PLANILLA DE COMPUTOS METRICOS

PROYECTO: VIVIENDA UNIFAMILIAR

CANTIDAD POSITIVA
Nro. Nro. CANTIDAD NEGATIVA
N° ACTIVIDAD PARC. TOTAL 0BS.

UNID. PAR LARGO ANCHO ALTO TOTAL PAR LARGO ANCHO ALTO TOTAL
1.- OBRAS PRELIMINARES

LETRERO DE OBRAS (STANDAR) HAGÁMOSLO POR TRINIDAD PZA 1.00


1
1.00 1.00 1.00

REPLANTEO Y TRAZADO DE OBRA (MENORES) M2 131.44

A1 1.00 11.40 2.84 32.38

2 A2 1.00 7.65 1.41 10.79

A3 1.00 7.65 1.54 11.78

A4 1.00 8.50 9.00 76.50 131.44

LIMPIEZA Y DESHIERBE DEL TERRENO M2 312.50


3
L1 1.00 25.00 12.50 312.50 312.50

PERFILADO Y NIVELACION MANUAL DEL TERRENO M2 131.44


4
IDEM REPLANTEO 1.00 131.44 131.44 131.44

CERRAMIENTO PERIMETRAL GLB 1.00


5
1.00 1.00 1.00

INSTALACION DE FAENAS GLB 1.00


6
1.00 1.00 1.00

ACOMETIDA ELECTRICA GLB


7
1.00 1.00 1.00

EXCAVACION MANUAL TERRENO SEMI DURO (0 - 1.5M.) M3 13.81


EJE 1 (A-G) 1.00 11.40 0.30 0.25 0.86 0.86

EJE 2 (E-F) 1.00 2.75 0.30 0.25 0.21 0.21

EJE 3 (A´-E) 1.00 7.65 0.30 0.25 0.57 0.57

EJE 4 (A´-D) 1.00 6.17 0.30 0.25 0.46 0.46


8
EJE 5 (E-F) 1.00 2.75 0.30 0.25 0.21 0.21

EJE 6 (A-D) 1.00 5.22 0.30 0.25 0.39 0.39

EJE 7 (A-D) 1.00 5.22 0.30 0.25 0.39 0.39


8

EJE 8 (A-E´) 1.00 8.50 0.30 0.25 0.64 0.64

EJE A (1-8) 1.00 16.30 0.30 0.25 1.22 1.22

EJE B (4-7) 1.00 2.32 0.30 0.25 0.17 0.17

EJE C (1-3) 1.00 4.35 0.30 0.25 0.33 0.33

EJE D (4-7) 1.00 7.24 0.30 0.25 0.54 0.54

EJE E (1-3´) 1.00 5.20 0.30 0.25 0.39 0.39

8 EJE E´ (5-8) 1.00 9.00 0.30 0.25 0.67 0.67

EJE F (2-5) 1.00 4.46 0.30 0.25 0.33 0.33

EJE G (1-2) 1.00 2.84 0.30 0.25 0.21 0.21

PARED DE BAÑOS 2.00 1.41 0.30 0.25 0.21 0.21

ZAPATAS 6.00 1.00 1.00 1.00 6.00 6.00

2.- TRABAJOS DE INFRAESTRUCTURA


CIMIENTO DE LADRILLO CORRIDO M3

LONG. DE EXC. DE MURO 1.00 102.78

COLUMNAS
EJE 1 (A-G) 1.00 0.20 0.20

EJE 2 (E-F) 1.00 0.10 0.10

EJE 4 (A´-D) 2.00 0.10 0.20

EJE 6 (A-D) 1.00 0.20 0.20

EJE 7 (A-D) 1.00 0.10 0.10

EJE 8 (A-E´) 1.00 0.40 0.40


9
EJE A (1-8) 1.00 0.50 0.50

EJE 3 (A´-E) 1.00 0.20 0.20

EJE C (1-3) 1.00 0.10 0.10

EJE D (4-7) 1.00 0.30 0.30

EJE E´ (5-8) 1.00 0.30 0.30

EJE F (2-5) 1.00 0.00

12.90
100.18 0.24 0.22 5.29

100.18 0.38 0.2 7.61

VIGA DE ARRIOSATRE M3 6.17


10
1.00 102.78 0.20 0.30 6.17

IMPERMEABILIZACION M2 19.40

11
LONG. DE EXC. DE MURO 102.78
11
PUERTAS 2.00 0.85 1.70

1.00 0.70 0.70

