1.01 ESTRUCTURAS 6,960,591.99 39.3% 2,735,570.07 23.9% 1,662,221.53 63.2% 4,397,791.62 36.8% 2,562,800.37
1.02 ARQUITECTURA 1,359,122.25 0.0% 0.00 0.0% 0.00 0.0% 0.00 100.0% 1,359,122.25
1.03 INSTALACIONES SANITARIAS 366,840.92 0.0% 0.00 0.0% 0.00 0.0% 0.00 100.0% 366,840.92
1.04 INSTALACIONES ELÉCTRICAS - MECÁNICAS - COMUNICACIONES 1,511,805.81 0.0% 0.00 0.0% 0.00 0.0% 0.00 100.0% 1,511,805.81
1.08 REAJUSTE INSTALACIONES ELÉCTRICAS - MECÁNICAS - COMUNICACIONES 0.00 0.00 0.00 0.00
CONTRATISTA CONTRATISTA
FECHA : FECHA :
SUPERVISIÓN SUPERVISION
FECHA : FECHA :
CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
1.01 DESARROLLO DEL ESTUDIO DEFINITIVO 503,392.13 100.0% 503,392.13 0.0% 0.00 100.0% 503,392.13 0.0% 0.00
1.02 ESTRUCTURAS 6,960,591.99 39.3% 2,735,570.07 23.9% 1,662,221.53 63.2% 4,397,791.62 36.8% 2,562,800.37
1.03 ARQUITECTURA 1,359,122.25 0.0% 0.00 0.0% 0.00 0.0% 0.00 100.0% 1,359,122.25
1.04 INSTALACIONES SANITARIAS 366,840.92 0.0% 0.00 0.0% 0.00 0.0% 0.00 100.0% 366,840.92
1.05 INSTALACIONES ELÉCTRICAS - MECÁNICAS - COMUNICACIONES 1,511,805.81 0.0% 0.00 0.0% 0.00 0.0% 0.00 100.0% 1,511,805.81
1.09 REAJUSTE INSTALACIONES ELÉCTRICAS - MECÁNICAS - COMUNICACIONES 0.00 0.00 0.00 0.00
CONTRATISTA CONTRATISTA
FECHA : FECHA :
SUPERVISIÓN SUPERVISION
FECHA : FECHA :
CRONOGRAMA DE AVANCE VALORIZADO DE OBRA
A ESTRUCTURAS 6,960,591.99
01 OBRAS PROVISIONALES Y PRELIMINARES 2,153,353.78
01.01 CONSTRUCCIONES PROVISIONALES 215,952.66
01.01.01 CONSTRUCCIONES PROVISIONALES glb 36,224.40 36,224.40 36,224.40 35,055.87 1,168.53 144,897.58
01.01.02 CERCO METÁLICO PROVISIONAL DE OBRA h= 2.40m m 25,579.16 25,579.16
01.01.03 CERCO DE TRIPLAY PROVISIONAL DE OBRA h= 2.40m m 20,910.15 20,910.15 41,820.30
01.01.04 CARTEL DE OBRA und 3,655.62 3,655.62
01.02 INSTALACIONES PROVISIONALES 123,195.85
01.02.01 INSTALACIÓN PROVISIONAL DE AGUA Y DESAGUE glb 33,209.43 33,209.43 66,418.86
01.02.02 INSTALACIÓN PROVISIONAL DE ENERGÍA ELÉCTRICA glb 56,776.99 56,776.99
01.03 TRABAJOS PRELIMINARES 399,993.94
01.03.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE MAQUINARIA, EQUIPOS Y VARIOS glb 14,217.25 13,758.62 458.62 28,434.49
01.03.02 LIMPIEZA INICIAL DE TERRENO m2 30,115.80 30,115.80
01.03.03 LIMPIEZA PERMANENTE DE OBRA m2 20,853.03 20,853.03 20,853.03 20,853.03 20,180.35 672.68 104,265.15
01.03.04 TRAZO Y REPLANTEO PRELIMINAR m2 84,212.70 84,212.70
01.03.05 TRAZO Y NIVELES DURANTE EL PROCESO m2 30,593.16 30,593.16 30,593.16 30,593.16 29,606.28 986.88 152,965.80
01.04 MITIGACION DE IMPACTO AMBIENTAL 323,789.97
01.04.01 RIEGO PERMANENTE EN ZONA DE TRABAJO mes 34,925.58 34,925.58 34,925.58 104,776.73
01.04.02 MONITOREO AMBIENTAL glb 43,802.65 43,802.65 43,802.65 43,802.65 42,389.66 1,412.99 219,013.24
01.05 DEMOLICIONES Y DESMONTAJES 96,898.90
01.05.01 DEMOLICIÓN DE ESTRUCTURAS DE CONCRETO m3 61,286.82 61,286.82
01.05.02 DESMONTAJE DE ESTRUCTURA EXISTENTES m2 13,887.15 13,887.15
01.05.03 DESMONTAJE DE CERCOS Y BARANDAS m 3,004.26 3,004.26
01.05.04 ELIMINACIÓN DE MATERIAL EXCEDENTE DE DEMOLICIONES, D = 20 Km m3 18,720.67 18,720.67
01.06 VARIOS 993,522.46
01.06.01 AGUA PARA LA OBRA - CONSUMO mes 4,855.00 4,855.00 4,855.00 4,855.00 4,698.39 156.61 24,275.00
01.06.02 ENERGÍA ELÉCTRICA PARA LA OBRA - CONSUMO mes 5,679.24 5,679.24 5,679.24 5,679.24 5,496.04 183.20 28,396.20
01.06.03 TRANSPORTE VERTICAL Y HORIZONTAL DE MATERIALES EN OBRA glb 155,268.33 155,268.33 155,268.33 155,268.33 150,259.68 5,008.66 776,341.66
01.06.04 POZA DE CURADO und 2,500.00 2,500.00
01.06.05 PANTALLA DE PROTECCIÓN HACIA VECINOS m 27,174.00 27,174.00
01.06.06 TRANSPOTE DE PERSONAL mes 20,800.00 20,800.00 20,800.00 20,800.00 20,129.03 670.97 104,000.00
01.06.07 PROGRAMA DE SEÑALIZACIÓN, CONTROL DE TRÁNSITO Y SEGURIDAD VIAL PROVISIONAL mes 6,167.12 6,167.12 6,167.12 6,167.12 5,968.18 198.94 30,835.60
02 MOVIMIENTO DE TIERRAS 2,052,851.53
02.01 MOVIMIENTO DE TIERRAS EN EXPLANACIONES 1,245,536.76
02.01.01 EXCAVACIÓN MASIVA EN EXPLANACIONES m3 28,440.80 28,440.80 28,440.80 85,322.40
02.01.02 CONFORMACIÓN Y COMPACTACIÓN DE SUB RASANTE m2 17,599.05 17,599.05 17,599.05 52,797.15
02.01.03 RELLENO MASIVO DE EXPLANACIONES CON MATERIAL DE PRÉSTAMO m3 61,390.99 122,781.98 122,781.98 306,954.94
02.01.04 RELLENO MASIVO DE EXPLANACIONES CON MATERIAL PROPIO m3 7,499.60 7,499.60 14,999.19
02.01.05 ELIMINACIÓN DE MATERIAL EXCEDENTE DE EXCAVACIONES, D = 20 Km m3 78,546.31 235,638.92 235,638.92 235,638.92 785,463.08
02.02 MOVIMIENTO DE TIERRAS LOCALIZADO 506,339.40
02.02.01 EXCAVACIÓN MASIVA PARA ESTRUCTURAS m3 17,490.63 17,490.63 17,490.63 17,490.63 69,962.50
02.02.02 EXCAVACIÓN MANUAL PARA ESTRUCTURAS m3 7,432.22 7,432.22 7,432.22 7,432.22 29,728.88
02.02.03 NIVELACIÓN Y COMPACTACIÓN DE TERRENO m2 3,610.00 3,610.00 3,610.00 3,610.00 14,440.01
02.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO PARA ESTRUCTURAS m3 55,433.99 55,433.99 110,867.98
02.02.05 ACARREO DE MATERIAL EXCEDENTE DE EXCAVACIONES m3 13,771.79 13,771.79 13,771.79 13,771.79 55,087.17
02.02.06 ELIMINACIÓN DE MATERIAL EXCEDENTE DE EXCAVACIONES, D = 20 Km m3 22,625.29 90,501.14 113,126.43 226,252.86
02.03 BASES Y SUB BASES 300,975.37
CRONOGRAMA DE AVANCE VALORIZADO DE OBRA
B ARQUITECTURA 1,359,122.25
01 MUROS Y TABIQUES 16,819.71
01.01 MURO DE LADRILLO KK TIPO IV, MEZCLA C:A 1:5 DE SOGA m2 4,648.46 4,648.46
01.02 MURO DE LADRILLO PANDERETA, MEZCLA C:A 1:5 DE SOGA m2 1,348.82 1,348.82
01.03 FALSA VIGA DE PLANCHA FIBROCEMENTO 6mm m2 10,473.32 349.11 10,822.43
02 REVOQUES Y ENLUCIDOS 93,010.29
02.01 TARRAJEO DE MUROS INTERIORES e= 1.5cm; C:A - 1:4 m2 3,454.18 115.14 3,569.32
02.02 TARRAJEO DE MUROS EXTERIORES e= 1.5cm; C:A - 1:4 m2 5,435.87 181.20 5,617.07
02.03 TARRAJEO DE MUROS CON IMPERMEABILIZANTE e= 1.5cm; C:A - 1:4 m2 4,050.16 4,050.16
02.04 TARRAJEO PULIDO BRUÑADO DE MUROS e= 1.5cm; C:A - 1:4 m2 25,696.01 24,867.11 828.90 51,392.02
02.05 VESTIDURA DE DERRAMES e= 1.5cm; C:A - 1:4 m 1,893.65 63.12 1,956.77
02.06 ACABADO DE MICROCEMENTO EN MUROS DE CONCRETO m2 8,224.12 274.14 8,498.26
02.07 ACABADO DE MICROCEMENTO EN ISOTIPO SURF m2 1,504.82 50.16 1,554.98
02.08 BRUÑAS m 9,128.75 9,128.75
02.09 BRUÑAS EN MURO e= 1" m 7,242.96 7,242.96
03 CIELORRASOS 2,657.10
CRONOGRAMA DE AVANCE VALORIZADO DE OBRA
GASTOS GENERALES (14.27%) 136,353.60 225,817.03 362,708.43 416,404.55 303,892.74 10,129.76 1,455,306.11
SUB TOTAL S/. 1,187,432.51 1,966,522.96 3,158,638.86 3,626,250.40 2,646,443.64 88,214.79 12,673,503.18
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
CONTRATISTA CONTRATISTA
FECHA : FECHA :
SUPERVISIÓN SUPERVISION
FECHA : FECHA :
S10
Formato de Valorización
Presupuesto
Subpresupuesto
CONTRATISTA
Lugar
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
Formato de Valorización
Presupuesto
Subpresupuesto
CONTRATISTA
Lugar
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
02.02.06 ELIMINACIÓN DE MATERIAL EXCEDENTE DE EXCAVACIONES, D = 20 Km m3 4,395.82 51.47 226,252.86 65.6% 2,885.57 148,520.42 34.4% 1,510.25 77,732.43 100.0% 4,395.82 226,252.86 0.0% - 0.00
02.03 BASES Y SUB BASES 300,975.37 0.00 163,276.51 163,276.51 137,698.86
02.03.01 BASE GRANULAR e= 0.15 m m2 15,807.53 19.04 300,975.37 0.0% - 0.00 54.2% 8,575.45 163,276.51 54.2% 8,575.45 163,276.51 45.8% 7,232.08 137,698.86
03 OBRAS DE CONCRETO SIMPLE 450,903.90 36,994.07 28,330.42 65,324.49 385,579.41
03.01 CONCRETO f'c= 100 kg/cm2 EN SOLADOS, e= 3" m2 85.16 34.21 2,913.32 64.9% 55.23 1,889.49 13.1% 11.14 381.10 77.9% 66.37 2,270.59 22.1% 18.79 642.74
03.02 CONCRETO f'c= 100 kg/cm2 EN SOLADOS, e= 4" m2 2,266.61 39.55 89,644.43 39.2% 887.60 35,104.58 31.2% 706.68 27,949.32 70.3% 1,594.28 63,053.90 29.7% 672.33 26,590.52
03.03 VEREDAS DE CONCRETO TIPO HS, f'c= 175 Kg/cm2, e= 0.12m m2 5,229.61 53.97 282,242.05 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 5,229.61 282,242.05
03.04 RAMPAS DE CONCRETO TIPO HS, f'c= 175 Kg/cm2, e= 0.12m m2 1,214.45 56.44 68,543.56 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1,214.45 68,543.56
03.05 GRADAS DE CONCRETO TIPO HS, f'c= 175 Kg/cm2 m3 13.25 413.06 5,473.05 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 13.25 5,473.05
03.06 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS m2 27.93 74.74 2,087.49 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 27.93 2,087.49
04 OBRAS DE CONCRETO ARMADO 2,046,961.44 513,558.05 642,576.99 1,156,135.04 890,826.41
04.01 LOSA DE CIMENTACION 37,174.81 0.00 21,816.45 21,816.45 15,358.36
04.01.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN LOSA DE CIMENTACIÓN m3 46.87 394.01 18,467.25 0.0% - 0.00 65.9% 30.87 12,161.51 65.9% 30.87 12,161.51 34.1% 16.00 6,305.74
04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA DE CIMENTACIÓN m2 117.56 52.19 6,135.46 0.0% - 0.00 72.7% 85.45 4,459.74 72.7% 85.45 4,459.74 27.3% 32.11 1,675.72
04.01.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 2,876.91 4.37 12,572.10 0.0% - 0.00 41.3% 1,188.83 5,195.20 41.3% 1,188.83 5,195.20 58.7% 1,688.08 7,376.90
04.02 CIMIENTOS REFORZADOS 524,380.88 188,180.63 201,843.06 390,023.69 134,357.19
04.02.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN CIMIENTOS REFORZADOS m3 754.08 408.09 307,732.51 27.0% 203.83 83,179.84 46.5% 350.70 143,118.28 73.5% 554.53 226,298.12 26.5% 199.55 81,434.39
04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CIMIENTOS REFORZADOS m2 895.49 37.67 33,733.11 45.4% 406.79 15,323.70 25.0% 223.96 8,436.64 70.4% 630.75 23,760.34 29.6% 264.74 9,972.77
04.02.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 41,857.04 4.37 182,915.26 49.0% 20,521.07 89,677.09 27.5% 11,507.58 50,288.14 76.5% 32,028.66 139,965.23 23.5% 9,828.38 42,950.03
04.03 SOBRECIMIENTOS REFORZADOS 1,538.49 0.00 0.00 0.00 1,538.49
04.03.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 210 Kg/cm2 EN SOBRECIMIENTOS m3 1.13 394.10 445.33 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.13 445.33
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTOS m2 15.06 47.69 718.21 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 15.06 718.21
04.03.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 85.80 4.37 374.95 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 85.80 374.95
04.04 CISTERNAS 33,729.08 0.00 0.00 0.00 33,729.08
04.04.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN CISTERNAS a/c= 0.48 m3 36.63 433.29 15,871.41 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 36.63 15,871.41
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNAS m2 116.21 59.23 6,883.12 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 116.21 6,883.12
04.04.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 2,230.13 4.37 9,745.67 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2,230.13 9,745.67
04.04.04 JUNTA WATER STOP 6" m 24.20 50.78 1,228.88 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 24.20 1,228.88
04.05 MUROS DE CONTENCIÓN 1,025,320.26 325,377.42 357,291.46 682,668.88 342,651.38
04.05.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN MUROS DE CONTENCIÓN m3 816.29 425.78 347,559.96 36.0% 293.62 125,019.09 29.0% 237.00 100,911.77 65.0% 530.63 225,930.86 35.0% 285.66 121,629.10
04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS DE CONTENCIÓN m2 421.77 59.23 24,981.44 263.7% 1,112.14 65,871.83 -163.7% - 690.37 -40,890.57 100.0% 421.77 24,981.26 0.0% 0.00 0.18
04.05.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS DE CONTENCIÓN m2 6,980.41 66.19 462,033.34 12.8% 895.54 59,275.64 52.4% 3,660.51 242,289.36 65.3% 4,556.05 301,565.00 34.7% 2,424.36 160,468.34
04.05.04 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 43,648.86 4.37 190,745.52 39.4% 17,210.72 75,210.86 28.8% 12,581.44 54,980.90 68.3% 29,792.17 130,191.76 31.7% 13,856.69 60,553.76
04.06 COLUMNAS 18,446.51 0.00 8,488.73 8,488.73 9,957.78
04.06.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN COLUMNAS m3 9.56 426.21 4,074.57 0.0% - 0.00 38.7% 3.70 1,575.27 38.7% 3.70 1,575.27 61.3% 5.86 2,499.30
04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 117.28 60.66 7,114.20 0.0% - 0.00 52.9% 62.08 3,765.77 52.9% 62.08 3,765.77 47.1% 55.20 3,348.43
04.06.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 1,660.81 4.37 7,257.74 0.0% - 0.00 43.4% 720.29 3,147.69 43.4% 720.29 3,147.69 56.6% 940.52 4,110.05
04.07 PLACAS 19,999.85 0.00 9,598.32 9,598.32 10,401.53
04.07.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN PLACAS m3 14.28 425.78 6,080.14 0.0% - 0.00 47.1% 6.73 2,863.97 47.1% 6.73 2,863.97 52.9% 7.55 3,216.17
04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS m2 132.80 60.33 8,011.82 0.0% - 0.00 41.9% 55.68 3,359.17 41.9% 55.68 3,359.17 58.1% 77.12 4,652.65
04.07.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 1,351.92 4.37 5,907.89 0.0% - 0.00 57.1% 772.35 3,375.18 57.1% 772.35 3,375.18 42.9% 579.57 2,532.71
04.08 VIGAS 9,466.11 0.00 0.00 0.00 9,466.11
04.08.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN VIGAS m3 5.81 404.89 2,352.41 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 5.81 2,352.41
04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 48.80 77.40 3,777.12 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 48.80 3,777.12
S10
Formato de Valorización
Presupuesto
Subpresupuesto
CONTRATISTA
Lugar
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
04.08.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 763.52 4.37 3,336.58 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 763.52 3,336.58
04.09 LOSAS ALIGERADAS 4,736.36 0.00 0.00 0.00 4,736.36
04.09.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN LOSAS ALIGERADAS m3 3.21 403.07 1,293.85 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.21 1,293.85
04.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 36.64 51.68 1,893.56 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 36.64 1,893.56
04.09.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 140.88 4.37 615.65 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 140.88 615.65
04.09.04 LADRILLO DE TECHO 30 x 30 x 15 cm und 305.00 3.06 933.30 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 305.00 933.30
04.10 LOSAS MACIZAS 7,739.94 0.00 0.00 0.00 7,739.94
04.10.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN LOSAS MACIZAS m3 6.27 403.07 2,527.25 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 6.27 2,527.25
04.10.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS m2 53.69 59.38 3,188.11 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 53.69 3,188.11
04.10.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 463.29 4.37 2,024.58 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 463.29 2,024.58
04.11 GRADERÍAS 53,013.96 0.00 0.00 0.00 53,013.96
04.11.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 210 Kg/cm2 EN GRADERÍAS m3 73.46 387.72 28,481.91 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 73.46 28,481.91
04.11.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERÍAS m2 167.89 75.75 12,717.67 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 167.89 12,717.67
04.11.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 2,703.52 4.37 11,814.38 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2,703.52 11,814.38
04.12 PARAPETOS 200,672.58 0.00 34,920.75 34,920.75 165,751.83
04.12.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 210 Kg/cm2 EN PARAPETOS m3 174.82 394.83 69,024.18 0.0% - 0.00 17.6% 30.68 12,114.41 17.6% 30.68 12,114.41 82.4% 144.14 56,909.77
