Documentos de Académico
Documentos de Profesional
Documentos de Cultura
N° Vaciado
Promedio
Probetas
Area Resistencia Promedio
Procedencia / Lugar de Estructura Fecha de Fecha de Rotura Edad Lectura Dial Resistencia Tipo fc. Resistencia Resistencia
Nº
Muestreo Moldeo (dias) (kg) (kg/cm2 kg/cm2 (%)
(cm2) (kg/cm2 (%)
Ø (mm.)
001 11/09/23 7 14.90 176.72 22040 124.72 100 124.72
123.92 123.92
04/09/23
V-001 002 11/09/23 7 14.90 176.72 21760 123.13 100 123.13
Base para Pararrayos Solado: 1,2,3,4,5,6
003 02/10/23 28 14.90 176.72 21800.00 123.36 100 123.36
122.79 122.79
004 02/10/23 28 14.90 176.72 21600.00 122.23 100 122.23
005 21/09/23 7 14.90 176.72 25340 143.39 100 143.39
141.78 141.78
14/09/23
006 21/09/23 7 14.90 176.72 24770 140.17 100 140.17
V-002
16/09/23
010 Transformador de 23/09/23 8 14.90 176.72 26410.00 149.45 100 149.45
V-003
potencia Solado
011 14/10/23 29 14.90 176.72 23630.00 133.71 100 133.71
128.08 128.08
012 14/10/23 29 14.90 176.72 21640.00 122.45 100 122.45
013 24/09/23 7 14.90 176.72 11300 63.94 100 63.94
84.68 84.68
17/09/23
014 24/09/23 7 14.90 176.72 18630 105.42 100 105.42
V-004
SELECCIONADOR DE SOLADO
A071 LINEA;BARRA 04/11/23 28 14.90 176.72 100
A071 04/11/23 28 14.90 176.72 100
A072 20/10/23 28 14.90 176.72 100
13/10/23
KV BP1-H;SOLADO
A074 10/11/23 28 14.90 176.72 100
A075 10/11/23 28 14.90 176.72 100
A076
N° Vaciado
Promedio
Probetas
Area Resistencia Promedio
Procedencia / Lugar de Estructura Fecha de Edad
Fecha de Rotura (dias) Lectura Dial Resistencia Tipo fc. Resistencia Resistencia
Nº
Muestreo Moldeo (kg) (kg/cm2 kg/cm2 (%)
Aparatos de medición utilizados
(cm2) (kg/cm2 (%)
Ø (mm.)
2 Vernier NA 5/10/2022
Promedio
Probetas
09/09/23
A002 Base pararrayos 9/16/2023 7 7 5 14.90 15.10 15.00 176.72 35260 200 280 71
V-001
A014 Base portico 10KV 9/19/2023 7 7 14.90 15.10 15.00 176.72 55550 314 280 112
V-003
A020 Base portico 10KV 9/20/2023 7 8 14.90 15.10 15.00 176.72 49700 281 280 100
V-004
A026 9/23/2023 7 8 14.90 15.10 15.00 176.72 52570 297 280 106
V-005
Promedio
Probetas
22/09/23
A044 29/09/23 7 7 14.90 15.10 15.00 176.72 43510.0 246 280 88
V-008
24/09/23
A050 01/10/23 7 14.90 15.10 15.00 78.50 280
V-009
Promedio
Probetas
30/09/23
A070 SUELO CEMENTO 03/10/23 3 14.90 15.10 15.00 176.72 280
V-015
ZAPATA 4 Y 5
A071 (Probetas de 6" x 12") 28/10/23 28 14.90 15.10 15.00 176.72 280
CON CHUSEADA
A071 28/10/23 28 14.90 15.10 15.00 176.72 280
A075 09/10/23 7 14.90 15.10 15.00 78.50 280
A076 09/10/23 7 14.90 15.10 15.00 78.50 280
02/10/23
A077 BASE TRANSFORMADOR 30/10/23 28 14.90 15.10 15.00 78.50 280
V-016
A070 BASE DE SALAS PEDESTALES BSE-05, BSE- 10/10/23 7 7 14.90 15.10 15.00 78.50 280
V-017
A070 BASE DE SALAS PEDESTALES BSE-13; BSE- 11/10/23 7 14.90 15.10 15.00 176.72 51880.0 294 280 105
V-018
A070 BASE DE CONTROL DE 11/10/23 7 14.90 15.10 15.00 176.72 51390.0 291 280 104
V-019
Promedio
Probetas
Muestreo Moldeo (dias) dias Aire Rotura Ø (mm.) Diametro (kg) (kg/cm2 kg/cm2 (%)
(cm2) (kg/cm2 (%)
A072 15/10/23 28 14.90 15.10 15.00 176.72 280
08/10/23
A073 BASE DE SALA 15/10/23 28 14.90 15.10 15.00 176.72 280
V-022
11/10/23
A085 BASE DE PORTICO 138 18/10/23 28 14.90 15.10 15.00 176.72 280
V-023
280 6 4.6
A086 DISEÑO 12/10/23 28 14.90 15.10 15.00 176.72 75850.0 429 280 153
428.4 153.0
A087 12/10/23 28 14.90 15.10 15.00 176.72 75580.0 428 280 153
A084 21/09/23 7 14.90 15.10 15.00 176.72 44510.0 252 100 252
354.9 248.9
14/09/23
A085 21/09/23 7 14.90 15.10 15.00 176.72 43470.0 246 100 246
CORROBORACION DE
V-025
100 5 4.4
A086 DISEÑO 12/10/23 28 14.90 15.10 15.00 176.72 34150.0 193 100 193
96.6 325.6
A087 12/10/23 28 14.90 15.10 15.00 176.72 80940.0 458 100 458
A084 20/10/23 7 14.90 15.10 15.00 176.72 280
13/10/23
Promedio
Probetas
Promedio
Probetas
Muestreo Moldeo (dias) dias Aire Rotura Ø (mm.) Diametro (kg) (kg/cm2 kg/cm2 (%)
(cm2) (kg/cm2 (%)
Item Equipo Número de Serie Fecha de Calibración
Aparatos de medición utilizados 1 Prensa Hidráulica
2 Vernier NA