Está en la página 1de 7

Fecha

N°:
REGISTRO
Estructura /Elemento Edad (Días)
Moldeo Ensayo

2/28/2023 14
1 COLUMNA CIRCULAR 2/14/2023
3/14/2023 28

2/25/2023 14
2 COLUMNA CIRCULAR 2/11/2023
3/11/2023 28

3 COLUMNA CIRCULAR 2/21/2023 3/7/2023 14

4 COLUMNA CIRCULAR 2/17/2023 3/3/2023 14

5 COLUMNA CIRCULAR 2/15/2023 3/15/2023 28

6 PISO ALMACEN 1/25/2023 2/8/2023 14

2/27/2023 14
7 MURO CONTENCION T. DE MANTENIMIENTO 2/13/2023
3/13/2023 28

8 MURO CONTENCION T. DE MANTENIMIENTO 2/17/2023 3/17/2023 28

9 VEREDA 2/17/2023 3/3/2023 14

10 VEREDE SECCION 1 2/24/2023 3/10/2023 14

3/7/2023 14
11 COLUMNA - VEREDA 2/21/2023
3/21/2023 28

12 VIGA CARPINTERIA 2/7/2023 3/7/2023 28

13 VIGA 2/21/2023 3/21/2023 28

14 PISO CARPINTERIA 2/25/2023 3/11/2023 14

15 PISO CARPINTERIA 1/31/2023 2/14/2023 14

16 RAMPA 2/8/2023 2/22/2023 14


REGISTRO DE ENSAYO DE RESISTENCIA A LA COMPRESIÓN SIMPLE
“DESMONTAJE DE ACTUAL TANQUE Y FABRICACIÓN E INSTALACIÓN DEL NUEVO TANQUE TK-2”
Norma ASTM C 39 / N.T.P 339.034

PROYECTO: : “DESMONTAJE DE ACTUAL TANQUE Y FABRICACION E INTALACION DEL NUEVO TANQUE TK-2”
CLIENTE: MINSUR
Fecha
Resistencia a la
N°:

Código de Diametro de Área de Lectura prensa Diseño f`c % Resistencia


REGISTRO

CODIGO DE MUESTRA Volumen M3 Estructura /Elemento Edad (Días) Diametro 1 Diametro 2 Compresión f`c a Prom.
Probeta Probetas (cm) Probetas (cm2) (kg) (Kg/cm2) Obtenida
Moldeo Ensayo (Kg/cm2)

