RESUMEN CANTIDAD FINAL DE OBRA EJECUTADA

CONTRATO: ABC N° 728/15 GNT-SCT-OBR

CONTRATISTA: CHINA RAILWAY GROUP LIMITED (SUCURSAL BOLIVIA)


CANTIDAD CANTIDAD (%)
No DESCRIPCION UND
FINAL DE OBRA EJECUTADA EJECUCION
1 MOVIMIENTO DE TIERRAS 100.00%
1.1 DESBROCE, DESBOSQUE, DESMONTE Y LIMPIEZA ML 160,184.52 160,184.52 100.00%
1.2 EXCAVACIÓN ML 55,625.39 55,625.39 100.00%
1.3 TERRAPLÉN ML 104,559.13 104,559.13 100.00%
2 OBRAS DE PAVIMENTACIÓN 100.00%
2.1 SUB BASE ML 159,646.42 159,646.42 100.00%
2.2 BASE ML 159,646.42 159,646.42 100.00%
2.3 IMPRIMACION ML 159,646.42 159,646.42 100.00%
2.4 BERMA DE CONCRETO ASFALTICO ML 158,114.71 158,114.71 100.00%
2.5 CARPETA DE CONCRETO ASFALTICO EN CALIENTE ML 158,114.71 158,114.71 100.00%
3 OBRAS DE DRENAJE MENOR 100.00%
3.1. ZANJAS DE CORONAMIENTO REVESTIDAS ML 9,560.60 9,560.60 100.00%
3.2. CUNETA DE BANQUINA ML 21,776.65 21,776.65 100.00%
3.3. CUNETAS REVESTIDAS EN TERRAPLEN ML 53,664.90 53,664.90 100.00%
3.4. CUNETAS REVESTIDAS EN CORTE ML 75,748.17 75,748.17 100.00%
3.5. CANALES LONGITUDINALES NO REVESTIDOS ML 200.00 200.00 100.00%
3.6. SUBDRENES ML 29,252.60 29,252.60 100.00%
3.7. BORDILLOS ML 18,593.20 18,593.20 100.00%
3.8. BAJANTE PARA TERRAPLEN GLOBAL 145.00 145.00 100.00%
3.9. ALCANTARIILA CIRCULAR
3.9.1. ASIENTO DE ALCANTARILLA CIRCULAR UNIDAD 242.00 242.00 100.00%
3.9.2. PREFABRICACIÓN DE ALCANTARILLA CIRCULAR ML 5,771.89 5,771.89 100.00%
3.9.3. INSTALACION DE ALCANTARILLA CIRCULAR ML 5,771.89 5,771.89 100.00%
3.9.4. OBRAS COMPLEMENTARIAS DE ALCANTARILLA CIRCULAR UNIDAD 484.00 484.00 100.00%
3.9.5. RELLENO DETRÁS DEL ESTRIBO DE ALCANTARILLA CIRCULAR UNIDAD 242.00 242.00 100.00%
3.10 ALCANTARILLA CAJÓN
3.10.1 EXCAVACIÓN DE BASE DE ALCANTARILLA CAJÓN INTERVENCIÓN 83.00 83.00 100.00%
3.10.2 LOSA DE PISO DE ALCANTARILLA CAJÓN INTERVENCIÓN 83.00 83.00 100.00%
3.10.3 MURO LATERAL Y LOSA SUPERIOR DE ALCANTARILLA CAJÓN INTERVENCIÓN 83.00 83.00 100.00%
3.10.4 OBRAS COMPLEMENTARIAS DE ALCANTARILLA CAJÓN INTERVENCIÓN 166.00 166.00 100.00%
3.10.5 RELLENO DE ALCANTARILLA CAJÓN INTERVENCIÓN 83.00 83.00 100.00%
DEMOLICIÓN Y REMOCIÓN DE ALCANTARILLAS TUBULARES/ALCANTARILLA
3.11 INTERVENCIÓN 44.00 44.00 100.00%
TIPO CAJÓN/PUENTES
4 OBRAS DE PUENTES 100.00%
4.1 FUNDACIÓN E INFRAESTRUCTURA
4.1.1 EXCAVACION PARA CABEZAL DE PILOTE INTERVENCIÓN 69.00 69.00 100.00%
4.1.2 RELLENO PARA CABEZAL DE PILOTE INTERVENCIÓN 69.00 69.00 100.00%
4.1.3 PILOTES INTERVENCIÓN 245.00 245.00 100.00%
4.1.4 CABEZALES DE PILOTES INTERVENCIÓN 23.00 23.00 100.00%
4.1.5 ESTRIBOS DE PUENTES (CABEZAL) INTERVENCIÓN 46.00 46.00 100.00%
4.1.6 PILAS PIEZA 164.00 164.00 100.00%
4.1.7 CABEZAL DE PILAS PIEZA 28.00 28.00 100.00%
4.2 SUPERESTRUCTURA
4.2.1 INSTALACIÓN DE DADOS DE APOYO Y APARATOS DE APOYO PIEZA 604.00 604.00 100.00%
4.2.2 PREFABRICACIÓN DE VIGA “T” PIEZA 188.00 188.00 100.00%
4.2.3 INSTALACIÓN DE VIGA“T” PIEZA 188.00 188.00 100.00%
4.2.4 DIAFRAGMAS TRANSVERSALES PIEZA 193.00 193.00 100.00%
4.2.5 COLOCACIÓN DE TABLERO DE PUENTES ML 1,376.93 1,376.93 100.00%
4.2.6 BARANDADO TIPO P-3 ML 2,753.86 2,753.86 100.00%
4.2.7 JUNTA DE DILATACION ML 757.37 757.37 100.00%
4.3 MUROS MSE (TIERRA ARMADA)
4.3.1 FUNDACIÓN DE MUROS MSE ML 823.21 823.21 100.00%
4.3.2 PANEL FRONTAL M2 7,190.15 7,190.15 100.00%
4.3.3 RELLENO SELECCIONADO PARA MSE ML 823.21 823.21 100.00%
4.4 OBRAS COMPLEMENTARIAS DE LOS PUENTES
4.4.1 GAVIONES TIPO COLCHON GLOBAL 46.00 46.00 100.00%
4.4.2 GAVIONES TIPO CAJON GLOBAL 46.00 46.00 100.00%
4.4.3 PROTECCION CON COLCHONETA TRITON PIEZA 23.00 23.00 100.00%
4.4.4 ACORAZADOS INTERVENCIÓN 0.00 0.00 100.00%
5 SEÑALIZACIÓN Y SEGURIDAD VIAL 100.00%

