Está en la página 1de 112

RESUMEN DE OBRA EJECUTADA EN EL PERÍODO

PERIODO DE EJECUCIÓN: Del 26 de Agosto al 20 de Septiembre del 2019


OBRA EJECUTADA
No. CONCEPTO UNIDAD P. U. (L.)
Cantidad TOTAL (L.)
1 ACTIVIDADES GENERALES
1.1 Limpieza del Derecho de Vía (Desmonte y Desbrozo) ha L 19,260.33 -
1.2 Cercado del Derecho de Vía ml L 115.99 -
Sub Total 1 -
2 TERRACERÍAS
2.1 Excavación Común (No Clasificada) m³ L 85.86 -
2.2 Excavación en Roca m³ L 255.34 -
2.3 Acarreo Adicional m³-km L 10.28 -
Sub Total 2 -
3 PAVIMENTO
3.1 Reciclaje y Estabilización con Cemento de la Estructura Existente m³ L 207.65 -
3.2 Base Granular Estabilizada con Cemento m³ L 625.33 -
3.3 Cemento para Estabilización ton L 5,305.40 -
3.4 Imprimación Asfáltica m² L 26.32 -
3.5 Concreto Hidráulico MR:650 PSI m³ L 3,769.52 -
3.6 Concreto Ciclópeo para Muros de retención m³ L 2,294.23 -
Bordillo de Concreto f'c=211 kg/cm2. Dimensiones 20x20 cm pin #4
3.7 ml L 260.36 -
@0.40
Bordillomde Concreto f'c=211 kg/cm2. Dimensiones 15x15 cm pin #3
3.8 ml L 206.25 -
@0.20 m
3.9 Concreto Clase B 180 kg/cm2 en Cierre de Hombros m³ L 3,043.85 -
Sub Total 3 -
4 OBRAS DE DRENAJE MENOR
4.1 Suministro e Instalación de Alcantarilla, Tubería TCR, d=24", Tipo III ml L 3,032.28 -
4.2 Suministro e Instalación de Alcantarilla, Tubería TCR, d=36", Tipo III ml L 5,641.20 -
4.3 Suministro e Instalación de Alcantarilla, Tubería TCR, d=42", Tipo III ml L 7,293.67 -
4.4 Suministro e Instalación de Alcantarilla, Tubería TCR, d=48", Tipo III ml L 8,572.97 -
4.5 Suministro e Instalación de Alcantarilla, Tubería TCR, d=60", Tipo III ml L 12,795.69 -
4.6 Concreto Clase B para Cabezales m³ L 2,232.94 -
4.7 Concreto Clase B para Disipadores de Energía m³ L 2,232.94 -
4.8 Tragantes Horizotales 1.5m x 1.5m Unidad L 23,359.91 -
4.9 Revestimiento de Cunetas con Concreto m³ L 3,125.18 -
Gaviones calibre 2.7 mm (Tipo caja 2x1x1 m) Con Geotextil de 300
4.10 m³ L 1,788.74 -
gr/m³ en parte posterior
Sub Total 4 -
5 OBRAS COMPLEMENTARIAS
5.1 Casetas Metálicas en Paradas de Buses Unidad L 30,960.97 -
5.2 Aceras de Concreto f'c= 211 kg/m² (e=10 cm) m² L 437.95 -
5.3 Barrera Flex Beam ml L 1,583.55 -
5.4 Barrera de Concreto (tipo New Jersey) ml L 2,420.32 -
Sub Total 5 -
6 SEÑALIZACIÓN VIAL
6.1.1 Linea Lateral Discontinua de 10 cm color blanca ml L 48.94 -
6.1.2 Linea Lateral Continua de 10 cm color blanca ml L 48.94 -
6.1.3 Linea Continua de 10 cm Color Amarillo ml L 44.84 -
6.1.4 Linea Discontinua de 10 cm Color Amarillo ml L 44.84 -
6.1.5 Reductores de velocidad ancho de carril 3.65 m, longitud de 7 m, e=6 mm Unidad L 9,427.53 -
6.1.6 Reductores de velocidad ancho de carril 7.3 m, longitud de 7 m, e=6 mm, Unidad L 18,092.89 -
6.1.7 Pintura Amarilla Refractiva para Bordillos ml L 39.52 -
6.1.8 Vialetas de 1 Cara Blanca y 1 Cara Roja Unidad L 59.62 -
6.1.9 Vialetas de 2 Caras Amarillas Unidad L 60.80 -
6.1.10 Vialetas de 1 Cara Blanca Unidad L 59.62 -
6.1.11 Flecha de una dirección blancas Unidad L 1,312.81 -
6.1.12 Flecha dobles blancas Unidad L 2,181.68 -
6.1.13 Suministro e Instalación de Pintura Termoplástica en Paradas de Buses y m² L 634.20 -
6.1.14 Suministro e instalación de boyas metálicas. Unidad L 528.04 -
Sub Total 6.1 -
6.2 SEÑALIZACIÓN VERTICAL
6.2.1 Señales de información y destino ID-2-3 Unidad L 7,603.72 -
6.2.2 Señales de información y destino ID-2-1 Unidad L 7,603.72 -
6.2.3 Señales de información y destino ID-2-4 Unidad L 7,603.72 -
6.2.4 Señales de información y destino ID-1-5 Unidad L 12,937.13 -
6.2.5 Señales para identificar el kilometraje II-4-1 Unidad L 2,270.30 -
6.2.6 Señales para identificar el kilometraje II-4-2b Unidad L 1,722.55 -
6.2.7 Señales preventivas P-1-1 Unidad L 4,173.03 -
6.2.8 Señales preventivas P-1-2 Unidad L 4,173.03 -
6.2.9 Señales preventivas P-1-5 Unidad L 4,173.03 -
6.2.10 Señales preventivas P-1-6 Unidad L 4,173.03 -
6.2.11 Señales preventivas P-1-9(Doble Cara) Unidad L 7,055.96 -
6.2.12 Señales preventivas P-6-3/ P-6-4 Unidad L 5,455.94 -
6.2.13 Señales preventivas P-1-12-4a Unidad L 4,173.03 -
6.2.14 Señales preventivas P-1-13 Unidad L 4,173.03 -
6.2.15 Señales preventivas P-5-4 Unidad L 4,173.03 -
6.2.16 Señales preventivas P-9-13/P-9-11 Unidad L 5,455.94 -
6.2.17 Señales preventivas P-9-1 Unidad L 4,173.03 -
6.2.18 Señales preventivas P-9-4 Unidad L 4,173.03 -
6.2.19 Señales preventivas P-9-14/P-10-7 Unidad L 6,176.67 -
6.2.20 Señales restrictivas R-16-1 Unidad L 6,191.08 -
6.2.21 Señales restrictivas R-10-1 Unidad L 6,191.08 -
6.2.22 Señales restrictivas R-1-1 Unidad L 4,684.75 -
6.2.23 Señales restrictivas R-3-11a Unidad L 8,180.31 -
6.2.24 Señales restrictivas R-1-1/1E-4-1 Unidad L 6,191.08 -
6.2.25 Señales restrictivas R-2-9 Unidad L 6,191.08 -
6.2.26 Señales restrictivas R-10-1 Unidad L 6,191.08 -
6.2.27 Señales restrictivas R-13-1 Unidad L 6,191.08 -
6.2.28 Señales restrictivas R-14-3 Unidad L 6,191.08 -
6.2.29 Señales restrictivas R-11-3 Unidad L 6,191.08 -
6.2.30 Señales restrictivas R-16-1 Unidad L 6,191.08 -
6.2.31 Señales restrictivas R-6-8 Unidad L 6,191.08 -
6.2.32 Señales restrictivas R-7-7 Unidad L 6,191.08 -
6.2.33 Señales restrictivas R-2-8 Unidad L 6,191.08 -
6.2.34 Señales restrictivas R-2-1/E-3-2 Unidad L 7,704.62 -
6.2.35 Señal de Información General IG-1-2 Unidad L 12,937.13 -
Sub Total 6.2 -
Sub Total 6 -
7 GESTIÓN AMBIENTAL Y SOCIAL
7.1.1 Especialista Ambiental (50% de tiempo) Mes L 29,156.44 0.50 14,578.22
7.1.2 Inspector Ambiental (100% del tiempo) Mes L 28,026.63 1.00 28,026.63
7.1.3 Especialista Social (100% de tiempo) Mes L 40,251.02 1.00 40,251.02
7.1.4 Especialista en Seguridad Vial (100% de tiempo) Mes L 59,976.15 1.00 59,976.15
7.1.5 Ingeniero Forestal (25% de tiempo) Mes L 11,522.12 1.00 11,522.12
7.1.6 Médico General (25% de tiempo) Mes L 12,640.20 1.00 12,640.20
7.2 Participación Comunitarias 4 reuniones comunitarias / trimestrales 2 reuni Unidad L 4,770.49 -
7.3 Enfoque de Género en el Proyecto (Contratación de 5 mujeres certificadas Mes L 2,385.25 -
Sub Total 7.1 166,994.34
7.4 CONTROL DE EROSIÓN Y SEDIMENTOS
7.4.1 Plantación de Vetiver para estabilización de talud m² L 59.75 -
7.4.2 Tierra vegetal superficial m² L 70.81 -
7.4.3 Encespado m² L 90.88 -
7.4.4 Plantación de arboles como compensación Unidad L 115.89 -
7.5 Plan de Seguridad Vial mes L 860,416.56 1.00 860,416.56
Sub Total 7.2 860,416.56
Sub Total 7 1,027,410.90
8 OBRAS DE DRENAJE MAYOR
CONSERVACIÓN DE PUENTES
8.1 Limpieza y Desmonte en Cajas y Puentes ha L 83,077.30 -
8.2 Barandal Metálico en Pretiles Existentes ml L 2,285.46 -
8.3 Juntas de Expansión de 1" (Suministro/Intalación) ml L 4,554.80 -
8.4 Juntas de Expansión de 1.2" (Suministro/Intalación) ml L 5,465.49 -
8.5 Apoyos de Neopreno Dureza 60 A.S.T.M. (0.50 x 0.50 x 0.025) Puente R Unidad L 23,264.05 -
8.6 Suministro y Colocación de Pintura de Tráfico para Pretil ml L 359.83 -
Sub Total 8 -
TOTAL OBRA L 1,027,410.90
MONTOS PROVISIONALES
Administración Delegada Global 111,847.95 111,847.95
Reconocimiento de Mayores Costos o Cláusula Escalatoria Global -
Sub Total 9 111,847.95
TOTAL CONSTRUCCIÓN 1,139,258.85
A EJECUTADA
TOTAL (L.)

-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

14,578.22
28,026.63
40,251.02
59,976.15
11,522.12
12,640.20
-
-
166,994.34

-
-
-
-
860,416.56
860,416.56
1,027,410.90

-
-
-
-
-
-
-
L 1,027,410.90

111,847.95
-
111,847.95
1,139,258.85
ESTIMACION DE

PROYECTO: OBRAS DE REHABILITACIÓN DE LA CARRETERA CA-6, T

CONTRATISTA : ETERNA, S.A. de C.V.


PROPIETARIO : INVEST-H

CONTRATO
N° DESCRIPSION UNIDAD CANTIDAD PRECIO UNITARIO
1 ACTIVIDADES GENERALES
1.1 Limpieza del Derecho de Vía (Desmonte y Desbrozo) ha 46.00 L 19,125.02
1.2 Cercado del Derecho de Vía ml 500.00 L 115.17
Sub Total 1
2 TERRACERIAS
2.1 Excavación Común (No Clasificada) m³ 170,277.00 L 85.25
2.2 Excavación en Roca m³ 32,000.00 L 253.54
2.3 Sobre - Acarreo m³ - km 438,100.00 L 10.21
Sub Total 2
3 PAVIMENTO
3.1 Reciclaje y Estabilización con Cemento de la Estructura Existente m³ 24,949.00 L 205.60
3.2 Base Granular Estabilizada con Cemento m³ 15,951.00 L 765.57
3.3 Cemento para estabilización ton 3,450.00 L 5,268.13
3.4 Imprimación Asfáltica m² 204,500.00 L 26.70
3.5 Concreto Hidráulico MR: 650 PSI m³ 43,560.00 L 3,890.31
3.6 Concreto Ciclópeo para Muros de Retención m³ 150.00 L 2,410.10
Bordillo de Concreto f'c=211 kg/cm².
3.7 ml 960.00 L 263.97
Dimensiones 20x20 cm pin #4 @0.40 m
Bordillo de Concreto f'c=211 kg/cm².
3.8 ml 1,516.00 L 207.76
Dimensiones 15x15 cm pin #3 @0.40 m
3.9 Concreto Clase B 180 kg/cm² en Cierre de Hombros m³ 2,030.00 L 3,156.41
Sub Total 3
4 OBRAS DE DRENAJE MENOR
Suministro e Instalación de Alcantarilla, Tubería TCR, d=24'', Tipo III
4.1 ml 206.00 L 3,037.96
(Accesos)

4.2 Suministro e Instalación de Alcantarilla, Tubería TCR, d=30'', Tipo III ml 14.00 L 4,246.34

4.3 Suministro e Instalación de Alcantarilla, Tubería TCR, d=36'', Tipo III ml 66.00 L 5,659.53

4.4 Suministro e Instalación de Alcantarilla, Tubería TCR, d=42'', Tipo III ml 14.00 L 7,310.73

4.5 Suministro e Instalación de Alcantarilla, Tubería TCR, d=48'', Tipo III ml 90.00 L 8,607.50

4.6 Suministro e Instalación de Alcantarilla, Tubería TCR, d=60'', Tipo III ml 56.00 L 12,850.72

4.7 Concreto Clase B 180 kg/cm² para Cabezales m³ 313.19 L 2,340.15


4.8 Concreto Clase B 180 kg/cm² para Disipadores de energía m³ 204.15 L 2,340.15
4.9 Tragantes Horizontales 1.50 m x 1.50 m Unidad 28.00 L 23,361.31
4.10 Tragantes Horizontales 2.00 m x 2.00 m Unidad 2.00 L 30,583.26
4.11 Revestimiento de Cunetas con Concreto m³ 4,940.82 L 3,239.00
4.12 Gaviones calibre 2.7 mm (Tipo Caja 2x1x1 m) m³ 500.00 L 1,893.28
Sub Total 4
5 OBRAS DE DRENAJE MAYOR
Sub Total 5
6 OBRAS COMPLEMENTARIAS
Sub Total 6
7.1 SEÑALIZACION HORIZONTAL
Sub Total 7.1
7.2 SEÑALIZACION VERTICAL
Sub Total 7.2
Sub Total 7
8 GESTION AMBIENTAL Y SOCIAL
8.1 Gestión Ambiental y Social
8.1.1 Especialista Ambiental (50% de tiempo) Mes 6.00 L 28,951.59
8.1.2 Inspector Ambiental (100% del tiempo) Mes 12.00 L 27,829.73
8.1.3 Especialista Social (100% del tiempo) Mes 12.00 L 39,968.24
8.1.4 Especialista Seguridad Vial (100% del tiempo) Mes 12.00 L 59,554.78
8.1.5 Ingeniero Forestal (25% del tiempo) Mes 4.00 L 11,441.17
8.1.6 Medico General (25% del tiempo) Mes 4.00 L 12,551.40
Participación Comunitarias 4 reuniones comunitarias / trimestrales 2
8.2 Reunión 6.00 L 4,736.98
reuniones de coordinación interinstitucional
Enfoque de Genero en el Proyecto (Contratación de 5 mujeres
8.3 Mes 30.00 L 2,368.48
certificadas durante 6 meses)
8.4 Plan de seguridad vial Mes 12.00 L 854,371.68
Sub Total 8.1
8.5 Control de Erosión y Sedimentos
8.5.1 Plantación de Vetiver para estabilización de talud m² 7,460.00 L 59.33
8.5.2 Tierra vegetal superficial m³ 1,492.00 L 70.32
8.5.3 Encespado m² 1,800.00 L 89.49
8.5.4 Siembra y Mantenimiento de arboles como compensación Unidad 1,690.00 L 115.08
Sub Total 8.5
Sub Total 8
TOTAL OBRA
9 MONTOS PROVISIONALES
9.1 Administración Delegada Global 1.00 L 13,677,931.50
9.2 Reconocimiento de Mayores Costos o Clausula Escalatoria Global 1.00 L 14,697,978.37
Sub Total 9
TOTAL CONSTRUCCION
Elaborada por: Olman Nuñez
Residente de Proyecto
ETERNA, S.A DE C.V.

