Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ENERO 2022
FICHA TECNICA
ATRASADA 27.38%
VALORIZACION DE OBRA N° 03
MARZO 2022
FICHA TECNICA
CULMINADA -45.54%
COSTO DIRECTO 478,112.57
GASTOS GENERALES 7.00% 32,194.61
UTILIDADES 8.00% 38,249.01
SUB TOTAL 548,556.19
IGV 18.00% 98,740.11
PRESUPUESTO TOTAL 647,296.30
SUPERVISION 3.50% 18,550.21
LIQUIDACION 2.50% 13,250.15
TOTAL 679,096.66
Presupuesto VAL Nº 01 VAL Nº 02 VAL Nº 03
Item Descripción Und Metrado C.U. Parcial METRADO VAL. METRADO VAL. METRADO VAL.
0 F 01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 89,129.93 70,020.30 17,809.64 1,300.00
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD
Y SALUD
1
2 01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X4.80M und 1.00 1,464.59
1.00 -
3 1,464.59 1,464.59 0.00 - 0.00
4 01.01.02 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m2 50.00 82.83 4,141.50 50.00 4,141.50 - 0.00 - 0.00
5 01.01.03 CERCO PROVISIONAL C/MALLA RASCHEL H=2.10M m 295.03 67.02 19,772.91 295.03 19,772.91 - 0.00 - 0.00
8 01.01.04.02 AGUA POTABLE DURANTE LA CONSTRUCCION mes 2.00 750.00 1,500.00 1.00 750.00 1.00 750.00 - 0.00
10 01.02.01 LIMPIEZA DE TERRENO MANUAL m2 5,366.48 2.01 10,786.62 3,756.54 7,550.64 1,609.94 3,235.99 - 0.00
11 01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 5,366.48 2.07 11,108.61 5,366.48 11,108.61 - 0.00 - 0.00
01.02.03 TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA mes 2.00 1,500.00
1.00 0.80
12 3,000.00 1,500.00 1,200.00 0.20 300.00
13 01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 5,000.00 5,000.00 0.50 2,500.00 0.30 1,500.00 0.20 1,000.00
14 01.02.05 REMOCIONES -
15 01.02.05.01 DESMONTAJE DE ELEMENTOS VARIOS GLB 1.00 1,000.00 1,000.00 1.00 1,000.00 - 0.00 - 0.00
16 01.02.05.02 REMOCION DE ARBOLES EXISTENTES und 5.00 82.36 411.80 5.00 411.80 - 0.00 - 0.00
17 01.02.06 DEMOLICIONES -
18 01.02.06.01 DEMOLICION DE VEREDAS DE CONCRETO e=variable m2 310.15 27.61 8,563.24 310.15 8,563.24 - 0.00 - 0.00
19 01.02.06.02 DEMOLICION DE RAMPAS DE CONCRETO e=variable m2 4.83 27.61 133.36 4.83 133.36 - 0.00 - 0.00
22 01.03.02 EQUIPOS DE PROTECCION INDIVIDUAL und 25.00 48.40 1,210.00 12.50 605.00 12.50 605.00 - 0.00
23 01.03.03 EQUIPOS DE PROTECCION COLECTIVA mes 2.00 1,134.90 2,269.80 1.00 1,134.90 1.00 1,134.90 - 0.00
24 01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 1,161.58 1,161.58 0.50 580.79 0.50 580.79 - 0.00
25 01.03.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00 2,000.00 2,000.00 0.50 1,000.00 0.50 1,000.00 - 0.00
26 01.03.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN GLB 1.00 2,105.92 2,105.92 0.50 1,052.96 0.50 1,052.96 - 0.00
27 01.03.07 SEGURIDAD Y SALUD DURANTE
IMPLEMENTACION EL TRABAJOPREVENCIÓN Y
PLAN DE VIGILANCIA, -
01.03.07.01 CONTROL DE COVID-19
ELABORACION E IMPLEMENTACION DEL PLAN COVID-19 GLB 1.00 10,000.00
0.50 0.50
28 10,000.00 5,000.00 5,000.00 - 0.00
29 02 ESTRUCTURAS -
31 02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS m3 11.18 41.18 460.39 11.18 460.39 - 0.00 - 0.00
02.01.02 EXCAVACIÓN A NIVEL DE LA SUB-RASANTE PARA VEREDAS Y m3 201.57 10.90
ÁREAS VERDES 201.57 -
32 2,197.11 2,197.11 0.00 - 0.00
33 02.01.03 EXCAVACIÓN MANUAL PARA SARDINELES m3 26.29 47.06 1,237.21 26.29 1,237.21 - 0.00 - 0.00
02.01.04 NIVELACION Y APISONADO PARA F. PISO, PATIOS Y VEREDAS m2 691.65 3.96
691.65 -
34 2,738.93 2,738.93 0.00 - 0.00
35 02.01.05 BASE GRANULAR E=0.20 M, CON EQUIPO LIVIANO m2 138.33 15.36 2,124.75 138.33 2,124.75 - 0.00 - 0.00
36 02.01.06 ELIMINACION MATERIAL EXCEDENTE C/ MAQUINA m3 351.07 27.00 9,478.89 245.75 6,635.22 70.21 1,895.78 35.11 947.89
38 02.02.01 SOLADO -
39 02.02.01.01 SOLADO DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 2.52 27.47 69.22 2.52 69.22 - 0.00 - 0.00
41 02.02.02.01 CIMIENTOS CORRIDOS: CONCRETO f`c=210 kg/cm2 m3 8.72 340.45 2,968.72 8.72 2,968.72 - 0.00 - 0.00
42 02.02.03 SOBRECIMIENTOS -
43 02.02.03.01 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 5.96 45.85 273.27 5.96 273.27 - 0.00 - 0.00
44 02.02.03.02 SOBRECIMIENTO: CONCRETO f'c=210 kg/cm2 m3 0.63 444.48 280.02 0.63 280.02 - 0.00 - 0.00
46 02.02.04.01 BASE DE CONCRETO F´c=140 kg/cm2 m3 15.40 284.31 4,378.37 - 0.00 15.40 4,378.37 - 0.00
47 02.02.05 RAMPAS -
02.02.05.01 RAMPAS DE CONCRETO F'C= 175 KG/CM2. e=10 cm, m2 4.83 34.66
FROTACHADO Y BRUÑADO - 4.83
48 167.41 0.00 167.41 - 0.00
50 02.02.06.01 FALSO PISO: MEZCLA, CONCRETO C:H 1:8 e=4" m2 15.60 35.48 553.49 15.60 553.49 - 0.00 - 0.00
53 02.02.07.02 VEREDA DE CONCRETO F'C= 175 KG/CM2. e=10 cm m2 135.95 34.66 4,712.03 135.95 4,712.03 - 0.00 - 0.00
54 02.02.07.03 JUNTA ASFALTICA m 67.97 6.24 424.13 - 0.00 - 0.00 67.97 424.13
56 02.03.01 ZAPATAS -
57 02.03.01.01 ZAPATAS: ENCOFRADO Y DESENCOFRADO m2 3.36 72.99 245.25 3.36 245.25 - 0.00 - 0.00
58 02.03.01.02 ZAPATAS: CONCRETO F'C=210 KG/CM2 m3 1.01 340.45 343.85 1.01 343.85 - 0.00 - 0.00
59 02.03.01.03 ZAPATAS: ACERO Fy=4200 kg/cm2 kg 20.79 5.73 119.13 20.79 119.13 - 0.00 - 0.00
02.03.01.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 2.52 1.32
2.52 -
60 3.33 3.33 0.00 - 0.00
61 02.03.02 COLUMNAS -
62 02.03.02.01 COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 31.08 66.99 2,082.05 31.08 2,082.05 - 0.00 - 0.00
63 02.03.02.02 COLUMNAS: CONCRETO f`c=210 kg/cm2 m3 2.33 543.63 1,266.66 2.33 1,266.66 - 0.00 - 0.00
64 02.03.02.03 COLUMNAS: ACERO Fy=4,200 kg/cm2 kg 247.04 5.62 1,388.36 247.04 1,388.36 - 0.00 - 0.00
02.03.02.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 31.08 1.32
31.08 -
65 41.03 41.03 0.00 - 0.00
66 02.03.03 VIGAS - - -
67 02.03.03.01 VIGAS: ENCOFRADO Y DESENCOFRADO m2 14.16 75.56 1,069.93 - 0.00 14.16 1,069.93 - 0.00
68 02.03.03.02 VIGAS: CONCRETO f'c= 210 kg/cm2 m3 1.67 393.13 656.53 - 0.00 1.67 656.53 - 0.00
69 02.03.03.03 VIGAS: ACERO Fy=4,200 kg/cm2 kg 213.91 5.62 1,202.17 - 0.00 213.91 1,202.17 - 0.00
02.03.03.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 14.16 1.32
- 14.16
70 18.69 0.00 18.69 - 0.00
72 02.03.04.01 LOSA ALIGERDA: ENCOFRADO Y DESENCOFRADO m2 22.67 48.00 1,088.16 - 0.00 22.67 1,088.16 - 0.00
73 02.03.04.02 LOSA ALIGERADA: LADRILLO DE ARCILLA DE 30x30x15 und 188.84 3.50 660.94 - 0.00 188.84 660.94 - 0.00
0 02.03.04.03 LOSA ALIGERADA: CONCRETO f'c= 210 kg/cm2 m3 1.98 369.47 731.55 - 0.00 1.98 731.55 - 0.00
1 02.03.04.04 LOSA ALIGERADA: ACERO Fy=4,200 kg/cm2 kg 66.52 5.62 373.84 - 0.00 66.52 373.84 - 0.00
02.03.04.05 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 22.67 1.32
- 22.67 -
2 29.92 0.00 29.92 0.00
6 02.03.05.03 ACERO DE REFUERZO fy=4200 kg/cm2 EN MOBILIARIO kg 406.90 5.62 2,286.78 - 0.00 406.90 2,286.78 - 0.00
02.03.05.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 37.80 1.32
- 37.80 -
7 49.90 0.00 49.90 0.00
8 02.03.06 SARDINELES -
9 02.03.06.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 295.79 58.53 17,312.59 207.05 12,118.81 88.74 5,193.78 - 0.00
02.03.06.02 SARDINEL DE CONCRETO PREMEZCLADO f'c=175 kg/cm2 m3 26.29 290.94
(0.15x0.40) 13.15 13.15 -
10 7,648.81 3,824.41 3,824.41 0.00
11 02.03.06.03 SARDINEL REFORZADO: ACERO Fy=4200 kg/cm2 kg 645.33 5.62 3,626.75 451.73 2,538.73 193.60 1,088.03 - 0.00
12 02.03.06.04 JUNTA EN SARDINELES E=1" m 32.87 5.06 166.32 16.44 83.16 - 0.00 16.44 83.16
13 03 ARQUITECTURA -
14 03.01 MUROS Y TABIQUES DE ALBAÑILERIA -
15 03.01.01 MUROS DE LADRILLO KING KONG DE ARCILLA -
03.01.01.01 MURO LADRILLO K.K.MEZC. C:A 1:5 TIPO IV P. TARRAJ. DE m2 38.02 76.95
SOGA (e=15cm) 38.02 - -
16 2,925.64 2,925.64 0.00 0.00
21 03.02.01.03 TARRAJEO EXTERIOR CON MICROCEMENTO m2 48.32 75.68 3,656.86 - 0.00 - 0.00 48.32 3,656.86
28 03.02.05 BRUÑAS - -
29 03.02.05.01 BRUÑAS 1.0cm m 4.35 8.49 36.93 - 0.00 4.35 36.93 - 0.00
30 03.03 CIELORRASOS - -
31 03.03.01 CIELORRASOS CON MEZCLA - -
32 03.03.01.01 CIELORRASOS CON MEZCLA DE C:A 1:5 m2 12.63 37.97 479.56 - 0.00 12.63 479.56 - 0.00
36 03.04.02 PISOS -
37 03.04.02.01 PISO PORCELANATO 0.60X0.60m m2 10.55 68.59 723.62 - 0.00 - 0.00 10.55 723.62
38 03.04.02.02 PISO PORCELANATO 0.45X0.45m m2 2.31 63.34 146.32 - 0.00 2.31 146.32 - 0.00
39 03.04.02.03 PISO DE ADOQUIN GRIS 10X20X6 CM m2 302.70 55.00 16,648.50 90.81 4,994.55 211.89 11,653.95 - 0.00
40 03.04.02.04 PISO DE ADOQUIN NEGRO 10X20X6 CM m2 42.29 64.24 2,716.71 12.69 815.01 25.37 1,630.03 4.23 271.67
41 03.04.02.05 PISO DE PIEDRA LAVADA m2 137.32 38.94 5,347.24 - 0.00 54.93 2,138.90 82.39 3,208.34
42 03.04.02.06 PISO DE GRASS BLOCK m2 167.19 39.68 6,634.10 - 0.00 - 0.00 167.19 6,634.10
46 03.05.02 CONTRAZOCALOS -
47 03.05.02.01 CONTRAZOCALO PORCELANATO 0.60X0.60m, h=0.10m m 11.73 11.95 140.17 - 0.00 - 0.00 11.73 140.17
48 03.06 COBERTURAS -
03.06.01 CUBIERTA LADRILLO PASTELERO 24x24 ASENT. C/MEZC. 1:5 m2 17.84 57.72
e=2.5cm; JUNTA 1:5 e=1.5cm - - 17.84
49 1,029.72 0.00 0.00 1,029.72
1 03.07.02 PERGOLAS -
2 03.07.02.01 PERGOLA DE MADERA und 4.00 11,500.00 46,000.00 - 0.00 1.00 11,500.00 3.00 34,500.00
3 03.07.03 MUEBLES -
03.07.03.01 MUEBLE DE MODULO DE VIGILANCIA(TABLERO DE und 1.00 1,800.00
MELAMINE) - - 1.00
4 1,800.00 0.00 0.00 1,800.00
8 03.08.02 PUERTAS -
03.08.02.01 PUERTA DE CRISTAL TEMPLADO 8mm CON ESTRUCTURA DE m2 1.86 500.00
METALICA CON ELEMENTOS METALICOS, C/CRISTAL
TRANSPARENTE INCOLORO Y/O ARENADO - - 1.86
10 03.08.03 OTROS -
11 03.08.03.01 LETRAS METALICAS und 68.00 110.77 7,532.36 - 0.00 - 0.00 68.00 7,532.36
12 03.09 CERRAJERIA -
13 03.09.01 BISAGRAS -
14 03.09.01.01 BISAGRAS CAPUCHINAS DE 4"X4" pza 3.00 14.49 43.47 - 0.00 - 0.00 3.00 43.47
15 03.09.01.02 BISAGRAS CAPUCHINAS 3 1/2"x3 1/2" pza 3.00 12.32 36.96 - 0.00 - 0.00 3.00 36.96
16 03.09.02 CERRADURAS -
17 03.09.02.01 CERRADURA CILINDRICA C/CHAPA DE PERILLA und 1.00 79.88 79.88 - 0.00 - 0.00 1.00 79.88
18 03.09.02.02 CERROJO DE 3" und 1.00 21.00 21.00 - 0.00 - 0.00 1.00 21.00
19 03.09.02.03 TIRADOR DE ACERO INOXIDABLE pza 2.00 31.49 62.98 - 0.00 - 0.00 2.00 62.98
22 03.11 PINTURA -
23 03.11.01 PINTURA LATEX EN CIELORRASO m2 17.79 12.15 216.15 - 0.00 - 0.00 17.79 216.15
24 03.11.02 PINTURA LATEX EN INTERIORES m2 54.64 12.15 663.88 - 0.00 - 0.00 54.64 663.88
25 03.11.03 PINTURA DEMARCACION DE LOSA DEPORTIVA m2 427.20 3.97 1,695.98 - 0.00 - 0.00 427.20 1,695.98
28 03.12.02 MANTENIMIENTO DE GRASS m2 1,584.24 3.17 5,022.04 - 0.00 - 0.00 1,584.24 5,022.04
29 03.12.03 GRASS ARTIFICIAL m2 333.28 9.86 3,286.14 - 0.00 - 0.00 333.28 3,286.14
30 03.12.04 JARDINERA P/PLANTAS ORNAMENTALES und 40.00 95.73 3,829.20 - 0.00 - 0.00 40.00 3,829.20
31 03.13 OTROS -
32 03.13.01 BANCA DE CONCRETO CON LISTONES DE MADERA und 14.00 199.17 2,788.38 - 0.00 - 0.00 14.00 2,788.38
33 03.13.02 TACHOS DE BASURA DE FIBRA DE VIDRIO und 15.00 416.20 6,243.00 - 0.00 - 0.00 15.00 6,243.00
03.13.03 LETRAS Y LOGOS DE VINIL PARA EL MODULO DE VIGILANCIA