1
RESUMEN CANTIDAD FINAL DE OBRA EJECUTADA

CONTRATO: ABC N° 728/15 GNT-SCT-OBR

CONTRATISTA: CHINA RAILWAY GROUP LIMITED (SUCURSAL BOLIVIA)


CANTIDAD CANTIDAD (%)
No DESCRIPCION UND
FINAL DE OBRA EJECUTADA EJECUCION
5.1 DEFENSAS LATERALES METALICAS, INCLUYE TERMINALES ML 19,264.00 19,264.00 100.00%
5.2 SEÑALIZACIONES PIEZA 1,633.00 1,633.00 100.00%
5.3 PINTADO DE LA SUPERFICIE DE RODADURA ML 533,984.32 533,984.32 100.00%
5.4 TACHAS REFLECTIVAS BIDIRECCIONALES PIEZA 40,542.00 40,542.00 100.00%
5.5 HITOS DE ARISTA DOBLE CARA PIEZA 993.00 993.00 100.00%
5.6 MOJONES DE KILOMETRAJE PIEZA 159.00 159.00 100.00%
6 OTRAS OBRAS 100.00%
6.1 MANTENIMIENTO DE LA VÍA MES 66.95 66.95 100.00%
6.2 REMEDIACIÓN AMBIENTAL
6.2.1 PROGRAMA AMBIENTAL DE CONSTRUCCIÓN MES 60.95 60.95 100.00%
6.2.2 PROGRAMA DE GESTION DE RESIDUOS LÍQUIDOS
CONSTRUCCIÓN DE PLANTA Y PISCINA DE TRATAMIENTO DE RESIDUOS
6.2.2.1 PIEZA 12.00 12.00 100.00%
LÍQUIDOS
LIMPIEZA Y MANTENIMIENTO DE PLANTAS DE TRATAMIENTO DE RESIDUOS
6.2.2.2 MES 60.95 60.95 100.00%
LÍQUIDOS
6.2.3 PROGRAMA DE MANEJO DE DESECHOS SÓLIDOS
6.2.3.1 EXCAVACIÓN DE POZO DE VERTEDERO PIEZA 7.00 7.00 100.00%
6.2.3.2 TRATAMIENTO DE RESIDUOS SÓLIDOS MES 60.95 60.95 100.00%
PERMISO DE DESMONTE PARA EL DESBROCE Y AUTORIZACIONES DE
6.2.4 GLOBAL 1.00 1.00 100.00%
BANCOS DE PRÉSTAMO Y BUZONES
6.2.5 PROGRAMA DE APROVECHAMIENTO DE RECURSOS HÍDRICOS
6.2.5.1 PROGRAMACIÓN DE MANEJO DE USO DE RECURSO DE AGUA GLOBAL 1.00 1.00 100.00%
6.2.5.2 PERFORACIÓN DE POZOS INTERVENCIÓN 10.00 10.00 100.00%
6.2.5.3 EXCAVACIÓN DE ATAJADOS INTERVENCIÓN 38.00 38.00 100.00%
6.2.6 PROGRAMACIÓN DE REVEGETACIÓN HA 106.35 106.35 100.00%
6.2.6.1 REFORESTACIÓN DE BANCOS DE PRÉSTAMO COLUVIAL HA 78.97 78.97 100.00%
6.2.6.2 REFORESTACIÓN DE BUZONES HA 27.38 27.38 100.00%
6.2.7 PROGRAMA DE SEGURIDAD VIAL DURANTE LA CONSTRUCCIÓN MES 60.95 60.95 100.00%
6.2.8 PROGRAMA DE SALUD Y SEGURIDAD OCUPACIONAL
6.2.8.1 ELABORACION DE PROGRAMAS DE SEGURIDAD Y SALUD OCUPACIONAL GLOBAL 1.00 1.00 100.00%
