Documentos de Académico
Documentos de Profesional
Documentos de Cultura
000 LITROS
PATIO
RED DESDE PISO 2
RED 1" TUB PVC P PARA CONSULTA EXTERNA TANQUE 1.000 LTS TANQUE 1.000 LTS
COMPRENSORES
REGISTRO PRINCIPAL CONSULTA EXTERNA 1" 1.51
1.00 M2
.68
PROYECCION DE TANQUES EXISTENTES V-A 0.75 V-A 0.75
V-A 0.75
2 1.20
V-A 0.75
2 1.20
V-A 0.75
2 1.20
V-A 0.75
4 0.70
NOTA:EQUIPO A VER
PLANO 3 DE 6 FICHA
TECNICA.
V-A 0.75
1 1.00
V-A 0.75
3 2.00
1 1.00 3 2.00
TUB-1/2"
TUB-1/2"
TUB-1/2"
1.72 REG Ø1/2" ASEO D.
.60
.60
TUB-1/2" TUB-1/2" ؽ" EQUIPOS
TUB-1/2"
P-A 1.00
1.68 M2 1
2.10
PROYECCION DE TANQUES EXISTENTES
TUB-1/2" TUB-1/2"
TUB-1/2"
1.40
TUB-1/2"
TUB-1/2"
ؽ" ؽ" REG Ø1/2"
1.40
TUB-1/2"
BAÑO
1.39
PISO 2 CAPACIDAD 4.000 LITROS
MICROBIOLOGIA LAVADO TUB-1/2"
ؽ" 1.78 M2 ZONA DE 1.94 M2
DE OJOS
TANQUE 1.000 LTS TANQUE 1.000 LTS TRABAJO
P-A 0.70
4 2.10
0.50 M2 1.20
LAVANDERIA TUB-1/2"
TUB-1/2"
1.29 .60 .15 1.59 .60 ؽ" ؽ" ؽ" 1.20
TUB-1/2"
1.49
UNI UNI
2.34
3.43
TUB-1/2"
4 2.10
TUB-1/2"
2.41
RED DESDE PISO 2
TUB-1/2"
RED 1" TUB PVC P PARA CONSULTA EXTERNA TANQUE 1.000 LTS TANQUE 1.000 LTS P-A 0.70 NEVERA REG Ø1/2" 3.26
4 1.40
TUB-1/2"
COMPRENSORES
2.10
1.00 M2 CONSULTORIO
REGISTRO PRINCIPAL CONSULTA EXTERNA 1" 1.51 LAVADO Y LABORATORIO CLINICO ؽ" P-A 0.70 ENFERMERIA
TUB-1/2" 4
.15
1.00 M2 2.10
ESTERILIZACIÓN 11.17 M2
.68
NOTA:EQUIPO A VER REG Ø1/2"
V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75
1.78 M2
TUB-1/2"
V-A 0.75 V-A 0.75 PLANO 3 DE 6 FICHA
1 1.00 3 2.00
2.35 2.35 AREA - REV Y
TUB-1/2"
2 1.20 2 1.20 2 1.20 4 0.70
1 1.00 3 2.00 TECNICA.
.70
ؽ"
TUB-1/2"
TUB-1/2"
TUB-1/2"
.15
.60
.60
TUB-1/2" TUB-1/2" ؽ" EQUIPOS
.53
TUBERIA PVC P Ø 3/4" TUBERIA PVC P Ø 3/4"
TUB-1/2"
1.00
1.00
P-A
1.68 M2 1
2.10 P-A 1.00
TUB-1/2" TUB-1/2"
TUB-1/2"
1.40
TUB-1/2"
TUB-1/2"
ؽ" ؽ" REG Ø1/2" 1 2.10
1.00 M2
1.40
TUB-1/2"
1.39
MICROBIOLOGIA LAVADO BAÑO TUB-1/2"
ؽ" 1.78 M2 ZONA DE 1.94 M2 MESON DE TRABAJO 1.17 M2
1.25
DE OJOS
TUB-1/2"
TUB-1/2"
2
1.20
4
.77 2.10
.39
LAVANDERIA 2.10
TUB-1/2"
TUB-1/2"
1.29 .60 .15 1.59 .60 ؽ" ؽ" ؽ" P-A 0.80
TUB-1/2"
3 2.10
1.49
.65
2.34 UNI UNI TUB-1/2"
TUBERIA PVC P Ø 1"
TUB-1/2"
P-A 0.70
5.28 M2 5.28 M2 1.00 M2
RX -
3.43
ESTERILIZACION
TUB-1/2"
4
TUB-1/2" 2.10
ؽ" ؽ"
2.41
TUB-1/2"
P-A 0.70 NEVERA REG Ø1/2" 3.26
4 1.40
2.00 M2 2.64 M2 ODONTOLOGIA
TUB-1/2"
2.10
1.00 M2 CONSULTORIO
1.45
TUB-3/4" TUB-3/4"
TUB-1/2"
LAVADO Y LABORATORIO CLINICO ؽ" P-A 0.70 ENFERMERIA
TUB-1/2" 2.26 M2
TUB-3/4"
ؽ" ؽ"
4 2.10
.15
1.35
ESTERILIZACIÓN 11.17 M2
1.78 M2
REG Ø1/2"
1.29 1.07 TUB-1/2" ؽ"
TUB-1/2"
TUB-1/2"
ALMAC 1.17 M2
TUB-1/2" REG Ø3/4" P-A 1.00
.80
.80
.80
ASEO P-A 0.70
.70
1 2.10
.15
TUB-1/2"
P-A 0.80 P-A 0.80
NOTA:EQUIPO C VER REG Ø1/2"
.53
ؽ" ؽ" ALMACEN TUBERIA PVC P Ø 3/4" TUBERIA PVC P Ø 3/4"
1.00
P-A 1.00
TECNICA.