-
34
35 03.13.03.01 LETRAS DE VINIL und 9.00 61.40 552.60 - 0.00 - 0.00 9.00 552.60
36 03.13.03.02 LOGOS EN VINIL und 7.00 154.22 1,079.54 - 0.00 - 0.00 7.00 1,079.54
39 03.13.04.02 PRESS PECHO (1.10X0.60X1.70) und 1.00 3,451.01 3,451.01 - 0.00 - 0.00 1.00 3,451.01
40 03.13.04.03 REMO (1.10X0.60X1.70) und 1.00 2,688.30 2,688.30 - 0.00 - 0.00 1.00 2,688.30
41 03.13.04.04 ESQUI (1.25X0.60X1.60) und 1.00 3,273.05 3,273.05 - 0.00 - 0.00 1.00 3,273.05
42 03.13.04.05 TORRE MULTI EJERCICIO (1.00X1.25X2.20) und 1.00 2,679.83 2,679.83 - 0.00 - 0.00 1.00 2,679.83
47 03.13.06.02 SUBE Y BAJA 3-12 AÑOS (CABALLITOS) und 3.00 3,128.98 9,386.94 - 0.00 - 0.00 3.00 9,386.94
48 03.13.06.03 COLUMPIO YOY MIXTO 4-10 AÑO und 1.00 4,806.94 4,806.94 - 0.00 - 0.00 1.00 4,806.94
49 03.13.06.04 CARRUSEL 3-12 AÑOS und 1.00 7,688.30 7,688.30 - 0.00 - 0.00 1.00 7,688.30
50 03.13.06.05 EL FOSO (TORRE DE JUEGOS) 6-12 AÑOS und 1.00 45,000.00 45,000.00 - 0.00 - 0.00 1.00 45,000.00
51 04 INSTALACIONES SANITARIAS -
52 04.01 TRABAJOS PRELIMINARES EXTERIORES -
04.01.01 CORTE DE PAVIMENTO PARA INSTALACIONES SANITARIAS m 26.07 7.25
(0.30 X 0.30m) - 26.07 -
53 189.01 0.00 189.01 0.00
04.01.02 RELLENO COMPACTADO CON EQUIPO, CON MATERIAL PROPIO m 26.07 14.13
- 26.07 -
54 368.37 0.00 368.37 0.00
58 04.02.01.02 LAVATORIO SIN PEDESTAL pza 1.00 160.00 160.00 - 0.00 - 0.00 1.00 160.00
05.01.01.01 SALIDAS - - -
05.01.01.01.01 SALIDA DE PARED C/TUBO SEL (3/4), CAJA PESADA pto 18.00 94.06 1,693.08 - 0.00 18.00 1,693.08 - 0.00
05.01.01.01.02 SALIDA DE TECHO C/TUBO SEL (3/4), CAJA PESADA pto 5.00 94.06 470.30 - 0.00 5.00 470.30 - 0.00
05.01.01.02 CANALIZACIONES, CONDUCTOS O TUBERIAS - -
05.01.01.02.01 TUBERÍAS DE PVC - SEL (ELECTRICAS) D=1" m 6.15 18.94 116.48 - 0.00 6.15 116.48 - 0.00
05.01.01.02.02 TUBERÍAS DE PVC - SEL (ELECTRICAS) D=2" m 66.00 28.16 1,858.56 - 0.00 66.00 1,858.56 - 0.00
05.01.01.02.03 TUBERÍAS DE PVC - SEL (ELECTRICAS) DE 20mm m 54.00 15.46 834.84 - 0.00 54.00 834.84 - 0.00
05.01.01.03 INTERRUPTORES Y TOMACORRIENTES - -
05.01.01.03.01 INTERRUPTOR SIMPLE DE 1 GOLPE und 2.00 12.62 25.24 - 0.00 - 0.00 2.00 25.24
05.01.01.03.02 TOMACORRIENTE DOBLE + LINEA A TIERRA und 8.00 13.58 108.64 - 0.00 - 0.00 8.00 108.64
05.01.01.04 CAJAS DE PASE - -
05.01.01.04.01 CAJA DE PASE OCTOGONAL DE 100x40mm und 2.00 12.46 24.92 - 0.00 2.00 24.92 - 0.00
05.01.01.04.02 CAJA DE PASE RECTANGULAR DE CONCRETO und 1.00 220.08 220.08 - 0.00 1.00 220.08 - 0.00
05.01.01.05 CABLES Y CONDUCTORES - -
05.01.01.05.01 CABLE 2 - 1x6mm2 NYY + 1x6mm2 NYY(T) m 72.60 14.58 1,058.51 - 0.00 - 0.00 72.60 1,058.51
05.01.01.05.02 CABLE THW 2 - 1x6mm2 +TW 1Tx6mm2 m 30.00 12.48 374.40 - 0.00 - 0.00 30.00 374.40
05.01.01.05.03 CABLE TW 2 - 1x4mm2 + TW 1Tx4mm2 m 63.00 9.83 619.29 - 0.00 - 0.00 63.00 619.29
05.01.01.05.04 CABLE TW 1Tx25mm2 m 15.00 12.40 186.00 - 0.00 - 0.00 15.00 186.00
05.01.02 TABLEROS PRINCIPALES - -
05.01.02.01 TABLERO DE DISTRIBUCIÓN DE CAJA METALICA CON 8 pza 2.00 360.04
POLOS - - 2.00
720.08 0.00 0.00 720.08
05.01.02.02 DISPOSITIVOS DE MANIOBRAS Y PROTECCIÓN - -
05.01.02.02.01 INTERRUPTOR TERMOMAGNETICO TRIFASICO DE 3x60A und 1.00 127.64
- - 1.00
127.64 0.00 0.00 127.64
05.01.02.02.02 INTERRUPTOR TERMOMAGNETICO TRIFASICO DE 3x40A und 1.00 127.64
- - 1.00
127.64 0.00 0.00 127.64
05.01.02.02.03 INTERRUPTOR TERMOMAGNETICO MONOFASICO DE 2x20A und 1.00 50.68
- - 1.00
50.68 0.00 0.00 50.68
05.01.02.02.04 INTERRUPTOR TERMOMAGNETICO MONOFASICO DE 2x16A und 3.00 50.68
- - 3.00
152.04 0.00 0.00 152.04
05.01.02.02.05 INTERRUPTOR DIFERENCIAL DE 30mA, SENSIBILIDAD DE und 4.00 147.15
2x25A - - 4.00
588.60 0.00 0.00 588.60
05.01.03 ARTEFACTOS -
05.01.03.01 ARTEFACTO BASIC LED (15W) und 5.00 235.75 1,178.75 - 0.00 - 0.00 5.00 1,178.75
05.01.03.02 REFLECTOR SOLAR LED und 14.00 1,500.00 21,000.00 - 0.00 - 0.00 14.00 21,000.00
05.01.04 PUESTA A TIERRA (SUMINISTRO E INSTALACION) -
05.01.04.01 SISTEMA DE POZO A TIERRA, BAJA TENSIÓN R=<05 OHMIOS und 1.00 2,396.70
- 1.00 -
2,396.70 0.00 2,396.70 0.00
05.01.05 OTROS - - -
05.01.05.01 ESTACION DE CARGA PARA CELULARES und 1.00 2,818.06 2,818.06 0.00 - 0.00 1.00 2,818.06
05.01.05.02 PRUEBA DE AISLAMIENTO, CONTINUIDAD Y PUESTA EN GLB 1.00 500.00
FUNCIONAMIENTO - - 1.00
500.00 0.00 0.00 500.00
05.01.05.03 CONEXION A RED EXISTENTE GLB 1.00 722.16 722.16 - 0.00 - 0.00 1.00 722.16
VAL Nº 02
ANTERIOR ACTUAL
1.00 0.00
50.00 0.00
295.03 0.00
0.00 0.00
2.00 0.00
2.00 0.00
0.00 0.00
5,366.48 0.00
5,366.48 0.00
1.80 0.20
0.80 0.20
0.00 0.00
1.00 0.00
5.00 0.00
0.00 0.00
310.15 0.00
4.83 0.00
0.00 0.00
1.00 0.00
25.00 0.00
2.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
0.00 0.00
1.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
11.18 0.00
201.57 0.00
26.29 0.00
691.65 0.00
138.33 0.00
315.96 35.11
0.00 0.00
0.00 0.00
2.52 0.00
0.00 0.00
8.72 0.00
0.00 0.00
5.96 0.00
0.63 0.00
0.00 0.00
15.40 0.00
0.00 0.00
4.83 0.00
0.00 0.00
15.60 0.00
0.00 0.00
50.98 0.00
135.95 0.00
0.00 67.97
0.00 0.00
0.00 0.00
3.36 0.00
1.01 0.00
20.79 0.00
2.52 0.00
0.00 0.00
31.08 0.00
2.33 0.00
247.04 0.00
31.08 0.00
0.00 0.00
14.16 0.00
1.67 0.00
213.91 0.00
14.16 0.00
0.00 0.00
22.67 0.00
188.84 0.00
1.98 0.00
66.52 0.00
22.67 0.00
0.00 0.00
34.02 3.78
5.04 0.00
406.90 0.00
37.80 0.00
0.00 0.00
295.79 0.00
26.29 0.00
645.33 0.00
16.44 16.44
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
38.02 0.00
0.00 0.00
0.00 0.00
9.14 0.00
38.02 0.00
0.00 48.32
0.00 0.00
33.60 0.00
0.00 0.00
5.16 0.00
0.00 0.00
44.18 0.00
0.00 0.00
4.35 0.00
0.00 0.00
0.00 0.00
12.63 0.00
0.00 0.00
0.00 0.00
12.86 0.00
0.00 0.00
0.00 10.55
2.31 0.00
302.70 0.00
38.06 4.23
54.93 82.39
0.00 167.19
0.00 0.00
0.00 0.00
0.00 11.03
0.00 0.00
0.00 11.73
0.00 0.00
0.00 17.84
0.00 0.00
0.00 0.00
0.00 5.01
0.00 0.00
1.00 3.00
0.00 0.00
0.00 1.00
0.00 0.00
0.00 0.00
0.00 20.25
0.00 0.00
0.00 1.86
0.00 0.00
0.00 68.00
0.00 0.00
0.00 0.00
0.00 3.00
0.00 3.00
0.00 0.00
0.00 1.00
0.00 1.00
0.00 2.00
0.00 0.00
0.00 0.65
0.00 0.00
0.00 17.79
0.00 54.64
0.00 427.20
0.00 0.00
0.00 1584.24
0.00 1584.24
0.00 333.28
0.00 40.00
0.00 0.00
0.00 14.00
0.00 15.00
0.00 0.00
0.00 9.00
0.00 7.00
0.00 0.00
0.00 1.00
0.00 1.00
0.00 1.00
0.00 1.00
0.00 1.00
0.00 0.00
0.00 1.00
0.00 0.00
0.00 4.00
0.00 3.00
0.00 1.00
0.00 1.00
0.00 1.00
0.00 0.00
0.00 0.00
0.00 0.00
26.07 0.00
26.07 0.00
0.00 0.00
0.00 0.00
1.00 0.00
0.00 1.00
0.00 0.00
1.00 1.00
0.00 0.00
0.00 0.00
2.00 0.00
0.00 0.00
10.71 0.00
2.00 0.00
0.00 0.00
1.00 0.00
1.00 0.00
2.00 0.00
3.00 0.00
2.00 0.00
0.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
0.00 0.00
0.00 0.00
1.00 0.00
1.00 0.00
2.00 0.00
0.00 0.00
3.57 0.00
3.00 0.00
10.88 0.00
0.00 0.00
3.00 0.00
1.00 0.00
2.00 0.00
1.00 0.00
2.00 0.00
1.00 0.00
1.00 0.00
2.00 0.00
0.00 0.00
0.00 0.00
0.00 1.00
0.00 0.00
0.00 1.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
18.00 0.00
5.00 0.00
0.00 0.00
6.15 0.00
66.00 0.00
54.00 0.00
0.00 0.00
0.00 2.00
0.00 8.00
0.00 0.00
2.00 0.00
1.00 0.00
0.00 0.00
0.00 72.60
0.00 30.00
0.00 63.00
0.00 15.00
0.00 0.00
0.00 2.00
0.00 0.00
0.00 1.00
0.00 1.00
0.00 1.00
0.00 3.00
0.00 4.00
0.00 0.00
0.00 5.00
0.00 14.00
0.00 0.00
1.00 0.00
0.00 0.00
0.00 1.00
0.00 1.00
0.00 1.00
METAS EJECUTAS MES DE ENERO 2022
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
PRECIO PRECIO VALOR. N° 01 ENERO 2022 VALOR. N° 02 FEBRERO 2022 VALOR. N° 03 MARZO 2022 TOTAL VALORIZADO
PARTIDA DESCRIPCION UND METRADO
UNITARIO PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
31
VALORIZACIONES MENSUALES Y FINAL EJECUTADO
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
PRECIO PRECIO VALOR. N° 01 ENERO 2022 VALOR. N° 02 FEBRERO 2022 VALOR. N° 03 MARZO 2022 TOTAL VALORIZADO
PARTIDA DESCRIPCION UND METRADO
UNITARIO PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
02.02.01 SOLADO
02.02.01.01 SOLADO DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 2.52 27.47 69.22 100.00% 2.52 69.22 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 2.52 69.22
02.02.02 CIMIENTOS CORRIDOS
02.02.02.01 CIMIENTOS CORRIDOS: CONCRETO f`c=210 kg/cm2 m3 8.72 340.45 2,968.72 100.00% 8.72 2,968.72 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 8.72 2,968.72
02.02.03 SOBRECIMIENTOS
02.02.03.01 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 5.96 45.85 273.27 100.00% 5.96 273.27 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 5.96 273.27
02.02.03.02 SOBRECIMIENTO: CONCRETO f'c=210 kg/cm2 m3 0.63 444.48 280.02 100.00% 0.63 280.02 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 0.63 280.02
02.02.04 BASES DE CONCRETO
02.02.04.01 BASE DE CONCRETO F´c=140 kg/cm2 m3 15.40 284.31 4,378.37 0.00% 0.00 0.00 100.00% 15.40 4,378.37 0.00% 0.00 0.00 100.00% 15.40 4,378.37
02.02.05 RAMPAS
02.02.05.01 RAMPAS DE CONCRETO F'C= 175 KG/CM2. e=10 cm, FROTACHADO Y BRUÑADO m2 4.83 34.66 167.41 0.00% 0.00 0.00 100.00% 4.83 167.41 0.00% 0.00 0.00 100.00% 4.83 167.41
02.02.06 FALSO PISO
02.02.06.01 FALSO PISO: MEZCLA, CONCRETO C:H 1:8 e=4" m2 15.60 35.48 553.49 100.00% 15.60 553.49 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 15.60 553.49
02.02.07 VEREDAS DE CONCRETO
02.02.07.01 VEREDA DE CONCRETO: ENCOFRADO Y DESENCOFRADO m2 50.98 33.77 1,721.59 100.00% 50.98 1,721.59 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 50.98 1,721.59
02.02.07.02 VEREDA DE CONCRETO F'C= 175 KG/CM2. e=10 cm m2 135.95 34.66 4,712.03 100.00% 135.95 4,712.03 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 135.95 4,712.03
02.02.07.03 JUNTA ASFALTICA m 67.97 6.24 424.13 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 67.97 424.13 100.00% 67.97 424.13
02.03 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 ZAPATAS: ENCOFRADO Y DESENCOFRADO m2 3.36 72.99 245.25 100.00% 3.36 245.25 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 3.36 245.25
02.03.01.02 ZAPATAS: CONCRETO F'C=210 KG/CM2 m3 1.01 340.45 343.85 100.00% 1.01 343.85 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.01 343.85
02.03.01.03 ZAPATAS: ACERO Fy=4200 kg/cm2 kg 20.79 5.73 119.13 100.00% 20.79 119.13 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 20.79 119.13
02.03.01.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 2.52 1.32 3.33 100.00% 2.52 3.33 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 2.52 3.33
02.03.02 COLUMNAS
02.03.02.01 COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 31.08 66.99 2,082.05 100.00% 31.08 2,082.05 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 31.08 2,082.05
02.03.02.02 COLUMNAS: CONCRETO f`c=210 kg/cm2 m3 2.33 543.63 1,266.66 100.00% 2.33 1,266.66 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 2.33 1,266.66