ADMINISTRADOR DE CONTRATOS
ETERNA, S.A DE C.V.
ESTIMACION DE AVANCE DE OBRA

CARRETERA CA-6, TRAMO III NETEAPA - DANLI, LOTE B ( ESTACION 74+240 - 89+160)

ESTIMACION No. 08 FECHA: 1/20/2020


PERIODO: DEL 21 DE ENERO DE 2020 AL 20 DE FEBRERO DE 2020

ATO PAGADO ESTIMACION ACTUAL TOTAL A LA FECHA


TOTAL CANTIDAD TOTAL CANTIDAD TOTAL CANTIDAD TOTAL

L 879,750.92 0.00 0.00 0.00 0.00 0.00 0.00


L 57,585.00 500.00 57,585.00 0.00 0.00 500.00 57,585.00
L 937,335.92 L 57,585.00 L - L 57,585.00

L 14,516,114.25 56,373.17 4,805,812.74 13,203.53 1,125,600.93 69,576.70 5,931,413.67


L 8,113,280.00 21,094.82 5,348,380.67 0.00 0.00 21,094.82 5,348,380.67
L 4,473,001.00 2,051.67 20,947.55 40,220.31 410,649.37 42,271.98 431,596.92
L 27,102,395.25 0.00 L 10,175,140.96 L 1,536,250.30 L 11,711,391.26

L 5,129,514.40 11,195.05 2,301,702.28 5,700.20 1,171,961.12 16,895.25 3,473,663.40


L 12,211,607.07 6,290.10 4,815,511.86 5,890.30 4,509,436.97 12,180.40 9,324,948.83
L 18,175,048.50 2,064.81 10,877,687.51 1,271.16 6,696,636.13 3,335.97 17,574,323.64
L 5,460,150.00 73,126.50 1,952,477.55 50,099.40 1,337,653.98 123,225.90 3,290,131.53
L 169,461,903.60 8,031.83 31,246,308.57 9,309.28 36,215,985.08 17,341.11 67,462,293.64
L 361,515.00 150.00 361,515.00 0.00 0.00 150.00 361,515.00
L 253,411.20 0.00 0.00 0.00 0.00 0.00 0.00

L 314,964.16 0.00 0.00 0.00 0.00 0.00 0.00


L 6,407,512.30 0.00 0.00 0.00 0.00 0.00 0.00
L 217,775,626.23 L 51,555,202.76 L 49,931,673.28 L 101,486,876.04

L 625,819.76 206.00 625,819.76 0.00 0.00 206.00 625,819.76

L 59,448.76 14.00 59,448.76 0.00 0.00 14.00 59,448.76

L 373,528.98 66.00 373,528.98 0.00 0.00 66.00 373,528.98

L 102,350.22 2.00 14,621.46 12.00 87,728.76 14.00 102,350.22

L 774,675.00 56.00 482,020.00 0.00 0.00 56.00 482,020.00

L 719,640.32 56.00 719,640.32 0.00 0.00 56.00 719,640.32


L 732,911.58 313.19 732,911.58 0.00 0.00 313.19 732,911.58
L 477,741.62 204.15 477,741.62 0.00 0.00 204.15 477,741.62
L 654,116.68 12.00 280,335.72 0.00 0.00 12.00 280,335.72
L 61,166.52 1.00 30,583.26 0.00 0.00 1.00 30,583.26
L 16,003,315.98 12.92 41,847.88 264.68 857,298.52 277.60 899,146.40
L 946,640.00 300.00 567,984.00 0.00 0.00 300.00 567,984.00
L 21,531,355.42 L 4,406,483.34 L 945,027.28 L 5,351,510.62

L 1,247,323.69 L - L - L -

L 14,091,008.94 L - L - L -

L 5,181,992.97 L - L - L -

L 1,306,986.72 L - L - L -
L 6,488,979.69 L - L - L -
L 173,709.54 4.00 115,806.40 0.50 14,475.80 4.50 130,282.20
L 333,956.76 8.00 222,637.84 1.00 27,829.73 9.00 250,467.57
L 479,618.88 8.00 319,745.92 1.00 39,968.24 9.00 359,714.16
L 714,657.36 8.00 476,438.24 1.00 59,554.78 9.00 535,993.02
L 45,764.68 3.00 34,323.51 0.00 0.00 3.00 34,323.51
L 50,205.60 3.00 37,654.20 0.00 0.00 3.00 37,654.20
L 28,421.88 2.00 9,473.96 0.00 0.00 2.00 9,473.96

L 71,054.40 30.00 71,054.40 0.00 0.00 30.00 71,054.40


L 10,252,460.16 8.00 6,834,973.44 1.00 854,371.68 9.00 7,689,345.12
L 12,149,849.26 L 8,122,107.91 L 996,200.23 L 9,118,308.14

L 442,601.80 0.00 0.00 0.00 0.00 0.00 0.00


L 104,917.44 0.00 0.00 0.00 0.00 0.00 0.00
L 161,082.00 0.00 0.00 0.00 0.00 0.00 0.00
L 194,485.20 1,200.00 138,096.00 0.00 0.00 1,200.00 138,096.00
L 903,086.44 L 138,096.00 L - L 138,096.00
L 13,052,935.70 L 8,260,203.91 L 996,200.23 L 9,256,404.14
L 302,226,960.84 L 74,454,615.97 L 53,409,151.09 L 127,863,767.05

L 13,677,931.50 1,249,644.92 297,532.13 1,547,177.05


L 14,697,978.37 2,366,064.45 1,552,123.15 3,918,187.59
L 28,375,909.87 3,615,709.37 1,849,655.28 5,465,364.64
L 330,602,870.71 78,070,325.34 55,258,806.37 133,329,131.69

102787.75
Revisada por: Dany Francisco
Jefe de Proyecto
AC&A S.A. HONDURAS

DE CONTRATOS
A DE C.V.
%
AVANCE

0.00% 0.00%

100.00% 0.00%

6.14% 0.00%

40.86% 7.75%
65.92% 0.00%

9.65% 9.18%

43.21% 5.67%

67.72% 22.85%
76.36% 36.93%

96.69% 36.85%
60.26% 24.50%
39.81% 21.37%

100.00% 0.00%

0.00% 0.00%

0.00% 0.00%
0.00% 0.00%

46.60% 22.93%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 85.71%

62.22% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00% corregir


42.86% 0.00%
50.00% 0.00%
5.62% 5.36%

60.00% 0.00%

24.85% 4.39%

0.00%

#DIV/0!
0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%
75.00% 8.33%
75.00% 8.33%

75.00% 8.33%

75.00% 8.33%
75.00% 0.00%
75.00% 0.00%

33.33% 0.00%

100.00% 0.00%

75.00% 8.33%

75.05% 8.20%

0.00% 0.00%

0.00% 0.00%
0.00% 0.00%

71.01% 0.00%

15.29% 0.00%

70.91% 7.63%

42.31% 17.67%

11.31% 2.18%
26.66% 10.56%
19.26% 6.52%
40.33% 16.71%

0.70%
No. CONCEPTO UNIDAD

1 ACTIVIDADES GENERALES
Limpieza del Derecho de Vía (Desmonte y
1.1 ha
Desbrozo)
1.2 Cercado del Derecho de Vía ml

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion de la actividad

No. CONCEPTO UNIDAD

2 TERRACERÍAS
2.1 Excavación Común (No Clasificada) m³
2.2 Excavación en Roca m³
2.3 Acarreo Adicional m³-km

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion de la actividad

No. CONCEPTO UNIDAD

3 PAVIMENTO
Reciclaje y Estabilización con Cemento de la
3.1 m³
Estructura Existente

3.2 Base Granular Estabilizada con Cemento m³

3.3 Cemento para Estabilización ton


3.4 Imprimación Asfáltica m²
3.5 Concreto Hidráulico MR:650 PSI m³
3.6 Concreto Ciclópeo para Muros de retención m³
Bordillo de Concreto f'c=211 kg/cm2.
3.7 ml
Dimensiones 20x20 cm pin #4 @0.40 m
Bordillo de Concreto f'c=211 kg/cm2.
3.8 ml
Dimensiones 15x15 cm pin #3 @0.20 m
Concreto Clase B 180 kg/cm2 en Cierre de
3.9 m³
Hombros

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion de la actividad

No. CONCEPTO UNIDAD

4 OBRAS DE DRENAJE MENOR


Suministro e Instalación de Alcantarilla, Tubería
4.1 ml
TCR, d=24", Tipo III
Suministro e Instalación de Alcantarilla, Tubería
4.2 ml
TCR, d=30", Tipo III
Suministro e Instalación de Alcantarilla, Tubería
4.3 ml
TCR, d=36", Tipo III
Suministro e Instalación de Alcantarilla, Tubería
4.4 ml
TCR, d=42", Tipo III
Suministro e Instalación de Alcantarilla, Tubería
4.5 ml
TCR, d=48", Tipo III
Suministro e Instalación de Alcantarilla, Tubería
4.6 ml
TCR, d=60", Tipo III
4.7 Concreto Clase B para Cabezales m³

4.8 Concreto Clase B para Disipadores de Energía m³

4.9 Tragantes Horizotales 1.5m x 1.5m Unidad

4.10 Tragantes Horizotales 2m x 2m Unidad

4.11 Revestimiento de Cunetas con Concreto m³


Gaviones calibre 2.7 mm (Tipo caja 2x1x1 m)
4.12 m³
Con Geotextil de 300 gr/m³ en parte posterior

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion de la actividad

No. CONCEPTO UNIDAD

5 OBRAS COMPLEMENTARIAS
5.1 Casetas Metálicas en Paradas de Buses Unidad
5.2 Aceras de Concreto f'c= 211 kg/m² (e=10 cm) m²
5.3 Barrera Flex Beam ml
5.4 Barrera de Concreto (tipo New Jersey) ml
ASC Actividad sin comenzar
IA Inicio de actividad
CO Continuacion de la actividad

No. CONCEPTO UNIDAD

6 SEÑALIZACIÓN VIAL
6.1 SEÑALIZACIÓN HORIZONTAL
6.1.1 Linea Lateral continua de 10 cm color blanca ml
6.1.2 Linea Lateral discontinua de 10 cm color blanca ml
6.1.3 Linea Continua de 10 cm Color Amarillo ml
6.1.4 Linea Discontinua de 10 cm Color Amarillo ml
Reductores de velocidad ancho de carril 3.65 m,
6.1.5 longitud de 7 m, e=6 mm, ancho 13 cm cada Unidad
linea
Reductores de velocidad ancho de carril 7.3 m,
6.1.6 longitud de 7 m, e=6 mm, ancho 13 cm cada Unidad
linea
6.1.7 Rayas Logarítmicas e=1.5 cm ml
6.1.8 Pintura Amarilla Refractiva para Bordillos ml
6.1.9 Vialetas de 1 Cara Blanca y 1 Cara Roja Unidad
6.1.10 Vialetas de 2 Caras Amarillas Unidad
6.1.11 Vialetas de 1 Cara Blanca Unidad
6.1.12 Suministro e Instalación de Pintura Unidad
Termoplástica
Flecha de una en Paradas
dirección de Buses y Escuelas
blancas
6.1.13 m²
6.1.14 Suministro e Instalación de boyas metálicas Unidad

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion del actividad

No. CONCEPTO UNIDAD

6 SEÑALIZACIÓN VIAL
6.2 SEÑALIZACIÓN VERTICAL
6.2.1 Señales de proximidad de zona
zona escolar
escolar E-1-3/E-
E-1-3 Unidad
Señales de proximidad de
6.2.2 3-3 Unidad
Señales de proximidad de zona escolar E-3-1/R-
6.2.3 2-1/E-3-2 Unidad
Señales de proximidad de zona escolar E-1-1/E-
6.2.4 1-2 Unidad
6.2.5 Señales de información y destino ID-2-1 Unidad
6.2.6 Señales de información y destino IG-1-2 Unidad
6.2.7 Señales para identificar el kilometraje II-4-1 Unidad
6.2.8 Señales de servicio de transporte IS-5-2 Unidad
6.2.9 Señales preventivas P-1-1 Unidad
6.2.10 Señales preventivas P-1-2 Unidad
6.2.11 Señales preventivas P-1-5 Unidad
6.2.12 Señales preventivas P-1-9(Doble Cara) Unidad
6.2.13 Señales preventivas P-5-4 Unidad
6.2.14 Señales preventivas P-6-3/ P-6-4 Unidad
6.2.15 Señales preventivas P-1-13 Unidad

6.2.16 Unidad
Señales de protección de estructuras P-12-4a
6.2.17 Señales preventivas P-9-13/P-9-11 Unidad
6.2.18 Señales preventivas P-9-14/P-10-7 Unidad
6.2.19 Señales preventivas P-9-4 Unidad
6.2.20 Señales restrictivas R-16-1 Unidad
6.2.21 Señales restrictivas R-10-1 Unidad
6.2.22 Señales restrictivas R-1-1 Unidad
6.2.23 Señales restrictivas R-2-1 Unidad
6.2.24 Señales restrictivas R-11-3 Unidad
6.2.25 Señales restrictivas R-6-8 Unidad
6.2.26 Señales restrictivas R-7-7 Unidad
6.2.27 Señales restrictivas R-2-8 Unidad
6.2.28 Señales restrictivas R-2-1/E-3-2 Unidad

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion de la actividad

No. CONCEPTO UNIDAD

7 GESTIÓN AMBIENTAL Y SOCIAL


7.1.1 Especialista Ambiental (50% de tiempo) Mes
7.1.2 Inspector Ambiental (100% del tiempo) Mes
7.1.3 Especialista Social (100% de tiempo) Mes

7.1.4 Especialista en Seguridad Vial (100% de tiempo) Mes

7.1.5 Ingeniero Forestal (25% de tiempo) Mes


7.1.6 Médico General (25% de tiempo) Mes
Participación Comunitarias 4 reuniones
7.2 comunitarias / trimestrales 2 reuniones de Unidad
coordinación interinstitucional

Enfoque de Género en el Proyecto (Contratación


7.3 Mes
de 5 mujeres certificadas durante 6 meses)

7.4 Plan de Seguridad Vial mes

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion de la actividad

No. CONCEPTO UNIDAD

7.5 CONTROL DE EROSIÓN Y SEDIMENTOS


7.5.1 Plantación de Vetiver para estabilización de talud m²

7.5.2 Tierra vegetal superficial m²


7.5.3 Encespado m²
7.5.4 Plantación de arboles como compensación Unidad

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion de la actividad

No. CONCEPTO UNIDAD

8 OBRAS DE DRENAJE MAYOR


CONSERVCIÓN DE PUENTES
8.1 Limpieza y Desmonte en Cajas y Puentes ha
8.2 Barandal Metálico en Pretiles Existentes ml
Juntas de Expansión de 1"
8.3 ml
(Suministro/Intalación)
Juntas de Expansión de 1.2"
8.4 ml
(Suministro/Intalación)
Apoyos de Neopreno Dureza 60 A.S.T.M. (0.40 x
8.5
0.40 x 0.025) Puente Río Neteapa
Apoyos de Neopreno Dureza 60 A.S.T.M. (0.50 x
8.6 Unidad
0.50 x 0.025) Puente Río Neteapa
Suministro y Colocación de Pintura de Tráfico
8.7 ml
para Pretil

