CUADRO DE CARGAS "HOTEL HAMPTON BY HILTON LA PAZ MIRAFLORES "

1) TABLERO DE DISTRIBUCION SÓTANO 1 "TD-S1" A= 977 m2


DESCRIPCION PI (W) F.D. MD(W)
CARGA BASICA ESTACIONAMIENTOS SOTANO 1 977 m² x 10 W/m² 9770 1.00 9770
PUERTA BATIENTE 2 und x 0.5 HP n= 0.9 829 1.00 829
ECG-02 1 und x 460 W/und n= 0.9 460 1.00 460
TOTAL 11059 --- 11059

2) TABLERO DE DISTRIBUCION SÓTANO 2 "TD-S2" A= 1105 m2


DESCRIPCION PI (W) F.D. MD(W)
CARGA BASICA ESTACIONAMIENTOS SOTANO 2 982 m² x 10 W/m² 9820 1.00 9820
CARGA BASICA ESTACIONAMIENTOS SOTANO 3 58 m² x 10 W/m² 580 1.00 580
CARGA BASICA DEPÓSITOS 65 m² x 5 W/m² 325 1.00 325
TOTAL 10725 --- 10725

3) TABLERO DE DISTRIBUCION OFICINAS SÓTANO 1 "TD-OF" A= 110 m2


DESCRIPCION PI (W) F.D. MD(W)
CARGA BASICA OFICINA 25 m² x 50 W/m² 1250 1.00 1250
CARGA BASICA HALL, COMEDOR 55 m² x 10 W/m² 550 1.00 550
CARGA BASICA DEPÓSITOS 30 m² x 5 W/m² 150 1.00 150
SECADORA DE MANOS 2 und x 2000 W 4000 1.00 4000
TALLER MANTENIMIENTO 2 und x 1.5 HP n= 0.9 2487 1.00 2487
TOTAL 8437 --- 8437

4) TABLERO DE DISTRIBUCION 1° PISO "TD-11" A= 440 m2


DESCRIPCION PI (W) F.D. MD(W)
CARGA BASICA REAS COMUNES PISO 1 160 m² x 10 W/m² 1600 1.00 1600
CARGAS BASICA ESCALERAS N°2 y N°3 190 m² x 10 W/m² 1900 1.00 1900
CARGAS BASICA ESCALERAS N°3 y N°4 90 m² x 10 W/m² 900 1.00 900
TOTAL 4400 --- 4400

5) TABLERO DE DISTRIBUCION HABITACION "T-HAB.1" A= 23 m2


DESCRIPCION PI (W) F.D. MD(W)
CARGA BASICA 23 m² x 20 W/m² 460 1.00 460
SECADORA DE CABELLOS 1 und x 500 W; n= 0.9 556 1.00 556
FAN COIL 1 und x 115 W; n= 0.9 128 1.00 128
TOTAL 1143 --- 1143

6) TABLERO DE DISTRIBUCION BAR "TD-BAR" A= 270 m2


DESCRIPCION PI (W) F.D. MD(W)
CARGA BASICA BAR 270 m² x 20 W/m² 5400 0.80 4320
EQUIPOS BAR 8000 0.80 6400
TOMACORRIENTES BAR 2 CTO. x 1000 W/CTO. 2000 0.80 1600
SECADORA DE MANOS 2 und x 2000 W/und 4000 0.80 3200
ECG-03 1 und x 135 W/und n= 0.9 150 0.80 120
ECG-04 1 und x 80 W/und n= 0.9 89 0.80 71
ECG-05 1 und x 50 W/und n= 0.9 56 0.80 44
TOTAL 19694 --- 15756

7) TABLERO DE DISTRIBUCION COCINA "TD-CO" A= 50 m2


DESCRIPCION PI (W) F.D. MD(W)
CARGA BASICA COCINA 50 m² x 30 W/m² 1500 0.80 1200
EQUIPOS COCINA 38000 0.80 30400
BOMBA SUMIDERO TRAMPA GRASA 2 und x 1 HP/und n= 0.9 1658 0.80 1326
ICG-03 1 und x 1 HP/und n= 0.9 829 0.80 663
TOTAL 41987 --- 33589

8) TABLERO DE DISTRIBUCION LOCAL COMERCIAL "TD-LC" A= 120 m2


DESCRIPCION PI (W) F.D. MD(W)
CARGA BASICA LOCAL COMERCIAL 120 m² x 25 W/m² 3000 0.80 2400
AIRE ACONDICIONADO 600 0.80 480
AVISO LUMINOSO 10 m x 100 W/m 1000 0.80 800
ECG-06 1 und x 25 W/und n= 0.9 28 0.80 22
ECG-07 1 und x 130 W/und n= 0.9 144 0.80 116
TOTAL 4772 --- 3818

9) TABLERO DE FUERZA PISO 1 "TF-1P"


DESCRIPCION PI (W) F.D. MD(W)
UMA-01 1 und x 5 HP/und n= 0.9 4144 0.80 3316
UMA-02 1 und x 5 HP/und n= 0.9 4144 0.80 3316
TOTAL 8289 --- 6631

10) TABLERO DE DISTRIBUCION "TD-21, TD-31, … , TD-81" A= 675 m2


DESCRIPCION PI (W) F.D. MD(W)
CORREDOR Y OFICIO 100 m² x 10 W/m² 1000 0.80 800
T-HAB1 25 und x 1143 und 28583 0.80 22867
TOTAL 29583 --- 23667
11) TABLERO DE DISTRIBUCION AZOTEA "TD-AZ" A= 200 m2
DESCRIPCION PI (W) F.D. MD(W)
CARGA BASICA 200 m² x 20 W/m² 4000 0.80 3200
SECADORA DE MANOS 2 und x 2000 W 4000 0.80 3200
JACUZZI 2 und x 5000 W 10000 0.80 8000
TROTADOR 2 und x 1 HP ; n= 0.9 1658 0.80 1326
ELIPTICA 2 und x 0.5 HP ; n= 0.9 829 0.80 663
BRAC.(TRABAJA ALTERNADO) 2 und x 2 HP ; n= 0.9 1658 0.80 1326
TOTAL 22144 --- 17716

12) SUB TABLERO GENERAL PISO 1 "STG-1P" A= 949 m2


DESCRIPCION PI (W) F.D. M.D. (W)
TD-11 A= 440 m2 4400
TD-BAR A= 270 m2 19694 900 x 103867 W x 0.80 78803
TD-CO A= 50 m2 41987 949 m2
TD-LC A= 120 m2 4772
TF-1P 29583 49 x 103867 W x 0.65 3486
TD-HAB.1 A= 23 m2 1143 949 m2
TD-HAB.1 A= 23 m2 1143
TD-HAB.1 A= 23 m2 1143
TOTAL 103867 --- 82289

13) SUB TABLERO GENERAL PISO 2 "STG-2P" A= 3375


DESCRIPCION PI (W) F.D. M.D. (W)
TD-21 A= 675 m2 29583
TD-31 A= 675 m2 29583 900 x 233579 W x 0.80 49830
TD-41 A= 675 m2 29583 3375 m2
TD-51 A= 675 m2 29583
TD-61 A= 675 m2 29583 2475 x 233579 W x 0.65 111340
TD-71 A= 675 m2 29583 3375 m2
TD-81 A= 675 m2 29583
TD-AZ A= 200 m2 22144
TF-SH 4352
TOTAL 233579 --- 161170

14) TABLERO GENERAL DE UPS "TG-UPS"


DESCRIPCION PI (W) F.D. MD(W)
TOMACORRIENTES COMPUTO 11 und x 150 W/pto. 1650 1.00 1650
RACK 1 (TE) 1 und x 1500 W 1500 1.00 1500
RACK 2 (DATA) 1 und x 1500 W 1500 1.00 1500
UPS-S1
RACK 3(TV) 1 und x 1500 W 1500 1.00 1500
RACK 4(CCTV+CAC) 1 und x 1500 W 1500 1.00 1500
SUB TOTAL 7650 --- 7650
TOMACORRIENTES COMPUTO 6 und x 150 W/pto. 900 1.00 900
CACI 1 und x 300 W/pto. 300 1.00 300
UPS-11 RACK 3°NIVEL 1 und x 1500 W 1500 1.00 1500
RACK 6°NIVEL 1 und x 1500 W 1500 1.00 1500
SUB TOTAL 4200 --- 4200
TOMACORRIENTES COMPUTO 3 und x 150 W/pto. 450 1.00 450
UPS-AZ RACK 8°NIVEL 1 und x 1500 W 1500 1.00 1500
SUB TOTAL 1950 --- 1950
TOTAL 13800 --- 13800
SE DEFINE UPS DE : 20kVA

15) TABLERO DE CONTROL CHILLERS "TC-CH1"


DESCRIPCION PI (W) F.D. MD(W)
TC-CH CHILLERS 1 1 und x 106300 W; 106300 1.00 106300
TOTAL 106300 --- 106300

16) TABLERO DE CONTROL CHILLERS "TC-CH2"


DESCRIPCION PI (W) F.D. MD(W)
TC-CH CHILLERS 2 1 und x 106300 W; 106300 1.00 106300
TOTAL 106300 --- 106300

17) TABLERO DE FUERZA AZOTEA "TF-AZ"


DESCRIPCION PI (W) F.D. MD(W)
BAHP 1, 2, 3 (TRABAJAN SOLO DOS UND.) 3 und x 10 HP ; n= 0.9 16578 1.00 16578
BAHS 1, 2, 3 TRABAJAN SOLO DOS UND.) 3 und x 25 HP ; n= 0.9 41444 1.00 41444
UMA - 03 1 und x 20 HP ; n= 0.9 16578 1.00 16578
EH-12, EH-13 2 und x 4 HP ; n= 0.9 6631 1.00 6631
EH-14, EH-15 2 und x 1/4 HP ; n= 0.9 414 1.00 414
EH-16, EH-17 2 und x 1/2 HP ; n= 0.9 829 1.00 829
TOTAL 82474 --- 82474

19) TABLERO DE FUERZA SERVICIOS HIGIENICOS "TF-SH"