02.03.02.03 COLUMNAS: ACERO Fy=4,200 kg/cm2 kg 247.04 5.62 1,388.36 100.00% 247.04 1,388.36 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 247.04 1,388.36
02.03.02.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 31.08 1.32 41.03 100.00% 31.08 41.03 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 31.08 41.03
02.03.03 VIGAS
02.03.03.01 VIGAS: ENCOFRADO Y DESENCOFRADO m2 14.16 75.56 1,069.93 0.00% 0.00 0.00 100.00% 14.16 1,069.93 0.00% 0.00 0.00 100.00% 14.16 1,069.93
02.03.03.02 VIGAS: CONCRETO f'c= 210 kg/cm2 m3 1.67 393.13 656.53 0.00% 0.00 0.00 100.00% 1.67 656.53 0.00% 0.00 0.00 100.00% 1.67 656.53
02.03.03.03 VIGAS: ACERO Fy=4,200 kg/cm2 kg 213.91 5.62 1,202.17 0.00% 0.00 0.00 100.00% 213.91 1,202.17 0.00% 0.00 0.00 100.00% 213.91 1,202.17
02.03.03.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 14.16 1.32 18.69 0.00% 0.00 0.00 100.00% 14.16 18.69 0.00% 0.00 0.00 100.00% 14.16 18.69
02.03.04 LOSAS ALIGERADAS
02.03.04.01 LOSA ALIGERDA: ENCOFRADO Y DESENCOFRADO m2 22.67 48.00 1,088.16 0.00% 0.00 0.00 100.00% 22.67 1,088.16 0.00% 0.00 0.00 100.00% 22.67 1,088.16
02.03.04.02 LOSA ALIGERADA: LADRILLO DE ARCILLA DE 30x30x15 und 188.84 3.50 660.94 0.00% 0.00 0.00 100.00% 188.84 660.94 0.00% 0.00 0.00 100.00% 188.84 660.94
02.03.04.03 LOSA ALIGERADA: CONCRETO f'c= 210 kg/cm2 m3 1.98 369.47 731.55 0.00% 0.00 0.00 100.00% 1.98 731.55 0.00% 0.00 0.00 100.00% 1.98 731.55
02.03.04.04 LOSA ALIGERADA: ACERO Fy=4,200 kg/cm2 kg 66.52 5.62 373.84 0.00% 0.00 0.00 100.00% 66.52 373.84 0.00% 0.00 0.00 100.00% 66.52 373.84
02.03.04.05 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 22.67 1.32 29.92 0.00% 0.00 0.00 100.00% 22.67 29.92 0.00% 0.00 0.00 100.00% 22.67 29.92
32
VALORIZACIONES MENSUALES Y FINAL EJECUTADO
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
PRECIO PRECIO VALOR. N° 01 ENERO 2022 VALOR. N° 02 FEBRERO 2022 VALOR. N° 03 MARZO 2022 TOTAL VALORIZADO
PARTIDA DESCRIPCION UND METRADO
UNITARIO PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
33
VALORIZACIONES MENSUALES Y FINAL EJECUTADO
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
PRECIO PRECIO VALOR. N° 01 ENERO 2022 VALOR. N° 02 FEBRERO 2022 VALOR. N° 03 MARZO 2022 TOTAL VALORIZADO
PARTIDA DESCRIPCION UND METRADO
UNITARIO PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
03.04.02.05 PISO DE PIEDRA LAVADA m2 137.32 38.94 5,347.24 0.00% 0.00 0.00 40.00% 54.93 2,138.90 60.00% 82.39 3,208.34 100.00% 137.32 5,347.24
03.04.02.06 PISO DE GRASS BLOCK m2 167.19 39.68 6,634.10 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 167.19 6,634.10 100.00% 167.19 6,634.10
03.05 ZOCALOS Y CONTRAZOCALOS
03.05.01 ZOCALOS
03.05.01.01 ZOCALO CERAMICO 0.25X0.45m m2 11.03 92.73 1,022.81 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 11.03 1,022.81 100.00% 11.03 1,022.81
03.05.02 CONTRAZOCALOS
03.05.02.01 CONTRAZOCALO PORCELANATO 0.60X0.60m, h=0.10m m 11.73 11.95 140.17 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 11.73 140.17 100.00% 11.73 140.17
03.06 COBERTURAS
03.06.01 CUBIERTA LADRILLO PASTELERO 24x24 ASENT. C/MEZC. 1:5 e=2.5cm; JUNTA 1:5 e=1.5cm m2 17.84 57.72 1,029.72 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 17.84 1,029.72 100.00% 17.84 1,029.72
03.07 CARPINTERIA DE MADERA
03.07.01 PUERTAS
03.07.01.01 PUERTA CONTRAPLACADA UNA HOJA BATIENTE m2 5.01 231.13 1,157.96 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 5.01 1,157.96 100.00% 5.01 1,157.96
03.07.02 PERGOLAS
03.07.02.01 PERGOLA DE MADERA und 4.00 11,500.00 46,000.00 0.00% 0.00 0.00 25.00% 1.00 11,500.00 75.00% 3.00 34,500.00 100.00% 4.00 46,000.00
03.07.03 MUEBLES
03.07.03.01 MUEBLE DE MODULO DE VIGILANCIA(TABLERO DE MELAMINE) und 1.00 1,800.00 1,800.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 1,800.00 100.00% 1.00 1,800.00
03.08 CARPINTERIA METALICA
03.08.01 VENTANAS
03.08.01.01 VENTANA DE ESTRUCTURA DE ALUMINIO ANONIZADO PIVOTANTE (PARTE SUPERIOR) m2 20.25 300.00 6,075.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 20.25 6,075.00 100.00% 20.25 6,075.00
03.08.02 PUERTAS
03.08.02.01 PUERTA DE CRISTAL TEMPLADO 8mm CON ESTRUCTURA DE METALICA CON ELEMENT m2 1.86 500.00 930.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.86 930.00 100.00% 1.86 930.00
03.08.03 OTROS
03.08.03.01 LETRAS METALICAS und 68.00 110.77 7,532.36 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 68.00 7,532.36 100.00% 68.00 7,532.36
03.09 CERRAJERIA
03.09.01 BISAGRAS
03.09.01.01 BISAGRAS CAPUCHINAS DE 4"X4" pza 3.00 14.49 43.47 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 3.00 43.47 100.00% 3.00 43.47
03.09.01.02 BISAGRAS CAPUCHINAS 3 1/2"x3 1/2" pza 3.00 12.32 36.96 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 3.00 36.96 100.00% 3.00 36.96
03.09.02 CERRADURAS
03.09.02.01 CERRADURA CILINDRICA C/CHAPA DE PERILLA und 1.00 79.88 79.88 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 79.88 100.00% 1.00 79.88
03.09.02.02 CERROJO DE 3" und 1.00 21.00 21.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 21.00 100.00% 1.00 21.00
03.09.02.03 TIRADOR DE ACERO INOXIDABLE pza 2.00 31.49 62.98 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 2.00 62.98 100.00% 2.00 62.98
03.10 VIDRIOS, CRISTALES Y SIMILARES
03.10.01 ESPEJO DE 8 MM COM MARCO DE ALUMINIO NEGRO m2 0.65 201.68 131.09 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 0.65 131.09 100.00% 0.65 131.09
03.11 PINTURA
03.11.01 PINTURA LATEX EN CIELORRASO m2 17.79 12.15 216.15 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 17.79 216.15 100.00% 17.79 216.15
03.11.02 PINTURA LATEX EN INTERIORES m2 54.64 12.15 663.88 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 54.64 663.88 100.00% 54.64 663.88
03.11.03 PINTURA DEMARCACION DE LOSA DEPORTIVA m2 427.20 3.97 1,695.98 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 427.20 1,695.98 100.00% 427.20 1,695.98
03.12 VARIOS, LIMPIEZA Y JARDINERÍA
03.12.01 SEMBRADO DE GRASS AMERICANO m2 1,584.24 14.50 22,971.48 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1,584.24 22,971.48 100.00% 1,584.24 22,971.48
34
VALORIZACIONES MENSUALES Y FINAL EJECUTADO
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
PRECIO PRECIO VALOR. N° 01 ENERO 2022 VALOR. N° 02 FEBRERO 2022 VALOR. N° 03 MARZO 2022 TOTAL VALORIZADO
PARTIDA DESCRIPCION UND METRADO
UNITARIO PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
03.12.02 MANTENIMIENTO DE GRASS m2 1,584.24 3.17 5,022.04 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1,584.24 5,022.04 100.00% 1,584.24 5,022.04
03.12.03 GRASS ARTIFICIAL m2 333.28 9.86 3,286.14 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 333.28 3,286.14 100.00% 333.28 3,286.14
03.12.04 JARDINERA P/PLANTAS ORNAMENTALES und 40.00 95.73 3,829.20 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 40.00 3,829.20 100.00% 40.00 3,829.20
03.13 OTROS
03.13.01 BANCA DE CONCRETO CON LISTONES DE MADERA und 14.00 199.17 2,788.38 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 14.00 2,788.38 100.00% 14.00 2,788.38
03.13.02 TACHOS DE BASURA DE FIBRA DE VIDRIO und 15.00 416.20 6,243.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 15.00 6,243.00 100.00% 15.00 6,243.00
03.13.03 LETRAS Y LOGOS DE VINIL PARA EL MODULO DE VIGILANCIA
03.13.03.01 LETRAS DE VINIL und 9.00 61.40 552.60 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 9.00 552.60 100.00% 9.00 552.60
03.13.03.02 LOGOS EN VINIL und 7.00 154.22 1,079.54 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 7.00 1,079.54 100.00% 7.00 1,079.54
03.13.04 EQUIPOS DE GIMNASIO
03.13.04.01 PRESS PIERNA (1.00X0.50X1.70) und 1.00 2,230.67 2,230.67 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 2,230.67 100.00% 1.00 2,230.67
03.13.04.02 PRESS PECHO (1.10X0.60X1.70) und 1.00 3,451.01 3,451.01 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 3,451.01 100.00% 1.00 3,451.01
03.13.04.03 REMO (1.10X0.60X1.70) und 1.00 2,688.30 2,688.30 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 2,688.30 100.00% 1.00 2,688.30
03.13.04.04 ESQUI (1.25X0.60X1.60) und 1.00 3,273.05 3,273.05 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 3,273.05 100.00% 1.00 3,273.05
03.13.04.05 TORRE MULTI EJERCICIO (1.00X1.25X2.20) und 1.00 2,679.83 2,679.83 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 2,679.83 100.00% 1.00 2,679.83
03.13.05 EQUIPOS DE CALISTENIA
03.13.05.01 CIRCUITO DE CALISTENIA(BARRAS, PARALELAS, ABDOMINALES) und 1.00 8,281.52 8,281.52 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 8,281.52 100.00% 1.00 8,281.52
03.13.06 JUEGOS INFANTILES
03.13.06.01 BALANCINES 3-6 AÑOS (CABALLITO, PERRITO, ANACONDA, DELFIN) und 4.00 4,740.00 18,960.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 4.00 18,960.00 100.00% 4.00 18,960.00
03.13.06.02 SUBE Y BAJA 3-12 AÑOS (CABALLITOS) und 3.00 3,128.98 9,386.94 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 3.00 9,386.94 100.00% 3.00 9,386.94
03.13.06.03 COLUMPIO YOY MIXTO 4-10 AÑO und 1.00 4,806.94 4,806.94 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 4,806.94 100.00% 1.00 4,806.94
03.13.06.04 CARRUSEL 3-12 AÑOS und 1.00 7,688.30 7,688.30 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 7,688.30 100.00% 1.00 7,688.30
03.13.06.05 EL FOSO (TORRE DE JUEGOS) 6-12 AÑOS und 1.00 45,000.00 45,000.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 45,000.00 100.00% 1.00 45,000.00
F 04 INSTALACIONES SANITARIAS
04 INSTALACIONES SANITARIAS
04.01 TRABAJOS PRELIMINARES EXTERIORES
04.01.01 CORTE DE PAVIMENTO PARA INSTALACIONES SANITARIAS (0.30 X 0.30m) m 26.07 7.25 189.01 0.00% 0.00 0.00 100.00% 26.07 189.01 0.00% 0.00 0.00 100.00% 26.07 189.01
04.01.02 RELLENO COMPACTADO CON EQUIPO, CON MATERIAL PROPIO m 26.07 14.13 368.37 0.00% 0.00 0.00 100.00% 26.07 368.37 0.00% 0.00 0.00 100.00% 26.07 368.37
04.02 APARATOS Y ACCESORIOS SANITARIOS
04.02.01 SUMINISTRO DE APARATOS SANITARIOS
04.02.01.01 INODORO TANQUE BAJO BLANCO NACIONAL, INCLUYE ACCESORIOS E INSTALACION pza 1.00 195.00 195.00 0.00% 0.00 0.00 100.00% 1.00 195.00 0.00% 0.00 0.00 100.00% 1.00 195.00
04.02.01.02 LAVATORIO SIN PEDESTAL pza 1.00 160.00 160.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 160.00 100.00% 1.00 160.00
04.02.02 INSTALACION DE APARATOS SANITARIOS
04.02.02.01 COLOCACION DE APARATOS SANITARIOS pza 2.00 142.98 285.96 0.00% 0.00 0.00 50.00% 1.00 142.98 50.00% 1.00 142.98 100.00% 2.00 285.96
04.03 SISTEMA DE AGUA FRIA
04.03.01 SALIDA DE AGUA FRIA
04.03.01.01 SALIDA DE AGUA FRIA Ø 1/2" pto 2.00 83.31 166.62 0.00% 0.00 0.00 100.00% 2.00 166.62 0.00% 0.00 0.00 100.00% 2.00 166.62
04.03.02 REDES DE DISTRIBUCION
04.03.02.01 TUBERIA PVC CLASE 10 SP P/AGUA FRIA D=11/2" m 10.71 24.31 260.36 0.00% 0.00 0.00 100.00% 10.71 260.36 0.00% 0.00 0.00 100.00% 10.71 260.36
35
VALORIZACIONES MENSUALES Y FINAL EJECUTADO