1.00 M2
MESON DE TRABAJO 1.17 M2
1 2.10
TUBERIA PVC P Ø 1" 2.77 M2 TUBERIA PVC P Ø 1" TUBERIA PVC P Ø 1"
1.25
TUBERIA PVC P Ø 1"
0.90
ؽ" P-A
REG Ø1/2" ؽ"
2.24
TUB-1/2"
TUB-1/2"
2 2.10
.77
.39
ؽ" P-A
0.80
.15
3
2.10
.65
TUB-1/2" 1.68
REG Ø1/2" ENTREVISTA REG Ø3/4"
TUB-1/2"
ESTERILIZACION RX -
ؽ" ؽ"
2.00 M2 2.64 M2 ODONTOLOGIA ؽ"
1.45
TUB-3/4" TUB-3/4"
TUB-1/2"
2.26 M2
TUB-3/4"
ؽ" ؽ"
CUBICULO TOMA DE
1.35
1.29 1.07 TUB-1/2" ؽ"
REG Ø3/4" 1.00
3.09
P-A
.80
7.67 M2
NOTA:EQUIPO C VER 1
0.80 0.80 2.10
REG Ø1/2"
TUB-1/2"
P-A
3
2.10
FILTRO
2.77 M2
P-A
3
2.10
4
2.10
PLANO 3 DE 6 FICHA
TECNICA.
5.75 M2 P-A 1.00
3.26
TUBERIA PVC P Ø 1" TUBERIA PVC P Ø 1" TUBERIA PVC P Ø 1" 1 2.10
2.24
.15
3.00
DEPOSITO TEMPORAL DE
ؽ"
REG Ø3/4"
RESIDUOS 14.83 M2 CAJA CONSULTORIO 1
CUBICULO TOMA DE FACTURACION RECEPCION 10.04 M2 V-A 0.75
3.09
MUESTRAS TUBERIA PVC P Ø 3/4" 7.67 M2 3.26 3 2.00
TUB-1/2"
2.12
5.75 M2 P-A 1.00
1 2.10
TOMA
2.15
ENTREGA
3.00
CONSULTORIO 1
TOMA RESULTADOS
2.15
ENTREGA
1.00
P-A 1.00
1.00
1.00
P-A
1
2.10
3.23
P-A 1.00
1
3.23
2.10
P. CAMILLA 2.29 M2 P-A 1.00
1 2.10
3.24
TUBERIA PVC P Ø 1"
1.00 1.58 2.60 TUBERIA PVC P Ø 1" ؽ" P. CAMILLA 2.29 M2
1.91 ؽ"
TUB-1/2" 1.40
.64
2.23
1.40
1.55
.64
REG Ø1/2"
TUB-1/2"
1.44 M2 1.85
RACK
TUB-1/2"
V-A 0.75
P-A 0.80
2.97 M2
3.08
3 2.10 7 1.50
.55 10.22
2.23
MESON DE PROCEDIMIENTO CONSULTORIO 2
1.71
3.26
1.55
3.00 M2 10.04 M2
ؽ" ؽ" TUB-1/2" ؽ"
SALA DE ESPERA V-A 0.75 CADENA DE FRIO
TUB-1/2"
3 2.00
TUB-1/2"
1.00
P-A 1.00 V-A 0.75
TUB-1/2"
TUB-1/2"
P-A 0.80
3.08
1 2.10
7 1.50
5.32
P-A 0.90
3 2.10
5.63
2
2.10
1.71
1.76 .55 .90 1.34
.15
ؽ" TUB-1/2" TUB-1/2" TUBERIA PVC P Ø 3/4" 3.00 M2 10.04 M2 3.26
SALA DE ESPERA
1.00
REG Ø1/2"
P-A 1.00
TUB-1/2" ؽ" V-A 0.75
CONSULTORIO 1
2.10 ؽ" ؽ" 3 2.00
VACUNACION
10.96 M2
4.46
3.26
33,00 M2
TUB-1/2"
2.50
2.23
V-A 0.75
3 2.00
1.00
P-A 1.00
TUB-1/2"
TUB-1/2"
TUBERIA PVC P Ø 3/4"
1 2.10
5.32
1.46
P-A 0.90
3.08
5.63
1253 M
CONSULTA EXTERNA
2.10
1.00
ؽ"
.20
1.00
P-A 1.00
1 2.10 REG Ø1/2"
P-A 1.00
1
TUB-1/2" TUB-1/2" CONSULTORIO 2.10
REG Ø1/2" P-A 1.00
1 2.10
VACUNACION
.15
10.96 M2 3.26
TUBERIA PVC P Ø 3/4" TUBERIA PVC P Ø 1" TUBERIA PVC P Ø 1" TUBERIA PVC P Ø 1" ؽ" TUB-1/2" 4.46
1.83 1.00 2.70 .80 .35 2.82
1.00
2.19 1.71 1.00 1.00 1.20 P-A
1.00
2.50
2.23
PVC P Ø 3/4" 1
V-A 0.75
REG Ø3/4"
2.10
V-A 0.75
PVC P Ø 3/4"
4 0.70
TUB-1/2" 3 2.00
TUB-1/2"
REG Ø3/4"
1.75
REG Ø1/2"
1.90
P-A 1.00 BAÑO
3.70
P-A
1.00
P-A
1.00
TUB-1/2"
P. SILLA DE ؽ" TUB-1/2"
1 2.10 1 2.10
TUB-1/2" ؽ" 1.30
RUEDAS
1.46
DISPENSADOR DE
1.05
3.08
1.00 M2 AGUA POTABLE BAÑOS HOMBRES
PVC P Ø 3/4"
1.05
PVC P Ø 3/4"
CONSULTA EXTERNA
MUESTRAS DE CUELLO
1.00
1.00 .90 BAÑOS MUJERES
UTERINO Y 2.56 9.45 M2 2.56
TUB-1/2"
GINECOLÓGICAS.
