Está en la página 1de 15

T1 T2

1 Q = 41.25 11.78 Q = 14.73


2 3 11.78
82.5

L = 1000 m L = 1000 m
D = 203 mm D = 152mm
L = 500 m L = 500 m L = 500
T3 T5
D = 203 D = 152.4 mm T6 m
Q = 41.25 Q = 14.74 Q = 2.95 D=

T4 T7
Q = 14.73 Q = 8.83
11.78 5 11.78
4 11.78

L = 1000 m L = 1000 m 6
D = 152.4 D = 101.6
L = 500 m
L = 500 m T10
T8 D = 101.6 mm
D = 152.4 Q = 8.86
Q = 14.74

T9
11.78 Q = 2.96
11.82

LOOP
7 L = 1000 m
D = 50.8 8

PhD. Mario Lucero


INICIAR PROGRAMA DOSBOX
INICIAR PROGRAMA LOOP
1.CONFIGURACIONES INICIALES
2. CONFIGURACIÓN DE LA RED:
TUBERÍAS
3. CONFIGURACIÓN DE LOS NODOS
4. PRESIÓN NODO INICIAL
RESULTADOS

También podría gustarte