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
PRECIO PRECIO VALOR. N° 01 ENERO 2022 VALOR. N° 02 FEBRERO 2022 VALOR. N° 03 MARZO 2022 TOTAL VALORIZADO
PARTIDA DESCRIPCION UND METRADO
UNITARIO PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
04.03.02.02 TUBERIA PVC CLASE 10 SP P/AGUA FRIA D=1/2" m 2.00 18.35 36.70 0.00% 0.00 0.00 100.00% 2.00 36.70 0.00% 0.00 0.00 100.00% 2.00 36.70
04.03.03 ACCESORIOS DE REDES DE AGUA FRIA
04.03.03.01 REDUCCION PVC AGUA C-10 DE 11/2" A 1/2" pza 1.00 7.00 7.00 0.00% 0.00 0.00 100.00% 1.00 7.00 0.00% 0.00 0.00 100.00% 1.00 7.00
04.03.03.02 TEE PVC AGUA C-10 1/2" pza 1.00 1.70 1.70 0.00% 0.00 0.00 100.00% 1.00 1.70 0.00% 0.00 0.00 100.00% 1.00 1.70
04.03.03.03 CODO PVC 90° AGUA C-10 11/2" pza 2.00 0.76 1.52 0.00% 0.00 0.00 100.00% 2.00 1.52 0.00% 0.00 0.00 100.00% 2.00 1.52
04.03.03.04 CODO PVC 90° AGUA C-10 1/2" pza 3.00 0.76 2.28 0.00% 0.00 0.00 100.00% 3.00 2.28 0.00% 0.00 0.00 100.00% 3.00 2.28
04.03.03.05 UNION UNIVERSAL PVC P/AGUA FRIA D=1/2" pza 2.00 2.88 5.76 0.00% 0.00 0.00 100.00% 2.00 5.76 0.00% 0.00 0.00 100.00% 2.00 5.76
04.03.04 VALVULAS
04.03.04.01 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" pza 1.00 92.63 92.63 0.00% 0.00 0.00 100.00% 1.00 92.63 0.00% 0.00 0.00 100.00% 1.00 92.63
04.03.04.02 GRIFERIA PARA LAVATORIO pza 1.00 98.26 98.26 0.00% 0.00 0.00 100.00% 1.00 98.26 0.00% 0.00 0.00 100.00% 1.00 98.26
04.03.04.03 PRUEBA HIDRAULICA GLB 1.00 500.00 500.00 0.00% 0.00 0.00 100.00% 1.00 500.00 0.00% 0.00 0.00 100.00% 1.00 500.00
04.03.04.04 LIMPIEZA Y DESINFECCION DE TUBERIAS GLB 1.00 200.00 200.00 0.00% 0.00 0.00 100.00% 1.00 200.00 0.00% 0.00 0.00 100.00% 1.00 200.00
04.04 DESAGUE Y VENTILACION
04.04.01 SALIDA DE DESAGUE
04.04.01.01 SALIDA DE DESAGUE PVC-SAL 4" pto 1.00 126.35 126.35 0.00% 0.00 0.00 100.00% 1.00 126.35 0.00% 0.00 0.00 100.00% 1.00 126.35
04.04.01.02 SALIDA DE DESAGUE PVC-SAL 2" pto 1.00 121.97 121.97 0.00% 0.00 0.00 100.00% 1.00 121.97 0.00% 0.00 0.00 100.00% 1.00 121.97
04.04.01.03 SALIDA DE VENTILACION (PROMEDIO) pto 2.00 113.76 227.52 0.00% 0.00 0.00 100.00% 2.00 227.52 0.00% 0.00 0.00 100.00% 2.00 227.52
04.04.02 REDES DE DISTRIBUCION
04.04.02.01 TUBERIA DE PVC SAL 4" m 3.57 35.54 126.88 0.00% 0.00 0.00 100.00% 3.57 126.88 0.00% 0.00 0.00 100.00% 3.57 126.88
04.04.02.02 TUBERIA DE PVC SAL 2" m 3.00 28.66 85.98 0.00% 0.00 0.00 100.00% 3.00 85.98 0.00% 0.00 0.00 100.00% 3.00 85.98
04.04.02.03 TUBERIA DE PVC SAL 4" - EMPLAME RED EXISTENTE m 10.88 35.54 386.68 0.00% 0.00 0.00 100.00% 10.88 386.68 0.00% 0.00 0.00 100.00% 10.88 386.68
04.04.03 ACCESORIOS DE REDES P/DESAGUE
04.04.03.01 CODO PVC SAL 2"X90° pza 3.00 1.69 5.07 0.00% 0.00 0.00 100.00% 3.00 5.07 0.00% 0.00 0.00 100.00% 3.00 5.07
04.04.03.02 CODO PVC SAL 4"X90° pza 1.00 12.82 12.82 0.00% 0.00 0.00 100.00% 1.00 12.82 0.00% 0.00 0.00 100.00% 1.00 12.82
04.04.03.03 REDUCCION PVC SAL DE 4" A 2" pza 2.00 11.39 22.78 0.00% 0.00 0.00 100.00% 2.00 22.78 0.00% 0.00 0.00 100.00% 2.00 22.78
04.04.03.04 TEE PVC SAL 2" pza 1.00 9.12 9.12 0.00% 0.00 0.00 100.00% 1.00 9.12 0.00% 0.00 0.00 100.00% 1.00 9.12
04.04.03.05 YEE PVC SAL 4" pza 2.00 17.26 34.52 0.00% 0.00 0.00 100.00% 2.00 34.52 0.00% 0.00 0.00 100.00% 2.00 34.52
04.04.03.06 TRAMPA "P" PVC SAL 2" pza 1.00 32.75 32.75 0.00% 0.00 0.00 100.00% 1.00 32.75 0.00% 0.00 0.00 100.00% 1.00 32.75
04.04.03.07 REGISTROS ROSCADO TIPO DADO DE BRONCE CROMADO 4" pza 1.00 62.56 62.56 0.00% 0.00 0.00 100.00% 1.00 62.56 0.00% 0.00 0.00 100.00% 1.00 62.56
04.04.03.08 SOMBRERO VENTILACION PVC DE 2" pza 2.00 11.83 23.66 0.00% 0.00 0.00 100.00% 2.00 23.66 0.00% 0.00 0.00 100.00% 2.00 23.66
04.04.04 CAMARAS DE INSPECCION
04.04.04.01 SUMINISTRO E INSTALACION DE CAJAS DE REGISTRO
04.04.04.01.01 CAJA DE REGISTRO 12" X 24" und 1.00 220.08 220.08 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 220.08 100.00% 1.00 220.08
04.04.04.02 SUMINISTRO E INSTALACION DE BUZONETAS
04.04.04.02.01 BUZON EXISTENTE (ACONDICIONAMIENTO P/EMPLAME TUB. PROY. DESAGUE) und 1.00 574.30 574.30 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 574.30 100.00% 1.00 574.30
F 05 INSTALACIONES ELECTRICAS Y ELECTROMECANICAS
05 INSTALACIONES ELECTRICAS Y ELECTROMECANICAS
05.01 INSTALACIONES ELECTRICAS
05.01.01 SALIDAS PARA ALUMBRADO, TOMACORRIENTE, FUERZA Y SEÑALES DEBILES
36
VALORIZACIONES MENSUALES Y FINAL EJECUTADO
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
PRECIO PRECIO VALOR. N° 01 ENERO 2022 VALOR. N° 02 FEBRERO 2022 VALOR. N° 03 MARZO 2022 TOTAL VALORIZADO
PARTIDA DESCRIPCION UND METRADO
UNITARIO PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
05.01.01.01 SALIDAS
05.01.01.01.01 SALIDA DE PARED C/TUBO SEL (3/4), CAJA PESADA pto 18.00 94.06 1,693.08 0.00% 0.00 0.00 100.00% 18.00 1,693.08 0.00% 0.00 0.00 100.00% 18.00 1,693.08
05.01.01.01.02 SALIDA DE TECHO C/TUBO SEL (3/4), CAJA PESADA pto 5.00 94.06 470.30 0.00% 0.00 0.00 100.00% 5.00 470.30 0.00% 0.00 0.00 100.00% 5.00 470.30
05.01.01.02 CANALIZACIONES, CONDUCTOS O TUBERIAS
05.01.01.02.01 TUBERÍAS DE PVC - SEL (ELECTRICAS) D=1" m 6.15 18.94 116.48 0.00% 0.00 0.00 100.00% 6.15 116.48 0.00% 0.00 0.00 100.00% 6.15 116.48
05.01.01.02.02 TUBERÍAS DE PVC - SEL (ELECTRICAS) D=2" m 66.00 28.16 1,858.56 0.00% 0.00 0.00 100.00% 66.00 1,858.56 0.00% 0.00 0.00 100.00% 66.00 1,858.56
05.01.01.02.03 TUBERÍAS DE PVC - SEL (ELECTRICAS) DE 20mm m 54.00 15.46 834.84 0.00% 0.00 0.00 100.00% 54.00 834.84 0.00% 0.00 0.00 100.00% 54.00 834.84
05.01.01.03 INTERRUPTORES Y TOMACORRIENTES
05.01.01.03.01 INTERRUPTOR SIMPLE DE 1 GOLPE und 2.00 12.62 25.24 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 2.00 25.24 100.00% 2.00 25.24
05.01.01.03.02 TOMACORRIENTE DOBLE + LINEA A TIERRA und 8.00 13.58 108.64 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 8.00 108.64 100.00% 8.00 108.64
05.01.01.04 CAJAS DE PASE
05.01.01.04.01 CAJA DE PASE OCTOGONAL DE 100x40mm und 2.00 12.46 24.92 0.00% 0.00 0.00 100.00% 2.00 24.92 0.00% 0.00 0.00 100.00% 2.00 24.92
05.01.01.04.02 CAJA DE PASE RECTANGULAR DE CONCRETO und 1.00 220.08 220.08 0.00% 0.00 0.00 100.00% 1.00 220.08 0.00% 0.00 0.00 100.00% 1.00 220.08
05.01.01.05 CABLES Y CONDUCTORES
05.01.01.05.01 CABLE 2 - 1x6mm2 NYY + 1x6mm2 NYY(T) m 72.60 14.58 1,058.51 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 72.60 1,058.51 100.00% 72.60 1,058.51
05.01.01.05.02 CABLE THW 2 - 1x6mm2 +TW 1Tx6mm2 m 30.00 12.48 374.40 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 30.00 374.40 100.00% 30.00 374.40
05.01.01.05.03 CABLE TW 2 - 1x4mm2 + TW 1Tx4mm2 m 63.00 9.83 619.29 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 63.00 619.29 100.00% 63.00 619.29
05.01.01.05.04 CABLE TW 1Tx25mm2 m 15.00 12.40 186.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 15.00 186.00 100.00% 15.00 186.00
05.01.02 TABLEROS PRINCIPALES
05.01.02.01 TABLERO DE DISTRIBUCIÓN DE CAJA METALICA CON 8 POLOS pza 2.00 360.04 720.08 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 2.00 720.08 100.00% 2.00 720.08
05.01.02.02 DISPOSITIVOS DE MANIOBRAS Y PROTECCIÓN
05.01.02.02.01 INTERRUPTOR TERMOMAGNETICO TRIFASICO DE 3x60A und 1.00 127.64 127.64 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 127.64 100.00% 1.00 127.64
05.01.02.02.02 INTERRUPTOR TERMOMAGNETICO TRIFASICO DE 3x40A und 1.00 127.64 127.64 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 127.64 100.00% 1.00 127.64
05.01.02.02.03 INTERRUPTOR TERMOMAGNETICO MONOFASICO DE 2x20A und 1.00 50.68 50.68 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 50.68 100.00% 1.00 50.68
05.01.02.02.04 INTERRUPTOR TERMOMAGNETICO MONOFASICO DE 2x16A und 3.00 50.68 152.04 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 3.00 152.04 100.00% 3.00 152.04
05.01.02.02.05 INTERRUPTOR DIFERENCIAL DE 30mA, SENSIBILIDAD DE 2x25A und 4.00 147.15 588.60 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 4.00 588.60 100.00% 4.00 588.60
05.01.03 ARTEFACTOS
05.01.03.01 ARTEFACTO BASIC LED (15W) und 5.00 235.75 1,178.75 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 5.00 1,178.75 100.00% 5.00 1,178.75
05.01.03.02 REFLECTOR SOLAR LED und 14.00 1,500.00 21,000.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 14.00 21,000.00 100.00% 14.00 21,000.00
05.01.04 PUESTA A TIERRA (SUMINISTRO E INSTALACION)
05.01.04.01 SISTEMA DE POZO A TIERRA, BAJA TENSIÓN R=<05 OHMIOS und 1.00 2,396.70 2,396.70 0.00% 0.00 0.00 100.00% 1.00 2,396.70 0.00% 0.00 0.00 100.00% 1.00 2,396.70
05.01.05 OTROS
05.01.05.01 ESTACION DE CARGA PARA CELULARES und 1.00 2,818.06 2,818.06 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 2,818.06 100.00% 1.00 2,818.06
05.01.05.02 PRUEBA DE AISLAMIENTO, CONTINUIDAD Y PUESTA EN FUNCIONAMIENTO GLB 1.00 500.00 500.00 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 500.00 100.00% 1.00 500.00
05.01.05.03 CONEXION A RED EXISTENTE 1.00 722.16 722.16 0.00% 0.00 0.00 0.00% 0.00 0.00 100.00% 1.00 722.16 100.00% 1.00 722.16
SUB TOTAL 478,112.57 27.04% 129,259.97 18.51% 88,494.62 54.46% 260,357.98 100.00% 478,112.57
COSTO DIRECTO TOTAL 478,112.57 27.04% 129,259.97 18.51% 88,494.62 54.46% 260,357.98 100.00% 478,112.57
37
VALORIZACIONES MENSUALES Y FINAL EJECUTADO
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
PRECIO PRECIO VALOR. N° 01 ENERO 2022 VALOR. N° 02 FEBRERO 2022 VALOR. N° 03 MARZO 2022 TOTAL VALORIZADO
PARTIDA DESCRIPCION UND METRADO
UNITARIO PARCIAL % METRADO MONTO % METRADO MONTO % METRADO MONTO % METRADO MONTO
GASTOS GENERALES (6.733688%) 32,194.61 27.04% 8,703.96 19.00% 5,958.95 54.46% 17,531.69 100.00% 32,194.61
UTILIDAD (8.00%) 38,249.01 27.04% 10,340.80 18.51% 7,079.57 54.46% 20,828.64 100.00% 38,249.01
SUB TOTAL 548,556.19 27.04% 148,304.73 18.51% 101,533.14 54.46% 298,718.31 100.00% 548,556.19
IGV (18.00%) 98,740.11 27.04% 26,694.85 18.51% 18,275.97 54.46% 53,769.30 100.00% 98,740.11
PRESUPUESTO CONTRATADO 647,296.30 27.04% 174,999.58 18.51% 119,809.11 54.46% 352,487.61 100.00% 647,296.30
VALORIZACION CONTRACTUAL 647,296.30 174,999.58 119,809.11 352,487.61 647,296.30
VALORIZACION CONTRACTUAL SIN IGV 548,556.19 148,304.73 101,533.14 298,718.31 548,556.19
38
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL DE OBRA : 719,218.11
"RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
►OBRA
ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA"
: MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO : 05/03/22
39
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL DE OBRA : 719,218.11
"RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
►OBRA
ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA"
: MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO : 05/03/22