6.2.8.2 EQUIPO DE PROTECCIÓN PERSONAL MES 60.95 60.95 100.00%
6.2.8.3 EXTINTORES MES 60.95 60.95 100.00%
6.2.8.4 INVERSIÓN MÉDICA MES 60.95 60.95 100.00%
6.2.9 PROGRAMAS DE EDUCACIÓN Y CAPACITACIÓN AMBIENTAL MES 60.95 60.95 100.00%
6.2.10 PROGRAMA DE RELACIONES COMUNALES
6.2.10.1 MANTENIMIENTO DE LA RELACIÓN CON LAS COMUNIDADES MES 60.95 60.95 100.00%
6.2.10.2 CERCOS DE ALAMBRE ML 97,437.60 97,437.60 100.00%
6.2.10.3 MANTENIMIENTO DE VIAS COMUNALES MES 60.95 60.95 100.00%
6.2.11 PROGRAMA DE RESCATE ARQUEOLÓGICO MES 60.95 60.95 100.00%
6.2.12 PROGRAMA DE CIERRE DE OPERACIONES Y RESTAURACIÓN DEL ÁREA
6.2.12.1 CIERRE Y RESTAURACIÓN DE CAMPAMENTOS Y ÁREAS INDUSTRIALES PUNTO 13.00 13.00 100.00%
6.2.12.2 CIERRE Y RESTAURACIÓN DE BANCOS DE PRÉSTAMOS PUNTO 57.00 57.00 100.00%
6.2.12.3 CIERRE Y RESTAURACIÓN DE BUZONES PUNTO 29.00 29.00 100.00%
6.2.13 MONITOREO DEL FACTOR AGUA MES 60.95 60.95 100.00%
6.2.14 MONITOREO DEL FACTOR AIRE MES 60.95 60.95 100.00%
6.2.15 SEGUIMIENTO AMBIENTAL POR MEDIDAS E IMPACTOS MES 60.95 60.95 100.00%
6.2.16 PRP
LEVANTAMIENTO EN EL CAMPO DE PRP Y ELABORACIÓN DE DOCUMENTOS
6.2.16.1 GLOBAL 1.00 1.00 100.00%
DE AFECTACION
6.3 CONTROL DE CALIDAD (CONTRATISTA) MES 60.95 60.95 100.00%
6.4 REVISION Y ACTUALIZACION DEL DISEÑO GLOBAL 1.00 1.00 100.00%
6.4.1 READECUACIÓN DEL DISEÑO EN LA FASE DE ESTUDIO GLOBAL 1.00 1.00 100.00%
6.4.2 READECUACIÓN DEL DISEÑO EN LA FASE DE CONSTRUCCIÓN GLOBAL 1.00 1.00 100.00%
6.5 TRANSFERENCIA TECNOLÓGICA
6.5.1 TRANSFERENCIA DE EDIFICACIONES PERMANENTES PARA CAMPAMENTOS M2 5,072.77 5,072.77 100.00%
6.5.2 TRANSFERENCIA TECNOLÓGICA DE EQUIPOS GLOBAL 1.00 1.00 100.00%
6.5.3 ACTIVIDAD DE CAPACITACIÓN TÉCNICA DEL PERSONAL PERSONA 32.00 32.00 100.00%
6.6 ESTACION DE PEAJE Y PESAJE
6.6.1 EJECUCIÓN DE OBRA CIVIL DE ESTACIÓN PEAJE Y PESAJE PEANA 2.00 2.00 100.00%
6.6.2 SUMINISTRO DE EQUIPOS DE ESTACION DE PEAJE Y PESAJE PEANA 2.00 2.00 100.00%
6.6.3 INSTALACIÓN Y AJUSTE DE LOS EQUIPOS DE ESTACIÓN DE PEAJE Y PESAJE PEANA 2.00 2.00 100.00%

