PROYECTO: SERVICIO DE GESTIÓN, MEJORAMIENTO Y CONSERVACIÓN VIAL POR NIVELES DE SERVICIO

CORREDOR: AP-107; AP-108 y AP-109


UBICACIÓN: PERÚ - APURÍMAC - AYMARAES - CARAYBAMBA

CONTROL DE SUSTENTO
EMPRESA: CASTELLO LOPEZ ALLISON RUC: 10722388815

PERIODO: Del : 21/02/2023 Al : 20/03/2023 FECHA: 01/04/2023

O.S. OCT-01208

DESCRIPCIÓN CANTIDAD UND P.U. TOTAL

CAMION VOLQUETE C2M 701 130.60 HM 101.69 S/. 13,281.36

CANTIDAD P.U. SUBTOTAL


SUBTOTAL 130.60 101.69 13,281.36
SUBTOTAL -

SUBTOTAL 13,281.36

SUBTOTAL S/. 13,281.36


IMPUESTO GENERAL A LAS VENTAS S/. 2,390.64
MONTO TOTAL S/. 15,672.00 (1)
DESCUENTOS
DESCUENTO POR COMBUSTIBLE S/. 0.00
DESCUENTO DE REAJUSTE POR EPP'S S/. 0.00
DESCUENTO POR SERVICIO MECANICO S/. 0.00
DESCUENTO POR RRHH (OPERADOR) S/. 0.00
--------------------
TOTAL DESCUENTOS S/. 0.00 (2)

SUB TOTAL S/. 13,281.36


IGV (18%) S/. 2,390.64
TOTAL A FACTURAR S/. 15,672.00 (1) - (2)

Oficina Técnica
CONTROL DE EQUIPOS DE PRODUCCIÓN Y AUXILIARES - CONSORCIO TINTAY

EMPRESA: CASTELLO LOPEZ ALLISON RUC: 10722388815

DESCRIPCIÓN: CAMION VOLQUETE C2M 701 PERIODO: Del 21-Feb Al 20-Mar


UNIDAD DE VAL: HR

FECHA 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar

Horometro inicial 19,820.40 19,825.50 19,834.90 19,844.30 - 19,854.70 19,854.70 19,861.20 19,869.50 19,877.30 19,885.10

Horometro final 19,825.50 19,834.90 19,844.30 19,849.30 - 19,854.70 19,861.20 19,869.50 19,877.30 19,885.10 19,893.80

Total Horas / día 5.1 9.4 9.4 5.0 0.0 0.0 6.5 8.3 7.8 7.8 8.7

Total Horas Efectivas / día 5.1 9.4 9.4 5.0 0.0 0.0 6.5 8.3 7.8 7.8 8.7

FECHA 4-Mar 5-Mar 6-Mar 7-Mar 8-Mar 9-Mar 10-Mar 11-Mar 12-Mar 13-Mar 14-Mar

Horometro inicial 19,893.80 19,899.40 19,899.40 19,899.40 19,909.60 - 19,917.70 19,921.90 19,927.40 19,930.20 19,940.20

Horometro final 19,899.40 19,899.40 19,899.40 19,909.60 19,917.70 - 19,921.90 19,927.40 19,927.40 19,940.20 19,952.00

Total Horas / día 5.6 0.0 0.0 10.2 8.1 0.0 4.2 5.5 0.0 10.0 11.8

Total Horas Efectivas / día 5.6 0.0 0.0 10.2 8.1 0.0 4.2 5.5 0.0 10.0 11.8

FECHA 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar

Horometro inicial 19,952.00 - - - - -

Horometro final 19,959.20 - - - - -

Total Horas / día 7.2 0.0 0.0 0.0 0.0 0.0

Total Horas efectivos / día 7.2 0.0 0.0 0.0 0.0 0.0

RESUMEN PRODUCCIÓN RESUMEN

Horometro inicial 19,820.4 HORAS MÍNIMAS MES 150

Horometro final 19,959.2 HORAS MÍNIMAS PERIODO 112.50

Total Horas efectivos / mes 130.600 HORAS EFECTIVAS PERIODO 130.60

DÍAS TRABAJADOS 21.0 HORAS A VALORIZAR 130.60

DÍAS DESCONTADOS 0.0

DÍAS EFECTIVOS TRABAJO 21.0 VALORIZACIÓN (HR) 130.60

DESCUENTO POR SOPLETEO 0.00

(*) Ingreso de equipo


(**) falta parte diario en fisico

ATENCION: Se esta detectando horas excesivas en los Partes Diarios para un determinado recorrido y altos consumo de combustible (RATIOS), se le hace saber a los preveedore de no dar alguna justificacion se le
procedera ha realizar el descuento respectivo en la proximas valorizaciones por: horas efectivas y Ratios de combustible establecidos.