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion del actividad

No. CONCEPTO UNIDAD

9 MONTOS PROVISIONALES
Administración Delegada Global

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion de lal actividad

No. CONCEPTO UNIDAD

9 MONTOS PROVISIONALES
Reconocimiento de Mayores Costos o Cláusula
Global
Escalatoria

ASC Actividad sin comenzar


IA Inicio de actividad
CO Continuacion de la actividad
CANTIDAD
EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado
CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

46.00 0.00 0.00 0.00 0.00 ASC

500.00 500.00 0.00 500.00 100.0% NST

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD

EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado


CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

170,277.00 56,373.17 13,203.53 69,576.70 40.861% CO


32,000.00 21,094.82 0.00 21,094.82 65.92% NST
438,100.00 0.00 40,220.31 42,271.98 9.65% ASC

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD

EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado


CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

24,949.00 11195.05 5700.20 16895.25 67.72% CO

15,951.00 6290.10 5890.30 12180.40 76.36% CO

3,450.00 2064.81 1271.16 3335.97 96.69% CO


204,500.00 73126.50 50099.40 123225.90 60.26% CO
43,560.00 8031.83 9309.28 17341.11 39.81% CO
150.00 150.00 0.00 150.00 100.00% CO

960.00 0.00 0.00 0.00 0.00% ASC


1,516.00 0.00 0.00 0.00 0.00% ASC

2,030.00 0.00 0.00 0.00 0.00% ASC

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD
EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado
CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

206.00 206.00 0.00 206.00 100.00% CO

14.00 14.00 0.00 14.00 100% IA

66.00 66.00 0.00 66.00 100% NST

14.00 0.00 12.00 14.00 14.29% ASC

90.00 56.00 0.00 56.00 62.22% NST

56.00 56.00 0.00 56.00 100% NST

313.19 313.19 0.00 313.19 100.00% NST

204.15 204.15 0.00 204.15 100.00% CO

28.00 12.00 0.00 12.00 42.86% CO

2.00 0.00 0.00 1.00 50% IA

4940.82 12.92 264.68 277.60 5.62% IA

500.00 0.00 0.00 300.00 60.0% IA

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD
EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado
CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

12.00 0.00 0.00 0.00 0.00 ASC


1,650.00 0.00 0.00 0.00 0.00 ASC
6,550.00 0.00 0.00 0.00 0.00 ASC
1,090.00 0.00 0.00 0.00 0.00 ASC
NST No se trabajo en el periodo
FI Fin de actividad

CANTIDAD
EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado
CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

9,210.00 0.00 0.00 0.00 0.00 ASC


40,365.00 0.00 0.00 0.00 0.00 ASC
26,671.00 0.00 0.00 0.00 0.00 ASC
11,033.00 0.00 0.00 0.00 0.00 ASC
36.00
0.00 0.00 0.00 0.00 ASC

4.00
0.00 0.00 0.00 0.00 ASC

94.90 0.00 0.00 0.00 0.00 ASC


272.00 0.00 0.00 0.00 0.00 ASC
1,856.00 0.00 0.00 0.00 0.00 ASC
1,274.00 0.00 0.00 0.00 0.00 ASC
1,353.00 0.00 0.00 0.00 0.00 ASC
90.00 0.00 0.00 0.00 0.00 ASC
151.00 0.00 0.00 0.00 0.00 ASC
65.00 0.00 0.00 0.00 0.00 ASC

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD
EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado
CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

2.00 0.00 0.00 0.00 0.00 ASC


1.00 0.00 0.00 0.00 0.00 ASC
2.00 0.00 0.00 0.00 0.00 ASC
2.00 0.00 0.00 0.00 0.00 ASC
10.00 0.00 0.00 0.00 0.00 ASC
2.00 0.00 0.00 0.00 0.00 ASC
30.00 0.00 0.00 0.00 0.00 ASC
2.00 0.00 0.00 0.00 0.00 ASC
2.00 0.00 0.00 0.00 0.00 ASC
16.00 0.00 0.00 0.00 0.00 ASC
10.00 0.00 0.00 0.00 0.00 ASC
90.00 0.00 0.00 0.00 0.00 ASC
4.00 0.00 0.00 0.00 0.00 ASC
1.00 0.00 0.00 0.00 0.00 ASC
2.00 0.00 0.00 0.00 0.00 ASC

8.00 0.00 0.00 0.00 0.00 ASC

8.00 0.00 0.00 0.00 0.00 ASC


6.00 0.00 0.00 0.00 0.00 ASC
4.00 0.00 0.00 0.00 0.00 ASC
2.00 0.00 0.00 0.00 0.00 ASC
4.00 0.00 0.00 0.00 0.00 ASC
12.00 0.00 0.00 0.00 0.00 ASC
1.00 0.00 0.00 0.00 0.00 ASC
4.00 0.00 0.00 0.00 0.00 ASC
1.00 0.00 0.00 0.00 0.00 ASC
1.00 0.00 0.00 0.00 0.00 ASC
3.00 0.00 0.00 0.00 0.00 ASC
4.00 0.00 0.00 0.00 0.00 ASC

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD

EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado


CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

6.00 4.00 0.50 4.50 75.00% CO


12.00 8.00 1.00 9.00 75.00% CO
12.00 8.00 1.00 9.00 75.00% CO

12.00 CO
8.00 1.00 9.00 75.00%
4.00 3.00 0.00 3.00 75.00% CO 100%
4.00 3.00 0.00 3.00 75.00% CO

6.00 NST
2.00 0.00 2.00 33.33%

30.00 FI
0.00 0.00 30.00 100%
12.00 8.00 1.00 9.00 75.00% CO

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD

EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado


CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

7460.00 0.00 0.00 0.00 0.00 ASC

1492.00 0.00 0.00 0.00 0.00 ASC


1800.00 0.00 0.00 0.00 0.00 ASC
1690.00 1200.00 0.00 1200.00 71% IA

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD
EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado
CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

1.60 0.00 0.00 0.00 0.00 ASC


104.00 0.00 0.00 0.00 0.00 ASC

11.20 ASC
0.00 0.00 0.00 0.00
11.30 ASC
0.00 0.00 0.00 0.00
10.00 ASC
0.00 0.00 0.00 0.00
20.00 ASC
0.00 0.00 0.00 0.00
231.40 ASC
0.00 0.00 0.00 0.00

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD

EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado


CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

13,677,931.50 1,249,644.92 297,532.13 1,547,177.05 11.31% CO

NST No se trabajo en el periodo


FI Fin de actividad

CANTIDAD

EJECUTADO EJECUTADA ACUMULADO % EJEC. Estado


CONTRATO
ANTERIOR DEL PERIODO AL PERIODO

14,697,978.37 2,366,064.45 1,552,123.15 3,918,187.59 16.10% CO

NST No se trabajo en el periodo


FI Fin de actividad
CONCEPTO UNIDAD
CONTRATO

CONCEPTO UNIDAD CONTRATO


Cercado del
ml 500.00
Derecho de Vía

CERCADO DE
500.00 500.0

TO R
A R IO
N TR TE
CO AN
O
T AD
CU A
E UT
EJ EC
EJ

CONTRATO
EJECUTADA DEL PER

No. CONCEPTO UNIDAD

2 TERRACERÍAS
CONCEPTO UNIDAD

2.1 Excavación Común (No Clasificada) m³

2.2 Excavación en Roca m³


2.3 Acarreo Adicional m³-km

TERRACER
500,000.00
450,000.00 438,100.00

400,000.00
350,000.00
300,000.00
250,000.00
200,000.00 170,277.00
150,000.00
100,000.00
56,373.17
350,000.00
300,000.00
250,000.00
200,000.00 170,277.00
150,000.00
100,000.00
56,373.17
50,000.00 32,000.00 21,094.82
0.00
0.00
CONTRATO EJECUTADO ANTERIOR

Excavación Común (No Clasificada) m³ Excavació

CONCEPTO UNIDAD

PAVIMENTOS
CONCEPTO UNIDAD
Reciclaje y Estabilización con Cemento de

la Estructura Existente
Base Granular Estabilizada con Cemento m³
Cemento para Estabilización ton
Imprimación Asfáltica m²
Concreto Hidráulico MR:650 PSI m³

Concreto Ciclópeo para Muros de retención m³


Bordillo de Concreto f'c=211 kg/cm2.
ml
Dimensiones 20x20 cm pin #4 @0.40 m
Bordillo de Concreto f'c=211 kg/cm2.
ml
Dimensiones 15x15 cm pin #3 @0.20 m
Concreto Clase B 180 kg/cm2 en Cierre de

Hombros

CON
EJEC
CONCEPTO UNIDAD

Obras de drenaje menor


CONCEPTO UNIDAD
Tubería TCR, d=24" ml
Tubería TCR, d=30" ml
Tubería TCR, d=36" ml
Tubería TCR, d=42" ml
Tubería TCR, d=48" ml
Tubería TCR, d=60" ml
Concreto Clase B para Cabezales m³
Concreto Clase B Disipadores de Ene m³
Tragantes Horizontales 1.5m x 1.5m Unidad
Tragantes Horizontales 2m x 2m Unidad
Revestimiento de Cunetas con Concr m³
Gaviones calibre 2.7 mm (Tipo caja 2 m³

Gaviones calibre 2.7 mm (Tipo caja 2x1x1 m) Con

ML

CONCEPTO UNIDAD

Gestión ambiental y social


CONCEPTO UNIDAD
Especialista Ambiental (50% de tiem Mes
Inspector Ambiental (100% del tiemp Mes
Especialista Social (100% de tiempo) Mes
Especialista en Seguridad Vial (100% Mes
Ingeniero Forestal (25% de tiempo) Mes
Médico General (25% de tiempo) Mes
Participación Comunitarias 4 reunioneUnidad
Enfoque de Género en el Proyecto (Co Mes
Plan de Seguridad Vial Mes

Enfoque de Género en el Proyecto (Contra


Participación Comunitarias 4 reuniones comunitarias / trimestra

CONCEPTO UNIDAD

Administración delegada
CONCEPTO UNIDAD
Administración delegada Global

A
16,000,000.00

14,000,000.00 13,677,931.50

12,000,000.00

10,000,000.00

8,000,000.00
A
16,000,000.00

14,000,000.00 13,677,931.50

12,000,000.00

10,000,000.00

8,000,000.00

6,000,000.00

4,000,000.00

2,000,000.00

0.00

TRATO
CON -
CONCEPTO UNIDAD

Clausula Escalatoria
CONCEPTO UNIDAD
Reconocimiento de Mayores Costos
o Clausula Escalatoria Global

C l au
16,000,000.00 14,697,978

12,000,000.00

8,000,000.00

4,000,000.00

0.00

CONTRATO

CONCEPTO UNIDAD

CONTROL DE EROSIÓN Y SEDIMENTOS


CONCEPTO UNIDAD
Plantación de Vetiver para estabilización de

talud
Tierra vegetal superficial m²
Encespado m²
Plantación de arboles como compensación Unidad

CO N T R O L D E
Plantación de V
Tierra vegetal

7460.00
Encespado m²
Plantación de a

1800.00

1690.00
1492.00

0.00

- 0.00
C ONTR ATO

EJ EC UTAD O AN
CANTIDAD
EJECUTADA DEL % EJEC.
EJECUTADO ANTERIOR ACUMULADO AL PERIODO
PERIODO
EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

500.00 0.00 500.00 100.0%

CERCADO DEL DERECHO DE VÍA


500.00 500.00 500.00

R 0.00 100.0%
TO IO
O O
A R IOD I OD
TR TE R R
N
AN PE PE
CO L AL
O DE
AD DA AD
O
UT A UL
EC UT
EJ E C UM
EJ AC

CONTRATO EJECUTADO ANTERIOR


EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

CANTIDAD
CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

170,277.00 56,373.17 13,203.53 69,576.70

32,000.00 21,094.82 0.00 21,094.82


438,100.00 0.00 40,220.31 42,271.98

TERRACERÍAS

69,576.70
56,373.17
69,576.70
56,373.17 40,220.31
0.00 21,094.82 42,271.98
21,094.82
0.00 13,203.53

EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

omún (No Clasificada) m³ Excavación en Roca m³ Acarreo Adicional m³-km

CANTIDAD
CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO


24,949.00 11195.05 5700.20 16895.25
15,951.00 6290.10 5890.30 12180.40
3,450.00 2064.81 1271.16 3335.97
204,500.00 73126.50 50099.40 123225.90
43,560.00 8031.83 9309.28 17341.11

150 150.00 0.00 150.00

960 0.00 0.00 0.00

1,516.00 0.00 0.00 0.00

2,030.00 0.00 0.00 0.00

Pavime ntos
CONTRATO EJECUTADO ANTERIOR
EJECUTADA DEL PERIODO ACUMULADO AL PERIODO
204,500.00
123225.90
73126.50

43,560.00
50099.40
24,949.00

15,951.00

17341.11
16895.25
11195.05

12180.40

3,450.00

9309.28
8031.83
6290.10
5890.30
5700.20

3335.97
2064.81
1271.16

150.00

150.00
0.00
150
CANTIDAD
CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

CONTRATO ML EJECUTADO ANTERIOR ML EJECUTADA DEL PERIODO ML ACUMULADO AL PERIODO


206 206.00 0.00 206.00
14 14.00 0.00 14.00
66 66.00 0.00 66.00
14 0.00 12.00 2.00
90 56.00 0.00 56.00
56 56.00 0.00 56.00
313.19 313.19 0.00 313.19
204.15 204.15 0.00 204.15
28 12.00 0.00 12.00
2 0.00 0.00 1.00
4940.82 12.92 264.68 277.60
500 0.00 0.00 300.00

OBRAS DE DRENAJE MENOR


Tubería TCR, d=24"
Tubería TCR, d=30"
Tubería TCR, d=36"
Tubería TCR, d=42"
Tubería TCR, d=48"
Tubería TCR, d=60"
Concreto Clase B para Cabezales
Concreto Clase B Disipadores de Energía
Tragantes Horizontales 1.5m x 1.5m
Tragantes Horizontales 2m x 2m
Revestimiento de Cunetas con Concreto
Gaviones calibre 2.7 mm (Tipo caja 2x1x1 m) Con Geotextil de 300 gr/m³ en parte posterior
0 1000 2000 3000 4000 5000 6000

ML ACUMULADO AL PERIODO ML EJECUTADA DEL PERIODO ML EJECUTADO ANTERIOR CONTRATO

CANTIDAD
CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO


6 4.00 0.50 4.50
12 8.00 1.00 9.00
12 8.00 1.00 9.00
12 8.00 1.00 9.00
4 3.00 0.00 3.00
4 3.00 0.00 3.00
6 2.00 0.00 2.00
6 30.00 0.00 30.00
12 8.00 1.00 9.00

GESTIÓN AMBIENTAL Y SOCIAL


Plan de Seguridad Vial
Enfoque de Género en el Proyecto (Contratación de 5 mujeres certificadas durante 6 meses)
ticipación Comunitarias 4 reuniones comunitarias / trimestrales 2 reuniones de coordinación interinstitucional
Médico General (25% de tiempo)
Ingeniero Forestal (25% de tiempo)
Especialista en Seguridad Vial (100% de tiempo)
Especialista Social (100% de tiempo)
Inspector Ambiental (100% del tiempo)
Especialista Ambiental (50% de tiempo)
0 5 10 15 20 25 30 35

