MUNICIPALIDAD DISTRITAL DE HUANCAYO

PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

01.00.00 ESTRUCTURAS
01.01.00 OBRAS PROVISIONALES 1.00 GLB
01.01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS, HERRAMIENTAS PA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

TRANSPORTE DE EQUIPOAS Y HERRAMIENTAS 1.00 - - - - 1.00 1.00

1.00 UND
01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA 3.60m. x 2.40m. # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

CARTEL DE OBRA 1.00 - - - - 1.00 1.00

6.00 MES
01.01.03 CASETA ADICIONAL P /GUARDIANIA Y*O DEPOSITOS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

ALMACEN DE OBRA 1.00 - - - 6.00 6.00 6.00

01.02.00 OBRAS PRELIMINARES 710.74 M2


01.02.01 LIMPIEZA DE TERRENO MANUAL # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 01
LIMPIEZA DE TERRENO 1.00 - 35.10 5.87 - 206.04 206.04

PABELLON 02
LIMPIEZA DE TERRENO 1.00 - 35.10 5.87 - 206.04 206.04

PABELLON 03
LIMPIEZA DE TERRENO 1.00 - 31.55 5.87 - 185.20 185.20

PABELLON 04
LIMPIEZA DE TERRENO 1.00 - 19.33 5.87 - 113.47 113.47

6.00 MES
01.02.02 TRAZO NIVELACION Y REPLANTEO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

TODA LA INSTITUCION EDUCATIVA 0.00 1.00 6.00 6.00 6.00

71.13 M2
01.02.03 DEMOLICION DE MUROS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

EN EL MURO PERIMETRICO PARA LA CONSTRUCCION DE ACCESO 1.00 - 28.45 2.5 71.13 71.13

28.45 M2
01.02.04 DEMOLICION DE CIMIENTO Y SOBRECIMIENTO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

EN EL MURO PERIMETRICO PARA LA CONSTRUCCION DE ACCESO 1.00 - 28.45 28.45 28.45

275.39 M2
01.02.05 DEMOLICION DE VEREDAS EXTERIORES # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

EN EL MURO PERIMETRICO PARA LA CONSTRUCCION DE ACCESO 1.00 - 275.39 275.39 275.39

909.95 M2
01.02.06 DEMOLICION DE LOSAS DEPORTIVAS # Veces # Elementos Area. M2 Ancho m Alto m Parcial Total UND

LOSA N° 01 1.00 - 410.10 410.10 410.10


LOSA N° 04 1.00 - 499.85 499.85 499.85

179.80 M3
01.02.07 TRANSPORTE DE MATERIAL DE ESCOMBROS # Veces # Elementos Area. M2 Ancho m Alto m Parcial Total UND

DEMOLICION DE MUROS 1.00 - 71.13 0.15 10.67


DEMOLICION DE CIMIENTO Y SOBRECIMIENTO 1.00 - 28.45 0.32 9.10
DEMOLICION DE VEREDAS EXTERIORES 1.00 - 275.39 0.1 27.54
DEMOLICION DE LOSAS DEPORTIVAS 1.00 - 909.95 0.1 91.00
138.31
F. esponj. 1.30
179.80

01.03.00 SEGURIDAD Y SALUD 1.00 GLB


01.03.01 EQUIPOS DE PROTECCIÓN INDIVIDUAL # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 - - 1.00 1.00

1.00 GLB
ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN DE
01.03.02 # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND
SEGURIDAD Y SALUD EN EL TRABAJO

1.00 - - 1.00 1.00

1.00 GLB
01.03.03 EQUIPOS DE PROTECCIÓN COLECTIVA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 - - 1.00 1.00

1.00 GLB
01.03.04 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 - - 1.00 1.00

1.00 GLB
01.03.05 CAPACITACIÓN EN SEGURIDAD Y SALUD # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 - - 1.00 1.00

1.00 GLB
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y
01.03.06 # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND
SALUD DURANTE EL TRABAJO

1.00 - - 1.00 1.00

01.04.00 MOVIMIENTO DE TIERRAS 1936.97 M3


01.04.01 EXCAVACION MASIVA CON EQUIPO. # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
volumem m3
modulo de primeria 1.00 1.00 1827.50 1827.50
modulo de secundaria 1 1 109.473 109.47

194.23 M3
01.04.02 EXCAVACION DE ZANJAS PARA CIMIENTOS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 01

EJES A ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.13 0.50 2.10 7.49
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.13 0.50 2.10 7.49

EJES B ENTRE
EJE 10-11-12 1.00 1.00 6.07 0.40 2.10 5.10

EJES C ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.97 0.50 2.10 8.37
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.98 0.50 2.10 8.38

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 2.10 3.76

EJE 3 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 2.10 3.76

EJE 5 y 6 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.90 2.10 3.99

EJE 7 y 8 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.90 2.10 3.99

EJE 10 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 2.10 3.76

EJE 11 ENTRE
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE A-B, B-C 1.00 1.00 3.52 0.50 2.10 3.70

EJE 1 2 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 2.10 3.76

ESCALERA

1.00 1.00 1.50 0.55 0.85 0.70

PABELLON 02

EJES A ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.13 0.50 2.10 7.49
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.13 0.50 2.10 7.49

EJES B ENTRE
EJE 10-11-12 1.00 1.00 6.07 0.40 2.10 5.10

EJES C ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.97 0.50 2.10 8.37
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.98 0.50 2.10 8.38

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 2.10 3.76

EJE 3 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 2.10 3.76

EJE 5 y 6 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.90 2.10 3.99

EJE 7 y 8 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.90 2.10 3.99

EJE 10 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 2.10 3.76

EJE 11 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.50 2.10 3.70

EJE 1 2 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 2.10 3.76

ESCALERA

1.00 1.00 1.50 0.55 0.85 0.70

PABELLON 3
EJES A ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 10.17 0.50 1.60 8.14
EJE 6-7, 7-8, 8-9, 9-10 1.00 1.00 10.17 0.50 1.60 8.14

EJES C ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 10.17 0.50 1.60 8.14
EJE 6-7, 7-8, 8-9, 9-10 1.00 1.00 10.17 0.50 1.60 8.14

EJE 1 Y 10 ENTRE
EJE A-B, B-C 2.00 1.00 3.06 0.50 1.60 4.90

EJE 2 Y 9 ENTRE
EJE A-B, B-C 2.00 1.00 4.17 0.50 1.60 6.67

EJE 5 y 6 ENTRE
EJE A-B, B-C 1.00 1.00 2.82 0.80 1.60 3.61

PABELLON 4
EJES A ENTRE
EJE 3 AL 7 1.00 1.00 4.79 0.50 2.10 5.03

EJES C ENTRE
EJE 3 AL 7 1.00 1.00 4.79 0.50 2.10 5.03

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 2.17 0.50 2.10 2.28

EJE 2 -3 ENTRE
EJE A-B, B-C 1.00 1.00 0.29 0.85 2.10 0.52

EJE 6 ENTRE
EJE A-B, B-C 1.00 1.00 3.47 0.50 2.10 3.64

EJE 7 ENTRE
EJE A-B, B-C 1.00 1.00 0.78 0.50 2.10 0.82

ESCALERA

1.00 1.00 1.50 0.55 0.85 0.70


MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
#VALUE! M3
01.04.03 EXCAVACION DE ZANJAS PARA ZAPATAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
Z-1 8.00 1.00 2.10 2.50 #VALUE!
Z-2 8.00 1.00 1.60 1.60 2.50 51.20
Z-3 2.00 1.00 1.20 1.20 2.50 7.20
Z-4 6.00 1.00 1.40 1.15 2.50 24.15
Z-5 2.00 1.00 2.00 1.70 2.50 17.00
0.00
PABELLON 2 0.00
Z-1 8.00 1.00 2.50 2.10 2.50 105.00
Z-2 8.00 1.00 1.60 1.60 2.50 51.20
Z-3 2.00 1.00 1.20 1.20 2.50 7.20
Z-4 6.00 1.00 1.40 1.15 2.50 24.15
Z-5 2.00 1.00 2.00 1.70 2.50 17.00

PABELLON 3 0.00
Z-1 12.00 1.00 1.20 1.00 2.00 28.80
Z-2 4.00 1.00 2.00 1.40 2.00 22.40
Z-3 2.00 1.00 2.50 1.80 2.00 18.00
Z-4 2.00 1.00 1.15 1.00 2.00 4.60
Z-5 1.00 1.00 1.30 1.00 2.00 2.60
0.00
PABELLON 4 0.00
ZC-1 1.00 1.00 5.40 2.50 2.50 33.75
Z-1 3.00 1.00 2.80 2.30 2.50 48.30
Z-2 3.00 1.00 2.50 2.00 2.50 37.50
Z-3 1.00 1.00 3.00 2.60 2.50 19.50
Z-4 2.00 1.00 1.80 1.80 2.50 16.20
Z-5 1.00 1.00 1.40 1.40 2.50 4.90
Z-6 3.00 1.00 1.35 1.60 2.50 16.20

MURO DE CONTENCION
MURO TIPO I AREA CAD
MC-01 1.00 1.00 4.00 3.65 14.60
MC-02 1.00 1.00 4.00 3.65 14.60

MURO TIPO II
MC-03 1.00 1.00 3.86 8.62 33.27
MC-04 1.00 1.00 8.48 8.62 73.10
MC-05 1.00 1.00 8.52 8.62 73.44
MC-06 1.00 1.00 0.99 8.62 8.53
MC-07 1.00 1.00 8.32 8.62 71.72
MC-08 1.00 1.00 3.91 8.62 33.70
MC-09 1.00 1.00 1.76 8.62 15.17
MC-10 1.00 1.00 3.00 8.62 25.86
MC-11 1.00 1.00 6.45 8.62 55.60
MC-12 1.00 1.00 2.13 8.62 18.36
MC-13 1.00 1.00 3.51 8.62 30.26
MC-14 1.00 1.00 6.45 8.62 55.60
MC-15 1.00 1.00 6.45 8.62 55.60
MC-16 1.00 1.00 6.42 8.62 55.34

903.27 M3
01.04.04 RELLENO CON MATERIAL DE PRESTAMO EN CAPAS DE 20 CM. # Veces # Elementos Long. m Area= Parcial Total UND

PABELLON 01

CIMIENTOS
EJES A ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.13 0.46 3.28
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.13 0.46 3.28
EJE 6-7 1.00 1.00 1.55 0.77 1.19

EJES B ENTRE
EJE 10-11-12 1.00 1.00 6.07 0.09 0.55

EJES C ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.97 0.46 3.67
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.98 0.46 3.67
EJE 6-7 1.00 1.00 1.95 0.77 1.50

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.66 1.69

EJE 2 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.77 2.71

EJE 3 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.66 1.69

EJE 4 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.77 2.71

EJE 5 y 6 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.57 1.20

EJE 7 y 8 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.57 1.20

EJE 9 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.77 2.71

EJE 10 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.69 1.77

EJE 11 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.47 1.65

EJE 1 2 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.59 1.51

ZAPATAS ALTO

Z-1
EJES A ENTRE
EJE 2-4 y 9 3.00 1.00 1.45 4.35 18.92
EJE 3y 10 2.00 1.00 1.45 1.96 5.68

EJES C ENTRE
EJE 2-4-9 Y 11 4.00 1.00 1.45 4.35 25.23

Z-2
EJES A ENTRE
EJE 1 y 12 2.00 1.00 1.45 2.10 6.09
EJE 3y 10 2.00 1.00 1.45 1.96 5.68
EJE 5-6 Y 7-8 2.00 1.00 1.45 1.55 4.50

EJES C ENTRE
EJE 5-6 y 7-8 2.00 1.00 1.45 1.59 4.61
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

Z-3
EJES C ENTRE
EJE 1 y 12 2.00 1.00 1.45 1.08 3.13

z-4
EJES B ENTRE
EJE 1 , 3, 10 Y 12 4.00 1.00 1.45 1.26 7.31

EJES C ENTRE
EJE 2-3 y 10 2.00 1.00 1.45 1.15 3.34

Z-5
EJES A ENTRE
EJE 5-6 y 7-8 2.00 1.00 1.45 2.43 7.05

PABELLON 02

CIMIENTOS
EJES A ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.13 0.46 3.28
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.13 0.46 3.28
EJE 6-7 1.00 1.00 1.55 0.77 1.19

EJES B ENTRE
EJE 10-11-12 1.00 1.00 6.07 0.09 0.55

EJES C ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.97 0.46 3.67
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.98 0.46 3.67
EJE 6-7 1.00 1.00 1.95 0.77 1.50

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.66 1.69

EJE 2 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.77 2.71

EJE 3 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.66 1.69

EJE 4 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.77 2.71

EJE 5 y 6 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.57 1.20

EJE 7 y 8 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.57 1.20

EJE 9 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.77 2.71

EJE 10 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.69 1.77

EJE 11 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.47 1.65

EJE 1 2 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.59 1.51

ZAPATAS ALTO

Z-1
EJES A ENTRE
EJE 2-4 y 9 3.00 1.00 1.45 4.35 18.92
EJE 3y 10 2.00 1.00 1.45 1.96 5.68

EJES C ENTRE
EJE 2-4-9 Y 11 4.00 1.00 1.45 4.35 25.23

Z-2
EJES A ENTRE
EJE 1 y 12 2.00 1.00 1.45 2.10 6.09
EJE 3y 10 2.00 1.00 1.45 1.96 5.68
EJE 5-6 Y 7-8 2.00 1.00 1.45 1.55 4.50

EJES C ENTRE
EJE 5-6 y 7-8 2.00 1.00 1.45 1.59 4.61

Z-3
EJES C ENTRE
EJE 1 y 12 2.00 1.00 1.45 1.08 3.13

z-4
EJES B ENTRE
EJE 1 , 3, 10 Y 12 4.00 1.00 1.45 1.26 7.31

EJES C ENTRE
EJE 2-3 y 10 2.00 1.00 1.45 1.15 3.34

Z-5
EJES A ENTRE
EJE 5-6 y 7-8 2.00 1.00 1.45 2.43 7.05

PABELLON 3
EJES A ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 10.17 0.32 3.25
EJE 6-7, 7-8, 8-9, 9-10 1.00 1.00 10.17 0.32 3.25

EJES C ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 10.17 0.32 3.25
EJE 6-7, 7-8, 8-9, 9-10 1.00 1.00 10.17 0.32 3.25

EJE 1 Y 10 ENTRE
EJE A-B, B-C 2.00 1.00 3.06 0.25 1.53

EJE 2 Y 9 ENTRE
EJE A-B, B-C 2.00 1.00 4.17 0.32 2.67

EJE 5 y 6 ENTRE
EJE A-B, B-C 1.00 1.00 2.82 0.26 0.73

ZAPATAS ALTO

Z-1
EJES A ENTRE
EJE 2-3 y 4 3.00 1.00 1.05 0.79 2.49
EJE 7 -8 Y 9 3.00 1.00 1.05 0.79 2.49

EJES C ENTRE
EJE 2-3 y 4 3.00 1.00 1.05 0.79 2.49
EJE 7 -8 Y 9 3.00 1.00 1.05 0.79 2.49
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

Z-2
EJES A ENTRE
EJE 1 y 10 2.00 1.00 1.05 2.31 4.85

EJES C ENTRE
EJE 1 y 10 2.00 1.00 1.05 2.31 4.85

Z-3
EJES A Y C ENTRE
EJE 5-6 2.00 1.00 1.05 3.45 7.25

z-4
EJES B ENTRE
EJE 1 Y 10 2.00 1.00 1.05 0.86 1.81

Z-5
EJES A ENTRE
EJE 5-6 y 7-8 1.00 1.00 1.05 0.75 0.79

PABELLON 4
EJES A ENTRE
EJE 3 AL 7 1.00 1.00 4.79 1.83 8.77

EJES C ENTRE
EJE 3 AL 7 1.00 1.00 4.79 1.83 8.77

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 2.17 2.53 5.49

EJE 2 -3 ENTRE
EJE A-B, B-C 1.00 1.00 0.29 1.98 0.57

EJE 6 ENTRE
EJE A-B, B-C 1.00 1.00 3.47 1.88 6.52

EJE 7 ENTRE
EJE A-B, B-C 1.00 1.00 0.78 1.83 1.43

ZAPATAS ALTO

Z-1
EJES A ENTRE
EJE 4-5 y 6 3.00 1.00 1.45 5.43 23.62

Z-2
EJES C ENTRE
EJE 4-5 y 6 3.00 1.00 1.45 4.33 18.84

Z-3
EJES B ENTRE
EJE 7 1.00 1.00 1.45 7.05 10.22

Z-4
EJES A ENTRE
EJE 7 1.00 1.00 1.45 2.73 3.96

EJES C ENTRE
EJE 7 1.00 1.00 1.45 2.27 3.29

Z-5
EJES C ENTRE
EJE 7 1.00 1.00 1.45 1.55 2.25

Z-6
EJES A Y C ENTRE
EJE 1 2.00 1.00 1.45 1.75 5.08

EJES B ENTRE
EJE 1 2.00 1.00 1.45 1.62 4.70

ZC-1
EJES A Y C ENTRE
EJE 1 2.00 1.00 1.45 10.99 31.87

MURO DE CONTENCION
MURO TIPO I AREA CAD
MC-01 1.00 1.00 4.00 2.24 8.96
MC-02 1.00 1.00 4.00 2.24 8.96

MURO TIPO II
MC-03 1.00 1.00 3.86 6.37 24.59
MC-04 1.00 1.00 8.48 6.37 54.02
MC-05 1.00 1.00 8.52 6.37 54.27
MC-06 1.00 1.00 0.99 6.37 6.31
MC-07 1.00 1.00 8.32 6.37 53.00
MC-08 1.00 1.00 3.91 6.37 24.91
MC-09 1.00 1.00 1.76 6.37 11.21
MC-10 1.00 1.00 3.00 6.37 19.11
MC-11 1.00 1.00 6.45 6.37 41.09
MC-12 1.00 1.00 2.13 6.37 13.57
MC-13 1.00 1.00 3.51 6.37 22.36
MC-14 1.00 1.00 6.45 6.37 41.09
MC-15 1.00 1.00 6.45 6.37 41.09
MC-16 1.00 1.00 6.42 6.37 40.90

#VALUE! M2
01.04.05 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACION CON MAQUINAR # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND
V.EXCAVADO F. ESPOJ.
- #VALUE! 1.30 - #VALUE!

2399.54 M2
01.04.06 AFIRMADO E= 0.10m EN PISOS Y VEREDAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND
VEREDAS
PABELLON 01
VEREDA DE CIRCULACION
FRONTAL 1.00 1.00 36.13 2.13 - 76.96
LATERAL 1.00 2.00 5.54 0.50 - 5.54
POSTERIOR 1.00 1.00 36.13 0.50 - 18.07
ACCESO A ESCALERA 1.00 1.00 3.20 2.65 - 8.48

PABELLON 02
VEREDA DE CIRCULACION
FRONTAL 1.00 1.00 36.13 2.13 - 76.96
LATERAL 1.00 2.00 5.54 0.50 - 5.54
POSTERIOR 1.00 1.00 36.13 0.50 - 18.07
ACCESO A ESCALERA 1.00 1.00 3.20 2.65 - 8.48
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
PABELLON 03
VEREDA DE CIRCULACION
FRONTAL 1.00 1.00 32.58 2.13 - 69.40
LATERAL 1.00 2.00 5.54 0.50 - 5.54
POSTERIOR 1.00 1.00 32.58 0.50 - 16.29

PABELLON 04
VEREDA DE CIRCULACION
FRONTAL 1.00 1.00 19.80 2.13 - 42.17
LATERAL 1.00 1.00 5.54 0.50 - 2.77
POSTERIOR 1.00 1.00 19.80 0.50 - 9.90

VEREDAS EXTERIORES
1.00 2.00 68.89 3.00 413.34
1.00 2.00 60.04 3.00 360.24
1.00 1.00 28.16 3.00 84.48
1.00 1.00 25.26 3.00 75.78
1.00 4.00 10.25 3.00 123.00
1.00 1.00 49.63 3.00 148.89
1.00 1.00 44.81 4.30 192.68
1.00 1.00 5.41 1.40 7.57
1.00 1.00 21.51 2.00 43.02

FALSO PISO

PABELLON 1
AULA Nº 01 1.00 1.00 41.64 0.00 41.64
AULA Nº 02 1.00 1.00 41.64 - 41.64
AULA Nº 03 1.00 1.00 41.64 - 41.64
S.S.H.H. VARONES 1.00 1.00 20.82 - 20.82
S.S.H.H. VARONES 1.00 1.00 20.82 - 20.82

PABELLON 2
AULA Nº 08 1.00 1.00 41.64 - 41.64
AULA Nº 09 1.00 1.00 41.64 - 41.64
AULA Nº 10 1.00 1.00 41.64 - 41.64
AULA Nº 11 1.00 1.00 41.64 - 41.64

PABELLON 3
DEPOSITO 1.00 1.00 20.49 - 20.49
SALA DE USO MULTIPLES 1.00 1.00 63.93 - 63.93
CRE-PRIMARIA 1.00 1.00 63.93 - 63.93
DEPOSITO 1.00 1.00 20.49 - 20.49

PABELLON 4
LABORATORIO DE CIENCIAS 1.00 1.00 63.93 - 63.93
DEPOSITO 1.00 1.00 20.49 - 20.49

711.1 M2
01.04.07 AFIRMADO E= 0.15m EN PATIO PRIMARIA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 30.13 23.60 711.07

279.26 M2
01.04.08 MEJORAMIENTO DE TERRENO E= 0.40 M (CAPAS DE 0.20 M) # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
Z-1 8.00 1.00 2.50 2.10 0.40 42.00
Z-2 8.00 1.00 1.60 1.60 0.40 20.48
Z-3 2.00 1.00 1.20 1.20 0.40 2.88
Z-4 6.00 1.00 1.40 1.15 0.40 9.66
Z-5 2.00 1.00 2.00 1.70 0.40 6.80
0.00
PABELLON 2 0.00
Z-1 8.00 1.00 2.50 2.10 0.40 42.00
Z-2 8.00 1.00 1.60 1.60 0.40 20.48
Z-3 2.00 1.00 1.20 1.20 0.40 2.88
Z-4 6.00 1.00 1.40 1.15 0.40 9.66
Z-5 2.00 1.00 2.00 1.70 0.40 6.80
0.00
PABELLON 3 0.00
Z-1 12.00 1.00 1.20 1.00 0.40 14.40
Z-2 4.00 1.00 2.00 1.40 0.40 11.20
Z-3 2.00 1.00 2.50 1.80 0.40 9.00
Z-4 2.00 1.00 1.15 1.00 0.40 2.30
Z-5 1.00 1.00 1.30 1.00 0.40 1.30
0.00
PABELLON 4 0.00
ZC-1 1.00 1.00 5.40 2.50 0.40 13.50
Z-1 3.00 1.00 2.80 2.30 0.40 19.32
Z-2 3.00 1.00 2.50 2.00 0.40 15.00
Z-3 1.00 1.00 3.00 2.60 0.40 7.80
Z-4 2.00 1.80 1.80 1.15 0.40 7.45
Z-5 1.00 1.40 1.40 1.70 0.40 3.33
Z-6 3.00 1.60 1.35 1.70 0.40 11.02

01.05.00 CONCRETO SIMPLE 69.01 M3


1.0501 CIMIENTOS CORRIDOS, CONCRETO 1:10+30% P. GDE. # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND
H
PABELLON 1
EJES A ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.13 0.50 0.70 2.50
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.13 0.50 0.70 2.50

EJES B ENTRE
EJE 10-11-12 1.00 1.00 6.07 0.40 0.70 1.70

EJES C ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.97 0.50 0.70 2.79
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.98 0.50 0.70 2.79

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 0.70 1.25

EJE 3 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 0.70 1.25

EJE 5 y 6 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.90 0.70 1.33

EJE 7 y 8 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.90 0.70 1.33

EJE 10 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 0.70 1.25

EJE 11 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.50 0.70 1.23
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE 1 2 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 0.70 1.25

PABELLON 2
EJES A ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.13 0.50 0.70 2.50
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.13 0.50 0.70 2.50

EJES B ENTRE
EJE 10-11-12 1.00 1.00 6.07 0.40 0.70 1.70

EJES C ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 7.97 0.50 0.70 2.79
EJE 8-9, 9-10, 10-11, 11-12 1.00 1.00 7.98 0.50 0.70 2.79

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 0.70 1.25

EJE 3 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 0.70 1.25

EJE 5 y 6 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.90 0.70 1.33

EJE 7 y 8 ENTRE
EJE A-B, B-C 1.00 1.00 2.11 0.90 0.70 1.33

EJE 10 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 0.70 1.25

EJE 11 ENTRE
EJE A-B, B-C 1.00 1.00 3.52 0.50 0.70 1.23

EJE 1 2 ENTRE
EJE A-B, B-C 1.00 1.00 2.56 0.70 0.70 1.25

PABELLON 3
EJES A ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 10.17 0.50 0.70 3.56
EJE 6-7, 7-8, 8-9, 9-10 1.00 1.00 10.17 0.50 0.70 3.56

EJES C ENTRE
EJE 1-2, 2-3, 3-4, 4-5 1.00 1.00 10.17 0.50 0.70 3.56
EJE 6-7, 7-8, 8-9, 9-10 1.00 1.00 10.17 0.50 0.70 3.56

EJE 1 Y 10 ENTRE
EJE A-B, B-C 2.00 1.00 3.06 0.50 0.70 2.14

EJE 2 Y 9 ENTRE
EJE A-B, B-C 2.00 1.00 4.17 0.50 0.70 2.92

EJE 5 y 6 ENTRE
EJE A-B, B-C 1.00 1.00 2.82 0.80 0.70 1.58

PABELLON 4
EJES A ENTRE
EJE 3 AL 7 1.00 1.00 4.79 0.50 0.70 1.68

EJES C ENTRE
EJE 3 AL 7 1.00 1.00 4.79 0.50 0.70 1.68

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 2.17 0.50 0.70 0.76

EJE 2 -3 ENTRE
EJE A-B, B-C 1.00 1.00 0.29 0.85 0.70 0.17

EJE 6 ENTRE
EJE A-B, B-C 1.00 1.00 3.47 0.50 0.70 1.21

EJE 7 ENTRE
EJE A-B, B-C 1.00 1.00 0.78 0.50 0.70 0.27

586.38 M2
01.05.02 FALSO PISO E=4" MEZCLA 1:10 CEMENTO - HORMIGON # Veces # Elementos Area = Alto m Parcial Total UND

PABELLON 1
AULA Nº 01 1.00 1.00 41.64 0.00 41.64
AULA Nº 02 1.00 1.00 41.64 - 41.64
AULA Nº 03 1.00 1.00 41.64 - 41.64
S.S.H.H. VARONES 1.00 1.00 20.82 - 20.82
S.S.H.H. VARONES 1.00 1.00 20.82 - 20.82

PABELLON 2
AULA Nº 08 1.00 1.00 41.64 - 41.64
AULA Nº 09 1.00 1.00 41.64 - 41.64
AULA Nº 10 1.00 1.00 41.64 - 41.64
AULA Nº 11 1.00 1.00 41.64 - 41.64

PABELLON 3
DEPOSITO 1.00 1.00 20.49 - 20.49
SALA DE USO MULTIPLES 1.00 1.00 63.93 - 63.93
CRE-PRIMARIA 1.00 1.00 63.93 - 63.93
DEPOSITO 1.00 1.00 20.49 - 20.49

PABELLON 4
LABORATORIO DE CIENCIAS 1.00 1.00 63.93 - 63.93
DEPOSITO 1.00 1.00 20.49 - 20.49
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

467.83 M2
01.05.03 SOLADO E=4" MEZCLA 1:10 CEMENTO - HORMIGON # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
Z-1 8.00 1.00 2.50 2.10 - 42.00
Z-2 8.00 1.00 1.60 1.60 - 20.48
Z-3 2.00 1.00 1.20 1.20 - 2.88
Z-4 6.00 1.00 1.40 1.15 - 9.66
Z-5 2.00 1.00 2.00 1.70 - 6.80
0.00
PABELLON 2 0.00
Z-1 8.00 1.00 2.50 2.10 - 42.00
Z-2 8.00 1.00 1.60 1.60 - 20.48
Z-3 2.00 1.00 1.20 1.20 - 2.88
Z-4 6.00 1.00 1.40 1.15 - 9.66
Z-5 2.00 1.00 2.00 1.70 - 6.80
0.00
PABELLON 3 0.00
Z-1 12.00 1.00 1.20 1.00 - 14.40
Z-2 4.00 1.00 2.00 1.40 - 11.20
Z-3 2.00 1.00 2.50 1.80 - 9.00
Z-4 2.00 1.00 1.15 1.00 - 2.30
Z-5 1.00 1.00 1.30 1.00 - 1.30
0.00
PABELLON 4 0.00
ZC-1 1.00 1.00 5.40 2.50 - 13.50
Z-1 3.00 1.00 2.80 2.30 - 19.32
Z-2 3.00 1.00 2.50 2.00 - 15.00
Z-3 1.00 1.00 3.00 2.60 - 7.80
Z-4 2.00 1.00 1.80 1.80 - 6.48
Z-5 1.00 1.00 1.40 1.40 - 1.96
Z-6 3.00 1.00 1.60 1.35 - 6.48

