PROYECTO ECOTANQUE 10,000 GLNS (POZA)

AREA
FECHA 2/22/2016
MONEDA DOLARES

ESTRUCTURA ECOTANQUE (POZA)


Item Descripción Unidad Cantidad Precio Unit. Total Precio Peso Unit. Total Peso
1.00 POZA TOTAL PRECIO $
1.01 PLANCHA 5 X 20 X 1/8" UND 6.00 177.00 1,062.00 212.00 1,272.00 1,422.00
2.00 BASTIDORAS DE POZA TOTAL KILOS
2.01 TUBO CUAD. 1 1/2" X 2.5MM UND 18.00 20.00 360.00 16.00 288.00 1,560.00
3.00 SOLDADURA

3.01 SOLDADURA CELLOCORD 1/8" UND 65.00 2.00 99.50 0.00 0.00
3.02 SOLDADURA SUPERCITO UND 65.00 1.00 105.00 0.00 0.00 225.00
4.00 PINTURA

4.01 JGO EPOXICO BASE JGO 2.00 60.00 120.00 0.00 0.00
4.02 JGO EPOXICO POLIURETANO JGO 1.00 70.00 70.00 0.00 0.00
4.03 THINNER GLB 0.00 0.00 50.00 0.00 0.00 240.00

COSTO TOTAL DE MATERIALES $ 1,422.00


COSTO MANO DE OBRA $ 936.00
SOLDADURA $ 225.00
PINTURA Y THINNER $ 240.00
EPPS DE PERSONAL $ 150.00
ARENADO $ 250.00

TOTAL COSTO $ 3,223.00