02.03.03.03 VIGAS: ACERO Fy=4,200 kg/cm2 kg 213.91 5.62 1,202.17 100.00% 213.91 1,202.17 0.00% 0.00 0.00 100.00% 213.91 1,202.17 0.00% 0.00 0.00
02.03.03.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 14.16 1.32 18.69 100.00% 14.16 18.69 0.00% 0.00 0.00 100.00% 14.16 18.69 0.00% 0.00 0.00
02.03.04 LOSAS ALIGERADAS
02.03.04.01 LOSA ALIGERDA: ENCOFRADO Y DESENCOFRADO m2 22.67 48.00 1,088.16 100.00% 22.67 1,088.16 0.00% 0.00 0.00 100.00% 22.67 1,088.16 0.00% 0.00 0.00
02.03.04.02 LOSA ALIGERADA: LADRILLO DE ARCILLA DE 30x30x15 und 188.84 3.50 660.94 100.00% 188.84 660.94 0.00% 0.00 0.00 100.00% 188.84 660.94 0.00% 0.00 0.00
02.03.04.03 LOSA ALIGERADA: CONCRETO f'c= 210 kg/cm2 m3 1.98 369.47 731.55 100.00% 1.98 731.55 0.00% 0.00 0.00 100.00% 1.98 731.55 0.00% 0.00 0.00
02.03.04.04 LOSA ALIGERADA: ACERO Fy=4,200 kg/cm2 kg 66.52 5.62 373.84 100.00% 66.52 373.84 0.00% 0.00 0.00 100.00% 66.52 373.84 0.00% 0.00 0.00
02.03.04.05 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 22.67 1.32 29.92 100.00% 22.67 29.92 0.00% 0.00 0.00 100.00% 22.67 29.92 0.00% 0.00 0.00
02.03.05 BANCAS ARMADAS
02.03.05.01 ENCOFRADO Y DESENCOFRADO EN MOBILIARIO m2 37.80 77.99 2,948.02 90.00% 34.02 2,653.22 10.00% 3.78 294.80 100.00% 37.80 2,948.02 0.00% 0.00 0.00
02.03.05.02 CONCRETO PREMEZCLADO f'c=175 kg/cm2 EN MOBILIARIO m3 5.04 290.94 1,466.34 100.00% 5.04 1,466.34 0.00% 0.00 0.00 100.00% 5.04 1,466.34 0.00% 0.00 0.00
02.03.05.03 ACERO DE REFUERZO fy=4200 kg/cm2 EN MOBILIARIO kg 406.90 5.62 2,286.78 100.00% 406.90 2,286.78 0.00% 0.00 0.00 100.00% 406.90 2,286.78 0.00% 0.00 0.00
02.03.05.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 37.80 1.32 49.90 100.00% 37.80 49.90 0.00% 0.00 0.00 100.00% 37.80 49.90 0.00% 0.00 0.00
02.03.06 SARDINELES
02.03.06.01 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 295.79 58.53 17,312.59 100.00% 295.79 17,312.59 0.00% 0.00 0.00 100.00% 295.79 17,312.59 0.00% 0.00 0.00
02.03.06.02 SARDINEL DE CONCRETO PREMEZCLADO f'c=175 kg/cm2 (0.15x0.40) m3 26.29 290.94 7,648.81 100.00% 26.29 7,648.81 0.00% 0.00 0.00 100.00% 26.29 7,648.81 0.00% 0.00 0.00
02.03.06.03 SARDINEL REFORZADO: ACERO Fy=4200 kg/cm2 kg 645.33 5.62 3,626.75 100.00% 645.33 3,626.75 0.00% 0.00 0.00 100.00% 645.33 3,626.75 0.00% 0.00 0.00
02.03.06.04 JUNTA EN SARDINELES E=1" m 32.87 5.06 166.32 50.00% 16.44 83.16 50.00% 16.44 83.16 100.00% 32.87 166.32 0.00% 0.00 0.00
COSTO DIRECTO TOTAL 80,612.43 97.83% 78,862.45 2.17% 1,749.98 100.00% 80,612.43 0.00% 0.00
GASTOS GENERALES (6.733688%) 5,428.19 97.83% 5,310.35 2.00% 117.84 100.00% 5,428.19 0.00% 0.00
UTILIDAD (8.00%) 6,448.99 97.83% 6,309.00 2.17% 140.00 100.00% 6,448.99 0.00% 0.00
SUB TOTAL 92,489.61 97.83% 90,481.80 2.17% 2,007.82 100.00% 92,489.61 0.00% 0.00
IGV (18.00%) 16,648.13 97.83% 16,286.72 2.17% 361.41 100.00% 16,648.13 0.00% 0.00
PRESUPUESTO CONTRATADO 109,137.74 97.83% 106,768.52 2.17% 2,369.23 100.00% 109,137.74 0.00% 0.00
VALORIZACION CONTRACTUAL 109,137.74 106,768.52 2,369.23 109,137.74 0.00
VALORIZACION CONTRACTUAL SIN IGV 92,489.61 90,481.80 2,007.82 92,489.61 0.00
40
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL DE OBRA : 719,218.11
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO : 05/03/22
41
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL DE OBRA : 719,218.11
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO : 05/03/22
03.07.02.01 PERGOLA DE MADERA und 4.00 11,500.00 46,000.00 25.00% 1.00 11,500.00 75.00% 3.00 34,500.00 100.00% 4.00 46,000.00 0.00% 0.00 0.00
03.07.03 MUEBLES
03.07.03.01 MUEBLE DE MODULO DE VIGILANCIA(TABLERO DE MELAMINE) und 1.00 1,800.00 1,800.00 0.00% 0.00 0.00 100.00% 1.00 1,800.00 100.00% 1.00 1,800.00 0.00% 0.00 0.00
03.08 CARPINTERIA METALICA
03.08.01 VENTANAS
03.08.01.01 VENTANA DE ESTRUCTURA DE ALUMINIO ANONIZADO PIVOTANTE (PARTE SUPERIOR) C m2 20.25 300.00 6,075.00 0.00% 0.00 0.00 100.00% 20.25 6,075.00 100.00% 20.25 6,075.00 0.00% 0.00 0.00
03.08.02 PUERTAS
03.08.02.01 PUERTA DE CRISTAL TEMPLADO 8mm CON ESTRUCTURA DE METALICA CON ELEMENTOS m2 1.86 500.00 930.00 0.00% 0.00 0.00 100.00% 1.86 930.00 100.00% 1.86 930.00 0.00% 0.00 0.00
03.08.03 OTROS
03.08.03.01 LETRAS METALICAS und 68.00 110.77 7,532.36 0.00% 0.00 0.00 100.00% 68.00 7,532.36 100.00% 68.00 7,532.36 0.00% 0.00 0.00
03.09 CERRAJERIA
03.09.01 BISAGRAS
03.09.01.01 BISAGRAS CAPUCHINAS DE 4"X4" pza 3.00 14.49 43.47 0.00% 0.00 0.00 100.00% 3.00 43.47 100.00% 3.00 43.47 0.00% 0.00 0.00
03.09.01.02 BISAGRAS CAPUCHINAS 3 1/2"x3 1/2" pza 3.00 12.32 36.96 0.00% 0.00 0.00 100.00% 3.00 36.96 100.00% 3.00 36.96 0.00% 0.00 0.00
03.09.02 CERRADURAS
03.09.02.01 CERRADURA CILINDRICA C/CHAPA DE PERILLA und 1.00 79.88 79.88 0.00% 0.00 0.00 100.00% 1.00 79.88 100.00% 1.00 79.88 0.00% 0.00 0.00
03.09.02.02 CERROJO DE 3" und 1.00 21.00 21.00 0.00% 0.00 0.00 100.00% 1.00 21.00 100.00% 1.00 21.00 0.00% 0.00 0.00
03.09.02.03 TIRADOR DE ACERO INOXIDABLE pza 2.00 31.49 62.98 0.00% 0.00 0.00 100.00% 2.00 62.98 100.00% 2.00 62.98 0.00% 0.00 0.00
03.10 VIDRIOS, CRISTALES Y SIMILARES
03.10.01 ESPEJO DE 8 MM COM MARCO DE ALUMINIO NEGRO m2 0.65 201.68 131.09 0.00% 0.00 0.00 100.00% 0.65 131.09 100.00% 0.65 131.09 0.00% 0.00 0.00
03.11 PINTURA
03.11.01 PINTURA LATEX EN CIELORRASO m2 17.79 12.15 216.15 0.00% 0.00 0.00 100.00% 17.79 216.15 100.00% 17.79 216.15 0.00% 0.00 0.00
03.11.02 PINTURA LATEX EN INTERIORES m2 54.64 12.15 663.88 0.00% 0.00 0.00 100.00% 54.64 663.88 100.00% 54.64 663.88 0.00% 0.00 0.00
03.11.03 PINTURA DEMARCACION DE LOSA DEPORTIVA m2 427.20 3.97 1,695.98 0.00% 0.00 0.00 100.00% 427.20 1,695.98 100.00% 427.20 1,695.98 0.00% 0.00 0.00
03.12 VARIOS, LIMPIEZA Y JARDINERÍA
03.12.01 SEMBRADO DE GRASS AMERICANO m2 1,584.24 14.50 22,971.48 0.00% 0.00 0.00 100.00% 1,584.24 22,971.48 100.00% 1,584.24 22,971.48 0.00% 0.00 0.00
03.12.02 MANTENIMIENTO DE GRASS m2 1,584.24 3.17 5,022.04 0.00% 0.00 0.00 100.00% 1,584.24 5,022.04 100.00% 1,584.24 5,022.04 0.00% 0.00 0.00
03.12.03 GRASS ARTIFICIAL m2 333.28 9.86 3,286.14 0.00% 0.00 0.00 100.00% 333.28 3,286.14 100.00% 333.28 3,286.14 0.00% 0.00 0.00
03.12.04 JARDINERA P/PLANTAS ORNAMENTALES und 40.00 95.73 3,829.20 0.00% 0.00 0.00 100.00% 40.00 3,829.20 100.00% 40.00 3,829.20 0.00% 0.00 0.00
03.13 OTROS
03.13.01 BANCA DE CONCRETO CON LISTONES DE MADERA und 14.00 199.17 2,788.38 0.00% 0.00 0.00 100.00% 14.00 2,788.38 100.00% 14.00 2,788.38 0.00% 0.00 0.00
03.13.02 TACHOS DE BASURA DE FIBRA DE VIDRIO und 15.00 416.20 6,243.00 0.00% 0.00 0.00 100.00% 15.00 6,243.00 100.00% 15.00 6,243.00 0.00% 0.00 0.00
03.13.03 LETRAS Y LOGOS DE VINIL PARA EL MODULO DE VIGILANCIA
03.13.03.01 LETRAS DE VINIL und 9.00 61.40 552.60 0.00% 0.00 0.00 100.00% 9.00 552.60 100.00% 9.00 552.60 0.00% 0.00 0.00
03.13.03.02 LOGOS EN VINIL und 7.00 154.22 1,079.54 0.00% 0.00 0.00 100.00% 7.00 1,079.54 100.00% 7.00 1,079.54 0.00% 0.00 0.00
03.13.04 EQUIPOS DE GIMNASIO
03.13.04.01 PRESS PIERNA (1.00X0.50X1.70) und 1.00 2,230.67 2,230.67 0.00% 0.00 0.00 100.00% 1.00 2,230.67 100.00% 1.00 2,230.67 0.00% 0.00 0.00
03.13.04.02 PRESS PECHO (1.10X0.60X1.70) und 1.00 3,451.01 3,451.01 0.00% 0.00 0.00 100.00% 1.00 3,451.01 100.00% 1.00 3,451.01 0.00% 0.00 0.00
03.13.04.03 REMO (1.10X0.60X1.70) und 1.00 2,688.30 2,688.30 0.00% 0.00 0.00 100.00% 1.00 2,688.30 100.00% 1.00 2,688.30 0.00% 0.00 0.00
03.13.04.04 ESQUI (1.25X0.60X1.60) und 1.00 3,273.05 3,273.05 0.00% 0.00 0.00 100.00% 1.00 3,273.05 100.00% 1.00 3,273.05 0.00% 0.00 0.00
03.13.04.05 TORRE MULTI EJERCICIO (1.00X1.25X2.20) und 1.00 2,679.83 2,679.83 0.00% 0.00 0.00 100.00% 1.00 2,679.83 100.00% 1.00 2,679.83 0.00% 0.00 0.00
03.13.05 EQUIPOS DE CALISTENIA
42
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL DE OBRA : 719,218.11
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO : 05/03/22
03.13.05.01 CIRCUITO DE CALISTENIA(BARRAS, PARALELAS, ABDOMINALES) und 1.00 8,281.52 8,281.52 0.00% 0.00 0.00 100.00% 1.00 8,281.52 100.00% 1.00 8,281.52 0.00% 0.00 0.00
03.13.06 JUEGOS INFANTILES
03.13.06.01 BALANCINES 3-6 AÑOS (CABALLITO, PERRITO, ANACONDA, DELFIN) und 4.00 4,740.00 18,960.00 0.00% 0.00 0.00 100.00% 4.00 18,960.00 100.00% 4.00 18,960.00 0.00% 0.00 0.00
03.13.06.02 SUBE Y BAJA 3-12 AÑOS (CABALLITOS) und 3.00 3,128.98 9,386.94 0.00% 0.00 0.00 100.00% 3.00 9,386.94 100.00% 3.00 9,386.94 0.00% 0.00 0.00
03.13.06.03 COLUMPIO YOY MIXTO 4-10 AÑO und 1.00 4,806.94 4,806.94 0.00% 0.00 0.00 100.00% 1.00 4,806.94 100.00% 1.00 4,806.94 0.00% 0.00 0.00
03.13.06.04 CARRUSEL 3-12 AÑOS und 1.00 7,688.30 7,688.30 0.00% 0.00 0.00 100.00% 1.00 7,688.30 100.00% 1.00 7,688.30 0.00% 0.00 0.00
03.13.06.05 EL FOSO (TORRE DE JUEGOS) 6-12 AÑOS und 1.00 45,000.00 45,000.00 0.00% 0.00 0.00 100.00% 1.00 45,000.00 100.00% 1.00 45,000.00 0.00% 0.00 0.00
COSTO DIRECTO TOTAL 265,753.31 15.01% 39,900.37 84.99% 225,852.94 100.00% 265,753.31 0.00% 0.00
GASTOS GENERALES (6.733688%) 17,895.00 15.01% 2,686.77 85.00% 15,208.23 100.00% 17,895.00 0.00% 0.00
UTILIDAD (8.00%) 21,260.26 15.01% 3,192.03 84.99% 18,068.24 100.00% 21,260.26 0.00% 0.00
SUB TOTAL 304,908.57 15.01% 45,779.17 84.99% 259,129.41 100.00% 304,908.57 0.00% 0.00
IGV (18.00%) 54,883.54 15.01% 8,240.25 84.99% 46,643.29 100.00% 54,883.54 0.00% 0.00
PRESUPUESTO CONTRATADO 359,792.11 15.01% 54,019.42 84.99% 305,772.70 100.00% 359,792.11 0.00% 0.00
VALORIZACION CONTRACTUAL 359,792.11 54,019.42 305,772.70 359,792.11 0.00
VALORIZACION CONTRACTUAL SIN IGV 304,908.57 45,779.17 259,129.41 304,908.57 0.00
43
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL DE OBRA : 719,218.11
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO : 05/03/22
44
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL DE OBRA : 719,218.11
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO : 05/03/22
04.04.03.05 YEE PVC SAL 4" pza 2.00 17.26 34.52 100.00% 2.00 34.52 0.00% 0.00 0.00 100.00% 2.00 34.52 0.00% 0.00 0.00
04.04.03.06 TRAMPA "P" PVC SAL 2" pza 1.00 32.75 32.75 100.00% 1.00 32.75 0.00% 0.00 0.00 100.00% 1.00 32.75 0.00% 0.00 0.00
04.04.03.07 REGISTROS ROSCADO TIPO DADO DE BRONCE CROMADO 4" pza 1.00 62.56 62.56 100.00% 1.00 62.56 0.00% 0.00 0.00 100.00% 1.00 62.56 0.00% 0.00 0.00
04.04.03.08 SOMBRERO VENTILACION PVC DE 2" pza 2.00 11.83 23.66 100.00% 2.00 23.66 0.00% 0.00 0.00 100.00% 2.00 23.66 0.00% 0.00 0.00
04.04.04 CAMARAS DE INSPECCION
04.04.04.01 SUMINISTRO E INSTALACION DE CAJAS DE REGISTRO
04.04.04.01.01 CAJA DE REGISTRO 12" X 24" und 1.00 220.08 220.08 0.00% 0.00 0.00 100.00% 1.00 220.08 100.00% 1.00 220.08 0.00% 0.00 0.00
04.04.04.02 SUMINISTRO E INSTALACION DE BUZONETAS
04.04.04.02.01 BUZON EXISTENTE (ACONDICIONAMIENTO P/EMPLAME TUB. PROY. DESAGUE) und 1.00 574.30 574.30 0.00% 0.00 0.00 100.00% 1.00 574.30 100.00% 1.00 574.30 0.00% 0.00 0.00
