PROYECTO: “CREACIÓN CAMINO VECINAL ENTRE LOS SECTORES DE PUCYUCANCHA, QUEUÑAPAMPA Y ICMAPATA DEL DISTRITO DE HAQUIRA –
PROVINCIA DE COTABAMBAS – DEPARTAMENTO DE APURIMAC ”
MATERIAL EXCEDENTE
CALCULO DE LA DISTANCIA MEDIA DE TRANSPORTE TRAMO I
BOTADERO INFLUENCIA DIST. Leja DIST. Cerc ACCESO DIST. MEDIA VOL. CORTE VOL. RELLENO VOL. EXCEDENTE X
N°
KM DE A (m) (m) (m) (m) (m3) (m3) DISTANCIA (m3xkm)
00+000.0 00+627.5 650.00 22.50 50.00 336.25 5352.55 811.80 1,526.83
TRAMO I 00+650.0
00+627.5 01+255.0 605.00 22.50 50.00 313.75 2664.75 3049.28 -120.64
01+255.0 01+812.5 605.00 47.50 50.00 326.25 2676.35 122.50 833.19
TRAMO I 01+860.0
01+812.5 02+370.0 510.00 47.50 50.00 278.75 4866.95 233.47 1,291.58
02+370.0 02+962.5 510.00 82.50 50.00 296.25 11406.3 1699.75 2,875.57
TRAMO I 02+880.0
02+962.5 03+555.0 675.00 82.50 50.00 378.75 4863.075 2254.02 988.18
03+555.0 04+327.5 675.00 97.50 50.00 386.25 13292.8 5419.53 3,041.05
TRAMO I 04+230.0
04+327.5 05+100.0 870.00 97.50 50.00 483.75 11704.05 510.40 5,414.93
05+100.0 05+850.0 870.00 120.00 50.00 495.00 4392.7 188.43 2,081.12
TRAMO I 05+970.0
05+850.0 06+600.0 630.00 120.00 50.00 375.00 4262.1637 464.37 1,424.17
00+000.0 00+542.5 640.00 97.50 50.00 368.75 3109.8 16.60 1,140.62
TRAMO II 00+640.0
00+542.5 01+085.0 445.00 97.50 50.00 271.25 7816.525 1199.70 1,794.81
01+085.0 01+410.0 445.00 120.00 50.00 282.50 2182.775 231.22 551.31
TRAMO II 01+530.0
01+410.0 01+735.0 205.00 120.00 50.00 162.50 2722.25 210.40 408.18
01+735.0 02+909.5 969.50 205.00 50.00 587.25 10489.9 115.10 6,092.60
TRAMO II 01+940.0
02+909.5 04+084.0 2144.00 969.50 50.00 1556.75 6365.2406 69.60 9,800.74
TOTAL 98168.18 16596.17 39,144.23
MATERIAL
DESCRIPCION DE ACTIVIDADES
EXCEDENTE
DISTANCIA MEDIA DE TRANSPORTE (km) 0.48
VELOCIDAD CARGADO (km/h) 20.00
VELOCIDAD DESCARGADO (km/h) 25.00
CAPACIDAD DEL VEHICULO (m3) 15.00
TIEMPO DE CARGUIO (min) 5.00
TIEMPO DE DESCARGA ( min) 2.00
TIEMPO DE RECORRIDO CARGADO (min) 1.44
TIEMPO DE RECORRIDO DESCARGADO (min) 1.15
TIEMPO TOTAL POR CICLO (min) 9.59
Nº DE MINUTOS POR JORNADA (min) 480.00
TIEMPO EFECTIVO (90%) (min) 432.00
Nº DE CICLOS POR DIA 45.00
VOLUMEN DIARIO TRANSPORTADO (m3/dia) 675.00
CANTIDAD DE UNIDADES=4 2700.00
PROYECTO: “CREACIÓN CAMINO VECINAL ENTRE LOS SECTORES DE PUCYUCANCHA, QUEUÑAPAMPA Y ICMAPATA DEL DISTRITO DE
HAQUIRA – PROVINCIA DE COTABAMBAS – DEPARTAMENTO DE APURIMAC ”
CANTERA INFLUENCIA DIST. Leja DIST. Cerc ACCESO DIST. MEDIA Long x Anc x e. Plazoletas Cruce Volumen Total VOL. AFIRMADO X
KM DE A (m) (m) (m) (m) (m3) (m3) Afirmado DISTANCIA (m3xkm)
00+000.0 01+000.0 1000.00 0.00 2500.00 700.00 840.00 8.40 848.40 593.88
01+000.0 02+000.0 1000.00 0.00 2500.00 700.00 840.00 8.40 848.40 593.88
02+000.0 03+000.0 1000.00 0.00 2500.00 700.00 840.00 8.40 848.40 593.88
00+000.0
03+000.0 04+000.0 1000.00 0.00 2500.00 700.00 840.00 8.40 848.40 593.88
04+000.0 05+000.0 1000.00 0.00 2500.00 700.00 840.00 8.40 848.40 593.88
05+000.0 06+075.0 1075.00 0.00 2500.00 700.00 903.00 8.40 911.40 637.98