04.12.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PARAPETOS m2 1,668.91 55.38 92,424.24 0.0% - 0.00 17.3% 289.03 16,006.65 17.3% 289.03 16,006.65 82.7% 1,379.88 76,417.59
04.12.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 8,975.78 4.37 39,224.16 0.0% - 0.00 17.3% 1,555.99 6,799.69 17.3% 1,555.99 6,799.69 82.7% 7,419.79 32,424.47
04.13 SARDINELES 110,742.61 0.00 8,618.22 8,618.22 102,124.40
04.13.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 210 Kg/cm2 EN SARDINELES m3 96.98 404.78 39,255.56 0.0% - 0.00 7.9% 7.64 3,093.00 7.9% 7.64 3,093.00 92.1% 89.34 36,162.56
04.13.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES m2 1,196.16 45.48 54,401.36 0.0% - 0.00 7.7% 91.90 4,179.43 7.7% 91.90 4,179.43 92.3% 1,104.26 50,221.93
04.13.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 3,909.77 4.37 17,085.69 0.0% - 0.00 7.9% 307.96 1,345.79 7.9% 307.96 1,345.79 92.1% 3,601.81 15,739.91
05 VARIOS 256,521.34 611.27 855.78 1,467.05 255,054.29
05.01 JUNTAS DE DILATACIÓN EN LOSAS, VEREDAS Y RAMPAS m 1,900.37 29.58 56,212.94 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1,900.37 56,212.94
05.02 JUNTAS DE CONSTRUCCION EN LOSAS, VEREDAS Y RAMPAS m 3,419.26 10.14 34,671.30 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3,419.26 34,671.30
05.03 ENCOFRADO PARA PAÑOS DE LOSAS m2 139.69 52.19 7,290.42 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 139.69 7,290.42
05.04 CONCRETO PREMEZCLADO TIPO HS, f'c= 175 Kg/cm2 EN UÑAS DE ANCLAJE A TERRENO m3 116.25 370.73 43,097.36 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 116.25 43,097.36
05.05 CONCRETO PREMEZCLADO TIPO HS, f'c= 210 Kg/cm2 EN CAMELLON Y RAMPA VEHICULAR m3 13.33 386.22 5,148.31 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 13.33 5,148.31
05.06 PROTECCIÓN LATERAL CON BITUMEN m2 109.62 10.81 1,184.99 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 109.62 1,184.99
05.07 PROTECCIÓN LATERAL CON POLETILENO m2 109.62 7.19 788.17 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 109.62 788.17
05.08 JUNTAS DE DILATACION EN MUROS DE CONTENCIÓN m 223.50 10.94 2,445.09 25.0% 55.88 611.27 35.0% 78.23 855.78 60.0% 134.10 1,467.05 40.0% 89.40 978.04
05.09 BANQUETAS DE CONCRETO und 5.00 1,250.00 6,250.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 5.00 6,250.00
05.10 ESTRUCTURAS METÁLICAS kg 6,546.23 11.59 75,870.81 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 6,546.23 75,870.81
05.11 ALCORQUE R1 (R= 0.40m) und 8.00 140.00 1,120.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 8.00 1,120.00
05.12 ALCORQUE R2 (R= 1.65m) und 3.00 850.00 2,550.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 2,550.00
05.13 LAVAPIES m2 3.30 350.00 1,155.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.30 1,155.00
05.14 COBERTURA DE ARENA SOBRE TANQUE DE GAS m3 14.40 109.45 1,576.08 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 14.40 1,576.08
05.15 SELLADO DE JUNTAS m 2,123.87 8.08 17,160.87 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2,123.87 17,160.87
S10
Formato de Valorización
Presupuesto
Subpresupuesto
CONTRATISTA
Lugar
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
CONTRATISTA CONTRATISTA
FECHA : FECHA :
SUPERVISIÓN SUPERVISION
FECHA : FECHA :
S10
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PROVINCIA Y
DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PROVINCIA Y
DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
09.01 REJA METÁLICA FIJA m2 18.61 714.63 13,299.26 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 18.61 13,299.26
09.02 REJA METÁLICA BATIENTE m2 89.34 805.99 72,007.15 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 89.34 72,007.15
09.03 BARANDAS METÁLICAS DE ACERO INOXIDABLE m 6.45 1,200.00 7,740.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 6.45 7,740.00
09.04 PASAMANO DE ACERO INOXIDABLE DE 50mm m 397.55 395.00 157,032.25 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 397.55 157,032.25
09.05 PUNTALES METÁLICOS "V" glb 1.00 1,808.00 1,808.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 1,808.00
09.06 ASTAS PARA BANDERAS h= 9.00m und 41.00 2,707.31 110,999.71 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 41.00 110,999.71
10 CERRAJERIA 8,694.51 0.00 0.00 0.00 8,694.51
10.01 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 24.00 25.60 614.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 24.00 614.40
10.02 BISAGRA PESADA DE FE 130mm und 64.00 63.99 4,095.36 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 64.00 4,095.36
10.03 CERRADURA Y PICAPORTE PARA REJAS METÁLICAS und 9.00 275.96 2,483.64 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 9.00 2,483.64
10.04 CERRADURA PARA PUERTAS EXTERIORES und 6.00 187.99 1,127.94 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 6.00 1,127.94
10.05 CERRADURA PARA PUERTAS INTERIORES und 3.00 124.39 373.17 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 373.17
11 VIDRIOS, CRISTALES Y SIMILARES 56,543.62 0.00 0.00 0.00 56,543.62
11.01 VENTANA DE CARPINTERÍA DE ALUMINIO, CRISTAL TEMPLADO 6mm m2 6.31 440.00 2,776.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 6.31 2,776.40
11.02 VENTANA DE CRISTAL TEMPLADO REFLEJANTE 8mm m2 2.82 1,007.44 2,840.98 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.82 2,840.98
11.03 VENTANA DE CRISTAL TRILAMINADO REFLEJANTE 19mm m2 12.16 1,753.03 21,316.84 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 12.16 21,316.84
11.04 ESPEJO BISELADO DE 6mm m2 0.72 187.78 135.20 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 0.72 135.20
11.05 BARANDA DE CRISTAL TEMPLADO 10mm m2 70.69 416.95 29,474.20 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 70.69 29,474.20
12 PINTURA 48,264.36 0.00 0.00 0.00 48,264.36
12.01 PINTURA LATEX + EMPASTE EN MUROS INTERIORES m2 138.71 15.93 2,209.65 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 138.71 2,209.65
12.02 PINTURA LATEX + EMPASTE EN MUROS EXTERIORES m2 200.74 17.64 3,541.05 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 200.74 3,541.05
12.03 PINTURA LATEX + EMPASTE EN CIELORRASOS m2 40.90 17.21 703.89 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 40.90 703.89
12.04 PINTURA AL DUCO PARA PUERTAS DE MADERA m2 28.16 34.10 960.26 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 28.16 960.26
12.05 PINTADO DE SARDINELES m 294.97 14.15 4,173.83 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 294.97 4,173.83
12.06 PINTURA MARINA PARA CARPINTERÍA DE MADERA m2 427.13 26.15 11,169.45 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 427.13 11,169.45
12.07 PINTADO DE GUÍAS Y SEPARACIÓN DE ASIENTOS m 1,018.00 13.59 13,834.62 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1,018.00 13,834.62
12.08 PINTADO DE ASIENTOS (NUMERACIÓN, SÍMBOLOS Y LETRAS) m2 328.50 35.53 11,671.61 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 328.50 11,671.61
13 APARATOS SANITARIOS Y ACCESORIOS 5,678.64 0.00 0.00 0.00 5,678.64
13.01 INODORO NACIONAL COLOR BLANCO und 3.00 429.99 1,289.97 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 1,289.97
13.02 LAVATORIO C/PEDESTAL NACIONAL COLOR BLANCO und 3.00 254.69 764.07 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 764.07
13.03 LLAVE DE LAVATORIO DE 1/2" und 3.00 376.00 1,128.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 1,128.00
13.04 CAÑO CON LLAVE LATERAL und 5.00 200.00 1,000.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 5.00 1,000.00
13.05 GRIFERÍA REGADERA CROMADA und 1.00 160.00 160.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 160.00
13.06 LLAVE Y REGADERA DE DUCHA DE 1/2" und 3.00 230.00 690.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 690.00
13.07 TUBO DE 1" PARA CORTINA DE DUCHA m 1.00 46.60 46.60 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 46.60
13.08 DISPENSADOR DE JABÓN LÍQUIDO und 3.00 45.00 135.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 135.00
13.09 DISPENSADOR DE PAPEL TOALLA und 3.00 90.00 270.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 270.00
13.10 DISPENSADOR DE PAPEL HIGIÉNICO und 3.00 65.00 195.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 195.00
14 MOBILIARIO URBANO 65,919.47 0.00 0.00 0.00 65,919.47
14.01 ISOTIPO SURF und 1.00 13,759.84 13,759.84 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 13,759.84
14.02 TUBOS DE PVC 4" PINTADO Y VACIADO CON CONCRETO h=3.80m und 22.00 186.22 4,096.84 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 22.00 4,096.84
14.03 TUBOS DE PVC 4" PINTADO Y VACIADO CON CONCRETO h=1.80m und 104.00 134.22 13,958.88 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 104.00 13,958.88
14.04 TUBOS DE PVC 4" PINTADO Y VACIADO CON CONCRETO h=2.20m und 160.00 142.71 22,833.60 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 160.00 22,833.60
14.05 TUBOS DE PVC 2" PINTADO Y VACIADO CON CONCRETO h=2.00m und 107.00 105.33 11,270.31 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 107.00 11,270.31
S10
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PROVINCIA Y
DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
CONTRATISTA CONTRATISTA
FECHA : FECHA :
SUPERVISIÓN SUPERVISION
S10
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PROVINCIA Y
DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
FECHA : FECHA :
S10
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
04.02.04 SUMIDERO DE BRONCE ROSCADO 2" und 6.00 53.67 322.02 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 6.00 322.02
04.02.05 SUMIDERO DE BRONCE ROSCADO 3" und 1.00 77.74 77.74 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 77.74
04.02.06 REGISTRO ROSCADO DE BRONCE DE 3" und 2.00 69.68 139.36 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.00 139.36
04.02.07 REGISTRO ROSCADO DE BRONCE DE 4" und 3.00 89.32 267.96 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 267.96
04.02.08 SOMBRERO DE VENTILACION 2" und 3.00 33.53 100.59 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 100.59
04.03 VARIOS 7,385.60 0.00 0.00 0.00 7,385.60
04.03.01 PRUEBA HIDRAÚLICA PARA SISTEMA DE DESAGUE m 820.89 3.08 2,528.34 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 820.89 2,528.34
04.03.02 CANALETAS PVC DESMONTABLES m 9.55 133.02 1,270.34 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 9.55 1,270.34
04.03.03 ACCESORIOS CÁMARA DE AGUAS NEGRAS glb 1.00 3,292.45 3,292.45 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 3,292.45
04.03.04 ACCESORIOS CAJA DE PERCOLACIÓN glb 1.00 294.47 294.47 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 294.47
04.04 SALIDA DE DESAGUE 1,677.48 0.00 0.00 0.00 1,677.48
04.04.01 SALIDA DE DESAGUE 2" pto 15.00 69.92 1,048.80 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 15.00 1,048.80
04.04.02 SALIDA DE DESAGUE 4" pto 3.00 127.35 382.05 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 382.05
04.04.03 SALIDA PARA VENTILACIÓN 2" pto 3.00 82.21 246.63 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 246.63
05 SISTEMA DE AGUA CONTRAINCENDIO 83,657.92 0.00 0.00 0.00 83,657.92
05.01 REDES DE DISTRIBUCIÓN 44,258.41 0.00 0.00 0.00 44,258.41
05.01.01 TUBERÍA PE100 DE 110mm m 568.85 75.33 42,851.47 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 568.85 42,851.47
05.01.02 TUBERÍA PE100 DE 75mm m 14.20 56.79 806.42 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 14.20 806.42
05.01.03 TUBERÍA DE ACERO SCH-40 DE 2 1/2" m 12.60 47.66 600.52 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 12.60 600.52
05.02 VÁLVULAS 4,038.01 0.00 0.00 0.00 4,038.01
05.02.01 VÁLVULA SIAMESA DE 4" x 2 1/2" x 2 1/2" TIPO POSTE und 1.00 3,097.89 3,097.89 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 3,097.89
05.02.02 VÁLVULA CHECK DE 4" und 1.00 940.12 940.12 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 940.12
05.03 VARIOS 35,361.50 0.00 0.00 0.00 35,361.50
05.03.01 BUSCHING REDUCTOR 160 x 110 mm und 1.00 42.80 42.80 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 42.80
05.03.02 TRANSICION PE 100 - SCH 40 und 7.00 187.99 1,315.93 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 7.00 1,315.93
05.03.03 CINTA SEÑALIZADORA DE LINEAS DE ACI m 583.05 2.31 1,346.85 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 583.05 1,346.85
05.03.04 GABINETE CONTRA INCENDIO und 7.00 2,553.92 17,877.44 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 7.00 17,877.44
05.03.05 LOSA DE CONCRETO EN MEDIA LUNA 120mm m 88.20 87.05 7,677.81 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 88.20 7,677.81
05.03.06 DADO DE CONCRETO 0.60m x 0.60m und 23.00 175.72 4,041.56 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 23.00 4,041.56
05.03.07 MURETE DE CONCRETO 1.50m x 0.50m x 0.30m und 1.00 331.03 331.03 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 331.03
05.03.08 PRUEBA HIDRAÚLICA PARA SISTEMA DE AGUA CONTRAINCENDIO m 595.65 4.58 2,728.08 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 595.65 2,728.08
CONTRATISTA CONTRATISTA
S10
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
FECHA : FECHA :
SUPERVISIÓN SUPERVISION
FECHA : FECHA :
S10
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
01.07.06 POSTE ORNAMENTAL TIPO BOLARDO h= 1.00m / Ø 0.12m CON LED DE 30W und 28.00 1,349.84 37,795.52 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 28.00 37,795.52
01.07.07 LUMINARIA URBANO PASTORAL CON UN BRAZO Y LED DE 74W und 6.00 2,058.87 12,353.22 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 6.00 12,353.22
01.07.08 LUMINARIA URBANO PASTORAL CON DOS BRAZOS Y LED DE 74W und 16.00 4,048.87 64,781.92 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 16.00 64,781.92
01.07.09 LUMINARIA PASTORAL LED DE 150W und 3.00 2,648.87 7,946.61 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 7,946.61
01.08 VARIOS 157,156.90 0.00 0.00 0.00 157,156.90
01.08.01 CONCRETO C:H 1:10 EN SOLADOS, e= 2" m2 180.00 28.98 5,216.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 180.00 5,216.40
01.08.02 POSTE DE CONCRETO ARMADO CENTRIFUGADO h= 8.00m/300/180mm und 31.00 635.87 19,711.97 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 31.00 19,711.97
01.08.03 DUCTO DE CONCRETO ARMADO DE 1 VÍA und 92.00 46.03 4,234.76 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 92.00 4,234.76
01.08.04 DUCTO DE CONCRETO ARMADO DE 2 VÍAS und 48.00 55.87 2,681.76 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 48.00 2,681.76
01.08.05 LOSA DE CONCRETO EN MEDIA LUNA 250mm m 778.00 56.57 44,011.46 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 778.00 44,011.46
01.08.06 LOSA DE CONCRETO EN MEDIA LUNA 400mm m 181.00 76.24 13,799.44 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 181.00 13,799.44
01.08.07 BUZÓN DE BAJA TENSIÓN TIPO A1 (0.60m x 0.70m) und 14.00 840.00 11,760.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 14.00 11,760.00
01.08.08 BUZÓN DE BAJA TENSIÓN TIPO A2 (0.75m x 0.86m) und 9.00 920.00 8,280.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 9.00 8,280.00
01.08.09 CINTA SEÑALIZADORA DE LINEAS DE BAJA TENSIÓN m 556.00 2.14 1,189.84 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 556.00 1,189.84
01.08.10 POZO A TIERRA und 19.00 2,435.33 46,271.27 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 19.00 46,271.27
02 SISTEMA DE MEDIA TENSIÓN 91,167.49 0.00 0.00 0.00 91,167.49
02.01 MOVIMIENTO DE TIERRAS 31,543.01 0.00 0.00 0.00 31,543.01
