0 08.01.01.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE MATERIALES Y HERRAMIENTAS LIMA - NAS GLB 1.00 63650.00 63,650.00
GG (2%) 31,052.46
IGV (18%) 279472.18
UTILIDAD (1%) 15,526.23
SON: UN MILLÓN OCHOCIENTOS SETENTA Y OCHO MIL SEISCIENTOS SETENTICUATRO CON 11/00 SOLES
ACERO BOCATOMA LA BANDA
49,752.00
966 S/ 19.40 S/ 18,740.40
25 S/ 19.40 S/ 485.00
4.32 S/ 19.40 S/ 83.81
2
BOCATOMA LA BANDA ACERO BARRAJE Y POZA BARRAJE MOVIL
C.U. EN PRECIO METRADO C.U. EN PRECIO METRAD C.U. EN PRECIO METRADO C.U. EN PRECIO METRADO C.U. EN PRECIO
OBRA PARCIAL 1/2" OBRA PARCIAL O 3/8" OBRA PARCIAL 1/2" OBRA PARCIAL 3/4" OBRA PARCIAL
S/ 45.22 S/ 53,133.50
S/ 1,285,026.80
S/ 414,973.20
MANO DE OBRA S/ 180,000.00
UTILIDAD S/ 234,973.20
AGREGADOS
AGREGADO
FINO AGREGADO PLANTA
PRECIO PRECIO PRECIO ARENA PRECIO
(ARENA C.U. EN OBRA GRUESO (3/4") C.U. EN OBRA AGUA (L) C.U. EN OBRA CONCRETERA
PARCIAL PARCIAL PARCIAL FINAM3 PARCIAL
GRUESA) M3 MIXER
M3
CONSIDERA IGV )
184906.406
184906.406
n° cisternas 32.4397204 500 16219.860205