Poste Exvacacion

Volumen de
Volumen Volumen
Tipo de Total a Concreto Volumen
Altura Ø Base Ø de Emp Volumen Altura Diametro Volumen Piedra Cemento
Estructura Concretar (m3) Cemento (m3) (Bls)
es la 9 parte
(m) (m) (m) (m3) (m) (m) (m) (m3) 30% por ser 1:8
Postes FVR 8/300 1.3 0.27 0.2505 0.069186 1.3 0.7 0.50029863 0.43111269 0.12933381 0.30177888 0.033530987 1.18400378
h R r h
1.3 0.135 0.12525 1.3 0.35

Volumen Postes= 0.069186 Volumen 0.50029863 Bolsa cemento 425 Kg= 0.02832 m3
Volumen Cemento (Bls) 1.184 Bls

Poste Exvacacion Volumen de Volumen


Volumen Volumen
Tipo de Total a Concreto Cemento (m3)
Altura Ø Base Ø de Emp Volumen Altura Diametro Volumen Piedra Cemento
Estructura Concretar (m3) es la 9 parte
(Bls)
(m) (m) (m) (m3) (m) (m) (m) (m3) 30% por ser 1:8
Postes FVR 8/300 0.1 0.7 0.03848451 0.03848451 0.03848451 0.004276057 0.1509907
h R r h
0.1 0 0 0.1 0.35

Volumen Postes= 0 Volumen 0.03848451 Bolsa cemento 425 Kg= 0.02832 m3


Volumen Cemento (Bls) 0.151 Bls

Total Cemento (Bls) 1.335 Bls