Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Book 1
Book 1
Fabricacion CHHGF
EMPRESA LA EÑEGANCIA
3 HOJA TECNICA DE COSTO ESTÁNDAR DE FABRICACIÓN DE UN PAR DE TENIS
HH
COSTO 5
SUMA DE VARIACIONES
2,000
1,750 3,750
10 20,000
10 17,500 37,500
37,500
18,750 HORAS
2 HORAS
160
140 300
10 1600 horas fabrica
10 1,400 3,000
1,400
0.5 50 1,450
3,000 1,450 2
49,816 3,000.00 16.61
15,000.00 3,000 5.00
ÓN DE UN PAR DE TENIS
COSTO COSTO TOTAL
ESTANDAR
80.00 140.00
1.00 7.00
30.00 1.50
1.50 1.50
150.00
16.50 33.00
5.25 10.50
ESTANDAR DE PRODUCCION D 193.50
LEGANCIA, S.A
ARIACIONES
COSTO STD
VARIACIONES O VARIACIONES
REAL DIFERENCIA CONSUMO REAL
TIEMPO REAL DES FAV FAVORABLES
COSTO STD
2,625 -10.00 80.00 -800.00
10,550 -50.00 0.10 -50.00
75 0.50 30.00 -15.00
1,550 -50.00 1.50 1,317.50
COMSUMO REAL
80.50 -0.50 2,635 527.50
0.95 0.05 10,550 149.00
32.00 -2.00 75 15.5
1.49 0.01 1,550
COSTO STA
3000 -100.00 16.50 1,650.00
17 -0.11 3000.00
COSTO STD
3000.00 -100.00 5.25 -330.00
TIEMPO REAL
5 0.25 3000.00 -525.00 750.00
-4,896.50 1,308.00
-3,588.50
296,736
232,200
64,536
-925
-1466.5
-1650
-330
-525 -4896.5
15
543
750.00 1,308
EN EL EJE BUSC 60,948
-18,742
42,206