1.30 1.70
.90
.93
10.00 M2
.20
3.88
3.69
4.07
1.90 P-A
1.00 CUARTO 11.63 M2
PVC P Ø 3/4"
1
2.10
ELECTRICO P-A 1.00
PVC P Ø 3/4"
2.94
1
REG Ø1/2" 4.02 M2 2.10
2.64
1254 M
TUB-1/2" ؽ"
2.29
TUB-1/2" TUB-1/2"
2.16
2.15
1.30 1.30 REG Ø1/2"
1.66
1.66
P-A 1.00
ؽ" TUB-1/2" TUB-1/2" ؽ" 1
1.35
.15
1.20 ؽ"
DE EQUIPOS TUB-1/2"
TUB-1/2"
1.10
5.00 M2 TUB-1/2"
ؽ" ؽ"
P-P 2.50
V 2.10
TUBERIA PVC P Ø 3/4" TUBERIA PVC P Ø 1" TUBERIA PVC P Ø 1" TUBERIA PVC P Ø 1" ؽ" TUB-1/2"
1.83 1.00 2.70 .80 .35 2.82 2.19 1.71
1.00
V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 1.00 1.00 1.20 P-A 1.00
PVC P Ø 3/4"
1
7 1.50 4 0.70 7 1.50 1 1.00 6 2.00 5 1.25 5 1.25 2 1.20 2 1.20 2.10 V-A 0.75
REG Ø3/4"
PVC P Ø 3/4"
4 0.70
.15 1.50 .55 .70 .41 .24 .30 1.50 1.00 .20 .60 2.00 .21 2.20 .15 1.25 2.77 1.25 .15 1.20 .60 1.20 TUB-1/2"
TUB-1/2"
REG Ø3/4"
1.75
REG Ø1/2" BAÑO
1.90
P-A 1.00
3.70
1 2.10 P-A 0.80 ؽ" 2.63 M2
ACCESO 3 2.10
TUB-1/2"
P-A 1.00 P-A 1.00 TUB-1/2"
P. SILLA DE ؽ" TUB-1/2"
1
2.10
1
2.10
TUB-1/2" ؽ" 1.30
CONSULTA EXTERNA RUEDAS DISPENSADOR DE
1.05
1.00 M2 AGUA POTABLE BAÑOS HOMBRES
PVC P Ø 3/4"
CONSULTORIO TOMA DE 9.45 M2
1.74
1.05
PVC P Ø 3/4"
MUESTRAS DE CUELLO
1.00 .90 BAÑOS MUJERES
UTERINO Y 2.56 9.45 M2 2.56
TUB-1/2"
GINECOLÓGICAS.
1.30 1.70
.90
P-A 0.90 11.18 M2
2
2.10 .95 OF.CIAU P-A 0.90 ؽ" TUB-1/2"
2 2.10 TUB-1/2" ؽ"
3.40 6.94 M2
DPA DPA
.93
.93
4.03
3.88
2.60 1.30 1.30
3.69
3.69
4.07
1.23 1.23 ESTADISTICA Y ARCHIVO
TUB-1/2"
1.90 CUARTO 11.63 M2
1253 M
P-A 1.00
PVC P Ø 3/4"
1 2.10
ELECTRICO
PVC P Ø 3/4"
2.94
REG Ø1/2" 4.02 M2
2.64
TUB-1/2" ؽ"
2.29
2.16
2.15
1256 M
1.30 1.30
1.66
1.66
ؽ" TUB-1/2" TUB-1/2" ؽ"
1.35
ALMACEN
1.20 .60
DE EQUIPOS ؽ" TUB-1/2"
TUB-1/2"
1.10
5.00 M2
PROPIETARIO:
TUB-1/2"
1254 M
.15
V-A 0.75
7 1.50
1.50 .55
V-A 0.75
4 0.70
1.50
V-A 0.75
1 1.00
1.25 2.77
V-A 0.75
5 1.25
1.25 .15
V-A 0.75
2 1.20
1.20 .60
V-A 0.75
2 1.20
1.20
ESE HOSPITAL
SAN JOSE DE
PLANTA RED HIDRAULICA PISO 1
ACCESO
GUADUAS
ESC_______________________1:50 PLANTA RED HIDRAULICA PISO 1 ___________________
___________________
CONEXION GENERAL
INGENIERO
SAMUEL MARTIN MORENO ALFONSO
T. P. No. 25202-60949 CND
DIBUJO
CONTIENE
PLANTA RED HIDRAULICA PISO 1
AREA A INTERVENIR CONSULTA EXTERNA
PROYECTO
REMODELACION Y
MEJORAMIENTO DEL
DEL CENTRO DE SALUD
CAPARRAPI.
FECHA:
PLANCHA
ABRIL -2023
ESCALAS:
P1/3
DETALLES DE INSTALACION Y CONSTRUCCIÓN 1:50
TANQUES EXISTENTES
PISO 2 CAPACIDAD 4.000 LITROS
PATIO
RED HASTA PISO 1
TANQUES EXISTENTES RED 1" TUB PVC P PARA CONSULTA EXTERNA TANQUE 1.000 LTS TANQUE 1.000 LTS
PISO 2 CAPACIDAD 4.000 LITROS
.68
NOTA:EQUIPO A VER
V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 PLANO 3 DE 6 FICHA V-A 0.75 V-A 0.75
V-A 0.75 V-A 0.75 2 1.20 2 1.20 2 1.20 4 0.70 1 1.00 3 2.00
1 1.00 3 2.00 TECNICA.
PATIO
RED HASTA PISO 1
RED 1" TUB PVC P PARA CONSULTA EXTERNA TANQUE 1.000 LTS TANQUE 1.000 LTS 3.26
COMPRENSORES
1.51 1.72 ASEO D.
.60
.60
1.00 M2 EQUIPOS
.68
NOTA:EQUIPO A VER P-A 1.00
V-A 0.75
1 1.00
V-A 0.75
3 2.00
V-A 0.75
2 1.20
V-A 0.75
2 1.20
V-A 0.75
2 1.20
V-A 0.75
4 0.70
PLANO 3 DE 6 FICHA
TECNICA.
