Stowage Plan - Dep Santos To Kakinada
Stowage Plan - Dep Santos To Kakinada
Coal in Bulk Coal in Bulk Coal in Bulk Coal in Bulk Coal in Bulk
AP FP
95% 87% 80% 89% 96%
11,000 M/T 11,900M/T 9,900 M/T 12,100 M/T 10,100 M/T
1 H-2 & H-4 4,500 & 4,500 0.00 m3 -19.34 27.34 5.26 7.83 14.70 6.55 2.57 Commence @ H2 & H4
2 H-1 & H-3 2,500 & 2,500 0.00 m3 -18.87 28.51 7.45 7.38 12.90 7.42 -0.07
3 H-5 & H-3 4,000 & 2,500 2.71 NO. 3 WBT & TST P/S 2,167 m³ -10.67 15.70 6.63 9.88 13.20 8.26 3.25
4 H-2 & H-4 4,500 & 4,500 6.49 NO. 2 & NO. 4 P/S 5,193 m³ -9.92 -29.15 7.49 10.34 12.40 8.92 2.85
5 H-1 & H-3 3,000 & 2,100 3.24 NO.1 WBT &TST P/S 2,589 m³ 11.99 -42.85 8.25 10.46 10.30 9.36 2.21
6 H-5 & H-3 3,000 & 2,800 3.11 NO.5 WBT &TST P/S 2,491 m³ -22.86 -75.45 8.86 11.06 11.10 9.96 2.20 Complete H-3
7 H-1 & H-4 3,000 & 2,900 0.00 Stripping Tanks m3 -32.35 -82.71 10.20 11.50 9.90 10.85 1.30 Complete H-4
8 H-2 & H-5 3,100 & 2,100 0.00 Stripping Tanks m3 -30.88 -85.26 11.23 12.26 8.90 11.75 1.03 Complete H-2
9 H-1 & H-5 2,000 & 1,400 Check Draft -33.83 -69.14 12.27 12.44 8.00 12.36 0.17 Draft survey
10 H-1 & H-5 500 & 500 for Trimming -35.43 -68.67 12.50 12.55 7.80 12.53 0.05 Complete H-1 & H-5
cargo ballast
Total Cargo : 55,000 0.0 15.6 Total Ballast : 12,440 m³
DISCH PORT: KAKINADA, INDIA VOY NO: 004 SF: 42.0 cft / mt
REMARKS: CARGO FIGURES ARE ALL ABOUT AND SUBJECT TO FOLLOWING PARAMETERS
A.) ACTUAL TURN OUT OF CARGO STOWAGE FACTOR D.) STEVEDORE'S PROPER CARGO DISTRIBUTION PERHOLDS
B.) ACTUAL SEA WATER DENSITY AT LOADING BERTH E.) DRAFT / AIR DRAFT RESTRICTIONS AT LOAD / DISCH PORT
C.) ACTUAL BUNKER ROB ON COMPLETION OF LOADING F.) VESSEL'S DEFLECTION ON COMPLETION OF LOADING