02.01.01 EXCAVACIÓN MANUAL DE ZANJAS m3 305.93 42.95 13,139.69 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 305.93 13,139.69
02.01.02 REFINE Y NIVELACION DE ZANJAS m2 243.30 6.01 1,462.23 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 243.30 1,462.23
02.01.03 CAMA DE APOYO DE ARENA EN ZANJAS m3 12.17 84.83 1,032.38 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 12.17 1,032.38
02.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS m3 243.30 41.72 10,150.48 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 243.30 10,150.48
02.01.05 ACARREO DE MATERIAL EXCEDENTE DE EXCAVACIONES m3 78.29 22.08 1,728.64 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 78.29 1,728.64
02.01.06 ELIMINACIÓN DE MATERIAL EXCEDENTE DE EXCAVACIONES, D = 20 Km m3 78.29 51.47 4,029.59 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 78.29 4,029.59
02.02 SUMINISTRO E INSTALACIÓN DE TUBERÍAS PVC 21,011.52 0.00 0.00 0.00 21,011.52
02.02.01 TUBERIA PVC-SAP ELECTRICA DE 100 mm m 405.50 39.65 16,078.08 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 405.50 16,078.08
02.02.02 DUCTO DE CONCRETO ARMADO DE 4 VÍAS und 72.00 68.52 4,933.44 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 72.00 4,933.44
02.03 VARIOS 38,612.96 0.00 0.00 0.00 38,612.96
02.03.01 BUZÓN DE MEDIA TENSIÓN (1.20m x 1.70m) und 12.00 2,200.00 26,400.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 12.00 26,400.00
02.03.02 TERMINALES TIPO CAMPANA CON UNION DE PVC SAP 4" und 72.00 56.10 4,039.20 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 72.00 4,039.20
02.03.03 POZO A TIERRA und 3.00 2,435.33 7,305.99 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 7,305.99
02.03.04 CINTA SEÑALIZADORA DE LINEAS DE MEDIA TENSIÓN m 405.50 2.14 867.77 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 405.50 867.77
03 SISTEMA DE COMUNICACIONES 780,218.76 0.00 0.00 0.00 780,218.76
03.01 RED DE FIBRA ÓPTICA Y CANALIZACIÓN 369,068.81 0.00 0.00 0.00 369,068.81
03.01.01 TUBERIA PVC-SAP ELECTRICA DE 100 mm m 2,090.36 39.65 82,882.77 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2,090.36 82,882.77
03.01.02 TUBERIA PVC-SAP ELECTRICA DE 50 mm m 390.00 14.39 5,612.10 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 390.00 5,612.10
03.01.03 CANALIZACION PARA BROADCAST 60x70 CON BANDEJA ESCALERILLA 400x150 mm m 32.00 241.94 7,742.08 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 32.00 7,742.08
03.01.04 BUZÓN DE COMUNICACIONES (0.85m x 0.85m x 0.92m) und 34.00 850.00 28,900.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 34.00 28,900.00
03.01.05 FIBRA OPTICA MONOMODO DE 12 HILOS DE EXTERIORES LSZH m 1,735.00 32.94 57,150.90 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1,735.00 57,150.90
03.01.06 FIBRA OPTICA MONOMODO DE 6 HILOS DE EXTERIORES LSZH m 650.00 26.61 17,296.50 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 650.00 17,296.50
03.01.07 GABINETE DE PARED DE 12 RU CON TOMACORRIENTE DOBLE ININTERRUMPIDO, BARRA DE und 4.00 6,881.71 27,526.84 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 27,526.84
TIERRA TGB
03.01.08 BANDEJA DE FIBRA OPTICA DE 48 HILOS CON ACCESORIOS und 4.00 4,091.05 16,364.20 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 16,364.20
03.01.09 PATCH CORD DE FIBRA OPTICA MONOMODO LC-LC DE 2m und 12.00 507.74 6,092.88 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 12.00 6,092.88
03.01.10 POSTES DE CONCRETO DE 9m CON CAJA DE PASE EN BASE 300x300x15mm und 17.00 745.57 12,674.69 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 17.00 12,674.69
03.01.11 CAJA NEMA CON TOMACORRRIENTE DOBLE, SW. 4 PUERTOS,CAJA MM F.O und 2.00 4,185.38 8,370.76 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.00 8,370.76
S10
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
03.01.12 CAJA NEMA CON TOMACORRRIENTE DOBLE, MEDIA CONVERTER,CAJA MM F.O und 6.00 906.92 5,441.52 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 6.00 5,441.52
03.01.13 CAJA DE PASE CUADRADA 250 x 250 x 150 mm und 4.00 37.93 151.72 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 151.72
03.01.14 EXCAVACIÓN MANUAL DE ZANJAS m3 555.32 42.95 23,850.99 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 555.32 23,850.99
03.01.15 REFINE Y NIVELACION DE ZANJAS m2 793.32 6.01 4,767.85 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 793.32 4,767.85
03.01.16 CAMA DE APOYO DE ARENA EN ZANJAS m3 238.00 84.83 20,189.54 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 238.00 20,189.54
03.01.17 RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS m3 317.33 41.72 13,239.01 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 317.33 13,239.01
03.01.18 CINTA SEÑALIZADORA AMARILLA m 1,322.20 2.65 3,503.83 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1,322.20 3,503.83
03.01.19 ACARREO DE MATERIAL EXCEDENTE DE EXCAVACIONES m3 309.39 22.08 6,831.33 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 309.39 6,831.33
03.01.20 ELIMINACIÓN DE MATERIAL EXCEDENTE DE EXCAVACIONES, D = 20 Km m3 309.39 51.47 15,924.30 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 309.39 15,924.30
03.01.21 DUCTO DE CONCRETO ARMADO DE 2 VÍAS - 5" und 72.05 63.22 4,555.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 72.05 4,555.00
03.02 RED DE CCTV DE VIDEO VIGILANCIA 99,201.51 0.00 0.00 0.00 99,201.51
03.02.01 CÁMARA FIJA DE EXTERIORES CON HOUSING IP 67, CON ACCESORIOS, EN PARED und 10.00 1,987.74 19,877.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 10.00 19,877.40
03.02.02 CÁMARA PTZ DE EXTERIORES, CON ACCESORIOS DE ANCLAJE EN POSTE und 1.00 6,738.21 6,738.21 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 6,738.21
03.02.03 CÁMARA FIJA DE EXTERIORES CON HOUSING IP 67, CON ACCESORIOS, EN POSTE und 9.00 2,769.10 24,921.90 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 9.00 24,921.90
03.02.04 CABLE ELECTRICO DE 70mm2 COLOR VERDE PARA EL SPAT CONECTADO AL TMGB Y TGBs m 800.00 59.58 47,664.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 800.00 47,664.00
03.03 RED DE VOZ Y DATOS 89,178.06 0.00 0.00 0.00 89,178.06
03.03.01 PATCH PANEL VACIO DE 24 PUERTOS und 4.00 588.21 2,352.84 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 2,352.84
03.03.02 JACK RJ-45 CAT 6A und 44.00 71.82 3,160.08 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 44.00 3,160.08
03.03.03 PATCH CORD CAT 6A DE 2m und 22.00 48.60 1,069.20 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 22.00 1,069.20
03.03.04 PATCH CORD CAT 6A DE 3m und 22.00 61.60 1,355.20 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 22.00 1,355.20
03.03.05 ORDENADOR HORIZONTAL 02 RU und 4.00 2,520.00 10,080.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 10,080.00
03.03.06 BANDEJA METALICA 19" 01 RU und 4.00 480.00 1,920.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 1,920.00
03.03.07 FACE PLATE DE 2 PUERTOS CON 01 TAPA CIEGA und 22.00 30.00 660.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 22.00 660.00
03.03.08 CABLE F/UTP CAT 6A LSZH m 440.00 9.28 4,083.20 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 440.00 4,083.20
03.03.09 TELEFONO IP TIPO I und 4.00 809.10 3,236.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 3,236.40
03.03.10 SWITCH DE BORDE 24 PUERTOS 10/100/1000BaseT, con 02 SFP und 4.00 7,992.00 31,968.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 31,968.00
03.03.11 TRANSCEIVER F.O. MONOMODO 10GBPS und 4.00 3,840.00 15,360.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 15,360.00
03.03.12 MEDIA CONVERTER 1000BaseT- F.O LC und 4.00 3,000.00 12,000.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 12,000.00
03.03.13 SALIDA DE DATOS CON TUBO PVC 25mm, CAJA 100x100x55mm und 22.00 87.87 1,933.14 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 22.00 1,933.14
03.04 SISTEMA DE PERIFONEO Y CATV 131,797.81 0.00 0.00 0.00 131,797.81
03.04.01 AMPLIFICADOR DE AUDIO 120W und 4.00 18,850.00 75,400.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 75,400.00
03.04.02 INTERFACE DE NETWORKING-RJ45 und 4.00 6,000.00 24,000.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 24,000.00
03.04.03 BOCINA DE 35W und 4.00 1,224.00 4,896.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 4,896.00
03.04.04 CABLE DE AUDIO 2x2.5mm2 m 120.00 11.17 1,340.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 120.00 1,340.40
03.04.05 SALIDA DE PERIFONEO CON TUBO PVC 20mm, CAJA OCTOGONAL 100x40mm und 4.00 102.47 409.88 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 409.88
03.04.06 AMPLIFICADOR DE CATV und 3.00 6,930.00 20,790.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 20,790.00
03.04.07 CONVERSOR DE FIBRA OPTICA A SALIDA COAXIAL und 3.00 1,120.00 3,360.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 3,360.00
03.04.08 CABLE COAXIAL m 50.00 10.13 506.50 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 50.00 506.50
03.04.09 SPLITERS und 3.00 264.00 792.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 792.00
03.04.10 SALIDA DE CATV CON TUBO PVC 20mm, CAJA 100x100x55mm CON TAPA GUNG und 3.00 101.01 303.03 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 303.03
03.05 SISTEMA DE ALARMA CONTRA INCENDIOS 42,906.76 0.00 0.00 0.00 42,906.76
03.05.01 PANEL REMOTO DE DETECCION DE ALARMAS DE INCENDIO und 4.00 9,520.00 38,080.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 38,080.00
03.05.02 DETECTOR DE HUMO und 4.00 224.00 896.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 896.00
03.05.03 PARLANTE CON LUZ ESTROBOSCOPICA und 4.00 196.00 784.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 784.00
S10
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
03.05.04 PULSADOR MANUAL und 4.00 196.00 784.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 784.00
03.05.05 CABLE FPL 2x18 AWG LSZH m 50.00 11.81 590.50 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 50.00 590.50
03.05.06 CABLE FPL 2x16 AWG LSZH m 50.00 10.97 548.50 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 50.00 548.50
03.05.07 SALIDA DACI CON TUBO PVC 20mm, CAJA OCTOGONAL 100x40mm, DETECTOR HUMO und 4.00 102.47 409.88 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 409.88
03.05.08 SALIDA DACI CON TUBO PVC 20mm, CAJA CUADRADA 100x100x55mm, ESTROBOSCOPICA und 4.00 101.01 404.04 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 404.04
03.05.09 SALIDA DACI CON TUBO PVC 20mm, CAJA RECTANGULAR 100x50x55mm, PULSADOR und 4.00 102.46 409.84 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 4.00 409.84
03.06 SISTEMA DE CONTROL DE ACCESOS E INTRUSIÓN 48,065.81 0.00 0.00 0.00 48,065.81
03.06.01 CONTROLADOR und 1.00 2,938.21 2,938.21 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 2,938.21
03.06.02 CONTROL DE ACCESO VEHICULAR und 2.00 22,080.00 44,160.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.00 44,160.00
03.06.03 CONTACTO MAGNÉTICO und 1.00 489.40 489.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 489.40
03.06.04 CABLE 2 x 1.5mm2 LSZH m 50.00 6.15 307.50 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 50.00 307.50
03.06.05 SALIDAS CON TUBO PVC 20mm, CAJA RECTANGULAR 100x50x55mm und 2.00 85.35 170.70 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.00 170.70
04 SISTEMA DE GAS GLP 126,619.66 0.00 0.00 0.00 126,619.66
04.01 MOVIMIENTO DE TIERRAS 17,725.87 0.00 0.00 0.00 17,725.87
04.01.01 EXCAVACIÓN MANUAL DE ZANJAS m3 170.83 42.95 7,337.15 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 170.83 7,337.15
04.01.02 REFINE Y NIVELACION DE ZANJAS m2 213.54 6.01 1,283.38 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 213.54 1,283.38
04.01.03 CAMA DE APOYO DE ARENA EN ZANJAS m3 10.68 84.83 905.98 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 10.68 905.98
04.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS m3 149.48 41.72 6,236.31 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 149.48 6,236.31
04.01.05 ACARREO DE MATERIAL EXCEDENTE DE EXCAVACIONES m3 26.69 22.08 589.32 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 26.69 589.32
04.01.06 ELIMINACIÓN DE MATERIAL EXCEDENTE DE EXCAVACIONES, D = 20 Km m3 26.69 51.47 1,373.73 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 26.69 1,373.73
04.02 REDES DE DISTRIBUCIÓN 33,107.62 0.00 0.00 0.00 33,107.62
04.02.01 TUBERIA DE Cu - K 3/4" m 2.30 81.96 188.51 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.30 188.51
04.02.02 TUBERÍA SCH 80 DE 1 1/2" m 11.40 45.45 518.13 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 11.40 518.13
04.02.03 TUBERÍA SCH 80 DE 1" m 6.60 38.75 255.75 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 6.60 255.75
04.02.04 TUBERÍA SCH 80 DE 3/4" m 13.00 35.13 456.69 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 13.00 456.69
04.02.05 TUBERIA DE PE-80 SDR 11 1 1/2" m 253.70 53.78 13,643.99 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 253.70 13,643.99
04.02.06 TUBERIA DE PE-80 SDR 11 1" m 67.50 50.48 3,407.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 67.50 3,407.40
04.02.07 TUBERIA DE PE-80 SDR 11 3/4" m 2.85 45.99 131.07 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.85 131.07
04.02.08 TUBERIA DE PE-80 SDR 11 1/2" m 34.00 42.76 1,453.84 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 34.00 1,453.84
04.02.09 DUCTO DE CONCRETO ARMADO DE 1 VÍA und 39.60 46.03 1,822.79 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 39.60 1,822.79
04.02.10 LOSA DE CONCRETO EN MEDIA LUNA 120mm m 129.00 87.05 11,229.45 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 129.00 11,229.45
04.03 ACCESORIOS 3,157.78 0.00 0.00 0.00 3,157.78
04.03.01 BUSCHING REDUCTOR PE 1 1/2" x 1" und 1.00 38.40 38.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 38.40
04.03.02 BUSCHING REDUCTOR PE 1" x 3/4" und 2.00 35.70 71.40 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.00 71.40
04.03.03 BUSCHING REDUCTOR PE 1" x 1/2" und 1.00 33.65 33.65 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 33.65
04.03.04 ADAPTADOR PE - Cu und 2.00 58.99 117.98 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.00 117.98
04.03.05 ADAPTADOR PE - SCH 80 und 3.00 56.49 169.47 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 3.00 169.47
04.03.06 VÁLVULA PESADA ESFÉRICA DE 1 1/2" (600 WOG o similar) und 1.00 271.49 271.49 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 271.49
04.03.07 VÁLVULA PESADA ESFÉRICA DE 1" (600 WOG o similar) und 1.00 169.49 169.49 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 169.49
04.03.08 VÁLVULA PESADA ESFÉRICA DE 3/4" (600 WOG o similar) und 2.00 143.09 286.18 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 2.00 286.18
04.03.09 VÁLVULA REGULADORA DE 1era ETAPA (Marca Fisher o similar) und 1.00 390.06 390.06 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 390.06
04.03.10 MEDIDOR DE GAS 10 m3/h EN GABINETE (0.50 x 0.50 x 0.18m) und 1.00 830.24 830.24 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 830.24
04.03.11 CINTA SEÑALIZADORA DE LINEAS DE GAS GLP m 355.90 2.19 779.42 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 355.90 779.42
04.04 VARIOS 72,628.39 0.00 0.00 0.00 72,628.39
S10
Formato de Valorización
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROVINCIA Y DEPARTAMENTO DE LIMA
PRESUPESTO CONTRATO ACUMULADO ANTERIOR VALORIZACION ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
Item Descripción
Und. Metrado Precio S/. Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/. % Metrado Parcial S/.