2
RESUMEN CANTIDAD FINAL DE OBRA EJECUTADA

CONTRATO: ABC N° 728/15 GNT-SCT-OBR

CONTRATISTA: CHINA RAILWAY GROUP LIMITED (SUCURSAL BOLIVIA)


CANTIDAD CANTIDAD (%)
No DESCRIPCION UND
FINAL DE OBRA EJECUTADA EJECUCION
TOTAL 100.00%

3
RESUMEN CANTIDAD VIGENTE vs. CANTIDAD FINAL DE OBRA

CONTRATO: ABC N° 728/15 GNT-SCT-OBR

CONTRATISTA: CHINA RAILWAY GROUP LIMITED (SUCURSAL BOLIVIA)


CANTIDAD
CANTIDAD INCREM.(+)/ (%)
No DESCRIPCION UND FINAL DE
VIGENTE DECREM.(-) (+)/(-)
OBRA
1 MOVIMIENTO DE TIERRAS 1.48%
1.1 DESBROCE, DESBOSQUE, DESMONTE Y LIMPIEZA ML 156,932.83 160,184.52 3,251.69 2.07%
1.2 EXCAVACIÓN ML 54,840.00 55,625.39 785.39 1.43%
1.3 TERRAPLÉN ML 103,595.45 104,559.13 963.68 0.93%
2 OBRAS DE PAVIMENTACIÓN 1.34%
2.1 SUB BASE ML 156,932.83 159,646.42 2,713.59 1.73%
2.2 BASE ML 156,932.83 159,646.42 2,713.59 1.73%
2.3 IMPRIMACION ML 156,932.83 159,646.42 2,713.59 1.73%
2.4 BERMA DE CONCRETO ASFALTICO ML 156,932.83 158,114.71 1,181.88 0.75%
2.5 CARPETA DE CONCRETO ASFALTICO EN CALIENTE ML 156,932.83 158,114.71 1,181.88 0.75%
3 OBRAS DE DRENAJE MENOR 5.58%
3.1. ZANJAS DE CORONAMIENTO REVESTIDAS ML 8,921.90 9,560.60 638.70 7.16%
3.2. CUNETA DE BANQUINA ML 22,217.00 21,776.65 -440.35 -1.98%
3.3. CUNETAS REVESTIDAS EN TERRAPLEN ML 41,676.10 53,664.90 11,988.80 28.77%
3.4. CUNETAS REVESTIDAS EN CORTE ML 60,033.15 75,748.17 15,715.02 26.18%
3.5. CANALES LONGITUDINALES NO REVESTIDOS ML 6,271.00 200.00 -6,071.00 -96.81%
3.6. SUBDRENES ML 25,396.00 29,252.60 3,856.60 15.19%
3.7. BORDILLOS ML 12,433.80 18,593.20 6,159.40 49.54%
3.8. BAJANTE PARA TERRAPLEN GLOBAL 166.00 145.00 -21.00 -12.65%
3.9. ALCANTARIILA CIRCULAR
3.9.1. ASIENTO DE ALCANTARILLA CIRCULAR UNIDAD 242.00 242.00 0.00 0.00%
3.9.2. PREFABRICACIÓN DE ALCANTARILLA CIRCULAR ML 5,655.00 5,771.89 116.89 2.07%
3.9.3. INSTALACION DE ALCANTARILLA CIRCULAR ML 5,655.00 5,771.89 116.89 2.07%
3.9.4. OBRAS COMPLEMENTARIAS DE ALCANTARILLA CIRCULAR UNIDAD 484.00 484.00 0.00 0.00%
3.9.5. RELLENO DETRÁS DEL ESTRIBO DE ALCANTARILLA CIRCULAR UNIDAD 242.00 242.00 0.00 0.00%
3.10 ALCANTARILLA CAJÓN
3.10.1 EXCAVACIÓN DE BASE DE ALCANTARILLA CAJÓN INTERVENCIÓN 74.00 83.00 9.00 12.16%