MURO DE CONTENCION
MURO TIPO I
MC-01 1.00 1.00 4.00 1.60 6.40
MC-02 1.00 1.00 4.00 1.60 6.40
0.00
MURO TIPO II 0.00
MC-03 1.00 1.00 3.86 2.60 10.04
MC-04 1.00 1.00 8.48 2.60 22.05
MC-05 1.00 1.00 8.52 2.60 22.15
MC-06 1.00 1.00 0.99 2.60 2.57
MC-07 1.00 1.00 8.32 2.60 21.63
MC-08 1.00 1.00 3.91 2.60 10.17
MC-09 1.00 1.00 1.76 2.60 4.58
MC-10 1.00 1.00 3.00 2.60 7.80
MC-11 1.00 1.00 6.45 2.60 16.77
MC-12 1.00 1.00 2.13 2.60 5.54
MC-13 1.00 1.00 3.51 2.60 9.13
MC-14 1.00 1.00 6.45 2.60 16.77
MC-15 1.00 1.00 6.45 2.60 16.77
MC-16 1.00 1.00 6.42 2.60 16.69

2399.54 M2
01.05.04 CONCRETO F´C=175 kg/cm² PARA VEREDAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND
VEREDAS
PABELLON 01
VEREDA DE CIRCULACION
FRONTAL 1.00 1.00 36.13 2.13 - 76.96
LATERAL 1.00 2.00 5.54 0.50 - 5.54
POSTERIOR 1.00 1.00 36.13 0.50 - 18.07
ACCESO A ESCALERA 1.00 1.00 3.20 2.65 - 8.48

PABELLON 02
VEREDA DE CIRCULACION
FRONTAL 1.00 1.00 36.13 2.13 - 76.96
LATERAL 1.00 2.00 5.54 0.50 - 5.54
POSTERIOR 1.00 1.00 36.13 0.50 - 18.07
ACCESO A ESCALERA 1.00 1.00 3.20 2.65 - 8.48

PABELLON 03
VEREDA DE CIRCULACION
FRONTAL 1.00 1.00 32.58 2.13 - 69.40
LATERAL 1.00 2.00 5.54 0.50 - 5.54
POSTERIOR 1.00 1.00 32.58 0.50 - 16.29

PABELLON 04
VEREDA DE CIRCULACION
FRONTAL 1.00 1.00 19.80 2.13 - 42.17
LATERAL 1.00 1.00 5.54 0.50 - 2.77
POSTERIOR 1.00 1.00 19.80 0.50 - 9.90

VEREDAS EXTERIORES
1.00 2.00 68.89 3.00 413.34
1.00 2.00 60.04 3.00 360.24
1.00 1.00 28.16 3.00 84.48
1.00 1.00 25.26 3.00 75.78
1.00 4.00 10.25 3.00 123.00
1.00 1.00 49.63 3.00 148.89
1.00 1.00 44.81 4.30 192.68
1.00 1.00 5.41 1.40 7.57
1.00 1.00 21.51 2.00 43.02

FALSO PISO

PABELLON 1
AULA Nº 01 1.00 1.00 41.64 0.00 41.64
AULA Nº 02 1.00 1.00 41.64 - 41.64
AULA Nº 03 1.00 1.00 41.64 - 41.64
S.S.H.H. VARONES 1.00 1.00 20.82 - 20.82
S.S.H.H. VARONES 1.00 1.00 20.82 - 20.82

PABELLON 2
AULA Nº 08 1.00 1.00 41.64 - 41.64
AULA Nº 09 1.00 1.00 41.64 - 41.64
AULA Nº 10 1.00 1.00 41.64 - 41.64
AULA Nº 11 1.00 1.00 41.64 - 41.64

PABELLON 3
DEPOSITO 1.00 1.00 20.49 - 20.49
SALA DE USO MULTIPLES 1.00 1.00 63.93 - 63.93
CRE-PRIMARIA 1.00 1.00 63.93 - 63.93
DEPOSITO 1.00 1.00 20.49 - 20.49

PABELLON 4
LABORATORIO DE CIENCIAS 1.00 1.00 63.93 - 63.93
DEPOSITO 1.00 1.00 20.49 - 20.49
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

2399.54 M2
01.05.05 ENCOFRADO Y DESENCOFRADO PARA VEREDAS # Veces Long. m B. m b m h m Parcial Total UND

Similar a la partida 01.05.04 2399.54

701.38 M
01.05.06 JUNTA ASFALTICA EN VEREDAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 01
VEREDA DE CIRCULACION
FRONTAL 1.00 15.00 2.13 - 31.95
LATERAL 1.00 5.00 0.50 - 2.50
POSTERIOR 1.00 15.00 0.50 - 7.50
ACCESO A ESCALERA 1.00 2.00 2.65 - 5.30
0.00
PABELLON 02 0.00
VEREDA DE CIRCULACION 0.00
FRONTAL 1.00 15.00 2.13 - 31.95
LATERAL 1.00 5.00 0.50 - 2.50
POSTERIOR 1.00 15.00 0.50 - 7.50
ACCESO A ESCALERA 1.00 5.00 2.65 - 13.25

PABELLON 03
VEREDA DE CIRCULACION
FRONTAL 1.00 13.00 2.13 - 27.69
LATERAL 1.00 5.00 0.50 - 2.50
POSTERIOR 1.00 13.00 0.50 - 6.50

PABELLON 04
VEREDA DE CIRCULACION
FRONTAL 1.00 8.00 2.13 - 17.04
LATERAL 1.00 2.00 0.50 - 1.00
POSTERIOR 1.00 8.00 0.50 - 4.00

VEREDAS EXTERIORES
1.00 55.00 3.00 165.00
1.00 48.00 3.00 144.00
1.00 11.00 3.00 33.00
1.00 10.00 3.00 30.00
1.00 4.00 3.00 12.00
1.00 20.00 3.00 60.00
1.00 18.00 4.30 77.40
1.00 2.00 1.40 2.80
1.00 8.00 2.00 16.00

10.57 M3
01.05.07 CONCRETO f'c=175 kg/cm2 PARA RAMPAS PEATONALES # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

RAMPA DE ACCESO EN ENTRADA 1.00 1.00 24.75 1.5 0.1 3.71


RAMPAS DE ACCESO AL MODULO DE PRIMARIA 1.00 1.00 17.08 1.2 0.1 2.05
RAMPAS DE AC. DEL M. DE PRIMARIA A PATIO DE HONOR 1.00 1.00 2.00 1.2 0.1 0.24
RAMPAS DE ACC. DEL M. DE PRIMARIA A LOSAS DEP. 1 1.00 1.00 9.53 1.3 0.1 1.24
RAMPAS DE ACC. DEL M. DE PRIMARIA A LOSAS DEP. 2 1.00 1.00 7.06 1.3 0.1 0.92
RAMPAS DE ACC. DEL PATIO H. A LOSAS DEPORTIVAS 1.00 1.00 15.05 1.6 0.1 2.41

105.67 M3
01.05.08 ENCOFRADO Y DESENCOFRADO PARA RAMPAS PEATONALES # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

RAMPA DE ACCESO EN ENTRADA 1.00 1.00 24.75 1.5 37.13


RAMPAS DE ACCESO AL MODULO DE PRIMARIA 1.00 1.00 17.08 1.2 20.50
RAMPAS DE AC. DEL M. DE PRIMARIA A PATIO DE HONOR 1.00 1.00 2.00 1.2 2.40
RAMPAS DE ACC. DEL M. DE PRIMARIA A LOSAS DEP. 1 1.00 1.00 9.53 1.3 12.39
RAMPAS DE ACC. DEL M. DE PRIMARIA A LOSAS DEP. 2 1.00 1.00 7.06 1.3 9.18
RAMPAS DE ACC. DEL PATIO H. A LOSAS DEPORTIVAS 1.00 1.00 15.05 1.6 24.08

711.1 M3
01.05.09 CONCRETO f'c=175 kg/cm2 PARA PATIO DE PRIMARIA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 30.13 23.60 711.07

711.1 M2
01.05.10 ENCOFRADO Y DESENCOFRADO PARA PATIO DE PRIMARIA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 30.13 23.60 711.07

423.3 M
01.05.11 JUNTA ASFALTICA EN PATIO 2" # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 9.00 23.60 212.40


1.00 7.00 30.13 210.91

01.06.00 CONCRETO ARMADO


01.06.01 SOBRECIMIENTOS 74.14 M3
01.06.01.01 CONCRETO f'c=175 kg/cm2 PARA SOBRECIMIENTOCONCRETO FC = 175 kg/c # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
EJES A ENTRE
EJE 1-2, 4-5, 8-9, 11-12 4.00 1.00 3.10 0.15 1.40 2.60
EJE 2-3, 3-4, 9-10, 10-11 4.00 1.00 3.35 0.15 1.40 2.81
PUERTAS 1.00 1.00 6.50 -0.15 1.40 -1.37

EJES C ENTRE 0.00


EJE 1-2, 4-5, 8-9, 11-12 4.00 1.00 3.10 0.15 1.40 2.60
EJE 2-3, 3-4, 9-10, 10-11 4.00 1.00 3.35 0.15 1.40 2.81

EJE 1 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.36 0.25 1.55 1.69

EJE 3 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.36 0.25 1.40 1.53

EJE 5 y 6 ENTRE 0.00


EJE A-B, B-C 2.00 1.00 4.36 0.25 1.40 3.05

EJE 7 y 8 ENTRE 0.00


EJE A-B, B-C 2.00 1.00 4.36 0.25 1.40 3.05

EJE 10 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.36 0.25 1.55 1.69

EJE 11 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 5.07 0.25 1.40 1.77

EJE 10 y 12 ENTRE 0.00


EJE A-B 1.00 1.00 6.06 0.25 1.40 2.12
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE 1 2 ENTRE 0.00
EJE A-B, B-C 1.00 1.00 4.36 0.25 1.55 1.69

PABELLON 2
EJES A ENTRE
EJE 1-2, 4-5, 8-9, 11-12 4.00 1.00 3.10 0.15 1.40 2.60
EJE 2-3, 3-4, 9-10, 10-11 4.00 1.00 3.35 0.15 1.40 2.81
PUERTAS 4.00 1.00 -1.10 0.15 1.40 -0.92

EJES C ENTRE 0.00


EJE 1-2, 4-5, 8-9, 11-12 4.00 1.00 3.10 0.15 1.40 2.60
EJE 2-3, 3-4, 9-10, 10-11 4.00 1.00 3.35 0.15 1.40 2.81

EJE 1 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.36 0.25 1.55 1.69

EJE 3 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.36 0.25 1.40 1.53

EJE 5 y 6 ENTRE 0.00


EJE A-B, B-C 2.00 1.00 4.36 0.25 1.40 3.05

EJE 7 y 8 ENTRE 0.00


EJE A-B, B-C 2.00 1.00 4.36 0.25 1.40 3.05

EJE 10 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.36 0.25 1.55 1.69

EJE 10 y 12 ENTRE 0.00


EJE A-B 1.00 1.00 6.06 0.25 1.40 2.12

EJE 1 2 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.36 0.25 1.55 1.69

PABELLON 3
EJES A ENTRE
EJE 1-2, 4-5, 6-7, 9-10 4.00 1.00 3.10 0.15 1.00 1.86
EJE 2-3, 3-4, 7-8, 8-9 4.00 1.00 3.58 0.15 1.00 2.15
PUERTAS 4.00 1.00 -1.10 0.15 1.00 -0.66

EJES C ENTRE
EJE 1-2, 4-5, 6-7, 9-10 4.00 1.00 3.10 0.15 1.00 1.86
EJE 2-3, 3-4, 7-8, 8-9 4.00 1.00 3.58 0.15 1.00 2.15

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 4.96 0.25 1.00 1.24

EJE 2 Y 9 ENTRE
EJE A-B, B-C 2.00 1.00 4.87 0.15 1.00 1.46

EJE 5 y 6 ENTRE
EJE A-B, B-C 2.00 1.00 4.96 0.25 1.00 2.48

EJE 10 ENTRE
EJE A-B, B-C 1.00 1.00 4.96 0.15 1.00 0.74

PABELLON 4
EJES A ENTRE
EJE 3 AL 7 1.00 1.00 9.86 0.15 1.40 2.07

EJES C ENTRE
EJE 3 AL 7 1.00 1.00 12.06 0.15 1.40 2.53

EJE 1 ENTRE
EJE A-B, B-C 1.00 1.00 4.38 0.25 1.40 1.53

EJE 2 ENTRE
EJE A-B, B-C 1.00 1.00 4.38 0.25 1.40 1.53

EJE 3 ENTRE
EJE A-B, B-C 1.00 1.00 3.66 0.15 1.40 0.77

EJE 6 ENTRE
EJE A, B-C 1.00 1.00 4.07 0.15 1.40 0.85

EJE 1 2 ENTRE
EJE A-B, B-C 1.00 1.00 3.66 0.15 1.40 0.77

0.00

821.18 M2
01.06.01.02 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
EJES A ENTRE
EJE 1-2, 4-5, 8-9, 11-12 4.00 2.00 3.10 - 1.40 34.72
EJE 2-3, 3-4, 9-10, 10-11 4.00 2.00 3.35 - 1.40 37.52
PUERTAS 1.00 2.00 6.50 1.40 18.20
0.00
EJES C ENTRE 0.00
EJE 1-2, 4-5, 8-9, 11-12 4.00 2.00 3.10 - 1.40 34.72
EJE 2-3, 3-4, 9-10, 10-11 4.00 2.00 3.35 - 1.40 37.52
0.00
EJE 1 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 1.55 13.52
0.00
EJE 3 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 1.40 12.21
0.00
EJE 5 y 6 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.36 - 1.40 24.42
0.00
EJE 7 y 8 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.36 - 1.40 24.42
0.00
EJE 10 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 1.55 13.52
0.00
EJE 11 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 5.07 - 1.40 14.20
0.00
EJE 10 y 12 ENTRE 0.00
EJE A-B 1.00 2.00 6.06 - 1.40 16.97
0.00
EJE 1 2 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 1.55 13.52
0.00
PABELLON 2 0.00
EJES A ENTRE 0.00
EJE 1-2, 4-5, 8-9, 11-12 4.00 2.00 3.10 - 1.40 34.72
EJE 2-3, 3-4, 9-10, 10-11 4.00 2.00 3.35 - 1.40 37.52
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
PUERTAS 4.00 2.00 -1.10 - 1.40 -12.32
0.00
EJES C ENTRE 0.00
EJE 1-2, 4-5, 8-9, 11-12 4.00 2.00 3.10 - 1.40 34.72
EJE 2-3, 3-4, 9-10, 10-11 4.00 2.00 3.35 - 1.40 37.52
0.00
EJE 1 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 1.55 13.52
0.00
EJE 3 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 1.40 12.21
0.00
EJE 5 y 6 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.36 - 1.40 24.42
0.00
EJE 7 y 8 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.36 - 1.40 24.42
0.00
EJE 10 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 1.55 13.52
0.00
EJE 10 y 12 ENTRE 0.00
EJE A-B 1.00 2.00 6.06 - 1.40 16.97
0.00
EJE 1 2 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 1.55 13.52
0.00
PABELLON 3 0.00
EJES A ENTRE 0.00
EJE 1-2, 4-5, 6-7, 9-10 4.00 2.00 3.10 - 1.00 24.80
EJE 2-3, 3-4, 7-8, 8-9 4.00 2.00 3.58 - 1.00 28.64
PUERTAS 4.00 2.00 -1.10 - 1.00 -8.80
0.00
EJES C ENTRE 0.00
EJE 1-2, 4-5, 6-7, 9-10 4.00 2.00 3.10 - 1.00 24.80
EJE 2-3, 3-4, 7-8, 8-9 4.00 2.00 3.58 - 1.00 28.64
0.00
EJE 1 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.96 - 1.00 9.92
0.00
EJE 2 Y 9 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.87 - 1.00 19.48
0.00
EJE 5 y 6 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.96 - 1.00 19.84
0.00
EJE 10 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.96 - 1.00 9.92
0.00
0.00
PABELLON 4 0.00
EJES A ENTRE 0.00
EJE 3 AL 7 1.00 2.00 9.86 - 1.40 27.61
0.00
EJES C ENTRE 0.00
EJE 3 AL 7 1.00 2.00 12.06 - 1.40 33.77
0.00
EJE 1 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.38 - 1.40 12.26
0.00
EJE 2 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.38 - 1.40 12.26
0.00
EJE 3 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 3.66 - 1.40 10.25
0.00
EJE 6 ENTRE 0.00
EJE A, B-C 1.00 2.00 4.07 - 1.40 11.40
0.00
EJE 1 2 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 3.66 - 1.40 10.25
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

2435.55 KG
01.06.01.03 ACERO ESTRUCTURAL TRABAJADO PARA SOBRECIMIENTO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1 1 - - - 2435.55

01.06.02 VIGA DE CIMENTACIÓN 38.38 M3


01.06.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTACION # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
EJES A ENTRE
EJE 1-2, 4-5, 8-9, 11-12 4.00 1.00 3.10 0.25 0.40 1.24
EJE 2-3, 3-4, 9-10, 10-11 4.00 1.00 3.35 0.25 0.40 1.34
EJE 6-7 1.00 1.00 3.00 0.25 0.40 0.30

EJES B ENTRE
EJE 6-7 1.00 1.00 3.00 0.25 0.40 0.30

EJES C ENTRE
EJE 1-2, 4-5, 8-9, 11-12 4.00 1.00 3.10 0.25 0.40 1.24
EJE 2-3, 3-4, 9-10, 10-11 4.00 1.00 3.35 0.25 0.40 1.34
EJE 6-7 1.00 1.00 3.00 0.25 0.40 0.30

EJE 1 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.36 0.25 0.40 0.44

EJE 2, 4 y 9 ENTRE
EJE A-B, B-C 3.00 1.00 5.07 0.25 0.40 1.52

EJE 3 ENTRE
EJE A-B, B-C 1.00 1.00 4.36 0.25 0.40 0.44
0.00
EJE 5 y 6 ENTRE
EJE A-B, B-C 2.00 1.00 4.36 0.25 0.40 0.87
0.00
EJE 7 y 8 ENTRE 0.00
EJE A-B, B-C 2.00 1.00 4.36 0.25 0.40 0.87
0.00
EJE 10 ENTRE 0.00
EJE A-B, B-C 1.00 1.00 4.36 0.25 0.40 0.44

EJE 11 ENTRE 0.00


EJE A, B-C 1.00 1.00 5.07 0.25 0.40 0.51
0.00
EJE 1 2 ENTRE 0.00
EJE A-B, B-C 1.00 1.00 4.36 0.25 0.40 0.44

PABELLON 2
EJES A ENTRE
EJE 1-2, 4-5, 8-9, 11-12 4.00 1.00 3.10 0.25 0.40 1.24
EJE 2-3, 3-4, 9-10, 10-11 4.00 1.00 3.35 0.25 0.40 1.34
EJE 6-7 1.00 1.00 3.00 0.25 0.40 0.30

EJES B ENTRE
EJE 6-7 1.00 1.00 3.00 0.25 0.40 0.30

EJES C ENTRE
EJE 1-2, 4-5, 8-9, 11-12 4.00 1.00 3.10 0.25 0.40 1.24
EJE 2-3, 3-4, 9-10, 10-11 4.00 1.00 3.35 0.25 0.40 1.34
EJE 6-7 1.00 1.00 3.00 0.25 0.40 0.30

EJE 1 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.36 0.25 0.40 0.44

EJE 2, 4 9 Y 11 ENTRE
EJE A-B, B-C 4.00 1.00 5.07 0.25 0.40 2.03

EJE 3 ENTRE
EJE A-B, B-C 1.00 1.00 4.36 0.25 0.40 0.44
0.00
EJE 5 y 6 ENTRE
EJE A-B, B-C 2.00 1.00 4.36 0.25 0.40 0.87
0.00
EJE 7 y 8 ENTRE 0.00
EJE A-B, B-C 2.00 1.00 4.36 0.25 0.40 0.87
0.00
EJE 10 ENTRE 0.00
EJE A-B, B-C 1.00 1.00 4.36 0.25 0.40 0.44

0.00
EJE 1 2 ENTRE 0.00
EJE A-B, B-C 1.00 1.00 4.36 0.25 0.40 0.44

PABELLON 3
EJES A ENTRE
EJE 1-2, 4-5, 6-7, 9-10 4.00 1.00 3.10 0.25 0.40 1.24
EJE 2-3, 3-4, 7-8, 8-9 4.00 1.00 3.58 0.25 0.40 1.43

EJES C ENTRE
EJE 1-2, 4-5, 6-7, 9-10 4.00 1.00 3.10 0.25 0.40 1.24
EJE 2-3, 3-4, 7-8, 8-9 4.00 1.00 3.58 0.25 0.40 1.43

EJE 1 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.96 0.25 0.40 0.50

EJE 2 Y 9 ENTRE
EJE A-B, B-C 2.00 1.00 4.87 0.25 0.40 0.97

EJE 3,4,7 Y 8ENTRE


EJE A-B, B-C 1.00 1.00 4.87 0.25 0.40 0.49
0.00
EJE 5 y 6 ENTRE
EJE A-B, B-C 2.00 1.00 4.96 0.25 0.40 0.99
0.00
EJE 10 ENTRE 0.00
EJE A-B, B-C 1.00 1.00 4.96 0.25 0.40 0.50

PABELLON 4
EJES A ENTRE
EJE 1 AL 7 1.00 1.00 15.06 0.25 0.40 1.51

EJES B ENTRE
EJE 1-2 1.00 1.00 3.00 0.25 0.40 0.30

EJES C ENTRE
EJE 1 AL 7 1.00 1.00 15.06 0.25 0.40 1.51

EJE 1 ENTRE 0.00


EJE A-B, B-C 1.00 1.00 4.38 0.25 0.40 0.44

EJE 2 ENTRE
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE A-B, B-C 1.00 1.00 4.38 0.25 0.40 0.44
0.00
EJE 3 ENTRE 0.00
EJE A-B, B-C 1.00 1.00 3.66 0.25 0.40 0.37
0.00
EJE 4 Y 5 ENTRE 0.00
EJE A-B, B-C 2.00 1.00 5.07 0.25 0.40 1.01

EJE 6 ENTRE 0.00


EJE A, B-C 1.00 1.00 5.07 0.25 0.40 0.51
0.00
EJE 1 2 ENTRE 0.00
EJE A-B, B-C 1.00 1.00 3.66 0.25 0.40 0.37

307.06 M2
01.06.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
EJES A ENTRE 0.00
EJE 1-2, 4-5, 8-9, 11-12 4.00 2.00 3.10 - 0.40 9.92
EJE 2-3, 3-4, 9-10, 10-11 4.00 2.00 3.35 - 0.40 10.72
EJE 6-7 1.00 2.00 3.00 - 0.40 2.40

EJES B ENTRE
EJE 6-7 1.00 2.00 3.00 - 0.40 2.40
0.00
EJES C ENTRE 0.00
EJE 1-2, 4-5, 8-9, 11-12 4.00 2.00 3.10 - 0.40 9.92
EJE 2-3, 3-4, 9-10, 10-11 4.00 2.00 3.35 - 0.40 10.72
EJE 6-7 1.00 2.00 3.00 - 0.40 2.40
0.00
EJE 1 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 0.40 3.49
0.00
EJE 2, 4, 9 Y 11 ENTRE 0.00
EJE A-B, B-C 4.00 2.00 5.07 - 0.40 16.22
0.00
EJE 3 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 0.40 3.49
0.00
EJE 5 y 6 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.36 - 0.40 6.98
0.00
EJE 7 y 8 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.36 - 0.40 6.98
0.00
EJE 10 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 0.40 3.49
0.00
0.00
EJE 1 2 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 0.40 3.49

PABELLON 2
EJES A ENTRE
EJE 1-2, 4-5, 8-9, 11-12 4.00 2.00 3.10 - 0.40 9.92
EJE 2-3, 3-4, 9-10, 10-11 4.00 2.00 3.35 - 0.40 10.72
EJE 6-7 1.00 2.00 3.00 - 0.40 2.40

EJES B ENTRE
EJE 6-7 1.00 2.00 3.00 - 0.40 2.40
0.00
EJES C ENTRE 0.00
EJE 1-2, 4-5, 8-9, 11-12 4.00 2.00 3.10 - 0.40 9.92
EJE 2-3, 3-4, 9-10, 10-11 4.00 2.00 3.35 - 0.40 10.72
EJE 6-7 1.00 2.00 3.00 - 0.40 2.40
0.00
EJE 1 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 0.40 3.49
0.00
EJE 2, 4 9 Y 11 ENTRE 0.00
EJE A-B, B-C 4.00 2.00 5.07 - 0.40 16.22
0.00
EJE 3 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 0.40 3.49
0.00
EJE 5 y 6 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.36 - 0.40 6.98
0.00
EJE 7 y 8 ENTRE 0.00
EJE A-B, B-C 2.00 2.00 4.36 - 0.40 6.98
0.00
EJE 10 ENTRE 0.00
EJE A-B, B-C 1.00 2.00 4.36 - 0.40 3.49
0.00
0.00
EJE 1 2 ENTRE - 0.00
EJE A-B, B-C 1.00 2.00 4.36 0.40 3.49
0.00
0.00
PABELLON 3
EJES A ENTRE
EJE 1-2, 4-5, 6-7, 9-10 4.00 2.00 3.10 - 0.40 9.92
EJE 2-3, 3-4, 7-8, 8-9 4.00 2.00 3.58 - 0.40 11.46

EJES C ENTRE
EJE 1-2, 4-5, 6-7, 9-10 4.00 2.00 3.10 - 0.40 9.92
EJE 2-3, 3-4, 7-8, 8-9 4.00 2.00 3.58 - 0.40 11.46

EJE 1 ENTRE
EJE A-B, B-C 1.00 2.00 4.96 - 0.40 3.97
0.00
EJE 2 Y 9 ENTRE
EJE A-B, B-C 2.00 2.00 4.87 - 0.40 7.79
0.00
EJE 3,4,7 Y 8ENTRE
EJE A-B, B-C 1.00 2.00 4.87 - 0.40 3.90
0.00
EJE 5 y 6 ENTRE
EJE A-B, B-C 2.00 2.00 4.96 - 0.40 7.94
0.00
EJE 10 ENTRE
EJE A-B, B-C 1.00 2.00 4.96 - 0.40 3.97
0.00

PABELLON 4
EJES A ENTRE
EJE 1 AL 7 1.00 2.00 15.06 - 0.40 12.05
0.00
EJES B ENTRE
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE 1-2 1.00 2.00 3.00 - 0.40 2.40
0.00
EJES C ENTRE
EJE 1 AL 7 1.00 2.00 15.06 - 0.40 12.05
0.00
EJE 1 ENTRE
EJE A-B, B-C 1.00 2.00 4.38 - 0.40 3.50
0.00
EJE 2 ENTRE
EJE A-B, B-C 1.00 2.00 4.38 - 0.40 3.50
0.00
EJE 3 ENTRE
EJE A-B, B-C 1.00 2.00 3.66 - 0.40 2.93
0.00
EJE 4 Y 5 ENTRE
EJE A-B, B-C 2.00 2.00 5.07 - 0.40 8.11
0.00
EJE 6 ENTRE
EJE A, B-C 1.00 2.00 5.07 - 0.40 4.06
0.00
EJE 1 2 ENTRE
EJE A-B, B-C 1.00 2.00 3.66 - 0.40 2.93
0.00
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

5351.95 KG
01.06.02.03 ACERO CORRUGADO FY = 4200 kg/cm² GRADO 60 # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 - - - 5351.95

01.06.03 ZAPATAS 159.61 M3


01.06.03.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
Z-1 8.00 1.00 2.50 2.10 0.60 25.20
Z-2 8.00 1.00 1.60 1.60 0.60 12.29
Z-3 2.00 1.00 1.20 1.20 0.60 1.73
Z-4 6.00 1.00 1.40 1.15 0.60 5.80
Z-5 2.00 1.00 2.00 1.70 0.60 4.08

PABELLON 2
Z-1 8.00 1.00 2.50 2.10 0.60 25.20
Z-2 8.00 1.00 1.60 1.60 0.60 12.29
Z-3 2.00 1.00 1.20 1.20 0.60 1.73
Z-4 6.00 1.00 1.40 1.15 0.60 5.80
Z-5 2.00 1.00 2.00 1.70 0.60 4.08

PABELLON 3
Z-1 12.00 1.00 1.20 1.00 0.50 7.20
Z-2 4.00 1.00 2.00 1.40 0.50 5.60
Z-3 2.00 1.00 2.50 1.80 0.50 4.50
Z-4 2.00 1.00 1.15 1.00 0.50 1.15
Z-5 1.00 1.00 1.30 1.00 0.50 0.65

PABELLON 4
ZC-1 1.00 1.00 5.40 2.50 0.60 8.10
Z-1 3.00 1.00 2.80 2.30 0.60 11.59
Z-2 3.00 1.00 2.50 2.00 0.60 9.00
Z-3 1.00 1.00 3.00 2.60 0.60 4.68
Z-4 2.00 1.00 1.80 1.80 0.60 3.89
Z-5 1.00 1.00 1.40 1.40 0.60 1.18
Z-6 3.00 1.00 1.60 1.35 0.60 3.89

5580.61 KG
01.06.03.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1 1 - - - 5580.61

01.06.04 COLUMNAS 94.51 M3


01.06.04.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS # Veces # Elementos Area Cad Alto m Parcial Total UND