COSTO DIRECTO TOTAL 4,644.21 76.37% 3,546.85 23.63% 1,097.36 100.00% 4,644.21 0.00% 0.00
GASTOS GENERALES (6.733688%) 312.73 76.37% 238.83 24.00% 73.89 100.00% 312.73 0.00% 0.00
UTILIDAD (8.00%) 371.54 76.37% 283.75 23.63% 87.79 100.00% 371.54 0.00% 0.00
SUB TOTAL 5,328.48 76.37% 4,069.43 23.63% 1,259.04 100.00% 5,328.48 0.00% 0.00
IGV (18.00%) 959.13 76.37% 732.50 23.63% 226.63 100.00% 959.13 0.00% 0.00
PRESUPUESTO CONTRATADO 6,287.61 76.37% 4,801.93 23.63% 1,485.67 100.00% 6,287.61 0.00% 0.00
VALORIZACION CONTRACTUAL 6,287.61 4,801.93 1,485.67 6,287.61 0.00
VALORIZACION CONTRACTUAL SIN IGV 5,328.48 4,069.43 1,259.04 5,328.48 0.00
45
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL DE OBRA : 719,218.11
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO : 05/03/22
COSTO DIRECTO TOTAL 37,972.69 20.05% 7,614.96 79.95% 30,357.73 100.00% 37,972.69 0.00% 0.00
GASTOS GENERALES (6.733688%) 2,556.96 20.05% 512.77 80.00% 2,044.19 100.00% 2,556.96 0.00% 0.00
UTILIDAD (8.00%) 3,037.82 20.05% 609.20 79.95% 2,428.62 100.00% 3,037.82 0.00% 0.00
46
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL DE OBRA : 719,218.11
►OBRA "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO DE OBRA : 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS CALENDARIOS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO : 05/03/22
SUB TOTAL 43,567.47 20.05% 8,736.93 79.95% 34,830.54 100.00% 43,567.47 0.00% 0.00
IGV (18.00%) 7,842.14 20.05% 1,572.65 79.95% 6,269.50 100.00% 7,842.14 0.00% 0.00
PRESUPUESTO CONTRATADO 51,409.61 20.05% 10,309.58 79.95% 41,100.04 100.00% 51,409.61 0.00% 0.00
VALORIZACION CONTRACTUAL 51,409.61 10,309.58 41,100.04 51,409.61 0.00
VALORIZACION CONTRACTUAL SIN IGV 43,567.47 8,736.93 34,830.54 43,567.47 0.00
47
RESUMEN GENERAL
VALORIZACION DE OBRA N° 03
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL : 719,218.11
"RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
►OBRA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO : 647,296.30 ###
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
F 01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 89,129.93 145.02% 129,259.97 99.29% 88,494.62 244.31% 217,754.59 -144.31% -128,624.66
###
F 02 ESTRUCTURAS 80,612.43 97.83% 78,862.45 2.17% 1,749.98 100.00% 80,612.43 0.00% 0.00
F 03 ARQUITECTURA 265,753.31 15.01% 39,900.37 84.99% 225,852.94 100.00% 265,753.31 0.00% 0.00
F 04 INSTALACIONES SANITARIAS 4,644.21 76.37% 3,546.85 23.63% 1,097.36 100.00% 4,644.21 0.00% 0.00
F 05 INSTALACIONES ELECTRICAS Y ELECTROMECANICAS 37,972.69 20.05% 7,614.96 79.95% 30,357.73 100.00% 37,972.69 0.00% 0.00
COSTO DIRECTO TOTAL 478,112.57 54.21% 259,184.60 72.69% 347,552.63 126.90% 606,737.23 -26.90% -128,624.66
GASTOS GENERALES (6.733688%) 32,194.61 54.21% 17,452.68 72.69% 23,403.11 126.90% 40,855.79 -26.90% -8,661.18
###
UTILIDAD (8.00%) 38,249.01 54.21% 20,734.77 72.69% 27,804.21 126.90% 48,538.98 -26.90% -10,289.97
###
SUB TOTAL 2 548,556.19 54.21% 297,372.05 72.69% 398,759.95 126.90% 696,132.00 -26.90% -147,575.81
###
IGV (18.00%) 98,740.11 54.21% 53,526.97 72.69% 71,776.79 126.90% 125,303.76 -26.90% -26,563.65
###
PRESUPUESTO CONTRATADO 647,296.30 54.21% 350,899.02 72.69% 470,536.74 126.90% 821,435.76 -26.90% -174,139.46
###
VALORIZACION CONTRACTUAL 647,296.30 54.21% 350,899.02 72.69% 470,536.74 126.90% 821,435.76 -26.90% -174,139.46
###
VALORIZACION CONTRACTUAL SIN IGV 548,556.19 297,372.05 398,759.95 696,132.00 -147,575.81
###
RESUMEN DE VALORIZACIONES DE OBRA
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL : 719,218.11
"RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
►OBRA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO : 647,296.30 ###
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
COSTO DIRECTO TOTAL 478,112.57 27.04% 129,259.97 18.51% 88,494.62 54.46% 260,357.98 100.00% 478,112.57
GASTOS GENERALES (6.733688%) 32,194.61 27.04% 8,703.96 18.51% 5,958.95 54.46% 17,531.69 100.00% 32,194.61
###
UTILIDAD (8.00%) 38,249.01 27.04% 10,340.80 18.51% 7,079.57 54.46% 20,828.64 100.00% 38,249.01
###
SUB TOTAL 2 548,556.19 27.04% 148,304.73 18.51% 101,533.14 54.46% 298,718.31 100.00% 548,556.19
###
IGV (18.00%) 98,740.11 27.04% 26,694.85 18.51% 18,275.97 54.46% 53,769.30 100.00% 98,740.11
###
PRESUPUESTO REFERENCIAL 647,296.30 27.04% 174,999.58 18.51% 119,809.11 54.46% 352,487.61 100.00% 647,296.30
###
VALORIZACION CONTRACTUAL 647,296.30 27.04% 174,999.58 18.51% 119,809.11 54.46% 352,487.61 100.00% 647,296.30
###
RESUMEN DE VALORIZACIONES MENSUALES DE OBRA
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL : 719,218.11
"RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA
►OBRA
: ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO : 647,296.30 ###
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA : 60 DIAS
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA : 05/01/22
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO DE OBRA : 05/03/22
COSTO DIRECTO TOTAL 478,112.57 27.04% 129,259.97 18.51% 88,494.62 54.46% 260,357.98 100.00% 478,112.57
GASTOS GENERALES (6.733688%) 32,194.61 27.04% 8,703.96 18.51% 5,958.95 54.46% 17,531.69 100.00% 32,194.61
###
UTILIDAD (8.00%) 38,249.01 27.04% 10,340.80 18.51% 7,079.57 54.46% 20,828.64 100.00% 38,249.01
###
SUB TOTAL 2 548,556.19 27.04% 148,304.73 18.51% 101,533.14 54.46% 298,718.31 100.00% 548,556.19
###
IGV (18.00%) 98,740.11 27.04% 26,694.85 18.51% 18,275.97 54.46% 53,769.30 100.00% 98,740.11
###
PRESUPUESTO REFERENCIAL 647,296.30 27.04% 174,999.58 18.51% 119,809.11 54.46% 352,487.61 100.00% 647,296.30
###
VALORIZACION CONTRACTUAL 647,296.30 27.04% 174,999.58 18.51% 119,809.11 54.46% 352,487.61 100.00% 647,296.30
###
VALORIZACION DE OBRA N° 03
CALCULO DEL COEFICIENTE REAJUSTE DE LA VALORIZACION DE OBRA N° 03
Ʃ 1.000000 Ʃ 1.000
FORMULA N° 02 ESTRUCTURAS
Ʃ 1.000000 Ʃ 1.000
FORMULA N° 03 ARQUITECTURA
Ir + 0.326 x Mr + 0.476 x Fr
K= 0.198 x Io Mo Fo
VAL N° 02 JUL 12
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI Io Ir Kr(SET )=
IU INCIDENCIA INCIDENCIA Material JUNIO 12 JULIO 12 JULIO 12
1 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.198 100.00% 0.198000 377.16 377.16 0.198
2 M 47 MANO DE OBRA INC. LEYES SOCIALES 0.326 100.00% 0.326000 448.25 448.25 0.326
3 F 32 FLETE TERRESTRE 0.476 100.00% 0.476000 449.56 449.56 0.476
Ʃ 1.000000 Ʃ 1.000
VALORIZACION DE OBRA N° 03
FORMULAS POLINOMICAS
1.000000
FORMULA N° 02 ESTRUCTURAS
1.000000
FORMULA N° 03 ARQUITECTURA
Ir + 0.326 x Mr + 0.476 x Fr
K= 0.198 x Io Mo Fo
1.000000
VALORIZACION DE OBRA N° 03
CALCULO DE LOS COEFICIENTES DE REAJUSTES (K)
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL. EFECT. (Ia) IND. ADEL. MAT. (Ia) JUNIO 2012 (Ir) JULIO 2012 (Ir)
IU INCIDENCIA INCIDENCIA Material JUNIO 12 COEFIC. FEBRERO 12 COEFIC. MAYO 12 COEFIC. JUNIO 12 COEFIC. JULIO 12 COEFIC.
1 C 21 CEMENTO PORTLAND TIPO I 0.075 100.00% 0.075000 354.74 0.075 354.74 0.075 354.74 0.075 354.74 0.075
2 M 47 MANO DE OBRA INC. LEYES SOCIALES 0.124 100.00% 0.124000 448.25 0.124 448.25 0.124 448.25 0.124 448.25 0.124
3 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.156 100.00% 0.156000 377.16 0.156 372.30 0.154 377.16 0.156 377.16 0.156
4 A 02 ACERO DE CONSTRUCCION LISO 0.292 100.00% 0.292000 490.10 0.292 522.59 0.311 490.10 0.292 490.10 0.292
5 M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.353 100.00% 0.353000 234.94 0.353 234.94 0.353 234.94 0.353 234.94 0.353
FORMULA N° 02 ESTRUCTURAS
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL. EFECT. (Ia) IND. ADEL. MAT. (Ia) JUNIO 2012 (Ir) JULIO 2012 (Ir)
IU INCIDENCIA INCIDENCIA Material JUNIO 12 COEFIC. FEBRERO 12 COEFIC. MAYO 12 COEFIC. JUNIO 12 COEFIC. JULIO 12 COEFIC.
1 M 47 MANO DE OBRA INC. LEYES SOCIALES 0.081 100.00% 0.081000 448.25 0.081 448.25 0.081 448.25 0.081 448.25 0.081
2 M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.122 100.00% 0.122000 234.94 0.122 234.94 0.122 234.94 0.122 234.94 0.122
3 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.146 100.00% 0.146000 377.16 0.146 372.30 0.144 377.16 0.146 377.16 0.146
4 A 02 ACERO DE CONSTRUCCION LISO 0.651 100.00% 0.651000 490.10 0.651 522.59 0.694 490.10 0.651 490.10 0.651
FORMULA N° 03 ARQUITECTURA
Ir + 0.326 x Mr + 0.476 x Fr
K= 0.198 x Io Mo Fo
VAL 01 VAL 02
MONOMIO SIMBOLO CODIGO DESCRIPCION COEF. DE % DE CI IND. BASE (Io) IND. ADEL. EFECT. (Ia) IND. ADEL. MAT. (Ia) JUNIO 2012 (Ir) JULIO 2012 (Ir)
IU INCIDENCIA INCIDENCIA Material JUNIO 12 COEFIC. FEBRERO 12 COEFIC. MAYO 12 COEFIC. JUNIO 12 COEFIC. JULIO 12 COEFIC.
1 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.198 100.00% 0.198000 377.16 0.198 372.30 0.195 377.16 0.198 377.16 0.198
2 M 47 MANO DE OBRA INC. LEYES SOCIALES 0.326 100.00% 0.326000 448.25 0.326 448.25 0.326 448.25 0.326 448.25 0.326
3 F 32 FLETE TERRESTRE 0.476 100.00% 0.476000 449.56 0.476 438.91 0.465 449.56 0.476 449.56 0.476
1 2 3 4 23 24 25 26 27 28 29
IU INSUMO ENE 12 FEB 12 MAR 12 ABR 12 MAY 12 JUN 12 JUL 12
1 01 Aceite, Lubricantes (Indice Base Jul.1992=100,0) 793.53 792.13 790.22 787.98 789.88 792.1
2 02 Acero de Construcción liso (Indice Base Jul.1992=100,0) 531.59 522.59 506.05 500.27 505.67 490.1
3 03 Acero de Construcción Corrugado (Indice Base Jul.1992=100,0) 526.73 517.8 501.65 496.88 498.41 486.71
4 04-3 Agregado Fino (Indice Base Jul.1992=100,0) 909.19 912.46 906.71 902.42 896.37 890.71
5 05-3 Agregado grueso (Indice Base Jul.1992=100,0) 358.53 359.55 359.01 360.44 357.34 359.7
6 06 Alambre y Cable de Cobre Desnudo (Indice Base Jul.1992=100,0) 837.58 860.62 874.54 856.09 836.45 818.85
7 07 Alambre y Cable Tipo TW y THW (Indice Base Jul.1992=100,0) 593.43 612.88 623.53 608.05 598.55 587.5
8 08 Alambre y Cable Tipo WP (Indice Base Jul.1992=100,0) 780.85 808.75 826.61 803.22 795.62 784.45
9 09 Alcantarilla Metal (Indice Base Jul.1992=100,0) 286.43 285.47 284.19 282.7 283.98 284.19
10 10 Aparatos Sanitarios con Griferia (Indice Base Jul.1992=100,0) 338.18 337.28 339.58 344.29 345.54 345.12
11 11 Artef. Alumbrado Exterior (Indice Base Jul.1992=100,0) 211.4 208.78 205.64 204.68 208.33 208.47
12 12 Artef. Alumbrado Interior (Indice Base Jul.1992=100,0) 295.3 291.98 287.42 286.26 295.17 295.34
13 13 Asfalto (Indice Base Jul.1992=100,0) 1,718.06 1,718.06 1,718.06 1,837.23 1,849.17 1,735.99
14 14 Baldosa Acustica (Indice Base Jul.1992=100,0) 263.68 263.68 263.68 267.68 267.68 267.68
16 16 Baldosa Vinílica (Indice Base Jul.1992=100,0) 324.45 329.93 346.15 352.48 352.48 352.48
17 17-3 Bloques y Ladrillo (Indice Base Jul.1992=100,0) 723.1 718.99 711.33 711.42 713.24 714.3
18 18 Cable Telefónico (Indice Base Jul.1992=100,0) 282.19 286.13 293.48 282.26 275.75 271.37
19 19 Cable NYY - N2XY (Indice Base Jul.1992=100,0) 691.7 711.05 724.35 709.06 691.33 677.87