04.04.01 TANQUE SOTERRADO DE GLP (500 GALONES) und 1.00 56,000.00 56,000.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 56,000.00
04.04.02 ACCESORIOS TANQUE SOTERRADO DE GLP glb 1.00 2,496.97 2,496.97 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 2,496.97
04.04.03 CAJA DE LLENADO und 1.00 1,696.09 1,696.09 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 1,696.09
04.04.04 POZO A TIERRA und 1.00 2,435.33 2,435.33 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 2,435.33
04.04.05 PRUEBAS DE HERMETICIDAD glb 1.00 10,000.00 10,000.00 0.0% - 0.00 0.0% - 0.00 0.0% - 0.00 100.0% 1.00 10,000.00
CONTRATISTA CONTRATISTA
FECHA : FECHA :
SUPERVISIÓN SUPERVISION
FECHA : FECHA :
S10
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PROVINCIA Y
DEPARTAMENTO DE LIMA
K = 0.084*(AMr / AMo) + 0.167*(CAr / CAo) + 0.174*(MOr / MOo) + 0.251*(MQr / MQo) + 0.129*(Dr / Do) + 0.195*(IPCr / IPCo)
BASE INDICE FEB-19 INDICE MAR-19 INDICE ABR-19 INDICE MAY-19 INDICE JUN-19 INDICE JUL-19
DESCRIPCION INDICE FACTOR (%)
IU IU K IU K IU K IU K IU K IU K
3 6 7 8 9 10 11
ACERO DE CONSTRUCCION CORRUGADO 3 55.95% 539.69 537.43 537.43 537.43 - - -
0.084 0.084 0.084 0.084 - - -
MADERA NACIONAL PARA ENCOF. Y CARPINT. 43 44.05% 685.65 690.11 690.11 690.11 - - -
AGREGADO GRUESO 5 29.34% 215.69 215.77 215.77 215.77 - - -
0.167 0.167 0.167 0.167 - - -
CEMENTO PORTLAND TIPO V 23 70.66% 439.25 439.25 439.25 439.25 - - -
MANO DE OBRA INC. LEYES SOCIALES 47 0.174 100.00% 602.11 600.40 0.174 600.40 0.174 600.40 0.174 - - - - - -
MAQUINARIA Y EQUIPO IMPORTADO 49 0.251 100.00% 311.07 309.88 0.250 309.88 0.250 309.88 0.250 - - - - - -
DOLAR (GENERAL PONDERADO) 30 0.129 100.00% 497.53 489.58 0.127 489.58 0.127 489.58 0.127 - - - - - -
INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.195 100.00% 451.18 452.29 0.195 452.29 0.195 452.29 0.195 - - - - - -
1.00 0.997 0.997 0.997 - - -
S10
Fórmula Polinómica
K = 0.084*(AMr / AMo) + 0.167*(CAr / CAo) + 0.174*(MOr / MOo) + 0.251*(MQr / MQo) + 0.129*(Dr / Do) + 0.195*(IPCr / IPCo)
BASE INDICE FEB-19 INDICE MAR-19 INDICE ABR-19 INDICE MAY-19 INDICE JUN-19 INDICE JUL-19
DESCRIPCION INDICE FACTOR (%)
IU IU K IU K IU K IU K IU K IU K
3 6 7 8 9 10 11
ACERO DE CONSTRUCCION CORRUGADO 3 55.95% 539.69 537.43 537.43 537.43 - - -
0.084 0.084 0.084 0.084 - - -
MADERA NACIONAL PARA ENCOF. Y CARPINT. 43 44.05% 685.65 690.11 690.11 690.11 - - -
AGREGADO GRUESO 5 29.34% 215.69 215.77 215.77 215.77 - - -
0.167 0.167 0.167 0.167 - - -
CEMENTO PORTLAND TIPO V 23 70.66% 439.25 439.25 439.25 439.25 - - -
MANO DE OBRA INC. LEYES SOCIALES 47 0.174 100.00% 602.11 600.40 0.174 600.40 0.174 600.40 0.174 - - - - - -
MAQUINARIA Y EQUIPO IMPORTADO 49 0.251 100.00% 311.07 309.88 0.250 309.88 0.250 309.88 0.250 - - - - - -
DOLAR (GENERAL PONDERADO) 30 0.129 100.00% 497.53 489.58 0.127 489.58 0.127 489.58 0.127 - - - - - -
INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.195 100.00% 451.18 452.29 0.195 452.29 0.195 452.29 0.195 - - - - - -
1.00 0.997 0.997 0.997 - - -
S10
Fórmula Polinómica
K = 0.155*(TCAr / TCAo) + 0.454*(MOr / MOo) + 0.073*(MQr / MQo) + 0.123*(Dr / Do) + 0.195*(IPCr / IPCo)
BASE INDICE FEB-19 INDICE MAR-19 INDICE ABR-19 INDICE MAY-19 INDICE JUN-19 INDICE JUL-19
DESCRIPCION INDICE FACTOR (%)
IU IU K IU K IU K IU K IU K IU K
3 6 7 8 9 10 11
ACERO DE CONSTRUCCION CORRUGADO 3 2.58% 539.69 537.43 537.43 537.43 - - -
CEMENTO PORTLAND TIPO V 23 0.155 21.29% 439.25 439.25 0.153 439.25 0.153 439.25 0.153 - - - - - -
TUBERIA DE PVC PARA AGUA 72 76.13% 439.71 431.72 431.72 431.72 - - -
MANO DE OBRA INC. LEYES SOCIALES 47 0.454 100.00% 602.11 600.40 0.453 600.40 0.453 600.40 0.453 - - - - - -
MAQUINARIA Y EQUIPO IMPORTADO 49 0.073 100.00% 311.07 309.88 0.073 309.88 0.073 309.88 0.073 - - - - - -
DOLAR (GENERAL PONDERADO) 30 0.123 100.00% 497.53 489.58 0.121 489.58 0.121 489.58 0.121 - - - - - -
INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.195 100.00% 451.18 452.29 0.195 452.29 0.195 452.29 0.195 - - - - - -
1.00 0.995 0.995 0.995 - - -
S10
Fórmula Polinómica
K = 0.068*(Cr / Co) + 0.071*(Tr / To) + 0.094*(Ar / Ao) + 0.068*(PCr / PCo) + 0.265*(MOr / MOo) + 0.239*(Dr / Do) + 0.195*(IPCr / IPCo)
BASE INDICE FEB-19 INDICE MAR-19 INDICE ABR-19 INDICE MAY-19 INDICE JUN-19 INDICE JUL-19
DESCRIPCION INDICE FACTOR (%)
IU IU K IU K IU K IU K IU K IU K
3 6 7 8 9 10 11
CEMENTO PORTLAND TIPO V 23 0.068 100.00% 439.25 439.25 0.068 439.25 0.068 439.25 0.068 - - - - - -
TUBERIA DE PVC PARA ELECTRICIDAD (SAP) 74 0.071 100.00% 439.71 431.72 0.070 431.72 0.070 431.72 0.070 - - - - - -
ARTEFACTO DE ALUMBRADO EXTERIOR 11 0.094 100.00% 244.87 246.76 0.095 246.76 0.095 246.76 0.095 - - - - - -
CABLE NYY Y NKY 19 39.71% 780.43 777.23 777.23 777.23 - - -
0.068 0.068 0.068 0.068 - - -
PLANCHA DE ACERO LAF 57 60.29% 420.20 416.22 416.22 416.22 - - -
MANO DE OBRA INC. LEYES SOCIALES 47 0.265 100.00% 602.11 600.40 0.264 600.40 0.264 600.40 0.264 - - - - - -
DOLAR (GENERAL PONDERADO) 30 0.239 100.00% 497.53 489.58 0.235 489.58 0.235 489.58 0.235 - - - - - -
INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.195 100.00% 451.18 452.29 0.195 452.29 0.195 452.29 0.195 - - - - - -
1.00 0.995 0.995 0.995 - - -
INDICES UNIFICADOS - AREA 2
Indice Descripción
Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19
3 4 5 6 7 8 9 10 11
ESTRUCTURAS
3 ACERO DE CONSTRUCCION CORRUGADO 539.69 542.08 537.43 537.43 537.43 537.43
5 AGREGADO GRUESO 215.69 215.77 215.77 215.77 215.77 215.77
23 CEMENTO PORTLAND TIPO V 439.25 439.25 439.25 439.25 439.25 439.25
30 DOLAR (GENERAL PONDERADO) 497.53 494.24 489.58 489.58 489.58 489.58
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 451.18 452.00 452.29 452.29 452.29 452.29
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 685.65 690.53 690.11 690.11 690.11 690.11
47 MANO DE OBRA INC. LEYES SOCIALES 602.11 602.11 600.40 600.40 600.40 600.40
49 MAQUINARIA Y EQUIPO IMPORTADO 311.07 311.16 309.88 309.88 309.88 309.88
ARQUITECTURA
3 ACERO DE CONSTRUCCION CORRUGADO 539.69 542.08 537.43 537.43 537.43 537.43 - - -
4 AGREGADO FINO 943.42 941.77 945.43 945.43 945.43 945.43
5 AGREGADO GRUESO 215.69 215.77 215.77 215.77 215.77 215.77 - - -
23 CEMENTO PORTLAND TIPO V 439.25 439.25 439.25 439.25 439.25 439.25 - - -
30 DOLAR (GENERAL PONDERADO) 497.53 494.24 489.58 489.58 489.58 489.58 - - -
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 451.18 452.00 452.29 452.29 452.29 452.29 - - -
40 LOSETA 447.10 447.10 450.25 450.25 450.25 450.25
43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 685.65 690.53 690.11 690.11 690.11 690.11 - - -
47 MANO DE OBRA INC. LEYES SOCIALES 602.11 602.11 600.40 600.40 600.40 600.40 - - -
49 MAQUINARIA Y EQUIPO IMPORTADO 311.07 311.16 309.88 309.88 309.88 309.88 - - -
51 PERFIL DE ACERO LIVIANO 359.59 358.56 350.73 350.73 350.73 350.73
65 TUBERIA DE ACERO NEGRO Y/O GALVANIZADO 259.07 262.51 260.27 260.27 260.27 260.27
79 VIDRIO INCOLORO NACIONAL (indice 30) 497.53 494.24 489.58 489.58 489.58 489.58
INSTALACIONES SANITARIAS
3 ACERO DE CONSTRUCCION CORRUGADO 539.69 542.08 537.43 537.43 537.43 537.43 - - -
23 CEMENTO PORTLAND TIPO V 439.25 439.25 439.25 439.25 439.25 439.25 - - -
30 DOLAR (GENERAL PONDERADO) 497.53 494.24 489.58 489.58 489.58 489.58 - - -
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 451.18 452.00 452.29 452.29 452.29 452.29 - - -
47 MANO DE OBRA INC. LEYES SOCIALES 602.11 602.11 600.40 600.40 600.40 600.40 - - -
48 MAQUINARIA Y EQUIPO NACIONAL 371.13 370.72 369.95 369.95 369.95 369.95
72 TUBERIA DE PVC PARA AGUA 439.71 432.82 431.72 431.72 431.72 431.72
77 VALVULA DE BRONCE NACIONAL 340.17 340.02 338.48 338.48 338.48 338.48
INSTALACIONES ELÉCTRICAS
11 ARTEFACTO DE ALUMBRADO EXTERIOR 244.87 243.89 246.76 246.76 246.76 246.76
12 ARTEFACTO DE ALUMBRADO INTERIOR 326.14 325.54 324.16 324.16 324.16 324.16
19 CABLE NYY Y NKY 780.43 779.12 777.23 777.23 777.23 777.23
23 CEMENTO PORTLAND TIPO V 439.25 439.25 439.25 439.25 439.25 439.25 - - -
30 DOLAR (GENERAL PONDERADO) 497.53 494.24 489.58 489.58 489.58 489.58 - - -
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 451.18 452.00 452.29 452.29 452.29 452.29 - - -
47 MANO DE OBRA INC. LEYES SOCIALES 602.11 602.11 600.40 600.40 600.40 600.40 - - -
57 PLANCHA DE ACERO LAF 420.20 418.83 416.22 416.22 416.22 416.22
74 TUBERIA DE PVC PARA ELECTRICIDAD (SAP) 439.71 432.82 431.72 431.72 431.72 431.72
S10
RESUMEN DE METRADOS
Presupuesto 1108002 CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS,
DISTRITO DE PUNTA NEGRA, PROVINCIA Y DEPARTAMENTO DE LIMA
02 MOVIMIENTO DE TIERRAS
02.01 MOVIMIENTO DE TIERRAS EN EXPLANACIONES
02.01.01 EXCAVACIÓN MASIVA EN EXPLANACIONES m3 13,026.32 91.5% 11,921.01 8.2% 1,067.73 99.7% 12,988.75 0.3% 37.58
02.01.02 CONFORMACIÓN Y COMPACTACIÓN DE SUB RASANTE m2 15,807.53 39.1% 6,186.96 53.5% 8,455.40 92.6% 14,642.36 7.4% 1,165.17
02.01.03 RELLENO MASIVO DE EXPLANACIONES CON MATERIAL DE PRÉSTAMO m3 3,961.22 97.5% 3,862.01 1.6% 62.33 99.1% 3,924.34 0.9% 36.88
02.01.04 RELLENO MASIVO DE EXPLANACIONES CON MATERIAL PROPIO m3 817.84 0.0% - 76.5% 625.68 76.5% 625.68 23.5% 192.16
02.01.05 ELIMINACIÓN DE MATERIAL EXCEDENTE DE EXCAVACIONES, D = 20 Km m3 15,260.60 97.5% 14,885.60 2.5% 375.00 100.0% 15,260.60 0.0% -
02.02 MOVIMIENTO DE TIERRAS LOCALIZADO
02.02.01 EXCAVACIÓN MASIVA PARA ESTRUCTURAS m3 5,539.39 41.7% 2,308.46 36.3% 2,008.65 77.9% 4,317.10 22.1% 1,222.29
02.02.02 EXCAVACIÓN MANUAL PARA ESTRUCTURAS m3 634.69 3.8% 24.27 22.1% 140.40 25.9% 164.67 74.1% 470.02
02.02.03 NIVELACIÓN Y COMPACTACIÓN DE TERRENO m2 2,390.73 46.5% 1,111.46 30.8% 736.26 77.3% 1,847.72 22.7% 543.01
02.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO PARA ESTRUCTURAS m3 2,657.43 41.0% 1,088.32 30.1% 798.82 71.0% 1,887.14 29.0% 770.29
02.02.05 ACARREO DE MATERIAL EXCEDENTE DE EXCAVACIONES m3 2,494.89 31.5% 786.09 28.0% 699.58 59.5% 1,485.66 40.5% 1,009.23
02.02.06 ELIMINACIÓN DE MATERIAL EXCEDENTE DE EXCAVACIONES, D = 20 Km m3 4,395.82 65.6% 2,885.57 34.4% 1,510.25 100.0% 4,395.82 0.0% -
02.03 BASES Y SUB BASES
02.03.01 BASE GRANULAR e= 0.15 m m2 15,807.53 0.0% - 54.2% 8,575.45 54.2% 8,575.45 45.8% 7,232.08
03 OBRAS DE CONCRETO SIMPLE
03.01 CONCRETO f'c= 100 kg/cm2 EN SOLADOS, e= 3" m2 85.16 64.9% 55.23 13.1% 11.14 77.9% 66.37 22.1% 18.79
03.02 CONCRETO f'c= 100 kg/cm2 EN SOLADOS, e= 4" m2 2,266.61 39.2% 887.60 31.2% 706.68 70.3% 1,594.28 29.7% 672.33
04 OBRAS DE CONCRETO ARMADO
04.01 LOSA DE CIMENTACION
04.01.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN LOSA DE CIMENTACIÓN m3 46.87 0.0% - 65.9% 30.87 65.9% 30.87 34.1% 16.00
04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA DE CIMENTACIÓN m2 117.56 0.0% - 72.7% 85.45 72.7% 85.45 27.3% 32.11
04.01.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 2,876.91 0.0% - 41.3% 1,188.83 41.3% 1,188.83 58.7% 1,688.08
04.02 CIMIENTOS REFORZADOS
04.02.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN CIMIENTOS REFORZADOS m3 754.08 27.0% 203.83 46.5% 350.70 73.5% 554.53 26.5% 199.55
04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CIMIENTOS REFORZADOS m2 895.49 45.4% 406.79 25.0% 223.96 70.4% 630.75 29.6% 264.74
04.02.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 41,857.04 49.0% 20,521.07 27.5% 11,507.58 76.5% 32,028.66 23.5% 9,828.38
04.05 MUROS DE CONTENCIÓN
04.05.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN MUROS DE CONTENCIÓN m3 816.29 36.0% 293.62 29.0% 237.00 65.0% 530.63 35.0% 285.66
04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS DE CONTENCIÓN m2 421.77 263.7% 1,112.14 -163.7% - 690.37 100.0% 421.77 0.0% 0.00
04.05.03 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS DE CONTENCIÓN m2 6,980.41 12.8% 895.54 52.4% 3,660.51 65.3% 4,556.05 34.7% 2,424.36
04.05.04 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 43,648.86 39.4% 17,210.72 28.8% 12,581.44 68.3% 29,792.17 31.7% 13,856.69
04.06 COLUMNAS
04.06.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN COLUMNAS m3 9.56 0.0% - 38.7% 3.70 38.7% 3.70 61.3% 5.86
04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 117.28 0.0% - 52.9% 62.08 52.9% 62.08 47.1% 55.20
04.06.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 1,660.81 0.0% - 43.4% 720.29 43.4% 720.29 56.6% 940.52
04.07 PLACAS
04.07.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 280 Kg/cm2 EN PLACAS m3 14.28 0.0% - 47.1% 6.73 47.1% 6.73 52.9% 7.55
04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS m2 132.80 0.0% - 41.9% 55.68 41.9% 55.68 58.1% 77.12
04.07.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 1,351.92 0.0% - 57.1% 772.35 57.1% 772.35 42.9% 579.57
04.12 PARAPETOS
04.12.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 210 Kg/cm2 EN PARAPETOS m3 174.82 0.0% - 17.6% 30.68 17.6% 30.68 82.4% 144.14
04.12.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PARAPETOS m2 1,668.91 0.0% - 17.3% 289.03 17.3% 289.03 82.7% 1,379.88
04.12.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 8,975.78 0.0% - 17.3% 1,555.99 17.3% 1,555.99 82.7% 7,419.79
04.13 SARDINELES
04.13.01 CONCRETO PREMEZCLADO TIPO HS, f'c= 210 Kg/cm2 EN SARDINELES m3 96.98 0.0% - 7.9% 7.64 7.9% 7.64 92.1% 89.34
04.13.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES m2 1,196.16 0.0% - 7.7% 91.90 7.7% 91.90 92.3% 1,104.26
04.13.03 ACERO CORRUGADO f'y= 4,200 Kg/cm2 GRADO 60 kg 3,909.77 0.0% - 7.9% 307.96 7.9% 307.96 92.1% 3,601.81
05 VARIOS
05.08 JUNTAS DE DILATACION EN MUROS DE CONTENCIÓN m 223.50 25.0% 55.88 35.0% 78.23 60.0% 134.10 40.0% 89.40
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS"
CONSTRUCCIONES PROVISIONALES
01.01.01
Construcciones provisionales gbl 1 0.60
CARTEL DE OBRA
01.01.04
Cartel informativo de obra und 2 2.00
MONITOREO AMBIENTAL