DESCRIPCION PI (W) F.D. MD(W)
EH-01 1 und x 2 HP ; n= 0.9 1658 1.00 1658
EH-02, EH-03, EH-04 3 und x 1/2 HP ; n= 0.9 1243 1.00 1243
EH-05, EH-06, EH-07 3 und x 1/4 HP ; n= 0.9 622 1.00 622
EH-08, EH-09, EH-10, EH-11 4 und x 1/4 HP ; n= 0.9 829 1.00 829
FC-TCH-01, FC-TCH-02 2 und x 250 W 500 0.80 400
FC-TCH-03 1 und x 335 W 335 0.80 268
TOTAL 4352 --- 4352
20) TABLERO DE TRANSFERENCIA AUTOMATICA "TTA-4"
DESCRIPCION PI (W) F.D. MD(W)
JET FAN 2, 3, 4, 5, 6, 7, 8, 9 8 und x 1.5 HP ; n= 0.9 9947 1.00 9947
ICG-01 1 und x 0.75 HP ; n= 0.9 622 1.00 622
ICG-02 1 und x 0.75 HP ; n= 0.9 622 1.00 622
TF-MO DAMPER MOTORIZADO 11 und x 40 W 440 1.00 440
ICG-03 2 und x 1.5 HP ; n= 0.9 2487 1.00 2487
EC-01 1 und x 7.5 HP ; n= 0.9 6217 1.00 6217
ICG-04 1 und x 5 HP ; n= 0.9 4144 1.00 4144
TOTAL 24478 --- 24478

21) TABLERO DE FUERZA ASCENSORES "TF-ASC-1"


DESCRIPCION PI (W) F.D. MD(W)
TF-ASC-1 ASCENSOR 1 1 und x 9 HP ; n= 0.9 7460 1.00 7460
TOTAL 7460 --- 7460

22) TABLERO DE FUERZA ASCENSORES "TF-ASC-2"


DESCRIPCION PI (W) F.D. MD(W)
TF-ASC-2 ASCENSOR 2 1 und x 9 HP ; n= 0.9 7460 1.00 7460
TOTAL 7460 --- 7460

23) TABLERO DE FUERZA ASCENSORES "TF-ASC-3"


DESCRIPCION PI (W) F.D. MD(W)
TF-ASC-3 ASCENSOR SERVICIOS 1 und x 10 HP ; n= 0.9 8289 1.00 8289
TOTAL 8289 --- 8289

24) TABLERO DE FUERZA ASCENSORES "TF-ASC-4"


DESCRIPCION PI (W) F.D. MD(W)
TF-ASC-4 ASCENSOR SOTANOS 1 und x 3 HP ; n= 0.9 2487 1.00 2487
TOTAL 2487 --- 2487

25) TABLERO DE FUERZA "TF-BA"


DESCRIPCION PI (W) F.D. MD(W)
BOMBA DE AGUA FRIA (TRABAJAN SOLO TRES) 3 und x 7 HP ; n= 0.9 17407 1.00 17407
BOMBA AGUA BLANDA (TRABAJAN SOLO UNO) 2 und x 1.25 HP ; n= 0.9 2072 1.00 2072
BOMBA AGUA CALIENTE (TRABAJAN SOLO DOS) 2 und x 7 HP ; n= 0.9 5802 1.00 5802
BOMBA SUMIDERO (TRABAJAN SOLO UNO) 2 und x 5 HP ; n= 0.9 4144 1.00 4144
BOMBA DESAGUE (TRABAJAN SOLO UNO) 2 und x 5 HP ; n= 0.9 4144 1.00 4144
TBJ 1 und x 2 HP ; n= 0.9 1658 1.00 1658
TOTAL 35228 --- 35228

26)TABLERO DE TRANSFERENCIA AUTOMATICA "TTA-3"


DESCRIPCION PI (W) F.D. MD(W)
ICE-1 1 und x 15 HP ; n= 0.9 12433 1.00 12433
TOTAL 12433 --- 12433

27)TABLERO DE TRANSFERENCIA AUTOMATICA "TTA-5"


DESCRIPCION PI (W) F.D. MD(W)
ICE-1 1 und x 15 HP ; n= 0.9 12433 1.00 12433
TOTAL 12433 --- 12433
28)TABLERO DE GENERAL DE EMERGENCIA "TGE" A= 8066 m2
DESCRIPCION PI (W) F.D. M.D. (W)
TD-S1 A= 977 m2 11059
TD-S2 A= 1105 m2 10725
TD-OF A= 110 m2 8437
TD-11 A= 440 m2 4400
TD-BAR A= 270 m2 19694
TD-CO A= 50 m2 41987
TD-LC A= 120 m2 4772
STG-1P
TF-1P 8289 900 x 738198 W x 0.80 65894
TD-HAB.1 A= 23 m2 1143 8066 m2
TD-HAB.1 A= 23 m2 1143
TD-HAB.1 A= 23 m2 1143
TD-21 A= 675 m2 29583 7166 x 738198 W x 0.65 426290
TD-31 A= 675 m2 29583 8066 m2
TD-41 A= 675 m2 29583
TD-51 A= 675 m2 29583
STG-2P TD-61 A= 675 m2 29583
TD-71 A= 675 m2 29583
TD-81 A= 675 m2 29583
TD-AZ A= 200 m2 19694
TF-SH 4352
TG-UPS 13800
TC-CH1 106300
TC-CH2 106300
TF-AZ 82474
TF-MO 24478
TF-BA 35228
TF-ASC1 7460
TF-ASC2 7460
TF-ASC3 8289
TF-ASC4 2487
SUB TOTAL 738198 --- 492184
FACTOR DE SIMULTANEIDAD --- 0.75
TOTAL 738198 369138
SE DEFINE GRUPO ELECTROGENO : 400 Kw

29) TABLERO DE FUERZA BOMBA CONTRA INCENDIO "TF-BCI"


DESCRIPCION PI (W) F.D. MD(W)
TTA-2 TF-BCI BOMBA CONTRA INCENDIO 100 HP n = 0.9 82889 1.00 82889
TOTAL 82889 --- 82889

26) ACOMETIDA A NIVEL TRANSFORMADOR "TG-BT" A= 8066 m2


DESCRIPCION PI (W) F.D. M.D. (W)
TGE 738198 900 x 870431 W x 0.80 77698
TTA-2 (BOMBA CONTRA INCENDIO) 82889 8066 m2
TTA-3 (PRESURIZACION ESCALERA) 12433
TTA-4 (EXTRACCION DE MONOXIDO) 24478 7166 x 870431 W x 0.65 502651
TTA-5 (PRESURIZACION DE ESCALERA) 12433 8066 m2
SUB TOTAL 870431 --- 580349
FACTOR DE SIMULTANEIDAD --- 0.70
TOTAL 870431 406244
SE DEFINE TRANSFORMADOR DE: 500 KVA

SOLICITAR A LUZ DEL SUR S.A.

1) NUEVO PUNTO DE DISEÑO PARA UNA CARGA DE 397kW,22,9kV PARA EL TABLERO GENERAL
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
N2XOH
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TG-BT 406244 380 0.85 1.00 3 726.15 907.68 3x 1000 2 240 1050 6 0.084 0.137 0.249 0.68 0.18% 0.18%
TTA-3 (TC-PR1) 12433 380 0.80 1.00 3 23.61 29.52 3x 40 1 10 95 48 1.995 0.166 2.937 4.16 1.09% 1.27%
TTA-4 (TF-MO) 24478 380 0.80 1.00 3 46.49 58.11 3x 60 1 16 125 33 1.247 0.152 1.886 3.62 0.95% 1.13%
TTA-5 (TC-PR2 12433 380 0.80 1.00 3 23.61 29.52 3x 40 1 10 95 72 1.995 0.166 2.937 6.24 1.64% 1.82%
TTA-P (TGE) 369138 380 0.80 1.00 3 701.06 876.32 3x 1000 3 120 1140 6 0.167 0.140 0.377 0.66 0.17% 0.35%