3.10.2 LOSA DE PISO DE ALCANTARILLA CAJÓN INTERVENCIÓN 74.00 83.00 9.00 12.16%
3.10.3 MURO LATERAL Y LOSA SUPERIOR DE ALCANTARILLA CAJÓN INTERVENCIÓN 74.00 83.00 9.00 12.16%
3.10.4 OBRAS COMPLEMENTARIAS DE ALCANTARILLA CAJÓN INTERVENCIÓN 148.00 166.00 18.00 12.16%
3.10.5 RELLENO DE ALCANTARILLA CAJÓN INTERVENCIÓN 74.00 83.00 9.00 12.16%
DEMOLICIÓN Y REMOCIÓN DE ALCANTARILLAS TUBULARES/ALCANTARILLA
3.11 INTERVENCIÓN 35.00 44.00 9.00 25.71%
TIPO CAJÓN/PUENTES
4 OBRAS DE PUENTES 2.63%
4.1 FUNDACIÓN E INFRAESTRUCTURA
4.1.1 EXCAVACION PARA CABEZAL DE PILOTE INTERVENCIÓN 74.00 69.00 -5.00 -6.76%
4.1.2 RELLENO PARA CABEZAL DE PILOTE INTERVENCIÓN 74.00 69.00 -5.00 -6.76%
4.1.3 PILOTES INTERVENCIÓN 245.00 245.00 0.00 0.00%
4.1.4 CABEZALES DE PILOTES INTERVENCIÓN 23.00 23.00 0.00 0.00%
4.1.5 ESTRIBOS DE PUENTES (CABEZAL) INTERVENCIÓN 46.00 46.00 0.00 0.00%
4.1.6 PILAS PIEZA 158.00 164.00 6.00 3.80%
4.1.7 CABEZAL DE PILAS PIEZA 28.00 28.00 0.00 0.00%
4.2 SUPERESTRUCTURA
4.2.1 INSTALACIÓN DE DADOS DE APOYO Y APARATOS DE APOYO PIEZA 606.00 604.00 -2.00 -0.33%
4.2.2 PREFABRICACIÓN DE VIGA “T” PIEZA 188.00 188.00 0.00 0.00%
4.2.3 INSTALACIÓN DE VIGA“T” PIEZA 188.00 188.00 0.00 0.00%
4.2.4 DIAFRAGMAS TRANSVERSALES PIEZA 177.00 193.00 16.00 9.04%
4.2.5 COLOCACIÓN DE TABLERO DE PUENTES ML 1,375.81 1,376.93 1.12 0.08%
4.2.6 BARANDADO TIPO P-3 ML 2,751.62 2,753.86 2.24 0.08%
4.2.7 JUNTA DE DILATACION ML 757.37 757.37 0.00 0.00%
4.3 MUROS MSE (TIERRA ARMADA) -
4.3.1 FUNDACIÓN DE MUROS MSE ML 682.95 823.21 140.26 20.54%
4.3.2 PANEL FRONTAL M2 7,190.15 7,190.15 0.00 0.00%
4.3.3 RELLENO SELECCIONADO PARA MSE ML 682.95 823.21 140.26 20.54%
4.4 OBRAS COMPLEMENTARIAS DE LOS PUENTES
4.4.1 GAVIONES TIPO COLCHON GLOBAL 46.00 46.00 0.00 0.00%
4.4.2 GAVIONES TIPO CAJON GLOBAL 46.00 46.00 0.00 0.00%
4.4.3 PROTECCION CON COLCHONETA TRITON PIEZA 20.00 23.00 3.00 15.00%
4.4.4 ACORAZADOS INTERVENCIÓN - 0.00 0.00 0.00%
5 SEÑALIZACIÓN Y SEGURIDAD VIAL 15.31%
5.1 DEFENSAS LATERALES METALICAS, INCLUYE TERMINALES ML 18,318.73 19,264.00 945.27 5.16%
5.2 SEÑALIZACIONES PIEZA 1,697.00 1,633.00 -64.00 -3.77%