V-A 0.75
1 1.00
V-A 0.75
3 2.00 1.68 M2 1 2.10
1.40
1.40
BAÑO
1.39
3.26 MICROBIOLOGIA LAVADO
1.78 M2 ZONA DE 1.94 M2
DE OJOS
1.72 ASEO D. TRABAJO
.60
.60
EQUIPOS
P-A 1.00
P-A 0.70
4 2.10
0.50 M2 1.20
1.68 M2 1
2.10 LAVANDERIA
1.29
1.40
.60 .15 1.59 .60
1.40
BAÑO
1.39
MICROBIOLOGIA LAVADO
1.78 M2 DE OJOS
ZONA DE 1.94 M2 1.20
1.49
TRABAJO
LAVANDERIA
P-A 0.70
4 2.10
0.50 M2 1.20
2.34 UNI UNI
1.49
2
UNI UNI 2.10
P-A 0.70
2.34 5.28 M2 5.28 M2 1.00 M2
3.43
INCLINACION DEL 10%
2.41
P-A 0.70
5.28 M2 5.28 M2 1.00 M2
3.43
4 2.10
NEVERA 3.26
2.10
ESTERILIZACIÓN 11.17 M2 4 2.10
.15
1.78 M2
2.35 2.35 AREA - REV Y ESTERILIZACIÓN 11.17 M2
ALMAC 1.17 M2
ASEO 1.78 M2 AREA - REV Y
2.35 2.35
.70
.15 0.50 M2
ALMAC 1.17 M2
.53
ALMACEN
1.00
P-A 1.00
1.00 M2
1
ASEO
.70
2.10
MESON DE TRABAJO 1.17 M2
1.25
P-A 0.90
.77
2
2.10
.15 0.50 M2
.39
INCLINACION DEL 8%
INCLINACION DEL 8%
P-A 0.80
3 2.10
.53
.65
ALMACEN
1.00
1.68 P-A 1.00
ESTERILIZACION ENTREVISTA RX - 1 2.10
1.00 M2
2.00 M2 2.64 M2 ODONTOLOGIA MESON DE TRABAJO 1.17 M2
1.25
1.45
1.35
1.29 1.07 2 2.10
.77
.39
INCLINACION DEL 8%
P-A 1.00
P-A 0.80
.80
.80
.80
.65
3 2.10 3 2.10
TECNICA.
2.77 M2
1.68
2.24
ENTREVISTA RX -
.15
1.45
CUBICULO TOMA DE
2.26 M2
3.09
MUESTRAS 7.67 M2
1.35
3.26
5.75 M2 P-A
1
1.00
2.10
1.29 1.07
3.00
.80
.80
.80
RECEPCION P-A 0.70 NOTA:EQUIPO C VER 1 2.10
FACTURACION 10.04 M2 V-A 0.75
P-A 0.80 P-A 0.80 4 2.10
3 2.00
PLANTA ELECTRICA FILTRO PLANO 3 DE 6 FICHA
2.12
3 2.10 3 2.10
TOMA
2.15
ENTREGA TECNICA.
DE DE EXISTENTE
INCLINACION DEL 8%
2.77 M2
MUESTRAS RESULTADOS
2.24
15.78 M2
1.00
P-A 1.00
1
2.10
.15
NOTA:EQUIPO B VER
PLANO 3 DE 6 FICHA
3.23 TECNICA.
P-A 1.00
CUBICULO TOMA DE
1 2.10
INCLINACION DEL 7%
P. CAMILLA 2.29 M2
3.09
MUESTRAS 7.67 M2 3.26
3.24 1.00 1.58 2.60
1.91 1.40 5.75 M2 P-A 1.00
1 2.10
.64
RACK
3.00
2.97 M2
.55 10.22 CAJA CONSULTORIO 1
2.23
FACTURACION RECEPCION
1.55
2.12
TOMA
2.15
P-A 0.80
V-A 0.75
ENTREGA
3.08
3 7 1.50
2.10
1.00
P-A 1.00
SALA DE ESPERA V-A 0.75
3 2.00 1 2.10
33,00 M2
1.00
1.00
P-A
1
2.10
3.23
5.32
P-A 0.90
5.63
2 2.10
INCLINACION DEL 7%
INCLINACION DEL 7%
P-A 1.00
1.76 .55 .90 1.34 1 2.10
.15
INCLINACION DEL 7%
P. CAMILLA 2.29 M2
1.00
P-A 1.00
CONSULTORIO 1 2.10
VACUNACION
10.96 M2 3.26 1.91 3.24 1.00 1.58 2.60
4.46
1.40
.64
RACK
2.50
2.23
V-A 0.75
3 2.00
2.97 M2
.55 10.22
2.23
1.46
1.55
3.08
CADENA DE FRIO
CONSULTA EXTERNA
1.00
1.44 M2 1.85
CONSULTORIO 3 V-A 0.75
P-A 0.80
3.08
10.00 M2
.20
3 2.10 7 1.50
P-A 1.00
1
MESON DE PROCEDIMIENTO CONSULTORIO 2
1.71
2.10
1.00
3.00 M2 10.04 M2 3.26
P-A
.15
1
2.10
1249 M
1.83 1.00 2.70 .80 .35 2.82 2.19 1.71
33,00 M2
1.00
1.00
P-A 1.00
1.75
1 2.10
1.90
P-A 1.00 BAÑO
3.70
5.32
3 2.10
P-A 0.90
5.63
P-A 1.00 P-A 1.00
P. SILLA DE 1 1 1.30 2
INCLINACION DEL 7%
INCLINACION DEL 7%
2.10 2.10
2.10
RUEDAS DISPENSADOR DE
1.05
1.00 M2
CONSULTORIO TOMA DE
AGUA POTABLE BAÑOS HOMBRES
9.45 M2 1.76 .55 .90 1.34
.15
1.74
1.05
MUESTRAS DE CUELLO
1.00 .90 BAÑOS MUJERES
UTERINO Y 2.56 9.45 M2 2.56
1250 M
GINECOLÓGICAS.
