Está en la página 1de 1

B A

Nivel 3 +6.15 +6.15 Nivel 3 A B


A B
0.40 0.40

Nivel 3 +6.15 +6.15 Nivel 3


Nivel 3 +6.15 +6.15 Nivel 3 Nivel 3 +6.15 +6.15 Nivel 3
0.40 0.40
0.40 0.40 0.35 0.40
2.30 2.30

losa y viga +3.45 +3.45 losa y viga 2.30 2.30


2.30 2.30 2.35 2.30
0.40 0.40

losa y viga +3.45 +3.45 losa y viga


losa y viga +3.45 +3.45 losa y viga losa y viga +3.45 +3.45 losa y viga
0.40 0.40
7.75
0.40 0.40 0.40 0.40

2.90 2.90
7.75 7.75
7.75 7.75

2.90 2.90 2.30 2.30

NS-S/C-1 +0.15 +0.15 NS-S/C-1 2.90

NPT +0.00 0.40 0.40 +0.00 NPT NS-S/E-2 +0.75 +0.75 NS-S/E-2
4.15

NFC-1 -0.75 0.50 0.50 -0.75 NFC-1 NS-S/C-1 +0.15 +0.15 NS-S/C-1
NS-S/C-1 +0.15 +0.15 NS-S/C-1 NS-S/C-1 +0.15 0.60 +0.15 NS-S/C-1
0.15
0.35 0.35 NPT +0.00 0.40 +0.00 NPT 1.00
0.15 0.15
NPT +0.00 +0.00 NPT 0.75
NPT +0.00 0.25
+0.00 NPT
cimetacion de zapata -1.60 0.50 0.50 -1.60 cimetacion de zapata NFC-1 -0.75 0.50 -0.75 NFC-1
0.75
NFC-1 -0.75 -0.75 NFC-1 NFC-1 -0.75 0.50 0.50 -0.75 NFC-1
0.35 0.35
0.35 0.35 0.35
cimetacion de zapata -1.60 0.50 0.50 -1.60 cimetacion de zapata
cimetacion de zapata -1.60 0.50 0.50 -1.60 cimetacion de zapata cimetacion de zapata -1.60 0.50 0.50 -1.60 cimetacion de zapa

PORTICO EJE 1-1 PORTICO EJE 3-3


1 1 : 50 3 1 : 50
PORTICO EJE 2-2 PORTICO EJE 4-4
2 1 : 50
4 1 : 50

5 4 3 2

Nivel 3 +6.15 +6.15 Nivel 3

0.40

2.30

{3D}
5
losa y viga +3.45 +3.45 losa y viga

0.40

7.75

2.30

NS-S/E-2 +0.75 VIVIENDA BIFAMILAIR EN EL DISTRITO DE HUARAZ,


0.40
PROVINCIA DE HUARAZ, DEPARTAMENTO DE ANCASH
+0.15 NS-S/C-1
cimentaciones -0.15 0.50
+0.00 NPT

-0.75 NFC-1 V°B°: PROYECTO: ESCALA:


0.95
PLANO ESTRUCTURAL INDICADA
cimetacion de zapata -1.60 0.50 -1.60 cimetacion de zapata

UBICACIÓN: RESPONSABLE: LÁMINA:

PE-03
CONSWA Ingenieros
DEPARTAMENTO: ANCASH
PROVINCIA: HUARAZ MODELADOR BIM:
PORTICO EJE A-A DISTRITO: HUARAZ PEREZ FLORES WALTER CESAR.
8 1 : 50 LOCALIDAD: LA SOLEDAD 01 DE 100
FECHA: DICIEMBRE, 2023

También podría gustarte