3.00 0.60 1.80

2.00 0.80 1.60


11

96.98 0.20 19.40

BASE DE HORMIGON POBRE M3 1.28


12
LONG. DE EXC. DE MURO 1.00 102.78 0.25 0.05 1.28 1.28

COLUMNAS M3 2.52
13
17.00 0.15 0.30 3.30 2.52 2.52

SOLDADO DE LADRILLO TUBULAR CARGA 1:5 M3 2.60


EJE 1 (A-G) 1.00 11.40 0.25 0.10 0.29 0.29

EJE 2 (E-F) 1.00 2.75 0.25 0.10 0.07 0.07

EJE 3 (A´-E) 1.00 7.65 0.25 0.10 0.19 0.19

EJE 4 (A´-D) 1.00 6.17 0.25 0.10 0.15 0.15

EJE 5 (E-F) 1.00 2.75 0.25 0.10 0.07 0.07 27.97


EJE 6 (A-D) 1.00 5.22 0.25 0.10 0.13 0.13

EJE 7 (A-D) 1.00 5.22 0.25 0.10 0.13 0.13

EJE 8 (A-E´) 1.00 8.50 0.25 0.10 0.21 0.21


14
EJE A (1-8) 1.00 16.30 0.25 0.10 0.41 0.41

EJE B (4-7) 1.00 2.32 0.25 0.10 0.06 0.06

EJE C (1-3) 1.00 4.35 0.25 0.10 0.11 0.11

EJE D (4-7) 1.00 7.24 0.25 0.10 0.18 0.18

EJE E (1-3´) 1.00 5.20 0.25 0.10 0.13 0.13

EJE E´ (5-8) 1.00 9.00 0.25 0.10 0.23 0.23

EJE F (2-5) 1.00 4.46 0.25 0.10 0.11 0.11

EJE G (1-2) 1.00 2.84 0.25 0.10 0.07 0.07

PARED DE BAÑOS 2.00 1.41 0.25 0.10 0.07 0.07

ZAPATAS DE H*A C/GRAVA M3 2.63


15 CON ARENA PACANOVA 1:3:4
ZAPATAS 6.00 1.00 1.00 0.25 1.50 1.50

COLUMNA DE H*A C/GRAVA Y ARENA M3 1.13

16
PACANOVA 1::2:3
16 ZAPATA CUELLO COLUMNA 6.00 0.25 0.25 3.00 1.13 1.13

VIGA CADENA H*A C/GRAVA Y ARENA M3 4.70

PACANOVA 1::2:3
EJE 1 (A-G) 1.00 11.40 0.15 0.30 0.51

EJE 2 (E-F) 1.00 2.75 0.15 0.30 0.12

EJE 3 (A´-E) 1.00 7.65 0.15 0.30 0.34

EJE 4 (A´-D) 1.00 6.17 0.15 0.30 0.28

EJE 5 (E-F) 1.00 2.75 0.15 0.30 0.12

EJE 6 (A-D) 1.00 5.40 0.15 0.30 0.24

EJE 7 (A-D) 1.00 5.22 0.15 0.30 0.23

17 EJE 8 (A-E´) 1.00 8.50 0.15 0.30 0.38

EJE A (1-8) 1.00 16.30 0.15 0.30 0.73

EJE B (4-7) 1.00 2.32 0.15 0.30 0.10

EJE C (1-3) 1.00 4.35 0.15 0.30 0.20

EJE D (4-7) 1.00 7.24 0.15 0.30 0.33

EJE E (1-3´) 1.00 5.20 0.15 0.30 0.23

EJE E´ (5-8) 1.00 9.00 0.15 0.30 0.40

EJE F (2-5) 1.00 4.46 0.15 0.30 0.20

EJE G (1-2) 1.00 2.84 0.15 0.30 0.13

PARED DE BAÑOS 2.00 1.41 0.15 0.30 0.13

LOSA ALIVIANADA M2 21.67


18
1.00 8.50 2.55 21.67

MURO DE LADRILLO TUBULAR M3 291.35


EJE 1 (A-F) 1.00 9.45 2.90 27.40

EJE 2 (E-F) 1.00 2.75 3.25 8.94

P1 1.00 0.70 2.70 1.89

V1 1.00 0.50 0.70 0.35

EJE 3 (A-E) 1.00 6.70 3.36 22.51

19 P3 2.00 0.80 2.70 4.32

EJE 4 (A-D) 1.00 5.21 3.60 18.76


19

EJE 5 (E-F) 1.00 2.75 3.25 8.94

EJE 6 (A-D) 1.00 5.22 3.60 18.79

