CRONOGRAMA GENERAL DE DESEMBOLSOS

Proyecto:
"RECONSTRUCCION AV. PRIMAVERA Y PUENTE DE CERRO AZUL – CP CASA BLANCA, DISTRITO DE CERRO AZUL, PROVINCIA
DE CAÑETE-LIMA"

Ubicación: CERRO AZUL - AV.PRIMAVERA


Plazo: 60 DIAS CALENDARIOS MUNICIPALIDAD DISTRITAL DE CERRO AZUL

Costo Directo: S/. 291,776.14

Costo Total Inc. IGV: S/. 426,855.06

DIAS NATURALES
MONTO EN NUEVOS SOLES

ADELANTOS AMORTIZACIONES TOTAL DESEMBOLSOS

DIRECTO (10%) MATERIALES VALORIZACIONES MONTO BRUTO DESEMBOLSADO IMPUESTO IGV 18% LEY

ADELANTO DIRECTO (*) ADELANTO MATERIALES (**)

(60 DIAS) (20%) 28033

0 S/. 24,519.00 S/. 24,519.00 S/. 4,413.42

0 S/. 49,038.01 S/. 49,038.01 S/. 8,826.84

30 S/. 240,170.35 S/. 16,182.54 S/. 32,365.08 S/. 191,622.72 S/. 34,492.10

60 S/. 121,571.23 S/. 8,336.46 S/. 16,672.92 S/. 96,561.85 S/. 17,381.13

TOTALES S/. 73,557.01 S/. 361,741.58 S/. 24,519.00 S/. 49,038.01 S/. 361,741.58 S/. 65,113.48
TOTAL DESEMBOLSADO S/. 361,741.58 S/. 65,113.48

MONTO TOTAL DEL PRESUPUESTO DESEMBOLSADO S/. 426,855.06

(*):
Las Deducciones por adelanto Directo seran considerados en las Valorizaciones del Plazo
contractual de Ejecuion de Obra y seran deducidos de acuerdo a los indices unificados del plazo
contractual de obra.

(**):
Las Deducciones por adelanto de Materiales; seran considerados en las Valorizaciones del Plazo
contractual de Ejecuion de Obra y seran deducidos de acuerdo a los materiales utilizados en
obra y a los indices unificados del plazo contractual de obra.

(***):
Los Reajustes se cosideraran en las Valorizaciones del Plazo Contractual de Ejecucion de Obra.