4
RESUMEN CANTIDAD VIGENTE vs. CANTIDAD FINAL DE OBRA

CONTRATO: ABC N° 728/15 GNT-SCT-OBR

CONTRATISTA: CHINA RAILWAY GROUP LIMITED (SUCURSAL BOLIVIA)


CANTIDAD
CANTIDAD INCREM.(+)/ (%)
No DESCRIPCION UND FINAL DE
VIGENTE DECREM.(-) (+)/(-)
OBRA
5.3 PINTADO DE LA SUPERFICIE DE RODADURA ML 512,959.44 533,984.32 21,024.88 4.10%
5.4 TACHAS REFLECTIVAS BIDIRECCIONALES PIEZA 43,358.49 40,542.00 -2,816.49 -6.50%
5.5 HITOS DE ARISTA DOBLE CARA PIEZA 510.00 993.00 483.00 94.71%
5.6 MOJONES DE KILOMETRAJE PIEZA 162.00 159.00 -3.00 -1.85%
6 OTRAS OBRAS 6.98%
6.1 MANTENIMIENTO DE LA VÍA MES 61.22 66.95 5.73 9.36%
6.2 REMEDIACIÓN AMBIENTAL
6.2.1 PROGRAMA AMBIENTAL DE CONSTRUCCIÓN MES 55.22 60.95 5.73 10.38%
6.2.2 PROGRAMA DE GESTION DE RESIDUOS LÍQUIDOS
CONSTRUCCIÓN DE PLANTA Y PISCINA DE TRATAMIENTO DE RESIDUOS
6.2.2.1 PIEZA 20.00 12.00 -8.00 -40.00%
LÍQUIDOS
LIMPIEZA Y MANTENIMIENTO DE PLANTAS DE TRATAMIENTO DE RESIDUOS
6.2.2.2 MES 55.22 60.95 5.73 10.38%
LÍQUIDOS
6.2.3 PROGRAMA DE MANEJO DE DESECHOS SÓLIDOS
6.2.3.1 EXCAVACIÓN DE POZO DE VERTEDERO PIEZA 7.00 7.00 0.00 0.00%
6.2.3.2 TRATAMIENTO DE RESIDUOS SÓLIDOS MES 55.22 60.95 5.73 10.38%
PERMISO DE DESMONTE PARA EL DESBROCE Y AUTORIZACIONES DE
6.2.4 GLOBAL 1.00 1.00 0.00 0.00%
BANCOS DE PRÉSTAMO Y BUZONES
6.2.5 PROGRAMA DE APROVECHAMIENTO DE RECURSOS HÍDRICOS
6.2.5.1 PROGRAMACIÓN DE MANEJO DE USO DE RECURSO DE AGUA GLOBAL 1.00 1.00 0.00 0.00%
6.2.5.2 PERFORACIÓN DE POZOS INTERVENCIÓN 8.00 10.00 2.00 25.00%
6.2.5.3 EXCAVACIÓN DE ATAJADOS INTERVENCIÓN 34.00 38.00 4.00 11.76%
6.2.6 PROGRAMACIÓN DE REVEGETACIÓN HA 105.66 106.35 0.69 0.65%
6.2.6.1 REFORESTACIÓN DE BANCOS DE PRÉSTAMO COLUVIAL HA 78.46 78.97 0.51 0.65%
6.2.6.2 REFORESTACIÓN DE BUZONES HA 27.20 27.38 0.18 0.65%
6.2.7 PROGRAMA DE SEGURIDAD VIAL DURANTE LA CONSTRUCCIÓN MES 55.22 60.95 5.73 10.38%
6.2.8 PROGRAMA DE SALUD Y SEGURIDAD OCUPACIONAL
6.2.8.1 ELABORACION DE PROGRAMAS DE SEGURIDAD Y SALUD OCUPACIONAL GLOBAL 1.00 1.00 0.00 0.00%
6.2.8.2 EQUIPO DE PROTECCIÓN PERSONAL MES 55.22 60.95 5.73 10.38%