LSOH-90
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TGE 369138 380 0.66 0.17% 0.35%
TD-S1 11059 380 0.80 1.00 3 21.00 26.25 3x 40 1 10 62 39 1.995 0.166 2.937 3.01 0.79% 1.14%
TD-S2 10725 380 0.80 1.00 3 20.37 25.46 3x 40 1 10 62 42 1.995 0.166 2.937 3.14 0.83% 1.18%
TD-OF 8437 380 0.80 1.00 3 16.02 20.03 3x 40 1 10 62 39 1.995 0.166 2.937 2.29 0.60% 0.96%
STG-1P 82289 380 0.80 1.00 3 156.28 195.35 3x 200 1 70 203 12 0.286 0.143 0.545 1.28 0.34% 0.69%
TD-11 4400 380 0.80 1.00 3 8.36 10.45 3x 30 1 10 62 3 1.995 0.166 2.937 0.09 0.02% 0.71%
TD-BAR 15756 380 0.80 1.00 3 29.92 37.40 3x 50 1 10 62 18 1.995 0.166 2.937 1.98 0.52% 1.21%
TD-CO 33589 380 0.80 1.00 3 63.79 79.74 3x 100 1 25 107 17 0.798 0.152 1.264 1.71 0.45% 1.14%
TD-LC 3818 380 0.80 1.00 3 7.25 9.06 3x 30 1 10 62 10 1.995 0.166 2.937 0.27 0.07% 0.76%
TF-1P 6631 380 0.80 1.00 3 12.59 15.74 3x 30 1 10 62 21 1.995 0.166 2.937 0.97 0.26% 0.94%
H-107 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.36%
H-108 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 36 3.325 0.166 5.519 1.61 0.73% 1.42%
H-109 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.02%
STG-2P 161170 380 0.80 1.00 3 306.09 382.61 3x 400 2 70 406 18 0.286 0.143 0.545 1.88 0.49% 0.85%
TD-21 23667 380 0.80 1.00 3 44.95 56.18 3x 70 1 16 85 2 1.247 0.152 1.886 0.21 0.06% 0.90%
TD-31 23667 380 0.80 1.00 3 44.95 56.18 3x 70 1 16 85 5 1.247 0.152 1.886 0.53 0.14% 0.99%
TD-41 23667 380 0.80 1.00 3 44.95 56.18 3x 70 1 16 85 8 1.247 0.152 1.886 0.85 0.22% 1.07%
TD-51 23667 380 0.80 1.00 3 44.95 56.18 3x 70 1 16 85 11 1.247 0.152 1.886 1.17 0.31% 1.15%
TD-61 23667 380 0.80 1.00 3 44.95 56.18 3x 70 1 25 107 14 0.798 0.152 1.264 0.99 0.26% 1.11%
TD-71 23667 380 0.80 1.00 3 44.95 56.18 3x 70 1 25 107 17 0.798 0.152 1.264 1.21 0.32% 1.16%
TD-81 23667 380 0.80 1.00 3 44.95 56.18 3x 70 1 25 107 20 0.798 0.152 1.264 1.42 0.37% 1.22%
TD-AZ 17716 380 0.80 1.00 3 33.65 42.06 3x 50 1 10 62 24 1.995 0.166 2.937 2.96 0.78% 1.63%
TF-SH 4352 380 0.80 1.00 3 8.26 10.33 3x 30 1 10 62 24 1.995 0.166 2.937 0.73 0.19% 1.04%
TG-UPS 13800 380 0.80 1.00 3 26.21 32.76 3x 40 1 10 62 15 1.995 0.166 2.937 1.44 0.38% 0.73%
UPS-S1 7650 380 0.80 1.00 1 25.16 31.46 3x 40 1 6 44 3 3.325 0.166 5.519 0.52 0.14% 0.87%
UPS-11 4200 380 0.80 1.00 1 13.82 17.27 3x 30 1 6 44 8 3.325 0.166 5.519 0.76 0.20% 0.93%
UPS-AZ 1950 380 0.80 1.00 1 6.41 8.02 3x 30 1 6 44 27 3.325 0.166 5.519 1.19 0.31% 1.05%
TC-CH1 106300 380 0.80 1.00 3 201.88 252.35 3x 300 1 150 318 81 0.134 0.141 0.332 6.79 1.79% 2.14%
TC-CH2 106300 380 0.80 1.00 3 201.88 252.35 3x 300 1 150 318 81 0.134 0.141 0.332 6.79 1.79% 2.14%
TF-AZ 82474 380 0.85 1.00 3 147.42 191.65 3x 200 1 70 203 72 0.286 0.143 0.552 7.61 2.00% 2.35%
TF-BA 35228 380 0.80 1.00 3 66.90 86.97 3x 100 1 25 107 24 0.798 0.152 1.264 2.64 0.69% 1.05%
TF-ASC-1 7460 380 0.80 1.00 3 14.17 19.84 3x 40 1 16 85 57 1.247 0.152 1.886 2.13 0.56% 0.91%
TF-ASC-2 7460 380 0.80 1.00 3 14.17 19.84 3x 40 1 16 85 57 1.247 0.152 1.886 2.13 0.56% 0.91%
TF-ASC-3 8289 380 0.80 1.00 3 15.74 22.04 3x 40 1 16 85 57 1.247 0.152 1.886 2.37 0.62% 0.98%
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
TF-ASC-4 2487 380 0.80 1.00 3 4.72 6.61 3x 30 1 6 44 27 3.325 0.166 4.780 0.85 0.22% 0.58%
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS 18 In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TD-21 23667 380 0.21 0.06% 0.90%
H-201 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 12 3.325 0.166 5.519 0.54 0.24% 1.15%
H-202 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 13 3.325 0.166 5.519 0.58 0.26% 1.17%
H-203 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 21 3.325 0.166 5.519 0.94 0.43% 1.33%
H-204 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 22 3.325 0.166 5.519 0.99 0.45% 1.35%
H-205 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 29 3.325 0.166 5.519 1.30 0.59% 1.49%
H-206 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.57%
H-207 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 36 3.325 0.166 5.519 1.61 0.73% 1.63%
H-208 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 35 3.325 0.166 5.519 1.57 0.71% 1.61%
H-209 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 32 3.325 0.166 5.519 1.43 0.65% 1.55%
H-210 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 28 3.325 0.166 5.519 1.25 0.57% 1.47%
H-211 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 22 3.325 0.166 5.519 0.99 0.45% 1.35%
H-212 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 21 3.325 0.166 5.519 0.94 0.43% 1.33%
H-213 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 15 3.325 0.166 5.519 0.67 0.31% 1.21%
H-214 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 9 3.325 0.166 5.519 0.40 0.18% 1.08%
H-215 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 9 3.325 0.166 5.519 0.40 0.18% 1.08%
H-216 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 13 3.325 0.166 5.519 0.58 0.26% 1.17%
H-217 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 13 3.325 0.166 5.519 0.58 0.26% 1.17%
H-218 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 10 3.325 0.166 5.519 0.45 0.20% 1.11%
H-219 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 8 3.325 0.166 5.519 0.36 0.16% 1.06%
H-220 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 8 3.325 0.166 5.519 0.36 0.16% 1.06%
H-221 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 13 3.325 0.166 5.519 0.58 0.26% 1.17%
H-222 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 14 3.325 0.166 5.519 0.63 0.29% 1.19%
H-223 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 20 3.325 0.166 5.519 0.90 0.41% 1.31%
H-224 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 20 3.325 0.166 5.519 0.90 0.41% 1.31%
H-225 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 14 3.325 0.166 5.519 0.63 0.29% 1.19%
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TD-31 23667 380 0.53 0.14% 0.99%
H-301 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 16 3.325 0.166 5.519 0.72 0.33% 1.31%
H-302 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 17 3.325 0.166 5.519 0.76 0.35% 1.33%
H-303 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 25 3.325 0.166 5.519 1.12 0.51% 1.49%
H-304 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 26 3.325 0.166 5.519 1.17 0.53% 1.51%
H-305 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.66%
H-306 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 37 3.325 0.166 5.519 1.66 0.75% 1.74%
H-307 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 40 3.325 0.166 5.519 1.79 0.81% 1.80%
H-308 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 39 3.325 0.166 5.519 1.75 0.79% 1.78%
H-309 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 36 3.325 0.166 5.519 1.61 0.73% 1.72%
H-310 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 32 3.325 0.166 5.519 1.43 0.65% 1.64%
H-311 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 26 3.325 0.166 5.519 1.17 0.53% 1.51%
H-312 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 25 3.325 0.166 5.519 1.12 0.51% 1.49%
H-313 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 19 3.325 0.166 5.519 0.85 0.39% 1.37%
H-314 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 13 3.325 0.166 5.519 0.58 0.26% 1.25%
H-315 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 13 3.325 0.166 5.519 0.58 0.26% 1.25%
H-316 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 17 3.325 0.166 5.519 0.76 0.35% 1.33%
H-317 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 17 3.325 0.166 5.519 0.76 0.35% 1.33%
H-318 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 14 3.325 0.166 5.519 0.63 0.29% 1.27%
H-319 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 12 3.325 0.166 5.519 0.54 0.24% 1.23%
H-320 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 12 3.325 0.166 5.519 0.54 0.24% 1.23%
H-321 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 17 3.325 0.166 5.519 0.76 0.35% 1.33%
H-322 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 18 3.325 0.166 5.519 0.81 0.37% 1.35%
H-323 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 24 3.325 0.166 5.519 1.08 0.49% 1.47%
H-324 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 24 3.325 0.166 5.519 1.08 0.49% 1.47%
H-325 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 18 3.325 0.166 5.519 0.81 0.37% 1.35%
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TD-41 23667 380 0.85 0.22% 1.07%
H-401 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 20 3.325 0.166 5.519 0.90 0.41% 1.48%
H-402 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 21 3.325 0.166 5.519 0.94 0.43% 1.50%
H-403 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 29 3.325 0.166 5.519 1.30 0.59% 1.66%
H-404 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 30 3.325 0.166 5.519 1.34 0.61% 1.68%
H-405 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 37 3.325 0.166 5.519 1.66 0.75% 1.82%
H-406 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 41 3.325 0.166 5.519 1.84 0.84% 1.90%
H-407 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 44 3.325 0.166 5.519 1.97 0.90% 1.97%
H-408 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 43 3.325 0.166 5.519 1.93 0.88% 1.94%
H-409 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 40 3.325 0.166 5.519 1.79 0.81% 1.88%
H-410 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 36 3.325 0.166 5.519 1.61 0.73% 1.80%
H-411 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 30 3.325 0.166 5.519 1.34 0.61% 1.68%
H-412 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 29 3.325 0.166 5.519 1.30 0.59% 1.66%
H-413 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 23 3.325 0.166 5.519 1.03 0.47% 1.54%
H-414 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 17 3.325 0.166 5.519 0.76 0.35% 1.42%
H-415 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 17 3.325 0.166 5.519 0.76 0.35% 1.42%
H-416 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 21 3.325 0.166 5.519 0.94 0.43% 1.50%
H-417 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 21 3.325 0.166 5.519 0.94 0.43% 1.50%
H-418 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 18 3.325 0.166 5.519 0.81 0.37% 1.44%
H-419 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 16 3.325 0.166 5.519 0.72 0.33% 1.39%
H-420 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 16 3.325 0.166 5.519 0.72 0.33% 1.39%
H-421 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 21 3.325 0.166 5.519 0.94 0.43% 1.50%
H-422 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 22 3.325 0.166 5.519 0.99 0.45% 1.52%
H-423 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 28 3.325 0.166 5.519 1.25 0.57% 1.64%
H-424 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 28 3.325 0.166 5.519 1.25 0.57% 1.64%
H-425 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 22 3.325 0.166 5.519 0.99 0.45% 1.52%
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TD-51 23667 380 1.17 0.31% 1.15%
H-501 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 24 3.325 0.166 5.519 1.08 0.49% 1.64%
H-502 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 25 3.325 0.166 5.519 1.12 0.51% 1.66%
H-503 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.82%
H-504 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 34 3.325 0.166 5.519 1.52 0.69% 1.85%
H-505 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 41 3.325 0.166 5.519 1.84 0.84% 1.99%
H-506 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 45 3.325 0.166 5.519 2.02 0.92% 2.07%
H-507 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 48 3.325 0.166 5.519 2.15 0.98% 2.13%
H-508 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 47 3.325 0.166 5.519 2.11 0.96% 2.11%
H-509 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 44 3.325 0.166 5.519 1.97 0.90% 2.05%
H-510 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 40 3.325 0.166 5.519 1.79 0.81% 1.97%
H-511 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 34 3.325 0.166 5.519 1.52 0.69% 1.85%
H-512 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.82%
H-513 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 27 3.325 0.166 5.519 1.21 0.55% 1.70%
H-514 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 21 3.325 0.166 5.519 0.94 0.43% 1.58%
H-515 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 21 3.325 0.166 5.519 0.94 0.43% 1.58%
H-516 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 25 3.325 0.166 5.519 1.12 0.51% 1.66%
H-517 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 25 3.325 0.166 5.519 1.12 0.51% 1.66%
H-518 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 22 3.325 0.166 5.519 0.99 0.45% 1.60%
H-519 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 20 3.325 0.166 5.519 0.90 0.41% 1.56%
H-520 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 20 3.325 0.166 5.519 0.90 0.41% 1.56%
H-521 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 25 3.325 0.166 5.519 1.12 0.51% 1.66%
H-522 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 26 3.325 0.166 5.519 1.17 0.53% 1.68%
H-523 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 32 3.325 0.166 5.519 1.43 0.65% 1.80%
H-524 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 32 3.325 0.166 5.519 1.43 0.65% 1.80%
H-525 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 26 3.325 0.166 5.519 1.17 0.53% 1.68%
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TD-61 23667 380 0.99 0.26% 1.11%
H-601 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 28 3.325 0.166 5.519 1.25 0.57% 1.68%
H-602 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 29 3.325 0.166 5.519 1.30 0.59% 1.70%
H-603 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 37 3.325 0.166 5.519 1.66 0.75% 1.86%
H-604 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 38 3.325 0.166 5.519 1.70 0.77% 1.88%
H-605 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 45 3.325 0.166 5.519 2.02 0.92% 2.02%
H-606 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 49 3.325 0.166 5.519 2.20 1.00% 2.11%
H-607 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 52 3.325 0.166 5.519 2.33 1.06% 2.17%
H-608 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 51 3.325 0.166 5.519 2.29 1.04% 2.15%
H-609 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 48 3.325 0.166 5.519 2.15 0.98% 2.09%
H-610 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 44 3.325 0.166 5.519 1.97 0.90% 2.00%
H-611 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 38 3.325 0.166 5.519 1.70 0.77% 1.88%
H-612 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 37 3.325 0.166 5.519 1.66 0.75% 1.86%
H-613 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 31 3.325 0.166 5.519 1.39 0.63% 1.74%
H-614 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 25 3.325 0.166 5.519 1.12 0.51% 1.62%
H-615 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 25 3.325 0.166 5.519 1.12 0.51% 1.62%
H-616 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 29 3.325 0.166 5.519 1.30 0.59% 1.70%
H-617 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 29 3.325 0.166 5.519 1.30 0.59% 1.70%
H-618 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 26 3.325 0.166 5.519 1.17 0.53% 1.64%
H-619 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 24 3.325 0.166 5.519 1.08 0.49% 1.60%
H-620 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 24 3.325 0.166 5.519 1.08 0.49% 1.60%
H-621 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 29 3.325 0.166 5.519 1.30 0.59% 1.70%
H-622 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 30 3.325 0.166 5.519 1.34 0.61% 1.72%
H-623 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 36 3.325 0.166 5.519 1.61 0.73% 1.84%
H-624 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 36 3.325 0.166 5.519 1.61 0.73% 1.84%
H-625 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 30 3.325 0.166 5.519 1.34 0.61% 1.72%
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TD-71 23667 380 1.21 0.32% 1.16%
H-701 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 32 3.325 0.166 5.519 1.43 0.65% 1.82%
H-702 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.84%
H-703 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 41 3.325 0.166 5.519 1.84 0.84% 2.00%
H-704 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 42 3.325 0.166 5.519 1.88 0.86% 2.02%
H-705 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 49 3.325 0.166 5.519 2.20 1.00% 2.16%
H-706 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 53 3.325 0.166 5.519 2.38 1.08% 2.24%
H-707 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 56 3.325 0.166 5.519 2.51 1.14% 2.30%
H-708 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 55 3.325 0.166 5.519 2.46 1.12% 2.28%
H-709 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 52 3.325 0.166 5.519 2.33 1.06% 2.22%
H-710 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 48 3.325 0.166 5.519 2.15 0.98% 2.14%
H-711 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 42 3.325 0.166 5.519 1.88 0.86% 2.02%
H-712 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 41 3.325 0.166 5.519 1.84 0.84% 2.00%
H-713 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 35 3.325 0.166 5.519 1.57 0.71% 1.88%
H-714 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 29 3.325 0.166 5.519 1.30 0.59% 1.75%
H-715 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 29 3.325 0.166 5.519 1.30 0.59% 1.75%
H-716 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.84%
H-717 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.84%
H-718 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 30 3.325 0.166 5.519 1.34 0.61% 1.77%
H-719 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 28 3.325 0.166 5.519 1.25 0.57% 1.73%
H-720 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 28 3.325 0.166 5.519 1.25 0.57% 1.73%
H-721 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.84%
H-722 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 34 3.325 0.166 5.519 1.52 0.69% 1.86%
H-723 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 40 3.325 0.166 5.519 1.79 0.81% 1.98%
H-724 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 40 3.325 0.166 5.519 1.79 0.81% 1.98%
H-725 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 34 3.325 0.166 5.519 1.52 0.69% 1.86%
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TD-81 23667 380 1.42 0.37% 1.22%
H-801 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 36 3.325 0.166 5.519 1.61 0.73% 1.95%
H-802 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 37 3.325 0.166 5.519 1.66 0.75% 1.97%
H-803 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 45 3.325 0.166 5.519 2.02 0.92% 2.14%
H-804 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 46 3.325 0.166 5.519 2.06 0.94% 2.16%
H-805 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 53 3.325 0.166 5.519 2.38 1.08% 2.30%
H-806 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 57 3.325 0.166 5.519 2.55 1.16% 2.38%
H-807 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 60 3.325 0.166 5.519 2.69 1.22% 2.44%
H-808 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 59 3.325 0.166 5.519 2.64 1.20% 2.42%
H-809 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 56 3.325 0.166 5.519 2.51 1.14% 2.36%
H-810 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 52 3.325 0.166 5.519 2.33 1.06% 2.28%
H-811 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 46 3.325 0.166 5.519 2.06 0.94% 2.16%
H-812 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 45 3.325 0.166 5.519 2.02 0.92% 2.14%
H-813 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 39 3.325 0.166 5.519 1.75 0.79% 2.01%
H-814 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.89%
H-815 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 33 3.325 0.166 5.519 1.48 0.67% 1.89%
H-816 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 37 3.325 0.166 5.519 1.66 0.75% 1.97%
H-817 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 37 3.325 0.166 5.519 1.66 0.75% 1.97%
H-818 T-HAB.1 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 34 3.325 0.166 5.519 1.52 0.69% 1.91%
H-819 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 32 3.325 0.166 5.519 1.43 0.65% 1.87%
H-820 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 32 3.325 0.166 5.519 1.43 0.65% 1.87%
H-821 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 37 3.325 0.166 5.519 1.66 0.75% 1.97%
H-822 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 38 3.325 0.166 5.519 1.70 0.77% 1.99%
H-823 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 44 3.325 0.166 5.519 1.97 0.90% 2.12%
H-824 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 44 3.325 0.166 5.519 1.97 0.90% 2.12%
H-825 T-HAB.2 1143 220 0.80 1.00 1 6.50 8.12 1x 20 1 6 44 38 3.325 0.166 5.519 1.70 0.77% 1.99%