C28-005 4/24/2021 28 14.87 14.9 14.90 174.4 69,040 395.9


0001 TK2-ZAP-280-001 11.80 ZAPATA DE TANQUE TK-2 3/27/2021 375.3 280 134
C28-006 4/24/2021 28 14.87 15.0 14.94 175.3 62,170 354.6
C28-009 4/18/2021 14 15.01 14.78 14.90 174.2 74,910 429.9
427.7 280 153
C28-010 4/18/2021 14 14.89 14.98 14.94 175.2 74,540 425.5
0002 TK2-ZAP-280-002 11.80 4/4/2021
C28-011 5/7/2021 33 14.79 15.04 14.92 174.7 78,780 450.9
438.6 280 157
C28-012 5/7/2021 33 14.88 14.92 14.90 174.4 74,320 426.2
C28-015 4/20/2021 15 14.96 14.85 14.91 174.5 74,100 424.7
417.6 280 149
C28-016 4/20/2021 15 14.98 14.88 14.93 175.1 71,880 410.6
0003 TK2-ZAP-280-003 3.92 4/5/2021
C28-017 5/7/2021 32 14.92 14.91 14.92 174.7 78,070 446.8
443.2 280 158
C28-018 5/7/2021 32 14.92 14.99 14.96 175.7 77,210 439.6
C28-021 4/23/2021 14 14.72 14.5 14.61 167.6 67,910 405.1
400.3 280 143
C28-022 4/23/2021 14 14.56 14.72 14.64 168.3 66,590 395.6
0004 TK2-BOM-280-004 1.08 BOMBAS DE AGUA B-2 4/9/2021
C28-023 5/7/2021 28 14.82 15 14.91 174.6 80,370 460
447.4 280 160
C28-024 5/7/2021 28 14.85 14.89 14.87 173.7 75,450 434
C28-025 4/23/2021 7 14.82 14.17 14.50 165.0 60,530 366.8
364.4 280 130
C28-026 4/23/2021 7 15.06 14.83 14.95 175.4 63,490 361.9
C28-027 4/30/2021 14 15.03 15.02 15.03 177.3 60,310 340.1
0005 TK2-BOM-280-005 1.47 BOMBAS DE AGUA B-1 (1) 4/16/2021 340.0 280 121
C28-028 4/30/2021 14 15.05 15.04 15.05 177.8 60,430 339.9
C28-029 5/14/2021 28 14.85 14.91 14.88 173.9 65,450 376
374.0 280 134
C28-030 5/14/2021 28 14.92 14.88 14.90 174.4 64,800 372
C28-031 4/23/2021 7 14.83 15.01 14.92 174.8 68,170 389.9
408.4 280 146
C28-032 4/23/2021 7 14.94 14.88 14.91 174.6 74,550 427.0
C28-033 4/30/2021 14 15.01 15.02 15.02 177.1 60,160 339.8
0006 TK2-BOM-280-006 2.65 BUZON BZ-3 4/16/2021 339.4 280 121
C28-034 4/30/2021 14 15.05 15.04 15.05 177.8 60,280 339.1
C28-035 5/14/2021 28 14.92 14.88 14.90 174.4 68,900 395
393.2 280 140
C28-036 5/14/2021 28 14.89 14.88 14.89 174.0 68,090 391
C28-037 4/24/2021 7 14.78 15.02 14.90 174.4 68,300 391.7
390.4 280 139
C28-038 4/24/2021 7 14.97 14.9 14.94 175.2 68,150 389.0
C28-039 5/1/2021 14 15.01 15.00 15.01 176.8 60,880 344.3
0007 TK2-BOM-280-007 1.47 BOMBAS DE AGUA B-1 (2) 4/17/2021 341.2 280 122
C28-040 5/1/2021 14 15.08 15.07 15.08 178.5 60,350 338.1
C28-041 5/15/2021 28 14.86 14.91 14.89 174.0 68,230 392
390.5 280 139
C28-042 5/15/2021 28 14.89 14.99 14.94 175.3 68,180 389
C28-043 4/25/2021 7 14.96 14.98 14.97 176.0 58,020 329.6
343.0 280 122
C28-044 4/25/2021 7 15.02 15.02 15.02 177.2 63,140 356.3
C28-045 5/7/2021 19 14.93 14.85 14.89 174.1 66,950 384.5
0008 TK2-BUZ-280-008 3.43 BUZON BZ-2 4/18/2021 390.3 280 139
C28-046 5/7/2021 19 14.95 14.86 14.91 174.5 69,100 396.0
C28-047 5/16/2021 28 14.82 14.99 14.91 174.5 76,520 438.6
432.7 280 155
C28-048 5/16/2021 28 14.92 14.86 14.89 174.1 74,320 426.8
C28-049 4/26/2021 7 14.93 15 14.97 175.9 64,420 366.2
370.6 280 132
C28-050 4/26/2021 7 14.92 14.89 14.91 174.5 65,420 374.9
C28-051 CIMIENTO CORRIDO SALA 5/7/2021 18 15.01 14.88 14.95 175.4 68,250 389.1
0009 TK2-SAL-280-009 4.90 ELECTRICA/ TAPA DE 4/19/2021 381.6 280 136
C28-052 BUZON BZ-03 5/7/2021 18 15.01 14.91 14.96 175.8 65,770 374.2