1.30 1.70
1.00
.90
VACUNACION
.93
.93
4.03
3.88
3.69
4.07
2.50
2.23
4.02 M2 V-A 0.75
2.64
3 2.00
2.29
2.16
2.15
1.30 1.30
1.66
1.66
1.35
ALMACEN .60
1.20
1251 M
1.46
DE EQUIPOS 1.10
3.08
5.00 M2
CONSULTA EXTERNA
1.00
P-P 2.50
V
2.10
V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75
7 1.50 4 0.70 7 1.50 1 1.00 6 2.00 5 1.25 5 1.25 2 1.20 2 1.20
.15 1.50 .55 .70 .41 .24 .30 1.50 1.00 .20 .60 2.00 .21 2.20 .15 1.25 2.77 1.25 .15 1.20 .60 1.20
CONSULTORIO 3
10.00 M2
.20
P-A 1.00
ACCESO 1 2.10
CONSULTA EXTERNA
P-A 1.00
1 2.10
1252 M
.15
1.83 1.00 2.70 .80 .35 2.82
1.00
2.19 1.71 1.00 1.00 1.20 P-A 1.00
1 2.10 V-A 0.75
4 0.70
1.75
1.90
P-A 1.00 BAÑO
3.70
1 2.10 P-A 0.80
3 2.10
2.63 M2
P-A 1.00 P-A 1.00
P. SILLA DE 1 2.10 1 2.10 1.30
RUEDAS DISPENSADOR DE
1253 M
1.05
1.00 M2 AGUA POTABLE BAÑOS HOMBRES
CONSULTORIO TOMA DE 9.45 M2
1.74
1.05
MUESTRAS DE CUELLO
1.00 .90 BAÑOS MUJERES
UTERINO Y 2.56 9.45 M2 2.56
GINECOLÓGICAS.
1.30 1.70
1256 M
.90
P-A 0.90 11.18 M2
2 2.10 .95 OF.CIAU P-A 0.90
2 2.10
3.40 6.94 M2
DPA DPA
.93
.93
1254 M
4.03
3.88
2.60 1.30 1.30
3.69
3.69
4.07
1.23 1.23 ESTADISTICA Y ARCHIVO
1.90 P-A 1.00 CUARTO 11.63 M2
1 2.10
ELECTRICO
2.94
4.02 M2
2.64
2.29
2.16
2.15
1.30 1.30
1.66
1.66
1.35
ALMACEN .60
1.20
DE EQUIPOS
5.00 M2
1.10
PROPIETARIO:
P-P 2.50
ESE HOSPITAL
V 2.10
V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75
7 1.50 4 0.70 7 1.50 1 1.00 6 2.00 5 1.25 5 1.25 2 1.20 2 1.20
.15 1.50 .55 .70 .41 .24 .30 1.50 1.00 .20 .60 2.00 .21 2.20 .15 1.25 2.77 1.25 .15 1.20 .60 1.20
SAN JOSE DE
PLANTA RED HIDRAULICA PISO 2 PLANTA RED HIDRAULICA PISO 2 GUADUAS
___________________
ESC_______________________1:50 CONEXION DESDE TANQUES
___________________
INGENIERO
SAMUEL MARTIN MORENO ALFONSO
T. P. No. 25202-60949 CND
DIBUJO
CONTIENE
PLANTA RED HIDRAULICA PISO 2
CONEXION DESDE TANQUES
PROYECTO
REMODELACION Y
MEJORAMIENTO DEL
DEL CENTRO DE SALUD
CAPARRAPI.
FECHA:
PLANCHA
ABRIL -2023
ESCALAS:
P2/3
DETALLES DE INSTALACION Y CONSTRUCCIÓN 1:50
1247 M
1240 M
1248 M
SALIDA DE CAJA N -3.60
IN
C
% LIN
INCLINACIÓN 10%
10 AC
N IÓ
IÓ
AC SALIDA N - 1.40 N
1249 M
IN 3%
CL
IN SALIDA N - 2.20
SALIDA DE CAJA N -1.90 LLEGADA N-1.05
PATIO
LLEGADA A CAJA N -1.30 N - 0.90 BAJANTE N-0.28
Ø4" BAJANTE N-0.85 Ø4" LLEGADA A CAJA N -1.60
SALIDA A CONEXION FINAL
BAJANTE N-0.40 BAJ CONEXION Ø4"
COMPRENSORES
CAJA 1X1 CAJA 1X1 1.51 CAJA 1X1
PVC-S Ø4" 1.00 M2 N - 0.90
.68
N - 0.90 NOTA:EQUIPO A VER
V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 PLANO 3 DE 6 FICHA V-A 0.75 V-A 0.75
V-A 0.75 V-A 0.75 2 1.20 2 1.20 2 1.20 4 0.70 1 1.00 3 2.00
1 1.00 3 2.00 TECNICA.
SALIDA DE CAJA N -3.60
Ø4"
ØREV 2"
ØREV 2" ØREV 2" ØREV 2"
3.26
ØREV 2"
LLEGADA DE CAJA N -3.20 SALIDA DE CAJA N -2.90 ØREV 2" ØREV 2"
LLEGADA CAJA N -2.10
SLØ2"
ØREV 2"
SLØ2" D.
