Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Hoja Nº7 Planilla de Avance
Hoja Nº7 Planilla de Avance
PLANILLA DE AVANCE # 1
Ubicación: Warnes/Santa Cruz Fecha: 15-dic-20
OBRA/SERVICIO: CONTRATANTE: CONTRATISTA:
IMPUTACIÓN : SOLPED 10070936; MONTOS DE CONTRATO AVANCE ANTERIOR AVANCE ACTUAL AVANCE HASTA LA FECHA
CONTRATO: 100000 ODS: 100000
PRECIO
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
No. DESCRIPCIÓN DEL ÍTEM UNID. CANTIDAD UNITARIO
[Bs.]
CANTIDAD
[Bs.]
CANTIDAD
[Bs.]
CANTIDAD
[Bs.] [%]
[Bs.]
MODULO I: ACTIVIDADES DE CONTRATO
1 INSTALACION DE FAENAS glb 1.00 374.59 374.59 0.00 0.00 0.50 187.30 0.50 187.30 50%
2 REPLANTEO Y TRAZADO glb 1.00 298.30 298.30 0.00 0.00 1.00 298.30 1.00 298.30 100%
3 EXCAVACION EN SUELO SEMIDURO H=1.5M m³ 9.26 69.98 648.01 0.00 0.00 9.26 648.01 9.26 648.01 100%
4 CIMIENTO DE HORMIGON CICLOPEO (50%PD) m³ 5.59 614.85 3,437.01 0.00 0.00 5.59 3,437.01 5.59 3,437.01 100%
5 SOBRECIMIENTO DE HORMIGON CICLOPEO (580%PD) m³ 1.18 999.44 1,179.34 0.00 0.00 1.18 1,179.34 1.18 1,179.34 100%
6 IMPER. SOBRECIMIENTOS C/CARTON ASFALTICO m² 3.92 207.82 814.65 0.00 0.00 3.92 814.65 3.92 814.65 100%
7 COLUMNAS DE HORMIGON ARMADO m³ 0.62 3932.04 2,437.86 0.00 0.00 0.62 2,437.86 0.62 2,437.86 100%
8 VIGA CADENA DE HORMIGON ARMADO m³ 1.91 3379.35 6,454.56 0.00 0.00 1.91 6,454.56 1.91 6,454.56 100%
9 MURO DE LADRILLO 18H VISTO E=12CM m² 43.77 247.58 10,836.58 0.00 0.00 43.77 10,836.58 43.77 10,836.58 100%
10 MURO DE LADRILLO 6 HUECOS E=10 CM. m² 9.88 112.29 1,109.43 0.00 0.00 9.88 1,109.43 9.88 1,109.43 100%
11 CUBIERTA DE CALAMINA GALVANIZADA N°28+CERCHA m² 67.32 242.48 16,323.75 0.00 0.00 67.32 16,323.75 67.32 16,323.75 100%
12 REVOQUE INTERIOR DE YESO S/LADRILLO m² 71.38 67.88 4,845.27 0.00 0.00 0.00 0.00 0.00 0.00 0%
13 REVESTIMIENTO DE CERAMICA m² 11.40 194.04 2,212.06 0.00 0.00 0.00 0.00 0.00 0.00 0%
14 CIELO FALSO DE YESO + MADERAMEN m² 43.73 233.15 10,195.65 0.00 0.00 0.00 0.00 0.00 0.00 0%
15 ALERO+MADERAMEN m² 10.95 168.49 1,844.97 0.00 0.00 0.00 0.00 0.00 0.00 0%
16 PISO CEMENTO C/EMPEDRADO m² 61.19 161.54 9,884.63 0.00 0.00 0.00 0.00 0.00 0.00 0%
17 PINTURA INTERIOR - LATEX m² 126.06 38.88 4,901.21 0.00 0.00 0.00 0.00 0.00 0.00 0%