N2XOH
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%) ∑ΔV(%)
TF-BCI 82889 380 0.80 1.00 3 157 197 3x 200 1 50 230 27 0.399 0.146 0.705 3.74 0.99% 0.99%
BCI 82889 380 0.80 1.00 3 157 157 3x 200 1 50 230 6 0.399 0.146 0.705 0.67 0.18% 1.16%
FUENTE: INDECO

FREETOX NHX-80
Conductor de cobre electrolítico recocido, sólido o cableado. Aislamiento de compuesto termoplástico no halogenado HFFR.
Tensión de servicio: 450/750 V Temperatura de operación: 80ºC
TABLA DE DATOS TECNICOS NH-80

CALIBRE N° HILOS DIAMETRO DIAMETRO ESPESOR DIAMETRO PESO AMPERAJE (*)


CONDUCTOR HILO CONDUCTOR AISLAMIENTO EXTERIOR

AIRE DUCTO
mm² mm mm mm mm Kg/Km A A
1.5 7 0.52 1.5 0.7 2.9 20 18 14
2.5 7 0.66 1.92 0.8 3.5 31 30 24
4 7 0.84 2.44 0.8 4 46 35 31
6 7 1.02 2.98 0.8 4.6 65 50 39
10 7 1.33 3.99 1 6 110 74 51
16 7 1.69 4.67 1 6.7 167 99 68
25 7 2.13 5.88 1.2 8.3 262 132 88
35 7 2.51 6.92 1.2 9.3 356 165 110
50 19 1.77 8.15 1.4 11 480 204 138
70 19 2.13 9.78 1.4 12.6 678 253 165
95 19 2.51 11.55 1.6 14.8 942 303 198
120 37 2.02 13 1.6 16.2 1174 352 231
150 37 2.24 14.41 1.8 18 1443 413 264
185 37 2.51 16.16 2 20.2 1809 473 303
240 37 2.87 18.51 2.2 22.9 2368 528 352
300 37 3.22 20.73 2.4 25.5 2963 633 391
(*)  TEMPERATURA AMBIENTE 30°C.
NO MAS DE TRES CONDUCTORES POR DUCTO.
FUENTE: INDECO

FREETOX NHX-80
Conductor de cobre electrolítico recocido, sólido o cableado. Aislamiento de compuesto termoplástico no halogenado HFFR.
Tensión de servicio: 450/750 V Temperatura de operación: 80ºC
TABLA DE DATOS TECNICOS NH-80

CALIBRE N° HILOS DIAMETRO DIAMETRO ESPESOR DIAMETRO PESO AMPERAJE (*)


