Está en la página 1de 2

SFP DRILLING - PROYECTO PARCOY

REPORTE PRELIMINAR
CONTROL AVANCE DIARIO
MES Junio
MES Junio Fecha 06/24/21 ACUMULADO:
Maquina Tot_Av(m)
Data Data H-400-1 463.6
Maquina T Dia T Noche Tot_Av(m) Maquina T Dia T Noche Tot_Av(m) H-400-2 702.5
H-400-1 261.7 287.2 548.9 H-400-1 15.2 6.8 22 H-400-3 265.4
H-400-2 333.7 331 664.7 H-400-2 10.9 18.5 29.4 H-400-4 962.7
H-400-3 163.7 203.6 367.3 H-400-3 8.5 14.5 23 H-400-5 795.7
H-400-4 200.9 200.4 401.3 H-400-4 17 13.5 30.5 LM-75 - 01 351.7
H-400-5 236.3 298.2 534.5 H-400-5 31.1 23 54.1 LM-90 676.1
LM-75 161.6 250.8 412.4 LM-75 0 0 0 H-200-2 301.4
LM-90 154.9 185.5 340.4 LM-90 16.8 13.1 29.9 DRILLCAT 395.1
H-200-2 36.9 38.1 75 H-200-2 4 7.4 11.4 Total Result 4914.2
DRILLCAT 139.6 156.4 296 DRILLCAT 7.5 3 10.5
Total Result 1689.3 1951.2 3640.5 Total Result 111 99.8 210.8
TOTAL MES X MAQUINAS

MES_OP Junio
MES Junio
TTotal Av (m) Maquina
Fecha H-400-1 H-400-2 H-400-3 H-400-4 H-400-5 LM-90 LM-75 H-200-2 DRILLCAT Total Result
06/01/21 24.2 0 7.7 30 0 0 28.6 0 10 100.5
06/02/21 22 6.5 2.5 30.1 0 26.9 24.2 0 0 112.2
06/03/21 35.6 51.7 31.4 32.4 0 16.3 18.5 0 0 185.9
06/04/21 34.6 38.8 40.7 24.6 20.2 38.6 24.2 0 13.7 235.4
06/05/21 28.5 32.2 25.7 27.9 31.3 33 16.2 0 19 213.8
06/06/21 25.1 27 21.1 24 32.8 22 12 0 21.2 185.2
06/07/21 25.9 30.5 18.7 19.5 19 8.3 12.4 0 1 135.3
06/08/21 18.5 28 19 14 25.4 3 34.2 0 15.6 157.7
06/09/21 17.1 20.2 14.7 20.2 36.8 12.2 35.8 0 19.1 176.1
06/10/21 20.9 38.6 11.9 26.1 33.8 12 30 0 14.1 187.4
06/11/21 6 28 16.4 21.5 24.6 25.7 24 0 19 165.2
06/12/21 10.4 29.8 4.3 21 23.1 27.2 23.2 0 10 149
06/13/21 26.5 20.2 16.1 28.4 8 19.1 12 0 0 130.3
06/14/21 12.8 11.7 2.7 23.9 27 0 20.8 0 0 98.9
06/15/21 25.4 54 15.8 0 45.2 0 20.3 0 3.8 164.5
06/16/21 28.7 14.1 21.5 0 32 2.4 15.2 0 9.2 123.1
06/17/21 15.2 18.6 0.6 0 22.8 2.9 10.3 0 18.7 89.1
06/18/21 12.8 49.3 0 0 5.5 1.2 9.5 12.3 23 113.6
06/19/21 37.1 27.2 0 0 21.7 0 5.5 20.3 20.4 132.2
06/20/21 26.7 12.1 0 0 28.5 0 5.4 14 17.6 104.3
06/21/21 27.3 55.8 5.8 0 16.2 0 4.4 17 18.5 145
06/22/21 23.5 32.1 38.1 0 23.9 37.1 16.3 0 20.5 191.5
06/23/21 22.1 8.9 29.6 27.2 2.6 22.6 9.4 0 11.1 133.5
06/24/21 22 29.4 23 30.5 54.1 29.9 0 11.4 10.5 210.8
Total Result 548.9 664.7 367.3 401.3 534.5 340.4 412.4 75 296 3640.5

82.00
SFP DRILLING - PROYECTO PARCOY
CONTROL AVANCE DIARIO: JUNIO 2021.
FECHA: 13-Jul
AVANCE ACUMULADO - MES
Avance (MTS) MINA
MAQUINA
av.dia Ac-mes 300.0
Mina_ Avance Diario Av. Dia (mt): 210.80
H400-1 22.00 548.9
H400-2 29.40 664.7 250.0 LEYENDA:
H400-3 23.00 367.3 200.0 Cambio Punto - Sondaje
H400-4 30.50 401.3 Cambio Camara
54.10 150.0
H400-5 534.5 Espera Camara (1), Falta Proy (2)
LM-90 29.90 340.4 100.0 Mantenimiento SFP
LM-75 - 412.4 Sostenimiento, Servic. Varios
50.0
H200-2 11.40 75.0 Aus. Personal SFP
DrillCAT 10.50 296.0 - Traslado, Instalacion/ Estandariz.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTAL 210.8 3,640.5 Atrapam. Tuberia, C.Linea
- 197.30 Triconeo