18 PUERTA DE MADERA ROBLE E=2" CHAPA, QUINCALLERIA m² 5.46 1795.82 9,805.18 0.00 0.00 0.00 0.00 0.00 0.00 0%
19 VENTANA DE MADERA ROBLE (MARCO 2"X3") m² 8.48 871.93 7,393.97 0.00 0.00 0.00 0.00 0.00 0.00 0%
20 PROV. Y COLOC. VIDRIOS DOBLE 3 MM m² 8.48 103.72 879.55 0.00 0.00 0.00 0.00 0.00 0.00 0%
21 BOTAGUAS DE Hº Aº m 10.80 165.49 1,787.29 0.00 0.00 0.00 0.00 0.00 0.00 0%
22 CANALETAS + BAJANTES (CALAMINA PLANA N°28) m 25.80 101.56 2,620.25 0.00 0.00 0.00 0.00 0.00 0.00 0%
23 ILUMINACION FLUORESCENTE 2x40W C/ALAMBRE N°14 pto 6.00 424.50 2,547.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
24 CUMBRERA DE CALAMINA PLANA N°28 m 9.90 40.37 399.66 0.00 0.00 0.00 0.00 0.00 0.00 0%
25 TOMACORRIENTES C/ALAMBRE N°12 pto 6.00 244.70 1,468.20 0.00 0.00 0.00 0.00 0.00 0.00 0%
26 RELLENO Y COMPACTADO MATERIAL SELECCIONADO m³ 3.68 117.16 431.15 0.00 0.00 0.00 0.00 0.00 0.00 0%
27 RETIRO DE MATERIAL EXCEDENTE m³ 7.26 64.80 470.45 0.00 0.00 0.00 0.00 0.00 0.00 0%
28 LAVAPLATOS TRAMONTINA 1 FOSA+MESON H°A° pza 1.00 1057.98 1,057.98 0.00 0.00 0.00 0.00 0.00 0.00 0%
29 PROV. Y TENDIDO TUBERIA PVC AGUA POTABLE 1/2" m 30.00 35.57 1,067.10 0.00 0.00 0.00 0.00 0.00 0.00 0%
30 PROV. Y TENDIDO TUBO PVC DESAGUE 2" m 20.00 46.71 934.20 0.00 0.00 0.00 0.00 0.00 0.00 0%
31 REJILLA DE PISO CON CAMARA INTERCEPTORA pza 3.00 371.63 1,114.89 0.00 0.00 0.00 0.00 0.00 0.00 0%
32 CAMARA DE INSPECCION H°C° 0.60 x 0.60 pza 1.00 996.07 996.07 0.00 0.00 0.00 0.00 0.00 0.00 0%
33 PROV. Y COLOC. DE TANQUE DURALIT 300 LTS pza 1.00 697.72 697.72 0.00 0.00 0.00 0.00 0.00 0.00 0%
34 PROV. E INSTALACION TERMICO BIPOLAR 30 AMP + CAJA pza 2.00 413.28 826.56 0.00 0.00 0.00 0.00 0.00 0.00 0%
35 BARNIZ CRISTAL SOBRE PIEDRA O LADRILLO m² 50.39 39.19 1,974.78 0.00 0.00 0.00 0.00 0.00 0.00 0%
36 REJAS METALICAS DE PROTECCIÓN m² 8.48 247.65 2,100.07 0.00 0.00 0.00 0.00 0.00 0.00 0%
37 ZOCALO DE CERAMICA m 36.70 40.17 1,474.24 0.00 0.00 0.00 0.00 0.00 0.00 0%
1 de 20
ILL-GLO-RE-009/14
PRECIO
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
No. DESCRIPCIÓN DEL ÍTEM UNID. CANTIDAD UNITARIO
[Bs.]
CANTIDAD
[Bs.]
CANTIDAD
[Bs.]
CANTIDAD
[Bs.] [%]
[Bs.]