CONDUCTOR HILO CONDUCTOR AISLAMIENTO EXTERIOR

AIRE DUCTO
mm² mm mm mm mm Kg/Km A A
1.5 7 0.52 1.5 0.7 2.9 20 18 14
2.5 7 0.66 1.92 0.8 3.5 31 30 24
4 7 0.84 2.44 0.8 4 46 35 31
6 7 1.02 2.98 0.8 4.6 65 50 39
10 7 1.33 3.99 1 6 110 74 51
16 7 1.69 4.67 1 6.7 167 99 68
25 7 2.13 5.88 1.2 8.3 262 132 88
35 7 2.51 6.92 1.2 9.3 356 165 110
50 19 1.77 8.15 1.4 11 480 204 138
70 19 2.13 9.78 1.4 12.6 678 253 165
95 19 2.51 11.55 1.6 14.8 942 303 198
120 37 2.02 13 1.6 16.2 1174 352 231
150 37 2.24 14.41 1.8 18 1443 413 264
185 37 2.51 16.16 2 20.2 1809 473 303
240 37 2.87 18.51 2.2 22.9 2368 528 352
300 37 3.22 20.73 2.4 25.5 2963 633 391
(*)  TEMPERATURA AMBIENTE 30°C.
NO MAS DE TRES CONDUCTORES POR DUCTO.
FUENTE: INDECO

FREETOX NHX-80
Conductor de cobre electrolítico recocido, sólido o cableado. Aislamiento de compuesto termoplástico no halogenado HFFR.
Tensión de servicio: 450/750 V Temperatura de operación: 80ºC
TABLA DE DATOS TECNICOS NH-80

CALIBRE N° HILOS DIAMETRO DIAMETRO ESPESOR DIAMETRO PESO AMPERAJE (*)


CONDUCTOR HILO CONDUCTOR AISLAMIENTO EXTERIOR

AIRE DUCTO
mm² mm mm mm mm Kg/Km A A
1.5 7 0.52 1.5 0.7 2.9 20 18 14
2.5 7 0.66 1.92 0.8 3.5 31 30 24
4 7 0.84 2.44 0.8 4 46 35 31
6 7 1.02 2.98 0.8 4.6 65 50 39
10 7 1.33 3.99 1 6 110 74 51
16 7 1.69 4.67 1 6.7 167 99 68
25 7 2.13 5.88 1.2 8.3 262 132 88
35 7 2.51 6.92 1.2 9.3 356 165 110
50 19 1.77 8.15 1.4 11 480 204 138
70 19 2.13 9.78 1.4 12.6 678 253 165
95 19 2.51 11.55 1.6 14.8 942 303 198
120 37 2.02 13 1.6 16.2 1174 352 231
150 37 2.24 14.41 1.8 18 1443 413 264
185 37 2.51 16.16 2 20.2 1809 473 303
240 37 2.87 18.51 2.2 22.9 2368 528 352
300 37 3.22 20.73 2.4 25.5 2963 633 391
(*)  TEMPERATURA AMBIENTE 30°C.
NO MAS DE TRES CONDUCTORES POR DUCTO.
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
N2XOH
TABLEROS M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km)
TG-CAMP 950000 440 0.85 1.00 3 1466.53 1833.16 3x 1800 8 240 4488 12 0.084
TG-CAMP1 750000 440 0.85 1.00 3 1157.79 1447.23 3x 1600 4 240 2244 12 0.084
TG-CAMP2 200000 440 0.85 1.00 3 308.74 385.93 3x 400 14 240 7854 0.084
TG-CAMP3 440 0.80 1.00 3 0.00 0.00 3x 1 10 95 72 1.995
TG-CAMP4 440 0.80 1.00 3 0.00 0.00 3x 3 120 1140 6 0.167

NYY
TABLEROS Pot. Instalada (W) F.D (%) M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km)
TG-CAMP1 0 380
TG-1 169,630.00 136,662.50 440 0.85 1.00 3 210.97 263.71 3x 300 1 185 483 132 0.109
TG-2 165,320.00 131,120.50 440 0.85 1.00 3 202.41 253.02 3x 300 1 185 483 142 0.109
TG-3 165,840.00 132,412.00 400 0.85 1.00 3 224.85 281.06 3x 300 5 240 2805 250 0.084
TG-1 169,630.00 136,662.50 440
C1 Comedor 01 11,150.00 0.75 8,362.50 440 0.85 1.00 3 12.91 16.14 3x 20 1 10 95 30 1.995
C2 Cocina 01 20,000.00 0.80 16,000.00 440 0.85 1.00 3 24.70 30.87 3x 32 1 16 127 75 1.247
C3 Caldera 3,920.00 0.80 3,136.00 440 0.85 1.00 3 4.84 6.05 3x 10 1 10 95 60 1.995
Congelados,
C4 Refrigerados 5,030.00 0.80 4,024.00 440 0.85 1.00 3 6.21 7.76 3x 10 1 10 95 80 1.995
C5 Mano de Obra 54,300.00 0.80 43,440.00 440 0.85 1.00 3 67.06 83.82 3x 100 1 150 428 100 0.134
C6 Ilum. Exterior 5,200.00 1.00 5,200.00 440 0.85 1.00 3 8.03 10.03 3x 10 1 10 95 12 1.995
C6a Ilum. Exterior 1,200.00 1.00 1,200.00 440 0.85 1.00 3 1.85 2.32 3x 1 10 95 33 1.995
C6a1 Ilum. Exterior 400.00 1.00 400.00 220 0.85 1.00 1 2.14 2.67 3x 1 10 95 47 1.995
C6b Ilum. Exterior 1,200.00 1.00 1,200.00 440 0.85 1.00 3 1.85 2.32 3x 1 10 95 44 1.995
C6b1 Ilum. Exterior 800.00 1.00 800.00 440 0.85 1.00 3 1.23 1.54 3x 1 10 95 33 1.995
C6b2 Ilum. Exterior 800.00 1.00 400.00 440 0.85 1.00 3 0.62 0.77 3x 1 10 95 119 1.995
C6c Ilum. Exterior 1,200.00 1.00 1,200.00 400 0.85 1.00 3 2.04 2.55 3x 1 10 95 29 1.995
C6d Ilum. Exterior 1,200.00 1.00 1,200.00 440 0.85 1.00 3 1.85 2.32 3x 1 10 95 62 1.995
C6e Ilum. Exterior 800.00 1.00 800.00 440 0.85 1.00 3 1.23 1.54 3x 1 10 95 27 1.995
C6f Ilum. Exterior 800.00 1.00 800.00 440 0.85 1.00 3 1.23 1.54 3x 1 10 95 27 1.995
C7 Oficina 01-a 67,670.00 0.82 55,330.00 440 0.85 1.00 3 85.41 106.77 3x 125 1 240 561 65 0.084
SSHH - Vestidores
C8 Cocina 1 1,020.00 0.75 765.00 440 0.85 1.00 3 1.18 1.48 3x 10 1 10 95 60 1.995
C9 SSHH - Cocina 540.00 0.75 405.00 440 0.85 1.00 3 0.63 0.78 3x 10 1 10 95 95 1.995
TG-2 165,320.00 131,120.50 440
C1 PTAR 24,690.00 0.75 18,517.50 440 0.85 1.00 3 28.59 35.73 3x 40 1 25 163 110 0.798
C2 Oficina 01-B 67,670.00 0.82 55,330.00 440 0.85 1.00 3 85.41 106.77 3x 125 1 240 561 105 0.084
C3 Secos 2,010.00 0.80 1,608.00 440 0.85 1.00 3 2.48 3.10 3x 10 1 10 95 90 1.995
C4 Staff 02-a 11,000.00 0.75 8,250.00 440 0.85 1.00 3 12.74 15.92 3x 16 1 10 95 86 1.995
C5 Staff 02-b 11,000.00 0.75 8,250.00 440 0.85 1.00 3 12.74 15.92 3x 16 1 10 95 120 1.995
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
C6 Staff-01 11,000.00 0.75 8,250.00 440 0.85 1.00 3 12.74 15.92 3x 16 1 10 95 65 1.995
C7 Ilum. Exterior 3,000.00 1.00 3,000.00 440 0.85 1.00 3 4.63 5.79 3x 10 1 10 95 42 1.995
C8 Comedor 02 34,050.00 0.80 27,240.00 440 0.85 1.00 3 42.05 52.56 3x 63 1 50 230 65 0.399
C9 SSHH - Comedor 01 900.00 0.75 675.00 440 0.85 1.00 3 1.04 1.30 3x 10 1 10 95 120 1.995
TG-2 165,840.00 132,412.00 440
C1 Est. Maq. Pesada 6,600.00 0.75 4,950.00 440 0.80 1.00 3 8.12 10.15 3x 16 1 10 95 200 1.995
C2 Cisterna 50,000.00 0.80 40,000.00 440 0.80 1.00 3 65.61 82.01 3x 100 1 150 428 110 0.134
C3 Losa Deportiva 01 1,600.00 0.80 1,280.00 440 0.80 1.00 3 2.10 2.62 3x 10 1 10 95 65 1.995
C4 Losa Deportiva 02 1,600.00 0.80 1,280.00 440 0.80 1.00 3 2.10 2.62 3x 10 1 10 95 95 1.995
C5 Sala Recreacional 25,000.00 0.75 18,750.00 440 0.80 1.00 3 30.75 38.44 3x 40 1 25 163 85 0.798
Almacen R.Peligrosos,
C6 R No Peligrosos 15,360.00 0.80 12,288.00 440 0.80 1.00 3 20.15 25.19 3x 30 1 150 428 436 0.134
C7 Almacen General 28,800.00 0.80 23,040.00 440 0.80 1.00 3 37.79 47.24 3x 50 1 120 382 295 0.167
C8 Control de Ingreso 1,030.00 0.80 824.00 440 0.80 1.00 3 1.35 1.69 3x 10 1 10 95 290 1.995
C9 Ilum. Exterior 3,300.00 1.00 3,300.00 440 0.80 1.00 3 5.41 6.77 3x 10 1 10 95 42 1.995
C10 Posta Medica 3,300.00 1.00 3,300.00 440 0.80 1.00 3 5.41 6.77 3x 10 1 10 95 65 1.995
C11 Grifo 12,250.00 0.80 9,800.00 440 0.80 1.00 3 16.07 20.09 3x 225 1 16 127 150 1.247
C12 Mano de Obra 01 17,000.00 0.80 13,600.00 440 0.80 1.00 3 22.31 27.88 3x 30 1 16 127 42 1.247