PABELLON 1
C-1 1.00 8.00 0.19 9.05 13.58
C-2 1.00 16.00 0.13 9.05 18.10

PABELLON 2
C-1 1.00 8.00 0.19 9.05 13.58
C-2 1.00 16.00 0.13 9.05 18.10

PABELLON 3
C-1 1.00 12.00 0.15 6.00 10.80
C-2 1.00 4.00 0.10 6.00 2.40

PABELLON 4
C-1 1.00 4.00 0.19 11.97 8.98
C-2 1.00 6.00 0.13 11.97 8.98

899.14 M2
01.06.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
C-1 1.00 8.00 2.00 - 9.05 144.80
C-2 1.00 16.00 1.00 - 9.05 144.80

PABELLON 2
C-1 1.00 8.00 2.00 - 9.05 144.80
C-2 1.00 16.00 1.00 - 9.05 144.80

PABELLON 3
C-1 1.00 12.00 1.60 - 6.00 115.20
C-2 1.00 4.00 0.80 - 6.00 19.20

PABELLON 4
C-1 1.00 4.00 2.00 11.97 95.76
C-2 1.00 6.00 1.25 11.97 89.78

20844.31 KG
01.06.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 - - - 20844.31


MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

01.06.05 PLACAS 71.17 M3


01.06.05.01 CONCRETO f'c=210 kg/cm2 PARA PLACAS # Veces # Elementos Area Cad Alto m Parcial Total UND

PABELLON 1
PL-1 1.00 8.00 0.25 9.05 17.74

PABELLON 2
PL-1 1.00 8.00 0.25 9.05 17.74

PABELLON 3
PL-1 1.00 8.00 0.19 6.00 9.12

PABELLON 4
PL-1 1.00 6.00 0.27 11.97 19.39
PL-2 1.00 2.00 0.30 11.97 7.18

699.68 M2
01.06.05.02 ENCOFRADO Y DESENCOFRADO DE PLACAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
P-1 1.00 8.00 2.40 - 9.05 173.76

PABELLON 2
PL-1 1.00 8.00 2.40 - 9.05 173.76

PABELLON 3
PL-1 1.00 8.00 2.00 - 6.00 96.00

PABELLON 4
PL-1 1.00 6.00 2.60 11.97 186.73
PL-2 1.00 2.00 2.90 11.97 69.43
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

12501.77 KG
01.06.05.03 ACERO ESTRUCTURAL TRABAJADO PARA PLACAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 - - - 12501.77

01.06.06 COLUMNETAS DE CONFINAMIENTO 20.03 M3


01.06.06.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
PRIMER NIVEL
EJE A 28.00 1.00 0.15 0.25 1.80 1.89
EJE C 16.00 1.00 0.15 0.25 1.08 0.64

SEGUNDO NIVEL
EJE A 24.00 1.00 0.15 0.25 1.95 1.76
EJE B 2.00 1.00 0.15 0.25 0.95 0.07
EJE C 16.00 1.00 0.15 0.25 1.08 0.64
EJE A' 18.00 1.00 0.15 0.25 0.95 0.64
EJE 1 Y 12 2.00 1.00 0.15 0.25 0.95 0.07

TERCER NIVEL
EJE 2 - 4 - 9 - 11 4.00 1.00 0.15 0.25 1.32 0.20
EJE 2 - 4 - 9 - 11 4.00 1.00 0.15 0.25 0.86 0.13
EJE 2 - 4 - 9 - 11 4.00 1.00 0.15 0.25 0.66 0.10

PABELLON 2
PRIMER NIVEL
EJE A 24.00 1.00 0.15 0.25 1.80 1.62
EJE C 16.00 1.00 0.15 0.25 1.08 0.64

SEGUNDO NIVEL
EJE A 24.00 1.00 0.15 0.25 1.95 1.76
EJE B 2.00 1.00 0.15 0.25 0.95 0.07
EJE C 16.00 1.00 0.15 0.25 1.08 0.64
EJE A' 18.00 1.00 0.15 0.25 0.95 0.64
EJE 1 Y 12 2.00 1.00 0.15 0.25 0.95 0.07

TERCER NIVEL
EJE 2 - 4 - 9 - 11 4.00 1.00 0.15 0.25 1.32 0.20
EJE 2 - 4 - 9 - 11 4.00 1.00 0.15 0.25 0.83 0.12
EJE 2 - 4 - 9 - 11 4.00 1.00 0.15 0.25 0.64 0.10

PABELLON 3
PRIMER NIVEL
EJE A 16.00 1.00 0.15 0.25 1.80 1.08
EJE C 16.00 1.00 0.15 0.25 1.08 0.64
EJE 2 Y 9 8.00 1.00 0.15 0.25 2.43 0.73

SEGUNDO NIVEL
EJE 2 - 3 - 4 - 7 - 8 - 9 6.00 1.00 0.15 0.25 1.32 0.30
EJE 2 - 3 - 4 - 7 - 8 - 9 6.00 1.00 0.15 0.25 0.86 0.19
EJE 2 - 3 - 4 - 7 - 8 - 9 6.00 1.00 0.15 0.25 0.66 0.15

PABELLON 4
PRIMER NIVEL
EJE A 8.00 1.00 0.15 0.25 1.80 0.54
EJE C 8.00 1.00 0.15 0.25 1.08 0.32
EJE 6 4.00 1.00 0.15 0.25 2.43 0.36

SEGUNDO NIVEL
EJE A 8.00 1.00 0.15 0.25 1.80 0.54
EJE C 8.00 1.00 0.15 0.25 1.08 0.32
EJE A' 10.00 1.00 0.15 0.25 0.95 0.36
EJE 6 4.00 1.00 0.15 0.25 2.43 0.36
EJE 1 Y 7 2.00 1.00 0.15 0.25 0.95 0.07

TERCER NIVEL
EJE A 8.00 1.00 0.15 0.25 1.80 0.54
EJE B 2.00 1.00 0.15 0.25 0.95 0.07
EJE C 8.00 1.00 0.15 0.25 1.08 0.32
EJE A' 10.00 1.00 0.15 0.25 0.95 0.36
EJE 6 4.00 1.00 0.15 0.25 2.43 0.36
EJE 1 Y 7 2.00 1.00 0.15 0.25 0.95 0.07

CUARTO NIVEL
EJE 4 - 5 - 6 3.00 1.00 0.15 0.25 1.32 0.15
EJE 4 - 5 - 6 3.00 1.00 0.15 0.25 0.86 0.10
EJE 4 - 5 - 6 3.00 1.00 0.15 0.25 0.66 0.07

EJE 3-7 2.00 1.00 0.15 0.25 1.26 0.09


EJE 3-7 2.00 1.00 0.15 0.25 1.02 0.08
EJE 3-7 2.00 1.00 0.15 0.25 0.86 0.06
EJE 3-7 2.00 1.00 0.15 0.25 0.66 0.05

0.00

328.71 M2
01.06.06.02 ENCOFRADO DESENCOFRADO PARA COLUMNETAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
PRIMER NIVEL PERIMETRO
EJE A 16.00 1.00 0.50 1.80 14.40
EJE A 10.00 1.00 0.65 1.80 11.70
EJE A 2.00 1.00 0.80 1.80 2.88

EJE C 16.00 1.00 0.50 1.08 8.60

SEGUNDO NIVEL
EJE A 16.00 1.00 0.50 1.95 15.60
EJE A 8.00 1.00 0.65 1.95 10.14

EJE B 1.00 1.00 0.50 0.95 0.48


EJE B 1.00 1.00 0.65 0.95 0.62

EJE C 16.00 1.00 0.50 1.08 8.60

EJE A' 18.00 1.00 0.50 0.95 8.55

EJE 1 Y 12 4.00 1.00 0.65 0.95 2.47

TERCER NIVEL
EJE 2 - 4 - 9 - 11 4.00 1.00 0.50 1.32 2.64
EJE 2 - 4 - 9 - 11 4.00 1.00 0.50 0.86 1.72
EJE 2 - 4 - 9 - 11 4.00 1.00 0.50 0.66 1.32

PABELLON 2
PRIMER NIVEL PERIMETRO
EJE A 16.00 1.00 0.50 1.80 14.40
EJE A 10.00 1.00 0.65 1.80 11.70
EJE A 2.00 1.00 0.80 1.80 2.88
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE C 16.00 1.00 0.50 1.08 8.60

SEGUNDO NIVEL
EJE A 16.00 1.00 0.50 1.95 15.60
EJE A 8.00 1.00 0.65 1.95 10.14

EJE B 1.00 1.00 0.50 0.95 0.48


EJE B 1.00 1.00 0.65 0.95 0.62

EJE C 16.00 1.00 0.50 1.08 8.60

EJE A' 18.00 1.00 0.50 0.95 8.55

EJE 1 Y 12 4.00 1.00 0.65 0.95 2.47

TERCER NIVEL
EJE 2 - 4 - 9 - 11 4.00 1.00 0.50 1.32 2.64
EJE 2 - 4 - 9 - 11 4.00 1.00 0.50 0.86 1.72
EJE 2 - 4 - 9 - 11 4.00 1.00 0.50 0.66 1.32

PABELLON 3
PRIMER NIVEL
EJE A 12.00 1.00 0.50 1.80 10.80
EJE A 4.00 1.00 0.65 1.80 4.68

EJE C 16.00 1.00 0.50 1.08 8.60

EJE 2 Y 9 6.00 1.00 0.50 2.43 7.27


EJE 2 Y 10 2.00 1.00 0.65 2.43 3.15

SEGUNDO NIVEL
EJE 2 - 3 - 4 - 7 - 8 - 9 6.00 1.00 0.50 1.32 3.96
EJE 2 - 3 - 4 - 7 - 8 - 9 6.00 1.00 0.50 0.86 2.58
EJE 2 - 3 - 4 - 7 - 8 - 9 6.00 1.00 0.50 0.66 1.98

PABELLON 4
PRIMER NIVEL PERIMETRO
EJE A 6.00 1.00 0.50 1.80 5.40
EJE A 2.00 1.00 0.65 1.80 2.34

EJE C 8.00 1.00 0.50 1.08 4.30

EJE 6 3.00 1.00 0.50 2.43 3.64


EJE 6 1.00 1.00 0.65 2.43 1.58

SEGUNDO NIVEL
EJE A 16.00 1.00 0.50 1.80 14.40
EJE A 8.00 1.00 0.65 1.80 9.36

EJE C 8.00 1.00 0.50 1.08 4.30

EJE 6 3.00 1.00 0.50 2.43 3.64


EJE 6 1.00 1.00 0.65 2.43 1.58

EJE A' 10.00 1.00 0.50 0.95 4.75

EJE 1 Y 12 4.00 1.00 0.50 0.95 1.90

TERCER NIVEL
EJE A 16.00 1.00 0.50 1.80 14.40
EJE A 8.00 1.00 0.65 1.80 9.36

EJE B 1.00 1.00 0.50 0.95 0.48


EJE B 1.00 1.00 0.65 0.95 0.62

EJE C 8.00 1.00 0.50 1.08 4.30

EJE 6 3.00 1.00 0.50 2.43 3.64


EJE 6 1.00 1.00 0.65 2.43 1.58

EJE A' 10.00 1.00 0.50 0.95 4.75

EJE 1 Y 12 4.00 1.00 0.50 0.95 1.90

CUARTO NIVEL
EJE 4 - 5 - 6 3.00 1.00 0.50 1.32 1.98
EJE 4 - 5 - 7 3.00 1.00 0.50 0.86 1.29
EJE 4 - 5 - 8 3.00 1.00 0.50 0.66 0.99

EJE 3-7 2.00 1.00 0.50 1.26 1.26


EJE 3-7 2.00 1.00 0.50 1.02 1.02
EJE 3-7 2.00 1.00 0.50 0.86 0.86
EJE 3-7 2.00 1.00 0.50 0.66 0.66

3477.60 KG
01.06.06.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1 1 - - - 3477.60

01.06.07 VIGUETAS DE CONFINAMIENTO 16.14 M3


01.06.07.01 CONCRETO f'c=175 kg/cm2 PARA VIGUETAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
PRIMER NIVEL
EJE A ENTRE
EJE 1 - 2 1.00 1.00 1.95 0.15 0.20 0.06
EJE 2 - 3 1.00 1.00 3.30 0.15 0.20 0.10
EJE 3 - 4 1.00 1.00 1.95 0.15 0.20 0.06
EJE 4 - 5 1.00 1.00 3.30 0.15 0.20 0.10
EJE 8 - 9 1.00 1.00 3.30 0.15 0.20 0.10
EJE 9 - 10 1.00 1.00 1.95 0.15 0.20 0.06
EJE 10 - 11 1.00 1.00 1.30 0.15 0.20 0.04
EJE 11 - 12 1.00 1.00 1.30 0.15 0.20 0.04

EJE C ENTRE
EJE 1 - 2 1.00 1.00 3.05 0.15 0.20 0.09
EJE 2 - 3 1.00 1.00 3.30 0.15 0.20 0.10
EJE 3 - 4 1.00 1.00 3.30 0.15 0.20 0.10
EJE 4 - 5 1.00 1.00 3.05 0.15 0.20 0.09
EJE 8 - 9 1.00 1.00 3.05 0.15 0.20 0.09
EJE 9 - 10 1.00 1.00 3.30 0.15 0.20 0.10
EJE 10 - 11 1.00 1.00 3.30 0.15 0.20 0.10
EJE 11 - 12 1.00 1.00 3.05 0.15 0.20 0.09

SEGUNDO NIVEL
EJE A ENTRE
EJE 1 - 2 1.00 1.00 1.95 0.15 0.20 0.06
EJE 2 - 3 1.00 1.00 3.30 0.15 0.20 0.10
EJE 3 - 4 1.00 1.00 1.95 0.15 0.20 0.06
EJE 4 - 5 1.00 1.00 3.30 0.15 0.20 0.10
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE 8 - 9 1.00 1.00 3.30 0.15 0.20 0.10
EJE 9 - 10 1.00 1.00 1.95 0.15 0.20 0.06
EJE 10 - 11 1.00 1.00 3.30 0.15 0.20 0.10
EJE 11 - 12 1.00 1.00 1.95 0.15 0.20 0.06

EJE C ENTRE
EJE 1 - 2 1.00 1.00 3.05 0.15 0.20 0.09
EJE 2 - 3 1.00 1.00 3.30 0.15 0.20 0.10
EJE 3 - 4 1.00 1.00 3.30 0.15 0.20 0.10
EJE 4 - 5 1.00 1.00 3.05 0.15 0.20 0.09
EJE 8 - 9 1.00 1.00 3.05 0.15 0.20 0.09
EJE 9 - 10 1.00 1.00 3.30 0.15 0.20 0.10
EJE 10 - 11 1.00 1.00 3.30 0.15 0.20 0.10
EJE 11 - 12 1.00 1.00 3.05 0.15 0.20 0.09

EJE B ENTRE
EJE 6 - 7 1.00 1.00 1.45 0.15 0.20 0.04

EJE A' ENTRE 0.00


EJE 1 - 2 1.00 1.00 4.13 0.15 0.20 0.12
EJE 2 - 3 1.00 1.00 3.74 0.15 0.20 0.11
EJE 3 - 4 1.00 1.00 3.74 0.15 0.20 0.11
EJE 4 - 5 1.00 1.00 4.13 0.15 0.20 0.12
EJE 6 - 7 1.00 1.00 3.50 0.15 0.20 0.11
EJE 8 - 9 1.00 1.00 4.13 0.15 0.20 0.12
EJE 9 - 10 1.00 1.00 3.74 0.15 0.20 0.11
EJE 10 - 11 1.00 1.00 3.74 0.15 0.20 0.11
EJE 11 - 12 1.00 1.00 4.13 0.15 0.20 0.12

EJES 1 Y 12 ENTRE
EJE A - A' 2.00 1.00 1.97 0.15 0.20 0.12

TERCER NIVEL
EJES 2 - 4 - 9 - 11 ENTRE
EJE A - B 4.00 1.00 2.21 0.15 0.20 0.27
EJE B - C 4.00 1.00 2.85 0.15 0.20 0.34

PABELLON 2
PRIMER NIVEL
EJE A ENTRE
EJE 1 - 2 1.00 1.00 1.95 0.15 0.20 0.06
EJE 2 - 3 1.00 1.00 3.30 0.15 0.20 0.10
EJE 3 - 4 1.00 1.00 1.95 0.15 0.20 0.06
EJE 4 - 5 1.00 1.00 3.30 0.15 0.20 0.10
EJE 8 - 9 1.00 1.00 3.30 0.15 0.20 0.10
EJE 9 - 10 1.00 1.00 1.95 0.15 0.20 0.06
EJE 10 - 11 1.00 1.00 3.30 0.15 0.20 0.10
EJE 11 - 12 1.00 1.00 1.95 0.15 0.20 0.06

EJE C ENTRE
EJE 1 - 2 1.00 1.00 3.05 0.15 0.20 0.09
EJE 2 - 3 1.00 1.00 3.30 0.15 0.20 0.10
EJE 3 - 4 1.00 1.00 3.30 0.15 0.20 0.10
EJE 4 - 5 1.00 1.00 3.05 0.15 0.20 0.09
EJE 8 - 9 1.00 1.00 3.05 0.15 0.20 0.09
EJE 9 - 10 1.00 1.00 3.30 0.15 0.20 0.10
EJE 10 - 11 1.00 1.00 3.30 0.15 0.20 0.10
EJE 11 - 12 1.00 1.00 3.05 0.15 0.20 0.09

SEGUNDO NIVEL
EJE A ENTRE
EJE 1 - 2 1.00 1.00 1.95 0.15 0.20 0.06
EJE 2 - 3 1.00 1.00 3.30 0.15 0.20 0.10
EJE 3 - 4 1.00 1.00 1.95 0.15 0.20 0.06
EJE 4 - 5 1.00 1.00 3.30 0.15 0.20 0.10
EJE 8 - 9 1.00 1.00 3.30 0.15 0.20 0.10
EJE 9 - 10 1.00 1.00 1.95 0.15 0.20 0.06
EJE 10 - 11 1.00 1.00 3.30 0.15 0.20 0.10
EJE 11 - 12 1.00 1.00 1.95 0.15 0.20 0.06

EJE C ENTRE
EJE 1 - 2 1.00 1.00 3.05 0.15 0.20 0.09
EJE 2 - 3 1.00 1.00 3.30 0.15 0.20 0.10
EJE 3 - 4 1.00 1.00 3.30 0.15 0.20 0.10
EJE 4 - 5 1.00 1.00 3.05 0.15 0.20 0.09
EJE 8 - 9 1.00 1.00 3.05 0.15 0.20 0.09
EJE 9 - 10 1.00 1.00 3.30 0.15 0.20 0.10
EJE 10 - 11 1.00 1.00 3.30 0.15 0.20 0.10
EJE 11 - 12 1.00 1.00 3.05 0.15 0.20 0.09

EJE B ENTRE
EJE 6 - 7 1.00 1.00 1.45 0.15 0.20 0.04

EJE A' ENTRE


EJE 1 - 2 1.00 1.00 4.13 0.15 0.20 0.12
EJE 2 - 3 1.00 1.00 3.74 0.15 0.20 0.11
EJE 3 - 4 1.00 1.00 3.74 0.15 0.20 0.11
EJE 4 - 5 1.00 1.00 4.13 0.15 0.20 0.12
EJE 6 - 7 1.00 1.00 3.50 0.15 0.20 0.11
EJE 8 - 9 1.00 1.00 4.13 0.15 0.20 0.12
EJE 9 - 10 1.00 1.00 3.74 0.15 0.20 0.11
EJE 10 - 11 1.00 1.00 3.74 0.15 0.20 0.11
EJE 11 - 12 1.00 1.00 4.13 0.15 0.20 0.12

EJES 1 Y 12 ENTRE
EJE A - A' 2.00 1.00 1.97 0.15 0.20 0.12

TERCER NIVEL
EJES 2 - 4 - 9 - 11 ENTRE
EJE A - B 4.00 1.00 2.21 0.15 0.20 0.27
EJE B - C 4.00 1.00 2.85 0.15 0.20 0.34

PABELLON 3
EJE A ENTRE
EJE 1 - 2 1.00 1.00 3.05 0.15 0.20 0.09
EJE 2 - 3 1.00 1.00 2.45 0.15 0.20 0.07
EJE 3 - 4 1.00 1.00 3.50 0.15 0.20 0.11
EJE 4 - 5 1.00 1.00 1.98 0.15 0.20 0.06
EJE 6 - 7 1.00 1.00 1.98 0.15 0.20 0.06
EJE 7 - 8 1.00 1.00 3.50 0.15 0.20 0.11
EJE 8 - 9 1.00 1.00 2.45 0.15 0.20 0.07
EJE 9 - 10 1.00 1.00 3.05 0.15 0.20 0.09

EJE C ENTRE
EJE 1 - 2 1.00 1.00 3.05 0.15 0.20 0.09
EJE 2 - 3 1.00 1.00 3.52 0.15 0.20 0.11
EJE 3 - 4 1.00 1.00 3.52 0.15 0.20 0.11
EJE 4 - 5 1.00 1.00 3.05 0.15 0.20 0.09
EJE 6 - 7 1.00 1.00 3.05 0.15 0.20 0.09
EJE 7 - 8 1.00 1.00 3.52 0.15 0.20 0.11
EJE 8 - 9 1.00 1.00 3.52 0.15 0.20 0.11
EJE 9 - 10 1.00 1.00 3.05 0.15 0.20 0.09

EJE 2 Y 9 ENTRE
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE A - B 2.00 1.00 1.11 0.15 0.20 0.07
EJE B - C 2.00 1.00 2.71 0.15 0.20 0.16

SEGUNDO NIVEL
EJES 2 - 3 - 4 - 7 - 8 -9 ENTRE
EJE A - B 6.00 1.00 2.21 0.15 0.20 0.40
EJE B - C 6.00 1.00 2.85 0.15 0.20 0.51

PABELLON 4
PRIMER NIVEL
EJE A ENTRE
EJE 3 - 4 1.00 1.00 1.93 0.15 0.20 0.06
EJE 4 - 5 1.00 1.00 2.93 0.15 0.20 0.09
EJE 5 - 6 1.00 1.00 1.93 0.15 0.20 0.06
EJE 6 - 7 1.00 1.00 2.93 0.15 0.20 0.09

EJE C ENTRE
EJE 3 - 4 1.00 1.00 3.00 0.15 0.20 0.09
EJE 4 - 5 1.00 1.00 2.93 0.15 0.20 0.09
EJE 5 - 6 1.00 1.00 3.00 0.15 0.20 0.09
EJE 6 - 7 1.00 1.00 2.93 0.15 0.20 0.09

EJE 6 ENTRE
EJE A - B 1.00 1.00 1.21 0.15 0.20 0.04
EJE B - C 1.00 1.00 2.81 0.15 0.20 0.08

SEGUNDO NIVEL
EJE A ENTRE
EJE 3 - 4 1.00 1.00 1.93 0.15 0.20 0.06
EJE 4 - 5 1.00 1.00 2.93 0.15 0.20 0.09
EJE 5 - 6 1.00 1.00 1.93 0.15 0.20 0.06
EJE 6 - 7 1.00 1.00 2.93 0.15 0.20 0.09

EJE C ENTRE
EJE 3 - 4 1.00 1.00 3.00 0.15 0.20 0.09
EJE 4 - 5 1.00 1.00 2.93 0.15 0.20 0.09
EJE 5 - 6 1.00 1.00 3.00 0.15 0.20 0.09
EJE 6 - 7 1.00 1.00 2.93 0.15 0.20 0.09

EJE 6 ENTRE
EJE A - B 1.00 1.00 1.21 0.15 0.20 0.04
EJE B - C 1.00 1.00 2.81 0.15 0.20 0.08

EJE A' ENTRE


EJE 1 - 2 1.00 1.00 3.50 0.15 0.20 0.11
EJE 3 - 4 1.00 1.00 4.13 0.15 0.20 0.12
EJE 4 - 5 1.00 1.00 3.74 0.15 0.20 0.11
EJE 5 - 6 1.00 1.00 3.99 0.15 0.20 0.12
EJE 6 - 7 1.00 1.00 3.88 0.15 0.20 0.12

EJES 1 Y 7 ENTRE
EJE A - A' 2.00 1.00 2.10 0.15 0.20 0.13

TERCER NIVEL
EJE A ENTRE
EJE 3 - 4 1.00 1.00 1.93 0.15 0.20 0.06
EJE 4 - 5 1.00 1.00 2.93 0.15 0.20 0.09
EJE 5 - 6 1.00 1.00 1.93 0.15 0.20 0.06
EJE 6 - 7 1.00 1.00 2.93 0.15 0.20 0.09

EJE C ENTRE
EJE 3 - 4 1.00 1.00 3.00 0.15 0.20 0.09
EJE 4 - 5 1.00 1.00 2.93 0.15 0.20 0.09
EJE 5 - 6 1.00 1.00 3.00 0.15 0.20 0.09
EJE 6 - 7 1.00 1.00 2.93 0.15 0.20 0.09

EJE 6 ENTRE
EJE A - B 1.00 1.00 1.21 0.15 0.20 0.04
EJE B - C 1.00 1.00 2.81 0.15 0.20 0.08

EJE A' ENTRE


EJE 1 - 2 1.00 1.00 3.50 0.15 0.20 0.11
EJE 3 - 4 1.00 1.00 4.13 0.15 0.20 0.12
EJE 4 - 5 1.00 1.00 3.74 0.15 0.20 0.11
EJE 5 - 6 1.00 1.00 3.99 0.15 0.20 0.12
EJE 6 - 7 1.00 1.00 3.88 0.15 0.20 0.12

EJE B ENTRE
EJE 6 - 7 1.00 1.00 1.45 0.15 0.20 0.04

EJES 1 Y 7 ENTRE
EJE A - A' 2.00 1.00 2.10 0.15 0.20 0.13

CUARTO NIVEL
EJES 4 - 5 - 6 ENTRE
EJE A - B 3.00 1.00 2.21 0.15 0.20 0.20
EJE B - C 3.00 1.00 2.85 0.15 0.20 0.26

EJES 3 - 7 ENTRE
EJE A - B 2.00 1.00 1.85 0.15 0.20 0.11
EJE B - C 2.00 1.00 1.85 0.15 0.20 0.11

216.83 M2
01.06.07.02 ENCOFRADO DESENCOFRADO PARA VIGUETAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
PRIMER NIVEL
EJE A ENTRE
EJE 1 - 2 2.00 1.00 1.95 0.20 0.78
EJE 2 - 3 2.00 1.00 3.30 0.20 1.32
EJE 3 - 4 2.00 1.00 1.95 0.20 0.78
EJE 4 - 5 2.00 1.00 3.30 0.20 1.32
EJE 8 - 9 2.00 1.00 3.30 0.20 1.32
EJE 9 - 10 2.00 1.00 1.95 0.20 0.78
EJE 10 - 11 2.00 1.00 1.30 0.20 0.52
EJE 11 - 12 2.00 1.00 1.30 0.20 0.52

EJE C ENTRE
EJE 1 - 2 2.00 1.00 3.05 0.20 1.22
EJE 2 - 3 2.00 1.00 3.30 0.20 1.32
EJE 3 - 4 2.00 1.00 3.30 0.20 1.32
EJE 4 - 5 2.00 1.00 3.05 0.20 1.22
EJE 8 - 9 2.00 1.00 3.05 0.20 1.22
EJE 9 - 10 2.00 1.00 3.30 0.20 1.32
EJE 10 - 11 2.00 1.00 3.30 0.20 1.32
EJE 11 - 12 2.00 1.00 3.05 0.20 1.22

SEGUNDO NIVEL
EJE A ENTRE
EJE 1 - 2 2.00 1.00 1.95 0.20 0.78
EJE 2 - 3 2.00 1.00 3.30 0.20 1.32
EJE 3 - 4 2.00 1.00 1.95 0.20 0.78
EJE 4 - 5 2.00 1.00 3.30 0.20 1.32
EJE 8 - 9 2.00 1.00 3.30 0.20 1.32
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE 9 - 10 2.00 1.00 1.95 0.20 0.78
EJE 10 - 11 2.00 1.00 3.30 0.20 1.32
EJE 11 - 12 2.00 1.00 1.95 0.20 0.78

EJE C ENTRE
EJE 1 - 2 2.00 1.00 3.05 0.20 1.22
EJE 2 - 3 2.00 1.00 3.30 0.20 1.32
EJE 3 - 4 2.00 1.00 3.30 0.20 1.32
EJE 4 - 5 2.00 1.00 3.05 0.20 1.22
EJE 8 - 9 2.00 1.00 3.05 0.20 1.22
EJE 9 - 10 2.00 1.00 3.30 0.20 1.32
EJE 10 - 11 2.00 1.00 3.30 0.20 1.32
EJE 11 - 12 2.00 1.00 3.05 0.20 1.22

EJE B ENTRE
EJE 6 - 7 2.00 1.00 1.45 0.20 0.58

EJE A' ENTRE


EJE 1 - 2 2.00 1.00 4.13 0.20 1.65
EJE 2 - 3 2.00 1.00 3.74 0.20 1.49
EJE 3 - 4 2.00 1.00 3.74 0.20 1.49
EJE 4 - 5 2.00 1.00 4.13 0.20 1.65
EJE 6 - 7 2.00 1.00 3.50 0.20 1.40
EJE 8 - 9 2.00 1.00 4.13 0.20 1.65
EJE 9 - 10 2.00 1.00 3.74 0.20 1.49
EJE 10 - 11 2.00 1.00 3.74 0.20 1.49
EJE 11 - 12 2.00 1.00 4.13 0.20 1.65

