Está en la página 1de 1

ESTIMACION DE INVERSION INCIAL EJECUTADA

PROYECTO: URBANIZACION VILLA LORENA


UBICACION: CARRETERA A LA JUTOSA, CHOLOMA, CORTÉS
CALCULADO POR: ING. ERNESTO ADOLFO HERNANDEZ PAZ - CICH 4312

OBRA ESTIMADA OBRA EJECUTADA OBRA POR EJECUTAR


PRECIO PRECIO PRECIO
ITEM DESCRICPIÓN UNIDAD CANTIDAD UNITARIO TOTAL CANTIDAD UNITARIO TOTAL % CANTIDAD UNITARIO TOTAL %
1 TERRACERIA Y CALLES
1.1 Limpieza y conformación M2 11,445.51 L 14.80 L 169,393.55 11,445.51 L 14.80 L 169,393.55 100% - L 14.80 L - 0%
1.2 Excavación Comun (no roca) en calles y lotes M3 47.50 L 65.00 L 3,087.50 47.50 L 65.00 L 3,087.50 100% - L 65.00 L - 0%
1.3 Relleno con material selecto importado en calles y lotes M3 10,987.69 L 235.00 L 2,582,107.06 10,987.69 L 235.00 L 2,582,107.06 100% - L 235.00 L - 0%
1.4 Botado Material Sobrante M3 47.50 L 155.00 L 7,362.50 47.50 L 155.00 L 7,362.50 100% - L 155.00 L - 0%
1.5 Saneamiento de Zonas Inestables M3 145.70 L 340.00 L 49,538.00 145.70 L 340.00 L 49,538.00 100% - L 340.00 L - 0%
1.6 Afinamiento y compactación de subrasante M2 3,060.67 L 25.00 L 76,516.75 - L 25.00 L - 0% 3,060.67 L 25.00 L 76,516.75 100%
1.7 Concreto Hidráulico 0.10 m f'c = 4000 PSI M2 3,060.67 L 875.00 L 2,678,086.25 - L 875.00 L - 0% 3,060.67 L 875.00 L 2,678,086.25 100%
1.8 Bordillo Montable ML 785.00 L 265.78 L 208,637.30 - L 265.78 L - 0% 785.00 L 265.78 L 208,637.30 100%
1.9 Aceras (e=0.10 m) f'c = 3000 PSI M2 939.60 L 344.79 L 323,964.68 - L 344.79 L - 0% 939.60 L 344.79 L 323,964.68 100%
1.10 Replanteo y marcaje de Lotes UND 33.00 L 498.52 L 16,451.16 33.00 L 498.52 L 16,451.16 100% - L 498.52 L - 0%
Sub-Total TERRACERIA Y CALLES -----> L 6,115,144.75 L 2,827,939.76 L 3,287,204.98
2 SISTEMA DE AGUA POTABLE
2.1 Excavación y aterrado de zanjos M3 204.00 L 125.78 L 25,659.12 - L 125.78 L - 0% 204.00 L 125.78 L 25,659.12 100%
2.2 Anclajes de concreto UND 2.00 L 325.33 L 650.66 - L 325.33 L - 0% 2.00 L 325.33 L 650.66 100%
2.3 Accesorios en red GBL 1.00 L 25,000.00 L 25,000.00 - L 25,000.00 L - 0% 1.00 L 25,000.00 L 25,000.00 100%
2.4 Valvula de compuerta de bronce de 2" UND 6.00 L 1,822.92 L 10,937.52 - L 1,822.92 L - 0% 6.00 L 1,822.92 L 10,937.52 100%
2.5 Suministro e instalacion TPVC SDR-26 Ø=2" ML 975.00 L 65.00 L 63,375.00 - L 65.00 L - 0% 975.00 L 65.00 L 63,375.00 100%
2.6 Suministro e instalacion TPVC SDR-26 Ø=3/4" ML 99.50 L 39.10 L 3,890.45 - L 39.10 L - 0% 99.50 L 39.10 L 3,890.45 100%
2.7 Caja de válvulas UND 6.00 L 5,426.87 L 32,561.22 - L 5,426.87 L - 0% 6.00 L 5,426.87 L 32,561.22 100%
2.8 Caja de acometidas y medidor UND 33.00 L 957.07 L 31,583.31 - L 957.07 L - 0% 33.00 L 957.07 L 31,583.31 100%
2.9 Pruebas Hidrostáticas ML 975.00 L 9.57 L 9,330.75 - L 9.57 L - 0% 975.00 L 9.57 L 9,330.75 100%
2.10 Hidrantes contra incendio (Tubo de 2 1/2" HG) UND 1.00 L 11,988.36 L 11,988.36 - L 11,988.36 L - 0% 1.00 L 11,988.36 L 11,988.36 100%
2.11 Hidrantes de purga UND 1.00 L 7,500.00 L 7,500.00 - L 7,500.00 L - 0% 1.00 L 7,500.00 L 7,500.00 100%
Sub-Total SISTEMA DE AGUA POTABLE -----> L 222,476.39 L - L 222,476.39
3 SISTEMA DE ALCANTARILLADO SANITARIO
3.1 Excavación y aterrado de zanjos M3 40.80 L 125.78 L 5,131.82 - L 125.78 L - 0% 40.80 L 125.78 L 5,131.82 100%
Suministro e instalación PVC SDR 50 2" ML 65.00 L 45.00 L 2,925.00 - L 45.00 L - 0% 65.00 L 45.00 L 2,925.00 144%
3.2 Suministro e instalación PVC SDR 50 4" ML 105.00 L 90.00 L 9,450.00 - L 90.00 L - 0% 105.00 L 90.00 L 9,450.00 117%
3.6 Fosa Septica Domiciliar UND 33.00 18,629.44 L 614,771.67 - 18,629.44 L - 0% 33.00 18,629.44 L 614,771.67 0%
Sub-Total SISTEMA DE ALCANTARILLADO SANITARIO -----> L 632,278.49 L - L 632,278.49
4 SISTEMA ELECTRICO
4.1 Permiso de Conexión ENEE GBL 1.00 L 50,000.00 L 50,000.00 - L 50,000.00 L - 0% 1.00 L 50,000.00 L 50,000.00 100%
4.2 Suministro en instalacion de banco de transformadores UND 1.00 L 200,000.00 L 200,000.00 - L 200,000.00 L - 0% 1.00 L 200,000.00 L 200,000.00 100%
4.3 Red de Distribucion (Incluye Posteadura) GBL 1.00 L 250,000.00 L 250,000.00 - L 250,000.00 L - 0% 1.00 L 250,000.00 L 250,000.00 100%
4.4. Luminarias de Alumbrado Público UND 15.00 3,450.00 L 51,750.00 - 3,450.00 L - 0% 15.00 3,450.00 L 51,750.00 100%
Sub-Total SISTEMA ELECTRICO -----> L 551,750.00 L - L 551,750.00
5 CERCO PERIMETRAL
5.1 Suministro e instalación de Cerca Perimetral ML 309.80 L 1,682.85 L 521,346.28 309.80 L 1,682.85 L 521,346.28 100% - L 1,682.85 L - 0%
Sub-Total CERCO PERIMETRAL-----> L 521,346.28 L 521,346.28 L -

GRAN TOTAL INFRAESTRUCTURA URBANIZACIÓN -----> L 8,042,995.91 L 3,349,286.04 L 4,693,709.87

ING. ERNESTO ADOLFO HERNANDEZ PAZ


- CICH 4312

También podría gustarte