LSOH-90
TABLEROS Pot. Instalada (W) F.D (%) M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km)
TG-CAMP2 13600 380
TG-1 0.00 0.00 440 0.85 1.00 3 0.00 0.00 3x 40 1 10 95 39 1.995
TG-2 0.00 0.00 440 0.85 1.00 3 0.00 0.00 3x 40 1 10 95 42 1.995
TG-3 0.00 0.00 400 0.85 1.00 3 0.00 0.00 3x 40 1 10 95 39 1.995
TG-1 0.00 0.00 440
C1 OFICINAS 1 0.75 0.00 440 0.85 1.00 3 0.00 0.00 3x 20 1 10 95 39 1.995
C2 OFICINAS 2 0.80 0.00 440 0.85 1.00 3 0.00 0.00 3x 32 1 10 95 42 1.995
C3 ALMACEN 0.80 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
REIDUOS PELIGROSOS
C4 RESIDUOS NO PELIGROSOS 0.80 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C5 COMEDORES 0.80 0.00 440 0.85 1.00 3 0.00 0.00 3x 100 1 10 95 42 1.995
C6 ILUMINACION EXTERIOR 1.00 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C7 Oficina 01-a 0.00 440 0.85 1.00 3 0.00 0.00 3x 125 1 10 95 42 1.995
SSHH - Vestidores
C8 Cocina 1 0.75 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C9 SSHH - Cocina 0.75 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
TG-2 0.00 0.00 440
C1 0.00 440 0.85 1.00 3 0.00 0.00 3x 40 1 10 95 39 1.995
C2 0.00 440 0.85 1.00 3 0.00 0.00 3x 125 1 10 95 42 1.995
C3 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C4 0.00 440 0.85 1.00 3 0.00 0.00 3x 16 1 10 95 42 1.995
PROYECTO: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
C5 0.00 440 0.85 1.00 3 0.00 0.00 3x 16 1 10 95 42 1.995
C6 0.00 440 0.85 1.00 3 0.00 0.00 3x 16 1 10 95 42 1.995
C7 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C8 0.00 440 0.85 1.00 3 0.00 0.00 3x 63 1 10 95 42 1.995
C9 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
TG-2 0.00 0.00 440
C1 0.75 0.00 440 0.80 1.00 3 0.00 0.00 3x 16 1 10 95 39 1.995
C2 0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 100 1 10 95 42 1.995
C3 0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C4 0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C5 0.75 0.00 440 0.80 1.00 3 0.00 0.00 3x 40 1 10 95 42 1.995
C6 0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 30 1 10 95 42 1.995
C7 0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 50 1 10 95 42 1.995
C8 0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C9 1.00 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C10 1.00 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995
C11 0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 225 1 10 95 42 1.995
C12 0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 30 1 10 95 42 1.995
O: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
N2XOH
M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%)
950000 440 0.85 1.00 3 1466.53 1833.16 3x 1800 8 240 4488 12 0.084 0.137 0.249 0.68 0.16%
750000 440 0.85 1.00 3 1157.79 1447.23 3x 1600 4 240 2244 12 0.084 0.137 0.249 1.08 0.25%
200000 440 0.85 1.00 3 308.74 385.93 3x 400 14 240 7854 0.084 0.137 0.249 0.00 0.00%
440 0.80 1.00 3 0.00 0.00 3x 1 10 95 72 1.995 0.166 2.937 0.00 0.00%
440 0.80 1.00 3 0.00 0.00 3x 3 120 1140 6 0.167 0.140 0.377 0.00 0.00%

NYY
Pot. Instalada (W) F.D (%) M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%)
0 380 0.00 0.00%
169,630.00 136,662.50 440 0.85 1.00 3 210.97 263.71 3x 300 1 185 483 132 0.109 0.139 0.287 10.00 2.27%
165,320.00 131,120.50 440 0.85 1.00 3 202.41 253.02 3x 300 1 185 483 142 0.109 0.139 0.287 10.32 2.35%
165,840.00 132,412.00 400 0.85 1.00 3 224.85 281.06 3x 300 5 240 2805 250 0.084 0.137 0.249 3.49 0.87%
169,630.00 136,662.50 440 0.00 0.00%
Comedor 01 11,150.00 0.75 8,362.50 440 0.85 1.00 3 12.91 16.14 3x 20 1 10 95 30 1.995 0.166 3.089 1.50 0.34%
Cocina 01 20,000.00 0.80 16,000.00 440 0.85 1.00 3 24.70 30.87 3x 32 1 16 127 75 1.247 0.152 1.975 4.57 1.04%
Caldera 3,920.00 0.80 3,136.00 440 0.85 1.00 3 4.84 6.05 3x 10 1 10 95 60 1.995 0.166 3.089 1.12 0.25%
Congelados,
Refrigerados 5,030.00 0.80 4,024.00 440 0.85 1.00 3 6.21 7.76 3x 10 1 10 95 80 1.995 0.166 3.089 1.92 0.44%
Mano de Obra 54,300.00 0.80 43,440.00 440 0.85 1.00 3 67.06 83.82 3x 100 1 150 428 100 0.134 0.141 0.326 2.73 0.62%
Ilum. Exterior 5,200.00 1.00 5,200.00 440 0.85 1.00 3 8.03 10.03 3x 10 1 10 95 12 1.995 0.166 3.089 0.37 0.08%
Ilum. Exterior 1,200.00 1.00 1,200.00 440 0.85 1.00 3 1.85 2.32 3x 1 10 95 33 1.995 0.166 3.089 0.24 0.05%
Ilum. Exterior 400.00 1.00 400.00 220 0.85 1.00 1 2.14 2.67 3x 1 10 95 47 1.995 0.166 3.566 0.45 0.20%
Ilum. Exterior 1,200.00 1.00 1,200.00 440 0.85 1.00 3 1.85 2.32 3x 1 10 95 44 1.995 0.166 3.089 0.31 0.07%
Ilum. Exterior 800.00 1.00 800.00 440 0.85 1.00 3 1.23 1.54 3x 1 10 95 33 1.995 0.166 3.089 0.16 0.04%
Ilum. Exterior 800.00 1.00 400.00 440 0.85 1.00 3 0.62 0.77 3x 1 10 95 119 1.995 0.166 3.089 0.28 0.06%
Ilum. Exterior 1,200.00 1.00 1,200.00 400 0.85 1.00 3 2.04 2.55 3x 1 10 95 29 1.995 0.166 3.089 0.23 0.06%
Ilum. Exterior 1,200.00 1.00 1,200.00 440 0.85 1.00 3 1.85 2.32 3x 1 10 95 62 1.995 0.166 3.089 0.44 0.10%
Ilum. Exterior 800.00 1.00 800.00 440 0.85 1.00 3 1.23 1.54 3x 1 10 95 27 1.995 0.166 3.089 0.13 0.03%
Ilum. Exterior 800.00 1.00 800.00 440 0.85 1.00 3 1.23 1.54 3x 1 10 95 27 1.995 0.166 3.089 0.13 0.03%
Oficina 01-a 67,670.00 0.82 55,330.00 440 0.85 1.00 3 85.41 106.77 3x 125 1 240 561 65 0.084 0.137 0.249 1.73 0.39%
SHH - Vestidores
Cocina 1 1,020.00 0.75 765.00 440 0.85 1.00 3 1.18 1.48 3x 10 1 10 95 60 1.995 0.166 3.089 0.27 0.06%
SSHH - Cocina 540.00 0.75 405.00 440 0.85 1.00 3 0.63 0.78 3x 10 1 10 95 95 1.995 0.166 3.089 0.23 0.05%
165,320.00 131,120.50 440 0.37 0.08%
PTAR 24,690.00 0.75 18,517.50 440 0.85 1.00 3 28.59 35.73 3x 40 1 25 163 110 0.798 0.152 1.314 5.16 1.17%
Oficina 01-B 67,670.00 0.82 55,330.00 440 0.85 1.00 3 85.41 106.77 3x 125 1 240 561 105 0.084 0.137 0.249 2.79 0.63%
Secos 2,010.00 0.80 1,608.00 440 0.85 1.00 3 2.48 3.10 3x 10 1 10 95 90 1.995 0.166 3.089 0.86 0.20%
Staff 02-a 11,000.00 0.75 8,250.00 440 0.85 1.00 3 12.74 15.92 3x 16 1 10 95 86 1.995 0.166 3.089 4.23 0.96%
Staff 02-b 11,000.00 0.75 8,250.00 440 0.85 1.00 3 12.74 15.92 3x 16 1 10 95 120 1.995 0.166 3.089 5.90 1.34%
O: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
Staff-01 11,000.00 0.75 8,250.00 440 0.85 1.00 3 12.74 15.92 3x 16 1 10 95 65 1.995 0.166 3.089 3.20 0.73%
Ilum. Exterior 3,000.00 1.00 3,000.00 440 0.85 1.00 3 4.63 5.79 3x 10 1 10 95 42 1.995 0.166 3.089 0.75 0.17%
Comedor 02 34,050.00 0.80 27,240.00 440 0.85 1.00 3 42.05 52.56 3x 63 1 50 230 65 0.399 0.146 0.721 2.46 0.56%
HH - Comedor 01 900.00 0.75 675.00 440 0.85 1.00 3 1.04 1.30 3x 10 1 10 95 120 1.995 0.166 3.089 0.48 0.11%
165,840.00 132,412.00 440 3.20 0.73%
st. Maq. Pesada 6,600.00 0.75 4,950.00 440 0.80 1.00 3 8.12 10.15 3x 16 1 10 95 200 1.995 0.166 2.937 5.96 1.35%
Cisterna 50,000.00 0.80 40,000.00 440 0.80 1.00 3 65.61 82.01 3x 100 1 150 428 110 0.134 0.141 0.332 3.00 0.68%
osa Deportiva 01 1,600.00 0.80 1,280.00 440 0.80 1.00 3 2.10 2.62 3x 10 1 10 95 65 1.995 0.166 2.937 0.50 0.11%
osa Deportiva 02 1,600.00 0.80 1,280.00 440 0.80 1.00 3 2.10 2.62 3x 10 1 10 95 95 1.995 0.166 2.937 0.73 0.17%
ala Recreacional 25,000.00 0.75 18,750.00 440 0.80 1.00 3 30.75 38.44 3x 40 1 25 163 85 0.798 0.152 1.264 4.13 0.94%
macen R.Peligrosos,
R No Peligrosos 15,360.00 0.80 12,288.00 440 0.80 1.00 3 20.15 25.19 3x 30 1 150 428 436 0.134 0.141 0.332 3.65 0.83%
Almacen General 28,800.00 0.80 23,040.00 440 0.80 1.00 3 37.79 47.24 3x 50 1 120 382 295 0.167 0.140 0.377 5.25 1.19%
ontrol de Ingreso 1,030.00 0.80 824.00 440 0.80 1.00 3 1.35 1.69 3x 10 1 10 95 290 1.995 0.166 2.937 1.44 0.33%
Ilum. Exterior 3,300.00 1.00 3,300.00 440 0.80 1.00 3 5.41 6.77 3x 10 1 10 95 42 1.995 0.166 2.937 0.83 0.19%
Posta Medica 3,300.00 1.00 3,300.00 440 0.80 1.00 3 5.41 6.77 3x 10 1 10 95 65 1.995 0.166 2.937 1.29 0.29%
Grifo 12,250.00 0.80 9,800.00 440 0.80 1.00 3 16.07 20.09 3x 225 1 16 127 150 1.247 0.152 1.886 5.68 1.29%
Mano de Obra 01 17,000.00 0.80 13,600.00 440 0.80 1.00 3 22.31 27.88 3x 30 1 16 127 42 1.247 0.152 1.886 2.21 0.50%