ACUMULADO AL PERIODO EJECUTADA DEL PERIODO


EJECUTADO ANTERIOR CONTRATO

CANTIDAD
CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO


13,677,931.50 1,547,177.05 297,532.13 1,547,177.05

Administración delegada
16,000,000.00

14,000,000.00 13,677,931.50

12,000,000.00

10,000,000.00

8,000,000.00
Administración delegada
16,000,000.00

14,000,000.00 13,677,931.50

12,000,000.00

10,000,000.00

8,000,000.00

6,000,000.00

4,000,000.00

2,000,000.00 1,547,177.05 1,547,177.05


297,532.13
0.00
ANTE -

EJECU -
TRATO

PERI -
CON -

ACU -
LADO
TADO

PERI -

MU -

ODO
RIOR
EJE -

TADA
CU -

ODO
DEL

AL
CANTIDAD
CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

2,366,064.45 1,552,123.15 3,918,187.59


14,697,978.37

C l au s u l a Es c al at o r i a G l o b al
16,000,000.00 14,697,978.37

12,000,000.00

8,000,000.00
3,918,187.59
4,000,000.00 2,366,064.45 1,552,123.15
0.00
EJECUTADA DEL PERIODO

ACUMULADO AL PERIODO
CONTRATO

EJECUTADO ANTERIOR

CANTIDAD
CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

CONTRATO EJECUTADO ANTERIOR EJECUTADA DEL PERIODO ACUMULADO AL PERIODO

7460.00 0.00 0.00 0.00

1492.00 0.00 0.00 0.00


1800.00 0.00 0.00 0.00
1690.00 1200.00 0.00 1200.00

CO N T R O L D E E R O S IÓ N Y S E D IM E N T O S
Plantación de Vetiver para estabilización de talud m²
Tierra vegetal superficial m²
7460.00

Encespado m²
Plantación de arboles como compensación Unidad
1800.00

1690.00
1492.00

1200.00

1200.00
0.00

- 0.00
0.00

0.00

0.00

0.00

0.00

0.00

A C U M U L A D O A L 0.00
0.00
C ONTR ATO

EJ EC UTAD O AN

EJ EC UTAD A D EL

P ER I OD O
P ER I OD O
TERI OR
CONTRATO

N° CONCEPTO CANTIDAD
UNIDAD PRECIO UNITARIO CANTIDAD
CONTRATO

1 ACTIVIDADES GENERALES
1.1 Limpieza del Derecho de Vía (Desmonte y Desbrozo) ha 46.00 L19125.02 0.00
1.2 Cercado del Derecho de Vía ml 500.00 L115.17 0.00
Sub Total 1
2 TERRACERIAS
2.1 Excavación Común (No Clasificada) m³ 170,277.00 L85.25 13,203.53
2.2 Excavación en Roca m³ 32,000.00 L253.54 0.00
2.3 Sobre - Acarreo m³ - km 438,100.00 L10.21 40,220.31
Sub Total 2
3 PAVIMENTO
3.1 Reciclaje y Estabilización con Cemento de la Estructura Existente m³ 24,949.00 L205.60 5,700.20
3.2 Base Granular Estabilizada con Cemento m³ 15,951.00 L765.57 5,890.30
3.3 Cemento para estabilización ton 3,450.00 L5268.13 1,271.16
3.4 Imprimación Asfáltica m² 204,500.00 L26.70 50,099.40
3.5 Concreto Hidráulico MR: 650 PSI m³ 43,560.00 L3890.31 9,309.28
3.6 Concreto Ciclópeo para Muros de Retención m³ 150.00 L2410.10 0.00
3.7 Bordillo de Concreto f'c=211 kg/cm². ml 960.00 L263.97 0.00
Dimensiones 20x20 cm pin #4 @0.40 m
3.8 Bordillo de Concreto f'c=211 kg/cm². ml 1,516.00 L207.76 0.00
Dimensiones 15x15 cm pin #3 @0.40 m
3.9 Concreto Clase B 180 kg/cm² en Cierre de Hombros m³ 2,030.00 L3156.41 0.00
Sub Total 3
4 OBRAS DE DRENAJE MENOR
4.1 Suministro e Instalación de Alcantarilla, Tubería TCR, d=24'', Tipo III (Accesos) ml 206.00 L3037.96 0.00
4.2 Suministro e Instalación de Alcantarilla, Tubería TCR, d=30'', Tipo III ml 14.00 L4246.34 0.00
4.3 Suministro e Instalación de Alcantarilla, Tubería TCR, d=36'', Tipo III ml 66.00 L5659.53 0.00
4.4 Suministro e Instalación de Alcantarilla, Tubería TCR, d=42'', Tipo III ml 14.00 L7310.73 12.00
4.5 Suministro e Instalación de Alcantarilla, Tubería TCR, d=48'', Tipo III ml 90.00 L8607.50 0.00
4.6 Suministro e Instalación de Alcantarilla, Tubería TCR, d=60'', Tipo III ml 56.00 L12850.72 0.00
4.7 Concreto Clase B 180 kg/cm² para Cabezales m³ 313.19 L2340.15 0.00
4.8 Concreto Clase B 180 kg/cm² para Disipadores de energía m³ 204.15 L2340.15 0.00
4.9 Tragantes Horizontales 1.50 m x 1.50 m Unidad 28.00 L23361.31 0.00
4.10 Tragantes Horizontales 2.00 m x 2.00 m Unidad 2.00 L30583.26 0.00
4.11 Revestimiento de Cunetas con Concreto m³ 4,940.82 L3239.00 264.68
4.12 Gaviones calibre 2.7 mm (Tipo Caja 2x1x1 m) m³ 500.00 L1893.28 0.00
Sub Total 4
5 OBRAS DE DRENAJE MAYOR
CONSERVACION DE PUENTES
5.1 Limpieza y Desmonte en Cajas y Puentes ha 1.60 L82493.63 0.00
5.2 Barandal Metálico en Pretiles Existentes ml 104.00 L2269.39 0.00
5.3 Juntas de Expansión de 1'' (Suministro/Instalación) ml 11.20 L4522.81 0.00
5.4 Juntas de Expansión de 2'' (Suministro/Instalación) ml 11.30 L5427.10 0.00
5.5 Apoyos de Neopreno Dureza 60 A.S.T.M. (0.40x0.40x0.025) En puente Rio Carrizal Unidad 10.00 L22264.42 0.00
5.6 Apoyos de Neopreno Dureza 60 A.S.T.M. (0.50x0.50x0.025) En puente Rio Azul Unidad 20.00 L23100.61 0.00
5.7 Suministro y Colocación de Pintura de Trafico para Pretil ml 231.40 L357.30 0.00
Sub Total 5
6 OBRAS COMPLEMENTARIAS
6.1 Casetas Metálicas en Paradas de Buses Unidad 12.00 L30743.47 0.00
6.2 Aceras de Concreto f'c=211 kg/cm² (e=10 cm) m² 1,650.00 L448.78 0.00
6.3 Barrera Flex Beam ml 6,550.00 L1575.60 0.00
6.4 Barrera de Concreto (Tipo New Jersey) ml 1,090.00 L2441.67 0.00
Sub Total 6
7.1 SEÑALIZACION HORIZONTAL
7.1.1 Línea Lateral Continua de 0.10 m color blanca ml 9,210.00 L48.59 0.00
7.1.2 Línea discontinua de 0.10 m blanca ml 40,365.00 L48.59 0.00
7.1.3 Línea continua de 0.10 m color amarilla ml 26,671.00 L44.52 0.00
7.1.4 Línea discontinua de 0.10 m color amarilla ml 11,033.00 L44.52 0.00
Reductores de velocidad ancho de carril 3.65 m, longitud de 7.00 m, e=6 mm, ancho 13 cm
7.1.5 Unidad 36.00 L9361.29 0.00
cada línea
7.1.6 Reductores de velocidad ancho de dos carriles 7.30 m, longitud de 7.00 m, e=6 mm, ancho 13 Unidad 4.00 L17965.78 0.00
cm cada línea
7.1.7 Rayas Logarítmicas e=1.5 cm ml 94.90 L1270.00 0.00
7.1.8 Pintura Amarrilla Refractiva para Bordillos ml 272.00 L39.24 0.00
7.1.9 Vialetas de 1 Cara Blanca y 1 Cara Roja Unidad 1,856.00 L59.20 0.00
7.1.10 Vialetas de 2 Caras Amarillas Unidad 1,274.00 L60.38 0.00
7.1.11 Vialetas de 1 Cara Blanca Unidad 1,353.00 L59.20 0.00
7.1.12 Suministro e Instalación de Pintura Termoplástica en Paradas de Buses y Escuelas m² 90.00 L629.75 0.00
7.1.13 Flecha de una dirección blancas Unidad 151.00 L1303.58 0.00
7.1.14 Suministro e Instalación de boyas metálicas Unidad 65.00 L524.32 0.00
Sub Total 7.1
7.2 SEÑALIZACION VERTICAL
7.2.1 Señales de proximidad de zona escolar E-1-3 Unidad 2.00 L4151.60 0.00
7.2.2 Señales de proximidad de zona escolar E-1-3/E-3-3 Unidad 1.00 L5427.93 0.00
7.2.3 Señales de proximidad de zona escolar E-3-1/R-2-1/E-3-2 Unidad 2.00 L7564.67 0.00
7.2.4 Señales de proximidad de zona escolar E-1-1/E-1-2 Unidad 2.00 L5427.93 0.00
7.2.5 Señales de información y destino ID-2-1 Unidad 10.00 L7564.67 0.00
7.2.6 Señales de información y destino IG-1-2 Unidad 2.00 L7564.67 0.00
7.2.7 Señales para identificar el kilometraje II-4-1 Unidad 30.00 L2258.65 0.00
7.2.8 Señales de servicio de transporte IS-5-2 Unidad 2.00 L7564.67 0.00
7.2.9 Señales preventivas P-1-1 Unidad 2.00 L4151.60 0.00
7.2.10 Señales preventivas P-1-2 Unidad 16.00 L4151.60 0.00
7.2.11 Señales preventivas P-1-5 Unidad 10.00 L4151.60 0.00
7.2.12 Señales preventivas P-1-9 (Doble Cara) Unidad 90.00 L7019.72 0.00
7.2.13 Señales preventivas P-5-4 Unidad 4.00 L4151.60 0.00
7.2.14 Señales preventivas P-6-3/P-6-4 Unidad 1.00 L5427.93 0.00
7.2.15 Señales preventivas P-1-13 Unidad 2.00 L4151.60 0.00
7.2.16 Señales de protección de estructuras P-12-4a Unidad 8.00 L4151.60 0.00
7.2.17 Señales preventivas P-9-13/P-9-11 Unidad 8.00 L5427.93 0.00
7.2.18 Señales preventivas P-9-14/P-10-7 Unidad 6.00 L6144.95 0.00
7.2.19 Señales preventivas P-9-4 Unidad 4.00 L4151.60 0.00
7.2.20 Señales restrictivas R-16-1 Unidad 2.00 L6159.29 0.00
7.2.21 Señales restrictivas R-10-1 Unidad 4.00 L6159.29 0.00
7.2.22 Señales restrictivas R-1-1 Unidad 12.00 L4660.71 0.00
7.2.23 Señales restrictivas R-2-1 Unidad 1.00 L6159.29 0.00
7.2.24 Señales restrictivas R-11-3 Unidad 4.00 L6159.29 0.00
7.2.25 Señales restrictivas R-6-8 Unidad 1.00 L6159.29 0.00
7.2.26 Señales restrictivas R-7-7 Unidad 1.00 L6159.29 0.00
7.2.27 Señales restrictivas R-2-8 Unidad 3.00 L6159.29 0.00
7.2.28 Señales restrictivas R-2-1/E-3-2 Unidad 4.00 L7664.72 0.00
Sub Total 7.2
Sub Total 7
8 GESTION AMBIENTAL Y SOCIAL
8.1 Gestión Ambiental y Social
8.1.1 Especialista Ambiental (50% de tiempo) Mes 6.00 L28951.59 0.50
8.1.2 Inspector Ambiental (100% del tiempo) Mes 12.00 L27829.73 1.00
8.1.3 Especialista Social (100% del tiempo) Mes 12.00 L39968.24 1.00
8.1.4 Especialista Seguridad Vial (100% del tiempo) Mes 12.00 L59554.78 1.00
8.1.5 Ingeniero Forestal (25% del tiempo) Mes 4.00 L11441.17 0.00
8.1.6 Medico General (25% del tiempo) Mes 4.00 L12551.40 0.00
Participación Comunitarias 4 reuniones comunitarias / trimestrales 2 reuniones de
8.2 Reunión 6.00 L4736.98 0.00
coordinación interinstitucional
8.3 Enfoque de Genero en el Proyecto (Contratación de 5 mujeres certificadas durante 6 meses) Mes 30.00 L2368.48 0.00
8.4 Plan de seguridad vial Mes 12.00 L854371.68 1.00
Sub Total 8.1
8.5 Control de Erosión y Sedimentos
8.5.1 Plantación de Vetiver para estabilización de talud m² 7,460.00 L59.33 0.00
8.5.2 Tierra vegetal superficial m³ 1,492.00 L70.32 0.00
8.5.3 Encespado m² 1,800.00 L89.49 0.00
8.5.4 Siembra y Mantenimiento de arboles como compensación Unidad 1,690.00 L115.08 0.00
Sub Total 8.5
Sub Total 8
TOTAL OBRA
9 MONTOS PROVISIONALES
9.1 Administración Delegada Global 1.00 L13677931.50
9.2 Reconocimiento de Mayores Costos o Clausula Escalatoria Global 1.00 L14697978.37
Sub Total 9
TOTAL CONSTRUCCION
OBRA EJECUTADA

% de Avance en el
TOTAL % de Avance Acumulado
período

0.00 0.00% 0.00% 0.00%


0.00 0.00% 100.00% 0.00%
L - 0.00% 6.14%

1,125,600.93 7.75% 40.86% 4.82%


0.00 0.00% 65.92% 5.18%
410,649.37 9.18% 9.65% 0.00%
L 1,536,250.30 5.67% 43.21% 4.13%

1,171,961.12 22.85% 67.72% 0.00%


4,509,436.97 36.93% 76.36% 0.00%
6,696,636.13 36.85% 96.69% 0.00%
1,337,653.98 24.50% 60.26% 0.00%
36,215,985.08 21.37% 39.81% 0.00%
0.00 0.00% 100.00% 52.33%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
L 49,931,673.28 22.93% 46.60%

0.00 0.00% 100.00% 33.01%


0.00 0.00% 100.00% 0.00%
0.00 0.00% 100.00% 0.00%
87,728.76 85.71% 100.00% 0.00%
0.00 0.00% 62.22% 13.33%
0.00 0.00% 100.00% 0.00%
0.00 0.00% 100.00% 28.70%
0.00 0.00% 100.00% 15.86%
0.00 0.00% 42.86% 7.14%
0.00 0.00% 50.00% 0.00%
857,298.52 5.36% 5.62% 0.00%
0.00 0.00% 60.00% 0.00%
L 945,027.28 4.39% 24.85%

0.00 0.00% 0.00% 0.00%


0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
L - 0.00% 0.00% 0.00%

0.00 0.00% 0.00% 0.00%


0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
L - 0.00% 0.00% 0.00%

0.00 0.00% 0.00% 0.00%


0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
L - 0.00% 0.00% 0.00%

0.00 0.00% 0.00% 0.00%


0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
L - 0.00% 0.00% 0.00%
L - 0.00% 0.00% 0.00%

14,475.80 8.33% 75.00% 8.33%


27,829.73 8.33% 75.00% 8.33%
39,968.24 8.33% 75.00% 8.33%
59,554.78 8.33% 75.00% 8.33%
0.00 0.00% 75.00% 0.00%
0.00 0.00% 75.00% 0.00%
0.00 0.00% 33.33% 0.00%
0.00 0.00% 100.00% 0.00%
854,371.68 8.33% 75.00% 8.33%
L 996,200.23 8.20% 75.05% 8.20%