C28-053 5/17/2021 28 14.98 14.77 14.88 173.8 75,080 432.0
432.1 280 154
CIMIENTO CORRIDO SALA
0009 TK2-SAL-280-009 4.90 ELECTRICA/ TAPA DE 4/19/2021
BUZON BZ-03
432.1 280 154
C28-054 5/17/2021 28 14.98 14.88 14.93 175.1 75,670 432.2
C28-055 4/28/2021 7 15.02 15.04 15.03 177.4 62,940 355
348 280 124.4
C28-056 4/28/2021 7 15.05 15.03 15.04 177.7 60,780 342
C28-057 BUZON BZ-1 / TAPA DE 5/7/2021 16 14.92 14.94 14.93 175.1 67,830 387
0010 TK2-BUZ-280-010 4.70 4/21/2021 380 280 135.7
C28-058 BUZON BZ-2 5/7/2021 16 15.02 14.86 14.94 175.3 65,310 373
C28-059 5/19/2021 28 15.01 14.9 14.94 175.2 71,360 407
404 280 144.4
C28-060 5/19/2021 28 15.02 14.8 14.92 174.8 70,140 401
C28-061 4/30/2021 7 15.07 15.06 15.07 178.2 57,890 325
325 280 116.0
C28-062 4/30/2021 7 15.08 15.07 15.08 178.5 58,010 325
C28-063 TAPA DE BUZON BZ-1 / 5/7/2021 14 14.97 14.88 14.93 175.0 61,020 349
0011 TK2-BUZ-280-011 1.76 4/23/2021 354 280 126.4
C28-064 DADO DE CONCRETO 5/7/2021 14 14.99 14.88 14.94 175.2 62,920 359
C28-065 5/21/2021 28 14.98 14.93 14.96 175.7 38,920 222
258 280 92.3
C28-066 5/21/2021 28 14.95 14.93 14.94 175.3 51,750 295
C28-067 5/1/2021 7 15.04 15.03 15.04 177.5 56,930 321
319 280 114.0
C28-068 5/1/2021 7 15.06 15.05 15.06 178.0 56,550 318
C28-069 BUZON BZ-06 / BUZON BZ- 5/8/2021 14 14.85 14.88 14.87 173.5 64,610 372
0012 TK2-BUZ-280-012 14.90 05 / BANCO DUCTO ENTRE 4/24/2021 369 280 131.8
C28-070 BZ-06 Y BZ-05 5/8/2021 14 15.02 14.87 14.95 175.4 64,180 366
C28-071 5/22/2021 28 15.04 15.12 15.08 178.6 64,930 364
371 280 132.4
C28-072 5/22/2021 28 15.04 14.14 14.59 167.2 63,170 378
C28-073 5/7/2021 12 14.84 14.89 14.87 173.5 51,360 296
295 280 105.4
C28-074 BANCO DUCTO ENTRE 5/7/2021 12 14.94 14.91 14.93 175.0 51,470 294
0013 TK2-BAN-280-013 16.86 4/25/2021
C28-075 BZ-05 Y BZ-04 5/23/2021 28 14.92 14.85 14.89 174.0 72,410 416
419 280 149.6
C28-076 5/23/2021 28 14.98 14.91 14.95 175.4 73,980 422
C28-079 5/7/2021 11 14.95 14.77 14.86 173.4 9,930 57
63 280 22.6
C28-080 5/7/2021 11 14.92 14.93 14.93 175.0 12,160 70
C28-081 BUZON BZ-04 / DADO DE 5/11/2021 15 14.98 14.93 14.96 175.7 14,390 82
0014 TK2-BUZ-280-014 3.14 4/26/2021 71 280 25.5
C28-082 BUZON BZ-6 5/11/2021 15 14.83 14.92 14.88 173.8 10,540 61
C28-083 5/25/2021 29 14.84 14.95 14.90 174.2 70,430 404
404 280 144.3
C28-084 5/25/2021 29 14.9 14.83 14.87 173.5 70,090 404
C28-085 5/7/2021 10 14.91 14.79 14.85 173.2 54,760 316
308 280 109.9
C28-086 5/7/2021 10 14.92 14.9 14.91 174.6 52,230 299
C28-087 5/11/2021 14 14.88 14.91 14.90 174.2 61,800 355
0015 TK2-BUZ-280-015 3.14 BUZON BZ-05 4/27/2021 358 280 127.8
C28-088 5/11/2021 14 14.94 14.97 14.96 175.7 63,430 361
C28-089 5/26/2021 29 14.98 14.9 14.94 175.3 77,120 440
439 280 156.8
C28-090 5/26/2021 29 14.86 14.9 14.88 173.9 76,230 438
C28-091 5/7/2021 9 14.86 15.01 14.94 175.2 40,730 232
249 280 88.9
C28-092 5/7/2021 9 14.85 14.9 14.88 173.8 46,130 265
C28-093 SALA ELECTRICA / 5/12/2021 14 14.92 14.91 14.92 174.7 56,400 323
0016 TK2-SAL-280-016 7.64 4/28/2021 355 280 126.8
C28-094 CASETA 5/12/2021 14 14.93 14.93 14.93 175.1 67,770 387
TK2-SAL-280-016 7.64 SALA ELECTRICA /
0016 CASETA
4/28/2021

