILTRO GEOTEXTIL N.T. 1.600 (NO INCLUYE TUBERIA) m3 99,165.00 314,337.00
CUNETAS CONCRETO CLASE F 140 KG/CM2 m3 165,276.00 590,301.00
ANALISIS RESUMIDOS POR CAPITULO Fecha : 02/06/10
060 CANALIZACION
MANEJO AGUAS ARROYO ml 12,714.00 20,554.00
LOCALIZACION-REPLANTEO VIAS URBA ml 4,169.00 4,982.00
ESTUDIOS Y DISEÑOS DE AJUSTES AL PROYECTO un 27,018,734.00 31,204,707.00
RELLENO MATERIAL SELECCIONADO COMPACTADO m3 15,256.00 58,179.00
RANA
SOLADO CONCRETO 1:3:4 m3 127,135.00 554,632.00
ACERO REFUERZO 60.000 PSI. kg 631.00 5,508.00
EXCAVACIONES VARIAS MATERIAL COMUN SECO m3 38,141.00 46,108.00
MANO (INCL RETIRO)
EXCAVACIONES VARIAS MATERIAL COMUN BAJO m3 43,226.00 52,730.00
AGUA MANO (INC RET)
BOX-COULVERT CONCRETO DE 3.000 PSI m3 352,504.00 1,030,347.00
MALLA DE REFUERZO 420 MPA kg 1,271.00 6,359.00
RELLENO MATERIAL DEL SITIO COMPACTADO RANA m3 9,318.00 11,852.00
CONCRETO DE 3.000 PSI PLACA DE FONDO CANAL m3 177,989.00 639,598.00
CONCRETO DE 3.000 PSI MUROS CANAL m3 305,124.00 829,357.00
TUB.PVC 4 DREN.NOVAFOR CON FILTRO ml 11,188.00 75,475.00
EXCAVACIONES VARIAS MATERIAL COMUN SECO m3 38,141.00 46,108.00
MANO (INCL RETIRO)
EXCAVACIONES VARIAS MATERIAL COMUN BAJO m3 43,226.00 52,730.00
AGUA MANO (INC RET)
RELLENO MATERIAL SELECCIONADO COMPACTADO m3 15,256.00 58,179.00
RANA
SOLADO CONCRETO 1:3:4 m3 127,135.00 554,632.00
CERCA EN TABLA m2 10,171.00 133,963.00
RETIRO MATERIAL PROCEDENTE EXCAVACION m3 3,261.00 14,374.00
EXCAVACION MECANICA MATERIAL BAJO AGUA CON m3 1,271.00 17,409.00
RETROEX ORUGA
CONCRETO 3.000 PSI BORDILLO 0.40x0.15 REF 2#3 ml 12,714.00 55,999.00
ANDEN CONCRETO 3.000 PSI E=0.10 M. (SIN m2 15,256.00 60,971.00
REFUERZO)
VALLA PREVENTIVA DE 1X1 MTS. MITIGACION un 383.00 110,242.00
AMBIENTAL
CONO SEÑALIZACION REFLECTIVO DE 90 CMS DE un 383.00 110,242.00
ALTO
SUMINISTRO E INST TANQUE PLASTICO 220 L (INCL un 18,250.00 167,235.00
MARCADO, BOLSA
SIEMBRA ARBOL MADERABLE 40 A 50 CMS DE ALTO un 1,533.00 11,172.00
SIEMBRA ARBOL FRUTAL X INGERTO 40 A 50 C un 1,533.00 20,689.00
ANALISIS RESUMIDOS POR CAPITULO Fecha : 02/06/10
200 BODEGAS
RIENDA DE 3 M TELECOM un 95,400.00 268,974.00
RIENDA BRAZO PORTAL un 95,400.00 279,605.00
CAJA TERM.DISPERSION 10 P un 106,000.00 250,419.00
CAJA TERM.DISPERSION 20 P un 26,500.00 286,238.00
INSTALACIÓN SISTEMA TOMA TIERRA un 80,560.00 659,798.00
SUBIDA A POSTES ETB un 21,200.00 335,225.00
POSTE DE PASO O TERMINAL un 48,417.00 371,232.00
RIENDA DE 3 M TM-ETB un 95,400.00 141,570.00
MONTAJE BLOQUE TERMINAL 100 P un 66,250.00 167,613.00
ANALISIS ANIDADOS
EXCAVACION MANUAL MATERIAL COMUN m3 50,854.00 58,482.00
ANALISIS RESUMIDOS POR CAPITULO Fecha : 02/06/10