38 REVOQUE EXTERIOR CON MORTERO (1:4) m² 11.80 120.15 1,417.77 0.00 0.00 0.00 0.00 0.00 0.00 0%
39 PINTURA EXTERIOR LATEX m² 11.80 39.06 460.91 0.00 0.00 0.00 0.00 0.00 0.00 0%
40 LIMPIEZA GENERAL GLB glb 1.00 277.14 277.14 0.00 0.00 0.00 0.00 0.00 0.00 0%
DE AVANCE
C
REPRESENTANTE LEGAL/ RESPONSABLE SUPERVISOR SECCIONAL SERVICIOS GENERALES GERENTE GENERAL Nº 1
CONSTRUCTORA MONTAÑO ANDRADE
2 de 20
CÓMPUTOS MÉTRICOS
PLANILLA DE AVANCE # 1
Ubicación: Warnes/Santa Cruz
CANTIDADES DE CONTRA
1 INSTALACION DE FAENAS
Glb. 1.00
2 REPLANTEO Y TRAZADO
Glb. 1.00
-4.00 1.50
-4.00 0.80
-1.00 1.00
-2.00 0.80
13 REVESTIMIENTO DE CERAMICA
m2 1.00 11.40
15 ALERO+MADERAMEN
m2 1.00 10.95
21 BOTAGUAS DE Hº Aº
m 1.00 10.80
37 ZOCALO DE CERAMICA
m 1.00 36.70
ALTO [m] PARCIAL TOTAL Nº DE LARGO ANCHO ALTO [m] PARCIAL TOTAL Nº DE
VECES [m] [m] VECES
1.00 0.00
1.00 0.50
1.00 0.00
1.00 1.00
9.26 0.00
9.26 1.00
5.59 0.00
0.40 3.05 2.00
0.40 2.29 3.00
0.40 0.24 1.00
1.18 0.00
0.30 0.66 2.00
0.30 0.56 3.00
0.30 0.06 1.00
3.92 0.00
2.18 2.00
1.86 3.00
0.21 1.00
-0.12 -1.00
-0.22 -2.00
0.62 0.00
1.95 0.62 8.00
1.91 0.00
0.30 1.06 2.00
0.30 0.85 3.00
43.77 0.00
1.90 34.69 2.00
1.90 19.45 2.00
9.88 0.00
1.90 9.65 1.00
1.90 3.27 1.00
67.32 0.00
67.32 1.00
71.38 0.00
71.38
11.40 0.00
11.40
43.73 0.00
43.73
10.95 0.00
10.95
61.19 0.00
61.19
126.06 0.00
126.06
5.46 0.00
5.46
8.48 0.00
8.48
8.48 0.00
8.48
10.80 0.00
10.80
25.80 0.00
25.80
6.00 0.00
6.00
9.90 0.00
9.90
6.00 0.00
6.00
3.68 0.00
3.68
7.26 0.00
7.26
1.00 0.00
1.00
30.00 0.00
30.00
20.00 0.00
20.00
3.00 0.00
3.00
1.00 0.00
1.00
1.00 0.00
1.00
2.00 0.00
2.00
50.39 0.00
50.39
8.48 0.00
8.48
36.70 0.00
36.70
11.80 0.00
11.80
11.80 0.00
11.80
1.00 0.00
1.00
AVANCE ANTERIOR
0.50
0.50
1.00
1.00
9.26
9.26 9.26
5.59
9.53 0.40 0.40 3.05
4.78 0.40 0.40 2.29
1.52 0.40 0.40 0.24
1.18
9.10 0.12 0.30 0.66
5.18 0.12 0.30 0.56
1.72 0.12 0.30 0.06
3.92
9.10 0.12 2.18
5.18 0.12 1.86
1.72 0.12 0.21
0.62
0.20 0.20 1.95 0.62
1.91
8.85 0.20 0.30 1.06
4.70 0.20 0.30 0.85
43.77
9.13 1.90 34.69
5.12 1.90 19.45
9.88
5.08 1.90 9.65
1.72 1.90 3.27
67.32