C28-095 5/26/2021 28 14.87 14.98 14.93 175.0 68,040 389


409 280 146.2
C28-096 5/26/2021 28 14.99 14.89 14.94 175.3 75,310 430
C28-097 5/7/2021 8 14.84 14.84 14.84 173.0 54,520 315
310 280 110.6
C28-098 5/7/2021 8 14.97 14.92 14.95 175.4 53,310 304
C28-099 BANCO DUCTO DE BZ-04, 5/13/2021 14 14.94 14.87 14.91 174.5 68,880 395
0017 TK2-BAN-280-017 1.76 4/29/2021 231 280 82.6
C28-100 BZ-03 5/13/2021 14 14.93 14.88 14.91 174.5 11,850 68
C28-101 5/27/2021 28 14.95 14.84 14.90 174.2 70,670 406
246 280 87.9
C28-102 5/27/2021 28 14.91 14.95 14.93 175.1 15,220 87
C28-103 5/8/2021 7 14.97 14.79 14.88 173.9 22,130 127
158 280 56.5
C28-104 5/8/2021 7 14.83 15 14.92 174.7 33,000 189
C28-105 5/15/2021 14 15.02 14.92 14.97 176.0 33,470 190
TK2-BUZ-280-018 1.57 TAPA DE BUZON BZ-4 Y 198 280 70.9
0018 C28-106 BZ-5
5/1/2021 5/15/2021 14 14.94 14.89 14.92 174.7 36,100 207
C28-107 5/29/2021 28 14.92 14.85 14.89 174.0 70,800 407
408 280 145.6
C28-108 5/29/2021 28 14.98 14.99 14.99 176.4 72,090 409
C28-109 5/9/2021 7 14.94 14.89 14.92 174.7 32,670 187
188 280 67.0
C28-110 5/9/2021 7 14.89 14.93 14.91 174.6 32,910 188
C28-111 5/16/2021 14 14.84 14.84 14.84 173.0 43,040 249
0019 TK2-ZAP-280-019 0.88 ZAPATAS Z-4(2) Y Z-2(1) 5/2/2021 245 280 87.4
C28-112 5/16/2021 14 14.83 14.88 14.86 173.3 41,740 241
C28-113 5/30/2021 28 15.11 14.81 14.96 175.8 61,740 351
353 280 126.2
C28-114 5/30/2021 28 14.91 14.95 14.93 175.1 62,250 356
C28-115 5/11/2021 8 14.85 14.92 14.89 174.0 32,180 185
184 280 65.8
C28-116 5/11/2021 8 14.85 14.91 14.88 173.9 31,910 183
C28-117 5/17/2021 14 14.82 14.94 14.88 173.9 36,170 208
TK2-ZAP-280-020 0.49 PEDESTALES DE LAS 210 280 75.0
0020 C28-118 ZAPATAS Z-4(2) Y Z-2(1)
5/3/2021 5/17/2021 14 14.97 14.99 14.98 176.2 37,370 212
C28-119 5/31/2021 28 15 14.88 14.94 175.3 59,520 340
343 280 122.7
C28-120 5/31/2021 28 14.93 14.94 14.94 175.2 60,860 347
C28-121 5/12/2021 7 14.94 14.89 14.92 174.7 49,340 282
290 280 103.6
C28-122 5/12/2021 7 14.86 14.93 14.90 174.2 51,910 298
C28-123 LOZA DE TECHO DE 5/19/2021 14 14.89 14.8 14.87 173.5 55,070 317
0021 TK2-SAL-280-021 4.41 5/5/2021 327 280 116.7
C28-124 CASETA ELECTRICA 5/19/2021 14 14.47 14.9 14.70 169.6 57,000 336
C28-125 6/2/2021 28 14.88 14..94 14.88 173.9 64,030 368
378 280 134.8
C28-126 6/2/2021 28 14.95 14.81 14.88 173.9 67,280 387
C28-127 5/13/2021 7 15.00 14.97 14.99 176.4 53,950 306
311 280 111.2
C28-128 5/13/2021 7 14.95 14.89 14.92 174.8 55,350 317
C28-129 TAPA DE BUZON BZ-6 / 5/20/2021 14 14.88 14.96 14.92 174.8 76,780 439
0022 TK2-BUZ-280-022 2.55 LOZA DE PISO DE LA 5/6/2021 419 280 149.7
C28-130 CASETA ELECTRICA 5/20/2021 14 14.87 14.96 14.92 174.7 69,750 399
C28-131 6/3/2021 28 14.97 14.95 14.96 175.8 73,950 421
414 280 148.0
C28-132 6/3/2021 28 15.05 14.94 15.00 176.6 72,070 408
C28-133 5/22/2021 7 14.78 15.12 14.95 175.5 28,780 164
175 280 62.5
C28-134 VEREDA DE CASETA 5/22/2021 7 14.4 14.76 14.58 167.0 31,090 186
0023 TK2-SAL-280-023 3.14 5/15/2021
C28-135 ELECTRICA 5/29/2021 14 14.72 14.95 14.84 172.8 49,420 286
277 280 98.8
C28-136 5/29/2021 14 14.96 14.93 14.95 175.4 46,940 268
C28-139 7/12/2021 7 14.96 15.1 15.03 177.4 72,400 408
TK2-SAL-280-024 2 VEREDA SALA ELECTRICA 7/5/2021 401 143.2
0024 (ADICIONAL)
280
C28-141 7/19/2021 14 14.78 14.81 14.795 171.9 67,700 394
REGISTRO DE ENSAYO DE RESISTENCIA A LA COMPRESIÓN SIMPLE
“DESMONTAJE DE ACTUAL TANQUE Y FABRICACIÓN E INSTALACIÓN DEL
NUEVO TANQUE TK-2”
Norma ASTM C 39 / N.T.P 339.034