EJE 7 (A-D) 1.00 5.22 3.60 18.79

EJE 8 (A-E´) 1.00 8.50 3.05 25.92

EJE A (1-8) 1.00 16.30 3.00 48.90

V1 1.00 1.20 1.60 1.92

EJE B (4-7) 2.00 2.32 3.00 13.92

P2 1.00 0.60 2.70 1.62

EJE C (1-3) 1.00 4.35 3.77 16.40

EJE D (4-7) 1.00 7.24 4.20 30.41

P3 2.00 0.80 2.70 4.32

V3 2.00 1.50 1.60 4.80

19 EJE E (1-3´) 1.00 5.20 3.10 16.12

V1 1.00 1.20 1.60 1.92

EJE F (2-5) 1.00 4.46 2.79 12.44

V3 1.00 1.50 1.60 2.40

PARED DE BAÑOS 2.00 1.41 3.00 8.46

P2 1.00 0.60 2.70 1.62

EJE E´ (5-8) 1.00 9.00 3.10 27.90

P4 2.00 1.50 2.70 8.10

MESON DE H*A M2 3.00


20 C/REVEST. DE AZULEJO E=0,07M
COCINA 1.00 3.20 0.60 1.92 1.92

COMEDOR 1.00 1.80 0.60 1.08 1.08

CIELO RASO ESTUCADO BAJO LOSA M2 20.97


21 ITEM LOSA 1.00 21.67 21.67

ITEM DE VIGA CADENA 1.00 4.70 0.15 0.70 0.70

REVOQUE DE CEMENTO INTERNO Y EXTERNO E=2CM M2 593.77


ITEM MURO 2.00 291.35 582.70 582.70

ITEM VIGA CADENA 2.00 4.70 9.39 9.39

C3 2.00 0.20 3.00 1.20 1.20

22 C2 2.00 0.20 4.20 1.68 1.68

C2 1.00 0.20 3.10 0.62 0.62


22

C1 1.00 0.20 3.10 0.62 0.62

C1 1.00 0.20 2.79 0.56 0.56

AZULEJO 1.00 3.00 3.00

RELLENO Y APISONADOMANUAL INCL MAT, DE RELLENO M3 23.83


23 DORMITORIO 2.00 4.20 3.20 0.14 3.76 3.76

BAÑO 1.00 1.90 1.26 0.14 0.34 0.34

BAÑO PRIVADO 2.00 2.17 1.26 0.14 0.77 0.77

SUITE 1.00 5.11 3.52 0.14 2.52 2.52

SUITE 1.00 5.11 3.42 0.14 2.45 2.45

COCINA 1.00 4.37 2.60 0.14 1.59 1.59

COMEDOR 1.00 5.78 3.06 0.14 2.48 2.48

23 PASILLO INTERIOR 1.00 8.35 3.14 0.14 3.67 3.67

GALERIA 1.00 8.50 2.55 0.14 3.03 3.03

PATIO 1.00 2.84 2.75 0.14 1.09 1.09

AREA DE SERVICIO 1.00 2.84 1.95 0.14 0.78 0.78

PASILLO INTERIOR 1.00 4.50 1.41 0.14 0.89 0.89

PASILLO INTERIOR 1.00 2.70 1.26 0.14 0.48 0.48

CONTRAPISO DE H* C/GRAVA M3 170.24


DORMITORIO 2.00 4.20 3.20 26.88 26.88

BAÑO 1.00 1.90 1.26 2.39 2.39

BAÑO PRIVADO 2.00 2.17 1.26 5.47 5.47

SUITE 1.00 5.11 3.52 17.99 17.99

SUITE 1.00 5.11 3.42 17.48 17.48

COCINA 1.00 4.37 2.60 11.36 11.36


24
COMEDOR 1.00 5.78 3.06 17.69 17.69

PASILLO INTERIOR 1.00 8.35 3.14 26.22 26.22

GALERIA 1.00 8.50 2.55 21.67 21.67

PATIO 1.00 2.84 2.75 7.81 7.81

AREA DE SERVICIO 1.00 2.84 1.95 5.54 5.54

PASILLO INTERIOR 1.00 4.50 1.41 6.35 6.35

PASILLO INTERIOR 1.00 2.70 1.26 3.40 3.40

PISO CERRAMICA ESMALTADA M2 165.51

25 ITEM CONTRAPISO 1.00 170.24 170.24