0.00 0.00% 0.00% 0.00%


0.00 0.00% 0.00% 0.00%
0.00 0.00% 0.00% 0.00%
0.00 0.00% 71.01% 0.00%
L - 0.00% 15.29% 0.00%
L 996,200.23 7.63% 70.91% 7.63%
L 53,409,151.08 17.67% 42.31% 0.98%

297,532.13 2.18% 11.31% 0.49%


1,552,123.15 10.56% 26.66% 0.00%
L 1,849,655.28 6.52% 19.26% 0.23%
L 55,258,806.36 16.71% 40.33% 0.91%
CONCEPTO CONTRATADO

Porcentaje de
Contrato(%)
No. Descripción Monto Total(L)
1 Actividades Generales 937,335.920 0.28
2 Terracerías 27,102,395.250 8.20
3 Pavimento 217,775,626.230 65.87
4 Obras de drenaje menor 21,531,355.421 6.51
5 Obras de drenaje mayor 1,247,323.690 0.38
6 Obras complementarias 14,091,008.940 4.26

7 Señalización Horizontal 5,181,992.970 1.57


8 Señalización Vertical 1,306,986.720 0.40
9 Gestión Ambiental y Social 13,052,935.700 3.95
A COSTO DIRECTO TOTAL 302,226,960.841 91.42
B ADMINISTRACIÓN DELEGADA 13,677,931.500 4.14
C CLAUSULA ESCALATORIA 14,697,978.370 4.45
TOTAL CONSTRUCCION 330,602,870.711 100.00

Resumen de Avance de Obra Ejecutada Acumulada Costo Directo Total + Adm


Monto del Contrato
No. Descripción
Dólares Lempiras
1 Total Construcción en L - -
2 Costo Directo Total 8,138,251.91 130,488,953.07
3 Administración Delegada 13,677,931.50
4 Clausula Escalatoria 5,801,292.06
5 Sub Total de Construcción 149,968,176.63
Retención 10% 13,048,895
6 Amortización 20% 26,097,791
7 Neto a Pagar 110,821,490.71

ESTIMACIÓN No.5
TOTAL LEMPIRAS DÓLARES $
Obra Física L 53,409,151.09 1,314,741
Administración Delegada L 297,532.13 -
Clausula Escalatoria L 1,552,123.15
Sub Total 1,314,740.93
Menos:Amortización de anticipo (20% de monto de
obra base)Según 262,948
Menos: Retenciónacta
(10%fechada 1/07/2019
del precio aceptado de las
obras) Subcláusula 14.3 de CE 131,474
TOTALES REALES DE ESTIMACIÓN No.5 920,318.65
TOTALES COBRADOS POR ETERNA ESTIMACIÓN No.5 48,809
DIFERENCIA DE VALORES POR COBRO EJECUTADO 871,509.7
PAGO ANTERIOR EJECUTADO ACUMULADO

Porcentaje Porcentaje
Total (L) Porcentaje anterior Total(L) Periodo(%) Total(L) Acumulado
57,585 0.02% 0 0.00% 57,585 6.14%
10,175,141 3.08% 1,536,250 0.46% 11,711,391 43.21%
51,555,203 15.59% 49,931,673 15.10% 101,486,876 46.60%
4,406,483.341 1.33% 945,027 0.29% 5,351,511 24.85%
0.000 0.00% 0 0.00% 0 0.00%
0.000 0.00% 0 0.00% 0 0.00%

0.000 0.00% 0 0.00% 0 0.00%


0.000 0.00% 0 0.00% 0 0.00%
8,260,204 2.50% 996,200 0.30% 9,256,404.14 70.91%
74,454,616 22.52% 53,409,151 16.16% 127,863,767 42.31%
1,249,645 0.38% 297,532.13 0.09% 1,547,177 11.31%
2,366,064 0.72% 1,552,123 0.47% 3,918,188 26.66%
78,070,325 23.61% 55,258,806.37 16.71% 133,329,132 40.33%

ada Acumulada Costo Directo Total + Administración Delegada + Clausula Escalatoria


Acumulado Anterior Este Periodo Acumulado Actual
Dolares Lempiras Dolares Lempiras Dolares Lempiras
74,454,616 53,409,151.09 127,863,767.05
1,832,804.47 29,387,236.92 1,314,740.93 21,080,591.94 3,147,545.40 50,467,828.86
0.00 1,249,644.92 0.00 297,532.13 0.00 1,547,177.05
0.00 2,366,064.45 0.00 1,552,123.15 0.00 3,918,187.59
1,832,804.47 33,002,946.29 1,314,740.93 22,930,247.21 3,147,545.40 55,933,193.50
183,280 2,938,724 131,474 2,108,059 314,755 5,046,783 NOTA, AL COSTO D
366,561 5,877,447 262,948 4,216,118 629,509 10,093,566
1,282,963.13 24,186,775.21 920,318.65 16,606,069.63 2,203,281.78 40,792,844.84

LEMPIRAS L. Factores aplicados #REF!


L. 21,080,591.94 Dólares Lempiras Cambio #REF!
L. 297,532.13 0.61 0.39 24.5893 #REF!
L. 1,552,123.15
L. 22,930,247.21 #REF!
L. 4,216,118.39 #REF!
L. 2,108,059.19 #REF!
L. 16,606,069.63 5
L 935,729.02 #REF!
15,670,340.6
330,602,871

NOTA, AL COSTO DIRECTO RESTARLE EL 10% Y 20%

#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
58047.9945 997263.3774 pendiente
#REF! #REF!
Resumen del periodo reportado septiembre 2019
Equipo Asignado en el Lote B
Equipo Mínimo Contrato Equipo Ingresado al Proyecto Condición
No.
Descripción Cantidad Descripción Cantidad Fecha Ingreso Ocioso Mal estado Activo

Tractor (tipo CAT D8, equivalente o Tractor (tipo CAT D8, equivalente o
1 2 0 -
mayor) mayor)

Tractor (tipo CAT D6, equivalente o Tractor (tipo CAT D6, equivalente o
2 3 0 10/18/2019
mayor) mayor)

Motoniveladora (tipo CAT140, Motoniveladora (tipo CAT140,


3 4 2 10/7/2019 X
equivalente o similar) equivalente o similar

Volquetas (capacidad: 10 m3 o Volquetas (capacidad: 10 m3 o


4 10 6 10/7/2019 X
mayor) mayor)

5 Compactadora pata de cabra 2 Compactadora pata de cabra 0 -

Compactadora Neumática
6 3 Compactadora Neumática (10 ton ) 1 -
(capacidad: 10 Ton o mayor)
Compactador Liso Vibratorio Compactador Liso Vibratorio
7 3 1 10/7/2019 X
(capacidad: 8 Ton o mayor) (capacidad: 8 Ton o mayor)
Cargadora de Ruedas (tipo CAT 950, Cargadora de Ruedas (tipo CAT
8 3 1 10/15/2019 X
equivalente o similar) 950, equivalente o similar)

Retroexcavadora (tipo CAT 325, Retroexcavadora (tipo CAT 325,


9 3 1 10/7/2019 X
equivalente o similar) equivalente o similar)
Excavadora Frontal sobre orugas
Excavadora Frontal sobre orugas
10 3 (tipo CAT 320, equivalente o 3 10/7/2019 X
(tipo CAT 320, equivalente o similar)
Equipo de Demolición con Martillos similar) con Martillos
Equipo de Demolición
11 1 0 -
Neumáticos Neumáticos
Recicladora de pavimento min 500 Recicladora de pavimento min 500
12 1 0 -
HP HP

13 Planta Clasificadora de Materiales 1 Planta Clasificadora de Materiales 1 7/10/2019 X

Planta Trituradora de agregados Planta Trituradora de agregados


14 1 1 10-Jul-19 X
mínimo 120 Ton/hora mínimo 120 Ton/hora

Pavimentadora de concreto Pavimentadora de concreto


15 1 1 9/5/2019 Mantenimiento
hidráulico autopropulsada hidráulico autopropulsada
Planta de concreto hidráulico con Planta de concreto hidráulico con
enfriadora de agua mínimo 80 m3 / enfriadora de agua mínimo 80 m3 /
hora o Planta de concreto hidráulico 1 de 80 m3 / hora o Planta de concreto 1 de 80 m3 /
16 con enfriadora de agua, min. 40 m3 / hora ó 2 de hidráulico con enfriadora de agua, hora ó 2 de 9/18/2019 1 X
hora. Las plantas deberán disponer 40 m3 /hora min. 40 m3 / hora. Las plantas 40 m3 /hora
del dispositivo para mezclar el deberán disponer del dispositivo
concreto para mezclar el concreto

Camiones Mezcladores de Concreto Camiones Mezcladores de


17 8 0 -
(mixer) mínimo 7 m3 Concreto (mixer) mínimo 7 m3

18 Equipo de Bombeo de Concreto 2 Equipo de Bombeo de Concreto 0 -

19 Equipo de Vibrado de Concreto 4 Equipo de Vibrado de Concreto 0 -

20 Camión Plataforma 2 Camión Plataforma 1 9/13/2019 X

21 Camión Utilitario 2 Camión Utilitario 0 -

Tanque de Agua (Capacidad: 3000 Tanque de Agua (Capacidad: 3000


22 3 1 9/16/2019 X
gal o mayor) gal o mayor)

23 Mezcladora (capacidad: 2 bolsas) 4 Mezcladora (capacidad: 2 bolsas) 0 -

24 Mezcladora (capacidad: 1 bolsa) 4 Mezcladora (capacidad: 1 bolsa) 2 -

Compresores (capacidad: 175 psi o Compresores (capacidad: 175 psi o


25 3 1 9/16/2019 X
mayor) mayor)
Equipo para pintado de
26 Equipo para pintado de Señalización 1 0 -
Señalización
27 Grúa (capacidad: 40 Ton o mayor) 1 Grúa (capacidad: 40 Ton o mayor) 1 9/16/2019 X

28 Equipo de Soldadura 3 Equipo de Soldadura 1 9/16/2019 X

29 Equipo Electrógeno 3 Equipo Electrógeno 0 -

Equipo de Bombeo de agua Equipo de Bombeo de agua


29 4 1 8/1/2019 X
(diferentes diámetros) (diferentes diámetros)
Equipo de Laboratorio Completo Equipo de Laboratorio Completo
30 1 1 9/9/2019 X
para control de Calidad para control de Calidad
OBSERVACIONES

es necesario incorporar el
equipo minimo

es necesario incorporar el
equipo minimo

es necesario incorporar el
equipo minimo

es necesario incorporar el
equipo minimo

es necesario incorporar el
equipo minimo

es necesario incorporar el
equipo minimo
es necesario incorporar el
equipo minimo
es necesario incorporar el
equipo minimo

es necesario incorporar el
equipo minimo
completo
aun no es necesario
funciona para ambos lotes A
yB

completo

completo

completo
completo

se necesitan para el
sieguiente periodo

se necesitan para el
sieguiente periodo

se necesitan para el
sieguiente periodo

es necesario incorporar el
equipo minimo

es necesario incorporar el
equipo minimo

es necesario incorporar el
equipo minimo

funciona con 1

aun no es necesario

completo

funciona con 1

funciona con 1
completo
TRABAJO PROGRAMADOS PARA EL SIGUIENTE PERÍODO
Item en
Concepto Unidad
programa
1 ACTIVIDADES GENERALES

1.1 Limpieza del Derecho de Vía (Desmonte y Desbrozo) ha


1.2 Cercado del Derecho de Vía ml

2 TERRACERIAS
2.1 Excavación Común (No Clasificada) m3
2.2 Excavación en Roca m3
2.3 Sobre - Acarreo m3-km
3 PAVIMENTO

3.1 Reciclaje y Estabilización con Cemento de la Estructura Existente m³


3.2 Base Granular Estabilizada con Cemento m³
3.3 Cemento para Estabilización ton
3.4 Imprimación Asfáltica m²
3.5 Concreto Hidráulico MR: 650 PSI m³
3.6 Concreto Ciclópeo para Muros de Retención m³
Bordillo de Concreto f'c=211 kg/cm².
3.7 Dimensiones 20x20 cm pin #4 @0.40 m
Bordillo de Concreto f'c=211 kg/cm².
3.8 Dimensiones 15x15 cm pin #3 @0.40 m
3.9 Concreto Clase B 180 kg/cm² en Cierre de Hombros
Sub Total 3
4 OBRAS DE DRENAJE MENOR
4 OBRAS DE DRENAJE MENOR
Suministro e Instalación de Alcantarilla, Tubería TCR, d=24'', Tipo III
ml
4.1 (Accesos)
4.2 Suministro e Instalación de Alcantarilla, Tubería TCR, d=30'', Tipo III ml
4.3 Suministro e Instalación de Alcantarilla, Tubería TCR, d=36'', Tipo III ml
4.4 Suministro e Instalación de Alcantarilla, Tubería TCR, d=42'', Tipo III ml
4.5 Suministro e Instalación de Alcantarilla, Tubería TCR, d=48'', Tipo III ml
4.6 Suministro e Instalación de Alcantarilla, Tubería TCR, d=60'', Tipo III ml
4.7 Concreto Clase B 180 kg/cm² para Cabezales m³
4.8 Concreto Clase B 180 kg/cm² para Disipadores de energía m³
4.9 Tragantes Horizontales 1.50 m x 1.50 m Unidad
4.1 Tragantes Horizontales 2.00 m x 2.00 m Unidad
4.11 Revestimiento de Cunetas con Concreto m³
4.12 Gaviones calibre 2.7 mm (Tipo Caja 2x1x1 m) m³
Sub Total 4
5 OBRAS DE DRENAJE MAYOR
CONSERVACION DE PUENTES
5.1 Limpieza y Desmonte en Cajas y Puentes ha
5.2 Barandal Metálico en Pretiles Existentes ml
5.3 Juntas de Expansión de 1'' (Suministro/Instalación) ml
5.4 Juntas de Expansión de 2'' (Suministro/Instalación) ml
Apoyos de Neopreno Dureza 60 A.S.T.M. (0.40x0.40x0.025) En puente
Rio Carrizal Unidad
5.5
Apoyos de Neopreno Dureza 60 A.S.T.M. (0.50x0.50x0.025) En puente
Rio Azul Unidad
5.6
5.7 Suministro y Colocación de Pintura de Trafico para Pretil ml
Sub Total 5
6 OBRAS COMPLEMENTARIAS
6.1 Casetas Metálicas en Paradas de Buses Unidad
6.2 Aceras de Concreto f'c=211 kg/cm² (e=10 cm) m²
6.3 Barrera Flex Beam ml
6.4 Barrera de Concreto (Tipo New Jersey) ml
Sub Total 6 0
8 GESTION AMBIENTAL Y SOCIAL
8.1 Gestión Ambiental y Social Global
9 MONTOS PROVISIONALES
9.1 Administración Delegada Global
9.2 Reconocimiento de Mayores Costos o Clausula Escalatoria Global
S PARA EL SIGUIENTE PERÍODO
Obra a Ejecutar al siguiente Porcentaje de Avance Acumulado a la
Periodo de Marzo 2020 Fecha(20 de febrero)

0.00%
292.78 100.00%

25,031 40.86% 293.623398


4,704 65.92% 18.5537864
64,402 9.65% 6307.78049

3,277.43 67.72% 15.940815


2,095.41 76.36% 2.73705483
453.21 96.69% 0.08602865
26,864.19 60.26% 1006.14956
5,422.31 39.81% 1.39379959
11.58 100.00%

100.00%
100.00%
100.00%
100.00% 0
62.22% 0
18.26 100.00%
80.57 100.00% 0.03442955
52.52 100.00% 0.02244258
21.55 42.86%
0.00 50.00%
1,016.85 5.62% 0.31393893
205.81 60.00%
1033267.14 70.91%