PROYECTO: : “DESMONTAJE DE ACTUAL TANQUE Y FABRICACION E INTALACION DEL NUEVO TANQUE TK-2”
CLIENTE: MINSUR
Fecha
N°:

Resistencia a
REGISTRO

Código de Lectura prensa Diseño f`c % Resistencia


CODIGO DE MUESTRA Volumen M3 Edad (Días) la Compresión f`c a Prom.
Probeta (kg) (Kg/cm2) Obtenida
Moldeo Ensayo (Kg/cm2)

RF5 -003 6/2/2021 14 2150 13


TK2-RF-5-001 - 5/19/2021 12.5 5 251
RF5 -004 6/2/2021 14 2160 13

RF5 -009 6/3/2021 14 2090 12


TK2-RF-5-002 - 5/20/2021 13.6 5 272
RF5 -010 6/3/2021 14 2470 15
REGISTRO DE ENSAYO DE RESISTENCIA A LA COMPRESIÓN SIMPLE
“DESMONTAJE DE ACTUAL TANQUE Y FABRICACIÓN E INSTALACIÓN DEL NUEVO TANQUE TK-2”
Norma ASTM C 39 / N.T.P 339.034

PROYECTO: : “DESMONTAJE DE ACTUAL TANQUE Y FABRICACION E INTALACION DEL NUEVO TANQUE TK-2”
CLIENTE: MINSUR
Fecha
Resistencia a la
N°:

Código de Área de Lectura prensa Diseño f`c % Resistencia


REGISTRO

CODIGO DE MUESTRA Volumen M3 Estructura /Elemento Edad (Días) Diametro 1 Diametro 2 Compresión f`c a Prom.
Probeta Probetas (cm2) (kg) (Kg/cm2) Obtenida
Moldeo Ensayo (Kg/cm2)