ØREV 2"
1.72 ASEO
.60
.60
SLØ2"
1250 M
1.40
EXISTENTE N - 1.70 EXISTENTE
SLØ3"
1.40
BAÑO
1.39
MICROBIOLOGIA LAVADO
1.78 M2 ZONA DE Ø2" 1.94 M2 ØREV 2"
ØREV 2"
DE OJOS
IN T-P TRABAJO Ø2" Ø2"
%
C
LIN ØREV 2"
P-A 0.70
4 2.10
0.50 M2 PVC-S 1.20
SLØ2"
INCLINACIÓN 10%
10 AC LAVANDERIA
IÓ
N IÓ 1.29 PVC-SØ2" .60 .15 Ø3"1.59 .60 SLØ2" PVC-S SLØ2" PVC-S SLØ4"
PVC-S
AC SALIDA N - 1.40 N
PVC-S
Ø3"
CL
IN 3%
Ø2"PVC-S ØREV 2" 1.20
Ø2"
1.49
IN SALIDA N - 2.20
SALIDA DE CAJA N -1.90 LLEGADA N-1.05 SLØ2" 2.34 UNI UNI Ø2"
PATIO Ø2" ODONTOLOGIA P-A 0.90
ASEO
ODONTOLOGIA
INCLINACIÓN 5%
2 2.10
P-A 0.70
5.28 M2 5.28 M2 ØREV 2"1.00 M2
3.43
LLEGADA A CAJA N -1.30 N - 0.90 BAJANTE N-0.28 T-P 4 2.10
lgani
2.41
BAJ CONEXION Ø4" Ø4" BAJANTE N-0.85 Ø4"
BAJANTE N-0.40 P-A 0.70 NEVERA 3.26
CAJA 1X1 CAJA 1X1
COMPRENSORES
1.51 CAJA 1X1 4
2.10
1.00 M2 PVC-S Ø2" 1.40
PVC-S Ø4" 1.00 M2 N - 0.90 Ø3" CONSULTORIO
.68
N - 0.90 NOTA:EQUIPO A VER LAVADO Y LABORATORIO CLINICO SLØ3" P-A 0.70 ENFERMERIA
INCLINACIÓN 5%
V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 PLANO 3 DE 6 FICHA V-A 0.75 V-A 0.75
4
.15
V-A 0.75 V-A 0.75 2 1.20 2 1.20 2 1.20 4 0.70 1 1.00 3 2.00 2.10
1 1.00 3 2.00 TECNICA.
ESTERILIZACIÓN 11.17 M2
ØREV 2"
Ø4"
3.26 Ø2"
1.78 M2 Ø2" AREA - REV Y
ØREV 2"
ØREV 2"
ØREV 2"
SLØ2"
ØREV 2"
ØREV 2"
ØREV 2" ØREV 2"
2.35 2.35
1.72 SLØ2" ASEO D. ØREV 2"
ALMAC 1.17 M2
.60
.60
SLØ2"
Ø4" PVC-S SLØ4" EQUIPOS
ASEO T-P Ø3"
.70
Ø3" SLØ2" 1.68 M2 SLØ2" P-A 1.00
1
2.10 PVC-S Ø3"
.15
1.40
SLØ3" 0.50 M2
1.40
1.39
MICROBIOLOGIA LAVADO BAÑO
ZONA DE Ø2" ØREV 2"
SLØ2"
INCLINACIÓN 3%
1.78 M2 1.94 M2 ØREV 2"
DE OJOS
SLØ2"
.53
TRABAJO Ø2"
T-P Ø2" ALMACEN
1.00
ØREV 2"
P-A
0.70
4 2.10
0.50 M2 PVC-S
SLØ2" 1.20 SLØ2" Ø3" Ø2"
P-A 1.00
mma de Ga
LAVANDERIA SLØ4" 1
1.29 PVC-SØ2" .60 .15 Ø3"1.59 .60 SLØ2" PVC-S SLØ2" PVC-S 1.00 M2 PVC-S 2.10
PVC-S
PVC-S
MESON DE TRABAJO 1.17 M2
Ø3"
1.20 ØREV 2"
1.25
Ø2"PVC-S Ø2"
ØREV 2"
1.49
1251 M
.39
INCLINACIÓN 5%
2 2.10
0.70
5.28 M2 5.28 M2 ØREV 2"1.00 M2
3.43
P-A
0.80
T-P 4 2.10 P-A
Ø2"PVC-S
2.41
P-A
0.70 NEVERA
PVC-S Ø2" 1.40 3.26 SLØ2" Ø2"
3
2.10
.65
ØREV 2"
SLØ2"
4 2.10
1.00 M2 CONSULTORIO
ØREV 2"
Ø3"
Ø2"PVC-S SLØ3" 1.68
ØREV 2"
LAVADO Y LABORATORIO CLINICO SLØ3" P-A 0.70 ENFERMERIA
INCLINACIÓN 5%
4
ENTREVISTA
.15
2.10
Ø2"
ESTERILIZACIÓN
1.78 M2 Ø2" AREA - REV Y
11.17 M2
ESTERILIZACION RX -
2.35 2.35
T-P
ALMAC 1.17 M2
Ø2"PVC-S SLØ2" 2.00 M2 2.64 M2 ODONTOLOGIA
1.45
ASEO Ø3" Ø3"
.70
PVC-S Ø3" ØREV 2"
SLØ2"
.15 0.50 M2 2.26 M2
INCLINACIÓN 3%
1.35
SLØ2"
.53
ALMACEN
1.29 1.07
1.00
SLØ2" Ø3" Ø2"
P-A 1.00
ØREV 2"
ØREV 2"
1
1.00 M2 PVC-S 2.10
ØREV 2" MESON DE TRABAJO 1.17 M2
SLØ2"
1.25
ØREV 2"
P-A 0.90
2
INCLINACIÓN 5% SLØ2" P-A 1.00
.80
.80
.77
.80
2.10
.39
P-A 0.80 0.70 1
P-A NOTA:EQUIPO C VER
SLØ2" Ø2"
3 2.10
0.80 0.80 2.10
PVC-S
.65
ØREV 2" P-A P-A 4
SLØ2" FILTRO 2.10
ØREV 2"
Ø2"PVC-S SLØ3" 1.68 PLANO 3 DE 6 FICHA
ØREV 2"
3 3
Ø2"PVC-S SLØ2"
ESTERILIZACION
2.00 M2
ENTREVISTA
2.64 M2
RX -
ODONTOLOGIA