1,812,228.08 11.31%
1,947,377.00 0.00%
PRECIO
N° DESCRIPCION UNIDAD CANTIDAD TOTAL
UNITARIO
1 ACTIVIDADES GENERALES
1.1 ETE-08 Limpieza de ha 46.00 19,125 L 879,750.92
1.2 MC-607 Cercado del ml 500.00 115 L 57,585.00
Sub Total 1 L 937,335.92
2 TERRACERIAS
2.1 ETE-09 Excavación m³ 170,277.00 85 L 14,516,114.25
2.2 MC-203.01|(2)Excavación m³ 32,000.00 254 L 8,113,280.00
2.3 ETE-10 Sobre - Acar m³ - km 438,100.00 10 L 4,473,001.00
Sub Total 2 L 27,102,395.25
3 PAVIMENTO
3.1 ETE-11 Reciclaje y m³ 24,949.00 206 L 5,129,514.40
3.2 ETE-12 Base Granul m³ 15,951.00 766 L 12,211,607.07
3.3 ETE-13 Cemento para ton 3,450.00 5,268 L 18,175,048.50
3.4 ETE-15 Imprimación
Bordillo de m² 204,500.00 27 L 5,460,150.00
3.5 ETE-16 Concreto
Bordillo deHi m³ 43,560.00 3,890 L 169,461,903.60
3.6 f'c=211
ETE-39 Concreto Ci m³ 150.00 2,410 L 361,515.00
kg/cm².
3.7 MC-609(1) f'c=211 ml 960.00 264 L 253,411.20
Dimension
kg/cm².
3.8 MC-609(1) es 20x20 ml 1,516.00 208 L 314,964.16
Dimension
Suministro
3.9 MC-610(2) cm pin #4Cl
Concreto
es 15x15
e m³ 2,030.00 3,156 L 6,407,512.30
@0.40 m
Suministro
cm
Subpin #3 3
Total
Instalación L 217,775,626.23
4 e
@0.40
OBRASmDE DRENAJE MENOR
de
Suministro
Instalación
Alcantarilla,
e
4.1 Suministro
MC-603(21) 24''
de ml 206.00 3,038 L 625,819.76
Tubería
Instalación
e
4.2 Suministro
MC-610(21) 30''
Alcantarilla,
TCR,
de ml 14.00 4,246 L 59,448.76
Instalación
e
Tubería
4.3 Suministro
d=24'',
MC-610(21) 36'' Tipo
Alcantarilla,
de ml 66.00 5,660 L 373,528.98
Instalación
TCR,
e
III
Tubería
4.4 MC-610(21) 42''
Alcantarilla,
de
d=30'', Tipo ml 14.00 7,311 L 102,350.22
Instalación
(Accesos)
TCR,
Tubería
4.5 MC-610(21) 48''
Alcantarilla,
III
de
d=36'', Tipo ml 90.00 8,608 L 774,675.00
TCR,
Tubería
4.6 MC-610(21) 60''
Alcantarilla,
III
d=42'', Tipo ml 56.00 12,851 L 719,640.32
TCR,
Tubería
III
d=48'',
TCR, Tipo
III
d=60'', Tipo
III
4.7 MC-610(2) Concreto Cl m³ 313.19 2,340 L 732,911.58
4.8 MC-610(2) Tragantes
Concreto Cla m³ 204.15 2,340 L 477,741.62
Horizontale
Tragantes
4.9 MC-604 Unidad 28.00 23,361 L 654,116.68
s 1.50 m x
Revestimie
Horizontale
4.10 MC-604 1.50
nto mm x
de Unidad 2.00 30,583 L 61,166.52
s 2.00
Gaviones
4.11 MC-630.01 Cunetas
2.00
calibre m 2.7 m³ 4,940.82 3,239 L 16,003,315.98
4.12 MC-630.01 con
mm (Tipo m³ 500.00 1,893 L 946,640.00
Concreto
Caja 2x1x1
Sub Total 4 L 21,531,355.42
m)
5 OBRAS
CONSERVA DE DRENAJE MAYOR
Limpieza
CION DE y
Desmonte
PUENTES
Barandal
5.1 ETE-30 Juntas dey ha 1.60 82,494 L 131,989.81
en Cajas
Metálico en
5.2 ETE-31 Expansión
Juntas
Puentes de ml 104.00 2,269 L 236,016.56
Apoyos
Pretiles
de 1'' de
5.3 ETE-32 Expansión
Neopreno
Existentes ml 11.20 4,523 L 50,655.47
Apoyos
(Suministro
de 2'' 60 de
5.4 ETE-32 Dureza
Neopreno
/Instalación ml 11.30 5,427 L 61,326.23
(Suministro
A.S.T.M.
5.5 ETE-28 Dureza
Suministro 60
)/Instalación Unidad 10.00 22,264 L 222,644.20
(0.40x0.40
A.S.T.M.
5.6 ETE-28 y
)x0.025) En Unidad 20.00 23,101 L 462,012.20
(0.50x0.50
Colocación
5.7 ETE-22(h) puente
x0.025) Rio
En ml 231.40 357 L 82,679.22
de Pintura
Carrizal
puente
Sub Rio5
Total
de Trafico L 1,247,323.69
6 Azul
Casetas
para
OBRAS Pretil
COMPLEMENTARIAS
Aceras
Metálicas de
6.1 ETE-18 Concreto Unidad 12.00 30,743 L 368,921.64
en Paradas
6.2 ETE-19 f'c=211
de Buses m² 1,650.00 449 L 740,487.00
Barrera
kg/cm² de
Barrera
6.3 ETE-20 ml 6,550.00 1,576 L 10,320,180.00
Flex
(e=10Beam
Concreto cm)
6.4 ETE-21 ml 1,090.00 2,442 L 2,661,420.30
(Tipo New
Sub Total
Jersey) 6 L 14,091,008.94
7.1 SEÑALIZACION HORIZONTAL
7.1.1 ETE-22(a) Línea ml 9,210.00 49 L 447,513.90
7.1.2 ETE-22(b) Lateral
Línea ml 40,365.00 49 L 1,961,335.35
Continua
discontinua
7.1.3 ETE-22(c) Línea
de 0.10 ml 26,671.00 45 L 1,187,392.92
de 0.10 m
continua mde
7.1.4 ETE-22(d) Línea
blanca ml 11,033.00 45 L 491,189.16
0.10 m
discontinua
7.1.5 ETE-22(e) Reductores
color Unidad 36.00 9,361 L 337,006.44
de
de 0.10 m
7.1.6 ETE-22(f) Reductores
color Unidad 4.00 17,966 L 71,863.12
velocidad
de
7.1.7 ETE-22(k) Rayas
ancho de ml 94.90 1,270 L 120,523.00
velocidad
Logarítmic
7.1.8 ETE-22(g) Pintura
ancho de ml 272.00 39 L 10,673.28
as e=1.5
Amarrilla
cm
Refractiva
para
7.1.9 ETE-23 Vialetas de Unidad 1,856.00 59 L 109,875.20
7.1.10 ETE-23 1 Cara
Vialetas de Unidad 1,274.00 60 L 76,924.12
Blanca
2 Caras y1
7.1.11 ETE-23 Vialetas
Cara de Unidad
Roja 1,353.00 59 L 80,097.60
Amarillas
1 Cara
7.1.12 ETE-22(i) Suministro m² 90.00 630 L 56,677.50
Blanca
e
7.1.13 ETE-22(j) Flecha de Unidad 151.00 1,304 L 196,840.58
Instalación
una
7.1.14 ETE-38 Suministro
de Pintura Unidad 65.00 524 L 34,080.80
dirección
e
Sub Total 7.1
blancas L 5,181,992.97
Señales
Instalaciónde
7.2 SEÑALIZACION
proximidad
de boyasde VERTICAL
Señales
7.2.1 ETE-24 de zona de Unidad
Señales
proximidad 2.00 4,152 L 8,303.20
7.2.2 ETE-24 escolar
proximidad
de zona E- Unidad 1.00 5,428 L 5,427.93
Señales
1-3zonaE-
de
escolar de
7.2.3 ETE-24 proximidad Unidad 2.00 7,565 L 15,129.34
escolar
1-3/E-3-3 E-
7.2.4 ETE-24 Señales
de zona de Unidad
3-1/R-2-1/E 2.00 5,428 L 10,855.86
información
escolar
Señales
-3-2 E-
de
7.2.5 ETE-24 Señales Unidad 10.00 7,565 L 75,646.70
y destino
1-1/E-1-2
información
7.2.6 ETE-24 para
ID-2-1 Unidad 2.00 7,565 L 15,129.34
y destino
identificar
7.2.7 ETE-24 Señales
IG-1-2 de Unidad 30.00 2,259 L 67,759.50
el
servicio de
7.2.8 ETE-24 kilometraje
Señales Unidad 2.00 7,565 L 15,129.34
transporte
7.2.9 ETE-24 II-4-1
preventivas
IS-5-2
Señales Unidad 2.00 4,152 L 8,303.20
7.2.10 ETE-24 P-1-1
preventivas Unidad 16.00 4,152 L 66,425.60
Señales
Señales
7.2.11 ETE-24 P-1-2
preventivas Unidad
preventivas 10.00 4,152 L 41,516.00
7.2.12 ETE-24 P-1-5
P-1-9 Unidad 90.00 7,020 L 631,774.80
Señales
7.2.13 ETE-24 (Doble
preventivas Unidad 4.00 4,152 L 16,606.40
Señales
Cara)
7.2.14 ETE-24 P-5-4
preventivas Unidad 1.00 5,428 L 5,427.93
Señales
Señales de
7.2.15 ETE-24 P-6-3/P-6-4
preventivas Unidad 2.00 4,152 L 8,303.20
protección
7.2.16 ETE-24 P-1-13
Señales
de Unidad 8.00 4,152 L 33,212.80
preventivas
estructuras
Señales
7.2.17 ETE-24 Unidad 8.00 5,428 L 43,423.44
P-9-13/P-9-
P-12-4a
preventivas
7.2.18 ETE-24 11
Señales Unidad 6.00 6,145 L 36,869.70
P-9-14/P-
7.2.19 ETE-24 preventivas
10-7
Señales Unidad 4.00 4,152 L 16,606.40
7.2.20 ETE-24 P-9-4
restrictivas Unidad 2.00 6,159 L 12,318.58
Señales
7.2.21 ETE-24 R-16-1
restrictivas Unidad 4.00 6,159 L 24,637.16
Señales
7.2.22 ETE-24 R-10-1
restrictivas Unidad 12.00 4,661 L 55,928.52
Señales
7.2.23 ETE-24 R-1-1
restrictivas Unidad 1.00 6,159 L 6,159.29
Señales
7.2.24 ETE-24 R-2-1
restrictivas Unidad 4.00 6,159 L 24,637.16
R-11-3
Señales
7.2.25 ETE-24 restrictivas
Señales Unidad 1.00 6,159 L 6,159.29
7.2.26 ETE-24 R-6-8
restrictivas Unidad 1.00 6,159 L 6,159.29
Señales
7.2.27 ETE-24 R-7-7
Señales
restrictivas Unidad 3.00 6,159 L 18,477.87
restrictivas
R-2-8
7.2.28 ETE-24 Unidad 4.00 7,665 L 30,658.88
R-2-1/E-3-
Sub Total 7.2
2 L 1,306,986.72
Sub Total 7 L 6,488,979.69
8 GESTION AMBIENTAL Y SOCIAL
Gestión
Especialist
8.1 Ficha 1 Ambiental
a y
8.1.1 Social
Inspector
Ambiental Mes 6.00 28,952 L 173,709.54
Ambiental
(50% de
Especialist
Participació
8.1.2 Mes 12.00 27,830 L 333,956.76
(100%
Socialdel
Especialist
tiempo)
a
n
8.1.3 tiempo)
a Mes 12.00 39,968 L 479,618.88
(100% del
Comunitari
8.1.4 Ingeniero
Seguridad
tiempo) Mes 12.00 59,555 L 714,657.36
as 4
Forestal
8.1.5 Vial
Medico
Enfoque(100%
reuniones de Mes 4.00 11,441 L 45,764.68
(25%
del delen
tiempo)
General
Genero
8.1.6 comunitaria
tiempo) Mes 4.00 12,551 L 50,205.60
(25%
el
s del
/Proyecto
8.2 Ficha 2 (Contrataci
tiempo) Reunión 6.00 4,737 L 28,421.88
trimestrales
8.3 Ficha 4 ón dede5
2 reuniones
Plan Mes 30.00 2,368 L 71,054.40
8.4 mujeres
de
Ficha 12 seguridad Mes 12.00 854,372 L 10,252,460.16
certificadas
coordinació
vial
Control de
Sub
durante Total
6y 8.1 L 12,149,849.26
Plantación
n
Erosión
8.5 Ficha 6 meses)
de Vetiver
interinstituc
Sedimento
8.5.1 ETE-25 para
ional
s
Tierra m² 7,460.00 59 L 442,601.80
8.5.2 Siembra
estabilizaci
MC-624.01 vegetal y m³ 1,492.00 70 L 104,917.44
Mantenimie
ón de talud
superficial
8.5.3 MC-629.01 nto
Encespado
de m² 1,800.00 89 L 161,082.00
8.5.4 ETE-26 arboles Unidad 1,690.00 115 L 194,485.20
como
Sub Total 8.5 L 903,086.44
compensac
Sub
iónTOTALTotal 8 L 13,052,935.70
L 302,226,960.84
OBRA
9 MONTOS
Reconocimi
Administrac PROVISIONALES
9.1 ento
ETE-34 ión de Global 1.00 13,677,932 L 13,677,931.50
Mayores
Delegada
9.2 Global 1.00 14,697,978 L 14,697,978.37
Costos o
Sub
ClausulaTotal 9
TOTAL L 28,375,909.87
Escalatoria
CONSTRU L 330,602,870.71
CCION
% FÍSICO EJECUTADO
% FÍSICO PROGRAMADO

AVANCE FINANCIERO DEL PROYECTO


PROGRAMADO
PERIODO
MENSUAL (LPS) ACUMULADO ACUMULADO (%)
0 - -
1 AGOSTO AGO 19 199,987.19 199,987.19 0.06%
2 SEPTIEMBRE SEP 19 1,028,381.22 1,228,368.41 0.37%
3 OCTUBRE OCT 19 4,044,517.63 5,272,886.04 1.59%
4 NOVIEMBRE NOV 19 7,300,959.59 12,573,845.63 3.80%
obra +AD+Clausula 5 DICIEMBRE DIC 19 32,106,111.37 44,679,957.00 13.51%
6 ENERO ENE 20 38,760,154.08 83,440,111.08 25.24%
7 FEBRERO FEB 20 37,308,849.83 120,748,960.91 36.52%
8 MARZO MAR 20 40,048,744.33 160,797,705.24 48.64%
9 ABRIL ABR 20 39,187,979.37 199,985,684.61 60.49%
10 MAYO MAY 20 39,992,190.88 239,977,875.49 72.59%
11 JUNIO JUN 20 36,111,581.70 276,089,457.19 83.51%
12 JULIO JUL 20 36,586,770.88 312,676,228.07 94.58%
13 AGOSTO AGO 20 17,926,642.66 330,602,870.73 100.00%
TOTAL 330,602,870.73

AVANCE FINANCIERO DEL PROYECTO

95%

85%

75%

65%

55%
85%

75%

65%

55%

45%

35%

25%

15%

5%

AGO 19 SEP 19 OCT 19 NOV 19 DIC 19 ENE 20 FEB 20 MAR 20 ABR 20 MAY 20 JUN 20 JUL 20
Column J 0.06% 0.37% 1.59% 3.80% 13.51% 25.24% 36.52% 48.64% 60.49% 72.59% 83.51% 94.58%
Column M 0.00% 0.32% 0.97% 1.57% 2.49% 3.39% 7.80% 17.71% 17.71% 17.71% 17.71% 23.61%