LSOH-90
Pot. Instalada (W) F.D (%) M.D.(W) U (V) cosφ n(%) FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) r(ohm/km) x(ohm/km) K ΔV(V) ΔV(%)
13600 380 2.21 0.58%
0.00 0.00 440 0.85 1.00 3 0.00 0.00 3x 40 1 10 95 39 1.995 0.166 3.089 0.00 0.00%
0.00 0.00 440 0.85 1.00 3 0.00 0.00 3x 40 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
0.00 0.00 400 0.85 1.00 3 0.00 0.00 3x 40 1 10 95 39 1.995 0.166 3.089 0.00 0.00%
0.00 0.00 440 2.21 0.50%
OFICINAS 1 0.75 0.00 440 0.85 1.00 3 0.00 0.00 3x 20 1 10 95 39 1.995 0.166 3.089 0.00 0.00%
OFICINAS 2 0.80 0.00 440 0.85 1.00 3 0.00 0.00 3x 32 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
ALMACEN 0.80 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
DUOS PELIGROSOS
UOS NO PELIGROSOS 0.80 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
COMEDORES 0.80 0.00 440 0.85 1.00 3 0.00 0.00 3x 100 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
MINACION EXTERIOR 1.00 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
Oficina 01-a 0.00 440 0.85 1.00 3 0.00 0.00 3x 125 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
SHH - Vestidores
Cocina 1 0.75 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
SSHH - Cocina 0.75 0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
0.00 0.00 440 0.00 0.00%
0.00 440 0.85 1.00 3 0.00 0.00 3x 40 1 10 95 39 1.995 0.166 3.089 0.00 0.00%
0.00 440 0.85 1.00 3 0.00 0.00 3x 125 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
0.00 440 0.85 1.00 3 0.00 0.00 3x 16 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
O: HOTEL HAMPTON

ΔV = K.I.L/1000
ΔV: CAIDA DE TENSION (V)
K: FACTOR DE CAIDA DE TENSION SELECCIÓN DEL INTERRUPTOR ( IEC 60364 )
K= v3(r.cosφ+x.senφTRIFASICO Icarga ≤ In ≤ In (cable)
K= 2(r.cosφ+x.senφ) MONOFASICO
L= LONGITUD (m)
0.00 440 0.85 1.00 3 0.00 0.00 3x 16 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
0.00 440 0.85 1.00 3 0.00 0.00 3x 16 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
0.00 440 0.85 1.00 3 0.00 0.00 3x 63 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
0.00 440 0.85 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 3.089 0.00 0.00%
0.00 0.00 440 0.00 0.00%
0.75 0.00 440 0.80 1.00 3 0.00 0.00 3x 16 1 10 95 39 1.995 0.166 2.937 0.00 0.00%
0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 100 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
0.75 0.00 440 0.80 1.00 3 0.00 0.00 3x 40 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 30 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 50 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
1.00 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
1.00 0.00 440 0.80 1.00 3 0.00 0.00 3x 10 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 225 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
0.80 0.00 440 0.80 1.00 3 0.00 0.00 3x 30 1 10 95 42 1.995 0.166 2.937 0.00 0.00%
N2XOH OK
TABLEROS U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
TG-CAMP2 380 0.85 3 977.30 1221.62 3x 1250 2 240 1050 15 0.60%

OK N2XOH

TABLEROS U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
TG-CAMP2
CAMP2-1 Tablero General 1 (TG-1) 380 0.85 3 236.93 296.16 3x 400 1 240 525 5 0.10%
CAMP2-2 Tablero General 2 (TG-2) 380 0.85 3 243.07 303.83 3x 400 2 150 820 84 1.09%
CAMP2-3 Tablero General 3 (TG-3) 380 0.85 3 497.30 621.62 3x 630 2 240 1050 72 1.46%

OK N2XOH
TABLEROS U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
TG-1 0.10%
TG1-1 T-EA.S 380 0.85 3 272.68 340.85 3x 400 1 150 410 40 1.27%
TG1-2 Ilum. Exterior 380 0.85 3 6.43 8.04 3x 16 1 6 68 236 2.62%
TG1-3 Ilum. Exterior 380 0.85 3 5.72 7.15 3x 16 1 6 68 210 2.09%
TG1-4 Oficina de seguridad (TD-OSEG) 220 0.85 1 33.90 42.38 3x 50 1 6 68 30 3.46%

Carga Instalada parcial 1


Demanda máxima parcial 1
Reserva
Carga Instalada parcial 2
Demanda máxima parcial 2
Factor de simultaneidad
Demanda máxima real

N2XOH
Edificios de alojamiento
TABLEROS U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
STAFF
T-EA.S 1.27%
CEA- S-1 Alojamiento Staff 1_TD-AS1 380 0.85 3 7.02 8.78 3x 16 1 4 55 40 0.69%
CEA- S-2 Alojamiento Staff 1_TD-AS2 380 0.85 3 7.02 8.78 3x 16 1 4 55 38 1.92%
CEA- S-3 Alojamiento Staff 1_TD-AS3 380 0.85 3 7.02 8.78 3x 16 1 4 55 32 1.82%
CEA- S-4 Alojamiento Staff 1_TD-AS4 380 0.85 3 7.02 8.78 3x 16 1 4 55 30 1.79%
CEA- S-5 Alojamiento Staff 1_TD-AS5 380 0.85 3 7.02 8.78 3x 16 1 4 55 24 1.68%
CEA- S-6 Alojamiento Staff 1_TD-AS6 380 0.85 3 7.02 8.78 3x 16 1 4 55 22 1.65%
CEA- S-7 Alojamiento Staff 1_TD-AS7 380 0.85 3 7.02 8.78 3x 16 1 4 55 16 1.54%
CEA- S-8 Alojamiento Staff 1_TD-AS8 380 0.85 3 7.02 8.78 3x 16 1 4 55 14 1.51%
CEA- S-9 Alojamiento Staff 1_TD-AS9 380 0.85 3 7.02 8.78 3x 16 1 4 55 15 1.53%
CEA- S-10 Alojamiento Staff 1_TD-AS10 380 0.85 3 7.02 8.78 3x 16 1 4 55 22 1.65%
CEA- S-11 Alojamiento Staff 1_TD-AS11 380 0.85 3 7.02 8.78 3x 16 1 4 55 58 2.27%
CEA- S-12 Alojamiento Staff 1_TD-AS12 380 0.85 3 7.02 8.78 3x 16 1 4 55 52 2.17%
CEA- S-13 Alojamiento Staff 1_TD-AS13 380 0.85 3 7.02 8.78 3x 16 1 4 55 48 2.10%
CEA- S-14 Alojamiento Staff 1_TD-AS14 380 0.85 3 7.02 8.78 3x 16 1 4 55 46 2.06%
CEA- S-15 Alojamiento Staff 1_TD-AS15 380 0.85 3 7.02 8.78 3x 16 1 4 55 40 1.96%
CEA- S-16 Alojamiento Staff 1_TD-AS16 380 0.85 3 7.02 8.78 3x 16 1 4 55 38 1.92%
CEA- S-17 Alojamiento Staff 1_TD-AS17 380 0.85 3 7.02 8.78 3x 16 1 4 55 32 1.82%
CEA- S-18 Alojamiento Staff 1_TD-AS18 380 0.85 3 7.02 8.78 3x 16 1 4 55 30 1.79%
CEA- S-19 Alojamiento Staff 1_TD-AS19 380 0.85 3 7.02 8.78 3x 16 1 4 55 24 1.68%
CEA- S-20 Alojamiento Staff 1_TD-AS20 380 0.85 3 7.02 8.78 3x 16 1 4 55 22 1.65%
CEA- S-21 Alojamiento Staff 1_TD-AS21 380 0.85 3 7.02 8.78 3x 16 1 4 55 23 1.66%
CEA- S-22 Alojamiento Staff 1_TD-AS22 380 0.85 3 7.02 8.78 3x 16 1 4 55 30 1.79%
CEA- S-23 Alojamiento Staff 1_TD-AS23 380 0.85 3 7.02 8.78 3x 16 1 4 55 65 2.39%
CEA- S-24 Alojamiento Staff 1_TD-AS24 380 0.85 3 7.02 8.78 3x 16 1 4 55 59 2.29%
CEA- S-25 Alojamiento Staff 1_TD-AS25 380 0.85 3 7.02 8.78 3x 16 1 4 55 55 2.22%
CEA- S-26 Alojamiento Staff 1_TD-AS26 380 0.85 3 7.02 8.78 3x 16 1 4 55 52 2.17%
CEA- S-27 Alojamiento Staff 1_TD-AS27 380 0.85 3 7.02 8.78 3x 16 1 4 55 47 2.08%
CEA- S-28 Alojamiento Staff 1_TD-AS28 380 0.85 3 7.02 8.78 3x 16 1 4 55 45 2.05%
CEA- S-29 Alojamiento Staff 1_TD-AS29 380 0.85 3 7.02 8.78 3x 16 1 4 55 39 1.94%
CEA- S-30 Alojamiento Staff 1_TD-AS30 380 0.85 3 7.02 8.78 3x 16 1 4 55 37 1.91%
CEA- S-31 Alojamiento Staff 1_TD-AS31 380 0.85 3 7.02 8.78 3x 16 1 4 55 31 1.80%
CEA- S-32 Alojamiento Staff 1_TD-AS32 380 0.85 3 7.02 8.78 3x 16 1 4 55 29 1.77%
CEA- S-33 Alojamiento Staff 1_TD-AS33 380 0.85 3 7.02 8.78 3x 16 1 4 55 30 1.79%
CEA- S-34 Alojamiento Staff 1_TD-AS34 380 0.85 3 7.02 8.78 3x 16 1 4 55 37 1.91%
CEA- S-35 Edificio Gerente 1 380 0.85 3 12.71 15.89 3x 16 1 4 55 19 1.86%
CEA- S-36 Edificio Gerente2 380 0.85 3 10.56 13.20 3x 16 1 4 55 28 2.00%
CEA- S-37 Edificio Gerente 3 380 0.85 3 10.56 13.20 3x 16 1 4 55 35 2.18%