G-001 5/28/2021 7 5.8 5.5 31.9 13,040 408.8


386.2 750 51
G-002 5/28/2021 7 5.6 5.8 32.5 11,810 363.6
0001 TK2-BS-G-001 0.18 BASE DE BOMBA B-1 5/21/2021
G-003 6/4/2021 14 5 5.09 25.5 8,310 326.5
374.3 750 50
G-004 6/4/2021 14 5.07 5.16 26.2 11,040 422.0
G-007 6/1/2021 7 5.08 5.09 25.9 9,600 371.3
379.2 750 51
G-008 6/1/2021 7 5.08 5.08 25.8 9,990 387.1
0002 TK2-ZAP-G-001 0.08 ZAPATA Z-3 5/25/2021
G-009 6/8/2021 14 5.1 5.09 26.0 7,370 283.9
288.9 750 39
G-010 6/8/2021 14 5.12 5.11 26.2 7,690 293.9
G-015 7/12/2021 7 5.06 5.01 25.4 10840 427.6
593.9 750 79
G-016 7/12/2021 7 5.09 5.04 25.7 19500 760.1
0003 TK2-ZAP-G-001 PEDESTALES 7/5/2021
G-017 7/19/2021 14 5.05 5.11 25.8 19130 741.3
759.7 750 101
G-018 7/19/2021 14 5.09 5.07 25.8 20080 778.1
REGISTRO DE ENSAYO DE RESISTENCIA A LA COMPRESIÓN SIMPLE
“DESMONTAJE DE ACTUAL TANQUE Y FABRICACIÓN E INSTALACIÓN DEL NUEVO TANQUE TK-2”
Norma ASTM C 39 / N.T.P 339.034

PROYECTO: : “DESMONTAJE DE ACTUAL TANQUE Y FABRICACION E INTALACION DEL NUEVO TANQUE TK-2”
CLIENTE: MINSUR
Fecha
Resistencia a
N°:

Código de Diametro de Área de Lectura prensa Diseño f`c % Resistencia


REGISTRO

CODIGO DE MUESTRA Volumen M3 Edad (Días) la Compresión f`c a Prom.


Probeta Probetas (cm) Probetas (cm2) (kg) (Kg/cm2) Obtenida
Moldeo Ensayo (Kg/cm2)

CD28-001 4/2/2021 3 14.96 175.8 62,800 357.3


357.0 280 128
CD28-002 4/2/2021 3 14.97 176.0 62,790 356.7
DISEÑO DE MEZCLA
CD28-003 CON CEMENTO 4/6/2021 7 15 176.7 74,980 424.3
0001 YURA TIPO 1 - 3/30/2021 421.3 280 150
CD28-004 VISCOCRETE 0.9 % 4/6/2021 7 14.89 174.1 72,830 418.2
SIKA AER 0.028 %
CD28-005 4/14/2021 15 14.97 176.0 73,360 416.8
414.8 280 148
CD28-006 4/14/2021 15 14.93 175.1 72,260 412.8

CD28-007 4/11/2021 4 14.97 176.0 68,900 391.5


386.3 280 138
CD28-008 4/11/2021 4 14.97 176.0 67,100 381.2
DISEÑO DE MEZCLA
CD28-009 CON CEMENTO 4/14/2021 7 14.98 176.2 73,510 417
0002 YURA TIPO 1 - 4/7/2021 416.0 280 149
CD28-010 VISCOCRETE 0.9 % 4/14/2021 7 14.97 176.0 73,040 415
SIKA AER 0.028 %
CD28-011 4/21/2021 14 14.915 174.7 75,750 434
432.1 280 154
CD28-012 4/21/2021 14 14.93 175.1 75,390 431

RF -001 5/7/2021 7 14.95 175.5 960 5


6.2 5 124
RELLENO RF -002 DISEÑO DE RELLENO 5/7/2021 7 14.77 171.3 1180 7
- 4/30/2021
FLUIDO FLUIDO
RF -003 5/15/2021 15 14.69 169.5 1260 7
7.2 5 143
RF -004 5/15/2021 15 14.69 169.5 1170 7