00+000.0 01+000.0 1000.00 0.00 2500.00 2740.00 840.00 8.40 848.40 2,324.62
01+000.0 02+000.0 1000.00 0.00 2500.00 2740.00 840.00 8.40 848.40 2,324.62
00+000.0 02+000.0 03+000.0 1000.00 0.00 2500.00 2740.00 840.00 8.40 848.40 2,324.62
03+000.0 04+000.0 1000.00 0.00 2500.00 2740.00 840.00 8.40 848.40 2,324.62
04+000.0 04+084.0 84.00 0.00 2500.00 2740.00 70.56 0.00 70.56 193.33
TOTAL 8533.56 84.00 8617.56 13,099.18
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subpartidas
MATERIAL CANTERA m3 1.000 10.00 10.00
CARGUIO Y ZARANDEO MATERIAL CANTERA m3 1.000 9.64 9.64
EXTRACCION MATERIAL CANTERA m3 1.000 10.41 10.41
TRANSPORTE MATERIAL CANTERA m3 1.000 3.36 3.36
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Equipos
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
Equipos
COSTO DE AFIRMADO
GERENCIA DE INFRAESTRUCTURA
PROYECTO: “CREACIÓN CAMINO VECINAL ENTRE LOS SECTORES DE PUCYUCANCHA, QUEUÑAPAMPA Y ICMAPATA DEL DISTRITO DE HAQUIRA –
PROVINCIA DE COTABAMBAS – DEPARTAMENTO DE APURIMAC ”
CANTERA INFLUENCIA DIST. Leja DIST. Cerc ACCESO DIST. MEDIA Long x Anc x e. Plazoletas Cruce Sobre Anchos Volumen Total VOL. AFIRMADO X
KM DE A (m) (m) (m) (m) (m3) e=0.15 m (m3) (m3) Afirmado DISTANCIA (m3xkm)
00+000.0 01+000.0 1000.00 0.00 500.00 1000.00 600.00 6.00 68.63 674.63 674.63
01+000.0 02+000.0 1000.00 0.00 500.00 1000.00 600.00 6.00 45.62 651.62 651.62
02+000.0 03+000.0 1000.00 0.00 500.00 1000.00 600.00 6.00 26.65 632.65 632.65
03+000.0 04+000.0 1000.00 0.00 500.00 1000.00 600.00 6.00 57.93 663.93 663.93
00+000.0
04+000.0 05+000.0 1000.00 0.00 500.00 1000.00 600.00 6.00 52.88 658.88 658.88
05+000.0 06+000.0 1000.00 0.00 500.00 1000.00 600.00 6.00 54.82 660.82 660.82
06+000.0 07+000.0 1000.00 0.00 500.00 1000.00 600.00 6.00 64.71 670.71 670.71
07+000.0 07+820.0 820.00 0.00 500.00 910.00 492.00 3.00 64.62 559.62 509.26
TOTAL 4692.00 45.00 435.85 5172.85 5,122.48
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subpartidas
MATERIAL CANTERA m3 1.000 5.00 5.00
CARGUIO Y ZARANDEO MATERIAL CANTERA m3 1.000 9.64 9.64
EXTRACCION MATERIAL CANTERA m3 1.000 10.41 10.41
TRANSPORTE MATERIAL CANTERA m3 1.000 2.69 2.69
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Equipos
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
Equipos
COSTO DE AFIRMADO
d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra
d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f r a e s t r u c t u r a d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f r a e s t r u c t u r a
d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra
GERENCIA DE INFRAESTRUCTURA d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra
d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f r a e s t r u c t u r a d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f r a e s t r u c t u r a
d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra
Del analisis de Precios Unitarios y el Estudio de Diseño de Mesclas de la Cantera Agua Dulce se tiene:
ALCANTARILLA D= 36" ALCANTARILLA D= 48" BADENES
