CLIMAS Y SISTEMAS DE MEXICO PROYECTO: REFORMA 390

FECHA DE FECHA DE ESTATUS FECHA CERRADA


# OBSERVACION NIVEL Y DEPARTAMENTO
LEVANTAMIENTO VENCIMIENTO
INICIADA CERRADA
1 10938 11 14-Feb 26-Feb 1 15-Feb
2 11034 13 1-Mar 5-Mar 1 9-Mar
3 11038 13 1-Mar 8-Mar 1 11-Mar
4 11040 13 1-Mar 8-Mar 1 11-Mar
5 11043 15 2-Mar 5-Mar 1 3-Mar
6 11044 18 2-Mar 9-Mar 1 9-Mar
7 11045 18 2-Mar 9-Mar 1 9-Mar
8 11048 13 2-Mar 5-Mar 1 3-Mar
9 11049 14 2-Mar 5-Mar 1 3-Mar
10 11060 17 dep 7 4-Mar 11-Mar 1 10-Mar
11 11069 17 dep 15 4-Mar 11-Mar 1 15-Mar
12 11079 15 dep 2 4-Mar 11-Mar 1 11-Mar
13 11089 3 7-Mar 14-Mar 1 11-Mar
14 11098 16 dep 4 8-Mar 12-Mar 1 11-Mar
15 11099 16 dep 6 8-Mar 12-Mar 1 11-Mar
16 11100 16 dep 8 8-Mar 12-Mar 1 15-Mar
17 11101 16 dep 10 8-Mar 12-Mar 1 22-Mar
18 11103 16 8-Mar 12-Mar 1 15-Mar
19 11104 16 8-Mar 12-Mar 1 11-Mar
20 11107 18 dep 12 8-Mar 12-Mar 1 9-Mar
21 11108 17 8-Mar 12-Mar 1 11-Mar
22 11116 6 dep 16 9-Mar 12-Mar 1 11-Mar
23 11117 6 dep 16 9-Mar 12-Mar 1 11-Mar
24 11121 6 dep 11 9-Mar 16-Mar 1 11-Mar
25 11123 6 dep 9 9-Mar 16-Mar 1 11-Mar
26 11135 14 10-Mar 17-Mar 1 15-Mar
27 11145 12 al 16 12-Mar 23-Mar daños a tablaroca
28 11146 11 zona A 14-Mar 17-Mar 1 22-Mar
29 11147 9 zona A 14-Mar 17-Mar 1 22-Mar
30 11148 9 zona A 14-Mar 21-Mar 1 5-Apr
31 11151 18 16-Mar 19-Mar 1 26-Mar
32 11152 13 16-Mar 19-Mar 1 22-Mar
33 11161 16 18-Mar 25-Mar 1 30-Mar
34 11163 16 18-Mar 19-Mar 1 22-Mar
35 11164 16 18-Mar 19-Mar 1 22-Mar
36 11165 16 18-Mar 19-Mar 1 22-Mar
37 11166 16 18-Mar 25-Mar 1 22-Mar
38 11167 16 18-Mar 25-Mar 1 22-Mar
39 11168 16 19-Mar 25-Mar 1 22-Mar
40 11176 4 dep 11 22-Mar 29-Mar 1 28-Mar
41 11179 todos 23-Mar 26-Mar daños a tablaroca
42 11191 15 25-Mar 1-Apr 1 28-Mar
43 11192 15 25-Mar 1-Apr 1 29-Mar
44 11193 15 25-Mar 1-Apr para revisión alinear ductos
45 11194 15 25-Mar 1-Apr 1 26-Mar
46 11196 15 25-Mar 1-Apr solicitud de prueba
47 11197 14 25-Mar 1-Apr 1 26-Mar
48 11198 14 25-Mar 1-Apr solicitud de prueba
49 11199 14 25-Mar 1-Apr para revisión Utilizar tramos de tubería completo
50 11200 14 25-Mar 1-Apr 1 26-Mar
51 11201 14 25-Mar 1-Apr 1 5-Apr
52 11202 14 25-Mar 1-Apr 1 26-Mar
53 11203 13 25-Mar 1-Apr 1 28-Mar
54 11204 13 25-Mar 1-Apr 1 5-Apr
55 11205 13 25-Mar 1-Apr solicitud de prueba
56 11206 13 25-Mar 1-Apr 1 5-Apr
57 11207 13 25-Mar 1-Apr 1 29-Mar
58 11208 13 25-Mar 1-Apr 1 28-Mar
59 11209 13 25-Mar 1-Apr 1 28-Mar