2.10
2.77 M2
2.10
TECNICA. Ø8" SLØ2"
1.45
Ø3"
ØREV 2"
2.26 M2 Ø2"
2.24
1.35
1.29 1.07
ØREV 2"
ØREV 2"
SLØ2" SLØ2"
.15
INCLINACIÓN 5% P-A 1.00
.80
.80
.80
P-A 0.80
FILTRO
P-A 0.80
P-A
4
0.70
NOTA:EQUIPO C VER 1
2.10
PVC-S PVC-S
SLØ3"
2.10
3 3 PLANO 3 DE 6 FICHA
2.10 2.10
TECNICA. Ø8" SLØ2" ØREV 2"
2.77 M2
Ø2" T-P
2.24
.15
PVC-S DEPOSITO TEMPORAL DE
T-P SLØ3" ØREV 2"
CUBICULO TOMA DE
RESIDUOS 14.83 M2
3.09
CUBICULO TOMA DE
MUESTRAS 7.67 M2 3.26
3.09
MUESTRAS 7.67 M2 3.26
5.75 M2 P-A
1
1.00
2.10
5.75 M2 P-A 1.00
1
3.00
PVC-S 2.10
CAJA CONSULTORIO 1
3.00
RECEPCION Ø8"
FACTURACION 10.04 M2 V-A 0.75
3 2.00
PLANTA ELECTRICA CAJA PVC-S CONSULTORIO 1
2.12
TOMA
Ø8"
2.15
DE
ENTREGA
DE EXISTENTE FACTURACION RECEPCION 10.04 M2 V-A 0.75
MUESTRAS RESULTADOS 3 2.00
15.78 M2
2.12
1.00
1.00
P-A
1
2.10
TOMA
2.15
NOTA:EQUIPO B VER ENTREGA
PLANO 3 DE 6 FICHA
DE DE
1252 M
3.23 TECNICA.
P-A
1.00
MUESTRAS RESULTADOS
IED Santa Ge
1
2.10
1.00
P. CAMILLA 2.29 M2 PVC-S P-A 1.00
1
Ø8" 2.10
.64
RACK
Ø2" SLØ2"
2.97 M2
.55
SLØ2" 10.22
ØREV 2"
3.23
2.23
1.55
CADENA DE FRIO
Ø2"
INCLINACIÓN 3%
1.00
1.44 M2 1.85 P-A
1
2.10
0.80
PVC-S V-A 0.75
P. CAMILLA 2.29 M2
3.08
P-A
3 2.10 7 1.50
PVC-S
MESON DE PROCEDIMIENTO CONSULTORIO 2
1.71
3.00 M2 PVC-S 10.04 M2 3.26 Ø8"
Ø2" SALA DE ESPERA Ø8" V-A 0.75
3.24 1.00 1.58 2.60
1247 M
Ø2"
1.91
3 2.00
SLØ2" SLØ2"
SLØ2" ØREV 2" 33,00 M2 1.40
.64
VEGETACION
RACK
1.00
P-A 1.00
5.32
P-A 0.90
2.97 M2
5.63
2
2.10 Ø2"
Ø6"
PVC-S .55
SLØ2" ØREV 2" 10.22
2.23
T-P 1.76 .55 .90 1.34
.15
1.55
Ø3" INCLINACIÓN 3%
Ø3" PVC-S PVC-S PVC-S PVC-S CADENA DE FRIO
Ø2"
1.00
INCLINACIÓN 3%
1.00
SLØ2" Ø4" P-A
Ø4" Ø6" Ø6" Ø6"
CONSULTORIO
VACUNACION
INCLINACIÓN 3%
1 2.10
1.44 M2 1.85
10.96 M2 3.26
V-A 0.75
4.46 P-A 0.80 PVC-S
3.08
7 1.50
2.50
2.23
V-A 0.75 3
3 2.00
2.10
PVC-S
MESON DE PROCEDIMIENTO CONSULTORIO 2
1.71
1248 M
Ø4" PVC-S 3.26
1.46
3.00 M2 10.04 M2
3.08
1253 M
1.00
Ø2" SALA DE ESPERA V-A 0.75
INCLINACIÓN 3%
SLØ2" SLØ2" Ø2" 3 2.00
33,00 M2
CONSULTORIO 3
PVC-S
10.00 M2
.20 Ø6" PVC-S SLØ2" ØREV 2"
Ø6" P-A 1.00
1
2.10
1.00
PVC-S PVC-S P-A 1.00
Ø4" Ø4"
Ø4" P-A 1.00
Ø2" Ø2" PVC-S 1 2.10
5.32
PVC-S 1
2.10
.15
P-A 0.90
5.63
PVC-S Ø6" PVC-S
Ø6" PVC-S
2
2.10 Ø2"
Ø6"
1249 M
INCLINACIÓN 3% T-P Ø2" PVC-S
T-P 1.76 .55 .90 1.34 PVC-S
1.83 1.00 2.70 .80 .35 2.82
.15
1.00
2.19 1.71 1.00 1.00 1.20 P-A 1.00
1 Ø4"
PVC-S PVC-S T-P 2.10
ØREV 2"
V-A 0.75
4 0.70
SLØ3"
Ø4" PVC-S PVC-S
Ø4" Ø3" INCLINACIÓN 3%
1.75
Ø4"
1.90
BAÑO
PVC-S PVC-S PVC-S PVC-S
1.00
Ø3"
P-A
3.70
1.00
3
2.10
1.00 1.00
P-A P-A
P. SILLA DE 1 1 1.30 ØREV 2"
P-A 1.00
SLØ2" Ø4"
2.10 2.10
RUEDAS
DISPENSADOR DE ØREV 2" Ø4" ØREV 2"
CONSULTORIO 1
2.10 Ø4" Ø6" Ø6" Ø6"
1.05
PVC-S 1.00 M2 BAÑOS HOMBRES
CONSULTORIO TOMA DE
AGUA POTABLE Ø4" 9.45 M2 Ø4" Ø4" SLØ4" INCLINACIÓN 3%
T-P
1.74
1.05
MUESTRAS DE CUELLO SLØ2" PVC-S
BAÑOS MUJERES
PVC-S SLØ2" VACUNACION
1.00 .90 UTERINO Y 2.56 9.45 M2 2.56 10.96 M2 3.26
INCLINACIÓN 3%
1250 M
ØREV 2" PVC-S
GINECOLÓGICAS.