OBRA DE ARTE ALIVIADERO
TIPO I TIPO II TIPO I TIPO II 8.5 10.5
Cantidad de Agua 1.59 1.981 ------ 2.69 4.38 5.299 0.514
"(1)" "(2)"
FUENTE INFLUENCIA OBRA UBICACIÓN DISTANCIA ACCESO DIST. MEDIA VOLUMEN (1)x(2)
KM DE A DE ARTE KM (m) (m) (m) (m3) (m3xm)
Aliviadero 1 00+220.00 220.00 580.00 690.00 0.51 354.66
Aliviadero 2 00+418.00 418.00 580.00 789.00 0.51 405.55
Aliviadero 3 00+590.00 590.00 580.00 875.00 0.51 449.75
00+000.0 00+000.0 01+136.0
Aliviadero 4 00+750.00 750.00 580.00 955.00 0.51 490.87
Alcantarilla 1 00+925.00 925.00 580.00 1042.50 2.69 2804.33
Alcantarilla 2 01+032.00 1032.00 580.00 1096.00 2.69 2948.24
Alcantarilla 3 01+138.00 1138.00 20.00 589.00 1.59 936.51
Alcantarilla 4 01+350.00 1350.00 20.00 695.00 2.69 1869.55
01+136.0 02+256.0 Alcantarilla 5 01+540.00 1540.00 20.00 790.00 2.69 2125.10
Alcantarilla 6 01+778.00 1778.00 20.00 909.00 1.98 1800.73
Alcantarilla 7 02+060.00 2060.00 20.00 1050.00 1.98 2080.05
Baden 1 02+272.00 2272.00 20.00 1156.00 5.30 6125.64
Alcantarilla 8 02+480.00 2480.00 20.00 1260.00 1.59 2003.40
02+272.0
Alcantarilla 9 02+700.00 428.00 20.00 234.00 1.98 463.55
Alcantarilla 10 03+035.00 763.00 20.00 401.50 1.98 795.37
02+256.0 03+376.0 Alcantarilla 11 03+085.00 813.00 20.00 426.50 2.69 1147.29
Aliviadero 5 03+160.00 888.00 20.00 464.00 0.51 238.50
Alcantarilla 12 03+275.00 4163.00 20.00 2101.50 2.69 5653.04
Aliviadero 6 03+315.00 4203.00 20.00 2121.50 0.51 1090.45
Alcantarilla 13 03+375.00 4263.00 20.00 2151.50 2.69 5787.54
Alcantarilla 14 03+580.00 4468.00 10.00 2244.00 2.69 6036.36
Alcantarilla 15 03+770.00 4658.00 10.00 2339.00 1.98 4633.56
03+376.0 04+235.5 Baden 2 03+958.00 1686.00 10.00 853.00 1.98 1689.79
Alcantarilla 16 04+112.00 1840.00 10.00 930.00 4.38 4073.40
Baden 3 04+325.00 2053.00 10.00 1036.50 4.38 4539.87
04+480.0
Puente 1 04+483.00 2211.00 10.00 1115.50 0.00
Alcantarilla 17 04+635.00 2363.00 10.00 1191.50 2.69 3205.13
04+235.5 05+095.0 Alcantarilla 18 04+755.00 2483.00 10.00 1251.50 2.69 3366.54
Alcantarilla 19 04+875.00 2603.00 10.00 1311.50 2.69 3527.94
Aliviadero 7 04+990.00 2718.00 10.00 1369.00 0.51 703.67
Alcantarilla 20 05+105.00 2833.00 10.00 1426.50 2.69 3837.29
05+095.0 05+507.5 Alcantarilla 21 05+245.00 2973.00 10.00 1496.50 2.69 4025.59
Alcantarilla 22 05+385.00 3113.00 10.00 1566.50 2.69 4213.89
05+710.0
Alcantarilla 23 05+515.00 3243.00 10.00 1631.50 2.69 4388.74
05+507.5 05+920.0 Alcantarilla 24 05+605.00 3333.00 10.00 1676.50 117.13 196368.44
Puente 2 05+710.00 3438.00 10.00 1729.00 0.00
Alcantarilla 25 05+950.00 3678.00 10.00 1849.00 1.98 3662.87
Baden 4 06+130.00 3858.00 10.00 1939.00 4.38 8492.82
05+095.0 06+457.5
Baden 5 06+220.00 3948.00 10.00 1984.00 5.30 10513.22
Alcantarilla 26 06+380.00 4108.00 10.00 2064.00 2.69 5552.16
Alcantarilla 27 06+520.00 4248.00 10.00 2134.00 2.69 5740.46
Baden 6 06+700.00 4428.00 10.00 2224.00 4.38 9741.12
Baden 7 06+850.00 4578.00 10.00 2299.00 5.30 12182.40
06+130.0
Alcantarilla 26 07+000.00 4728.00 10.00 2374.00 2.69 6386.06