FECHA DE FECHA DE ESTATUS DESCRIPCION


# OBSERVACION NIVEL Y DEPARTAMENTO LEVANTAMIENTO VENCIMIENTO INICIADA CERRADA
N4 –PASILLO LADO OXFORD
1 #11224 FRENTE AL DEP 08 31-Mar 7-Apr 4-Apr Aplicar primer o anticorrosivo

2 #11225 N4 DEP 08 31-Mar 7-Apr 6-Apr Ajustar trayectorias-RECORTE DE DUCTO DE MAS

3 #11222 N4 DEP 12 31-Mar 7-Apr 6-Apr retirar los ductos qué no CUMPLEN CON CALIDAD
4 #11221 N4 DEP 14 31-Mar 7-Apr 4-Apr TAPAR PERFORACIONES EN DUCTOS
ESTA OBSERVACION LO No se han integrado registros de acceso de equipos
5 #11188 N3 EN GENERAL 25-Mar 31-Mar CONTESTARA EL ING JOAQUIN de Hvac
N3 DEP 12
6 #11184 TODAS LAS REJILLAS 25-Mar 31-Mar Se observan plenos con parche.

7 #11180 N3 EN GENERAL 23-Mar 31-Mar Ubicación de extracción en cocinas

NO APLICA PARA CLIMAS (REVISAR CON


8 #11160 EN GENERAL LA CONTRATISTA DE ELECTRICOS) Desocnectadores

9 #11155 N 18 DEP 02 17-Mar 24-Mar 4-Apr Protección de ductos


Se observa la invasión de los patines de refuerzos estructurales en
10 #11154 N 18 DEP 01 17-Mar 24-Mar pasos de ductos verticales.,corregir

NO APLICA PORQUE CLIMAS NO UTILIZA


11 #11130 ESTE CALIBRE DE CABLE (SE UTILIZA Instalar capuchones en empalmes y conexiones
CALIBRE 16 DE COLOR NEGRO)
12 #11128 N 16 DEP 06 10-Mar 17-Mar 4-Apr Perforaciones
13 #11127 N 16 DEP 09 10-Mar 17-Mar 4-Apr Falta de grapas en verticales
14 #11053 N 18 3-Mar 10-Mar Coordinar espacio entre especialidades min separación 1".

15 #11008 25-Feb 3-Mar 6-Apr #11008: Ductos golpeados


Siguen sin atender recomendaciones de integrar tapones a circuitos
16 #11003 25-Feb 3-Mar 6-Apr de tuberías preliminares.
Es importante realizar las
revisiones necesarias del proyecto para identificar las
17 #10974 N 09 DEP 09 17-Feb 24-Feb 4-Apr secciones de ductos en tiempo y evitar retrabajos.
Realizar los ajustes necesarios para integrar todos los sistemas
18 #10971 17-Feb 24-Feb

NO APLICA PORQUE CLIMAS NO REALIZA


19 #10970 ESTOS TRABAJOS ( FP ES LA EMPRESA Pendiente invertida
RESPONSABLE
Coordinar el sembrado de equipos respecto al desarrollo y espacio
necesario para la integración de plenos o ductos
20 #10933 10-Feb 17-Feb
qué conecten a rejillas, difusores.
Mejorar la calidad de ensamble de ramales en ductos qué alimentan
21 #10932 10-Feb 17-Feb 6-Apr al interior de departamentos.

NO APLICA PORQUE CLIMAS NO REALIZA


22 #10887 ESTOS TRABAJOS (CELSA ES LA EMPRESA Desconectadores
RESPONSABLE)

Confirmar instalación de compuertas, realizar ajustes en ductos.


23 #10757 N 15 7-Jan 13-Jan 6-Apr

24 #11386 5/5/2022 Alinear ductos,mejorar calidad.