2. Vigas de cimentación Concreto simple f ́c= 175 kg/cm2 a/c = 0.90 UND: M3
c:H 1:7 a/c=0.90
Cuadrilla: 0.2 c+2op+2of+8p
Rendimiento= 20 m3/dia
Total 0.2384 m3
B) ANALISIS DE COSTOS UNITARIOS POR PARTIDA
METRADO 250 M3 REND =
25 M3/DIA
DESCRIP. UND CANT
MATERIALES
PIEDRA M3 0.476
MANO DE OBRA
CAPATAZ HH 0.03
OPERARIO HH 0.32
OFICIAL HH 0.64
PEON HH 2.56
OPERADOR HH 0.32
EQUIPO / HERRAMIENTAS
MEZCLADORA HM 0.32
HERRAMIENTAS 0.03
COSTO POR M3
19.00 54.99
85.00 69.66
60.00 6.27
120.00 57.18
185.12
85.00 2.72
70.00 22.40
55.00 35.20
40.00 102.40
70.00 22.40
37.55
100.00 32.00
185.12 5.55
COSTO POR M3 410.78
DESCRIP. CANT METRADO MAT. EMPLEAR UND P.U. PARCIAL
POR PARTIDA S/.
MATERIALES CEMENTO 2.89 250 723.57 BLS M3 19.00 13747.90
HORMIGON AGUA 0.82 250 204.89 M3 M3 85.00 17415.77
PIEDRA 0.10 250 26.14 60.00 1568.35
0.48 250 119.12 120.00 14294.12
10 p3 COSTO POR M3
x (1 m3 /
35.315 p3) x
AGUA
42.5 kg x
0.85
TOTAL
47026.13
46280.00
9388.40
102694.53