Alcantarilla 27 07+085.00 4813.00 10.00 2416.50 2.69 6500.39
06+457.5 07+820.0
Alcantarilla 28 07+280.00 5008.00 10.00 2514.00 2.69 6762.66
Alcantarilla 29 07+360.00 5088.00 10.00 2554.00 2.69 6870.26
Aliviadero 8 07+520.00 5248.00 10.00 2634.00 0.51 1353.88
Aliviadero 9 07+610.00 5338.00 10.00 2679.00 0.51 1377.01
Alcantarilla 30 07+730.00 5458.00 10.00 2739.00 2.69 7367.91
d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f r a e s t r u c t u r a d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f r a e s t r u c t u r a
d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra
GERENCIA DE INFRAESTRUCTURA d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra
d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f r a e s t r u c t u r a d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f r a e s t r u c t u r a
d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p r o y e c t o s d e in f ra e s t ru c t u ra
231.40 376683.49
DISTANCIA MEDIA DE TRANSPORTE = 1.63 km
d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra
d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra
GERENCIA DE INFRAESTRUCTURA d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra
d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra d iv is ió n d e e s t u d io s y p ro y e c t o s d e in f ra e s t ru c t u ra
d i v i s i ó n d e e s t u d i o s y p r o y e c t o s d e i n f r a e s t r u c t u r a d i v i s ió n d e e s t u d i o s y p r o y e c t o s d e i n f r a e s t r u c t u r a d i v i s ió n d e e s t u d i o s y p r o y e c t o s d e i n f r a e s t r u c t u r a d i v i s ió n d e e s t u d i o s y p r o y e c t o s d e i n f r a e s t r u c t u r a
Con Motobomba
Tiempo de carguio con motobomba 1 galon = 3.7854 lts
f = 2" , Q=5 lt/seg. V= 1000 glns
Q=V/T V= 3785.4 lts
T=V/Q
3785.4
T=
5
T= 757.08 seg
T= 12.62 min
Con Motobomba
Tiempo de descarga del agua con motobomba.
f = 2" , Q=2.5 lt/seg.
Q=V/T
T=V/Q
3785.4
T=
2.5
T= 1514.16 seg
T= 25.24 min
GERENCIA DE INFRAESTRUCTURA
PROYECTO: “CREACIÓN CAMINO VECINAL ENTRE LOS SECTORES DE PUCYUCANCHA, QUEUÑAPAMPA Y ICMAPATA DEL
DISTRITO DE HAQUIRA – PROVINCIA DE COTABAMBAS – DEPARTAMENTO DE APURIMAC ”
PIE DE
OBRA
CANTERA
AGREGADO
AGUA DULCE
CANTERA
AGREGADO
CALCAPAMPA
Según la imagen anterior se muestra que la distancia de la canteras a Pie de Obra, seguiendo la ruta Palma Real-Kiteni-Ivochote:
COORDENADAS UTM DISTANCIA
Cantera Agua Dulce: Extracion de arena fina, Arena
ESTE (X) NORTE (Y)
Gruesa, Piedra Mediana y Grava Selecionada 35.00 Km
708584 8601887
COORDENADAS DISTANCIA
Cantera Calcapampa: Extracion Grava Selecionada (Piedra
ESTE (X) NORTE (Y)
Chancada de 1/2" y 3/4") 132.50 Km
761542 8586125
Del analisis de Precios Unitarios y el Estudio de Diseño de Mesclas de el Agua Dulce y Calcapampa se tiene:
Cant. Obra de Arte Tipo / Longitud Grava Selecionada Arena Gruesa Piedra Mediana Piedra Chancada
1 Puente Kamankiriato II 16 m
DMT AGREGADOS
MUNICIPALIDAD DISTRITAL DE ECHARATI
PROYECTO: “CONSTRUCCION DE LA CARRETERA VECINAL KAMANKIRIATO
