According to
Plans and
1 Technical 100%
Specifications
According to
Plans and
2 Technical 100%
Specifications
According to
Plans and
3 Technical 100%
Specifications
According to
Plans and
4 Technical 100%
Specifications
According to
Plans and
5 Technical 100%
Specifications
According to
Plans and
6 Technical 100%
Specifications
According to
Plans and
7 Technical 100%
Specifications
According to
Plans and
8 Technical 100%
Specifications
According to
Plans and
9 Technical 100%
Specifications
According to
Plans and
10 Technical 100%
Specifications
(*) Se marcarán en el Layout de PAT CTIN con números los extremos de cada tramo recto de bandeja de modo que se pueda definir cada una como un tramo entre dos números.
Se comprueba:
1ª Fase de ejecución / 1st Execution phase:
El correcto estado y tendido del conductor de cobre. En caso de la realización de empalmes en el conductor, se harán mediante soldadura y se indicará el lugar. Latiguillo de unión entre bandeja y pilar sin tensiones. conexión a pilar mediante terminal adecuado, sin hilos por fuera y correcta sujeción mediante autotaladrante o tuerca. Se dará un baño con pintura de cinc alrededor del taladro. Soldaduras libres de burbujas
y sin perdida sustancial de material fundente. Conexión a electrodos (si aplica) según instrucciones del fabricante. Electrodos y/o picas de PaT instalados según fabricante y planos.
2ª Fase de ejecución:
Ensayo de continuidad de bandejas según el procedimiento recogido en el CAP.
Observaciones:
Contratista (Firma/Fecha):
Contractor (Signature/Date):
1500
394070
0.0038064303
ABENSUR Programa de Puntos de inspección
P.P.I.Nº EC016
Hoja:
Rev.: 0
Operaciones mantenimiento
Hoja:
Rev.: 0
Operaciones mantenimiento
Hoja:
Rev.: 0
Operaciones mantenimiento