EJES 1 Y 12 ENTRE
EJE A - A' 4.00 1.00 1.97 0.20 1.58

TERCER NIVEL
EJES 2 - 4 - 9 - 11 ENTRE
EJE A - B 8.00 1.00 2.21 0.20 3.54
EJE B - C 8.00 1.00 2.85 0.20 4.56

PABELLON 2
PRIMER NIVEL
EJE A ENTRE
EJE 1 - 2 2.00 1.00 1.95 0.20 0.78
EJE 2 - 3 2.00 1.00 3.30 0.20 1.32
EJE 3 - 4 2.00 1.00 1.95 0.20 0.78
EJE 4 - 5 2.00 1.00 3.30 0.20 1.32
EJE 8 - 9 2.00 1.00 3.30 0.20 1.32
EJE 9 - 10 2.00 1.00 1.95 0.20 0.78
EJE 10 - 11 2.00 1.00 3.30 0.20 1.32
EJE 11 - 12 2.00 1.00 1.95 0.20 0.78

EJE C ENTRE
EJE 1 - 2 2.00 1.00 3.05 0.20 1.22
EJE 2 - 3 2.00 1.00 3.30 0.20 1.32
EJE 3 - 4 2.00 1.00 3.30 0.20 1.32
EJE 4 - 5 2.00 1.00 3.05 0.20 1.22
EJE 8 - 9 2.00 1.00 3.05 0.20 1.22
EJE 9 - 10 2.00 1.00 3.30 0.20 1.32
EJE 10 - 11 2.00 1.00 3.30 0.20 1.32
EJE 11 - 12 2.00 1.00 3.05 0.20 1.22

SEGUNDO NIVEL
EJE A ENTRE
EJE 1 - 2 2.00 1.00 1.95 0.20 0.78
EJE 2 - 3 2.00 1.00 3.30 0.20 1.32
EJE 3 - 4 2.00 1.00 1.95 0.20 0.78
EJE 4 - 5 2.00 1.00 3.30 0.20 1.32
EJE 8 - 9 2.00 1.00 3.30 0.20 1.32
EJE 9 - 10 2.00 1.00 1.95 0.20 0.78
EJE 10 - 11 2.00 1.00 3.30 0.20 1.32
EJE 11 - 12 2.00 1.00 1.95 0.20 0.78

EJE C ENTRE
EJE 1 - 2 2.00 1.00 3.05 0.20 1.22
EJE 2 - 3 2.00 1.00 3.30 0.20 1.32
EJE 3 - 4 2.00 1.00 3.30 0.20 1.32
EJE 4 - 5 2.00 1.00 3.05 0.20 1.22
EJE 8 - 9 2.00 1.00 3.05 0.20 1.22
EJE 9 - 10 2.00 1.00 3.30 0.20 1.32
EJE 10 - 11 2.00 1.00 3.30 0.20 1.32
EJE 11 - 12 2.00 1.00 3.05 0.20 1.22

EJE B ENTRE
EJE 6 - 7 2.00 1.00 1.45 0.20 0.58

EJE A' ENTRE


EJE 1 - 2 2.00 1.00 4.13 0.20 1.65
EJE 2 - 3 2.00 1.00 3.74 0.20 1.49
EJE 3 - 4 2.00 1.00 3.74 0.20 1.49
EJE 4 - 5 2.00 1.00 4.13 0.20 1.65
EJE 6 - 7 2.00 1.00 3.50 0.20 1.40
EJE 8 - 9 2.00 1.00 4.13 0.20 1.65
EJE 9 - 10 2.00 1.00 3.74 0.20 1.49
EJE 10 - 11 2.00 1.00 3.74 0.20 1.49
EJE 11 - 12 2.00 1.00 4.13 0.20 1.65

EJES 1 Y 12 ENTRE
EJE A - A' 4.00 1.00 1.97 0.20 1.58

TERCER NIVEL
EJES 2 - 4 - 9 - 11 ENTRE
EJE A - B 8.00 1.00 2.21 0.20 3.54
EJE B - C 8.00 1.00 2.85 0.20 4.56

PABELLON 3
EJE A ENTRE
EJE 1 - 2 2.00 1.00 3.05 0.20 1.22
EJE 2 - 3 2.00 1.00 2.45 0.20 0.98
EJE 3 - 4 2.00 1.00 3.50 0.20 1.40
EJE 4 - 5 2.00 1.00 1.98 0.20 0.79
EJE 6 - 7 2.00 1.00 1.98 0.20 0.79
EJE 7 - 8 2.00 1.00 3.50 0.20 1.40
EJE 8 - 9 2.00 1.00 2.45 0.20 0.98
EJE 9 - 10 2.00 1.00 3.05 0.20 1.22

EJE C ENTRE
EJE 1 - 2 2.00 1.00 3.05 0.20 1.22
EJE 2 - 3 2.00 1.00 3.52 0.20 1.41
EJE 3 - 4 2.00 1.00 3.52 0.20 1.41
EJE 4 - 5 2.00 1.00 3.05 0.20 1.22
EJE 6 - 7 2.00 1.00 3.05 0.20 1.22
EJE 7 - 8 2.00 1.00 3.52 0.20 1.41
EJE 8 - 9 2.00 1.00 3.52 0.20 1.41
EJE 9 - 10 2.00 1.00 3.05 0.20 1.22

EJE 2 Y 9 ENTRE
EJE A - B 4.00 1.00 1.11 0.20 0.88
EJE B - C 4.00 1.00 2.71 0.20 2.16
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

SEGUNDO NIVEL
EJES 2 - 3 - 4 - 7 - 8 -9 ENTRE
EJE A - B 12.00 1.00 2.21 0.20 5.30
EJE B - C 12.00 1.00 2.85 0.20 6.84

PABELLON 4
PRIMER NIVEL
EJE A ENTRE
EJE 3 - 4 2.00 1.00 1.93 0.20 0.77
EJE 4 - 5 2.00 1.00 2.93 0.20 1.17
EJE 5 - 6 2.00 1.00 1.93 0.20 0.77
EJE 6 - 7 2.00 1.00 2.93 0.20 1.17

EJE C ENTRE
EJE 3 - 4 2.00 1.00 3.00 0.20 1.20
EJE 4 - 5 2.00 1.00 2.93 0.20 1.17
EJE 5 - 6 2.00 1.00 3.00 0.20 1.20
EJE 6 - 7 2.00 1.00 2.93 0.20 1.17

EJE 6 ENTRE
EJE A - B 2.00 1.00 1.21 0.20 0.48
EJE B - C 2.00 1.00 2.81 0.20 1.12

SEGUNDO NIVEL
EJE A ENTRE
EJE 3 - 4 2.00 1.00 1.93 0.20 0.77
EJE 4 - 5 2.00 1.00 2.93 0.20 1.17
EJE 5 - 6 2.00 1.00 1.93 0.20 0.77
EJE 6 - 7 2.00 1.00 2.93 0.20 1.17

EJE C ENTRE
EJE 3 - 4 2.00 1.00 3.00 0.20 1.20
EJE 4 - 5 2.00 1.00 2.93 0.20 1.17
EJE 5 - 6 2.00 1.00 3.00 0.20 1.20
EJE 6 - 7 2.00 1.00 2.93 0.20 1.17

EJE 6 ENTRE
EJE A - B 2.00 1.00 1.21 0.20 0.48
EJE B - C 2.00 1.00 2.81 0.20 1.12

EJE A' ENTRE


EJE 1 - 2 2.00 1.00 3.50 0.20 1.40
EJE 3 - 4 2.00 1.00 4.13 0.20 1.65
EJE 4 - 5 2.00 1.00 3.74 0.20 1.49
EJE 5 - 6 2.00 1.00 3.99 0.20 1.59
EJE 6 - 7 2.00 1.00 3.88 0.20 1.55

EJES 1 Y 7 ENTRE
EJE A - A' 8.00 1.00 2.10 0.20 3.36

TERCER NIVEL
EJE A ENTRE
EJE 3 - 4 2.00 1.00 1.93 0.20 0.77
EJE 4 - 5 2.00 1.00 2.93 0.20 1.17
EJE 5 - 6 2.00 1.00 1.93 0.20 0.77
EJE 6 - 7 2.00 1.00 2.93 0.20 1.17

EJE C ENTRE
EJE 3 - 4 2.00 1.00 3.00 0.20 1.20
EJE 4 - 5 2.00 1.00 2.93 0.20 1.17
EJE 5 - 6 2.00 1.00 3.00 0.20 1.20
EJE 6 - 7 2.00 1.00 2.93 0.20 1.17

EJE 6 ENTRE
EJE A - B 2.00 1.00 1.21 0.20 0.48
EJE B - C 2.00 1.00 2.81 0.20 1.12

EJE A' ENTRE


EJE 1 - 2 2.00 1.00 3.50 0.20 1.40
EJE 3 - 4 2.00 1.00 4.13 0.20 1.65
EJE 4 - 5 2.00 1.00 3.74 0.20 1.49
EJE 5 - 6 2.00 1.00 3.99 0.20 1.59
EJE 6 - 7 2.00 1.00 3.88 0.20 1.55

EJE B ENTRE
EJE 6 - 7 2.00 1.00 1.45 0.20 0.58

EJES 1 Y 7 ENTRE
EJE A - A' 4.00 1.00 2.10 0.20 1.68

CUARTO NIVEL
EJES 4 - 5 - 6 ENTRE
EJE A - B 6.00 1.00 2.21 0.20 2.65
EJE B - C 6.00 1.00 2.85 0.20 3.42

EJES 3 - 7 ENTRE
EJE A - B 4.00 1.00 1.85 0.20 1.48
EJE B - C 4.00 1.00 1.85 0.20 1.48

1838.14 KG
01.06.07.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGUETAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1 1 - - - 1838.14

01.06.08 ESCALERAS 17.12 M3


01.06.08.01 CONCRETO f'c=210 kg/cm2 PARA ESCALERAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1 AREA CAD


PRIMER TRAMO 1.30 1.60 2.08
DESCANSO 3.53 0.40 1.41
SEGUNDO TRAMO 0.63 1.60 1.01

PABELLON 2
PRIMER TRAMO 1.30 1.60 2.08
DESCANSO 3.53 0.40 1.41
SEGUNDO TRAMO 0.63 1.60 1.01

PABELLON 4
PRIMER TRAMO 1.30 1.60 2.08
DESCANSO 3.53 0.40 1.41
SEGUNDO TRAMO 0.63 1.60 1.01
TERCER TRAMO 0.75 1.60 1.20
DESCANSO 3.53 0.40 1.41
CUARTO TRAMO 0.63 1.60 1.01
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

75.51 M2
01.06.08.02 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
PRIMER TRAMO
LATERAL AREA CAD 0.78 0.78
FONDO 2.80 1.60 4.48
CONTRAPASOS 10.00 1.60 0.17 2.64

SEGUNDO TRAMO
LATERAL AREA CAD 0.63 0.63
FONDO 2.78 1.60 4.45
CONTRAPASOS 9.00 1.60 0.17 2.38

DESCANSO AREA CAD 3.53 3.53

PABELLON 2
PRIMER TRAMO
LATERAL AREA CAD 0.78 0.78
FONDO 2.80 1.60 4.48
CONTRAPASOS 10.00 1.60 0.17 2.64

SEGUNDO TRAMO
LATERAL AREA CAD 0.63 0.63
FONDO 2.78 1.60 4.45
CONTRAPASOS 9.00 1.60 0.17 2.38

DESCANSO AREA CAD 3.53 3.53

PABELLON 4
PRIMER TRAMO
LATERAL AREA CAD 0.78 0.78
FONDO 2.80 1.60 4.48
CONTRAPASOS 10.00 1.60 0.17 2.64

SEGUNDO TRAMO
LATERAL AREA CAD 0.63 0.63
FONDO 2.78 1.60 4.45
CONTRAPASOS 9.00 1.60 0.17 2.38

TERCER TRAMO
LATERAL AREA CAD 0.75 0.75
FONDO 2.80 1.60 4.48
CONTRAPASOS 10.00 1.60 0.17 2.64

CUARTO TRAMO
LATERAL AREA CAD 0.63 0.63
FONDO 2.78 1.60 4.45
CONTRAPASOS 9.00 1.60 0.17 2.38

DESCANSO 2 AREA CAD 3.53 7.06

1109.39 KG
01.06.08.03 ACERO ESTRUCTURAL TRABAJADO PARA ESCALERA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1 1 - - - 1109.39

01.06.09 VIGAS 180.26 M3


01.06.09.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1
PRIMER NIVEL
VP-100
EJES 2 - 4 - 9 - 11 4.00 1.00 8.00 0.30 0.50 4.80

VP-101
EJES 1 - 5 - 8 - 12 4.00 1.00 8.00 0.25 0.50 4.00

VP-102
EJES 3 - 10 2.00 1.00 8.00 0.25 0.50 2.00

VP-103
EJES 6 - 7 2.00 1.00 5.32 0.25 0.50 1.33

VP-104
EJES 6 - 7 2.00 1.00 3.19 0.25 0.40 0.64
ESCALERA 1.00 1.00 5.11 0.25 0.40 0.51

VA-100
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.60 0.25 0.50 0.90
EJE 2 - 3 2.00 1.00 3.60 0.25 0.50 0.90
EJE 3 - 4 2.00 1.00 3.60 0.25 0.50 0.90
EJE 4 - 5 2.00 1.00 3.60 0.25 0.50 0.90
EJE 8 - 9 2.00 1.00 3.60 0.25 0.50 0.90
EJE 9 - 10 2.00 1.00 3.60 0.25 0.50 0.90
EJE 10 - 11 2.00 1.00 3.60 0.25 0.50 0.90
EJE 11 - 12 2.00 1.00 3.60 0.25 0.50 0.90

VA-101
EJES A - B ENTRE
EJE 6 - 7 2.00 1.00 3.50 0.25 0.50 0.88

VA-102
EJES C ENTRE
EJE 6 - 7 1.00 1.00 3.50 0.25 0.50 0.44

VCH-100
EJES A' ENTRE
EJE 1 - 2 1.00 1.00 3.60 0.25 0.20 0.18
EJE 2 - 3 1.00 1.00 3.60 0.25 0.20 0.18
EJE 3 - 4 1.00 1.00 3.60 0.25 0.20 0.18
EJE 4 - 5 1.00 1.00 3.60 0.25 0.20 0.18
EJE 6 - 7 1.00 1.00 3.50 0.25 0.20 0.18
EJE 8 - 9 1.00 1.00 3.60 0.25 0.20 0.18
EJE 9 - 10 1.00 1.00 3.60 0.25 0.20 0.18
EJE 10 - 11 1.00 1.00 3.60 0.25 0.20 0.18
EJE 11 - 12 1.00 1.00 3.60 0.25 0.20 0.18

SEGUNDO NIVEL
VA-202
EJES 2 - 4 - 9 - 11 4.00 1.00 10.28 0.30 0.50 6.17
EJES 2 - 4 - 9 - 11 4.00 1.00 1.78 0.30 0.28 0.60
EJES 2 - 4 - 9 - 11 4.00 1.00 2.63 0.30 0.38 1.20

VA-203
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 -12 8.00 1.00 10.28 0.25 0.50 10.28

VA-200
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.60 0.25 0.50 0.90
EJE 2 - 3 2.00 1.00 3.60 0.25 0.50 0.90
EJE 3 - 4 2.00 1.00 3.60 0.25 0.50 0.90
EJE 4 - 5 2.00 1.00 3.60 0.25 0.50 0.90
EJE 8 - 9 2.00 1.00 3.60 0.25 0.50 0.90
EJE 9 - 10 2.00 1.00 3.60 0.25 0.50 0.90
EJE 10 - 11 2.00 1.00 3.60 0.25 0.50 0.90
EJE 11 - 12 2.00 1.00 3.60 0.25 0.50 0.90

VA-201
EJES A - B - C ENTRE
EJE 6 - 7 3.00 1.00 3.50 0.25 0.40 1.05

VCH-200
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 - 12 16.00 1.00 5.36 0.25 0.20 4.29

V-A
EJES 6 - 7 2.00 1.00 3.19 0.25 0.40 0.64

PABELLON 2
PRIMER NIVEL
VP-100
EJES 2 - 4 - 9 - 11 4.00 1.00 8.00 0.30 0.50 4.80

VP-101
EJES 1 - 5 - 8 - 12 4.00 1.00 8.00 0.25 0.50 4.00

VP-102
EJES 3 - 10 2.00 1.00 8.00 0.25 0.50 2.00

VP-103
EJES 6 - 7 2.00 1.00 5.32 0.25 0.50 1.33

VP-104
EJES 6 - 7 2.00 1.00 3.19 0.25 0.40 0.64
ESCALERA 1.00 1.00 5.11 0.25 0.40 0.51

VA-100
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.60 0.25 0.50 0.90
EJE 2 - 3 2.00 1.00 3.60 0.25 0.50 0.90
EJE 3 - 4 2.00 1.00 3.60 0.25 0.50 0.90
EJE 4 - 5 2.00 1.00 3.60 0.25 0.50 0.90
EJE 8 - 9 2.00 1.00 3.60 0.25 0.50 0.90
EJE 9 - 10 2.00 1.00 3.60 0.25 0.50 0.90
EJE 10 - 11 2.00 1.00 3.60 0.25 0.50 0.90
EJE 11 - 12 2.00 1.00 3.60 0.25 0.50 0.90

VA-101
EJES A - B ENTRE
EJE 6 - 7 2.00 1.00 3.50 0.25 0.50 0.88

VA-102
EJES C ENTRE
EJE 6 - 7 1.00 1.00 3.50 0.25 0.50 0.44

VCH-100
EJES A' ENTRE
EJE 1 - 2 1.00 1.00 3.60 0.25 0.20 0.18
EJE 2 - 3 1.00 1.00 3.60 0.25 0.20 0.18
EJE 3 - 4 1.00 1.00 3.60 0.25 0.20 0.18
EJE 4 - 5 1.00 1.00 3.60 0.25 0.20 0.18
EJE 6 - 7 1.00 1.00 3.50 0.25 0.20 0.18
EJE 8 - 9 1.00 1.00 3.60 0.25 0.20 0.18
EJE 9 - 10 1.00 1.00 3.60 0.25 0.20 0.18
EJE 10 - 11 1.00 1.00 3.60 0.25 0.20 0.18
EJE 11 - 12 1.00 1.00 3.60 0.25 0.20 0.18

SEGUNDO NIVEL
VA-202
EJES 2 - 4 - 9 - 11 4.00 1.00 10.28 0.30 0.50 6.17
EJES 2 - 4 - 9 - 11 4.00 1.00 1.78 0.30 0.28 0.60
EJES 2 - 4 - 9 - 11 4.00 1.00 2.63 0.30 0.38 1.20

VA-203
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 -12 8.00 1.00 10.28 0.25 0.50 10.28

VA-200
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.60 0.25 0.50 0.90
EJE 2 - 3 2.00 1.00 3.60 0.25 0.50 0.90
EJE 3 - 4 2.00 1.00 3.60 0.25 0.50 0.90
EJE 4 - 5 2.00 1.00 3.60 0.25 0.50 0.90
EJE 8 - 9 2.00 1.00 3.60 0.25 0.50 0.90
EJE 9 - 10 2.00 1.00 3.60 0.25 0.50 0.90
EJE 10 - 11 2.00 1.00 3.60 0.25 0.50 0.90
EJE 11 - 12 2.00 1.00 3.60 0.25 0.50 0.90

VA-201
EJES A - B - C ENTRE
EJE 6 - 7 3.00 1.00 3.50 0.25 0.40 1.05

VCH-200
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 - 12 16.00 1.00 5.36 0.25 0.20 4.29

V-A
EJES 6 - 7 2.00 1.00 3.19 0.25 0.40 0.64

PABELLON 3
VA-102
EJES 2 - 3 - 4 - 7 - 8 - 9 6.00 1.00 10.28 0.30 0.40 7.40
EJES 2 - 3 - 4 - 7 - 8 - 9 6.00 1.00 2.63 0.30 0.39 1.85
EJES 2 - 3 - 4 - 7 - 8 - 9 6.00 1.00 1.78 0.30 0.23 0.74

VA-101
EJES 1 - 5 - 6 - 10 4.00 1.00 10.28 0.25 0.40 4.11

VA-100
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.60 0.25 0.50 0.90
EJE 2 - 3 2.00 1.00 3.58 0.25 0.50 0.89
EJE 3 - 4 2.00 1.00 3.58 0.25 0.50 0.89
EJE 4 - 5 2.00 1.00 3.60 0.25 0.50 0.90
EJE 8 - 9 2.00 1.00 3.60 0.25 0.50 0.90
EJE 9 - 10 2.00 1.00 3.58 0.25 0.50 0.89
EJE 10 - 11 2.00 1.00 3.58 0.25 0.50 0.89
EJE 11 - 12 2.00 1.00 3.60 0.25 0.50 0.90

VCH-100
EJES 1 - 5 - 6 - 10 8.00 1.00 5.31 0.25 0.20 2.12

PABELLON 4
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
PRIMER NIVEL
VP-100
EJES 4 - 5 - 6 3.00 1.00 8.00 0.30 0.50 3.60

VP-101
EJES 3 - 7 2.00 1.00 8.00 0.25 0.50 2.00

VP-102
EJES 1 - 2 2.00 1.00 5.32 0.25 0.50 1.33

VP-103
EJES 1 - 2 2.00 1.00 3.19 0.25 0.40 0.64
ESCALERA 1.00 1.00 5.11 0.25 0.40 0.51

VA-100
EJES A - C ENTRE
EJE 3 - 4 2.00 1.00 3.60 0.25 0.50 0.90
EJE 4 - 5 2.00 1.00 3.57 0.25 0.50 0.89
EJE 5 - 6 2.00 1.00 3.57 0.25 0.50 0.89
EJE 6 - 7 2.00 1.00 3.60 0.25 0.50 0.90

VA-101
EJES A - B ENTRE
EJE 1 - 2 2.00 1.00 3.50 0.25 0.50 0.88

VA-102
EJES C ENTRE
EJE 1 - 2 1.00 1.00 3.50 0.25 0.50 0.44

VCH-100
EJES A' ENTRE
EJE 1 - 2 1.00 1.00 3.00 0.25 0.20 0.15
EJE 3 - 4 1.00 1.00 3.60 0.25 0.20 0.18
EJE 4 - 5 1.00 1.00 3.57 0.25 0.20 0.18
EJE 5 - 6 1.00 1.00 3.57 0.25 0.20 0.18
EJE 6 - 7 1.00 1.00 3.60 0.25 0.20 0.18

SEGUNDO NIVEL
VP-200
EJES 4 - 5 - 6 3.00 1.00 8.00 0.30 0.50 3.60

VP-201
EJES 3 - 7 2.00 1.00 8.00 0.25 0.50 2.00

VP-202
EJES 1 - 2 2.00 1.00 5.32 0.25 0.50 1.33

VP-203
EJES 1 - 2 2.00 1.00 3.19 0.25 0.40 0.64
ESCALERA 1.00 1.00 5.11 0.25 0.40 0.51

VA-200
EJES A - C ENTRE
EJE 3 - 4 2.00 1.00 3.60 0.25 0.50 0.90
EJE 4 - 5 2.00 1.00 3.57 0.25 0.50 0.89
EJE 5 - 6 2.00 1.00 3.57 0.25 0.50 0.89
EJE 6 - 7 2.00 1.00 3.60 0.25 0.50 0.90

VA-201
EJES A - B ENTRE
EJE 1 - 2 2.00 1.00 3.50 0.25 0.50 0.88

VA-202
EJES C ENTRE
EJE 1 - 2 1.00 1.00 3.50 0.25 0.50 0.44

VCH-200
EJES A' ENTRE
EJE 1 - 2 1.00 1.00 3.00 0.25 0.20 0.15
EJE 3 - 4 1.00 1.00 3.60 0.25 0.20 0.18
EJE 4 - 5 1.00 1.00 3.57 0.25 0.20 0.18
EJE 5 - 6 1.00 1.00 3.57 0.25 0.20 0.18
EJE 6 - 7 1.00 1.00 3.60 0.25 0.20 0.18

TERCER NIVEL
VA-302
EJES 4 - 5 - 6 3.00 1.00 10.28 0.30 0.50 4.63
EJES 4 - 5 - 6 6.00 1.00 2.63 0.30 0.33 1.56
EJES 4 - 5 - 6 6.00 1.00 1.78 0.30 0.23 0.74

VA-301
EJES 3 - 7 2.00 1.00 10.28 0.25 0.50 2.57
EJES 3 - 7 4.00 1.00 2.63 0.25 0.33 0.87
EJES 3 - 7 4.00 1.00 1.78 0.25 0.23 0.41

VA-303
EJES 1 - 2 2.00 1.00 10.28 0.25 0.50 2.57

VA-300
EJES A - C ENTRE
EJE 3 - 4 2.00 1.00 3.60 0.25 0.50 0.90
EJE 4 - 5 2.00 1.00 3.57 0.25 0.50 0.89
EJE 5 - 6 2.00 1.00 3.57 0.25 0.50 0.89
EJE 6 - 7 2.00 1.00 3.60 0.25 0.50 0.90

VA-304
EJES A - B - C 3.00 1.00 3.00 0.25 0.40 0.90

VCH-300
EJES 1 - 2 4.00 1.00 5.31 0.25 0.20 1.06

V-A
EJES 1 - 2 2.00 1.00 3.19 0.25 0.40 0.64

0.00

1112.38 M2
01.06.09.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 1 PERIMETRO
PRIMER NIVEL
VP-100
EJES 2 - 4 - 9 - 11 ENTRE
EJE A - C 4.00 1.00 5.07 - 0.90 18.25
EJE A' - A 4.00 1.00 2.13 - 0.90 7.67

VP-101
EJES 1 - 5 - 8 - 12
EJE A - B 4.00 1.00 2.18 - 0.60 5.23
EJE B - C 4.00 1.00 2.18 - 0.60 5.23
EJE A' - A 4.00 1.00 2.13 - 0.60 5.11

VP-102
EJES 3 - 10
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE A - B 2.00 1.00 2.18 - 0.60 2.62
EJE B - C 2.00 1.00 2.18 - 0.60 2.62
EJE A' - A 2.00 1.00 2.13 - 0.60 2.56

VP-103
EJES 6 - 7
EJE A - B 2.00 1.00 2.18 - 0.60 2.62
EJE A' - A 2.00 1.00 2.13 - 0.60 2.56

VP-104
EJES 6 - 7
EJE B - C 2.00 1.00 2.18 - 0.80 3.49
ESCALERA 1.00 1.00 5.11 - 0.65 3.32

VA-100
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.10 - 0.85 5.27
EJE 2 - 3 2.00 1.00 3.35 - 0.85 5.70
EJE 3 - 4 2.00 1.00 3.35 - 0.85 5.70
EJE 4 - 5 2.00 1.00 3.10 - 0.85 5.27
EJE 8 - 9 2.00 1.00 3.10 - 0.85 5.27
EJE 9 - 10 2.00 1.00 3.35 - 0.85 5.70
EJE 10 - 11 2.00 1.00 3.35 - 0.85 5.70
EJE 11 - 12 2.00 1.00 3.10 - 0.85 5.27

VA-101
EJE A - B 2.00 1.00 3.00 - 0.85 5.10

VA-102
EJE C 1.00 1.00 3.00 - 0.51 1.53

VCH-100
EJES A' ENTRE
EJE 1 - 2 1.00 1.00 3.60 - 0.45 1.62
EJE 2 - 3 1.00 1.00 3.60 - 0.45 1.62
EJE 3 - 4 1.00 1.00 3.60 - 0.45 1.62
EJE 4 - 5 1.00 1.00 3.60 - 0.45 1.62
EJE 6 - 7 1.00 1.00 3.60 - 0.45 1.62
EJE 8 - 9 1.00 1.00 3.60 - 0.45 1.62
EJE 9 - 10 1.00 1.00 3.60 - 0.45 1.62
EJE 10 - 11 1.00 1.00 3.60 - 0.45 1.62
EJE 11 - 12 1.00 1.00 3.60 - 0.45 1.62

SEGUNDO NIVEL
VA-202
EJES 2 - 4 - 9 - 11
EJE A - C 4.00 1.00 5.07 - 1.30 26.36
EJE A' - A 4.00 1.00 2.63 - 1.30 13.68
EJE C - C' 4.00 1.00 1.78 - 1.30 9.26

VA-203
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 -12
EJE A - B 4.00 1.00 2.18 - 1.00 8.72
EJE B - C 4.00 1.00 2.18 - 1.00 8.72
EJE A' - A 4.00 1.00 2.63 - 1.00 10.52
EJE C - C' 4.00 1.00 1.78 - 1.00 7.12

VA-200
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.60 - 1.25 9.00
EJE 2 - 3 2.00 1.00 3.60 - 1.25 9.00
EJE 3 - 4 2.00 1.00 3.60 - 1.25 9.00
EJE 4 - 5 2.00 1.00 3.60 - 1.25 9.00
EJE 8 - 9 2.00 1.00 3.60 - 1.25 9.00
EJE 9 - 10 2.00 1.00 3.60 - 1.25 9.00
EJE 10 - 11 2.00 1.00 3.60 - 1.25 9.00
EJE 11 - 12 2.00 1.00 3.60 - 1.25 9.00