25

INGRESO DEPOSIT DE RESIDUOS 1 2.2 2.15 4.73

ZOCALO DE CERAMICA ESMALTADA H=10CM ML 118.17


DORMITORIO 2.00 15.10 30.20 30.20

PASILLO INTERIOR 1.00 19.52 19.52 19.52


26
SUITE 1.00 16.29 16.29 16.29

SUITE 1.00 15.98 15.98 15.98

COCINA 1.00 11.60 11.60 11.60

COMEDOR 1.00 2.18 2.18 2.18

PASILLO INTERIOR 1.00 19.70 19.70 19.70


26
COLUMNAS 11.00 0.20 2.20 2.20

COLUMNAS 10.00 0.05 0.50 0.50

MESON GRANITO PULIDO ML 1.60


27
BAÑO PRIVADO 2.00 0.80 1.60 1.60

DINTEL DE LADRILLO TUBULARARMADO ML 54.25


P1, V2 2.00 2.75 5.50 5.50

P2 2.00 2.32 4.64 4.64

P2 1.00 1.41 1.41 1.41

P3 2.00 3.35 6.70 6.70

28 P3, V3 2.00 3.67 7.34 7.34

P3, V3 2.00 3.57 7.14 7.14

P4 1.00 3.00 3.00 3.00

P4 1.00 5.30 5.30 5.30

V1 2.00 4.35 8.70 8.70

V3 1.00 4.52 4.52 4.52

PROV. Y COLOC. VENTANAS M2 11.39


MADERA CARP. ALUMINIO

VIDRIO 4MM C/MALLA


29
V1 2.00 1.20 1.60 3.84 3.84

V2 1.00 0.50 0.70 0.35 0.35

V3 3.00 1.50 1.60 7.20 7.20

PROV Y COLOCADO DE PUERTA M2 15.39


MADERA C/MARCO

30 P1 1.00 0.70 2.70 1.89 1.89


30

P2 3.00 0.60 2.70 4.86 4.86

P3 4.00 0.80 2.70 8.64 8.64

PROV. COLOCADO DE PUERTA BLINDEX 5MM M2 8.10


31
P4 2.00 1.50 2.70 8.10 8.10

PINTUIRA LATEX INT Y EXT (PINTURA BLANCA) 614.74


32 ITEM REVOQUE 1.00 593.77 593.77

ITEM CIELO RAZO 1.00 20.97 20.97

BARNIZADO DE CARPINTERIA DE MADERA M2 30.78


P1 (X2) 2.00 0.70 2.70 3.78 3.78
33
P2 (X2) 6.00 0.60 2.70 9.72 9.72

P3 (X2) 8.00 0.80 2.70 17.28 17.28

CUBIERTA DE TEJA COLONIAL S/ TIJERA DE MADERA M2 167.21


A1 1.00 16.70 5.98 99.87 99.87

A2 1.00 1.81 0.35 0.63 0.63


34
A3 1.00 3.04 2.11 6.41 6.41

A4 1.00 4.66 5.09 23.72 23.72

A5 1.00 9.19 3.98 36.58 36.58

3.- INSTALACIONES
CAMARA DE INSPECCION PREFABRICADA (0.60X0.60) H=0.45M PZA 1.00
35
1.00 1.00 1.00

PROV. Y COLOC. LLAVE DE PASO 3/4" PZA 30.00


36
1.00 30.00 30.00 30.00

PROV. E INST. INODORO TANQUE BAJO PZA 3.00


37
BLANCO 3.00 3.00 3.00

PROV. E INST. LAVAMANOS C/PEDESTAL PZA 2.00


38
BLANCO 2.00 2.00 2.00

CAMARA SEPTICA 3,00 X 2,00 X 2,15 M PZA 1.00


39
1.00 1.00 1.00

POZO ABSORVENTE D=2,00M.H =8M PZA


40
1.00 1.00 1.00

PROVICION DE BOMBA SEMERGIBLE PZA 1.00


41
41
1.00 1.00 1.00

INST. TOMACORRIENTES DOBLES (EMPOTRADA) PTO 3.00


42
3.00 3.00 3.00

PROV. E INST. DE LAVAPLATOS C/ GRIFO PZA 1.00


43
1.00 1.00 1.00