10.52 6.40 67.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ILL-GLO-RE-009/14
CONTROL MASySO PARA CONTRATISTAS: CONTROL FÍSICO DE LA OBRA: CONTROL DE PAGOS POR IMPRODUCTIVOS: [Bs.] INCIDENCIA [%]
CONTROL PARA EL PERIODO 20-nov-14 15-dic-14 ACTUAL ACUM. AVANCE PLANILLA 1 36.4% IMPRODUCTIVOS PLANILLA DE AVANCE 1
Nro. DE TRABAJADORES 4.00 4.00 AVANCE PLANILLA 2 0.0% IMPRODUCTIVOS PLANILLA DE AVANCE 2
Nro. DE ACCIDENTES FATALES (AF) 0.00 0.00 AVANCE PLANILLA 3 0.0% IMPRODUCTIVOS PLANILLA DE AVANCE 3
Nro. DE INCIDENTES AMBIENTALES (AA) 0.00 0.00 AVANCE PLANILLA 4 0.0% IMPRODUCTIVOS PLANILLA DE AVANCE 4
Nro. DE ACCIDENTES C/TIEMPO PERDIDO (ACTP) 0.00 0.00 AVANCE PLANILLA 5 0.0% IMPRODUCTIVOS PLANILLA DE AVANCE 5
Nro. DE ACCIDENTES S/TIEMPO PERDIDO (ASTP) 0.00 0.00 AVANCE PLANILLA 6 0.0% IMPRODUCTIVOS PLANILLA DE AVANCE 6
Nro. DE DÍAS PERDIDOS POR ACCIDENTES (DPA) 0.00 0.00 TOTAL AVANZADO 36.4% TOTAL IMPRODUCTIVOS 0.00 0%
Nro. DE HORAS DE EXPOSICIÓN (HHT) 800.00 800.00 CONTROL ECONÓMICO PLANILLA ACTUAL:
ENFERMEDADES OCUPACIONALES (EO) 0.00 0.00 TOTAL EJECUTADO PLANILLA ACTUAL 43,726.79 Bs.
ÍNDICE DE FRECUENCIA (IF) 0.00 0.00 AMORTIZACIÓN ANTICIPO ( %) NO APLICA 0.00 Bs.
TASA DE INCIDENTES DE LESIONES INCAPACITANTES (TILI) 0.00 0.00 RETENCIÓN GARANTÍA DE BUENA EJECUCIÓN ( 10 %) 4,372.68 Bs.
ÍNDICE DE SEVERIDAD (IS) 0.00 0.00 LIQUIDO PAGABLE 39,354.11 Bs.
SON: TREINTA Y NUEVE MIL QUINIENTOS VEINTE Y DOS 68/100 BOLIVIANOS
DE AVANCE
15 de 20
ILL-GLO-RE-009/14
DESCRIPCIÓN FOTOGRAFÍA
Descripción de la fotografía que muestre los trabajos ejecutados de mayor
relevancia ejecutados durante el periodo.
FOTOGRAFÍA
FOTOGRAFÍA
FOTOGRAFÍA
CONTRATISTA: SUPERVISIÓN:
PLANILLA
DE AVANCE
SUPERVISOR #1
16 de 20
SINCHI WAYÂA S.A.
FORMATO DE PRESUPUESTO
Ubicación: COLQUECHAQUITA - POTOSÍ Fecha: 2-ago-11
OBRA: CONTRATANTE:
FORMATO DE PRESUPUESTO
Ubicación: COLQUECHAQUITA - POTOSÍ Fecha: 2-ago-11
OBRA: CONTRATANTE:
18 de 20
SINCHI WAYÂA S.A.
PRESUPUESTO REFERENCIAL
Ubicación: COLQUECHAQUITA - POTOSÍ Fecha: 2-ago-11
OBRA: CONTRATANTE:
PRESUPUESTO REFERENCIAL
Ubicación: COLQUECHAQUITA - POTOSÍ Fecha: 2-ago-11
OBRA: CONTRATANTE:
20 de 20