Carga Instalada parcial 1


Demanda máxima parcial 1
Reserva
Carga Instalada parcial 2
Demanda máxima parcial 2
Factor de simultaneidad
Demanda máxima real

N2XOH

TABLEROS U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
TG-2 1.09%
TG2-1 Almacen General TD- ALM 380 0.85 3 34.53 43.17 3x 50 1 10 95 40 2.50%
TG2-2 TD 1A 380 0.85 3 84.80 106.00 3x 125 1 25 160 37 2.45%
TG2-3 TD 1B 380 0.85 3 71.46 89.33 3x 100 1 16 125 27 2.35%
TG2-4 TD 2 380 0.85 3 113.04 141.30 3x 160 1 35 195 42 2.62%

Carga Instalada parcial 1


Demanda máxima parcial 1
Reserva
Carga Instalada parcial 2
Demanda máxima parcial 2
Factor de simultaneidad
Demanda máxima real

OK N2XOH

TABLEROS U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
TG-3 1.46%
TG3-1 T-EA.1 380 0.85 3 129.15 161.43 3x 200 1 50 230 5 1.62%
TG3-2 T-EA.2 380 0.85 3 129.15 161.43 3x 200 1 75 275 42 2.45%
TG3-3 Ilum. Exterior 380 0.85 3 5.72 7.15 3x 16 1 6 68 130 2.70%
TG3-4 Ilum. Exterior 380 0.85 3 5.72 7.15 3x 16 1 10 95 230 2.80%
TG3-5 T-EA.3 380 0.85 3 129.15 161.43 3x 200 1 150 410 60 2.30%
TG3-6 T-EA.4 380 0.85 3 139.35 174.18 3x 200 1 150 410 86 2.75%
TG3-7 T-EA.5 380 0.85 3 172.20 215.25 3x 250 1 95 330 76 3.36%

Carga Instalada parcial 1


Demanda máxima parcial 1
Reserva
Carga Instalada parcial 2
Demanda máxima parcial 2
Factor de simultaneidad
Demanda máxima real
ok N2XOH

TABLEROS Edificios de alojamiento de Obreros 1 U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
T-EA.1 1.62%
T-EA.-1-1 Edificio de Alojamiento_TD-ALO.1 380 0.85 3 23.92 29.90 3x 32 1 4 55 24 3.03%
T-EA.-1-2 Edificio de Alojamiento_TD-ALO.2 380 0.85 3 23.92 29.90 3x 32 1 4 55 16 2.56%
T-EA.-1-3 Edificio de Alojamiento_TD-ALO.3 380 0.85 3 23.92 29.90 3x 32 1 4 55 16 2.56%
T-EA.-1-4 Edificio de Alojamiento_TD-ALO.4 380 0.85 3 23.92 29.90 3x 32 1 4 55 24 3.03%
T-EA.-1-5 Edificio de Alojamiento_TD-ALO.5 380 0.85 3 23.92 29.90 3x 32 1 6 68 36 3.05%
T-EA.-1-6 Edificio de Alojamiento_TD-ALO.6 380 0.85 3 23.92 29.90 3x 32 1 6 68 45 3.40%

Carga Instalada parcial 1


Demanda máxima parcial 1
Reserva
Carga Instalada parcial 2
Demanda máxima parcial 2
Factor de simultaneidad
Demanda máxima real
ok N2XOH
TABLEROS Edificios de alojamiento de Obreros 2 U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
T-EA.2 2.45%
T-EA.-2-1 Edificio de Alojamiento_TD-ALO.7 380 0.85 3 23.92 29.90 3x 32 1 6 68 24 3.40%
T-EA.-2-2 Edificio de Alojamiento_TD-ALO.8 380 0.85 3 23.92 29.90 3x 32 1 4 55 16 3.39%
T-EA.-2-3 Edificio de Alojamiento_TD-ALO.9 380 0.85 3 23.92 29.90 3x 32 1 4 55 16 3.39%
T-EA.-2-4 Edificio de Alojamiento_TD-ALO.10 380 0.85 3 23.92 29.90 3x 32 1 6 68 24 3.40%
T-EA.-2-5 Edificio de Alojamiento_TD-ALO.11 380 0.85 3 23.92 29.90 3x 32 1 10 95 36 3.32%
T-EA.-2-6 Edificio de Alojamiento_TD-ALO.12 380 0.85 3 23.92 29.90 3x 32 1 16 125 45 3.15%

Carga Instalada parcial 1


Demanda máxima parcial 1
Reserva
Carga Instalada parcial 2
Demanda máxima parcial 2
Factor de simultaneidad
Demanda máxima real
ok N2XOH
TABLEROS Edificios de alojamiento de Obreros 3 U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
T-EA.3 2.30%
T-EA.3-1 Edificio de Alojamiento_TD-ALO.13 380 0.85 3 23.92 29.90 3x 32 1 6 68 24 3.25%
T-EA.3-2 Edificio de Alojamiento_TD-ALO.14 380 0.85 3 23.92 29.90 3x 32 1 4 55 16 3.24%
T-EA.3-3 Edificio de Alojamiento_TD-ALO.15 380 0.85 3 23.92 29.90 3x 32 1 4 55 16 3.24%
T-EA.3-4 Edificio de Alojamiento_TD-ALO.16 380 0.85 3 23.92 29.90 3x 32 1 6 68 24 3.25%
T-EA.3-5 Edificio de Alojamiento_TD-ALO.17 380 0.85 3 23.92 29.90 3x 32 1 10 95 36 3.17%
T-EA.3-6 Edificio de Alojamiento_TD-ALO.18 380 0.85 3 23.92 29.90 3x 32 1 10 95 45 3.39%

Carga Instalada parcial 1


Demanda máxima parcial 1
Reserva
Carga Instalada parcial 2
Demanda máxima parcial 2
Factor de simultaneidad
Demanda máxima real
ok N2XOH
TABLEROS Edificios de alojamiento de Obreros 4 U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
T-EA.4 2.75%
T-EA.-4-1 Edificio de Alojamiento_TD-ALO.19 13 380 0.85 3 23.92 29.90 3x 32 1 10 95 24 3.33%
T-EA.-4-2 Edificio de Alojamiento_TD-ALO.20 14 380 0.85 3 23.92 29.90 3x 32 1 10 95 16 3.14%
T-EA.-4-3 Edificio de Alojamiento_TD-ALO.21 15 380 0.85 3 23.92 29.90 3x 32 1 10 95 16 3.14%
T-EA.-4-4 Edificio de Alojamiento_TD-ALO.22 16 380 0.85 3 23.92 29.90 3x 32 1 10 95 24 3.33%
T-EA.-4-5 Edificio de Alojamiento_TD-ALO.23 17 380 0.85 3 23.92 29.90 3x 32 1 16 125 36 3.31%
T-EA.-4-6 Edificio de Alojamiento_TD-ALO.24 18 380 0.85 3 23.92 29.90 3x 32 1 16 125 38 3.34%
T-EA.-4-7 Oficina de Seguridad (TD-OSEG) 380 0.85 3 11.33 14.17 3x 16 1 16 125 71 3.27%

Carga Instalada parcial 1


Demanda máxima parcial 1
Reserva
Carga Instalada parcial 2
Demanda máxima parcial 2
Factor de simultaneidad
Demanda máxima real
ok N2XOH
TABLEROS Edificios de alojamiento de Obreros 5 U (V) cosφ FASES I (A) Id (A) ITM TERNAS S(mm²) In (cable) (A) L(m) ∑ΔV(%)
T-EA.5 3.36%
T-EA.5-1 Edificio de Alojamiento_TD-ALO.25 19 380 0.85 3 23.92 29.90 3x 32 1 6 68 24 3.25%
T-EA.5-2 Edificio de Alojamiento_TD-ALO.26 20 380 0.85 3 23.92 29.90 3x 32 1 4 55 14 3.12%
T-EA.5-3 Edificio de Alojamiento_TD-ALO.27 21 380 0.85 3 23.92 29.90 3x 32 1 4 55 14 3.12%
T-EA.5-4 Edificio de Alojamiento_TD-ALO.28 22 380 0.85 3 23.92 29.90 3x 32 1 4 55 16 3.24%
T-EA.5-5 Edificio de Alojamiento_TD-ALO.29 23 380 0.85 3 23.92 29.90 3x 32 1 16 125 57 3.18%
T-EA.5-6 Edificio de Alojamiento_TD-ALO.30 24 380 0.85 3 23.92 29.90 3x 32 1 10 95 49 3.49%
T-EA.5-7 Edificio de Alojamiento_TD-ALO.31 25 380 0.85 3 23.92 29.90 3x 32 1 10 95 49 3.49%
T-EA.5-8 Edificio de Alojamiento_TD-ALO.32 26 380 0.85 3 23.92 29.90 3x 32 1 16 125 57 3.18%

Carga Instalada parcial 1


Demanda máxima parcial 1
Reserva
Carga Instalada parcial 2
Demanda máxima parcial 2
Factor de simultaneidad
Demanda máxima real
A.O. 01
A.O. 02
A.O. 03
A.O. 04
A.O. 05
A.O. 06
A.O. 07
A.O. 08
A.O. 09
A.O. 10
A.O. 11
A.O. 12
A.O. 13
A.O. 14
A.O. 15
A.O. 16
A.O. 17
A.O. 18
A.O. 19
A.O. 20
A.O. 21
A.O. 22
A.O. 23
A.O. 24
A.O. 25
A.O. 26
A.O. 27
A.O. 28
A.O. 29
A.O. 30
A.O. 31
A.O. 32