01.04.02
(Ver sustento) glb 1 0.50
POZA DE CURADO
01.07.04
Para curado de testigos de concreto und 1 1.00
TRANSPORTE DE PERSONAL
mes 3 3.00
01.06.06 Transporte de Staff de obra, se considera 2
minibuses que haran 2 rutas de recorrido
PARTIDA : 02.01.02
CORTE POSTERIOR A LA EXCAVACION MASIVA PARA EXPLANACION
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
AREA DIST. VOLUMEN ( M3 )
PLANOS E-01-E05
VIA VEHICULAR Y ESTACIONAMIENTOS
Sector1 1 269.63 269.63
Sector2 1 47.59 47.59
Sector3 1 10.63 10.63
Sector4 1 599.77 599.77
Sector5 1 2782.13 2782.13
Sector6 1 63.86 63.86
Sector7 1 49.55 49.55
Sector8 1 511.44 511.44
Sector9 1 173.24 173.24
Sector10 1 15.34 15.34
Sector11 1 102.28 102.28
Sector12 1 46.77 46.77
RAMPAS
Sector1 1 0.24 0.24
Sector2 1 66.42 66.42
Sector3 1 72.03 72.03
Sector4 1 49.13 49.13
Sector5 1 0 0.00
Sector6 1 23.53 23.53
Sector7 1 0.8 0.80
Sector8 1 64.94 64.94
Sector9 1 14.24 14.24
Sector10 1 70.41 70.41
Sector11 1 11.11 11.11
Sector12 1 0.65 0.65
Sector13 1 3.41 3.41
Sector14 1 5.85 5.85
Sector15 1 0 0.00
Sector16 1 0 0.00
Sector17 1 15.04 15.04
Sector18 1 37.19 37.19
42 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROYECTO :
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 001 ESTRUCTURAS
PARTIDA : 02.01.02
CORTE POSTERIOR A LA EXCAVACION MASIVA PARA EXPLANACION
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
AREA DIST. VOLUMEN ( M3 )
Sector19 1 57.26 57.26
Sector20 1 51.51 25.76
Sector21 1 11.32 11.32
Sector22 1 1.05 1.05
Sector23 1 0.31 0.31
Sector24 1 0 0.00
JARDINES
Sector1 1 5.07 5.07
Sector2 1 11.82 0.00
Sector3 1 0.08 0.08
Sector4 1 0.19 0.19
Sector5 1 0.05 0.05
Sector6 1 29.64 29.64
Sector7 1 9.73 9.73
Sector8 1 4.23 4.23
Sector9 1 0 0.00
Sector10 1 29.64 29.64
Sector11 1 0.01 0.01
Sector12 1 170.36 170.36
Sector13 1 0.02 0.02
Sector14 1 20.2 20.20
Sector15 1 0 0.00
Sector16 1 5.39 5.39
Sector17 1 0.01 0.01
Sector18 1 28.62 28.62
Sector19 1 5.14 5.14
Sector20 1 2.26 2.26
Sector21 1 0.01 0.01
Sector22 1 0.01 0.01
Sector23 1 0.01 0.01
Sector24 1 0.06 0.06
Sector25 1 0 0.00
Sector26 1 0.07 0.07
Sector27 1 0.13 0.13
Sector28 1 2.36 2.36
Sector29 1 3.92 3.92
Sector30 1 2.92 2.92
Sector31 1 10.77 10.77
Sector32 1 16.16 16.16
Sector33 1 24.29 24.29
Sector34 1 0.41 0.41
Sector35 1 5.98 5.98
Sector36 1 17.18 17.18
Sector37 1 384.75 384.75
Sector38 1 64.44 64.44
Sector39 1 31.55 31.55
Sector40 1 37.58 37.58
Sector41 1 67.13 67.13
Sector42 1 11.57 11.57
Sector43 1 12.81 12.81
TRIBUNAS
Sector1 1 40.07 40.07
Sector2 1 181.02 181.02
ESPEJO DE AGUA
Sector1 1 0.03 0.03
43 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROYECTO :
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 001 ESTRUCTURAS
PARTIDA : 02.01.02
CORTE POSTERIOR A LA EXCAVACION MASIVA PARA EXPLANACION
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
AREA DIST. VOLUMEN ( M3 )
Sector2 1 0.23 0.23
GARITAS
Sector1 1 0 0.00
Sector2 1 4.56 4.56
Sector3 1 8.85 8.85
Sector4 1 0.47 0.47
0.00
GRADAS SOBRE TERRENO
Sector1 1 63.27 63.27
Sector2 1 2 2.00
Sector3 1 2.82 2.82
Sector4 1 0 0.00
Sector5 1 13.73 13.73
Sector6 1 1.1 1.10
Sector7 1 1.2 1.20
Sector8 1 10.79 10.79
PARTIDA : 02.01.03
CONFORMACIÓN Y COMPACTACIÓN DE SUB RASANTE
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M2 )
AREA DISTANCIA VOLUMEN
PLANOS E-01-E05
VIA VEHICULAR Y ESTACIONAMIENTOS
1 830.73 830.73
Sector4
44 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROYECTO :
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 001 ESTRUCTURAS
PARTIDA : 02.01.02
CORTE POSTERIOR A LA EXCAVACION MASIVA PARA EXPLANACION
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
AREA DIST. VOLUMEN ( M3 )
RAMPAS
TRIBUNAS
ESPEJO DE AGUA
GARITAS
TOTAL 14,642.36
PARTIDA : 02.01.04
RELLENO MASIVO DE EXPLANACIONES CON MATERIAL DE PRÉSTAMO
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M3 )
AREA DISTANCIA VOLUMEN
PLANOS E-01-E05
VIA VEHICULAR Y ESTACIONAMIENTOS
45 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROYECTO :
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 001 ESTRUCTURAS
PARTIDA : 02.01.02
CORTE POSTERIOR A LA EXCAVACION MASIVA PARA EXPLANACION
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
AREA DIST. VOLUMEN ( M3 )
Sector5 1 0 0.00
Sector7 1 0 0.00
Sector8 1 0 0.00
Sector11 1 0 0.00
Sector12 1 0 0.00
Sector14 1 0 0.00
Sector15 1 0 0.00
RAMPAS
Sector2 1 0 0.00
Sector3 1 0 0.00
Sector10 1 0 0.00
Sector13 1 0 0.00
Sector18 1 0 0.00
46 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROYECTO :
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 001 ESTRUCTURAS
PARTIDA : 02.01.02
CORTE POSTERIOR A LA EXCAVACION MASIVA PARA EXPLANACION
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
AREA DIST. VOLUMEN ( M3 )
Sector19 1 0 0.00
Sector21 1 0 0.00
Sector22 1 0 0.00
TRIBUNAS
ESPEJO DE AGUA
GARITAS
Sector2 1 0 0.00
Sector3 1 0 0.00
0.00
Sector1 1 0 0.00
Sector5 1 0 0.00
Sector8 1 0 -
PARTIDA : 02.01.05
RELLENO MASIVO DE EXPLANACIONES CON MATERIAL PROPIO
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M3 )
AREA DISTANCIA VOLUMEN
47 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROYECTO :
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 001 ESTRUCTURAS
PARTIDA : 02.01.02
CORTE POSTERIOR A LA EXCAVACION MASIVA PARA EXPLANACION
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
AREA DIST. VOLUMEN ( M3 )
PLANOS E-01-E05
JARDINES
Sector6 1 0 0.00
Sector7 1 0 0.00
Sector8 1 0 0.00
Sector10 1 0 0.00
Sector18 1 0 0.00
Sector29 1 0 0.00
Sector30 1 0 0.00
Sector31 1 0 0.00
Sector32 1 0 0.00
Sector35 1 0 -
Sector36 1 0 -
Sector37 1 0 -
48 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PROYECTO :
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 001 ESTRUCTURAS
PARTIDA : 02.01.02
CORTE POSTERIOR A LA EXCAVACION MASIVA PARA EXPLANACION
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
AREA DIST. VOLUMEN ( M3 )
Sector38 1 0 -
Sector39 1 0 -
Sector40 1 0 -
Sector41 1 0 -
Sector42 1 0 -
Sector43 1 0 -
PARTIDA : 02.01.06
ELIMINACIÓN DE MATERIAL EXCEDENTE DE EXCAVACIONES, D = 20 Km
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M3 )
AREA DISTANCIA VOLUMEN
PLANOS E-01-E05
Corte posterior a la excavacion masiva para 1.25 12,988.75 16,235.93
TOTAL 15,260.60
49 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
LARGO ANCHO ALTO ( M3 )
RAMPA 02 (CORTES 1-1 AL 5-5) MURO DERECHO 1 26.83 1.60 1.20 0.00
CIMIENTO MURO CORTE 3-3 (lado izquierdo) 1 17.89 1.60 0.50 14.31
CIMIENTO MURO CORTE 3-3 (lado derecho) 1 22.45 2.55 4.57 130.81
CIMIENTO MURO CORTE 5-5 (lado izquierdo) 1 5.36 2.00 4.13 44.27
CIMIENTO MURO CORTE 10-10 (lado izquierdo) 1 42.35 1.00 1.35 0.00
CIMIENTO MURO CORTE 18-18 (lado izquierdo) 1 14.50 2.00 2.80 81.20
CIMIENTO MURO CORTE 18-18 (lado derecho) 1 11.00 2.00 3.75 0.00
CIMIENTO MURO CORTE 19-19 (lado izquierdo) 1 15.93 2.00 2.55 81.24
CIMIENTO MURO CORTE 19-19 (lado derecho) 1 10.34 2.00 1.62 0.00
CIMIENTO MURO CORTE 20-20 (lado izquierdo) 1 14.30 2.00 2.55 72.93
0.00
CIMIENTO MURO CORTE 9-9 (lado izquierdo) 1 7.67 1.60 2.20 13.50
CIMIENTO MURO CORTE 12-12 (lado izquierdo) 1 23.03 1.60 2.30 84.75
50 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
0.00
CIMIENTO MURO CORTE 16-16 (lado izquierdo) 1 22.19 1.60 0.60 21.30
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 0-0 1.00 15.80 3.00 2.80 132.72
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 1-1 1.00 8.35 3.00 3.70 92.69
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 2-2 1.00 3.92 3.00 3.70 43.51
ZAPATA MURO DE CONTENCIÓN M-1 CORTE 2a-2a 1.00 4.24 3.00 4.90 62.33
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 3-3 1.00 7.66 3.00 3.70 85.03
ZAPATA MURO DE CONTENCIÓN M-1 CORTE 3a-3a 1.00 4.24 3.00 4.90 62.33
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 4-4 1.00 9.33 3.00 3.70 103.56
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 5-5 1.00 12.88 3.00 3.70 142.97
TOTAL 4,317.10
PARTIDA : 02.02.02
EXCAVACIÓN MANUAL PARA ESTRUCTURAS
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M3 )
LARGO ANCHO ALTO
CASETAS
GARITA 01 (E-13)
GARITA 02 (E-14) -
GARITA 03 (E-15) -
51 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
GARITA 04 (E-16) -
EXTERIORES (PARAPETOS) -
MURETE 3 (CORTE 16-16) lado derecho 1.00 22.19 0.80 1.90 33.73
0.00
SECTOR 1 0.00
52 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
SECTOR 2 0.00
0.00
SECTOR 3 0.00
53 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
TOTAL 164.67
PARTIDA : 02.02.03
NIVELACIÓN Y COMPACTACIÓN DE TERRENO
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
LARGO ANCHO ALTO ( M2 )
EXTERIORES
PLANOS DE VEREDAS (E-17 AL E-22)
SECTOR 1
CIMIENTO RAMPA 02 (CORTES 1-1 AL 5-5) MURO
IZQUIERDO
1 7.05 1.00 7.05
CIMIENTO RAMPA 02 (CORTES 1-1 AL 5-5) MURO
1 12.22 1.60 19.55
DERECHO
MURO (CORTE 24-24) 5 12.75 0.80 51.00
espejo de agua (CORTE 24-24) 1 47.98 0.00
SECTOR 2 0.00
SECTOR 3 0.00
0.00
54 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
SECTOR 2 0.00
0.00
SECTOR 3 0.00
0.00
AREA 0.00
0.00
GARITA 01 0.00
GARITA 02 0.00
0.00
GARITA 03 0.00
0.00
GARITA 04 0.00
0.00
0.00
TOTAL 1,847.72
55 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
PARTIDA : 02.02.04
RELLENO CON MATERIAL PROPIO PARA ESTRUCTURAS
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M3 )
AREA DISTANCIA VOLUMEN
EXTERIORES
PLANOS DE VEREDAS (E-17 AL E-22)
SECTOR 1
CIMIENTO RAMPA 02 (CORTES 1-1 AL 5-5) MURO
IZQUIERDO
1 7.05 0.85 0.20 0.00
CIMIENTO RAMPA 02 (CORTES 1-1 AL 5-5) MURO
1 12.22 1.25 0.20 0.00
DERECHO
MURO (CORTE 24-24) 5 12.75 0.65 1.40 0.00
RAMPA 02 (CORTES 1-1 AL 5-5) MURO DERECHO 1 26.83 1.45 0.50 0.00
SECTOR 2 0.00
SECTOR 3 0.00
SECTOR 1 0.00
CIMIENTO MURO CORTE 3-3 (lado izquierdo) 1 17.89 1.45 0.20 5.19
CIMIENTO MURO CORTE 3-3 (lado derecho) 1 22.45 2.40 3.60 96.98
CIMIENTO MURO CORTE 5-5 (lado izquierdo) 1 5.36 1.85 3.00 29.75
CIMIENTO MURO CORTE 10-10 (lado izquierdo) 1 42.35 0.85 1.00 0.00
CIMIENTO MURO CORTE 18-18 (lado izquierdo) 1 14.50 1.85. 1.20 17.40
CIMIENTO MURO CORTE 18-18 (lado derecho) 1 11.00 1.85 1.20 0.00
CIMIENTO MURO CORTE 19-19 (lado izquierdo) 1 15.93 1.85 1.20 35.36
CIMIENTO MURO CORTE 19-19 (lado derecho) 1 10.34 1.85 1.20 0.00
CIMIENTO MURO CORTE 20-20 (lado izquierdo) 1 14.30 1.85 1.20 31.75
0.00
SECTOR 2 0.00
CIMIENTO MURO CORTE 9-9 (lado izquierdo) 1 7.67 1.45 0.80 0.00
56 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
CIMIENTO MURO CORTE 12-12 (lado izquierdo) 1 23.03 1.45 0.80 26.71
0.00
SECTOR 3 0.00
CIMIENTO MURO CORTE 16-16 (lado izquierdo) 1 22.19 1.45 0.80 25.74
0.00
SECTOR 1 0.00
0.00
SECTOR 2 0.00
SECTOR 3 0.00
MURETE 3 (CORTE 16-16) lado derecho 1.00 22.19 0.65 1.90 27.40
0.00
CASETAS 0.00
GARITA 01 0.00
0.00
GARITA 02 0.00
57 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
0.00
GARITA 04 0.00
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 0-0 1.00 15.80 2.75 1.41 61.26
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 1-1 1.00 8.35 2.75 1.99 45.70
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 2-2 1.00 3.92 2.75 2.31 24.90
ZAPATA MURO DE CONTENCIÓN M-1 CORTE 2a-2a 1.00 4.24 2.75 2.74 31.95
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 3-3 1.00 7.66 2.75 3.00 63.20
ZAPATA MURO DE CONTENCIÓN M-1 CORTE 3a-3a 1.00 4.24 2.75 4.28 49.90
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 4-4 1.00 9.33 2.75 3.08 79.03
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 5-5 1.00 12.88 2.75 3.08 109.09
TOTAL 1,887.14
PARTIDA : 02.02.05
ACARREO DE MATERIAL EXCEDENTE DE EXCAVACIONES
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M3 )
AREA DISTANCIA VOLUMEN
ESPONJAMIENTO =25%
TOTAL 1,485.66
58 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA
PROYECTO :
NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
PARTIDA : 0.00
ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACIONES, D= 20KM
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M3 )
AREA DISTANCIA VOLUMEN
ESPONJAMIENTO =25%
TOTAL 4,395.82
59 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO
PROYECTO : DE PUNTA NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
AREA DISTANCIA VOLUMEN ( M2 )
PLANO E-01
TOTAL 8,575.45
60 de 86
COBRA
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE
PROYECTO : PUNTA NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
DIMENSIONES TOTAL
DESCRIPCIÓN CANTIDAD
LARGO ANCHO ALTO ( M3 )
ZAPATA MURO DE CONTENCIÓN M-1 CORTE 3a-3a 1.00 4.24 2.55 10.81
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 4-4 1.00 9.33 2.00 18.66
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 5-5 1.00 12.88 2.00 25.76
SECTOR 1 -
TOTAL 66.37
PARTIDA : 03.02
CONCRETO f'c=100kg/cm2 EN SOLADOS, E=4"
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M3 )
LARGO ANCHO ALTO
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 0-0 1.00 15.80 2.00 31.60
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 1-1 1.00 8.35 2.00 16.70
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 2-2 1.00 3.92 2.00 7.84
ZAPATA MURO DE CONTENCIÓN M-1 CORTE 2a-2a 1.00 4.24 2.55 10.81
ZAPATA MURO DE CONTENCIÓN M-2 CORTE 3-3 1.00 7.66 2.00 15.32
SECTOR 1
61 de 86
MURO MTE 3 (CORTE 24-24) 1 11.10 0.80 0.00
SECTOR 2 0.00
SECTOR 3 0.00
SECTOR 2 0.00
62 de 86
CIMIENTO MURO M-2 (paseo de la fama) 1 60.20 1.60 96.32
0.00
SECTOR 3 0.00
CIMIENTO MURETE 3 (CORTE 16-16) lado derecho 1.00 22.19 0.80 17.75
GARITA 01
0.00
AREA 0.00
0.00
0.00
GARITA 03 0.00
0.00
63 de 86
Sector rectangular garita 1.00 2.65 4.00 10.60
0.00
0.00
GARITA 04 0.00
TOTAL 1,594.28
64 de 86
COBRA
PROYECTO :
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS,
DISTRITO DE PUNTA NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 03.06 VEREDAS DE CONCRETO TIPO HS, f'c= 175 Kg/cm2, e= 0.12m
DIMENSIONES
DESCRIPCIÓN CANT.