AVANCE FÍSICO DEL PROYECTO


PROGRAMADO
PERIODO
MENSUAL (LPS) ACUMULADO ACUMULADO (%)
0 - -
1 AGOSTO AGO 19 199,987.19 199,987.19 0.07%
2 SEPTIEMBRE SEP 19 1,028,381.22 1,228,368.41 0.41%
3 OCTUBRE OCT 19 4,044,517.63 5,272,886.04 1.74%
4 NOVIEMBRE NOV 19 7,300,959.59 12,573,845.63 4.16%
5 DICIEMBRE DIC 19 32,106,111.37 44,679,957.00 14.78%
6 ENERO ENE 20 35,309,071.05 79,989,028.05 26.47%
7 FEBRERO FEB 20 33,791,799.92 113,780,827.97 37.65%
8 MARZO MAR 20 36,289,139.25 150,069,967.22 49.65%
9 ABRIL ABR 20 35,549,651.87 185,619,619.09 61.42%
10 MAYO MAY 20 36,232,585.80 221,852,204.89 73.41%
11 JUNIO JUN 20 32,473,254.20 254,325,459.09 84.15%
12 JULIO JUL 20 32,827,165.80 287,152,624.89 95.01%
Sin Clausula escalatoria y Admi 13 AGOSTO AGO 20 15,074,335.98 302,226,960.87 100.00%
TOTAL 302,226,960.87

AVANCE FÍSICO DEL PROYECTO

95%

85%

75%

65%

55%

45%

35%

25%

15%

5%
AGO 19 SEP 19 OCT 19 NOV 19 DIC 19 ENE 20 FEB 20 MAR 20 ABR 20 MAY 20 JUN 20
Column J 0.07% 0.41% 1.74% 4.16% 14.78% 26.47% 37.65% 49.65% 61.42% 73.41% 84.15%

Column 0.00% 0.34% 0.95% 1.51% 2.45% 3.38% 8.02% 18.50% 18.50% 18.50% 18.50%
M
ROYECTO
EJECUTADO
PERIODO
MENSUAL (LPS) ACUMULADO (%) ACUMULADO (%)
- - 0
- - 0.00% 1 AGOSTO AGO 19
1,071,242.88 1,071,242.88 0.32% 2 SEPTIEMBRE SEP 19
2,121,006.04 3,192,248.92 0.97% 3 OCTUBRE OCT 19
1,984,963.65 5,177,212.57 1.57% 4 NOVIEMBRE NOV 19
3,055,720.03 8,232,932.60 2.49% 5 DICIEMBRE DIC 19
2,985,669.47 11,218,602.07 3.39% 6 ENERO ENE 20
14,562,131.23 25,780,733.30 7.80% 7 FEBRERO FEB 20
32,770,210.92 58,550,944.22 17.71% 8 MARZO MAR 20
- 58,550,944.22 17.71% 9 ABRIL ABR 20
- 58,550,944.22 17.71% 10 MAYO MAY 20
58,550,944.22 17.71% 11 JUNIO JUN 20
19,519,379.99 78,070,324.21 23.61% 70.96% 12 JULIO JUL 20
55,258,806.37 133,329,130.57 40.33% 13 AGOSTO AGO 20
TOTAL 14 SEPTIEMBRE SEP 20
15 OCTUBRE OCT 20
16 NOVIEMBRE NOV 20
17 DICIEMBRE DIC 20
YECTO
18 ENERO ENE 20

PERIODO
PERIODO

1 MAYO MAY 20
2 JUNIO JUN 20
3 JULIO JUL 20
4 AGOSTO AGO 20
5 SEPTIEMBRE SEP 20
6 OCTUBRE OCT 20
7 NOVIEMBRE NOV 20
8 DICIEMBRE DIC 20
9 ENERO ENE 20

20 ABR 20 MAY 20 JUN 20 JUL 20 AGO 20


4% 60.49% 72.59% 83.51% 94.58% 100.00%
1% 17.71% 17.71% 17.71% 23.61% 40.33%

YECTO
EJECUTADO
MENSUAL (LPS) ACUMULADO (%) ACUMULADO (%)
- -
- - 0.00%
1,020,192.80 1,020,192.80 0.34%
1,853,802.67 2,873,995.47 0.95%
1,685,075.74 4,559,071.21 1.51%
2,833,462.52 7,392,533.73 2.45%
2,832,544.05 10,225,077.78 3.38%
14,010,358.25 24,235,436.03 8.02%
31,674,280.80 55,909,716.83 18.50%
- 55,909,716.83 18.50%
- 55,909,716.83 18.50%
55,909,716.83 18.50% 65.65%
18,544,899.14 74,454,615.97 24.64%
53,409,151.09 127,863,767.06 42.31%
TOTAL 70,787,310.16 24.64%

ROYECTO

20 MAR 20 ABR 20 MAY 20 JUN 20 JUL 20 AGO 20


5% 49.65% 61.42% 73.41% 84.15% 95.01% 100.00%

2% 18.50% 18.50% 18.50% 18.50% 24.64% 42.31%


AVANCE FINANCIERO DEL PROYECTO
PROGRAMADO EJECUTADO
MENSUAL (LPS) ACUMULADO ACUMULADO (%) MENSUAL (LPS) ACUMULADO (%) ACUMULADO (%)
- - - -
199,987.19 199,987.19 0.04% - - 0.00%
1,028,381.22 1,228,368.41 0.24% 1,071,242.88 1,071,242.88 0.32%
4,044,517.63 5,272,886.04 1.02% 2,121,006.04 3,192,248.92 0.97%
7,300,959.59 12,573,845.63 2.42% 1,984,963.65 5,177,212.57 1.57%
32,106,111.37 44,679,957.00 8.61% 3,055,720.03 8,232,932.60 2.49%
38,760,154.08 83,440,111.08 16.08% 2,985,669.47 11,218,602.07 3.39%
37,308,849.83 120,748,960.91 23.27% 14,562,131.23 25,780,733.30 7.80%
40,048,744.33 160,797,705.24 30.99% 32,770,210.92 58,550,945.35 17.71%
39,187,979.37 199,985,684.61 38.54% - 58,550,945.35 17.71%
39,992,190.88 239,977,875.49 46.24% - 58,550,945.35 17.71%
2,983,270.05 242,961,145.54 46.82% 58,550,945.35 17.71%
12,018,434.60 254,979,580.14 49.13%
30,945,810.81 285,925,390.95 55.10%
54,825,402.65 340,750,793.60 65.66%
54,312,932.97 395,063,726.57 76.13%
51,638,241.87 446,701,968.44 86.08%
54,610,322.33 501,312,290.77 96.60%
17,632,993.38 518,945,284.15 100.00%
TOTAL 518,945,284.15 TOTAL 58,550,945.35 17.71%

AVANCE FINANCIERO DEL PROYECTO


PROGRAMADO EJECUTADO
MENSUAL (LPS) ACUMULADO ACUMULADO (%) MENSUAL (LPS) ACUMULADO (%) ACUMULADO (%)
- - -
58,550,945.35 58,550,945.35 17.35%
2,983,270.05 61,534,215.40 18.23% - - -
12,018,434.60 73,552,650.00 21.79% #VALUE! #VALUE!
30,945,810.81 104,498,460.81 30.96%
54,825,402.65 159,323,863.46 47.20%
54,312,932.97 213,636,796.43 63.30%
51,638,241.87 265,275,038.30 78.60%
54,610,322.33 319,885,360.63 94.78%
17,632,993.38 337,518,354.01 100.00%
TOTAL 337,518,354.01 TOTAL 0 0
Lempiras Dolares
39.47% 60.53%

ESTADO FINANCIERO CONTRATO DE CONSTRUCCIÓN


Partidas Contractuales

DESCRIPCIÓN TOTAL OBRA ADMINISTRACIÓN DELEGADA CLAUSULA ESCALATORIA

Dolares $ Lempiras L Dolares $ Lempiras L Dolares $


Montos Contratados 7,439,739 119,288,981.44 13,677,931.50
Estimación No.1 26,370.140 422,819.56 51,050.08
Estimación No.2 45,634 731,696 267,203.37
Estimación No.3 41,480 665,099 299,887.91
Estimacion No.4 69,750 1,118,368 222,257.57
Estimacion No.5 69,727 1,118,005 50,337.67
MONTOS Estimacion No 6 344,885 5,529,888 61,986.96
FACTURADOS Estimacion No 7 779,707 12,501,839 0.00
Estimacion No 8 456,509 7,319,672 296,920.29 0.00
Estimacion No 9 1,314,741 21,080,592 297,532.13

ESTADO FINANCIERO CONTRATO DE CONSTRUCCIÓN

Amortización de anticipo(20%) Retención 10% Valor Neto Monto Disponible T

Dolares $ Lempiras L Dolares $ Lempiras L Dolares $ Lempiras L Dolares $

1,487,947.84 23,857,796 743,974 11,928,898 5,951,791.37


5,274.03 84,563.91 2,637.01 42,281.96 18,459.10 347,023.77 5,933,332.27
9,126.79 146,339.18 4,563.39 73,169.59 31,943.76 779,390.51 5,901,388.51
8,296.10 133,019.88 4,148.05 66,509.94 29,036.35 765,457.49 5,872,352.16
13,949.93 223,673.53 6,974.96 111,836.77 48,824.75 1,005,114.93 5,823,527.41
13,945.41 223,601.03 6,972.70 111,800.51 48,808.92 935,729.01 5,774,718.49
68,976.91 1,105,977.68 34,488.46 552,988.84 241,419.19 4,422,694.86 5,533,299.30
155,941.34 2,500,367.73 77,970.67 1,250,183.86 545,794.70 9,847,217.16 5,005,963.70
91,301.72 1,463,934.34 45,650.86 731,967.17 319,556.04 6,098,251.03 4,699,892.33
262,948.19 4,216,118.39 131,474.09 2,108,059.19 920,318.65 16,606,069.63 4,099,129.71
Cambio $
24.5893

CCIÓN
das Contractuales

CLAUSULA ESCALATORIA VALOR TOTAL 51,050.08


330602870.711
Lempiras L Dolares $ Lempiras L 130,488,953 26,097,791
14,697,978.37 7,439,739.21 147,664,891.31 8,138,252 1,627,650
0.00 26,370.14 473,869.64
0.00 45,633.94 998,899.28 130,015,083.43 1853802.665
0.00 41,480.50 964,987.30
0.00 69,749.64 1,340,625.22
102,787.75 69,727.03 1,271,130.55 302,226,960.84
489,786.02 344,884.56 6,081,661.38 7,439,739 119,288,981
1,095,930.12 779,706.71 13,597,768.75
677,560.56 456,508.62 8,294,152.54
1,552,123.15 1,314,740.93 22,930,247.21

Monto Disponible Total 267203.37


1685075.739 obra
Lempiras L % 299,887.91 AD
1,984,963.65 CONSTRUCCION
123,807,095.02 83.84% estimacion 4
123,460,071.25 83.61% 2833462.514 periodo obra
122,680,680.74 83.08% 222,257.57 AD
121,915,223.26 82.56% 3055720.084 total construccion
120,910,108.33 81.88% estimacion 5
119,974,379.32 81.25% 2,832,544 periodo obra
115,551,684.45 78.25% 50,338 AD
106,051,491.06 71.82% 2,882,882 total construccion
91,488,920.46 65.93%
89,877,788.17 60.87% ESTIMACION 6
14,010,358.25 periodo obra
61,986.96 AD
L 14,562,131.23 total construccion
489,786.02 Clausula

ESTIMACION 7

L 31,674,280.80 periodo obra


0.00 AD
L 31,674,280.80 total construccion
0.00 Clausula

ESTIMACION 8
L 53,409,151.09 periodo obra
297,532.13 AD
L 55,258,806.37 total construccion
1,552,123.15 Clausula

L 53,409,151.09 periodo obra


297,532.13 AD
total construccion
Clausula
ESTIMACION No. MONTO FINANCIERO NETO ESTADO
Dolares $ Lempiras L.
1 22,352.78 358,405.12 Aprobado por la supervisión
2 31,943.76 779,390.51 Aprobado por la supervisión
3 40,566.56 650,445.27 Aprobado por la supervisión
4 48,824.75 1,005,114.93 Aprobado por la supervisión
5 48,808.92 935,729.01 Aprobado por la supervisión
6 241,419.19 4,422,694.86 Aprobado por la supervisión
7 545,794.70 9,847,217.16 Pendiente
8 319,556.04 6,098,251.03
9 920,318.65 16,606,069.63
Total $ 2,219,585.34 L40,703,317.53
6

8
PROYECTO: OBRAS DE

CONTRATISTA : ETERNA, S.A. de C.V.


PROPIETARIO : INVEST-H

N° DESCRIPSION

1 ACTIVIDADES GENERALES
1.1 ETE-08 Limpieza del Derecho de Vía (Desmonte y Desbrozo)
1.2 MC-607 Cercado del Derecho de Vía
Sub Total 1
2 TERRACERIAS
2.1 ETE-09 Excavación Común (No Clasificada)
2.2 MC-203.01|(2) Excavación en Roca
2.3 ETE-10 Sobre - Acarreo
Sub Total 2
3 PAVIMENTO
3.1 ETE-11 Reciclaje y Estabilización con Cemento de la Estructura Existente
3.2 ETE-12 Base Granular Estabilizada con Cemento
3.3 ETE-13 Cemento para estabilización
3.4 ETE-15 Imprimación Asfáltica
3.5 ETE-16 Concreto Hidráulico MR: 650 PSI
3.6 ETE-39 Concreto Ciclópeo para Muros de Retención
3.7 MC-609(1)
Bordillo de Concreto f'c=211 kg/cm². Dimensiones 20x20 cm pin #4
@0.40 m

3.8 MC-609(1)
Bordillo de Concreto f'c=211 kg/cm². Dimensiones 15x15 cm pin #3
@0.20 m
3.9 MC-610(2) Concreto Clase B 180 kg/cm² en Cierre de Hombros
Sub Total 3
4 OBRAS DE DRENAJE MENOR
4.1 MC-603(21) 24''
Suministro e Instalación de Alcantarilla, Tubería TCR, d=24'', Tipo III
(Accesos)
4.2 MC-610(21) 30'' Suministro e Instalación de Alcantarilla, Tubería TCR, d=30'', Tipo III

4.3 MC-610(21) 36'' Suministro e Instalación de Alcantarilla, Tubería TCR, d=36'', Tipo III

4.4 MC-610(21) 42'' Suministro e Instalación de Alcantarilla, Tubería TCR, d=42'', Tipo III

4.5 MC-610(21) 48'' Suministro e Instalación de Alcantarilla, Tubería TCR, d=48'', Tipo III

4.6 MC-610(21) 60'' Suministro e Instalación de Alcantarilla, Tubería TCR, d=60'', Tipo III

4.7 MC-610(2) Concreto Clase B 180 kg/cm² para Cabezales


4.8 MC-610(2) Concreto Clase B 180 kg/cm² para Disipadores de energía
4.9 MC-604 Tragantes Horizontales 1.50 m x 1.50 m
4.10 MC-604 Tragantes Horizontales 2.00 m x 2.00 m
4.11 MC-630.01 Revestimiento de Cunetas con Concreto