200
TOTAL MES X MAQUINAS 8
MAQUINAS 25
FECHA H400-1 H400-2 H400-3 H400-4 H400-5 LM-90 LM-75 H200-2 DrillCAT Total (m) Prom/Maq.
1-Jun 24.20 - 7.70 30.00 - - 28.60 MP 10.00 100.50 12.56 18-Jun 3,837.80
2-Jun 22.00 6.50 2.50 30.10 - 26.90 24.20 MP - 112.20 14.03
3-Jun 35.60 51.70 31.40 32.40 - 16.30 18.50 MP - 185.90 23.24
4-Jun 34.60 38.80 40.70 24.60 20.20 38.60 24.20 MP 13.70 235.40 29.43
5-Jun 28.50 32.20 25.70 27.90 31.30 33.00 16.20 MP 19.00 213.80 26.73
6-Jun 25.10 27.00 21.10 24.00 32.80 22.00 12.00 MP 21.20 185.20 23.15
7-Jun 25.90 30.50 18.70 19.50 19.00 8.30 12.40 MP 1.00 135.30 16.91
8-Jun 18.50 28.00 19.00 14.00 25.40 3.00 34.20 MP 15.60 157.70 19.71 25-Jun 215
9-Jun 17.10 20.20 14.70 20.20 36.80 12.20 35.80 MP 19.10 176.10 22.01 26-Jun 215
10-Jun 20.90 38.60 11.90 26.10 33.80 12.00 30.00 MP 14.10 187.40 23.43 27-Jun 215 645
11-Jun 6.00 28.00 16.40 21.50 24.60 25.70 24.00 Pruebas 19.00 165.20 20.65 28-Jun 215 4,482.80
12-Jun 10.40 29.80 4.30 21.00 23.10 27.20 23.20 Pruebas 10.00 149.00 18.63 29-Jun 215
13-Jun 26.50 20.20 16.10 28.40 8.00 19.10 12.00 Rep. Personal - 130.30 16.29 30-Jun 215
14-Jun 12.80 11.70 2.70 23.90 27.00 - 20.80 - - 98.90 12.36 5,127.80
15-Jun 25.40 54.00 15.80 - 45.20 - 20.30 - 3.80 164.50 20.56
16-Jun 28.70 14.10 21.50 - 32.00 2.40 15.20 - 9.20 123.10 15.39
17-Jun 15.20 18.60 0.60 - 22.80 2.90 10.30 - 18.70 89.10 11.14
18-Jun 12.80 49.30 - - 5.50 1.20 9.50 12.30 23.00 113.60 14.20
19-Jun 37.10 27.20 - - 21.70 - 5.50 20.30 20.40 132.20 16.53
20-Jun 26.70 12.10 - - 28.50 - 5.40 14.00 17.60 104.30 13.04
21-Jun 27.30 55.80 5.80 - 16.20 - 4.40 17.00 18.50 145.00 18.13
22-Jun 23.50 32.10 38.10 - 23.90 37.10 16.30 - 20.50 191.50 23.94
23-Jun 22.10 8.90 29.60 27.20 2.60 22.60 9.40 - 11.10 133.50 16.69
24-Jun 22.00 29.40 23.00 30.50 54.10 29.90 - 11.40 10.50 210.80 26.35
25-Jun - 28.80 34.50 41.00 28.40 - 29.50 24.20 10.90 197.30 24.66

Total (m) 548.90 693.50 401.80 442.30 562.90 340.40 441.90 99.20 306.90 3,837.80
STATUS: 3
Camara Act. CM 669 CM 2642 CM 2703 CM 624 CM 2579 CM 2120 CM 3098 CM 2531 CM 2330
N° Talad/Camara 5.0 6.0 6.0 1.0 3.0 2.0 10.0 2.0 1.0
Long. Tal. /Actual 240.0 m 75.0 m 120.0 m 235.0m 390.0m 410.0m 340.0m 50.0 m 150.0 m
Inclinacion (+) 20° (+) 28° (-) 31° 0° (-) 70° (-) 2° (+) 19° (+) 55° (-) 13°
Ejecut. Tal / al dia 240.8 m 58.20 m 131.00m 98.70m 85.10m 89.6m 29.50m 35.60m 164.20 m
Proyeccion . Dia Camb. Camara Continua Continua Continua Continua triconeo Continua Continua Continua/ C. Punto