1.30 1.70
4.46
.90
2.50
2.23
3.40 6.94 M2
ØREV 2"
DPA ØREV 2"
V-A 0.75
Ø4" Ø4" PVC-S Ø4"
Ø4" 3 2.00
.93
.93
PVC-S PVC-S
4.03
3.69
3.69
4.07
Ø4" 1.23 1.23 ESTADISTICA Y ARCHIVO
1.90 P-A 1.00 CUARTO Ø4" 11.63 M2
1
2.10
ELECTRICO Ø4"
2.94
4.02 M2
Ø4"
1.46
2.64
ØREV 2"
3.08
Ø2"
2.29
SLØ2"
2.16
CONSULTA EXTERNA
1.00
2.15
1.30 PVC-S 1.30
Ø4"
1.66
1.66
SLØ3" ØREV 2"
Ø4"
Ø4"
1.35
INCLINACIÓN 3%
ØREV 2" ØREV 2"
Ø4"1.20
1251 M
DE EQUIPOS 1.10
5.00 M2 Ø4" Ø2" Ø4"
ØREV 2"
Ø3"
SLØ4" SLØ4"
SLØ3" SLØ2"
T-P SLØ4" CONSULTORIO 3
P-P 2.50
PVC-S
V
2.10
10.00 M2
.20
V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75 V-A 0.75
Ø6" PVC-S
7 1.50 4 0.70 7 1.50 1 1.00 6 2.00 5 1.25 5 1.25 2 1.20 2 1.20
.15 1.50 .55 .70 .41 .24 .30 1.50 1.00 .20 .60 2.00 .21 2.20 .15 1.25 2.77 1.25 .15 1.20 .60 1.20 Ø6" P-A
1
1.00
2.10
PVC-S PVC-S
ACCESO Ø4" Ø4"
Ø4" PVC-S
P-A
1
1.00
2.10
.15
CONSULTA EXTERNA PVC-S Ø6" PVC-S
1252 M
Ø6" PVC-S
INCLINACIÓN 3% T-P Ø2" PVC-S
1.83 1.00 2.70 .80 .35 2.82
1.00
2.19 1.71 1.00 1.00 1.20 P-A 1.00
1 2.10 Ø4"
PVC-S PVC-S T-P ØREV 2"
V-A 0.75
4 0.70
CAJA ELECTRICA Ø4" PVC-S PVC-S SLØ3"
EXISTENTE
Ø4"
1.75
Ø4"
1.90
P-A 1.00 BAÑO
3.70
1 P-A 0.80
2.10
3
2.10
2.63 M2
P-A 1.00 P-A 1.00
P. SILLA DE 1
2.10
1
2.10 1.30 ØREV 2"
1.05
PVC-S 1.00 M2 BAÑOS HOMBRES
AGUA POTABLE Ø4" Ø4" SLØ4"
1253 M
CONSULTORIO TOMA DE 9.45 M2 Ø4" T-P
1.74
1.05
MUESTRAS DE CUELLO SLØ2" PVC-S
BAÑOS MUJERES
PVC-S SLØ2"
1.00 .90 UTERINO Y 9.45 M2
2.56 2.56
INCLINACIÓN 3%
ØREV 2" PVC-S
GINECOLÓGICAS.
1.30 1.70
1256 M
.90
P-A
0.90 11.18 M2
2
2.10 Ø4" .95 OF.CIAU P-A 0.90 Ø4"
2
3.40 6.94 M2
2.10
ØREV 2" DPA PVC-S DPA ØREV 2"
.93
.93
1254 M
PVC-S PVC-S
4.03
SLØ4" SLØ4"
3.88
2.60 1.30 1.30
3.69
3.69
4.07
Ø4" 1.23 1.23 ESTADISTICA Y ARCHIVO
1.90 P-A 1.00 CUARTO Ø4" 11.63 M2
1
2.10
ELECTRICO Ø4"
2.94
4.02 M2
SLØ3" SLØ3"
2.64
ØREV 2"
Ø4"
Ø2"
2.29
SLØ2"
2.16
2.15
1.30 PVC-S 1.30
Ø4"
1.66
1.66
SLØ3" ØREV 2"
Ø4"
Ø4"
1.35
ALMACEN .60 ØREV 2" PVC-S ØREV 2"
DE EQUIPOS Ø4"1.20 1.10
5.00 M2 Ø4" Ø2" Ø4"
ØREV 2"
Ø3"
SLØ4" SLØ4"
SLØ3" SLØ2"
T-P SLØ4" 2.50
P-P
V
2.10
.15
V-A 0.75
7 1.50
1.50 .55
V-A 0.75
4 0.70
1.50
V-A 0.75
1 1.00
1.25 2.77
V-A 0.75
5 1.25
1.25 .15
V-A 0.75
2 1.20
1.20 .60
V-A 0.75
2 1.20
1.20
PROPIETARIO:
PLANTA RED SANITARIA PISO 1 ACCESO ESE HOSPITAL
INGENIERO
SAMUEL MARTIN MORENO ALFONSO
T. P. No. 25202-60949 CND
DIBUJO
PROYECTO
REMODELACION Y
MEJORAMIENTO DEL
DEL CENTRO DE SALUD
CAPARRAPI.
FECHA:
PLANCHA
ABRIL -2023
ESCALAS:
P3/3
DETALLES DE INSTALACION Y CONSTRUCCIÓN 1:50