AREA ANCHO TOTAL (M2)
LOSAS DE CONCRETO
VEREDAS -
SECTOR 1 -
1.00 3.60 -
1.00 3.60 -
SECTOR 2 -
1.00 2.54 -
65 de 86
COBRA
PROYECTO :
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS,
DISTRITO DE PUNTA NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 03.06 VEREDAS DE CONCRETO TIPO HS, f'c= 175 Kg/cm2, e= 0.12m
DIMENSIONES
DESCRIPCIÓN CANT.
AREA ANCHO TOTAL (M2)
1.00 38.92 -
SECTOR 3 -
1.00 52.24 -
TOTAL -
PARTIDA : 03.06 RAMPAS DE CONCRETO TIPO HS, f'c= 175 Kg/cm2, e= 0.12m
DIMENSIONES
DESCRIPCIÓN CANT.
AREA ANCHO TOTAL (M2)
SECTOR 1
CORTE 1-1 1.00 11.30 1.60 -
66 de 86
COBRA
PROYECTO :
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS,
DISTRITO DE PUNTA NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 03.06 VEREDAS DE CONCRETO TIPO HS, f'c= 175 Kg/cm2, e= 0.12m
DIMENSIONES
DESCRIPCIÓN CANT.
AREA ANCHO TOTAL (M2)
SECTOR 2 -
SECTOR 3 -
67 de 86
COBRA
PROYECTO :
"CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS,
DISTRITO DE PUNTA NEGRA, PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 03.06 VEREDAS DE CONCRETO TIPO HS, f'c= 175 Kg/cm2, e= 0.12m
DIMENSIONES
DESCRIPCIÓN CANT.
AREA ANCHO TOTAL (M2)
TOTAL -
DIMENSIONES
DESCRIPCIÓN CANT. TOTAL CONCRETO TOTAL ENCOFRADO
AREA LARGO ALTO
(M3) (M2)
EXTERIORES
EXTERIORES (planos E-17 a E-22) AREA
SECTOR 1
CORTE 12-12 16 0.08 2.81 0.17 - 0.00
SECTOR 2 - 0.00
SECTOR 3 - 0.00
TOTAL - 0.00
68 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA
Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 LOSAS DE CIMENTACIÓN METRADO : CLAUSTRO SAC
FECHA : dic 2018
CONCRETO F'C = 210 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
69 de 86
0.00 0.00
TANQUE DE GAS 1 4.40 2.40 0.20 0.00 1 13.60 0.20 0.00 Acero longitudinal 1 5/8 22 4.40 0.2 0.2 0.00 0.00 0.00
Acero transversal 1 5/8 38 2.40 0.20 0.20 0.00 0.00 0.00
70 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA Y
DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 CIMIENTOS REFORZADOS
71 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA Y
DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 CIMIENTOS REFORZADOS
72 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA Y
DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 CIMIENTOS REFORZADOS
73 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA Y
DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 MUROS DE CONTENCIÓN
CONCRETO F'C = 280 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
74 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA Y
DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 MUROS DE CONTENCIÓN
CONCRETO F'C = 280 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
REFUERZO VERTICAL 1 3/8 246 3.30 0.2 0.2 0.00 0.00 0.00
MURO CORTE 16-16 1 24.14 0.15 1.56 0.00 1 48.28 1.56 - REFUERZO HORIZONTAL 1 3/8 7 24.09 0.2 0.2 0.90 0.00 0.00
REFUERZO VERTICAL 1 1/2 121 1.71 0.2 0.2 0.00 0.00 0.00
SECTOR 3 (E-197, E-22) 0.00 -
MURO CORTE 11-11 1 25.00 0.20 1.60 - 1 50.00 1.60 - REFUERZO HORIZONTAL 1 3/8 14 24.95 0.2 0.2 0.90 - 0.00
REFUERZO VERTICAL 1 3/8 202 2.15 0.2 0.2 0.00 - 0.00
TALUDES, SARDINELES, JARDINERAS,
0.00 -
MUROS DE CONTENCION (E-26 AL E-31)
SECTOR 1 (E-26, E-29) 0.00 -
MURO CORTE 2-2 1 5.50 0.20 2.40 0.00 1 11.00 2.40 0.00 REFUERZO HORIZONTAL 1 3/8 20 5.45 0.2 0.2 0.00 - 0.00
REFUERZO VERTICAL 1 3/8 23 2.75 0.2 0.2 0.00 - 0.00
REFUERZO VERTICAL 1 1/2 23 2.75 0.2 0.2 0.00 - 0.00
MURO CORTE 3-3 (lado izquierdo) 1 17.89 0.20 1.80 6.44 1 35.78 1.80 64.40 REFUERZO HORIZONTAL 1 3/8 16 17.84 0.2 0.2 0.90 19.14 306.24
REFUERZO VERTICAL 1 3/8 72 2.15 0.2 0.2 0.00 2.55 183.60
REFUERZO VERTICAL 1 1/2 72 2.15 0.2 0.2 0.00 2.55 183.60
MURO CORTE 3-3 (lado derecho) 1 22.45 0.28 4.50 13.89 1 44.90 4.50 101.03 REFUERZO HORIZONTAL 1 3/8 38 22.40 0.2 0.2 0.90 11.85 450.30
REFUERZO VERTICAL 1 3/8 91 4.85 0.2 0.2 0.00 2.63 238.88
REFUERZO VERTICAL 1 1/2 91 4.85 0.2 0.2 0.00 2.63 238.88
REFUERZO VERTICAL 1 1/2 91 2.60 0.2 0.00 1.40 127.40
MURO M-2 1 8.85 0.25 3.30 7.30 1 17.70 3.30 58.41 REFUERZO HORIZONTAL 1 3/8 28 8.80 0.2 0.2 0.45 9.65 270.20
REFUERZO VERTICAL 1 3/8 36 3.65 0.2 0.2 0.00 4.05 145.80
REFUERZO VERTICAL 1 1/2 36 3.65 0.2 0.2 0.00 4.05 145.80
MURO M-4 1 14.00 0.25 1.80 6.30 1 28.00 1.80 50.40 REFUERZO HORIZONTAL 1 3/8 16 13.95 0.2 0.2 0.45 14.80 236.80
REFUERZO VERTICAL 1 3/8 57 2.15 0.2 0.2 0.00 2.55 145.35
REFUERZO VERTICAL 1 1/2 57 2.15 0.2 0.2 0.00 2.55 145.35
MURO M-5 1 9.38 0.25 1.45 3.40 1 18.76 1.45 27.20 REFUERZO HORIZONTAL 1 3/8 14 9.33 0.2 0.2 0.45 10.18 142.52
REFUERZO VERTICAL 1 3/8 38 1.80 0.2 0.2 0.00 2.20 83.60
REFUERZO VERTICAL 1 1/2 38 1.80 0.2 0.2 0.00 2.20 83.60
MURO CORTE 4-4 (lado izquierdo) 1 5.19 0.25 4.50 5.84 1 10.38 4.50 46.71 REFUERZO HORIZONTAL 1 3/8 38 5.14 0.2 0.2 0.00 5.54 210.52
REFUERZO VERTICAL 1 3/8 22 4.85 0.2 0.2 0.00 5.25 115.50
REFUERZO VERTICAL 1 1/2 22 4.85 0.2 0.2 0.00 5.25 115.50
MURO M-2 1 34.25 0.25 3.30 28.26 1 68.50 3.30 226.05 REFUERZO HORIZONTAL 1 3/8 28 34.20 0.2 0.2 1.35 35.95 1,006.60
REFUERZO VERTICAL 1 3/8 138 3.65 0.2 0.2 0.00 4.05 558.90
REFUERZO VERTICAL 1 1/2 138 3.65 0.2 0.2 0.00 4.05 558.90
MURO CORTE 5-5 (lado izquierdo) 1 5.36 0.25 5.00 6.70 1 10.72 5.00 53.60 REFUERZO HORIZONTAL 1 3/8 42 5.31 0.2 0.2 0.00 5.71 239.82
REFUERZO VERTICAL 1 3/8 22 5.35 0.2 0.2 0.00 5.75 126.50
REFUERZO VERTICAL 1 1/2 22 5.35 0.2 0.2 0.00 5.75 126.50
MURO CORTE 10-10 (lado izquierdo) 1 42.35 0.20 2.15 0.00 1 84.70 2.15 0.00 REFUERZO HORIZONTAL 1 3/8 18 42.30 0.2 0.2 1.80 - 0.00
REFUERZO VERTICAL 1 3/8 170 2.35 0.2 0.2 0.00 - 0.00
REFUERZO VERTICAL 1 1/2 213 2.35 0.2 0.2 0.00 - 0.00
MURO CORTE 11-11 1 12.31 0.20 2.40 0.00 1 24.62 2.40 0.00 REFUERZO HORIZONTAL 1 3/8 20 12.26 0.2 0.2 0.45 - 0.00
REFUERZO VERTICAL 1 3/8 50 2.75 0.2 0.2 0.00 - 0.00
REFUERZO VERTICAL 1 1/2 50 2.75 0.2 0.2 0.00 - 0.00
MURO CORTE 18-18 (lado izquierdo) 1 14.50 0.25 3.30 11.96 1 29.00 3.30 95.70 REFUERZO HORIZONTAL 1 3/8 28 14.45 0.2 0.2 0.45 15.30 428.40
REFUERZO VERTICAL 1 3/8 59 3.65 0.2 0.2 0.00 4.05 238.95
REFUERZO VERTICAL 1 1/2 59 3.65 0.2 0.2 0.00 4.05 238.95
MURO CORTE 18-18 (lado derecho) 1 11.00 0.25 4.25 0.00 1 22.00 4.25 0.00 REFUERZO HORIZONTAL 1 3/8 36 10.95 0.2 0.2 0.45 - 0.00
75 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA Y
DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 MUROS DE CONTENCIÓN
CONCRETO F'C = 280 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
REFUERZO VERTICAL 1 3/8 45 4.60 0.2 0.2 0.00 - 0.00
REFUERZO VERTICAL 1 1/2 45 4.60 0.2 0.2 0.00 - 0.00
MURO CORTE 19-19 (lado izquierdo) 1 15.93 0.25 3.30 13.14 1 31.86 3.30 105.14 REFUERZO HORIZONTAL 1 3/8 28 15.88 0.2 0.2 0.45 16.73 468.44
REFUERZO VERTICAL 1 3/8 65 3.65 0.2 0.2 0.00 4.05 263.25
REFUERZO VERTICAL 1 1/2 65 3.65 0.2 0.2 0.00 4.05 263.25
MURO CORTE 19-19 (lado derecho) 1 10.34 0.20 2.40 0.00 1 20.68 2.40 0.00 REFUERZO HORIZONTAL 1 3/8 20 10.29 0.2 0.2 0.45 - 0.00
REFUERZO VERTICAL 1 3/8 42 2.75 0.2 0.2 0.00 - 0.00
REFUERZO VERTICAL 1 1/2 42 2.75 0.2 0.2 0.00 - 0.00
MURO CORTE 20-20 (lado izquierdo) 1 14.30 0.25 3.30 11.80 1 28.60 3.30 94.38 REFUERZO HORIZONTAL 1 3/8 28 14.25 0.2 0.2 0.45 15.10 422.80
REFUERZO VERTICAL 1 3/8 58 3.65 0.2 0.2 0.00 4.05 234.90
REFUERZO VERTICAL 1 1/2 58 3.65 0.2 0.2 0.00 4.05 234.90
MURO M-2 CORTE 23-23 1 14.12 0.25 3.30 11.65 1 28.24 3.30 93.19 REFUERZO HORIZONTAL 1 3/8 28 14.07 0.2 0.2 0.45 14.92 417.76
REFUERZO VERTICAL 1 3/8 57 3.65 0.2 0.2 0.00 4.05 230.85
REFUERZO VERTICAL 1 1/2 57 3.65 0.2 0.2 0.00 4.05 230.85
1 21.91 0.25 3.30 18.08 1 43.82 3.30 144.61 REFUERZO HORIZONTAL 1 3/8 28 21.86 0.2 0.2 0.90 23.16 648.48
REFUERZO VERTICAL 1 3/8 88 3.65 0.2 0.2 0.00 4.05 356.40
REFUERZO VERTICAL 1 1/2 88 3.65 0.2 0.2 0.00 4.05 356.40
MURO M-2 (paseo de la fama) 1 54.79 0.25 3.30 45.20 1 109.58 3.30 361.61 REFUERZO HORIZONTAL 1 3/8 28 54.74 0.2 0.2 2.70 57.84 1,619.52
REFUERZO VERTICAL 1 3/8 220 3.65 0.2 0.2 0.00 4.05 891.00
REFUERZO VERTICAL 1 1/2 220 3.65 0.2 0.2 0.00 4.05 891.00
MURO M-2 (paseo de la fama) 1 70.23 0.25 3.30 36.54 1 140.46 3.30 346.33 REFUERZO HORIZONTAL 1 3/8 28 70.18 0.2 0.2 3.15 60.46 1,692.84
REFUERZO VERTICAL 1 3/8 282 3.65 0.2 0.2 0.00 3.32 936.52
REFUERZO VERTICAL 1 1/2 282 3.65 0.2 0.2 0.00 3.50 985.70
0.00 -
SECTOR 2 (E-27, E-30) 0.00 -
MURO CORTE 6-6 1 40.80 0.20 1.40 - 1 81.60 1.40 - REFUERZO HORIZONTAL 1 3/8 12 40.75 0.2 0.2 1.80 - 0.00
REFUERZO VERTICAL 1 3/8 328 1.65 0.2 0.2 0.00 - 0.00
MURO CORTE 9-9 (lado izquierdo) 1 7.67 0.20 2.40 - 1 15.34 2.40 - REFUERZO HORIZONTAL 1 3/8 20 7.62 0.2 0.2 0.00 - 0.00
REFUERZO VERTICAL 1 3/8 62 2.75 0.2 0.2 0.00 - 0.00
MURO CORTE 10-10 1 41.45 0.20 2.40 - 1 82.90 2.40 - REFUERZO HORIZONTAL 1 3/8 20 41.40 0.2 0.2 1.80 - 0.00
REFUERZO VERTICAL 1 3/8 334 2.75 0.2 0.2 0.00 - 0.00
MURO CORTE 11-11 1 28.20 0.20 2.40 - 1 56.40 2.40 - REFUERZO HORIZONTAL 1 3/8 20 28.15 0.2 0.2 1.35 - 0.00
REFUERZO VERTICAL 1 3/8 228 2.75 0.2 0.2 0.00 - 0.00
MURO CORTE 12-12 (lado izquierdo) 1 23.03 0.20 2.40 11.05 1 46.06 2.40 110.54 REFUERZO HORIZONTAL 1 3/8 20 22.98 0.2 0.2 0.90 24.28 485.60
REFUERZO VERTICAL 1 3/8 186 2.75 0.2 0.2 0.00 3.15 585.90
MURO M-2 (paseo de la fama) 1 165.94 0.25 3.30 59.11 1 331.88 3.30 494.45 REFUERZO HORIZONTAL 1 3/8 28 165.89 0.2 0.2 8.10 95.91 2,685.61
REFUERZO VERTICAL 1 3/8 665 3.65 0.2 0.2 0.00 2.23 1,481.29
REFUERZO VERTICAL 1 1/2 665 3.65 0.2 0.2 0.00 2.39 1,591.47
MURO M-2 (paseo de la fama) 1 60.20 0.25 3.30 49.67 1 120.40 3.30 397.32 REFUERZO HORIZONTAL 1 3/8 28 60.15 0.2 0.2 2.70 63.25 1,771.00
REFUERZO VERTICAL 1 3/8 242 3.65 0.2 0.2 0.00 4.05 980.10
REFUERZO VERTICAL 1 1/2 242 3.65 0.2 0.2 0.00 4.05 980.10
0.00 -
SECTOR 3 (E-28, E-31) 0.00 -
MURO CORTE 4-4 1 21.65 0.15 1.20 1.95 1 43.30 1.20 25.98 REFUERZO HORIZONTAL 1 3/8 6 21.60 0.2 0.2 0.90 11.45 68.70