20 20 Cemento Asfáltico (Indice Base Jul.1992=100,0) 2,064.35 2,064.35 2,064.35 2,220.00 2,235.76 2,061.06
21 21-3 Cemento Portland Tipo I (Indice Base Jul.1992=100,0) 354.74 354.74 354.74 354.74 354.74 354.74
22 22 Cemento Portland Tipo II (Indice Base Jul.1992=100,0) 367.3 367.3 367.3 367.3 367.3 367.3
23 23 Cemento Portland Tipo V (Indice Base Jul.1992=100,0) 368.1 368.1 368.1 368.1 368.1 368.1
24 24 Ceramica Esmaltada y S/Esmaltar (Indice Base Jul.1992=100,0) 266.77 267.61 266.49 270.38 271.05 271.21
26 26 Cerrajería Nacional (Indice Base Jul.1992=100,0) 361.03 360.06 360.06 360.06 360.06 360.09
27 27 Detonante (Indice Base Jul.1992=100,0) 512.99 511.28 509.01 506.32 508.62 509.01
28 28-2 Dinamita (Indice Base Jul.1992=100,0) 405.7 404.34 402.54 400.43 402.24 486.3
28-4 Dinamita (Indice Base Jul.1992=100,0) 414.25 413.57 411.72 409.79 411.95 488.35
30 30 Dolar mas inflación (Indice Base Jul.1992=100,0) 354.05 354.43 354.39 355.21 357.9 357.75
31 31 Ducto de Concreto (Indice Base Jul.1992=100,0) 355.55 357.1 357.26 357.75 361.24 361.31
32 32 Flete terrestre (Indice Base Jul.1992=100,0) 438.91 438.91 445.65 445.65 445.65 449.56
33 33 Flete aéreo (Indice Base Jul.1992=100,0) 610.91 621.08 618.3 607.19 609.89 610.32
34 34 Gasolina (Indice Base Jul.1992=100,0) 542.76 545.34 566.9 566.04 566.04 565.17
37 37 Herramienta Manual (Indice Base Jul.1992=100,0) 284.11 285.84 286.86 286.44 290.26 292.3
38 38-3 Hormigón (Indice Base Jul.1992=100,0) 779.17 778.57 779.8 778.52 770.07 766.91
39 39 Índice General de precios al Consumidor (Indice Base Jul.1992=100,0) 371.1 372.3 375.16 377.15 377.3 377.16
40 40-3 Loseta (Indice Base Jul.1992=100,0) 402.35 403.55 403.48 404.04 404.3 403.33
41 41 Madera en tiras para Piso (Indice Base Jul.1992=100,0) 352.76 352.76 354.29 353.78 353.78 353.78
42 42 Madera imp.para enc/carp (Indice Base Jul.1992=100,0) 224.05 234.22 233.63 233.03 233.48 233.63
43 43-3 Madera nac para enc/car (Indice Base Jul.1992=100,0) 735.06 736.94 744.15 740.14 736.64 737.55
44 44 Madera terciada para encofrado y carpinteria (Indice Base Jul.1992=100,0) 343.19 343.51 343.92 345.25 343.48 343.84
45 45 Madera terciada para encofrado (Indice Base Jul.1992=100,0) 311.33 311.27 311.46 311.46 311.46 311.64
46 46 Malla de Acero (Indice Base Jul.1992=100,0) 475.3 475.62 474.59 469.89 471.9 472.05
47 47 Mano de obra (Indice Base Jul.1992=100,0) 448.25 448.25 448.25 448.25 448.25 448.25
80 Concreto premezclado (Indice Base Jul.1992=100,0) 104.22 104.32 105.07 105.19 105.41 105.22
48 48 Maquinaria y Equipo Nac. (Indice Base Jul.1992=100,0) 328.71 328.23 327.49 326.76 329.22 328.79
49 49 Maquinaria y Equipo Imp. (Indice Base Jul.1992=100,0) 235.2 234.94 234.24 233.54 234.59 234.94
50 50 Marco y tapa fo. fdo. (Indice Base Jul.1992=100,0) 625.1 623.04 620.22 617.1 619.77 620.22
51 51 Perfil de Acero Liviano (Indice Base Jul.1992=100,0) 336.71 335.06 328.98 323.31 324.79 315.55
52 52 Perfil de Aluminio (Indice Base Jul.1992=100,0) 302.59 277.28 276.66 275.7 279.96 276.68
53 53 Petróleo Diesel (Indice Base Jul.1992=100,0) 864.95 870.25 906.68 906.68 912.64 912.64
54 54 Pintura Látex (Indice Base Jul.1992=100,0) 349.48 349.48 359.83 359.83 363.01 363.28
55 55 Pintura Temple (Indice Base Jul.1992=100,0) 439.57 438.3 443.11 445.6 478.01 480.41
56 56 Plancha de Acero LAC (Indice Base Jul.1992=100,0) 567.2 565.3 562.77 559.82 562.35 546.32
57 57 Plancha de Acero LAF (Indice Base Jul.1992=100,0) 413.22 411.84 410 407.85 409.69 404.4
59 59 Plancha de Fibro - Cemento (Indice Base Jul.1992=100,0) 188.17 192.9 192.9 192.9 200.22 200.22
60 60 Plancha de Poliuretano (Indice Base Jul.1992=100,0) 295.99 295.99 295.99 295.99 295.99 295.99
61 61 Plancha Galvanizada (Indice Base Jul.1992=100,0) 290.63 289.66 288.36 286.85 288.15 288.36
62 62 Poste de Concreto (Indice Base Jul.1992=100,0) 386.19 391.46 402.41 399.03 402.01 396.68
64 64 Terrazo (Indice Base Jul.1992=100,0) 231.38 231.38 231.38 231.38 251.35 251.35
65 65 Tubería de Acero Negro y/o galv. (Indice Base Jul.1992=100,0) 261.97 260.92 259.64 258.47 260.47 258.98
66 66 Tuberia de PVC para la red de Agua Potable y Alcantarillado (Indice Base Jul.1992=100,0) 474.17 472.64 470.38 475.44 477.77 478.16
68 68 Tubería de Cobre (Indice Base Jul.1992=100,0) 309.3 299.95 298.65 297.31 285.38 288.76
69 69-3 Tuberia de Concreto Simple (Indice Base Jul.1992=100,0) 428.87 428.87 428.87 428.87 428.87 428.87
70 70 Tuberia de Concreto Reforzado (Indice Base Jul.1992=100,0) 218.25 218.25 218.25 218.25 218.25 218.25
71 71 Tubería de fo.fdo. (Indice Base Jul.1992=100,0) 508.68 506.99 504.72 502.07 504.34 504.72
72 72 Tubería de PVC (Indice Base Jul.1992=100,0) 344.83 342.06 340.98 343.28 346.99 350.65
73 73 Ductos y Acces. Telef. (Indice Base Jul.1992=100,0) 403.14 401.8 399.99 403.67 405.73 406.04
77 77 Válvula de bronce Nac. (Indice Base Jul.1992=100,0) 274.92 274.34 274.69 274.05 275.39 274.16
78 78 Válvula fo.fdo. Nac (Indice Base Jul.1992=100,0) 454.04 453.53 452.86 452.06 457.73 457.84
VALORIZACION DE OBRA N° 03
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS
: "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y
LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA ANTIGUA DE LA URB.
►OBRA LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS,
PROVINCIA LIMA, DEPARTAMENTO LIMA"
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA
CUADRO DE REAJUSTES
CALCULO DEL REAJUSTE DE LA OBRA
VALORES CALCULADOS SIN IGV
FORMULA N° 02 ESTRUCTURAS
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 ENERO 2022 0.00 0.00 1.000 0.00 0.00 0.00
2 FEBRERO 2022 0.00 755.40 1.000 0.00 0.00 0.00
3 MARZO 2022 0.00 0.00 1.000 0.00 0.00 0.00
4 #N/A 0.00 #N/A #N/A #N/A #N/A #N/A
5 #N/A 0.00 #N/A #N/A #N/A #N/A #N/A
6 #N/A 0.00 #N/A #N/A #N/A #N/A #N/A
7 #N/A 0.00 #N/A #N/A #N/A #N/A #N/A
8 #N/A 0.00 #N/A 0.00 #N/A #N/A
9 #N/A 0.00 #N/A 0.00 #N/A #N/A
10 #N/A 0.00 #N/A 0.00 #N/A #N/A
11 #N/A 0.00 #N/A 0.00 #N/A #N/A
12 #N/A 0.00 #N/A 0.00 #N/A #N/A
13 #N/A 0.00 #N/A 0.00 #N/A #N/A
14 #N/A 0.00 #N/A 0.00 #N/A #N/A
15 #N/A 0.00 #N/A 0.00 #N/A #N/A
16 #N/A 0.00 #N/A 0.00 #N/A #N/A
TOTALES 0.00 #N/A #N/A #N/A #N/A
REINTEGRO ACUM. ANTERIOR 0.00
REINTEGRO DEL MES #N/A
REINTEGRO TOTAL #N/A
FORMULA N° 03 ARQUITECTURA
VALORIZACION AVANCE REAJUSTE REINTEGRO
C= VALx(Kr-1)
No MES PROGRAMADO REAL Kr CALENDARIO VALORIZACION RECONOCIDO
1 ENERO 2022 0.00 #NAME? 1.000 0.00 #NAME? #NAME?
2 FEBRERO 2022 0.00 #NAME? 1.000 0.00 #NAME? #NAME?
3 MARZO 2022 0.00 #NAME? 1.000 0.00 #NAME? #NAME?
4 #N/A 0.00 #N/A #N/A #N/A #N/A #N/A
5 #N/A 0.00 #N/A #N/A #N/A #N/A #N/A
6 #N/A 0.00 #N/A #N/A #N/A #N/A #N/A
7 #N/A 0.00 #N/A #N/A #N/A #N/A #N/A
8 #N/A 0.00 #N/A 0.00 #N/A #N/A
9 #N/A 0.00 #N/A 0.00 #N/A #N/A
10 #N/A 0.00 #N/A 0.00 #N/A #N/A
11 #N/A 0.00 #N/A 0.00 #N/A #N/A
12 #N/A 0.00 #N/A 0.00 #N/A #N/A
13 #N/A 0.00 #N/A 0.00 #N/A #N/A
14 #N/A 0.00 #N/A 0.00 #N/A #N/A
15 #N/A 0.00 #N/A 0.00 #N/A #N/A
16 #N/A 0.00 #N/A 0.00 #N/A #N/A
TOTALES 0.00 #NAME? #N/A #NAME? #NAME?
REINTEGRO ACUM. ANTERIOR #NAME?
REINTEGRO DEL MES #NAME?
REINTEGRO TOTAL #NAME?
RESUMEN DEL REAJUSTE MENSUAL
REINTEGRO ACUM. ANTERIOR #NAME?
REINTEGRO DEL MES #N/A
REINTEGRO TOTAL #N/A
VALORIZACION DE OBRA N° 03
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS
: "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA ANTIGUA DE LA URB.
►OBRA
LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA"
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA
MONTO CONTRATADO (C/ IGV) 647,296.30 ADELANTO EN EFECTIVO (C/ IGV) 64,729.63 ADELANTO PARA MATERIALES (C/ IGV) 129,459.26
MONTO CONTRATADO (S/ IGV) 548,556.19 ADELANTO EN EFECTIVO (S/ IGV) 54,855.62 ADELANTO PARA MATERIALES (S/ IGV) 109,711.24
% DEL ADELANTO EN EFECTIVO 10.00% % DEL ADELANTO PARA MATERIALES 20.00%
CUADRO DE REINTEGRO
REAJUSTE NETO DEL COSTO DE LA OBRA
VALORES CALCULADOS SIN IGV
FORMULA N° 01 : OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
ADELANTO MONTO ADELANTO EN EFECTIVO % ADELANTO EN EFECTIVO FACTOR DE CALCULO ( % /Ka ) CONTROL DE PORCENTAJE DE AVANCE
No MES PARCIAL ACUMULADO Ka PARCIAL ACUMULADO PARCIAL ACUMULADO AVANCES CALENDARIO VALORIZACION
1 05/01/2022 54,855.62 54,855.62 1.017 10.00% 10.00% 0.09833 0.09833
ACUM. MENSUAL 0.00% 0.00%
EN EJECUCION
TOTALES 0.00 #VALUE! 0.00 #VALUE! 0.00 #VALUE! 0.00 #VALUE! #VALUE!
REINTEGRO ACUM. ANTERIOR 0.00
REINTEGRO DEL MES #VALUE!
VALORIZACION DE OBRA N° 03
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS
: "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA ANTIGUA DE LA URB.
►OBRA
LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA"
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA
MONTO CONTRATADO (C/ IGV) 647,296.30 ADELANTO EN EFECTIVO (C/ IGV) 64,729.63 ADELANTO PARA MATERIALES (C/ IGV) 129,459.26
MONTO CONTRATADO (S/ IGV) 548,556.19 ADELANTO EN EFECTIVO (S/ IGV) 54,855.62 ADELANTO PARA MATERIALES (S/ IGV) 109,711.24
% DEL ADELANTO EN EFECTIVO 10.00% % DEL ADELANTO PARA MATERIALES 20.00%
CUADRO DE REINTEGRO
REAJUSTE NETO DEL COSTO DE LA OBRA
VALORES CALCULADOS SIN IGV
FORMULA N° 02 : ESTRUCTURAS
ADELANTO MONTO ADELANTO EN EFECTIVO % ADELANTO EN EFECTIVO FACTOR DE CALCULO ( % /Ka ) CONTROL DE PORCENTAJE DE AVANCE
No MES PARCIAL ACUMULADO Ka PARCIAL ACUMULADO PARCIAL ACUMULADO AVANCES CALENDARIO VALORIZACION
1 FEBRERO 12 54,855.62 0.00 1.041 10.00% 10.00% 0.09606 0.09606
ACUM. MENSUAL #REF! #REF!
#REF!
TOTALES 0.00 #VALUE! 0.00 #VALUE! 0.00 #VALUE! 0.00 #VALUE! #VALUE!
REINTEGRO ACUM. ANTERIOR #N/A
REINTEGRO DEL MES #VALUE!
VALORIZACION DE OBRA N° 03
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS
: "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA ANTIGUA DE LA URB.
►OBRA
LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA"
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA
MONTO CONTRATADO (C/ IGV) 647,296.30 ADELANTO EN EFECTIVO (C/ IGV) 64,729.63 ADELANTO PARA MATERIALES (C/ IGV) 129,459.26
MONTO CONTRATADO (S/ IGV) 548,556.19 ADELANTO EN EFECTIVO (S/ IGV) 54,855.62 ADELANTO PARA MATERIALES (S/ IGV) 109,711.24
% DEL ADELANTO EN EFECTIVO 10.00% % DEL ADELANTO PARA MATERIALES 20.00%
CUADRO DE REINTEGRO
REAJUSTE NETO DEL COSTO DE LA OBRA
VALORES CALCULADOS SIN IGV
FORMULA N° 03 : ARQUITECTURA
ADELANTO MONTO ADELANTO EN EFECTIVO % ADELANTO EN EFECTIVO FACTOR DE CALCULO ( % /Ka ) CONTROL DE PORCENTAJE DE AVANCE
No MES PARCIAL ACUMULADO Ka PARCIAL ACUMULADO PARCIAL ACUMULADO AVANCES CALENDARIO VALORIZACION
1 05/01/2022 54,855.62 54,855.62 0.986 10.00% 10.00% 0.10142 0.10142
ACUM. MENSUAL #REF! #REF!
#REF!
TOTALES 0.00 #NAME? 0.00 #NAME? 0.00 #NAME? 0.00 #NAME? #NAME?
REINTEGRO ACUM. ANTERIOR #NAME?
REINTEGRO DEL MES #NAME?