4.12 MC-630.01 Gaviones calibre 2.7 mm (Tipo Caja 2x1x1 m)

Sub Total 4
5 OBRAS DE DRENAJE MAYOR
CONSERVACION DE PUENTES

5.1 ETE-30 Limpieza y Desmonte en Cajas y Puentes

5.2 ETE-31 Barandal Metálico en Pretiles Existentes

5.3 ETE-32 Juntas de Expansión de 1'' (Suministro/Instalación)

5.4 ETE-32 Juntas de Expansión de 2'' (Suministro/Instalación)

5.5 ETE-28
Apoyos de Neopreno Dureza 60 A.S.T.M. (0.40x0.40x0.025) En puente
Rio Carrizal
5.6 ETE-28
Apoyos de Neopreno Dureza 60 A.S.T.M. (0.50x0.50x0.025) En puente
Rio Azul
5.7 ETE-22(h) Suministro y Colocación de Pintura de Trafico para Pretil
Sub Total 5
6 OBRAS COMPLEMENTARIAS
6.1 ETE-18 Casetas Metálicas en Paradas de Buses
6.2 ETE-19 Aceras de Concreto f'c=211 kg/cm² (e=10 cm)
6.3 ETE-20 Barrera Flex Beam
6.4 ETE-21 Barrera de Concreto (Tipo New Jersey)
Sub Total 6
7.1 SEÑALIZACION HORIZONTAL
7.1.1 ETE-22(a) Línea Lateral Continua de 0.10 m color blanca
7.1.2 ETE-22(b) Línea discontinua de 0.10 m blanca
7.1.3 ETE-22(c) Línea continua de 0.10 m color amarilla
7.1.4 ETE-22(d) Línea discontinua de 0.10 m color amarilla

7.1.5 ETE-22(e)
Reductores de velocidad ancho de carril 3.65 m, longitud de 7.00 m,
e=6 mm, ancho 13 cm cada línea

7.1.6 ETE-22(f)
Reductores de velocidad ancho de dos carriles 7.30 m, longitud de
7.00 m, e=6 mm, ancho 13 cm cada línea
7.1.7 ETE-22(k) Rayas Logarítmicas e=1.5 cm
7.1.8 ETE-22(g) Pintura Amarrilla Refractiva para Bordillos
7.1.9 ETE-23 Vialetas de 1 Cara Blanca y 1 Cara Roja
7.1.10 ETE-23 Vialetas de 2 Caras Amarillas
7.1.11 ETE-23 Vialetas de 1 Cara Blanca
7.1.12 ETE-22(i)
Suministro e Instalación de Pintura Termoplástica en Paradas de Buses
y Escuelas
7.1.13 ETE-22(j) Flecha de una dirección blancas
7.1.14 ETE-38 Suministro e Instalación de boyas metálicas
Sub Total 7.1
7.2 SEÑALIZACION VERTICAL
7.2.1 ETE-24 Señales de proximidad de zona escolar E-1-3
7.2.2 ETE-24 Señales de proximidad de zona escolar E-1-3/E-3-3
7.2.3 ETE-24 Señales de proximidad de zona escolar E-3-1/R-2-1/E-3-2
7.2.4 ETE-24 Señales de proximidad de zona escolar E-1-1/E-1-2
7.2.5 ETE-24 Señales de información y destino ID-2-1
7.2.6 ETE-24 Señales de información y destino IG-1-2
7.2.7 ETE-24 Señales para identificar el kilometraje II-4-1
7.2.8 ETE-24 Señales de servicio de transporte IS-5-2
7.2.9 ETE-24 Señales preventivas P-1-1
7.2.10 ETE-24 Señales preventivas P-1-2
7.2.11 ETE-24 Señales preventivas P-1-5
7.2.12 ETE-24 Señales preventivas P-1-9 (Doble Cara)
7.2.13 ETE-24 Señales preventivas P-5-4
7.2.14 ETE-24 Señales preventivas P-6-3/P-6-4
7.2.15 ETE-24 Señales preventivas P-1-13
7.2.16 ETE-24 Señales de protección de estructuras P-12-4a
7.2.17 ETE-24 Señales preventivas P-9-13/P-9-11
7.2.18 ETE-24 Señales preventivas P-9-14/P-10-7
7.2.19 ETE-24 Señales preventivas P-9-4
7.2.20 ETE-24 Señales restrictivas R-16-1
7.2.21 ETE-24 Señales restrictivas R-10-1
7.2.22 ETE-24 Señales restrictivas R-1-1
7.2.23 ETE-24 Señales restrictivas R-2-1
7.2.24 ETE-24 Señales restrictivas R-11-3
7.2.25 ETE-24 Señales restrictivas R-6-8
7.2.26 ETE-24 Señales restrictivas R-7-7
7.2.27 ETE-24 Señales restrictivas R-2-8
7.2.28 ETE-24 Señales restrictivas R-2-1/E-3-2
Sub Total 7.2
Sub Total 7
8 GESTION AMBIENTAL Y SOCIAL
8.1 Ficha 1 Gestión Ambiental y Social
8.1.1 Especialista Ambiental (50% de tiempo)
8.1.2 Inspector Ambiental (100% del tiempo)
8.1.3 Especialista Social (100% del tiempo)
8.1.4 Especialista Seguridad Vial (100% del tiempo)
8.1.5 Ingeniero Forestal (25% del tiempo)
8.1.6 Medico General (25% del tiempo)

8.2 Ficha 2
Participación Comunitarias 4 reuniones comunitarias / trimestrales 2
reuniones de coordinación interinstitucional

8.3 Ficha 4
Enfoque de Genero en el Proyecto (Contratación de 5 mujeres
certificadas durante 6 meses)
8.4 Ficha 12 Plan de seguridad vial
Sub Total 8.1
8.5 Ficha 6 Control de Erosión y Sedimentos
8.5.1 ETE-25 Plantación de Vetiver para estabilización de talud
8.5.2 MC-624.01 Tierra vegetal superficial
8.5.3 MC-629.01 Encespado
8.5.4 ETE-26 Siembra y Mantenimiento de arboles como compensación
Sub Total 8.5
Sub Total 8
TOTAL OBRA
9 MONTOS PROVISIONALES
9.1 ETE-34 Administración Delegada
9.2 Reconocimiento de Mayores Costos o Clausula Escalatoria
Sub Total 9
TOTAL CONSTRUCCION
PROYECTO: OBRAS DE REHABILITACIÓN DE LA CARRETERA CA-6, TRAMO III NETEAPA - DANLI, LOTE

AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE

L. 28,445.28 L. 181,057.06 L. 175,217.06

L. 1,501,438.56 L. 2,065,090.06
L. 839,177.16 L. 1,154,210.67
L 462,653.85 L. 636,337.64

L. 362,249.22
L. 498,640.62
L. 742,147.81
L. 199,721.44

L. 26,923.29 L. 467,409.13
L. 199,987.19 L. 999,935.94 L. 1,033,267.14 L. 999,935.94
L. 199,987.19 L. 1,028,381.22 L. 4,044,517.06 L. 7,300,959.59
6, TRAMO III NETEAPA - DANLI, LOTE B ( ESTACION 74+240 - 89+160)

ESTIMACION No. 06
PERIODO: DEL 21 DE ENERO AL 20 DE FEBRERO DE 2020

DICIEMBRE ENERO FEBRERO MARZO

L. 181,057.63 L. 181,057.63 L. 132,915.70


L. 23,865.78 L. 33,719.22

L. 2,133,926.40 L. 2,133,926.40 L. 1,996,253.73 L. 2,133,926.40


L. 1,192,684.36 L. 1,192,684.36 L. 1,115,736.98 L. 1,192,684.36
L. 657,548.90 L. 657,548.90 L. 615,126.39 L. 657,548.90

L. 673,839.93 L. 673,839.93 L. 630,366.39 L. 673,839.93


L. 1,604,180.79 L. 1,604,180.79 L. 1,500,685.26 L. 1,604,180.79
L. 2,387,569.76 L. 2,387,569.76 L. 2,233,533.00 L. 2,387,569.76
L. 717,273.96 L. 717,273.96 L. 670,998.22 L. 717,273.96
L. 20,818,303.75 L. 21,094,476.54 L. 19,733,542.57 L. 21,094,476.54
L. 27,904.44

L. 131,487.34

L. 59,448.76

L. 373,528.98

L. 4,776.34 L. 97,573.88

L. 550,987.59 L. 223,687.41

L. 484,957.62 L. 234,682.70
L. 137,217.33 L. 188,546.59 L. 176,382.30 L. 188,546.59
L. 92,910.79 L. 114,973.17 L. 122,902.35
L. 503,397.29
L. 2,703,226.79 L. 3,081,082.86 L. 3,293,571.34

L. 91,087.80 L. 389,647.54
L. 1,033,267.14 L. 1,033,267.14 L. 966,604.74 L. 1,033,267.14
L. 1,663,512.38 L. 1,695,310.14 L. 1,812,228.08
L. 1,787,570.65 L. 1,821,739.77 L. 1,947,377.00

L. 32,106,111.37 L. 38,760,154.08 L. 37,308,849.83 L. 40,048,744.33


FECHA: 2/20/2020
O AL 20 DE FEBRERO DE 2020

ABRIL MAYO JUNIO

L. 2,065,090.06 L. 486,462.64
L. 1,154,210.67 L. 271,891.47
L. 636,337.64 L. 149,898.78

L. 652,103.16 L. 673,839.93 L. 652,103.16 L. 3,171.71


L. 1,552,433.03 L. 1,604,180.79 L. 1,552,433.03 L. 2,027.81
L. 2,310,551.38 L. 2,387,569.76 L. 2,310,551.38 L. 438.59
L. 694,136.09 L. 717,273.96 L. 694,136.09 L. 25,997.61
L. 20,414,009.56 L. 21,094,476.54 L. 20,414,009.56 L. 5,247.40
L. 270,006.52 L. 63,604.05 L. 0.00

L. 0.00

L. 71,960.56 L. 346.36
L. 1,206,748.15 L. 1,914,244.30 L. 606.46
#DIV/0!
#DIV/0!

L. 0.00

L. 0.00

L. 0.00

L. 0.00

L. 0.00

L. 0.00
L. 42,218.76 L. 0.00
L. 118,937.76 L. 28,017.56 L. 0.00
L. 150,719.39 L. 0.00
L. 61,166.52 L. 0.00
L. 3,187,327.10 L. 3,293,571.34 L. 444,536.56 L. 137.25

L. 377,078.27 L. 88,826.39 L. 0.00


#DIV/0!
#DIV/0!
#DIV/0!

L. 131,989.81 L. 0.00

L. 46,613.27 L. 189,403.29 L. 0.00

L. 50,655.47 L. 0.00

L. 61,326.23 L. 0.00

L. 23,913.64 L. 147,811.01 L. 6.64


L. 152,720.70 L. 230,043.57 L. 9.96

L. 0.00
#DIV/0!
#DIV/0!
L. 0.00
L. 0.00
L. 684,786.94 L. 2,654,937.97 L. 2,569,294.81 L. 1,630.68
L. 386,275.59 L. 158.20
#DIV/0!
#DIV/0!
L. 0.00
L. 999,935.94 L. 1,033,267.14 L. 999,935.94
L. 85,918.64
L. 1,753,769.11 L. 1,812,228.08 L. 1,753,769.11
L. 1,884,558.39 L. 1,947,377.00 L. 1,884,558.39

L. 39,187,979.37 L. 39,992,190.88 L. 36,111,581.70


JULIO AGOSTO SEPTIEMBRE TOTAL PRECIO UNITARIO

L. 879,750.36 L 19,125.02
L. 57,585.00 L 115.17

L. 14,516,114.25 L 85.25
L. 8,113,280.03 L 253.54
L 4,473,001.00 L 10.21

L. 137,332.74 L. 5,132,686.10 L 205.60


L. 690,691.96 L. 12,213,634.87 L 765.57
L. 1,027,985.90 L. 18,175,487.10 L 5,268.13
L. 332,062.31 L. 5,486,147.60 L 26.70
L. 21,094,476.54 L. 3,704,132.00 L. 169,467,151.00 L 3,890.31
L. 361,515.01 L 2,410.10

L 263.97
L. 155,715.90 L. 97,695.30 L. 253,411.20
L 207.76
L. 162,053.43 L. 80,950.16 L. 315,310.51
L. 1,978,052.44 L. 1,308,467.41 L. 6,408,118.76 L 3,156.41

L. 625,819.76 L 3,037.96

L. 59,448.76 L 4,246.34

L 5,659.53
L. 373,528.98

L. 102,350.22 L 7,310.73

L 8,607.50
L. 774,675.00

L 12,850.72
L. 719,640.32
L. 732,911.57 L 2,340.15
L. 477,741.63 L 2,340.15
L. 654,116.68 L 23,361.31
L. 61,166.52 L 30,583.26
L 3,239.00
L. 16,003,315.99

L 1,893.28
L. 946,640.00

L 82,493.63
L. 131,989.81
L 2,269.39
L. 236,016.56

L 4,522.81
L. 50,655.47
L 5,427.10
L. 61,326.23

L. 50,919.55 L. 222,650.84 L 22,264.42

L. 79,247.93 L. 462,022.16 L 23,100.61

L. 82,679.22 L. 82,679.22 L 357.30

L. 201,506.37 L. 167,415.27 L. 368,921.64 L 30,743.47


L. 404,456.74 L. 336,030.26 L. 740,487.00 L 448.78
L. 2,654,937.97 L. 1,756,222.30 L. 10,321,810.67 L 1,575.60
L. 1,369,337.71 L. 905,807.01 L. 2,661,578.51 L 2,441.67

L. 790,973.65 L. 4,391,019.32 L. 31,458.96 L. 5,181,992.97


L 48.59
L 48.59
L 44.52
L 44.52

L 9,361.29

L 17,965.78

L 1,270.00
L 39.24
L 59.20
L 60.38
L 59.20
L 629.75
L 1,303.58
L 524.32
L. 199,497.00 L. 1,107,489.72 L. 1,306,986.72
L 4,151.60
L 5,427.93
L 7,564.67
L 5,427.93
L 7,564.67
L 7,564.67
L 2,258.65
L 7,564.67
L 4,151.60
L 4,151.60
L 4,151.60
L 7,019.72
L 4,151.60
L 5,427.93
L 4,151.60
L 4,151.60
L 5,427.93
L 6,144.95
L 4,151.60
L 6,159.29
L 6,159.29
L 4,660.71
L 6,159.29
L 6,159.29
L 6,159.29
L 6,159.29
L 6,159.29
L 7,664.72

L. 1,033,267.14 L. 783,910.73 L. 12,149,849.26


L. 464,650.52 L. 352,517.28 L. 903,086.44 L 28,951.59
L 27,829.73
L 39,968.24
L 59,554.78
L 11,441.17
L 12,551.40

L 4,736.98

L 2,368.48

L 854,371.68
L 59.33
L 70.32
L 89.49
L 115.08

L. 1,812,228.08 L. 1,374,886.50 L. 13,677,931.48 L 13,677,931.50


L. 1,947,377.00 L. 1,477,420.18 L. 14,697,978.38 L 14,697,978.37

L. 36,586,770.88 L. 17,926,642.66 L. 330,642,511.58


L 952.14
L -

L 370.10

L 389.63
L 414.54
#DIV/0!
#DIV/0!

L -

L -

L -

L -

L -

L -
L -
L -
L -
L -
L -

L -
#DIV/0!
#DIV/0!
#DIV/0!

L -

L -

L -

L -

L -
L -

L 231.40
#DIV/0!
#DIV/0!
L 5.45
L 748.76
L 1,114.64
L 370.98
#DIV/0!
#DIV/0!
L -
L -
L -
L -

L -

L -
L -
L -
L -
L -
L -

L -
L -
L -
#DIV/0!
#DIV/0!
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
L -
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
L 12.18
L -
L -
L -
L -
L -

L -

L -
L -
#DIV/0!
#DIV/0!
L -
L -
L -
L -
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
L 0.10
L 0.10
#DIV/0!
#DIV/0!

También podría gustarte