Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Plano Estructural 03
Plano Estructural 03
2.90 2.90
7.75 7.75
7.75 7.75
NPT +0.00 0.40 0.40 +0.00 NPT NS-S/E-2 +0.75 +0.75 NS-S/E-2
4.15
NFC-1 -0.75 0.50 0.50 -0.75 NFC-1 NS-S/C-1 +0.15 +0.15 NS-S/C-1
NS-S/C-1 +0.15 +0.15 NS-S/C-1 NS-S/C-1 +0.15 0.60 +0.15 NS-S/C-1
0.15
0.35 0.35 NPT +0.00 0.40 +0.00 NPT 1.00
0.15 0.15
NPT +0.00 +0.00 NPT 0.75
NPT +0.00 0.25
+0.00 NPT
cimetacion de zapata -1.60 0.50 0.50 -1.60 cimetacion de zapata NFC-1 -0.75 0.50 -0.75 NFC-1
0.75
NFC-1 -0.75 -0.75 NFC-1 NFC-1 -0.75 0.50 0.50 -0.75 NFC-1
0.35 0.35
0.35 0.35 0.35
cimetacion de zapata -1.60 0.50 0.50 -1.60 cimetacion de zapata
cimetacion de zapata -1.60 0.50 0.50 -1.60 cimetacion de zapata cimetacion de zapata -1.60 0.50 0.50 -1.60 cimetacion de zapa
5 4 3 2
0.40
2.30
{3D}
5
losa y viga +3.45 +3.45 losa y viga
0.40
7.75
2.30
PE-03
CONSWA Ingenieros
DEPARTAMENTO: ANCASH
PROVINCIA: HUARAZ MODELADOR BIM:
PORTICO EJE A-A DISTRITO: HUARAZ PEREZ FLORES WALTER CESAR.
8 1 : 50 LOCALIDAD: LA SOLEDAD 01 DE 100
FECHA: DICIEMBRE, 2023