LIQUIDACION FINAL DE CONTRATO DE OBRA
1.02 PAGADO
1.02.01 Contrato principal S/. 548,556.19
1.02.02 Reintegros Cont. principal S/. 0.00 548,556.19
2.02. AMORTIZADOS
3.02.01 Adelanto Directo 54,855.62
3.02.02 Adelanto de Materiales S/. 109,711.24 164,566.86
3.02 PAGADO
3.02.01 Valorizaciones Contrato Principa S/. 69,118.08
3.02.02 Del Adelanto Directo S/. 9,874.01
3.02.03 Del Adelanto de materiales S/. 19,748.02
3.02.04 Reintegros de Adicionales S/. 0.00
3.02.05 Reajuste que No corresponde S/. 0.00
3.02.06 Deductivos S/. 0.00 98,740.11
B. FORMA DE PAGO
B.1) SIN FACTURAR (DEVOLUCION RETENCION FIEL CUMPLIMIENTO)
A FAVOR DEL A CARGO DEL
CONTRATISTA
TOTAL (S/.) 0.00
B.2) FACTURADO
A FAVOR DEL A CARGO DEL
CONTRATISTA CONTRATISTA
B.2.3 Contrato Principal 0.00 0.00
0.00
TOTAL (S/.) 0.00
CONTRATO PRINCIPAL
Valorización Bruta Reajuste TOTAL Amortizaciones de VALORIZAC. Otras Deducciones ( E ) NETO PAGADO S/. Comprob. de Pago
Monto S/. Concedido REAJUSTADO Adelantos ( D ) NETA Fondo de Gastos de Multa Fecha de
En Efectivo Para Mater. ( VN ) Garantía Licit. y Pub. Efectivo IGV No Cobranza
A B C=A+B D1 AM-1 VN = C - D FG
Para liquidación: -
54,855.62
9,874.01 19,748.02 29,622.03 647,296.30
647,296.30
0.00
64,729.63 548,556.19
Obra :
"RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE
OTROS ACTIVOS EN EL(LA) PARQUE ISLA ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD
CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA"
Contratista: HUASCARAN CONSTRUCTORA BLAS SAC
as calendarios
as calendarios
as calendarios
as calendarios
VALORIZACION DE OBRA N° 03
►ENTIDAD EJECUTORA :: MUNICIPALIDAD
"RENOVACION DEDISTRITAL
VEREDA,DE CHORRILLOS
AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA;
ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA ANTIGUA DE LA URB. LOS CEDROS DE
►OBRA VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA,
DEPARTAMENTO LIMA"
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA
AMORTIZACION DEL
ADELANTO EN EFECTIVO
D.S. Nº 017-79-VC
FORMULA:
AMORT = AxVAL/C
DONDE:
AMORTIZACION DEL
ADELANTO DE MATERIALES
D.S. Nº 017-79-VC
FORMULA:
AMORT = AxVAL/C
DONDE:
TOTAL 109,711.24
D.S. Nº 017-79-VC
FORMULA:
De = A x VAL / C x ( K / Ka - 1 )
DONDE:
TOTAL -363.99
TOTAL 0.00
VALORIZACION DE OBRA N° 03
: "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y
►ENTIDAD EJECUTORA : MUNICIPALIDAD
SEGURIDAD DISTRITALADEMÁS
Y LUMINARIA; DE CHORRILLOS
DE OTROS ACTIVOS EN EL(LA)
PARQUE ISLA ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA
►OBRA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA,
DEPARTAMENTO LIMA"
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA
D.S. Nº 017-79-VC
FORMULA:
De = A x VAL / C x ( K / Ka - 1 )
DONDE:
FORMULA N° 03 ARQUITECTURA
No. FECHA PAGO ADEL. EFEC. ADEL. EFEC. PORCENTAJE
TOTAL Err:509
ENERO 2022
ENERO 2022
VALORIZACION Nº 01
a) VALORIZACION
1.- Monto Valorizado (sin IGV) Err:509
2.- Reintegros (sin IGV) 0.00
b) TOTAL VALORIZADO (a.1+b.2) Err:509
c) DEDUCCIONES
1.- Amort. Adelanto en Efectivo (sin IGV) 8,604.50
2.- Amort. Adelanto de Materiales (sin IGV) 92,975.63
d) TOTAL DE RETENCIONES (c.1+c.2) 101,580.13
e) TOTAL A PAGAR POR LA VALORIZACION (b-d) Err:509
f) I.G.V (18 % ) Err:509
g) TOTAL A RECIBIR POR LA CONTRATISTA (e+f+g) Err:509
RESUMEN DE CALENDARIO VALORIZADO DE AVANCE DE OBRA PROGRAMADO VS EJECUTADO
Dec-99
►ENTIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CHORRILLOS MONTO REFERENCIAL 719,218.11
"RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y
►OBRA LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA ANTIGUA DE LA URB. LOS
CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA
: LIMA, DEPARTAMENTO LIMA" MONTO CONTRATADO 647,296.30
►CONTRATISTA : HUASCARAN CONSTRUCTORA BLAS SAC PLAZO DE EJECUCION DE OBRA 60 DC
►SUPERVISOR : ING. MANUEL ANTONIO CRUZ CHUYES FECHA DE INICIO DE OBRA 1/5/2022
►MODALIDA DE EJECUCION : CONTRATO A SUMA ALZADA FECHA DE TERMINO
0 DE OBRA 3/5/2022
FECHA DE TERMINO CONTRACTUAL 3/5/2022
1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 89,129.93 79,756.28 70,020.30 8,473.65 17,809.64 900.00 88,494.62 ###
2 ESTRUCTURAS 80,612.43 46,444.99 50,026.72 34,167.46 28,835.75 0.00 0.00 ###
3 ARQUITECTURA 265,753.31 3,257.11 9,212.95 181,599.92 30,687.42 80,896.27 Err:509 ###
4 INSTALACIONES SANITARIAS 4,644.21 0.00 0.00 4,644.20 3,546.85 0.00 Err:509 ###
5 INSTALACIONES ELECTRICAS Y ELECTROMECANICAS 37,972.69 0.00 0.00 37,972.69 7,614.96 0 Err:509 ###
COSTO DIRECTO TOTAL 478,112.57 129,458.38 129,259.97 266,857.93 88,494.62 81,796.27 88,494.62
GASTOS GENERALES (6.733688%) 32,194.61 8,717.32 8,703.96 17,969.38 5,958.95 5,507.91 5,958.95
UTILIDAD (8.00%) 38,249.01 10,356.67 10,340.80 21,348.63 7,079.57 6,543.70 7,079.57
SUB TOTAL 2 548,556.19 148,532.37 148,304.73 306,175.94 101,533.14 93,847.88 101,533.14
IGV (18.00%) 98,740.11 26,735.83 26,694.85 55,111.67 18,275.97 16,892.62 18,275.97
PRESUPUESTO DE OBRAS CIVILES 647,296.30 175,268.20 174,999.58 361,287.61 119,809.11 110,740.50 119,809.11
MARZO 2022
MARZO 2022
III. DEDUCCIONES
III.1. DEDUCCION DEL REAJUSTE POR ADELANTO DE EFECTIVO
DEL PRESENTE MES 0.00 0.00
MES ANTERIOR 0.00 0.00
PENULTIMO MES 0.00 0.00
TOTAL III.1. 0.00 0.00 0.00
V. AMORTIZACIONES
V.1. AMORTIZACION POR ADELANTO EN EFECTIVO 24,983.79 10,153.31 35,137.10
V.2. AMORTIZACION POR ADELANTO DE MATERIALES 0.00 109,711.24 109,711.24
TOTAL V. 24,983.79 119,864.55 144,848.34
ENTIDAD "RENOVACION DE VEREDA, AREA VERDE, CENTRAL DE VIGILANCIA Y SEGURIDAD Y LUMINARIA; ADEMÁS DE OTROS ACTIVOS EN EL(LA) PARQUE ISLA ANTIGUA DE LA URB. LOS CEDROS DE VILLA EN LA LOCALIDAD CHORRILLOS, DISTRITO DE CHORRILLOS, PROVINCIA LIMA, DEPARTAMENTO LIMA"
FECHA FEBRERO 2022
INFORME N° 1
700,000
647,296.30
647,296.30
600,000
536,555.81
536,555.81
500,000
414,617.76
NUEVOS SOLES (S/.)
414,617.76
400,000
294,808.69
300,000 294,808.69
200,000 174,999.58175,268.20
175,268.20
174,999.58
100,000
0.00
0.00 0 0.00
DICIEMBRE 2021 ENERO 2022 FEBRERO 2022 MARZO 2022
AVANCE PROGRAM. AVANCE PROGRAM. ACUM. REMESA DE FONDOS AVANCE REAL ACUM.
110,740.50
AVANCE PROGRAM. 0.00 175,268.20 361,287.61
MES - AÑO DICIEMBRE 2021 ENERO 2022 FEBRERO 2022 MARZO 2022
RESUMEN DE PLANILLA DE METRADOS N° 03
PARTIDA DESCRIPCION UND METRADO AVANCE ANTERIOR AVANCE MENSUAL AVANCE ACUMULADO SALDO
% METRADO % METRADO % METRADO % METRADO
F 01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X4.80M und 1.00 100.00% 1.000 0.00% 0.000 100.00% 1.00 0.00% 0.00
01.01.02 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m2 50.00 100.00% 50.000 0.00% 0.000 100.00% 50.00 0.00% 0.00
01.01.03 CERCO PROVISIONAL C/MALLA RASCHEL H=2.10M m 295.03 100.00% 295.030 0.00% 0.000 100.00% 295.03 0.00% 0.00
01.01.04 INSTALACIONES PROVISIONALES
01.01.04.01 SERVICIOS HIGIENICOS DURANTE LA CONSTRUCCION mes 2.00 100.00% 2.000 0.00% 0.000 100.00% 2.00 0.00% 0.00
01.01.04.02 AGUA POTABLE DURANTE LA CONSTRUCCION mes 2.00 100.00% 2.000 0.00% 0.000 100.00% 2.00 0.00% 0.00
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 5,366.48 100.00% 5,366.480 0.00% 0.000 100.00% 5,366.48 0.00% 0.00
01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 5,366.48 100.00% 5,366.480 0.00% 0.000 100.00% 5,366.48 0.00% 0.00
01.02.03 TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA mes 2.00 90.00% 1.800 10.00% 0.200 100.00% 2.00 0.00% 0.00
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 80.00% 0.800 20.00% 0.200 100.00% 1.00 0.00% 0.00
01.02.05 REMOCIONES
01.02.05.01 DESMONTAJE DE ELEMENTOS VARIOS GLB 1.00 100.00% 1.000 0.00% 0.000 100.00% 1.00 0.00% 0.00
01.02.05.02 REMOCION DE ARBOLES EXISTENTES und 5.00 100.00% 5.000 0.00% 0.000 100.00% 5.00 0.00% 0.00
01.02.06 DEMOLICIONES
01.02.06.01 DEMOLICION DE VEREDAS DE CONCRETO e=variable m2 310.15 100.00% 310.150 0.00% 0.000 100.00% 310.15 0.00% 0.00
01.02.06.02 DEMOLICION DE RAMPAS DE CONCRETO e=variable m2 4.83 100.00% 4.830 0.00% 0.000 100.00% 4.83 0.00% 0.00
01.03 SEGURIDAD Y SALUD
01.03.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEG GLB 1.00 100.00% 1.000 0.00% 0.000 100.00% 1.00 0.00% 0.00
01.03.02 EQUIPOS DE PROTECCION INDIVIDUAL und 25.00 100.00% 25.000 0.00% 0.000 100.00% 25.00 0.00% 0.00
01.03.03 EQUIPOS DE PROTECCION COLECTIVA mes 2.00 100.00% 2.000 0.00% 0.000 100.00% 2.00 0.00% 0.00
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 100.00% 1.000 0.00% 0.000 100.00% 1.00 0.00% 0.00
01.03.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00 100.00% 1.000 0.00% 0.000 100.00% 1.00 0.00% 0.00
01.03.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y S GLB 1.00 100.00% 1.000 0.00% 0.000 100.00% 1.00 0.00% 0.00
01.03.07 IMPLEMENTACION PLAN DE VIGILANCIA, PREVENCIÓN Y CONTROL DE COV
01.03.07.01 ELABORACION E IMPLEMENTACION DEL PLAN COVID-19 GLB 1.00 100.00% 1.000 0.00% 0.000 100.00% 1.00 0.00% 0.00
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION DE ZANJAS Y ZAPATAS m3 11.18 100.00% 11.180 0.00% 0.000 100.00% 11.18 0.00% 0.00
02.01.02 EXCAVACIÓN A NIVEL DE LA SUB-RASANTE PARA VEREDAS Y ÁREAS VER m3 201.57 100.00% 201.570 0.00% 0.000 100.00% 201.57 0.00% 0.00
RESUMEN DE PLANILLA DE METRADOS N° 03
PARTIDA DESCRIPCION UND METRADO AVANCE ANTERIOR AVANCE MENSUAL AVANCE ACUMULADO SALDO
% METRADO % METRADO % METRADO % METRADO
02.01.03 EXCAVACIÓN MANUAL PARA SARDINELES m3 26.29 100.00% 26.290 0.00% 0.000 100.00% 26.29 0.00% 0.00
02.01.04 NIVELACION Y APISONADO PARA F. PISO, PATIOS Y VEREDAS m2 691.65 100.00% 691.650 0.00% 0.000 100.00% 691.65 0.00% 0.00
02.01.05 BASE GRANULAR E=0.20 M, CON EQUIPO LIVIANO m2 138.33 100.00% 138.330 0.00% 0.000 100.00% 138.33 0.00% 0.00
02.01.06 ELIMINACION MATERIAL EXCEDENTE C/ MAQUINA m3 351.07 90.00% 315.963 10.00% 35.107 100.00% 351.07 0.00% 0.00
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 SOLADO
02.02.01.01 SOLADO DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 2.52 100.00% 2.520 0.00% 0.000 100.00% 2.52 0.00% 0.00
02.02.02 CIMIENTOS CORRIDOS
02.02.02.01 CIMIENTOS CORRIDOS: CONCRETO f`c=210 kg/cm2 m3 8.72 100.00% 8.720 0.00% 0.000 100.00% 8.72 0.00% 0.00
02.02.03 SOBRECIMIENTOS
02.02.03.01 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO m2 5.96 100.00% 5.960 0.00% 0.000 100.00% 5.96 0.00% 0.00
02.02.03.02 SOBRECIMIENTO: CONCRETO f'c=210 kg/cm2 m3 0.63 100.00% 0.630 0.00% 0.000 100.00% 0.63 0.00% 0.00
02.02.04 BASES DE CONCRETO
02.02.04.01 BASE DE CONCRETO F´c=140 kg/cm2 m3 15.40 100.00% 15.400 0.00% 0.000 100.00% 15.40 0.00% 0.00
02.02.05 RAMPAS
02.02.05.01 RAMPAS DE CONCRETO F'C= 175 KG/CM2. e=10 cm, FROTACHADO Y B m2 4.83 100.00% 4.830 0.00% 0.000 100.00% 4.83 0.00% 0.00
02.02.06 FALSO PISO
02.02.06.01 FALSO PISO: MEZCLA, CONCRETO C:H 1:8 e=4" m2 15.60 100.00% 15.600 0.00% 0.000 100.00% 15.60 0.00% 0.00
02.02.07 VEREDAS DE CONCRETO
02.02.07.01 VEREDA DE CONCRETO: ENCOFRADO Y DESENCOFRADO m2 50.98 100.00% 50.980 0.00% 0.000 100.00% 50.98 0.00% 0.00
02.02.07.02 VEREDA DE CONCRETO F'C= 175 KG/CM2. e=10 cm m2 135.95 100.00% 135.950 0.00% 0.000 100.00% 135.95 0.00% 0.00
02.02.07.03 JUNTA ASFALTICA m 67.97 0.00% 0.000 100.00% 67.970 100.00% 67.97 0.00% 0.00
02.03 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 ZAPATAS: ENCOFRADO Y DESENCOFRADO m2 3.36 100.00% 3.360 0.00% 0.000 100.00% 3.36 0.00% 0.00
02.03.01.02 ZAPATAS: CONCRETO F'C=210 KG/CM2 m3 1.01 100.00% 1.010 0.00% 0.000 100.00% 1.01 0.00% 0.00
02.03.01.03 ZAPATAS: ACERO Fy=4200 kg/cm2 kg 20.79 100.00% 20.790 0.00% 0.000 100.00% 20.79 0.00% 0.00
02.03.01.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 2.52 100.00% 2.520 0.00% 0.000 100.00% 2.52 0.00% 0.00
02.03.02 COLUMNAS
02.03.02.01 COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 31.08 100.00% 31.080 0.00% 0.000 100.00% 31.08 0.00% 0.00
02.03.02.02 COLUMNAS: CONCRETO f`c=210 kg/cm2 m3 2.33 100.00% 2.330 0.00% 0.000 100.00% 2.33 0.00% 0.00
02.03.02.03 COLUMNAS: ACERO Fy=4,200 kg/cm2 kg 247.04 100.00% 247.040 0.00% 0.000 100.00% 247.04 0.00% 0.00
02.03.02.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 31.08 100.00% 31.080 0.00% 0.000 100.00% 31.08 0.00% 0.00
RESUMEN DE PLANILLA DE METRADOS N° 03
PARTIDA DESCRIPCION UND METRADO AVANCE ANTERIOR AVANCE MENSUAL AVANCE ACUMULADO SALDO
% METRADO % METRADO % METRADO % METRADO
02.03.03 VIGAS
02.03.03.01 VIGAS: ENCOFRADO Y DESENCOFRADO m2 14.16 100.00% 14.160 0.00% 0.000 100.00% 14.16 0.00% 0.00
02.03.03.02 VIGAS: CONCRETO f'c= 210 kg/cm2 m3 1.67 100.00% 1.670 0.00% 0.000 100.00% 1.67 0.00% 0.00
02.03.03.03 VIGAS: ACERO Fy=4,200 kg/cm2 kg 213.91 100.00% 213.910 0.00% 0.000 100.00% 213.91 0.00% 0.00
02.03.03.04 CURADO EN OBRAS DE CONCRETO CON ADITIVO QUIMICO m2 14.16 100.00% 14.160 0.00% 0.000 100.00% 14.16 0.00% 0.00
02.03.04 LOSAS ALIGERADAS
02.03.04.01 LOSA ALIGERDA: ENCOFRADO Y DESENCOFRADO m2 22.67 100.00% 22.670 0.00% 0.000 100.00% 22.67 0.00% 0.00
02.03.04.02 LOSA ALIGERADA: LADRILLO DE ARCILLA DE 30x30x15 und 188.84 100.00% 188.840 0.00% 0.000 100.00% 188.84 0.00% 0.00