2 TRABAJOS PRELIMINARES 791,689.12
3 MOVIMIENTO DE TIERRAS 2,844,507.44
VEREDAS Y JARDIN MOVIMIENTO TIERRA 657,812.72
MARTILLO 395,976.23
RAMPAS 26,120.90
VEREDAS DE CONCRETO 1,577,153.32
JARDINERA 187,444.27
4 MURO PARA VEREDAS 8,954.44
MOVIMIENTO DE TIERRAS 8,954.44
5 OBRAS DE CONCRETO SIMPLE 85.64
ZAPATAS 85.64
6 OBRAS DE CONCRETO ARMADO 160,425.89
ZAPATAS 11,988.28
MURO DE CONCRETO PANTALLA 49,029.59
LOSAS MACIZA 38,859.16
SEÑALIZACION 19,486.10
BASUREROS 32,342.76
VARIOS 8,620.00
PRUEBAS Y/O CONTROL DE CALIDAD DE OBRA 100.00
3,814,100.00
162022.968
PISTA VEREDA
SEÑALIZACION MURO DE
CALZADA VEREDA SARDINELES AREAS VERDES
VERTICAL CONTENCION
8,437.47
197,922.28 LA CUARTA PARTE
328,906.36 LA MITAD
197,988.12 LA MITAD
13,060.45 LA MITAD
788,576.66 LA MITAD
187,444.27
8,954.44
85.64
11,988.28
49,029.59
38,859.16
8791.8 10,694.30
8,620.00
100.00
60 9,829.78 6,185.76 1
598.94
598.94
21854.1667 21854.1667
189180.158
15,178,899.90 12,402,977.8
1050495.1 x
x 13029267420517.5 858380.218920728
15,178,899.90
prcio social 12,402,977.8 858380.219
Valor actual de los costos sociales (VACS) S/ 11,579,073.60 S/ 9,461,488.90 S/143,614,993,001,294.00
Costo Anual Equivalente (CAE) 0 S/9,461,488.90 S/9,939,247,732,862.22
Costo por capacidad de producción 638.62 521.828969 S/0.00
Costo por beneficiario directo 30153.84 S/ 24,639.29 7920789692.48966 S/6,042,296,044.18
521.828969413713 S/15,735,147.25
S/0.00
S/ 30,153.84 S/ 24,639.29
S/801,359.79