REFUERZO VERTICAL 1 3/8 86 1.75 0.2 0.2 0.00 1.08 92.45
MURO CORTE 16-16 (lado izquierdo) 1 22.19 0.20 3.07 13.62 1 44.38 3.07 136.25 REFUERZO HORIZONTAL 1 3/8 26 22.14 0.2 0.2 0.90 23.44 609.44
REFUERZO VERTICAL 1 1/2 112 3.42 0.2 0.2 0.00 3.82 427.84
76 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA Y
DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 MUROS DE CONTENCIÓN
CONCRETO F'C = 280 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
REFUERZO VERTICAL 1 3/8 90 3.42 0.2 0.2 0.00 3.82 343.80
MURO CORTE 17-17 2 15.51 0.20 3.77 23.39 2 31.02 3.77 233.89 REFUERZO HORIZONTAL 2 3/8 32 15.46 0.2 0.2 0.45 16.31 1,043.84
REFUERZO VERTICAL 2 3/8 126 4.12 0.2 0.2 0.00 4.52 1,139.04
MURO M-2 (paseo de la fama) 1 59.86 0.25 3.30 34.57 1 119.72 3.30 316.06 REFUERZO HORIZONTAL 1 3/8 28 59.81 0.2 0.2 2.70 45.30 1,268.27
REFUERZO VERTICAL 1 3/8 240 3.65 0.2 0.2 0.00 2.92 699.84
REFUERZO VERTICAL 1 1/2 240 3.65 0.2 0.2 0.00 2.92 699.84
MURO M-1 (paseo de la fama) 1 55.84 0.28 4.50 49.44 1 111.68 4.50 401.04 REFUERZO HORIZONTAL 1 3/8 38 55.79 0.2 0.2 2.70 44.17 1,678.37
REFUERZO VERTICAL 1 3/8 224 4.85 0.2 0.2 0.00 3.94 882.00
REFUERZO VERTICAL 1 1/2 224 4.85 0.2 0.2 0.00 3.94 882.00
REFUERZO VERTICAL 1 1/2 224 2.60 0.2 0.00 2.25 503.20
0.00 -
GRADERIAS (E-32 al E-34) 0.00 -
MURO DE CONTENCIÓN M-2 CORTE 0-0 1.00 15.80 0.25 2.28 9.01 1 31.60 6.35 200.66 Acero vertical 1 1/2 64 2.68 0.2 0.2 0.00 3.08 197.12
Acero vertical 1 3/8 64 2.68 0.2 0.2 0.00 3.08 197.12
Acero horizontal 1 3/8 20 15.80 0.2 0.2 0.45 16.65 333.00
MURO DE CONTENCIÓN M-2 CORTE 1-1 1.00 8.35 0.25 2.73 5.70 1 16.70 6.35 106.05 Acero vertical 1 1/2 34 3.13 0.2 0.2 0.00 3.53 120.02
Acero vertical 1 3/8 34 3.13 0.2 0.2 0.00 3.53 120.02
Acero horizontal 1 3/8 24 8.35 0.2 0.2 0.00 8.75 210.00
MURO DE CONTENCIÓN M-2 CORTE 2-2 1.00 3.92 0.25 2.73 2.68 1 7.84 6.35 49.78 Acero vertical 1 1/2 17 3.13 0.2 0.2 0.00 3.53 60.01
Acero vertical 1 3/8 17 3.13 0.2 0.2 0.00 3.53 60.01
Acero horizontal 1 3/8 24 3.92 0.2 0.2 0.00 4.32 103.68
MURO DE CONTENCIÓN M-1 CORTE 2a-2a 1.00 4.24 0.25 3.93 4.17 1 8.48 6.35 53.85 Acero vertical 1 1/2 18 4.33 0.2 0.2 0.00 4.73 85.14
Acero vertical 1 1/2 18 4.33 0.2 0.2 0.00 4.73 85.14
Acero vertical 1 3/8 18 4.33 0.2 0.2 0.00 4.73 85.14
Acero horizontal 1 3/8 34 4.24 0.2 0.2 0.00 4.64 157.76
MURO DE CONTENCIÓN M-2 CORTE 3-3 1.00 7.66 0.25 2.73 5.23 1 15.32 6.35 97.28 Acero vertical 1 1/2 32 3.13 0.2 0.2 0.00 3.53 112.96
Acero vertical 1 3/8 32 3.13 0.2 0.2 0.00 3.53 112.96
Acero horizontal 1 3/8 24 7.66 0.2 0.2 0.00 8.06 193.44
MURO DE CONTENCIÓN M-1 CORTE 3a-3a 1.00 4.24 0.25 3.93 4.17 1 8.48 6.35 53.85 Acero vertical 1 1/2 18 4.33 0.2 0.2 0.00 4.73 85.14
Acero vertical 1 1/2 18 4.33 0.2 0.2 0.00 4.73 85.14
Acero vertical 1 3/8 18 4.33 0.2 0.2 0.00 4.73 85.14
Acero horizontal 1 3/8 34 4.24 0.2 0.2 0.00 4.64 157.76
MURO DE CONTENCIÓN M-2 CORTE 4-4 1.00 9.33 0.25 2.73 6.37 1 18.66 6.35 118.49 Acero vertical 1 1/2 38 3.13 0.2 0.2 0.00 3.53 134.14
Acero vertical 1 3/8 38 3.13 0.2 0.2 0.00 3.53 134.14
Acero horizontal 1 3/8 24 9.33 0.2 0.2 0.45 10.18 244.32 |
MURO DE CONTENCIÓN M-2 CORTE 5-5 1.00 12.88 0.25 3.00 9.66 1 25.76 6.35 163.58 Acero vertical 1 1/2 53 3.40 0.2 0.2 0.00 3.80 201.40
Acero vertical 1 3/8 53 3.40 0.2 0.2 0.00 3.80 201.40
Acero horizontal 1 3/8 26 12.88 0.2 0.2 0.45 13.73 356.98
77 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA
Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 COLUMNAS METRADO : CLAUSTRO SAC
FECHA : dic 2018
CONCRETO F'C = 210 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
0.00 0.00
CASETAS (E-12 AL E-16) 0.00 0.00
GARITA 01 0.00 0.00
Columna C1 2 0.25 0.25 3.20 0.00 2 1.00 3.20 0.00 vertical 2 5/8 4 0.4 4.4 0.00 0.00 0.00
estribos 1 3/8 32 0.25 0.25 0.00 0.00 0.00
0.00 0.00
Columnas C2 1 0.25 0.45 3.20 0.00 1 1.70 3.20 0.00 Vertical 1 5/8 6 0.40 4.4 0.00 0.00 0.00
estribos 1 3/8 32 0.67 0.22 0.52 0.35 0.00 0.00 0.00
0.00 0.00
Columnas C3 1 0.25 0.25 3.20 0.00 1 1.00 3.20 0.00 Vertical 1 5/8 5 0.4 4.4 0.00 0.00 0.00
estribos 1 3/8 32 0.45 0.34 0.18 0.00 0.00 0.00
0.00 0.00
Columnas C4 1 1.19 0.25 3.20 0.00 1 2.90 3.20 0.00 Vertical 1 5/8 8 0.4 4.4 0.00 0.00 0.00
Vertical 1 1/2 4 0.4 4.4 0.00 0.00 0.00
estribo largo 1 3/8 32 0.25 1.2 0.25 1.2 0.00 0.00 0.00
estribo corto 2 3/8 32 0.25 0.25 0.25 0.25 0.00 0.00 0.00
0.00 0.00
Columnas C6 1 1.00 0.25 3.20 0.00 1 2.50 3.20 0.00 Vertical 1 5/8 12 0.4 4.4 0.00 0.00 0.00
Vertical 1 1/2 4 0.4 4.4 0.00 0.00 0.00
estribo largo 1 3/8 32 0.25 1 0.25 1 0.00 0.00 0.00
estribo corto 2 3/8 32 0.25 0.25 0.25 0.25 0.00 0.00 0.00
0.00 0.00
Columnas C7 1 1.50 0.50 3.20 0.00 1 4.00 3.20 0.00 Vertical 1 5/8 12 0.4 4.4 0.00 0.00 0.00
Vertical 1 1/2 6 0.4 4.4 0.00 0.00 0.00
estribo largo 1 3/8 32 0.50 1.5 0.5 1.5 0.00 0.00 0.00
estribo corto 2 3/8 32 0.30 0.5 0.3 0.5 0.00 0.00 0.00
0.00 0.00
GARITA 02 0.00 0.00
Columna C1 7 0.15 0.40 3.20 1.34 7 1.10 3.20 24.64 Vertical 7 5/8 4 0.4 4.4 0.00 4.80 134.40
estribo 7 3/8 32 0.40 0.15 0.11 0.11 0.00 0.77 172.48
0.00 0.00
Columna C2 1 0.70 0.30 3.20 0.67 1 2.00 3.20 6.40 Vertical 1 5/8 7 0.4 4.4 0.00 4.80 33.60
estribo largo 1 3/8 32 2.00 0.11 0.11 0.00 2.22 71.04
estribo corto 1 3/8 32 2.00 0.11 0.11 0.00 2.22 71.04
0.00 0.00
GARITA 03 0.00 0.00
Columna C1 5 0.15 0.40 3.20 0.96 5 1.10 3.20 17.60 Vertical 5 1/2 4 0.4 4.4 0.00 4.80 96.00
estribo 5 3/8 32 0.40 0.15 0.11 0.11 0.00 0.77 123.20
0.00 0.00
Columna C2 2 0.15 0.25 3.20 0.24 2 0.80 3.20 5.12 Vertical 2 1/2 4 0.4 4.4 0.00 4.80 38.40
estribo 2 3/8 32 0.25 0.15 0.11 0.11 0.00 0.62 39.68
0.00 0.00
Columna C3 2 0.15 0.50 3.20 0.48 2 1.30 3.20 8.32 Vertical 2 1/2 4 0.4 4.4 0.00 4.80 38.40
estribo 2 3/8 32 0.20 0.15 0.11 0.11 0.00 0.57 36.48
78 de 86
0.00 0.00
GARITA 04 0.00 0.00
Columna C1 4 0.30 0.30 2.10 0.00 4 1.20 2.10 0.00 Vertical 6 1/2 4 0.2 2.8 0.2 0.00 0.00 0.00
estribo 6 3/8 24 0.40 0.15 0.11 0.11 0.00 0.00 0.00
0.00 0.00
79 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA, PRONVINCIA
Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 PLACAS METRADO : CLAUSTRO SAC
FECHA : dic 2018
CONCRETO F'C = 210 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
80 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 PARAPETOS METRADO : CLAUSTRO SAC
FECHA : dic 2018
CONCRETO F'C = 210 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
81 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 PARAPETOS METRADO : CLAUSTRO SAC
FECHA : dic 2018
CONCRETO F'C = 210 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
MURETE 3 (CORTE 17-17) 1.00 13.95 0.15 1.45 0.00 1 27.90 1.45 0.00 Acero Longitudinal 1 3/8 12 13.95 0.45 0.00 0.00
1.00 13.95 0.80 0.25 0.00 1 27.90 0.25 0.00 Acero Transversal 1 1/2 70 2.50 0.00 0.00 0.00
espejo de agua (CORTE 21-21) 1.00 30.67 0.15 0.80 0.00 1 61.34 0.80 0.00 Acero Longitudinal 1 1/2 12 30.67 1.95 0.00 0.00
1.00 15.34 1.15 0.15 0.00 1 30.67 0.15 0.00 Acero Transversal 1 1/2 123 2.85 0.00 0.00 0.00
0.00 0.00
SECTOR 2 0.00 0.00
MURETE 1 (CORTE 5-5) 1.00 31.22 0.15 0.95 4.45 1 62.44 0.95 59.32 Acero Longitudinal 1 3/8 7 31.22 1.35 32.57 227.99
1.00 31.22 0.40 0.25 3.12 1 62.44 0.25 15.61 Acero Transversal 1 1/2 156 1.60 0.00 1.60 249.60
MURETE 1 (CORTE 7-7) 1.00 24.61 0.15 0.95 3.51 1 49.22 0.95 46.76 Acero Longitudinal 1 3/8 7 24.61 0.90 25.51 178.57
1.00 24.61 0.25 0.25 1.54 1 49.22 0.25 12.31 Acero Transversal 1 1/2 123 1.60 0.00 1.60 196.80
MURETE 1 (CORTE 8-8) 1.00 25.58 0.15 0.95 0.00 1 51.16 0.95 0.00 Acero Longitudinal 1 3/8 7 25.58 0.90 0.00 0.00
1.00 25.58 0.25 0.25 0.00 1 51.16 0.25 0.00 Acero Transversal 1 1/2 128 1.60 0.00 0.00 0.00
MURETE 3 (CORTE 10-10) 1.00 41.38 0.15 1.45 0.00 1 82.76 1.45 0.00 Acero Longitudinal 1 3/8 12 41.38 1.80 0.00 0.00
1.00 41.38 0.80 0.25 0.00 1 82.76 0.25 0.00 Acero Transversal 1 1/2 207 2.50 0.00 0.00 0.00
MURETE 3 (CORTE 12-12) 1.00 23.03 0.15 1.15 3.97 1 46.06 1.15 52.97 Acero Longitudinal 1 3/8 9 23.03 0.90 23.93 215.37
1.00 23.03 0.60 0.25 3.45 1 46.06 0.25 11.52 Acero Transversal 1 1/2 115 2.50 0.00 2.50 287.50
0.00 0.00
SECTOR 3 0.00 0.00
MURETE 1 (CORTE 7-7) 1.00 19.48 0.15 0.95 0.00 1 38.96 0.95 0.00 Acero Longitudinal 1 3/8 7 19.48 0.90 0.00 0.00
1.00 19.48 0.40 0.25 0.00 1 38.96 0.25 0.00 Acero Transversal 1 1/2 78 1.60 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MURETE 1 (CORTE 8-8) 1.00 53.45 0.15 0.95 0.00 1 106.90 0.95 0.00 Acero Longitudinal 1 3/8 7 53.45 2.25 0.00 0.00
1.00 53.45 0.40 0.25 0.00 1 106.90 0.25 0.00 Acero Transversal 1 1/2 214 1.60 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MURETE 1 (CORTE 10-10) 1.00 1.75 0.15 0.95 0.00 1 3.50 0.95 0.00 Acero Longitudinal 1 3/8 7 1.75 0.00 0.00 0.00
1.00 1.75 0.40 0.25 0.00 1 3.50 0.25 0.00 Acero Transversal 1 1/2 7 1.60 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MURETE 2 (CORTE 11-11) 1.00 11.50 0.15 1.15 0.00 1 23.00 1.15 0.00 Acero Longitudinal 1 3/8 9 11.50 0.45 0.00 0.00
1.00 11.50 0.60 0.25 0.00 1 23.00 0.25 0.00 Acero Transversal 1 1/2 46 2.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MURETE 3 (CORTE 12-12) 1.00 5.00 0.15 1.15 0.00 1 10.00 1.15 0.00 Acero Longitudinal 1 3/8 12 5.00 0.00 0.00 0.00
1.00 5.00 0.60 0.25 0.00 1 10.00 0.25 0.00 Acero Transversal 1 1/2 20 2.50 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MURETE 1 (CORTE 15-15) 1.00 2.15 0.15 1.20 0.39 1 4.30 1.20 5.16 Acero Longitudinal 1 3/8 9 2.15 0.00 2.15 19.35
1.00 2.15 0.60 0.25 0.32 1 4.30 0.25 1.08 Acero Transversal 1 1/2 9 1.60 0.00 1.60 14.40
0.00 0.00
MURETE 3 (CORTE 16-16) lado derecho 1.00 22.19 0.15 1.65 5.49 1 44.38 1.65 73.23 Acero Longitudinal 1 3/8 12 22.19 0.90 23.09 277.08
1.00 22.19 0.80 0.25 4.44 1 44.38 0.25 11.10 Acero Transversal 1 1/2 111 2.70 0.00 2.70 299.70