VA-201
EJES A - B - C ENTRE
EJE 6 - 7 3.00 1.00 3.00 - 1.05 9.45

VCH-200
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 - 12 16.00 1.00 5.36 - 0.40 34.30

V-A
EJES 1 - 2 2.00 1.00 3.19 - 0.80 5.10

PABELLON 2 PERIMETRO
PRIMER NIVEL
VP-100
EJES 2 - 4 - 9 - 11 ENTRE
EJE A - C 4.00 1.00 5.07 - 0.90 18.25
EJE A' - A 4.00 1.00 2.13 - 0.90 7.67

VP-101
EJES 1 - 5 - 8 - 12
EJE A - B 4.00 1.00 2.18 - 0.60 5.23
EJE B - C 4.00 1.00 2.18 - 0.60 5.23
EJE A' - A 4.00 1.00 2.13 - 0.60 5.11

VP-102
EJES 3 - 10
EJE A - B 2.00 1.00 2.18 - 0.60 2.62
EJE B - C 2.00 1.00 2.18 - 0.60 2.62
EJE A' - A 2.00 1.00 2.13 - 0.60 2.56

VP-103
EJES 6 - 7
EJE A - B 2.00 1.00 2.18 - 0.60 2.62
EJE A' - A 2.00 1.00 2.13 - 0.60 2.56

VP-104
EJES 6 - 7
EJE B - C 2.00 1.00 2.18 - 0.80 3.49
ESCALERA 1.00 1.00 5.11 - 0.65 3.32

VA-100
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.10 - 0.85 5.27
EJE 2 - 3 2.00 1.00 3.35 - 0.85 5.70
EJE 3 - 4 2.00 1.00 3.35 - 0.85 5.70
EJE 4 - 5 2.00 1.00 3.10 - 0.85 5.27
EJE 8 - 9 2.00 1.00 3.10 - 0.85 5.27
EJE 9 - 10 2.00 1.00 3.35 - 0.85 5.70
EJE 10 - 11 2.00 1.00 3.35 - 0.85 5.70
EJE 11 - 12 2.00 1.00 3.10 - 0.85 5.27

VA-101
EJE A - B 2.00 1.00 3.00 - 0.85 5.10

VA-102
EJE C 1.00 1.00 3.00 - 0.51 1.53
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
VCH-100
EJES A' ENTRE
EJE 1 - 2 1.00 1.00 3.60 - 0.45 1.62
EJE 2 - 3 1.00 1.00 3.60 - 0.45 1.62
EJE 3 - 4 1.00 1.00 3.60 - 0.45 1.62
EJE 4 - 5 1.00 1.00 3.60 - 0.45 1.62
EJE 6 - 7 1.00 1.00 3.60 - 0.45 1.62
EJE 8 - 9 1.00 1.00 3.60 - 0.45 1.62
EJE 9 - 10 1.00 1.00 3.60 - 0.45 1.62
EJE 10 - 11 1.00 1.00 3.60 - 0.45 1.62
EJE 11 - 12 1.00 1.00 3.60 - 0.45 1.62

SEGUNDO NIVEL
VA-202
EJES 2 - 4 - 9 - 11
EJE A - C 4.00 1.00 5.07 - 1.30 26.36
EJE A' - A 4.00 1.00 2.63 - 1.30 13.68
EJE C - C' 4.00 1.00 1.78 - 1.30 9.26

VA-203
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 -12
EJE A - B 4.00 1.00 2.18 - 1.00 8.72
EJE B - C 4.00 1.00 2.18 - 1.00 8.72
EJE A' - A 4.00 1.00 2.63 - 1.00 10.52
EJE C - C' 4.00 1.00 1.78 - 1.00 7.12

VA-200
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.60 - 1.25 9.00
EJE 2 - 3 2.00 1.00 3.60 - 1.25 9.00
EJE 3 - 4 2.00 1.00 3.60 - 1.25 9.00
EJE 4 - 5 2.00 1.00 3.60 - 1.25 9.00
EJE 8 - 9 2.00 1.00 3.60 - 1.25 9.00
EJE 9 - 10 2.00 1.00 3.60 - 1.25 9.00
EJE 10 - 11 2.00 1.00 3.60 - 1.25 9.00
EJE 11 - 12 2.00 1.00 3.60 - 1.25 9.00

VA-201
EJES A - B - C ENTRE
EJE 6 - 7 3.00 1.00 3.00 - 1.05 9.45

VCH-200
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 - 12 16.00 1.00 5.36 - 0.40 34.30

V-A
EJES 1 - 2 2.00 1.00 3.19 - 0.80 5.10

PABELLON 3 PERIMETRO
VA-102
EJES 3 - 4 - 7 - 8
EJE A - C 4.00 1.00 4.87 - 1.10 21.43
EJE A' - A 4.00 1.00 2.63 - 1.10 11.57
EJE C - C' 4.00 1.00 1.78 - 1.10 7.83

EJES 2 - 9
EJE A - C 2.00 1.00 4.87 - 0.95 9.25
EJE A' - A 2.00 1.00 2.63 - 0.95 5.00
EJE C - C' 2.00 1.00 1.78 - 0.95 3.38

VA-101
EJES 1 - 5 - 6 - 10
EJE A - B 4.00 1.00 2.48 - 0.80 7.94
EJE B - C 4.00 1.00 2.48 - 0.80 7.94
EJE A' - A 4.00 1.00 2.63 - 0.80 8.42
EJE C - C' 4.00 1.00 1.78 - 0.80 5.70

VA-100
EJES A - C ENTRE
EJE 1 - 2 2.00 1.00 3.60 - 1.05 7.56
EJE 2 - 3 2.00 1.00 3.58 - 1.05 7.51
EJE 3 - 4 2.00 1.00 3.58 - 1.05 7.51
EJE 4 - 5 2.00 1.00 3.60 - 1.05 7.56
EJE 8 - 9 2.00 1.00 3.60 - 1.05 7.56
EJE 9 - 10 2.00 1.00 3.58 - 1.05 7.51
EJE 10 - 11 2.00 1.00 3.58 - 1.05 7.51
EJE 11 - 12 2.00 1.00 3.60 - 1.05 7.56

VCH-100
EJES 1 - 5 - 6 - 10 8.00 1.00 5.31 - 0.40 16.99

PABELLON 4 PERIMETRO
PRIMER NIVEL
VP-100
EJES 4 - 5
EJE A - C 2.00 1.00 5.07 - 0.90 9.13
EJE A - A' 2.00 1.00 2.13 - 0.90 3.83

EJE 6
EJE A - C 1.00 1.00 5.07 - 0.75 3.80
EJE A - A' 1.00 1.00 2.13 - 0.75 1.60

VP-101
EJES 3 - 7
EJE A - B 2.00 1.00 1.84 - 0.60 2.20
EJE B - C 2.00 1.00 1.84 - 0.60 2.20
EJE A' - A 2.00 1.00 2.13 - 0.60 2.56

VP-102
EJES 1 - 2
EJE A - B 2.00 1.00 2.19 - 0.60 2.62
EJE A - A' 2.00 1.00 2.13 - 0.60 2.56

VP-103
EJES 1 - 2 2.00 1.00 2.19 - 0.80 3.50
ESCALERA 1.00 1.00 5.11 - 0.65 3.32

VA-100
EJES A - C ENTRE
EJE 3 - 4 2.00 1.00 3.05 - 0.85 5.19
EJE 4 - 5 2.00 1.00 2.98 - 0.85 5.06
EJE 5 - 6 2.00 1.00 2.98 - 0.85 5.06
EJE 6 - 7 2.00 1.00 3.05 - 0.85 5.19

VA-101
EJES A - B ENTRE
EJE 1 - 2 2.00 1.00 3.00 - 0.85 5.10

VA-102
EJES C ENTRE
EJE 1 - 2 2.00 1.00 3.00 - 0.51 3.06

VCH-100
EJES A' ENTRE
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJE 1 - 2 1.00 1.00 3.00 - 0.45 1.35
EJE 3 - 4 1.00 1.00 3.60 - 0.45 1.62
EJE 4 - 5 1.00 1.00 3.57 - 0.45 1.61
EJE 5 - 6 1.00 1.00 3.57 - 0.45 1.61
EJE 6 - 7 1.00 1.00 3.60 - 0.45 1.62
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
SEGUNDO NIVEL
VP-200
EJES 4 - 5
EJE A - C 2.00 1.00 5.07 - 0.90 9.13
EJE A - A' 2.00 1.00 2.13 - 0.90 3.83

EJE 6
EJE A - C 1.00 1.00 5.07 - 0.75 3.80
EJE A - A' 1.00 1.00 2.13 - 0.75 1.60

VP-201
EJES 3 - 7
EJE A - B 2.00 1.00 1.84 - 0.60 2.20
EJE B - C 2.00 1.00 1.84 - 0.60 2.20
EJE A' - A 2.00 1.00 2.13 - 0.60 2.56

VP-202
EJES 1 - 2
EJE A - B 2.00 1.00 2.19 - 0.60 2.62
EJE A - A' 2.00 1.00 2.13 - 0.60 2.56

VP-203
EJES 1 - 2 2.00 1.00 2.19 - 0.80 3.50
ESCALERA 1.00 1.00 5.11 - 0.65 3.32

VA-200
EJES A - C ENTRE
EJE 3 - 4 2.00 1.00 3.05 - 0.85 5.19
EJE 4 - 5 2.00 1.00 2.98 - 0.85 5.06
EJE 5 - 6 2.00 1.00 2.98 - 0.85 5.06
EJE 6 - 7 2.00 1.00 3.05 - 0.85 5.19

VA-201
EJES A - B ENTRE
EJE 1 - 2 2.00 1.00 3.00 - 0.85 5.10

VA-202
EJES C ENTRE
EJE 1 - 2 2.00 1.00 3.00 - 0.51 3.06

VCH-200
EJES A' ENTRE
EJE 1 - 2 1.00 1.00 3.00 - 0.45 1.35
EJE 3 - 4 1.00 1.00 3.60 - 0.45 1.62
EJE 4 - 5 1.00 1.00 3.57 - 0.45 1.61
EJE 5 - 6 1.00 1.00 3.57 - 0.45 1.61
EJE 6 - 7 1.00 1.00 3.60 - 0.45 1.62

TERCER NIVEL
VA-302
EJES 4 - 5
EJE A - C 2.00 1.00 5.07 - 1.30 13.18
EJE A - A' 2.00 1.00 2.63 - 1.30 6.84
EJE C - C' 2.00 1.00 1.78 - 1.30 4.63

EJE 6
EJE A - C 2.00 1.00 5.07 - 1.15 11.66
EJE A - A' 2.00 1.00 2.63 - 1.15 6.05
EJE C - C' 2.00 1.00 1.78 - 1.15 4.09

VA-301
EJES 3 - 7
EJE A - B 2.00 1.00 1.84 - 1.00 3.67
EJE B - C 2.00 1.00 1.84 - 1.00 3.67
EJE A' - A 2.00 1.00 2.63 - 1.00 5.26
EJE C - C' 2.00 1.00 1.78 - 1.00 3.56

VA-303
EJES 1 - 2
EJE A - B 2.00 1.00 1.84 - 1.25 4.60
EJE B - C 2.00 1.00 1.84 - 1.25 4.59
EJE A - A' 2.00 1.00 2.63 - 1.25 6.57
EJE C - C' 2.00 1.00 1.78 - 1.25 4.45

VA-300
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS
EJES A - C ENTRE
EJE 3 - 4 2.00 1.00 3.05 - 1.25 7.63
EJE 4 - 5 2.00 1.00 2.98 - 1.25 7.44
EJE 5 - 6 2.00 1.00 2.98 - 1.25 7.44
EJE 6 - 7 2.00 1.00 3.05 - 1.25 7.63

VA-304
EJES A - B - C 3.00 1.00 3.00 - 1.05 9.45

VCH-200
EJES 1 - 2 4.00 1.00 5.31 - 0.40 8.50

V-A
EJES 1 - 2 2.00 1.00 3.19 - 0.80 5.10

23854.12 KG
01.06.09.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 - - - 23854.12


MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

01.06.10 LOSAS ALIGERADAS 59.11 M3


01.06.10.01 CONCRETO F´c = 210 kg/cm² # Veces # Elementos Area ( m2) Parcial Total UND

Factor m3/m2

PABELLON 01
1° PISO
AULA PRIMARIA N° 03 2.00 1.00 19.33 0.0875 3.38
AULA PRIMARIA N° 02 2.00 1.00 19.33 0.0875 3.38
ESCALERA 1.00 1.00 8.06 0.0875 0.71
AULA PRIMARIA N° 01 2.00 1.00 19.33 0.0875 3.38
SS.HH VARONES Y MUJERES 2.00 1.00 19.33 0.0875 3.38
PASADIZO O BALCON TOTAL 8.00 1.00 6.77 0.0875 4.74
PASADIZO O BALCON EN ESCALERA 1.00 1.00 5.64 0.0875 0.49

PABELLON 02
1° PISO
AULA PRIMARIA N° 03 2.00 1.00 19.33 0.0875 3.38
AULA PRIMARIA N° 02 2.00 1.00 19.33 0.0875 3.38
ESCALERA 1.00 1.00 8.06 0.0875 0.71
AULA PRIMARIA N° 01 2.00 1.00 19.33 0.0875 3.38
SS.HH VARONES Y MUJERES 2.00 1.00 19.33 0.0875 3.38
PASADIZO O BALCON TOTAL 8.00 1.00 6.77 0.0875 4.74
PASADIZO O BALCON EN ESCALERA 1.00 1.00 5.64 0.0875 0.49

PABELLON 04
1° PISO
ESCALERA 1.00 1.00 8.06 0.0875 0.71
LABORATORIO DE CIENCIAS 3.00 1.00 19.33 0.0875 5.07
DEPOSITO 1.00 1.00 19.33 0.0875 1.69
PASADIZO O BALCON TOTAL 4.00 1.00 6.77 0.0875 2.37
PASADIZO O BALCON EN ESCALERA 1.00 1.00 5.64 0.0875 0.49

2° PISO
ESCALERA 1.00 1.00 8.06 0.0875 0.71
SALON DE USOS MULTIPLES 3.00 1.00 19.33 0.0875 5.07
DEPOSITO 1.00 1.00 19.33 0.0875 1.69
PASADIZO O BALCON TOTAL 4.00 1.00 6.77 0.0875 2.37

675.56 M2
01.06.10.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PABELLON 01 0.00
1° PISO
AULA PRIMARIA N° 03 2.00 1.00 19.33 - 38.66
AULA PRIMARIA N° 02 2.00 1.00 19.33 - 38.66
ESCALERA 1.00 1.00 8.06 - 8.06
AULA PRIMARIA N° 01 2.00 1.00 19.33 - 38.66
SS.HH VARONES Y MUJERES 2.00 1.00 19.33 - 38.66
PASADIZO O BALCON TOTAL 8.00 1.00 6.77 - 54.16
PASADIZO O BALCON EN ESCALERA 1.00 1.00 5.64 - 5.64

PABELLON 02
1° PISO
AULA PRIMARIA N° 03 2.00 1.00 19.33 - 38.66
AULA PRIMARIA N° 02 2.00 1.00 19.33 - 38.66
ESCALERA 1.00 1.00 8.06 - 8.06
AULA PRIMARIA N° 01 2.00 1.00 19.33 - 38.66
SS.HH VARONES Y MUJERES 2.00 1.00 19.33 - 38.66
PASADIZO O BALCON TOTAL 8.00 1.00 6.77 - 54.16
PASADIZO O BALCON EN ESCALERA 1.00 1.00 5.64 - 5.64
0.00
PABELLON 04 0.00
1° PISO 0.00
ESCALERA 1.00 1.00 8.06 - 8.06
LABORATORIO DE CIENCIAS 3.00 1.00 19.33 - 57.99
DEPOSITO 1.00 1.00 19.33 - 19.33
PASADIZO O BALCON TOTAL 4.00 1.00 6.77 - 27.08
PASADIZO O BALCON EN ESCALERA 1.00 1.00 5.64 - 5.64
0.00
2° PISO 0.00
ESCALERA 1.00 1.00 8.06 - 8.06
SALON DE USOS MULTIPLES 3.00 1.00 19.33 - 57.99
DEPOSITO 1.00 1.00 19.33 - 19.33
PASADIZO O BALCON TOTAL 4.00 1.00 6.77 - 27.08

0.00
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

3777.25 KG
01.06.10.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSA ALIGERADA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 - - - 3777.25


0.00

5628.00 UND
01.06.10.04 LADRILLO DE ARCILLA HUECO 15 x 30 x 30cm. PROVEIDO Y COLOCADO. # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND
FACTOR
1° PISO 0.00
AULA PRIMARIA N° 03 2.00 1.00 19.33 8.33 322.04
AULA PRIMARIA N° 02 2.00 1.00 19.33 8.33 322.04
ESCALERA 1.00 1.00 8.06 8.33 67.14
AULA PRIMARIA N° 01 2.00 1.00 19.33 8.33 322.04
SS.HH VARONES Y MUJERES 2.00 1.00 19.33 8.33 322.04
PASADIZO O BALCON TOTAL 8.00 1.00 6.77 8.33 451.15
PASADIZO O BALCON EN ESCALERA 1.00 1.00 5.64 8.33 46.98

PABELLON 02
1° PISO
AULA PRIMARIA N° 03 2.00 1.00 19.33 8.33 322.04
AULA PRIMARIA N° 02 2.00 1.00 19.33 8.33 322.04
ESCALERA 1.00 1.00 8.06 8.33 67.14
AULA PRIMARIA N° 01 2.00 1.00 19.33 8.33 322.04
SS.HH VARONES Y MUJERES 2.00 1.00 19.33 8.33 322.04
PASADIZO O BALCON TOTAL 8.00 1.00 6.77 8.33 451.15
PASADIZO O BALCON EN ESCALERA 1.00 1.00 5.64 8.33 46.98

PABELLON 04
1° PISO
ESCALERA 1.00 1.00 8.06 8.33 67.14
LABORATORIO DE CIENCIAS 3.00 1.00 19.33 8.33 483.06
DEPOSITO 1.00 1.00 19.33 8.33 161.02
PASADIZO O BALCON TOTAL 4.00 1.00 6.77 8.33 225.58
PASADIZO O BALCON EN ESCALERA 1.00 1.00 5.64 8.33 46.98
0.00
2° PISO 0.00
ESCALERA 1.00 1.00 8.06 8.33 67.14
SALON DE USOS MULTIPLES 3.00 1.00 19.33 8.33 483.06
DEPOSITO 1.00 1.00 19.33 8.33 161.02
PASADIZO O BALCON TOTAL 4.00 1.00 6.77 8.33 225.58

01.06.11 CISTERNAS SUBTERRANEAS 12.85 M3


01.06.11.01 CONCRETO f'c=210 kg/cm2 PARA CISTERNA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

LATERALES 1.00 1.00 3.00 AREA CAD 3.52 10.56

TECHO 1.00 1.00 2.20 5.00 0.15 1.65


1.00 1.00 0.80 4.20 0.15 0.50

TAPA 2.00 1.00 1.40 0.10 0.50 0.14

TECHO CASETA 1.00 1.00 AREA CAD 5.78 0.15 0.87

0.00

45.80 M2
01.06.11.02 ENCOFRADO Y DESENCOFRADO PARA CISTERNA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PERIMETRO
LATERALES 2.00 1.00 3.00 - 3.75 22.50

TECHO 1.00 1.00 2.20 - 5.00 11.00


1.00 1.00 0.80 - 4.20 3.36

TAPA 4.00 1.00 0.80 - 0.50 1.60


4.00 1.00 0.60 - 0.65 1.56

TECHO CASETA 1.00 1.00 AREA CAD 5.78 5.78

702.54 KG
01.06.11.03 ACERO ESTRUCTURAL TRABAJADO PARA CISTERNA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 - - - 702.54

01.06.12 TANQUE ELEVADO 16.93 M3


01.06.12.01 CONCRETO f'c=210 kg/cm2 PARA TANQUE ELEVADO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

COLUMNAS 4.00 1.00 12.84 0.4 0.40 8.22

VIGAS 16.00 1.00 1.95 0.25 0.50 3.90

FONDO 1.00 1.00 AREA CAD 5.78 0.20 1.16

TECHO 1.00 1.00 AREA CAD 5.72 0.15 0.86

PARED 4.00 1.00 1.95 0.20 1.77 2.76

TAPA 2.00 1.00 1.40 0.10 0.15 0.04

0.00

87.53 M2
01.06.12.02 ENCOFRADO Y DESENCOFRADO PARA TANQUE ELEVADO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

PERIMETRO
COLUMNAS 4.00 1.00 12.84 - 0.16 8.22

VIGAS 16.00 1.00 1.95 - 1.25 39.00

FONDO 1.00 1.00 AREA CAD 5.78 5.78

TECHO 1.00 1.00 AREA CAD 5.72 5.72

PARED 4.00 1.00 1.95 - 3.54 27.61

TAPA 4.00 1.00 0.80 - 0.15 0.48


4.00 1.00 0.60 - 0.30 0.72
MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

1899.17 KG
01.06.12.03 ACERO ESTRUCTURAL TRABAJADO PARA TANQUE ELEVADO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 - - - 1899.17


MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

01.06.13 MURO DE CONTENCION


01.06.13.01 ZAPATA DE MURO DE CONTENCION 78.18 M3
01.06.13.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS MUROS DE CONTENCION # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

MURO DE CONTENCION
MURO TIPO I
MC-01 1.00 1.00 4.00 1.60 0.40 2.56
MC-02 1.00 1.00 4.00 1.60 0.40 2.56
0.00
MURO TIPO II 0.00
MC-03 1.00 1.00 3.86 2.60 0.40 4.01
MC-04 1.00 1.00 8.48 2.60 0.40 8.82
MC-05 1.00 1.00 8.52 2.60 0.40 8.86
MC-06 1.00 1.00 0.99 2.60 0.40 1.03
MC-07 1.00 1.00 8.32 2.60 0.40 8.65
MC-08 1.00 1.00 3.91 2.60 0.40 4.07
MC-09 1.00 1.00 1.76 2.60 0.40 1.83
MC-10 1.00 1.00 3.00 2.60 0.40 3.12
MC-11 1.00 1.00 6.45 2.60 0.40 6.71
MC-12 1.00 1.00 2.13 2.60 0.40 2.22
MC-13 1.00 1.00 3.51 2.60 0.40 3.65
MC-14 1.00 1.00 6.45 2.60 0.40 6.71
MC-15 1.00 1.00 6.45 2.60 0.40 6.71
MC-16 1.00 1.00 6.42 2.60 0.40 6.68

0.00

4877.13 KG
01.06.13.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATA DE MURO DE CONTENC # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 - - - 4877.13

01.06.13.02 PANTALLA DE MURO DE CONTENCION 74.75 M3


01.06.13.02.01 CONCRETO f'c=210 kg/cm2 PARA PANTALLA DE MURO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

MURO DE CONTENCION
MURO TIPO I AREA CAD
MC-01 1.00 1.00 4.00 0.65 2.60
MC-02 1.00 1.00 4.00 0.65 2.60

MURO TIPO II
MC-03 1.00 1.00 3.86 0.99 3.82
MC-04 1.00 1.00 8.48 0.99 8.40
MC-05 1.00 1.00 8.52 0.99 8.43
MC-06 1.00 1.00 0.99 0.99 0.98
MC-07 1.00 1.00 8.32 0.99 8.24
MC-08 1.00 1.00 3.91 0.99 3.87
MC-09 1.00 1.00 1.76 0.99 1.74
MC-10 1.00 1.00 3.00 0.99 2.97
MC-11 1.00 1.00 6.45 0.99 6.39
MC-12 1.00 1.00 2.13 0.99 2.11
MC-13 1.00 1.00 3.51 0.99 3.47
MC-14 1.00 1.00 6.45 0.99 6.39
MC-15 1.00 1.00 6.45 0.99 6.39
MC-16 1.00 1.00 6.42 0.99 6.36

0.00

273.70 M2
01.06.13.02.02 ENCOFRADO Y DESENCOFRADO PARA PANTALLA DE MURO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

MURO DE CONTENCION
MURO TIPO I
MC-01 1.00 1.00 4.00 2.60 10.40
MC-02 1.00 1.00 4.00 2.60 10.40

MURO TIPO II
MC-03 1.00 1.00 3.86 3.60 13.90
MC-04 1.00 1.00 8.48 3.60 30.53
MC-05 1.00 1.00 8.52 3.60 30.67
MC-06 1.00 1.00 0.99 3.60 3.56
MC-07 1.00 1.00 8.32 3.60 29.95
MC-08 1.00 1.00 3.91 3.60 14.08
MC-09 1.00 1.00 1.76 3.60 6.34
MC-10 1.00 1.00 3.00 3.60 10.80
MC-11 1.00 1.00 6.45 3.60 23.22
MC-12 1.00 1.00 2.13 3.60 7.67
MC-13 1.00 1.00 3.51 3.60 12.64
MC-14 1.00 1.00 6.45 3.60 23.22
MC-15 1.00 1.00 6.45 3.60 23.22
MC-16 1.00 1.00 6.42 3.60 23.11

273.70 M2
01.06.13.02.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN PANTALLA EXTERIOR # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

MURO DE CONTENCION
MURO TIPO I H1
MC-01 1.00 1.00 4.00 2.60 10.40
MC-02 1.00 1.00 4.00 2.60 10.40

MURO TIPO II
MC-03 1.00 1.00 3.86 3.60 13.90
MC-04 1.00 1.00 8.48 3.60 30.53
MC-05 1.00 1.00 8.52 3.60 30.67
MC-06 1.00 1.00 0.99 3.60 3.56
MC-07 1.00 1.00 8.32 3.60 29.95
MC-08 1.00 1.00 3.91 3.60 14.08
MC-09 1.00 1.00 1.76 3.60 6.34
MC-10 1.00 1.00 3.00 3.60 10.80
MC-11 1.00 1.00 6.45 3.60 23.22
MC-12 1.00 1.00 2.13 3.60 7.67
MC-13 1.00 1.00 3.51 3.60 12.64
MC-14 1.00 1.00 6.45 3.60 23.22
MC-15 1.00 1.00 6.45 3.60 23.22
MC-16 1.00 1.00 6.42 3.60 23.11

4177.79 KG
01.06.12.03 ACERO ESTRUCTURAL TRABAJADO PARA PANTALLA MURO DE CONTENCI # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

1.00 1.00 - - - 4177.79


MUNICIPALIDAD DISTRITAL DE HUANCAYO
PROYECTO
MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE LA I.E“
P.N.P.SGTO. 1 ° RAMIRO VILLA VERDE LAZO - DISTRITO DE HUANCAYO, PROVINCIA DE HUANCAYO, REGIÓN
" JUNÍN
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
---------
METRADO - ESTRUCTURAS

1.07 VARIOS 15.65 M2


01.07.01 ACABADO PULIDO DE CORONA EN MURO # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

MURO DE CONTENCION
MURO TIPO I
MC-01 1.00 1.00 4.00 0.20 0.80
MC-02 1.00 1.00 4.00 0.20 0.80
0.00
MURO TIPO II 0.00
MC-03 1.00 1.00 3.86 0.20 0.77
MC-04 1.00 1.00 8.48 0.20 1.70
MC-05 1.00 1.00 8.52 0.20 1.70
MC-06 1.00 1.00 0.99 0.20 0.20
MC-07 1.00 1.00 8.32 0.20 1.66
MC-08 1.00 1.00 3.91 0.20 0.78
MC-09 1.00 1.00 1.76 0.20 0.35
MC-10 1.00 1.00 3.00 0.20 0.60
MC-11 1.00 1.00 6.45 0.20 1.29
MC-12 1.00 1.00 2.13 0.20 0.43
MC-13 1.00 1.00 3.51 0.20 0.70
MC-14 1.00 1.00 6.45 0.20 1.29
MC-15 1.00 1.00 6.45 0.20 1.29
MC-16 1.00 1.00 6.42 0.20 1.28

0.00

7.58 M2
01.07.02 JUNTA DE DILATACIÓN DE TECNOPOR e= 1", PARA MUROS # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

MURO DE CONTENCION AREA CAD


MURO TIPO I
MC-01 1.00 1.00 0.65 0.65
0.00
MURO TIPO II 0.00
MC-03 1.00 1.00 0.99 0.99
MC-05 1.00 1.00 0.99 0.99
MC-08 1.00 1.00 0.99 0.99
MC-10 1.00 1.00 0.99 0.99
MC-13 1.00 1.00 0.99 0.99
MC-14 1.00 1.00 0.99 0.99
MC-15 1.00 1.00 0.99 0.99

27.80 M
01.07.03 SELLO ASFÁLTICO EN PANTALLA # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

MURO DE CONTENCION
MURO TIPO I
MC-01 1.00 1.00 2.60 2.60

MURO TIPO II
MC-03 1.00 1.00 3.60 3.60
MC-05 1.00 1.00 3.60 3.60
MC-08 1.00 1.00 3.60 3.60
MC-10 1.00 1.00 3.60 3.60
MC-13 1.00 1.00 3.60 3.60
MC-14 1.00 1.00 3.60 3.60
MC-15 1.00 1.00 3.60 3.60

78.25 M
01.07.04 DRENAJE CON GRAVA DE 1/2" - 3/4" Y TUBO DE PVC Ø 2" # Veces # Elementos Long. m Ancho m Alto m Parcial Total UND

