EMPLAZAMIENTO

FUNDACIONES

1 2 3 4 5
ZAPATA CENTRICA T1
150x150x40 cm ZAPATA MEDIANERA T2

D12c/15.0 (L=80.0 cm)


ZAPATA CENTRICA T1

17
D12c/15.0 (L=140.0 cm)
14
150x150x30 cm
7.5

7.5
7.5 7.5

D12c/15.0 (L=140.0 cm) D12c/15.0 (L=140.0 cm)


7.5 7.5
15 16

A ARMADURA DE
8D12 (L=1190.0 cm)
PIEL
7.5

7.5
28

FUNDACION T1 28
8D12 (L=1190.0cm)
1050X140 cm
5.0

ZAPATA CENTRICA T2
200x200x40 cm
D16c/10.0 (L=190.0 cm)
5.0

D16c/10.6 (L=190.0 cm)


5.0 5.0
29

B eD8c/10.0 (L=202.7 cm) eD8c/10.0/15.0 (L=227.6 cm) eD8c/10.0 (L=202.7 cm) eD8c/10.0/15.0 (L=227.6 cm) 8D12 (L=1190.0 cm)
30

eD8c/10.0/15.0 (L=227.6 cm) 9


D12c/10.0 (L=130.0 cm)

9 11 3D25 (L=277.5cm) 11 9
eD8c/10.0 (L=202.7 cm) 11 b eD8c/10.0 (L=202.711 cm) 3 31 eD8c/10.0 (L=202.7 cm) 11 32 5D12 (L=85.0cm)
A 27 3D20 (L=202.5cm) 5D12 (L=1200.0cm)
28
5.0
D12c/15.0 (L=1190.0 cm)
13

FUNDACION T1
1050X140 cm
ZAPATA CENTRICA T2
200x200x40 cm 325D12 (L=85.0cm) A 6 31 5D12 (L=1200.0cm)
5 b
FUNDACION T1

4 3D20 (L=149.6cm) 4D25 (L=235.0cm) 3D25 (L=281.1cm)


1050X140 cm

12
10.0 10.0

C
A-A
FUNDACION T1
1050X140 cm

D eD8 c/10.0cm 9
FUNDACION T1
1050X140 cm

31
Elemento
Longitud (cm)
Cantidad
Subtotal (cm) Masa total (kg) 5D12 (L=1200.0 cm)
Nombre Num en un elemento total

3 25 277.5 3 12 3330.0

4 20 149.6 3 12 1795.2

5 25 235.0 4 16 3760.0

6 25 281.1 3 12 3373.2

9 8 227.6 90 360 81936.0

E 11 8 202.7 62 248 50269.6


5.0

VIGA FUND T1 4 2758.52


12 12 1190.0 9 36 42840.0
EMPRESA:

B 400 S D8 D 12 D 16 D 20 D 25
13 12 130.0 120 480 62400.0
PROYECTO:
Peso unitario (kg/m) 0.40 0.89 1.58 2.47 3.85
27 20 202.5 3 12 2430.0

Longitud total (m) 1322.06 2019.60 148.20 42.25 104.63


28 12 1190.0 8 32 38080.0
PLANO:
Peso total (kg) 522.21 1793.40 234.16 104.36 402.83
31 12 1200.0 10 40 48000.0

32 12 85.0 10 40 3400.0
SUPERVISOR DE OBRA: FISCAL DE OBRA:
14 12 140.0 10 20 2800.0 Ing. Hernan Flores Ing. Miroslav Morant
ZAP T1 2 49.73
15 12 140.0 10 20 2800.0 DIRECTOR DE OBRA: RESIDENTE DE OBRA:
Ing. Daniel Veizaga
29 16 190.0 19 38 7220.0
ZAP T2 2 234.16
30 16 190.0 20 40 7600.0 N
Zona:
16 12 140.0 6 6 840.0 1ro de MAYO
ZAP T3 1 14.56 Distrito:
17 12 80.0 10 10 800.0 D9
Subdistrito:

Manzana:

Superficie de Terreno:

Superficie Construida:

ESCALA: FECHA:

INDICADA MAYO - 2022 1 de 3