6.2.8.3 EXTINTORES MES 55.22 60.95 5.73 10.38%
6.2.8.4 INVERSIÓN MÉDICA MES 55.22 60.95 5.73 10.38%
6.2.9 PROGRAMAS DE EDUCACIÓN Y CAPACITACIÓN AMBIENTAL MES 55.22 60.95 5.73 10.38%
6.2.10 PROGRAMA DE RELACIONES COMUNALES
6.2.10.1 MANTENIMIENTO DE LA RELACIÓN CON LAS COMUNIDADES MES 55.22 60.95 5.73 10.38%
6.2.10.2 CERCOS DE ALAMBRE ML 90,000.00 97,437.60 7,437.60 8.26%
6.2.10.3 MANTENIMIENTO DE VIAS COMUNALES MES 55.22 60.95 5.73 10.38%
6.2.11 PROGRAMA DE RESCATE ARQUEOLÓGICO MES 55.22 60.95 5.73 10.38%
6.2.12 PROGRAMA DE CIERRE DE OPERACIONES Y RESTAURACIÓN DEL ÁREA
6.2.12.1 CIERRE Y RESTAURACIÓN DE CAMPAMENTOS Y ÁREAS INDUSTRIALES PUNTO 8.00 13.00 5.00 62.50%
6.2.12.2 CIERRE Y RESTAURACIÓN DE BANCOS DE PRÉSTAMOS PUNTO 42.00 57.00 15.00 35.71%
6.2.12.3 CIERRE Y RESTAURACIÓN DE BUZONES PUNTO 27.00 29.00 2.00 7.41%
6.2.13 MONITOREO DEL FACTOR AGUA MES 55.22 60.95 5.73 10.38%
6.2.14 MONITOREO DEL FACTOR AIRE MES 55.22 60.95 5.73 10.38%
6.2.15 SEGUIMIENTO AMBIENTAL POR MEDIDAS E IMPACTOS MES 55.22 60.95 5.73 10.38%
6.2.16 PRP
LEVANTAMIENTO EN EL CAMPO DE PRP Y ELABORACIÓN DE DOCUMENTOS
6.2.16.1 GLOBAL 1.00 1.00 0.00 0.00%
DE AFECTACION
6.3 CONTROL DE CALIDAD (CONTRATISTA) MES 55.22 60.95 5.73 10.38%
6.4 REVISION Y ACTUALIZACION DEL DISEÑO GLOBAL 1.00 1.00 0.00 0.00%
6.4.1 READECUACIÓN DEL DISEÑO EN LA FASE DE ESTUDIO GLOBAL 1.00 1.00 0.00 0.00%
6.4.2 READECUACIÓN DEL DISEÑO EN LA FASE DE CONSTRUCCIÓN GLOBAL 1.00 1.00 0.00 0.00%
6.5 TRANSFERENCIA TECNOLÓGICA
6.5.1 TRANSFERENCIA DE EDIFICACIONES PERMANENTES PARA CAMPAMENTOS M2 5,000.00 5,072.77 72.77 1.46%
6.5.2 TRANSFERENCIA TECNOLÓGICA DE EQUIPOS GLOBAL 1.00 1.00 0.00 0.00%
6.5.3 ACTIVIDAD DE CAPACITACIÓN TÉCNICA DEL PERSONAL PERSONA 32.00 32.00 0.00 0.00%
6.6 ESTACION DE PEAJE Y PESAJE
6.6.1 EJECUCIÓN DE OBRA CIVIL DE ESTACIÓN PEAJE Y PESAJE PEANA 2.00 2.00 0.00 0.00%
6.6.2 SUMINISTRO DE EQUIPOS DE ESTACION DE PEAJE Y PESAJE PEANA 2.00 2.00 0.00 0.00%
6.6.3 INSTALACIÓN Y AJUSTE DE LOS EQUIPOS DE ESTACIÓN DE PEAJE Y PESAJE PEANA 2.00 2.00 0.00 0.00%

TOTAL 5.55%