MURO DE CONTENCION
MURO TIPO I
MC-01 1.00 1.00 4.00 4.00
MC-02 1.00 1.00 4.00 4.00

MURO TIPO II
MC-03 1.00 1.00 3.86 3.86
MC-04 1.00 1.00 8.48 8.48
MC-05 1.00 1.00 8.52 8.52
MC-06 1.00 1.00 0.99 0.99
MC-07 1.00 1.00 8.32 8.32
MC-08 1.00 1.00 3.91 3.91
MC-09 1.00 1.00 1.76 1.76
MC-10 1.00 1.00 3.00 3.00
MC-11 1.00 1.00 6.45 6.45
MC-12 1.00 1.00 2.13 2.13
MC-13 1.00 1.00 3.51 3.51
MC-14 1.00 1.00 6.45 6.45
MC-15 1.00 1.00 6.45 6.45
MC-16 1.00 1.00 6.42 6.42
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

01.05.01 SOBRECIMIENTOS
01.05.01.03 ACERO CORRUGADO fy = 4200 kg/cm² GRADO 60
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ACERO EN SOBRECIMIENTO REFORZADOS

PABELLON 01
EJE A ENTRE
EJE 1-2 Longitudinal 3/8 1.00 5.00 1.86 9.30
vertical 3/8 1.00 4.00 1.85 7.40

EJE 2-3 Longitudinal 3/8 1.00 5.00 3.25 16.25


vertical 3/8 1.00 12.00 1.85 22.20

EJE 3-4 Longitudinal 3/8 1.00 5.00 2.11 10.55


vertical 3/8 1.00 5.00 1.85 9.25

EJE 4-5 Longitudinal 3/8 1.00 5.00 3.00 15.00


vertical 3/8 1.00 11.00 1.85 20.35

EJE 8-9 Longitudinal 3/8 1.00 5.00 3.00 15.00


vertical 3/8 1.00 11.00 1.85 20.35

EJE 9-10 Longitudinal 3/8 1.00 5.00 2.11 10.55


vertical 3/8 1.00 5.00 1.85 9.25

EJE 10-11 Longitudinal 3/8 1.00 5.00 1.12 5.60


vertical 3/8 1.00 3.00 1.85 5.55

EJE 11-12 Longitudinal 3/8 1.00 5.00 0.72 3.60


vertical 3/8 1.00 1.00 1.85 1.85

EJE C ENTRE
EJE 1-2, 4-5, 8-9, 11-12 Longitudinal 3/8 4.00 5.00 3.00 60.00
vertical 3/8 4.00 11.00 1.85 81.40

EJE 2-3, 3-4, 9-10, 10-11 Longitudinal 3/8 4.00 5.00 3.25 65.00
vertical 3/8 4.00 12.00 1.85 88.80

EJE 1 ENTRE
EJE A-B Longitudinal 3/8 2.00 6.00 2.13 25.56
vertical 3/8 2.00 9.00 2.00 36.00

EJE B-C Longitudinal 3/8 2.00 6.00 2.13 25.56


vertical 3/8 2.00 9.00 2.00 36.00

EJE 3 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

EJE 5 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

EJE 6 ENTRE
EJE A-B Longitudinal 3/8 1.00 5.00 2.13 10.65
vertical 3/8 1.00 9.00 1.85 16.65

EJE B-C Longitudinal 3/8 1.00 5.00 2.13 10.65


vertical 3/8 1.00 9.00 1.85 16.65

EJE 7 ENTRE
EJE A-B Longitudinal 3/8 1.00 5.00 2.13 10.65
vertical 3/8 1.00 9.00 1.85 16.65

EJE B-C Longitudinal 3/8 1.00 5.00 2.13 10.65


vertical 3/8 1.00 9.00 1.85 16.65

EJE 8 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

EJE 10 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 2.00 36.00

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 2.00 36.00

EJE 11 ENTRE
EJE A-B-C Longitudinal 3/8 1.00 5.00 5.02 25.10
vertical 3/8 1.00 20.00 1.85 37.00

EJE 12 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

PABELLON 02
EJE A ENTRE
EJE 1-2 Longitudinal 3/8 1.00 5.00 1.86 9.30
vertical 3/8 1.00 4.00 1.85 7.40

EJE 2-3 Longitudinal 3/8 1.00 5.00 3.25 16.25


vertical 3/8 1.00 12.00 1.85 22.20

EJE 3-4 Longitudinal 3/8 1.00 5.00 2.11 10.55


vertical 3/8 1.00 5.00 1.85 9.25

EJE 4-5 Longitudinal 3/8 1.00 5.00 3.00 15.00


vertical 3/8 1.00 11.00 1.85 20.35

EJE 8-9 Longitudinal 3/8 1.00 5.00 3.00 15.00


vertical 3/8 1.00 11.00 1.85 20.35

EJE 9-10 Longitudinal 3/8 1.00 5.00 2.11 10.55


vertical 3/8 1.00 5.00 1.85 9.25

EJE 10-11 Longitudinal 3/8 1.00 5.00 1.12 5.60


vertical 3/8 1.00 3.00 1.85 5.55

EJE 11-12 Longitudinal 3/8 1.00 5.00 0.72 3.60


vertical 3/8 1.00 1.00 1.85 1.85

EJE C ENTRE
EJE 1-2, 4-5, 8-9, 11-12 Longitudinal 3/8 4.00 5.00 3.00 60.00
vertical 3/8 4.00 11.00 1.85 81.40

EJE 2-3, 3-4, 9-10, 10-11 Longitudinal 3/8 4.00 5.00 3.25 65.00
vertical 3/8 4.00 12.00 1.85 88.80

EJE 1 ENTRE
EJE A-B Longitudinal 3/8 2.00 6.00 2.13 25.56
vertical 3/8 2.00 9.00 2.00 36.00

EJE B-C Longitudinal 3/8 2.00 6.00 2.13 25.56


vertical 3/8 2.00 9.00 2.00 36.00

EJE 3 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

EJE 5 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

EJE 6 ENTRE
EJE A-B Longitudinal 3/8 1.00 5.00 2.13 10.65
vertical 3/8 1.00 9.00 1.85 16.65

EJE B-C Longitudinal 3/8 1.00 5.00 2.13 10.65


vertical 3/8 1.00 9.00 1.85 16.65

EJE 7 ENTRE
EJE A-B Longitudinal 3/8 1.00 5.00 2.13 10.65
vertical 3/8 1.00 9.00 1.85 16.65

EJE B-C Longitudinal 3/8 1.00 5.00 2.13 10.65


vertical 3/8 1.00 9.00 1.85 16.65

EJE 8 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

EJE 10 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 2.00 36.00

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 2.00 36.00

EJE 12 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

PABELLON 03
EJE A ENTRE
EJE 1-2, 9-10 Longitudinal 3/8 2.00 4.00 3.00 24.00
vertical 3/8 2.00 12.00 1.45 34.80

EJE 2-3, 8-9 Longitudinal 3/8 2.00 4.00 2.40 19.20


vertical 3/8 2.00 8.00 1.45 23.20

EJE 3-4, 7-8 Longitudinal 3/8 2.00 4.00 3.48 27.84


vertical 3/8 2.00 12.00 1.45 34.80

EJE 4-5, 6-7 Longitudinal 3/8 2.00 4.00 1.93 15.44


vertical 3/8 2.00 6.00 1.45 17.40

EJE C ENTRE
EJE 1-2, 4-5, 6-7, 9-10 Longitudinal 3/8 4.00 4.00 3.00 48.00
vertical 3/8 4.00 12.00 1.45 69.60

EJE 2-3, 3-4, 7-8, 8-9 Longitudinal 3/8 4.00 4.00 3.48 55.68
vertical 3/8 4.00 12.00 1.45 69.60

EJE 1 ENTRE
EJE A-B Longitudinal 3/8 2.00 4.00 2.43 19.44
vertical 3/8 2.00 10.00 1.45 29.00

EJE B-C Longitudinal 3/8 2.00 4.00 2.43 19.44


vertical 3/8 2.00 10.00 1.45 29.00

EJE 3 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

EJE 2 Y 9 ENTRE
EJE A-B Longitudinal 3/8 2.00 4.00 1.06 8.48
vertical 3/8 2.00 3.00 1.45 8.70

EJE B-C Longitudinal 3/8 2.00 4.00 2.66 21.28


vertical 3/8 2.00 9.00 1.45 26.10

EJE 5 ENTRE
EJE A-B Longitudinal 3/8 2.00 4.00 2.43 19.44
vertical 3/8 2.00 10.00 1.45 29.00

EJE B-C Longitudinal 3/8 2.00 4.00 2.43 19.44


vertical 3/8 2.00 10.00 1.45 29.00

EJE 6 ENTRE
EJE A-B Longitudinal 3/8 2.00 4.00 2.43 19.44
vertical 3/8 2.00 10.00 1.45 29.00

EJE B-C Longitudinal 3/8 2.00 4.00 2.43 19.44


vertical 3/8 2.00 10.00 1.45 29.00

EJE 10 ENTRE
EJE A-B Longitudinal 3/8 2.00 4.00 2.43 19.44
vertical 3/8 2.00 10.00 1.45 29.00

EJE B-C Longitudinal 3/8 2.00 4.00 2.43 19.44


vertical 3/8 2.00 10.00 1.45 29.00

PABELLON 04

EJE A ENTRE
EJE 3-4 Longitudinal 3/8 1.00 5.00 1.88 9.40
vertical 3/8 1.00 6.00 1.85 11.10

EJE 4-5 Longitudinal 3/8 1.00 5.00 2.88 14.40


vertical 3/8 1.00 10.00 1.45 14.50

EJE 5-6 Longitudinal 3/8 1.00 5.00 1.80 9.00


vertical 3/8 1.00 6.00 1.45 8.70

EJE 6-7 Longitudinal 3/8 1.00 5.00 2.95 14.75


vertical 3/8 1.00 10.00 1.45 14.50

EJE C ENTRE
EJE 3-4, 6-7 Longitudinal 3/8 2.00 5.00 2.95 29.50
vertical 3/8 2.00 10.00 1.45 29.00

EJE 4-5, 5-6 Longitudinal 3/8 2.00 5.00 2.88 28.80


vertical 3/8 2.00 10.00 1.45 29.00

EJE 1 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

EJE 2 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 2.13 21.30
vertical 3/8 2.00 9.00 1.85 33.30

EJE B-C Longitudinal 3/8 2.00 5.00 2.13 21.30


vertical 3/8 2.00 9.00 1.85 33.30

EJE 3 ENTRE
EJE A-B Longitudinal 3/8 2.00 5.00 1.73 17.30
vertical 3/8 2.00 5.00 1.85 18.50

EJE B-C Longitudinal 3/8 2.00 5.00 1.73 17.30


vertical 3/8 2.00 5.00 1.85 18.50

EJE 6 ENTRE
EJE A-B Longitudinal 3/8 1.00 5.00 1.15 5.75
vertical 3/8 1.00 3.00 1.85 5.55

EJE B-C Longitudinal 3/8 2.00 5.00 2.76 27.60


vertical 3/8 2.00 10.00 1.85 37.00

EJE 7 ENTRE
EJE A-B Longitudinal 3/8 1.00 5.00 1.73 8.65
vertical 3/8 1.00 5.00 1.85 9.25

EJE B-C Longitudinal 3/8 1.00 5.00 1.73 8.65


vertical 3/8 1.00 5.00 1.85 9.25

Suma 0.00 4199.23 0 0.00 0.00 0.00


Peso 0.00 2435.55 0 0.00 0.00 0.00 2435.55 KG
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

01.05.02 ZAPATAS
01.05.02.02 ACERO CORRUGADO fy = 4200 kg/cm² GRADO 60
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ZAPATAS

PABELLON 01

Z-1 Longitudinal 5/8 8.00 13.00 2.36 245.44


Transversal 5/8 8.00 15.00 1.96 235.20

Z-2
Longitudinal 5/8 8.00 10.00 2.36 188.80
Transversal 5/8 8.00 10.00 2.36 188.80

Z-3
Longitudinal 5/8 2.00 7.00 1.06 14.84
Transversal 5/8 2.00 7.00 1.06 14.84

Z-4
Longitudinal 5/8 6.00 7.00 1.26 52.92
Transversal 5/8 6.00 9.00 1.01 54.54

Z-5
Longitudinal 5/8 2.00 10.00 1.86 37.20
Transversal 5/8 2.00 12.00 1.56 37.44

PABELLON 02

Z-1 Longitudinal 5/8 8.00 13.00 2.36 245.44


Transversal 5/8 8.00 15.00 1.96 235.20

Z-2
Longitudinal 5/8 8.00 10.00 2.36 188.80
Transversal 5/8 8.00 10.00 2.36 188.80

Z-3
Longitudinal 5/8 2.00 7.00 1.06 14.84
Transversal 5/8 2.00 7.00 1.06 14.84

Z-4
Longitudinal 5/8 6.00 7.00 1.26 52.92
Transversal 5/8 6.00 9.00 1.01 54.54

Z-5
Longitudinal 5/8 2.00 10.00 1.86 37.20
Transversal 5/8 2.00 12.00 1.56 37.44

PABELLON 03

Z-1 Longitudinal 5/8 12.00 6.00 1.06 76.32


Transversal 5/8 12.00 7.00 0.86 72.24

Z-2
Longitudinal 5/8 4.00 8.00 1.86 59.52
Transversal 5/8 4.00 11.00 1.26 55.44

Z-3
Longitudinal 5/8 2.00 10.00 2.36 47.20
Transversal 5/8 2.00 13.00 1.66 43.16

Z-4
Longitudinal 5/8 2.00 6.00 1.01 12.12
Transversal 5/8 2.00 6.00 0.86 10.32

Z-5
Longitudinal 5/8 1.00 6.00 1.16 6.96
Transversal 5/8 1.00 7.00 0.86 6.02

PABELLON 04

Z-1 Longitudinal 5/8 3.00 16.00 2.66 127.68


Transversal 5/8 3.00 17.00 2.16 110.16

Z-2
Longitudinal 5/8 3.00 14.00 2.36 99.12
Transversal 5/8 3.00 15.00 1.86 83.70

Z-3
Longitudinal 5/8 1.00 15.00 2.86 42.90
Transversal 5/8 1.00 26.00 2.46 63.96

Z-4
Longitudinal 5/8 2.00 11.00 1.66 36.52
Transversal 5/8 2.00 11.00 1.66 36.52

Z-5
Longitudinal 5/8 1.00 9.00 1.26 11.34
Transversal 5/8 1.00 9.00 1.26 11.34

Z-6
Longitudinal 5/8 3.00 10.00 1.21 36.30
Transversal 5/8 3.00 8.00 1.46 35.04

ZC-1
superior Longitudinal 1/2 1.00 7.00 5.66 39.62
Transversal 1/2 1.00 14.00 2.86 40.04

inferior Longitudinal 5/8 1.00 22.00 5.66 124.52


Transversal 5/8 1.00 31.00 2.86 88.66

Suma 0 0 79.66 3437.1 0 0


Peso 0.00 0.00 81.25 5499.36 0.00 0 5580.61 KG

01.05.03 VIGAS DE CONEXIÓN


01.05.03.03 ACERO CORRUGADO fy = 4200 kg/cm² GRADO 60
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
VIGAS DE CONEXIÓN

PABELLON 01
EJE A ENTRE
EJE 1-5 Longitudinal 5/8 1.00 4.00 16.07 64.28
Estribos 3/8 1.00 94.00 1.18 110.92

EJE 6-7 Longitudinal 5/8 1.00 4.00 3.82 15.28


Estribos 3/8 1.00 23.00 1.18 27.14

EJE 8-12 Longitudinal 5/8 1.00 4.00 16.07 64.28


Estribos 3/8 1.00 94.00 1.18 110.92

EJE B ENTRE
EJE 6-7 Longitudinal 5/8 1.00 4.00 3.57 14.28
Estribos 3/8 1.00 23.00 1.18 27.14

EJE C ENTRE
EJE 1-5 Longitudinal 5/8 1.00 4.00 16.07 64.28
Estribos 3/8 1.00 94.00 1.18 110.92

EJE 6-7 Longitudinal 5/8 1.00 4.00 3.82 15.28


Estribos 3/8 1.00 23.00 1.18 27.14

EJE 8-12 Longitudinal 5/8 1.00 4.00 16.07 64.28


Estribos 3/8 1.00 94.00 1.18 110.92

EJE 1 y 12 ENTRE
EJE A-C Longitudinal 5/8 2.00 4.00 6.19 49.52
Estribos 3/8 2.00 40.00 1.18 94.40

EJE 2, 4 y 9 ENTRE
EJE A-C Longitudinal 5/8 3.00 4.00 6.19 74.28
Estribos 3/8 3.00 31.00 1.18 109.74

EJE 3,5,6,7,8,10 y 11 ENTRE


EJE A-C Longitudinal 5/8 7.00 4.00 6.19 173.32
Estribos 3/8 7.00 40.00 1.18 330.40

PABELLON 02
EJE A ENTRE
EJE 1-5 Longitudinal 5/8 1.00 4.00 16.07 64.28
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

Estribos 3/8 1.00 94.00 1.18 110.92

EJE 6-7 Longitudinal 5/8 1.00 4.00 3.82 15.28


Estribos 3/8 1.00 23.00 1.18 27.14

EJE 8-12 Longitudinal 5/8 1.00 4.00 16.07 64.28


Estribos 3/8 1.00 94.00 1.18 110.92

EJE B ENTRE
EJE 6-7 Longitudinal 5/8 1.00 4.00 3.57 14.28
Estribos 3/8 1.00 23.00 1.18 27.14

EJE C ENTRE
EJE 1-5 Longitudinal 5/8 1.00 4.00 16.07 64.28
Estribos 3/8 1.00 94.00 1.18 110.92

EJE 6-7 Longitudinal 5/8 1.00 4.00 3.82 15.28


Estribos 3/8 1.00 23.00 1.18 27.14

EJE 8-12 Longitudinal 5/8 1.00 4.00 16.07 64.28


Estribos 3/8 1.00 94.00 1.18 110.92

EJE 1 y 12 ENTRE
EJE A-C Longitudinal 5/8 2.00 4.00 6.19 49.52
Estribos 3/8 2.00 40.00 1.18 94.40

EJE 2, 4 y 9 ENTRE
EJE A-C Longitudinal 5/8 3.00 4.00 6.19 74.28
Estribos 3/8 3.00 31.00 1.18 109.74

EJE 3,5,6,7,8,10 y 11 ENTRE


EJE A-C Longitudinal 5/8 7.00 4.00 6.19 173.32
Estribos 3/8 7.00 40.00 1.18 330.40

PABELLON 03
EJE A ENTRE
EJE 1-5 Longitudinal 5/8 1.00 4.00 16.07 64.28
Estribos 3/8 1.00 96.00 1.18 113.28

EJE 6-10 Longitudinal 5/8 1.00 4.00 16.07 64.28


Estribos 3/8 1.00 96.00 1.18 113.28

EJE C ENTRE
EJE 1-5 Longitudinal 5/8 1.00 4.00 16.07 64.28
Estribos 3/8 1.00 96.00 1.18 113.28

EJE 6-10 Longitudinal 5/8 1.00 4.00 16.07 64.28


Estribos 3/8 1.00 96.00 1.18 113.28

EJE 1,5,6 y 10 ENTRE


EJE A-C Longitudinal 5/8 4.00 4.00 6.19 99.04
Estribos 3/8 4.00 42.00 1.18 198.24

EJE 2 y 9 ENTRE
EJE A-C Longitudinal 5/8 2.00 4.00 6.19 49.52
Estribos 3/8 2.00 30.00 1.18 70.80

EJE 3,4,7 y 8 ENTRE


EJE A-C Longitudinal 5/8 4.00 4.00 6.19 99.04
Estribos 3/8 4.00 30.00 1.18 141.60

PABELLON 04
EJE A ENTRE
EJE 1-2 Longitudinal 5/8 1.00 4.00 3.82 15.28
Estribos 3/8 1.00 23.00 1.18 27.14

EJE 3-7 Longitudinal 5/8 1.00 4.00 16.07 64.28


Estribos 3/8 1.00 92.00 1.18 108.56

EJE B ENTRE
EJE 1-2 Longitudinal 5/8 1.00 4.00 3.82 15.28
Estribos 3/8 1.00 23.00 1.18 27.14

EJE C ENTRE
EJE 1-2 Longitudinal 5/8 1.00 4.00 3.82 15.28
Estribos 3/8 1.00 23.00 1.18 27.14

EJE 3-7 Longitudinal 5/8 1.00 4.00 16.07 64.28


Estribos 3/8 1.00 92.00 1.18 108.56
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

EJE 1 y 2 ENTRE
EJE A-C Longitudinal 5/8 2.00 4.00 6.19 49.52
Estribos 3/8 2.00 40.00 1.18 94.40

EJE 3 y 7 ENTRE
EJE A-C Longitudinal 5/8 2.00 4.00 6.19 49.52
Estribos 3/8 2.00 36.00 1.18 84.96

EJE 4,5 y 6 ENTRE


EJE A-C Longitudinal 5/8 3.00 4.00 6.19 74.28
Estribos 3/8 3.00 31.00 1.18 109.74

Suma 0 3570.68 0 2050.6 0 0


Peso 0.00 2070.99 0 3280.96 0 0 5,351.95 KG

01.05.04 COLUMNAS
01.05.04.03 ACERO CORRUGADO fy = 4200 kg/cm² GRADO 60
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
COLUMNAS

PABELLON 01
C-1
longitudunal 5/8 8.00 12.00 11.13 1068.48
traslape 5/8 8.00 12.00 0.50
estribos 3/8 8.00 80.00 1.30 832.00
estribos 3/8 8.00 80.00 1.30 832.00

C-2
longitudunal 5/8 16.00 10.00 11.13 1780.80
longitudinal 5/8 16.00 10.00 0.50
estribos 3/8 16.00 80.00 1.30 1664.00
estribos 3/8 16.00 80.00 0.82 1049.60

PABELLON 02
C-1
longitudunal 5/8 8.00 12.00 11.13 1068.48
traslape 5/8 8.00 12.00 0.50
estribos 3/8 8.00 80.00 1.30 832.00
estribos 3/8 8.00 80.00 1.30 832.00

C-2
longitudunal 5/8 16.00 10.00 11.13 1780.80
longitudinal 5/8 16.00 10.00 0.50
estribos 3/8 16.00 80.00 1.30 1664.00
estribos 3/8 16.00 80.00 0.82 1049.60

PABELLON 03
C-1
longitudunal 5/8 12.00 10.00 7.38 885.60
estribos 3/8 12.00 52.00 1.40 873.60
estribos 3/8 12.00 52.00 0.92 574.08

C-2
longitudunal 5/8 4.00 6.00 7.38 177.12
estribos 3/8 4.00 52.00 1.10 228.80

PABELLON 04
C-1
longitudunal 5/8 4.00 12.00 14.55 698.40
traslape 5/8 4.00 12.00 0.50
estribos 3/8 4.00 109.00 1.30 566.80
estribos 3/8 4.00 109.00 1.30 566.80

C-2
longitudunal 5/8 6.00 10.00 14.55 873.00
longitudinal 5/8 6.00 10.00 0.50
estribos 3/8 6.00 109.00 1.30 850.20
estribos 3/8 6.00 109.00 0.82 536.28

Suma 0 12951.76 0 8332.68 0 0


Peso 0.00 7512.02 0.00 13332.29 0.00 0 20,844.31 KG

01.05.04 PLACAS
01.05.04.03 ACERO CORRUGADO fy = 4200 kg/cm² GRADO 60
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
PLACAS

PABELLON 01
P-1
PRIMER NIVEL
longitudunal 3/4 8.00 9.00 7.50 540.00
longitudunal 5/8 8.00 6.00 7.50
estribos 3/8 8.00 37.00 1.28 378.88
estribos 3/8 8.00 37.00 1.98 586.08

SEGUNDO NIVEL

longitudunal 5/8 8.00 15.00 3.73 447.60


estribos 3/8 8.00 40.00 1.28 409.60
estribos 3/8 8.00 40.00 1.98 633.60

PABELLON 02
P-1
PRIMER NIVEL
longitudunal 3/4 8.00 9.00 7.50 540.00
longitudunal 5/8 8.00 6.00 7.50
estribos 3/8 8.00 37.00 1.28 378.88
estribos 3/8 8.00 37.00 1.98 586.08

SEGUNDO NIVEL

longitudunal 5/8 8.00 15.00 3.73 447.60


estribos 3/8 8.00 40.00 1.28 409.60
estribos 3/8 8.00 40.00 1.98 633.60
PABELLON 03
P-1
longitudunal 5/8 8.00 12.00 7.39 709.44
estribos 3/8 8.00 50.00 1.88 752.00
estribos 3/8 8.00 50.00 0.80 320.00
estribos 3/8 8.00 50.00 0.80 320.00

PABELLON 04
P-1
PRIMER NIVEL
longitudunal 3/4 6.00 9.00 7.50 405.00
longitudunal 5/8 6.00 6.00 7.50
estribos 3/8 6.00 37.00 1.28 284.16
estribos 3/8 6.00 37.00 2.18 483.96

SEGUNDO NIVEL

longitudunal 5/8 6.00 15.00 3.73 335.70


estribos 3/8 6.00 28.00 1.28 215.04
estribos 3/8 6.00 28.00 2.18 366.24

TERCER NIVEL

longitudunal 5/8 6.00 15.00 3.73 335.70


estribos 3/8 6.00 40.00 1.28 307.20
estribos 3/8 6.00 40.00 2.18 523.20

P-2
PRIMER NIVEL
longitudunal 3/4 2.00 12.00 7.50 180.00
longitudunal 5/8 2.00 8.00 7.50
estribos 3/8 2.00 37.00 0.84 62.16
estribos 3/8 2.00 37.00 0.84
estribos 3/8 2.00 37.00 2.78 205.72

SEGUNDO NIVEL

longitudunal 5/8 2.00 12.00 3.73 89.52


longitudunal 1/2 2.00 8.00 3.73 59.68
estribos 3/8 2.00 28.00 0.84 47.04
estribos 3/8 2.00 28.00 0.84 47.04
estribos 3/8 2.00 28.00 2.18

TERCER NIVEL

longitudunal 5/8 2.00 12.00 3.73 89.52


longitudunal 1/2 2.00 8.00 3.73 59.68
estribos 3/8 2.00 40.00 0.84 67.20
estribos 3/8 2.00 40.00 0.84 67.20

Suma 0 8084.48 119.36 2455.08 1665 0


Peso 0.00 4689.00 121.75 3928.13 3762.90 0 12,501.77 KG

6.08 COLUMNETAS DE CONFINAMIENTO


06.08.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETAS
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ACERO EN COLUMNETA
PABELLON 1
PRIMER NIVEL
EJE A
Acero longitudinal 3/8 28.00 4.00 3.75 420.00
estribos 1/4 28.00 20.00 0.74 414.40

EJE C
Acero longitudinal 3/8 16.00 4.00 3.03 193.92
estribos 1/4 16.00 17.00 0.74 201.28

SEGUNDO NIVEL
EJE A
Acero longitudinal 3/8 24.00 4.00 3.00 288.00
estribos 1/4 24.00 16.00 0.74 284.16

EJE B
Acero longitudinal 3/8 2.00 4.00 2.00 16.00
estribos 1/4 2.00 12.00 0.74 17.76

EJE C
Acero longitudinal 3/8 16.00 4.00 2.13 136.32
estribos 1/4 16.00 12.00 0.74 142.08

EJE A'
Acero longitudinal 3/8 18.00 4.00 1.70 122.40
estribos 1/4 18.00 10.00 0.74 133.20

EJE 1 Y 12
Acero longitudinal 3/8 2.00 4.00 1.70 13.60
estribos 1/4 2.00 10.00 0.74 14.80

TERCER NIVEL
EJE 2 - 4 - 9 - 11
Acero longitudinal 3/8 4.00 4.00 2.37 37.92
estribos 1/4 4.00 13.00 0.74 38.48

EJE 2 - 4 - 9 - 11
Acero longitudinal 3/8 4.00 4.00 1.91 30.56
estribos 1/4 4.00 11.00 0.74 32.56

EJE 2 - 4 - 9 - 11
Acero longitudinal 3/8 4.00 4.00 1.71 27.36
estribos 1/4 4.00 10.00 0.74 29.60

PABELLON 2
PRIMER NIVEL
EJE A
Acero longitudinal 3/8 24.00 4.00 3.75 360.00
estribos 1/4 24.00 20.00 0.74 355.20

EJE C
Acero longitudinal 3/8 16.00 4.00 3.03 193.92
estribos 1/4 16.00 17.00 0.74 201.28

SEGUNDO NIVEL
EJE A
Acero longitudinal 3/8 24.00 4.00 3.00 288.00
estribos 1/4 24.00 16.00 0.74 284.16

EJE B
Acero longitudinal 3/8 2.00 4.00 2.00 16.00
estribos 1/4 2.00 12.00 0.74 17.76

EJE C
Acero longitudinal 3/8 16.00 4.00 2.13 136.32
estribos 1/4 16.00 12.00 0.74 142.08

EJE A'
Acero longitudinal 3/8 18.00 4.00 1.70 122.40
estribos 1/4 18.00 10.00 0.74 133.20

EJE 1 Y 12
Acero longitudinal 3/8 2.00 4.00 1.70 13.60
estribos 1/4 2.00 10.00 0.74 14.80

TERCER NIVEL
EJE 2 - 4 - 9 - 11
Acero longitudinal 3/8 4.00 4.00 2.37 37.92
estribos 1/4 4.00 13.00 0.74 38.48