-TUNQUIMAYO II, ZONAL IVOCHOTE" JULIO 2014
GERENCIA DE INFRAESTRUCTURA
PROYECTO: “CREACIÓN CAMINO VECINAL ENTRE LOS SECTORES DE PUCYUCANCHA, QUEUÑAPAMPA Y ICMAPATA DEL
DISTRITO DE HAQUIRA – PROVINCIA DE COTABAMBAS – DEPARTAMENTO DE APURIMAC ”
DMT AGREGADOS
MUNICIPALIDAD DISTRITAL DE ECHARATI
PROYECTO: “CONSTRUCCION DE LA CARRETERA VECINAL KAMANKIRIATO
-TUNQUIMAYO II, ZONAL IVOCHOTE" JULIO 2014
GERENCIA DE INFRAESTRUCTURA
PROYECTO: “CREACIÓN CAMINO VECINAL ENTRE LOS SECTORES DE PUCYUCANCHA, QUEUÑAPAMPA Y ICMAPATA DEL
DISTRITO DE HAQUIRA – PROVINCIA DE COTABAMBAS – DEPARTAMENTO DE APURIMAC ”
DMT AGREGADOS
MUNICIPALIDAD DISTRITAL DE ECHARATI
PROYECTO: “CONSTRUCCION DE LA CARRETERA VECINAL KAMANKIRIATO
-TUNQUIMAYO II, ZONAL IVOCHOTE" JULIO 2014
GERENCIA DE INFRAESTRUCTURA
PROYECTO: “CREACIÓN CAMINO VECINAL ENTRE LOS SECTORES DE PUCYUCANCHA, QUEUÑAPAMPA Y ICMAPATA DEL
DISTRITO DE HAQUIRA – PROVINCIA DE COTABAMBAS – DEPARTAMENTO DE APURIMAC ”
GERENCIA DE INFRAESTRUCTURA
PROYECTO: “CREACIÓN CAMINO VECINAL ENTRE LOS SECTORES DE PUCYUCANCHA, QUEUÑAPAMPA Y ICMAPATA DEL
DISTRITO DE HAQUIRA – PROVINCIA DE COTABAMBAS – DEPARTAMENTO DE APURIMAC ”
DMT AGREGADOS
MUNICIPALIDAD DISTRITAL DE ECHARATI
PROYECTO: “CONSTRUCCION DE LA CARRETERA VECINAL KAMANKIRIATO
-TUNQUIMAYO II, ZONAL IVOCHOTE" JULIO 2014
GERENCIA DE INFRAESTRUCTURA
GRAVA
DESCRIPCION DE ACTIVIDADES
SELECIONADA
DISTANCIA MEDIA DE TRANSPORTE (km) 39.48
VELOCIDAD CARGADO (km/h) 20.00 valor asumido
VELOCIDAD DESCARGADO (km/h) 25.00 valor asumido
CAPACIDAD DEL VEHICULO (m3) 15.00
TIEMPO DE CARGUIO (min) 10.00 valor asumido
TIEMPO DE DESCARGA ( min) 3.00 valor asumido
TIEMPO DE RECORRIDO CARGADO (min) 118.45
TIEMPO DE RECORRIDO DESCARGADO (min) 94.76
TIEMPO TOTAL POR CICLO (min) 226.20
Nº DE MINUTOS POR JORNADA (min) 480.00
TIEMPO EFECTIVO (90%) (min) 432.00
Nº DE CICLOS POR DIA 1.90
VOLUMEN DIARIO TRANSPORTADO (m3/dia) 28.50
GERENCIA DE INFRAESTRUCTURA
GERENCIA DE INFRAESTRUCTURA
Código Descripción Recurso Und Cuadrilla Cantidad Precio S/. Parcial S/.
Subpartidas
GRAVA SELECCIONADA EN CANTERA m3 1.000 100.00 100.00
TRANSPORTE DE GRAVA SELECCIONADA m3 1.000 49.49 49.49
Código Descripción Recurso Und Cuadrilla Cantidad Precio S/. Parcial S/.
Subpartidas
PIEDRA MEDIANA EN CANTERA m3 1.000 60.00 60.00
TRANSPORTE DE AGREGADOS m3 1.000 49.49 49.49
Código Descripción Recurso Und Cuadrilla Cantidad Precio S/. Parcial S/.
Subpartidas
PIEDRA CHANCADA EN CANTERA m3 1.000 150.00 150.00
TRANSPORTE DE AGREGADOS m3 1.000 156.72 156.72
Código Descripción Recurso Und Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
COSTO DE AGREGADOS
MUNICIPALIDAD DISTRITAL DE ECHARATI
PROYECTO: “CONSTRUCCION DE LA CARRETERA VECINAL KAMANKIRIATO
-TUNQUIMAYO II, ZONAL IVOCHOTE" JULIO 2014
GERENCIA DE INFRAESTRUCTURA
Código Descripción Recurso Und Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
Equipos
Código Descripción Recurso Und Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
Equipos
COSTO DE AGREGADOS