0.00 0.00
82 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 SARDINELES METRADO : CLAUSTRO SAC
FECHA : dic 2018
CONCRETO F'C = 210 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
EXTERIORES
PLANOS DE SARDINELES, JARDINERAS,
MUROS DE CONTENCION (E-26 AL E-31)
SECTOR 1
CORTE 2-2 (SARDINEL) 1 3.30 0.15 0.55 0.00 1 6.60 0.55 0.00 REFUERZO HORIZONTAL 1 3/8 5 3.25 0.00 0.00 0.00
1 3.30 0.25 0.25 0.00 1 6.60 0.25 0.00 REFUERZO VERTICAL 1 3/8 17 1.05 0.00 0.00 0.00
1 2.02 0.15 0.65 0.00 1 4.04 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 4 1.97 0.00 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 10 0.60 0.00 0.00 0.00
CORTE 4-4 (SARDINEL) 1 5.19 0.15 0.65 0.00 1 10.38 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 4 5.14 0.00 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 26 0.60 0.00 0.00 0.00
CORTE 5-5 (SARDINEL) 1 5.22 0.15 0.40 0.00 1 10.44 0.40 0.00 REFUERZO HORIZONTAL 1 3/8 2 5.17 0.00 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 26 0.35 0.00 0.00 0.00
CORTE 8-8(SARDINEL) 1 1.85 0.15 0.40 0.00 1 3.70 0.40 0.00 REFUERZO HORIZONTAL 1 3/8 2 1.80 0.00 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 9 0.35 0.00 0.00 0.00
CORTE 8-8 (SARDINEL) 1 1.85 0.15 0.65 0.00 1 3.70 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 4 1.80 0.00 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 9 0.60 0.00 0.00 0.00
CORTE 9-9, 12-12, 13-13 (SARDINEL) 1 39.86 0.15 0.55 0.00 1 79.72 0.55 0.00 REFUERZO HORIZONTAL 1 3/8 5 39.81 1.80 0.00 0.00
1 39.86 0.25 0.25 0.00 1 79.72 0.25 0.00 REFUERZO VERTICAL 1 3/8 199 1.05 0.00 0.00 0.00
CORTE 11-11 (SARDINEL) 1 2.59 0.15 0.55 0.00 1 5.18 0.55 0.00 REFUERZO HORIZONTAL 1 3/8 5 2.54 0.00 0.00 0.00
1 2.59 0.25 0.25 0.00 1 5.18 0.25 0.00 REFUERZO VERTICAL 1 3/8 13 1.05 0.00 0.00 0.00
CORTE 14-14 (SARDINEL) 1 17.59 0.20 0.50 0.00 1 35.18 0.50 0.00 REFUERZO HORIZONTAL 1 3/8 3 17.54 0.45 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 88 0.45 0.00 0.00 0.00
CORTE 15-15 (SARDINEL) 1 34.41 0.20 0.65 0.00 1 68.82 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 4 34.36 1.35 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 172 0.60 0.00 0.00 0.00
CORTE 2-2 (SARDINEL) lado derecho 1 12.80 0.15 0.55 0.00 1 25.60 0.55 0.00 REFUERZO HORIZONTAL 1 3/8 5 12.75 0.45 0.00 0.00
1 12.80 0.25 0.25 0.00 1 25.60 0.25 0.00 REFUERZO VERTICAL 1 3/8 64 1.05 0.00 0.00 0.00
SECTOR 2 0.00 0.00 0.00 0.00
CORTE 1-1 (SARDINEL) 1 22.60 0.15 0.65 0.00 1 45.20 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 5 22.55 0.90 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 113 0.60 0.00 0.00 0.00
CORTE 2-2 (SARDINEL) lado derecho 1 44.97 0.15 0.55 0.00 1 89.94 0.55 0.00 REFUERZO HORIZONTAL 1 3/8 5 44.92 1.80 0.00 0.00
1 44.97 0.25 0.25 0.00 1 89.94 0.25 0.00 REFUERZO VERTICAL 1 3/8 225 1.05 0.00 0.00 0.00
CORTE 2-2 (SARDINEL) lado izquierdo 1 45.73 0.15 0.65 0.00 1 91.46 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 4 45.68 2.25 0.00 0.00
0.00 REFUERZO VERTICAL 1 3/8 229 0.60 0.00 0.00 0.00
CORTE 3-3 (SARDINEL) 1 20.75 0.15 0.55 0.00 1 41.50 0.55 0.00 REFUERZO HORIZONTAL 1 3/8 5 20.70 0.90 0.00 0.00
1 20.75 0.25 0.25 0.00 1 41.50 0.25 0.00 REFUERZO VERTICAL 1 3/8 104 1.05 0.00 0.00 0.00
CORTE 4-4 (SARDINEL) 1 19.55 0.15 0.65 0.00 1 39.10 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 4 19.50 0.90 0.00 0.00
REFUERZO VERTICAL 1 3/8 98 0.60 0.00 0.00 0.00
CORTE 5-5 (SARDINEL) 1 29.96 0.15 0.55 2.47 1 59.92 0.55 32.96 REFUERZO HORIZONTAL 1 3/8 5 29.91 1.35 31.26 156.30
1 29.96 0.25 0.25 1.87 1 59.92 0.25 14.98 REFUERZO VERTICAL 1 3/8 150 1.05 0.00 1.05 157.50
CORTE 7-7 (SARDINEL) 1 43.96 0.15 0.50 3.30 1 87.92 0.50 43.96 REFUERZO HORIZONTAL 1 3/8 3 43.91 1.80 45.71 137.13
REFUERZO VERTICAL 1 3/8 220 0.45 0.00 0.45 99.00
SARDINEL SKATE 1 44.44 0.15 0.50 0.00 1 88.88 0.50 0.00 REFUERZO HORIZONTAL 1 3/8 3 44.39 1.80 0.00 0.00
83 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 SARDINELES METRADO : CLAUSTRO SAC
FECHA : dic 2018
CONCRETO F'C = 210 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
0.00 0.00 REFUERZO VERTICAL 1 3/8 222 0.45 0.00 0.00 0.00
SARDINEL ESTACIONAMIENTO 02 1 47.43 0.15 0.50 0.00 1 94.86 0.50 0.00 REFUERZO HORIZONTAL 1 3/8 3 47.38 2.25 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 237 0.45 0.00 0.00 0.00
CORTE 8-8 (SARDINEL) 1 19.18 0.15 0.55 0.00 1 38.36 0.55 0.00 REFUERZO HORIZONTAL 1 3/8 5 19.13 0.90 0.00 0.00
1 19.18 0.25 0.25 0.00 1 38.36 0.25 0.00 REFUERZO VERTICAL 1 3/8 96 1.05 0.00 0.00 0.00
CORTE 9-9 (SARDINEL) 1 10.64 0.15 0.50 0.00 1 21.28 0.50 0.00 REFUERZO HORIZONTAL 1 3/8 3 10.59 0.45 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 53 0.45 0.00 0.00 0.00
CORTE 10-10 (SARDINEL) 1 37.22 0.15 0.50 0.00 1 74.44 0.50 0.00 REFUERZO HORIZONTAL 1 3/8 3 37.17 1.80 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 186 0.45 0.00 0.00 0.00
CORTE 11-11 (SARDINEL) 1 30.39 0.20 0.65 0.00 1 60.78 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 5 30.34 1.35 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 152 0.60 0.00 0.00 0.00
CORTE SN (SARDINEL) 1 91.46 0.15 0.65 0.00 1 182.92 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 5 91.41 4.50 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 457 0.60 0.00 0.00 0.00
SECTOR 3 0.00 0.00 0.00 0.00
CORTE 1-1 y 2-2 (SARDINEL) 1 28.00 0.15 0.40 0.00 1 56.00 0.40 0.00 REFUERZO HORIZONTAL 1 3/8 2 27.95 1.35 0.00 0.00
0.00 REFUERZO VERTICAL 1 3/8 140 0.35 0.00 0.00 0.00
CORTE 3-3 (SARDINEL) 1 9.11 0.15 0.65 0.00 1 18.22 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 5 9.06 0.45 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 46 0.60 0.00 0.00 0.00
1 5.24 0.15 0.40 0.00 1 10.48 0.40 0.00 REFUERZO HORIZONTAL 1 3/8 2 5.19 0.00 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 26 0.35 0.00 0.00 0.00
CORTE 4-4 (SARDINEL) 1 91.08 0.15 0.50 0.00 1 182.16 0.50 0.00 REFUERZO HORIZONTAL 1 3/8 3 91.03 4.50 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 455 0.45 0.00 0.00 0.00
CORTE 5-5 (SARDINEL) 1 34.58 0.15 0.65 0.00 1 69.16 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 5 34.53 1.35 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 173 0.60 0.00 0.00 0.00
1 36.65 0.15 0.40 0.00 1 73.30 0.40 0.00 REFUERZO HORIZONTAL 1 3/8 2 36.60 1.80 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 183 0.35 0.00 0.00 0.00
CORTE 6-6 (SARDINEL) 1 27.94 0.15 0.50 0.00 1 55.88 0.50 0.00 REFUERZO HORIZONTAL 1 3/8 3 27.89 1.35 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 140 0.45 0.00 0.00 0.00
CORTE 9-9 (SARDINEL) 1 24.36 0.15 0.50 0.00 1 48.72 0.50 0.00 REFUERZO HORIZONTAL 1 3/8 3 24.31 0.90 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 122 0.45 0.00 0.00 0.00
CORTE 10-10 (SARDINEL) 1 2.51 0.15 0.55 0.00 1 5.02 0.55 0.00 Acero Longitudinal 1 3/8 5 2.51 0.00 0.00 0.00
1 2.51 0.25 0.25 0.00 1 5.02 0.25 0.00 Acero Transversal 1 3/8 13 1.05 0.00 0.00 0.00
1 3.09 0.15 0.55 0.00 1 6.18 0.55 0.00 Acero Longitudinal 1 3/8 5 3.09 0.00 0.00 0.00
1 3.09 0.25 0.25 0.00 1 6.18 0.25 0.00 Acero Transversal 1 3/8 15 1.05 0.00 0.00 0.00
1 1.55 0.15 0.65 0.00 1 3.10 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 5 1.50 0.00 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 8 0.60 0.00 0.00 0.00
CORTE 11-11 (SARDINEL) 1 14.02 0.15 0.40 0.00 1 28.04 0.40 0.00 REFUERZO HORIZONTAL 1 3/8 2 13.97 0.45 0.00 0.00
0.00 REFUERZO VERTICAL 1 3/8 70 0.35 0.00 0.00 0.00
CORTE 12-12 (SARDINEL) 1 30.87 0.15 0.40 0.00 1 61.74 0.40 0.00 REFUERZO HORIZONTAL 1 3/8 2 30.82 1.35 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 154 0.35 0.00 0.00 0.00
CORTE 13-13 (SARDINEL) 1 10.18 0.15 0.40 0.00 1 20.36 0.40 0.00 REFUERZO HORIZONTAL 1 3/8 2 10.13 0.45 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 51 0.35 0.00 0.00 0.00
CORTE 14-14 (SARDINEL) 1 27.87 0.15 0.40 0.00 1 55.74 0.40 0.00 REFUERZO HORIZONTAL 1 3/8 2 27.82 1.35 0.00 0.00
0.00 0.00 REFUERZO VERTICAL 1 3/8 139 0.35 0.00 0.00 0.00
CORTE 15-15 (SARDINEL) 1 2.46 0.15 0.55 0.00 1 4.92 0.55 0.00 Acero Longitudinal 1 3/8 5 2.46 0.00 0.00 0.00
84 de 86
COBRA
PROYECTO : "CREACIÓN DEL CENTRO DE ALTO RENDIMIENTO DE SURF EN LA PLAYA DE PUNTA ROCAS, DISTRITO DE PUNTA NEGRA,
PRONVINCIA Y DEPARTAMENTO DE LIMA"
FORMULA : 01 ESTRUCTURAS
PARTIDA : 0 SARDINELES METRADO : CLAUSTRO SAC
FECHA : dic 2018
CONCRETO F'C = 210 KG/CM2 ENCOFR. Y DESENCOFR. NORMAL ACERO FY = 4,200 KG/CM2 LONGITUD TOTAL
DESCRIPCION TOTAL Nª DE TOTAL Nª DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
CANT. LARGO ANCHO ALTO LARGO ALTO DIAM. CANT. LONG.
(M3) VECES (M2) ELEMENTOS DE ACERO VECES a b c d Lemp. 0.250 0.560 0.994 1.552 2.235 3.973
1 2.46 0.25 0.25 0.00 1 4.92 0.25 0.00 Acero Transversal 1 3/8 12 1.05 0.00 0.00 0.00
1 2.45 0.15 0.55 0.00 1 4.90 0.55 0.00 Acero Longitudinal 1 3/8 5 2.45 0.00 0.00 0.00
1 2.45 0.25 0.25 0.00 1 4.90 0.25 0.00 Acero Transversal 1 3/8 12 1.05 0.00 0.00 0.00
1 2.48 0.15 0.55 0.00 1 4.96 0.55 0.00 Acero Longitudinal 1 3/8 5 2.48 0.00 0.00 0.00
1 2.48 0.25 0.25 0.00 1 4.96 0.25 0.00 Acero Transversal 1 3/8 12 1.05 0.00 0.00 0.00
1 2.49 0.15 0.55 0.00 1 4.98 0.55 0.00 Acero Longitudinal 1 3/8 5 2.49 0.00 0.00 0.00
1 2.49 0.25 0.25 0.00 1 4.98 0.25 0.00 Acero Transversal 1 3/8 12 1.05 0.00 0.00 0.00
1 2.48 0.15 0.65 0.00 1 4.96 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 5 2.43 0.00 0.00 0.00
0.00 REFUERZO VERTICAL 1 3/8 12 0.60 0.00 0.00 0.00
SIN CORTE (SARDINEL) 1 23.20 0.15 0.65 0.00 1 46.40 0.65 0.00 REFUERZO HORIZONTAL 1 3/8 5 23.15 0.90 0.00 0.00
REFUERZO VERTICAL 1 3/8 116 0.60 0.00 0.00 0.00
85 de 86
COBRA
PARTIDA : 05.08
JUNTAS DE DILATACION EN MUROS DE CONTENCION
DIMENSIONES
TOTAL
DESCRIPCIÓN CANTIDAD
( M)
LARGO ANCHO ALTO
TOTAL 134.10