EJE 2 - 4 - 9 - 11
Acero longitudinal 3/8 4.00 4.00 1.91 30.56
estribos 1/4 4.00 11.00 0.74 32.56

EJE 2 - 4 - 9 - 11
Acero longitudinal 3/8 4.00 4.00 1.71 27.36
estribos 1/4 4.00 10.00 0.74 29.60

PABELLON 3
PRIMER NIVEL
EJE A
Acero longitudinal 3/8 16.00 4.00 2.27 145.28
estribos 1/4 16.00 18.00 0.74 213.12

EJE C
Acero longitudinal 3/8 16.00 4.00 2.63 168.32
estribos 1/4 16.00 15.00 0.74 177.60

EJE 2 Y 9
Acero longitudinal 3/8 8.00 4.00 3.98 127.36
estribos 1/4 8.00 21.00 0.74 124.32

SEGUNDO NIVEL
EJE 2 - 3 - 4 - 7 - 8 - 9
Acero longitudinal 3/8 6.00 4.00 2.37 56.88
estribos 1/4 6.00 13.00 0.74 57.72

EJE 2 - 3 - 4 - 7 - 8 - 9
Acero longitudinal 3/8 6.00 4.00 2.18 52.32
estribos 1/4 6.00 12.00 0.74 53.28

EJE 2 - 3 - 4 - 7 - 8 - 9
Acero longitudinal 3/8 6.00 4.00 1.98 47.52
estribos 1/4 6.00 11.00 0.74 48.84

PABELLON 4
PRIMER NIVEL
EJE A
Acero longitudinal 3/8 8.00 4.00 3.75 120.00
estribos 1/4 8.00 20.00 0.74 118.40

EJE C
Acero longitudinal 3/8 8.00 4.00 3.03 96.96
estribos 1/4 8.00 17.00 0.74 100.64

EJE 6
Acero longitudinal 3/8 4.00 4.00 4.38 70.08
estribos 1/4 4.00 23.00 0.74 68.08

SEGUNDO NIVEL
EJE A
Acero longitudinal 3/8 8.00 4.00 2.85 91.20
estribos 1/4 8.00 16.00 0.74 94.72

EJE C
Acero longitudinal 3/8 8.00 4.00 2.13 68.16
estribos 1/4 8.00 12.00 0.74 71.04

EJE A'
Acero longitudinal 3/8 10.00 4.00 1.70 68.00
estribos 1/4 10.00 10.00 0.74 74.00

EJE 6
Acero longitudinal 3/8 4.00 4.00 3.48 55.68
estribos 1/4 4.00 19.00 0.74 56.24

EJE 1 Y 12
Acero longitudinal 3/8 2.00 4.00 1.70 13.60
estribos 1/4 2.00 10.00 0.74 14.80

TERCER NIVEL
EJE A
Acero longitudinal 3/8 8.00 4.00 2.85 91.20
estribos 1/4 8.00 16.00 0.74 94.72

EJE B
Acero longitudinal 3/8 2.00 4.00 2.00 16.00
estribos 1/4 2.00 11.00 0.74 16.28

EJE C
Acero longitudinal 3/8 8.00 4.00 2.13 68.16
estribos 1/4 8.00 12.00 0.74 71.04

EJE A'
Acero longitudinal 3/8 10.00 4.00 1.70 68.00
estribos 1/4 10.00 10.00 0.74 74.00

EJE 6
Acero longitudinal 3/8 4.00 4.00 3.48 55.68
estribos 1/4 4.00 19.00 0.74 56.24

EJE 1 Y 12
Acero longitudinal 3/8 2.00 4.00 1.70 13.60
estribos 1/4 2.00 10.00 0.74 14.80

TERCER NIVEL
EJE 4 - 5 - 6
Acero longitudinal 3/8 3.00 4.00 2.37 28.44
estribos 1/4 3.00 13.00 0.74 28.86

EJE 4 - 5 - 6
Acero longitudinal 3/8 3.00 4.00 1.91 22.92
estribos 1/4 3.00 11.00 0.74 24.42

EJE 4 - 5 - 6
Acero longitudinal 3/8 3.00 4.00 1.71 20.52
estribos 1/4 3.00 10.00 0.74 22.20

EJE 3 - 7
Acero longitudinal 3/8 2.00 4.00 2.31 18.48
estribos 1/4 2.00 13.00 0.74 19.24

EJE 3 - 7
Acero longitudinal 3/8 2.00 4.00 2.07 16.56
estribos 1/4 2.00 12.00 0.74 17.76

EJE 3 - 7
Acero longitudinal 3/8 2.00 4.00 1.91 15.28
estribos 1/4 2.00 11.00 0.74 16.28

EJE 3 - 7
Acero longitudinal 3/8 2.00 4.00 1.71 13.68
estribos 1/4 2.00 10.00 0.74 14.80

Suma 4300.88 4142.04 0.00 0.00 0.00 0.00


Peso 1075.22 2402.38 0.00 0.00 0.00 0.00 3,477.60 KG

01.05.09 VIGUETAS DE CONFINAMIENTO


01.05.09.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGUETAS
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
VIGUETAS
PABELLON 1
PRIMER NIVEL

EJE A ENTRE
EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 1.65 6.60
estribos 1/4 1.00 10.00 0.64 6.40

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 1.65 6.60
estribos 1/4 1.00 10.00 0.64 6.40

EJE C ENTRE
EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

SEGUNDO NIVEL
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

EJE A ENTRE
EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE C ENTRE
EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE B ENTRE
EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 1.80 7.20
estribos 1/4 1.00 10.00 0.64 6.40

EJE A' ENTRE


EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 3.85 15.40
estribos 1/4 1.00 21.00 0.64 13.44

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJES 1 Y 12 ENTRE
EJE A - A'
Acero longitudinal 3/8 2.00 4.00 2.32 18.56
estribos 1/4 2.00 13.00 0.64 16.64

TERCER NIVEL

EJES 2 - 4 - 9 - 11 ENTRE
EJE A - B
Acero longitudinal 3/8 4.00 4.00 2.56 40.96
estribos 1/4 4.00 14.00 0.64 35.84

EJE B - C
Acero longitudinal 3/8 4.00 4.00 3.20 51.20
estribos 1/4 4.00 17.00 0.64 43.52

PABELLON 2
PRIMER NIVEL

EJE A ENTRE
EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE C ENTRE
EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

SEGUNDO NIVEL

EJE A ENTRE
EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 2.30 9.20
estribos 1/4 1.00 13.00 0.64 8.32

EJE C ENTRE
EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 3.65 14.60
estribos 1/4 1.00 20.00 0.64 12.80

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE B ENTRE
EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 1.80 7.20
estribos 1/4 1.00 10.00 0.64 6.40

EJE A' ENTRE


EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 3.85 15.40
estribos 1/4 1.00 21.00 0.64 13.44

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 10 - 11
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 11 - 12
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJES 1 Y 12 ENTRE
EJE A - A'
Acero longitudinal 3/8 2.00 4.00 2.32 18.56
estribos 1/4 2.00 13.00 0.64 16.64

TERCER NIVEL

EJES 2 - 4 - 9 - 11 ENTRE
EJE A - B
Acero longitudinal 3/8 4.00 4.00 2.56 40.96
estribos 1/4 4.00 14.00 0.64 35.84

EJE B - C
Acero longitudinal 3/8 4.00 4.00 3.20 51.20
estribos 1/4 4.00 17.00 0.64 43.52

PABELLON 3
PRIMER NIVEL

EJE A ENTRE
EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJE 2 - 3
Acero longitudinal 3/8 1.00 4.00 2.80 11.20
estribos 1/4 1.00 15.00 0.64 9.60

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 3.85 15.40
estribos 1/4 1.00 21.00 0.64 13.44

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 2.33 9.32
estribos 1/4 1.00 13.00 0.64 8.32

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 2.33 9.32
estribos 1/4 1.00 13.00 0.64 8.32

EJE 7 - 8
Acero longitudinal 3/8 1.00 4.00 3.85 15.40
estribos 1/4 1.00 21.00 0.64 13.44

EJE 8 - 9
Acero longitudinal 3/8 1.00 4.00 2.80 11.20
estribos 1/4 1.00 15.00 0.64 9.60

EJE 9 - 10
Acero longitudinal 3/8 1.00 4.00 3.40 13.60
estribos 1/4 1.00 18.00 0.64 11.52

EJES 2 Y 9 ENTRE
EJE A - B
Acero longitudinal 3/8 2.00 4.00 1.46 11.68
estribos 1/4 2.00 9.00 0.64 11.52

EJE B - C
Acero longitudinal 3/8 2.00 4.00 3.06 24.48
estribos 1/4 2.00 17.00 0.64 21.76

SEGUNDO NIVEL

EJES 2 - 3 - 4 - 7 - 8 -9 ENTRE
EJE A - B
Acero longitudinal 3/8 6.00 4.00 2.56 61.44
estribos 1/4 6.00 14.00 0.64 53.76

EJE B - C
Acero longitudinal 3/8 6.00 4.00 3.20 76.80
estribos 1/4 6.00 17.00 0.64 65.28

PABELLON 4
PRIMER NIVEL

EJE A ENTRE
EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 2.28 9.12
estribos 1/4 1.00 13.00 0.64 8.32

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE 5 - 6
Acero longitudinal 3/8 1.00 4.00 2.28 9.12
estribos 1/4 1.00 13.00 0.64 8.32

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE C ENTRE
EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 3.35 13.40
estribos 1/4 1.00 18.00 0.64 11.52

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE 5 - 6
Acero longitudinal 3/8 1.00 4.00 3.35 13.40
estribos 1/4 1.00 18.00 0.64 11.52

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE 6 ENTRE
EJE A - B
Acero longitudinal 3/8 1.00 4.00 1.56 6.24
estribos 1/4 1.00 9.00 0.64 5.76

EJE B - C
Acero longitudinal 3/8 1.00 4.00 3.16 12.64
estribos 1/4 1.00 17.00 0.64 10.88

SEGUNDO NIVEL

EJE A ENTRE
EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 2.28 9.12
estribos 1/4 1.00 13.00 0.64 8.32

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE 5 - 6
Acero longitudinal 3/8 1.00 4.00 2.28 9.12
estribos 1/4 1.00 13.00 0.64 8.32

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE C ENTRE
EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 3.35 13.40
estribos 1/4 1.00 18.00 0.64 11.52
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE 5 - 6
Acero longitudinal 3/8 1.00 4.00 3.35 13.40
estribos 1/4 1.00 18.00 0.64 11.52

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE 6 ENTRE
EJE A - B
Acero longitudinal 3/8 1.00 4.00 1.56 6.24
estribos 1/4 1.00 9.00 0.64 5.76

EJE B - C
Acero longitudinal 3/8 1.00 4.00 3.16 12.64
estribos 1/4 1.00 17.00 0.64 10.88

EJE A' ENTRE


EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 3.85 15.40
estribos 1/4 1.00 21.00 0.64 13.44

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 5 - 6
Acero longitudinal 3/8 1.00 4.00 4.34 17.36
estribos 1/4 1.00 23.00 0.64 14.72

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 4.23 16.92
estribos 1/4 1.00 23.00 0.64 14.72

EJES 1 Y 7 ENTRE
EJE A - A'
Acero longitudinal 3/8 2.00 4.00 2.45 19.60
estribos 1/4 2.00 14.00 0.64 17.92

TERCER NIVEL

EJE A ENTRE
EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 2.28 9.12
estribos 1/4 1.00 13.00 0.64 8.32

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE 5 - 6
Acero longitudinal 3/8 1.00 4.00 2.28 9.12
estribos 1/4 1.00 13.00 0.64 8.32

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE C ENTRE
EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 3.35 13.40
estribos 1/4 1.00 18.00 0.64 11.52

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE 5 - 6
Acero longitudinal 3/8 1.00 4.00 3.35 13.40
estribos 1/4 1.00 18.00 0.64 11.52

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 3.28 13.12
estribos 1/4 1.00 18.00 0.64 11.52

EJE 6 ENTRE
EJE A - B
Acero longitudinal 3/8 1.00 4.00 1.56 6.24
estribos 1/4 1.00 9.00 0.64 5.76

EJE B - C
Acero longitudinal 3/8 1.00 4.00 3.16 12.64
estribos 1/4 1.00 17.00 0.64 10.88

EJE A' ENTRE


EJE 1 - 2
Acero longitudinal 3/8 1.00 4.00 3.85 15.40
estribos 1/4 1.00 21.00 0.64 13.44

EJE 3 - 4
Acero longitudinal 3/8 1.00 4.00 4.48 17.92
estribos 1/4 1.00 24.00 0.64 15.36

EJE 4 - 5
Acero longitudinal 3/8 1.00 4.00 4.09 16.36
estribos 1/4 1.00 22.00 0.64 14.08

EJE 5 - 6
Acero longitudinal 3/8 1.00 4.00 4.34 17.36
estribos 1/4 1.00 23.00 0.64 14.72

EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 4.23 16.92
estribos 1/4 1.00 23.00 0.64 14.72

EJE B ENTRE
EJE 6 - 7
Acero longitudinal 3/8 1.00 4.00 1.80 7.20
estribos 1/4 1.00 10.00 0.64 6.40

EJES 1 Y 7 ENTRE
EJE A - A'
Acero longitudinal 3/8 2.00 4.00 2.45 19.60
estribos 1/4 2.00 14.00 0.64 17.92

CUARTO NIVEL

EJES 4 - 5 - 6 ENTRE
EJE A - B
Acero longitudinal 3/8 3.00 4.00 2.56 30.72
estribos 1/4 3.00 14.00 0.64 26.88

EJE B - C
Acero longitudinal 3/8 3.00 4.00 3.20 38.40
estribos 1/4 3.00 17.00 0.64 32.64

EJES 3 -7 ENTRE
EJE A - B
Acero longitudinal 3/8 2.00 4.00 2.20 17.60
estribos 1/4 2.00 12.00 0.64 15.36

EJE B - C
Acero longitudinal 3/8 2.00 4.00 2.20 17.60
estribos 1/4 2.00 12.00 0.64 15.36

Suma 2008.32 2303.56 0.00 0.00 0.00 0.00


Peso 502.08 1336.06 0.00 0.00 0.00 0.00 1,838.14 KG

6.08 ESCALERAS
06.08.03 ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAS
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ACERO EN ESCALERA
PABELLON 1
PRIMER TRAMO
Acero longitudinal Sup. 1/2 1.00 8.00 4.73 37.84
Acero longitudinal Inf. 1/2 1.00 8.00 4.83 38.64

Acero transversal Sup 3/8 1.00 16.00 1.55 24.80


Acero transversal Inf. 3/8 1.00 19.00 1.55 29.45

SEGUNDO TRAMO
Acero longitudinal Sup. 1/2 1.00 8.00 3.22 25.76
Acero longitudinal Inf. 1/2 1.00 8.00 3.24 25.92

Acero transversal Sup 3/8 1.00 17.00 1.55 26.35


Acero transversal Inf. 3/8 1.00 17.00 1.55 26.35

DESCANSO
Acero longitudinal Sup. 1/2 1.00 17.00 1.82 30.94
Acero longitudinal Inf. 1/2 1.00 17.00 1.82 30.94

Acero transversal Sup 3/8 1.00 7.00 3.15 22.05


Acero transversal Inf. 3/8 1.00 7.00 3.15 22.05

PABELLON 2
PRIMER TRAMO
Acero longitudinal Sup. 1/2 1.00 8.00 4.73 37.84
Acero longitudinal Inf. 1/2 1.00 8.00 4.83 38.64

Acero transversal Sup 3/8 1.00 16.00 1.55 24.80


Acero transversal Inf. 3/8 1.00 19.00 1.55 29.45

SEGUNDO TRAMO
Acero longitudinal Sup. 1/2 1.00 8.00 3.22 25.76
Acero longitudinal Inf. 1/2 1.00 8.00 3.24 25.92

Acero transversal Sup 3/8 1.00 17.00 1.55 26.35


Acero transversal Inf. 3/8 1.00 17.00 1.55 26.35

DESCANSO
Acero longitudinal Sup. 1/2 1.00 17.00 1.82 30.94
Acero longitudinal Inf. 1/2 1.00 17.00 1.82 30.94

Acero transversal Sup 3/8 1.00 7.00 3.15 22.05


Acero transversal Inf. 3/8 1.00 7.00 3.15 22.05

PABELLON 4
PRIMER TRAMO
Acero longitudinal Sup. 1/2 1.00 8.00 4.73 37.84
Acero longitudinal Inf. 1/2 1.00 8.00 4.83 38.64

Acero transversal Sup 3/8 1.00 16.00 1.55 24.80


Acero transversal Inf. 3/8 1.00 19.00 1.55 29.45

SEGUNDO TRAMO
Acero longitudinal Sup. 1/2 1.00 8.00 3.22 25.76
Acero longitudinal Inf. 1/2 1.00 8.00 3.24 25.92

Acero transversal Sup 3/8 1.00 17.00 1.55 26.35


Acero transversal Inf. 3/8 1.00 17.00 1.55 26.35

DESCANSO 1
Acero longitudinal Sup. 1/2 1.00 17.00 1.82 30.94
Acero longitudinal Inf. 1/2 1.00 17.00 1.82 30.94

Acero transversal Sup 3/8 1.00 7.00 3.15 22.05


Acero transversal Inf. 3/8 1.00 7.00 3.15 22.05

TERCER TRAMO
Acero longitudinal Sup. 1/2 1.00 8.00 4.14 33.12
Acero longitudinal Inf. 1/2 1.00 8.00 3.96 31.68

Acero transversal Sup 3/8 1.00 15.00 1.55 23.25


Acero transversal Inf. 3/8 1.00 15.00 1.55 23.25

CUARTO TRAMO
Acero longitudinal Sup. 1/2 1.00 8.00 3.22 25.76
Acero longitudinal Inf. 1/2 1.00 8.00 3.24 25.92

Acero transversal Sup 3/8 1.00 17.00 1.55 26.35


Acero transversal Inf. 3/8 1.00 17.00 1.55 26.35

DESCANSO 2
Acero longitudinal Sup. 1/2 1.00 17.00 1.82 30.94
Acero longitudinal Inf. 1/2 1.00 17.00 1.82 30.94

Acero transversal Sup 3/8 1.00 7.00 3.15 22.05


Acero transversal Inf. 3/8 1.00 7.00 3.15 22.05

Suma 0.00 596.45 748.48 0.00 0.00 0.00


Peso 0.00 345.94 763.45 0.00 0.00 0.00 1,109.39 KG

6.08 VIGAS
06.08.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ACERO EN VIGAS
PABELLON 1
PRIMER NIVEL
VIGA VP-100
EJE 2 - 4 - 9 - 11
Acero Long. Sup. 3/4 4.00 3.00 8.42 101.04
Acero Long. Sup. 3/4 4.00 2.00 4.40 35.20
Acero Long. Sup. 5/8 4.00 2.00 2.10 16.80
Acero Long. Neutro 3/8 4.00 2.00 7.92 63.36
Acero Long. Inf. 5/8 4.00 3.00 8.32 99.84
estribos 3/8 4.00 51.00 1.48 301.92

VIGA VP-101
EJES 1 - 5 - 8 - 12
Acero Long. Sup. 5/8 4.00 2.00 8.32 66.56
Acero Long. Sup. 5/8 4.00 1.00 5.60 22.40
Acero Long. Neutro 3/8 4.00 2.00 7.92 63.36
Acero Long. Inf. 5/8 4.00 3.00 8.32 99.84
estribos 3/8 4.00 60.00 1.38 331.20

VIGA VP-102
EJES 3 - 10
Acero Long. Sup. 3/4 2.00 2.00 8.42 33.68
Acero Long. Sup. 5/8 2.00 3.00 5.70 34.20
Acero Long. Neutro 3/8 2.00 2.00 7.92 31.68
Acero Long. Inf. 5/8 2.00 2.00 8.32 33.28
estribos 3/8 2.00 60.00 1.38 165.60

VIGA VP-103
EJES 6 - 7
Acero Long. Sup. 5/8 2.00 2.00 5.64 22.56
Acero Long. Sup. 5/8 2.00 1.00 3.05 6.10
Acero Long. Neutro 3/8 2.00 2.00 5.24 20.96
Acero Long. Inf. 5/8 2.00 2.00 5.64 22.56
estribos 3/8 2.00 37.00 1.38 102.12

VIGA VP-104
EJES 6 - 7
Acero Long. Sup. 5/8 2.00 2.00 5.91 23.64
Acero Long. Inf. 5/8 2.00 2.00 5.91 23.64
estribos 3/8 2.00 40.00 1.18 94.40

VIGA VA-100
EJES A - C ENTRE
EJES 1 - 5 Y 8 - 12
Acero Long. Sup. 5/8 4.00 2.00 17.27 138.16
Acero Long. Sup. 5/8 4.00 2.00 9.05 72.40
Acero Long. Neutro 3/8 4.00 2.00 16.57 132.56
Acero Long. Inf. 5/8 4.00 2.00 17.27 138.16
Acero Long. Inf. 5/8 4.00 2.00 9.05 72.40
estribos 3/8 4.00 106.00 1.38 585.12

VIGA VA-101
EJES A - B
Acero Long. Sup. 5/8 2.00 2.00 3.82 15.28
Acero Long. Neutro 3/8 2.00 2.00 3.42 13.68
Acero Long. Inf. 5/8 2.00 2.00 3.82 15.28
estribos 3/8 2.00 19.00 1.38 52.44

VIGA VA-102
EJE C
Acero Long. Sup. 5/8 1.00 2.00 3.82 7.64
Acero Long. Inf. 5/8 1.00 2.00 3.82 7.64
estribos 3/8 1.00 19.00 1.18 22.42

VIGA VCH-100
EJE A'
EJES 1 - 5 Y 8 - 12
Acero Long. 5/8 2.00 4.00 17.27 138.16
estribos 3/8 2.00 88.00 0.78 137.28

EJE A'
EJES 6 - 7
Acero Long. 5/8 1.00 4.00 3.82 15.28
estribos 3/8 1.00 19.00 0.78 14.82

SEGUNDO NIVEL
VIGA VA-202
EJE 2 - 4 - 9 - 11
Acero Long. Sup. 5/8 4.00 3.00 11.80 141.60
Acero Long. Sup. 5/8 4.00 2.00 6.02 48.16
Acero Long. Neutro 3/8 4.00 2.00 11.10 88.80
Acero Long. Inf. 5/8 4.00 3.00 11.80 141.60
estribos 3/8 4.00 66.00 1.48 390.72
estribos 3/8 4.00 14.00 1.94 108.64
estribos 3/8 4.00 19.00 2.14 162.64

VIGA VA-203
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 -12
Acero Long. Sup. 5/8 8.00 2.00 11.80 188.80
Acero Long. Sup. 5/8 8.00 1.00 3.05 24.40
Acero Long. Neutro 3/8 8.00 2.00 11.10 177.60
Acero Long. Inf. 5/8 8.00 2.00 11.80 188.80
estribos 3/8 8.00 75.00 1.28 768.00

VIGA VA-200
EJES A - C ENTRE
EJES 1 - 5 Y 8 - 12
Acero Long. Sup. 5/8 4.00 2.00 17.27 138.16
Acero Long. Neutro 3/8 4.00 2.00 16.57 132.56
Acero Long. Inf. 5/8 4.00 2.00 17.27 138.16
estribos 3/8 4.00 106.00 1.38 585.12

VIGA VA-201
EJES A - B - C
Acero Long. Sup. 5/8 3.00 2.00 3.82 22.92
Acero Long. Inf. 5/8 3.00 2.00 3.82 22.92
estribos 3/8 3.00 19.00 1.38 78.66

VIGA VCH-200
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 - 12
Acero Long. 5/8 2.00 4.00 11.52 92.16
estribos 3/8 2.00 61.00 0.78 95.16

VIGA V-A
EJES 6 - 7
Acero Long. Sup. 5/8 2.00 2.00 3.51 14.04
Acero Long. Inf. 5/8 2.00 2.00 3.51 14.04
estribos 3/8 2.00 26.00 1.18 61.36

PABELLON 2
PRIMER NIVEL
VIGA VP-100
EJE 2 - 4 - 9 - 11
Acero Long. Sup. 3/4 4.00 3.00 8.42 101.04
Acero Long. Sup. 3/4 4.00 2.00 4.40 35.20
Acero Long. Sup. 5/8 4.00 2.00 2.10 16.80
Acero Long. Neutro 3/8 4.00 2.00 7.92 63.36
Acero Long. Inf. 5/8 4.00 3.00 8.32 99.84
estribos 3/8 4.00 51.00 1.48 301.92

VIGA VP-101
EJES 1 - 5 - 8 - 12
Acero Long. Sup. 5/8 4.00 2.00 8.32 66.56
Acero Long. Sup. 5/8 4.00 1.00 5.60 22.40
Acero Long. Neutro 3/8 4.00 2.00 7.92 63.36
Acero Long. Inf. 5/8 4.00 3.00 8.32 99.84
estribos 3/8 4.00 60.00 1.38 331.20

VIGA VP-102
EJES 3 - 10
Acero Long. Sup. 3/4 2.00 2.00 8.42 33.68
Acero Long. Sup. 5/8 2.00 3.00 5.70 34.20
Acero Long. Neutro 3/8 2.00 2.00 7.92 31.68
Acero Long. Inf. 5/8 2.00 2.00 8.32 33.28
estribos 3/8 2.00 60.00 1.38 165.60

VIGA VP-103
EJES 6 - 7
Acero Long. Sup. 5/8 2.00 2.00 5.64 22.56
Acero Long. Sup. 5/8 2.00 1.00 3.05 6.10
Acero Long. Neutro 3/8 2.00 2.00 5.24 20.96
Acero Long. Inf. 5/8 2.00 2.00 5.64 22.56
estribos 3/8 2.00 37.00 1.38 102.12

VIGA VP-104
EJES 6 - 7
Acero Long. Sup. 5/8 2.00 2.00 5.91 23.64
Acero Long. Inf. 5/8 2.00 2.00 5.91 23.64
estribos 3/8 2.00 40.00 1.18 94.40

VIGA VA-100
EJES A - C ENTRE
EJES 1 - 5 Y 8 - 12
Acero Long. Sup. 5/8 4.00 2.00 17.27 138.16
Acero Long. Sup. 5/8 4.00 2.00 9.05 72.40
Acero Long. Neutro 3/8 4.00 2.00 16.57 132.56
Acero Long. Inf. 5/8 4.00 2.00 17.27 138.16
Acero Long. Inf. 5/8 4.00 2.00 9.05 72.40
estribos 3/8 4.00 106.00 1.38 585.12

VIGA VA-101
EJES A - B
Acero Long. Sup. 5/8 2.00 2.00 3.82 15.28
Acero Long. Neutro 3/8 2.00 2.00 3.42 13.68
Acero Long. Inf. 5/8 2.00 2.00 3.82 15.28
estribos 3/8 2.00 19.00 1.38 52.44

VIGA VA-102
EJE C
Acero Long. Sup. 5/8 1.00 2.00 3.82 7.64
Acero Long. Inf. 5/8 1.00 2.00 3.82 7.64
estribos 3/8 1.00 19.00 1.18 22.42

VIGA VCH-100
EJE A'
EJES 1 - 5 Y 8 - 12
Acero Long. 5/8 2.00 4.00 17.27 138.16
estribos 3/8 2.00 88.00 0.78 137.28

EJE A'
EJES 6 - 7
Acero Long. 5/8 1.00 4.00 3.82 15.28
estribos 3/8 1.00 19.00 0.78 14.82
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

SEGUNDO NIVEL
VIGA VA-202
EJE 2 - 4 - 9 - 11
Acero Long. Sup. 5/8 4.00 3.00 11.80 141.60
Acero Long. Sup. 5/8 4.00 2.00 6.02 48.16
Acero Long. Neutro 3/8 4.00 2.00 11.10 88.80
Acero Long. Inf. 5/8 4.00 3.00 11.80 141.60
estribos 3/8 4.00 66.00 1.48 390.72
estribos 3/8 4.00 14.00 1.94 108.64
estribos 3/8 4.00 19.00 2.14 162.64

VIGA VA-203
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 -12
Acero Long. Sup. 5/8 8.00 2.00 11.80 188.80
Acero Long. Sup. 5/8 8.00 1.00 3.05 24.40
Acero Long. Neutro 3/8 8.00 2.00 11.10 177.60
Acero Long. Inf. 5/8 8.00 2.00 11.80 188.80
estribos 3/8 8.00 75.00 1.28 768.00

VIGA VA-200
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

EJES A - C ENTRE
EJES 1 - 5 Y 8 - 12
Acero Long. Sup. 5/8 4.00 2.00 17.27 138.16
Acero Long. Neutro 3/8 4.00 2.00 16.57 132.56
Acero Long. Inf. 5/8 4.00 2.00 17.27 138.16
estribos 3/8 4.00 106.00 1.38 585.12

VIGA VA-201
EJES A - B - C
Acero Long. Sup. 5/8 3.00 2.00 3.82 22.92
Acero Long. Inf. 5/8 3.00 2.00 3.82 22.92
estribos 3/8 3.00 19.00 1.38 78.66

VIGA VCH-200
EJES 1 - 3 - 5 - 6 - 7 - 8 - 10 - 12
Acero Long. 5/8 8.00 4.00 11.52 368.64
estribos 3/8 8.00 61.00 0.78 380.64

VIGA V-A
EJES 6 - 7
Acero Long. Sup. 5/8 2.00 2.00 3.51 14.04
Acero Long. Inf. 5/8 2.00 2.00 3.51 14.04
estribos 3/8 2.00 26.00 1.18 61.36

PABELLON 3
VIGA VA-102
EJES 2 - 3 - 4 - 7 - 8 - 9
Acero Long. Sup. 5/8 6.00 3.00 11.80 212.40
Acero Long. Sup. 5/8 6.00 2.00 6.22 74.64
Acero Long. Inf. 5/8 6.00 3.00 11.80 212.40
estribos 3/8 6.00 68.00 1.28 522.24
estribos 3/8 6.00 14.00 1.74 146.16
estribos 3/8 6.00 19.00 1.94 221.16

VIGA VA-101
EJES 1 - 5 - 6 - 10
Acero Long. Sup. 5/8 4.00 2.00 11.80 94.40
Acero Long. Sup. 5/8 4.00 1.00 3.05 12.20
Acero Long. Inf. 5/8 4.00 2.00 11.80 94.40
estribos 3/8 4.00 83.00 1.18 391.76

VIGA VA-100
EJES A - C ENTRE
EJE 1 - 5 Y 6 - 10
Acero Long. Sup. 5/8 4.00 2.00 17.27 138.16
Acero Long. Sup. 5/8 4.00 1.00 4.70 18.80
Acero Long. Inf. 5/8 4.00 2.00 17.27 138.16
Acero Long. Inf. 5/8 4.00 1.00 4.70 18.80
estribos 3/8 4.00 117.00 1.18 552.24

VIGA VCH-100
EJES 1 - 5 - 6 - 10
Acero Long. 5/8 4.00 4.00 11.11 177.76
estribos 3/8 4.00 63.00 0.78 196.56

PABELLON 4
PRIMER NIVEL
VIGA VP-100
EJES 4 - 5 - 6
Acero Long. Sup. 3/4 3.00 3.00 8.42 75.78
Acero Long. Sup. 3/4 3.00 2.00 7.30 43.80
Acero Long. Neutro 3/8 3.00 2.00 7.92 47.52
Acero Long. Inf. 5/8 3.00 3.00 8.32 74.88
estribos 3/8 3.00 51.00 1.48 226.44

VIGA VP-101
EJES 3 - 7
Acero Long. Sup. 3/4 2.00 2.00 8.42 33.68
Acero Long. Sup. 3/4 2.00 1.00 6.29 12.58
Acero Long. Sup. 5/8 2.00 2.00 6.17 24.68
Acero Long. Neutro 3/8 2.00 2.00 7.92 31.68
Acero Long. Inf. 3/4 2.00 2.00 8.42 33.68
Acero Long. Inf. 3/4 2.00 1.00 6.29 12.58
Acero Long. Inf. 5/8 2.00 2.00 6.17 24.68
estribos 3/8 2.00 51.00 1.38 140.76

VIGA VP-102
EJES 1 - 2
Acero Long. Sup. 5/8 2.00 2.00 5.64 22.56
Acero Long. Sup. 5/8 2.00 1.00 3.05 6.10
Acero Long. Neutro 3/8 2.00 2.00 5.24 20.96
Acero Long. Inf. 5/8 2.00 2.00 5.64 22.56
estribos 3/8 2.00 37.00 1.38 102.12

VIGA VP-103
EJES 1 - 2
Acero Long. Sup. 5/8 2.00 2.00 5.90 23.60
Acero Long. Inf. 5/8 2.00 2.00 5.90 23.60
estribos 3/8 2.00 40.00 1.18 94.40

VIGA VA-100
EJES A - C
Acero Long. Sup. 5/8 2.00 2.00 17.27 69.08
Acero Long. Sup. 5/8 2.00 2.00 13.15 52.60
Acero Long. Neutro 3/8 2.00 2.00 16.57 66.28
Acero Long. Inf. 5/8 2.00 2.00 17.27 69.08
Acero Long. Inf. 5/8 2.00 2.00 13.15 52.60
estribos 3/8 2.00 110.00 1.38 303.60

VIGA VA-101
EJES A - B
Acero Long. Sup. 5/8 2.00 2.00 3.82 15.28
Acero Long. Neutro 3/8 2.00 2.00 3.42 13.68
Acero Long. Inf. 5/8 2.00 2.00 3.82 15.28
estribos 3/8 2.00 19.00 1.38 52.44

VIGA VA-102
EJE C
Acero Long. Sup. 5/8 1.00 2.00 3.82 7.64
Acero Long. Inf. 5/8 1.00 2.00 3.82 7.64
estribos 3/8 1.00 19.00 1.18 22.42

VIGA VCH-100
EJE A' ENTRE
EJES 3 - 4 Y 6 - 7
Acero Long. 5/8 2.00 4.00 4.47 35.76
estribos 3/8 2.00 22.00 0.78 34.32

EJE A' ENTRE


EJES 4 - 5 Y 5 - 6
Acero Long. 5/8 2.00 4.00 4.50 36.00
estribos 3/8 2.00 22.00 0.78 34.32

EJE A' ENTRE


EJES 1 - 2
Acero Long. 5/8 1.00 4.00 3.82 15.28
estribos 3/8 1.00 19.00 0.78 14.82

SEGUNDO NIVEL
VIGA VP-200
EJES 4 - 5 - 6
Acero Long. Sup. 3/4 3.00 3.00 8.42 75.78
Acero Long. Sup. 3/4 3.00 2.00 7.30 43.80
Acero Long. Neutro 3/8 3.00 2.00 7.92 47.52
Acero Long. Inf. 5/8 3.00 3.00 8.32 74.88
estribos 3/8 3.00 51.00 1.48 226.44

VIGA VP-201
EJES 3 - 7
Acero Long. Sup. 3/4 2.00 2.00 8.42 33.68
Acero Long. Sup. 3/4 2.00 1.00 6.29 12.58
Acero Long. Sup. 5/8 2.00 2.00 6.17 24.68
Acero Long. Neutro 3/8 2.00 2.00 7.92 31.68
Acero Long. Inf. 3/4 2.00 2.00 8.42 33.68
Acero Long. Inf. 3/4 2.00 1.00 6.29 12.58
Acero Long. Inf. 5/8 2.00 2.00 6.17 24.68
estribos 3/8 2.00 51.00 1.38 140.76

VIGA VP-202
EJES 1 - 2
Acero Long. Sup. 5/8 2.00 2.00 5.64 22.56
Acero Long. Sup. 5/8 2.00 1.00 3.05 6.10
Acero Long. Neutro 3/8 2.00 2.00 5.24 20.96
Acero Long. Inf. 5/8 2.00 2.00 5.64 22.56
estribos 3/8 2.00 37.00 1.38 102.12

VIGA VP-203
EJES 1 - 2
Acero Long. Sup. 5/8 2.00 2.00 5.90 23.60
Acero Long. Inf. 5/8 2.00 2.00 5.90 23.60
estribos 3/8 2.00 40.00 1.18 94.40

VIGA VA-200
EJES A - C
Acero Long. Sup. 5/8 2.00 2.00 17.27 69.08
Acero Long. Sup. 5/8 2.00 2.00 13.15 52.60
Acero Long. Neutro 3/8 2.00 2.00 16.57 66.28
Acero Long. Inf. 5/8 2.00 2.00 17.27 69.08
Acero Long. Inf. 5/8 2.00 2.00 13.15 52.60
estribos 3/8 2.00 110.00 1.38 303.60

VIGA VA-201
EJES A - B
Acero Long. Sup. 5/8 2.00 2.00 3.82 15.28
Acero Long. Neutro 3/8 2.00 2.00 3.42 13.68
Acero Long. Inf. 5/8 2.00 2.00 3.82 15.28
estribos 3/8 2.00 19.00 1.38 52.44

VIGA VA-202
EJE C
Acero Long. Sup. 5/8 1.00 2.00 3.82 7.64
Acero Long. Inf. 5/8 1.00 2.00 3.82 7.64
estribos 3/8 1.00 19.00 1.18 22.42

VIGA VCH-200
EJE A' ENTRE
EJES 3 - 4 Y 6 - 7
Acero Long. 5/8 2.00 4.00 4.47 35.76
estribos 3/8 2.00 22.00 0.78 34.32

EJE A' ENTRE


EJES 4 - 5 Y 5 - 6
Acero Long. 5/8 2.00 4.00 4.50 36.00
estribos 3/8 2.00 22.00 0.78 34.32

EJE A' ENTRE


EJES 1 - 2
Acero Long. 5/8 1.00 4.00 3.82 15.28
estribos 3/8 1.00 19.00 0.78 14.82

TERCER NIVEL
VIGA VA-302
EJES 4 - 5 - 6
Acero Long. Sup. 5/8 3.00 3.00 11.80 106.20
Acero Long. Sup. 5/8 3.00 2.00 6.05 36.30
Acero Long. Neutro 3/8 3.00 2.00 11.10 66.60
Acero Long. Inf. 5/8 3.00 3.00 11.80 106.20
estribos 3/8 3.00 66.00 1.48 293.04
estribos 3/8 3.00 14.00 1.94 81.48
estribos 3/8 3.00 19.00 2.14 121.98

VIGA VA-301
EJES 3 - 7
Acero Long. Sup. 5/8 2.00 3.00 11.80 70.80
Acero Long. Sup. 5/8 2.00 2.00 6.22 24.88
Acero Long. Neutro 3/8 2.00 2.00 11.10 44.40
Acero Long. Inf. 5/8 2.00 2.00 11.80 47.20
estribos 3/8 2.00 66.00 1.48 195.36
estribos 3/8 2.00 14.00 1.94 54.32
estribos 3/8 2.00 19.00 2.14 81.32

VIGA VA-303
EJES 1 - 2
Acero Long. Sup. 5/8 2.00 2.00 11.80 47.20
Acero Long. Sup. 5/8 2.00 1.00 3.05 6.10
Acero Long. Neutro 3/8 2.00 2.00 11.10 44.4
Acero Long. Inf. 5/8 2.00 2.00 11.80 47.20
estribos 3/8 2.00 75.00 1.38 207.00

VIGA VA-300
EJES A - C
Acero Long. Sup. 5/8 2.00 2.00 17.27 69.08
Acero Long. Neutro 3/8 2.00 2.00 16.57 66.28
Acero Long. Inf. 5/8 2.00 2.00 17.27 69.08
estribos 3/8 2.00 100.00 1.38 276.00

VIGA VA-304
EJES A - B - C
Acero Long. Sup. 5/8 3.00 2.00 3.82 22.92
Acero Long. Neutro 3/8 3.00 2.00 3.42 20.52
Acero Long. Inf. 5/8 3.00 2.00 3.82 22.92
estribos 3/8 3.00 19.00 1.18 67.26

VIGA VCH-300
EJES 1 - 2
Acero Long. 5/8 2.00 4.00 11.56 92.48
estribos 3/8 2.00 73.00 0.78 113.88

VIGA V-A
EJES 1 - 2
Acero Long. Sup. 5/8 2.00 2.00 3.51 14.04
Acero Long. Inf. 5/8 2.00 2.00 3.51 14.04
estribos 3/8 2.00 26.00 1.18 61.36

Suma 0 16086.68 0.00 7998.20 764.04 0.00


Peso 0.00 9330.2744 0.00 12797.12 1726.73 0.00 23,854.12 KG

01.05.06 LOSA ALIGERADA


01.05.06.03 ACERO CORRUGADO fy = 4200 kg/cm² GRADO 60
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ACERO EN LOSA

PABELLLON 1

EJE 1-5 ENTRE


EJE A-C
acero negativo 1/2 2.00 13.00 1.38 35.75

1/2 3.00 13.00 2.60 101.40


acero positivo 1/2 1.00 13.00 15.70 204.10

EJE 1-5 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.38
1/2 3.00 5.00 2.60
acero positivo 1/2 1.00 5.00 15.70

acero de temperatura 1/4 4.00 14.00 7.95 445.20

EJE 6-7 ENTRE


EJE A-B
acero negativo 1/2 2.00 7.00 1.28 17.85
acero positivo 1/2 1.00 7.00 3.45 24.15

EJE 6-7 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.28 12.75
acero positivo 1/2 1.00 5.00 3.45 17.25

acero de temperatura 1/4 1.00 11.00 5.26 57.86

EJE 8-12 ENTRE


EJE A-C
acero negativo 1/2 2.00 13.00 1.38 35.75
1/2 3.00 13.00 2.60 101.40
acero positivo 1/2 1.00 13.00 15.70 204.10

EJE 8-12 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.38 13.75
1/2 3.00 5.00 2.60 39.00
acero positivo 1/2 1.00 5.00 15.70 78.50

acero de temperatura 1/4 4.00 14.00 7.95 445.20

PABELLLON 2

EJE 1-5 ENTRE


EJE A-C
acero negativo 1/2 2.00 13.00 1.38 35.75
1/2 3.00 13.00 2.60 101.40
acero positivo 1/2 1.00 13.00 15.70 204.10

EJE 1-5 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.38 13.75
1/2 3.00 5.00 2.60 39.00
acero positivo 1/2 1.00 5.00 15.70 78.50

acero de temperatura 1/4 4.00 14.00 7.95 445.20

EJE 6-7 ENTRE


EJE A-B
acero negativo 1/2 2.00 7.00 1.28 17.85
acero positivo 1/2 1.00 7.00 3.45 24.15

EJE 6-7 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.28 12.75
acero positivo 1/2 1.00 5.00 3.45 17.25
0.00
acero de temperatura 1/4 1.00 11.00 5.26 57.86

EJE 8-12 ENTRE


EJE A-C
acero negativo 1/2 2.00 13.00 1.38 35.75
1/2 3.00 13.00 2.60 101.40
acero positivo 1/2 1.00 13.00 15.70 204.10

EJE 8-12 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.38 13.75
1/2 3.00 5.00 2.60 39.00
acero positivo 1/2 1.00 5.00 15.70 78.50

acero de temperatura 1/4 4.00 14.00 7.95 445.20

PABELLLON 4

1° PISO
EJE 1-2 ENTRE
EJE A-B
acero negativo 1/2 2.00 7.00 1.28 17.85
acero positivo 1/2 1.00 7.00 3.45 24.15

EJE 1-2 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.28 12.75
acero positivo 1/2 1.00 5.00 3.45 17.25
0.00
acero de temperatura 1/4 1.00 11.00 5.26 57.86

EJE 3-7 ENTRE


EJE A-C
acero negativo 1/2 2.00 13.00 1.38 35.75
1/2 3.00 13.00 2.60 101.40
acero positivo 1/2 1.00 13.00 15.70 204.10

EJE 3-7 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.38 13.75
1/2 3.00 5.00 2.60 39.00
acero positivo 1/2 1.00 5.00 15.70 78.50

acero de temperatura 1/4 4.00 14.00 7.95 445.20

2° PISO
EJE 1-2 ENTRE
EJE A-B
acero negativo 1/2 2.00 7.00 1.28 17.85
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

acero positivo 1/2 1.00 7.00 3.45 24.15

EJE 1-2 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.28 12.75
acero positivo 1/2 1.00 5.00 3.45 17.25

acero de temperatura 1/4 1.00 11.00 5.26 57.86

EJE 3-7 ENTRE


EJE A-C
acero negativo 1/2 2.00 13.00 1.38 35.75
1/2 3.00 13.00 2.60 101.40
acero positivo 1/2 1.00 13.00 15.70 204.10

EJE 3-7 ENTRE


VOLADIZO
acero negativo 1/2 2.00 5.00 1.38 13.75
1/2 3.00 5.00 2.60 39.00
acero positivo 1/2 1.00 5.00 15.70 78.50

acero de temperatura 1/4 4.00 14.00 7.95 445.20

Suma 2902.64 0.00 2991.75 0 0 0


Peso 725.66 0.00 3051.59 0.00 0.00 0 3,777.25 KG
MUNICIPALIDAD DISTRITAL DE CHILIA
: PROYECTO
CONSTRUCCIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO EN I.E. JUAN ACEVEDO ARCE DE LA LOCALIDAD DE CHILLIA - DISTRITO "
”DE CHILIA - PATAZ - LA LIBERTAD
-------------------------------------------------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

6.08 CISTERNAS SUBTERRANEAS


06.08.03 ACERO ESTRUCTURAL TRABAJADO PARA CISTERNA
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ACERO EN CISTERNA

LATERALES
Acero longitudinal 3/8 4.00 11.00 2.80 123.20
Acero transversal 3/8 4.00 9.00 2.95 106.20

FONDO
Acero longitudinal 1/2 2.00 16.00 7.30 233.60
Acero transversal 1/2 2.00 28.00 3.45 193.20

TECHO
Acero longitudinal 3/8 1.00 13.00 5.35 69.55
Acero transversal 3/8 1.00 28.00 2.45 68.60

TAPA
Acero longitudinal 3/8 4.00 5.00 1.15 23.00
Acero transversal 3/8 4.00 3.00 0.75 9.00
Acero transversal 1/2 4.00 2.00 0.75 6.00

TECHO CASETA
Acero longitudinal 3/8 1.00 11.00 2.30 25.30
Acero transversal 3/8 1.00 11.00 2.30 25.30

Suma 0.00 450.15 432.80 0.00 0.00 0.00


Peso 0.00 261.09 441.46 0.00 0.00 0.00 702.54 KG

6.08 TANQUE ELEVADO


06.08.03 ACERO ESTRUCTURAL TRABAJADO PARA TANQUE ELEVADO
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ACERO EN TANQUE ELEVADO

COLUMNAS
Acero longitudinal 3/4 4.00 8.00 13.94 446.08
estribos 3/8 4.00 77.00 2.44 751.52

VIGAS
Acero longitudinal 3/8 16.00 4.00 3.27 209.28
estribos 3/8 16.00 7.00 1.38 154.56

FONDO
Acero longitudinal 3/8 1.00 11.00 2.30 25.30
Acero transversal 3/8 1.00 11.00 2.30 25.30

TECHO
Acero longitudinal 3/8 1.00 11.00 2.30 25.30
Acero transversal 3/8 1.00 6.00 2.30 13.80

PARED
Acero longitudinal 3/8 4.00 9.00 5.14 185.04
Acero transversal 3/8 4.00 16.00 1.90 121.60

TAPA
Acero longitudinal 3/8 2.00 5.00 0.75 7.50
Acero longitudinal 3/8 2.00 5.00 0.35 3.50
Acero transversal 3/8 4.00 1.00 0.75 3.00
Acero transversal 1/2 4.00 2.00 0.75 6.00

Suma 0.00 1525.70 6.00 0.00 446.08 0.00


Peso 0.00 884.91 6.12 0.00 1008.14 0.00 1,899.17 KG

6.08 ZAPATA DE MURO DE CONTENCION


06.08.03
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATA DE MURO DE CONTENCION
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ACERO EN ZAPATA DE MURO

MURO DE CONTENCION
MURO TIPO I
MC-01
Acero longitudinal 1/2 9.00 2.00 4.25 76.50
Acero transversal 1/2 23.00 2.00 1.85 85.10

MC-02
Acero longitudinal 1/2 9.00 2.00 4.25 76.50
Acero transversal 1/2 23.00 2.00 1.85 85.10

MURO TIPO II
MC-03
Acero longitudinal 1/2 15.00 2.00 4.11 123.30
Acero transversal 1/2 22.00 2.00 2.85 125.40

MC-04
Acero longitudinal 1/2 15.00 2.00 8.73 261.90
Acero transversal 1/2 47.00 2.00 2.85 267.90

MC-05
Acero longitudinal 1/2 15.00 2.00 8.77 263.10
Acero transversal 1/2 48.00 2.00 2.85 273.60

MC-06
Acero longitudinal 1/2 15.00 2.00 1.24 37.20
Acero transversal 1/2 6.00 2.00 2.85 34.20

MC-07
Acero longitudinal 1/2 15.00 2.00 8.57 257.10
Acero transversal 1/2 46.00 2.00 2.85 262.20

MC-08
Acero longitudinal 1/2 15.00 2.00 4.16 124.80
Acero transversal 1/2 22.00 2.00 2.85 125.40

MC-09
Acero longitudinal 1/2 15.00 2.00 2.01 60.30
Acero transversal 1/2 10.00 2.00 2.85 57.00

MC-10
Acero longitudinal 1/2 15.00 2.00 3.25 97.50
Acero transversal 1/2 17.00 2.00 2.85 96.90

MC-11
Acero longitudinal 1/2 15.00 2.00 6.70 201.00
Acero transversal 1/2 36.00 2.00 2.85 205.20

MC-12
Acero longitudinal 1/2 15.00 2.00 2.38 71.40
Acero transversal 1/2 12.00 2.00 2.85 68.40

MC-13
Acero longitudinal 1/2 15.00 2.00 3.76 112.80
Acero transversal 1/2 20.00 2.00 2.85 114.00

MC-14
Acero longitudinal 1/2 15.00 2.00 6.70 201.00
Acero transversal 1/2 36.00 2.00 2.85 205.20

MC-15
Acero longitudinal 1/2 15.00 2.00 6.70 201.00
Acero transversal 1/2 36.00 2.00 2.85 205.20

MC-16
Acero longitudinal 1/2 15.00 2.00 6.67 200.10
Acero transversal 1/2 36.00 2.00 2.85 205.20

Suma 0.00 0.00 4781.50 0.00 0.00 0.00


Peso 0.00 0.00 4877.13 0.00 0.00 0.00 4,877.13 KG

6.08 PANTALLA DE MURO DE CONTENCION


06.08.03
ACERO ESTRUCTURAL TRABAJADO PARA PANTALLA DE MURO DE CONTENCION
Long x D
1/4 3/8 1/2 5/8 3/4 1
Diseño del N° de pza. por Long.
N° Descripción f Cantidad 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
fierro elementos Por pza
5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04
ACERO EN ZAPATA DE MURO

MURO DE CONTENCION
MURO TIPO I
MC-01
Acero Int. Hor. 3/8 9.00 1.00 3.94 35.46
Acero Ext. Hor. 3/8 15.00 1.00 3.94 59.10
Acero Principal Vert. 1/2 14.00 1.00 3.32 46.48
Acero Secundario Vert. 1/2 11.00 1.00 3.32 36.52

MC-02
Acero Int. Hor. 3/8 9.00 1.00 3.94 35.46
Acero Ext. Hor. 3/8 15.00 1.00 3.94 59.10
Acero Principal Vert. 1/2 14.00 1.00 3.32 46.48
Acero Secundario Vert. 1/2 11.00 1.00 3.32 36.52

MURO TIPO II
MC-03
Acero Int. Hor. 3/8 13.00 1.00 3.80 49.40
Acero Ext. Hor. 3/8 20.00 1.00 3.80 76.00
Acero Principal Vert. 1/2 14.00 1.00 4.32 60.48
Acero Secundario Vert. 1/2 11.00 1.00 4.32 47.52
Acero Principal Vert. Inf. 1/2 13.00 2.00 1.83 47.58

MC-04
Acero Int. Hor. 3/8 13.00 1.00 8.42 109.46
Acero Ext. Hor. 3/8 20.00 1.00 8.42 168.40
Acero Principal Vert. 1/2 29.00 1.00 4.32 125.28
Acero Secundario Vert. 1/2 22.00 1.00 4.32 95.04
Acero Principal Vert. Inf. 1/2 28.00 2.00 1.83 102.48

MC-05
Acero Int. Hor. 3/8 13.00 1.00 8.46 109.98
Acero Ext. Hor. 3/8 20.00 1.00 8.46 169.20
Acero Principal Vert. 1/2 29.00 1.00 4.32 125.28
Acero Secundario Vert. 1/2 22.00 1.00 4.32 95.04
Acero Principal Vert. Inf. 1/2 28.00 2.00 1.83 102.48

MC-06
Acero Int. Hor. 3/8 13.00 1.00 0.93 12.09
Acero Ext. Hor. 3/8 20.00 1.00 0.93 18.60
Acero Principal Vert. 1/2 4.00 1.00 4.32 17.28
Acero Secundario Vert. 1/2 3.00 1.00 4.32 12.96
Acero Principal Vert. Inf. 1/2 3.00 2.00 1.83 10.98

MC-07
Acero Int. Hor. 3/8 13.00 1.00 8.26 107.38
Acero Ext. Hor. 3/8 20.00 1.00 8.26 165.20
Acero Principal Vert. 1/2 29.00 1.00 4.32 125.28
Acero Secundario Vert. 1/2 22.00 1.00 4.32 95.04
Acero Principal Vert. Inf. 1/2 28.00 2.00 1.83 102.48

MC-08
Acero Int. Hor. 3/8 13.00 1.00 3.85 50.05
Acero Ext. Hor. 3/8 20.00 1.00 3.85 77.00
Acero Principal Vert. 1/2 14.00 1.00 4.32 60.48
Acero Secundario Vert. 1/2 11.00 1.00 4.32 47.52
Acero Principal Vert. Inf. 1/2 13.00 2.00 1.83 47.58

MC-09
Acero Int. Hor. 3/8 13.00 1.00 1.70 22.10
Acero Ext. Hor. 3/8 20.00 1.00 1.70 34.00
Acero Principal Vert. 1/2 7.00 1.00 4.32 30.24
Acero Secundario Vert. 1/2 5.00 1.00 4.32 21.60
Acero Principal Vert. Inf. 1/2 6.00 2.00 1.83 21.96

MC-10
Acero Int. Hor. 3/8 13.00 1.00 2.94 38.22
Acero Ext. Hor. 3/8 20.00 1.00 2.94 58.80
Acero Principal Vert. 1/2 11.00 1.00 4.32 47.52
Acero Secundario Vert. 1/2 8.00 1.00 4.32 34.56
Acero Principal Vert. Inf. 1/2 10.00 2.00 1.83 36.60

MC-11
Acero Int. Hor. 3/8 13.00 1.00 6.39 83.07
Acero Ext. Hor. 3/8 20.00 1.00 6.39 127.80
Acero Principal Vert. 1/2 22.00 1.00 4.32 95.04
Acero Secundario Vert. 1/2 17.00 1.00 4.32 73.44
Acero Principal Vert. Inf. 1/2 21.00 2.00 1.83 76.86

MC-12
Acero Int. Hor. 3/8 13.00 1.00 2.07 26.91
Acero Ext. Hor. 3/8 20.00 1.00 2.07 41.40
Acero Principal Vert. 1/2 8.00 1.00 4.32 34.56
Acero Secundario Vert. 1/2 6.00 1.00 4.32 25.92
Acero Principal Vert. Inf. 1/2 7.00 2.00 1.83 25.62

MC-13
Acero Int. Hor. 3/8 13.00 1.00 3.45 44.85
Acero Ext. Hor. 3/8 20.00 1.00 3.45 69.00
Acero Principal Vert. 1/2 13.00 1.00 4.32 56.16
Acero Secundario Vert. 1/2 10.00 1.00 4.32 43.20
Acero Principal Vert. Inf. 1/2 12.00 2.00 1.83 43.92

MC-14
Acero Int. Hor. 3/8 13.00 1.00 6.39 83.07
Acero Ext. Hor. 3/8 20.00 1.00 6.39 127.80
Acero Principal Vert. 1/2 13.00 1.00 4.32 56.16
Acero Secundario Vert. 1/2 10.00 1.00 4.32 43.20
Acero Principal Vert. Inf. 1/2 12.00 2.00 1.83 43.92

MC-15
Acero Int. Hor. 3/8 13.00 1.00 6.39 83.07
Acero Ext. Hor. 3/8 20.00 1.00 6.39 127.80
Acero Principal Vert. 1/2 13.00 1.00 4.32 56.16
Acero Secundario Vert. 1/2 10.00 1.00 4.32 43.20
Acero Principal Vert. Inf. 1/2 12.00 2.00 1.83 43.92

MC-16
Acero Int. Hor. 3/8 13.00 1.00 6.36 82.68
Acero Ext. Hor. 3/8 20.00 1.00 6.36 127.20
Acero Principal Vert. 1/2 22.00 1.00 4.32 95.04
Acero Secundario Vert. 1/2 17.00 1.00 4.32 73.44
Acero Principal Vert. Inf. 1/2 21.00 2.00 1.83 76.86

Suma 0.00 2479.65 2685.88 0.00 0.00 0.00


Peso 0.00 1438.20 2739.60 0.00 0.00 0.00 4,177.79 KG
UNIVERSIDAD PERUANA LOS ANDES
PROYECTO
VIVIENDA DE DOS PLANTAS Y AZOTEA
--------------------------------------------------------------------------------------------------------------------------------
-----
RESUMEN DE METRADOS

ITEM DESCRIPCION UND METRADO


1.00.00 VIVIENDA DE DOS PISOS
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
UNIVERSIDAD PERUANA LOS ANDES
PROYECTO
VIVIENDA DE DOS PLANTAS Y AZOTEA
-------------------------------------------------------------------------------------------------------
---------------------------------------------
PLANILLA DE METRADOS

02.00.00 ESTRUCTURAS
02.01.00 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACIÓN DE ZANJAS # Veces # Elementos Long. m Ancho m Alto m

02.01.02 RELLENO CON MATERIAL P # Veces # Elementos Long. m Ancho m Alto m

02.01.03 RELLENO CON MATERIAL PR # Veces # Elementos Long. m Ancho m Alto m


NA LOS ANDES
NTAS Y AZOTEA
--------------------------------------------------------
----------------
ETRADOS
1.80

0.00
Parcial Total UND 1.20

0.00 M3
Parcial Total UND

0.00 M3
Parcial Total UND
0.17