Está en la página 1de 25

PLANILLA DE METRADO

Proyecto : CONSTRUCION DE PAVIMENTO EN CALLE 6 MIRAFLORES DISTRITO DE LOS ORGANOS PROVINCIA TALARA DEPARTAMENTO PIURA
Ubicación: DISTRITO DE LOS ORGANOS Fecha: Nov-21

PARTIDA Und. Largo(m) Ancho(m) Alto(m) Area(m2) Cantidad N°Elem. Factor PARCIAL TOTAL
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA UND 1.00 1.00 1.00
01.01.02 ALQUILER DE LOCAL PARA LA OBRA MES 3.00 3.00 3.00
01.01.03 ALQUILER DEPOSITO PARA ALMACENAMIENTO DE AG MES 3.00 3.00 3.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GBL 1.00 1.00 1.00
01.01.05 CERCO PERIMETRICO DE MALLA RASCHEL Y POSTE D M 415.00
Tramo-1
65.00 2.00 130.00
27.00 2.00 54.00
Tramo-2
87.35 2.00 174.70
28.15 2.00 56.30
01.02 TRABAJOS PRELIMINARES
01.02.01 DESMONTAJE DE CORREDORES M2 132.30
Corredor -1 13.95 2.80 1.00 39.06
Corredor - 2 13.84 4.75 1.00 65.74
Corredor-3 13.75 2.00 1.00 27.50
01.02.02 TALA DE ÁRBOLES Y ELIMINACIÓN DE RAÍCES CON EQ UND 5.00
Arboles 5.00 5.00
01.02.03 DEMOLICION DE VEREDAS DE 0.10 M. M2 1229.72
Vereda-01 11.25 1.38 1.00 15.53
Vereda-2 13.90 2.80 1.00 38.92
Vereda-3 13.95 1.40 1.00 19.53
Vereda-4 13.84 4.75 1.00 65.74
vereda-5 13.85 1.00 1.00 13.85
vereda-6 13.75 1.25 1.00 17.19
vereda - 7 13.95 1.15 1.00 16.04
vereda-8 15.70 1.50 1.00 23.55
vereda - 9 82.75 1.80 1.00 148.95
vereda-10 25.67 1.40 1.00 35.94
vereda-11 14.90 1.00 1.00 14.90
vereda-12 14.30 1.00 1.00 14.30
vereda-13 12.08 1.58 1.00 19.09
2.00 1.00 2.00 4.00
vereda-14 15.45 1.00 1.00 15.45
Tramo-01 57.45 6.10 1.00 350.45
Tramo-02 59.47 7.00 1.00 416.29
01.02.04 DEMOLICIÓN DE SARDINEL DE CONCRETO(0.15mx0.30 M 36.53
TRAMO -01
11.79 1.00 11.79
12.37 1.00 12.37
TRAMO-02
12.37 1.00 12.37
01.02.05 REUBICACION DE POSTE DE LUZ (PAGO A EMPRESA P UND 6.00 6.00 6.00
01.02.06 ELIMIN. DESMONTE (CARG+V) D=5KM M3 157.83
Veredas 0.10 1229.72 1.25 153.72
Sardinel 36.53 0.15 0.60 1.25 4.11
01.02.07 TRAZO, NIVELACION Y REPLANTEO M2 4208.29
TRAMO -01 86.50 28.15 2434.98
TRAMO-02 65.80 26.95 1773.31
01.03 SEGURIDAD Y SALUD EN EL TRABAJO
01.03.01 EQUIPOS DE PROTECCION INDIVIDUAL UND 20.00 20.00 20.00
01.03.02 EQUIPOS DE PROTECCION COLECTIVA GBL 1.00 1.00 1.00
01.03.03 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD GBL 1.00 1.00 1.00
01.03.04 CAPACITACIÓN EN SEGURIDAD Y SALUD GBL 1.00 1.00 1.00
01.03.05 RECURSOS PARA RESPUESTAS ANTE EMERGENCIA GBL 1.00 1.00 1.00
02 PAVIMENTACION
02.01 MOVIMIENTO DE TIERRAS
02.01.01 CORTE EN TERRENO A NIVEL DE SUB RASANTE C/EQU M3 439.89
Pavimento-01 0.50 489.40 1.00 244.70
Pavimento-02 0.50 390.37 1.00 195.19
02.01.02 PERFILADO Y COMPACTADO DE SUB RASANTE C/EQUI M2 879.77
Pavimento-01 489.40 1.00 489.40
Pavimento-02 390.37 1.00 390.37
02.01.03 ELIMIN. DESMONTE (CARG+V) D=5KM M3 0.50 864.71 1.00 1.25 540.44 540.44
02.02 PAVIMENTO CON LOSA DE CONCRETO
02.02.01 CONFORMACIÓN Y COMPACTACIÓN SUBBASE GRANULA M2 879.77
Pavimento-01 489.40 1.00 489.40
Pavimento-02 390.37 1.00 390.37
02.02.02 CONFORMACIÓN Y COMPACTACIÓN BASE GRANULAR E M2 879.77
Pavimento-01 489.40 1.00 489.40
Pavimento-02 390.37 1.00 390.37
02.02.03 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO M2 88.24
Pavimento-01 86.50 0.20 1.00 1.00 17.30
5.50 0.20 1.00 29.00 31.90
Pavimento-02 68.70 0.20 1.00 1.00 13.74
5.50 0.20 1.00 23.00 25.30
02.02.04 CONCRETO F´C=210 KG/CM2 PARA PAVIMENTO M3 175.95
Pavimento-01 0.20 489.40 1.00 97.88
Pavimento-02 0.20 390.37 1.00 78.07
02.02.05 CURADO DE CONCRETO CON ADITIVO M2 879.77
Pavimento-01 489.40 1.00 489.40
Pavimento-02 390.37 1.00 390.37
02.02.06 JUNTAS ASFÁLTICAS M 441.20
Pavimento-01 86.50 1.00 1.00 86.50
5.50 1.00 29.00 159.50
Pavimento-02 68.70 1.00 1.00 68.70
5.50 1.00 23.00 126.50
02.03 SEÑALIZACION Y SEGURIDAD VIAL
02.03.01 TACHAS REFLECTIVAS PARA ROMPEMUELLES UND 4.00 36.00 144.00 144.00
03 SARDINELES
03.01 EXCAVACION MANUAL DE ZANJA P/SARDINEL M3 62.37
AV-01 81.77 0.15 0.50 1.00 1.00 6.13
AV-02 53.89 0.15 0.50 1.00 1.00 4.04
AV-03 27.20 0.15 0.50 1.00 1.00 2.04
AV-04 30.00 0.15 0.50 1.00 1.00 2.25
AV-05 62.82 0.15 0.50 1.00 1.00 4.71
AV-06 62.52 0.15 0.50 1.00 1.00 4.69
AV-07 82.63 0.15 0.50 1.00 1.00 6.20
AV-08 34.71 0.15 0.50 1.00 1.00 2.60
AV-09 36.35 0.15 0.50 1.00 1.00 2.73
AV-10 27.17 0.15 0.50 1.00 1.00 2.04
AV-11 32.14 0.15 0.50 1.00 1.00 2.41
AV-12 35.50 0.15 0.50 1.00 1.00 2.66
AV-13 38.85 0.15 0.50 1.00 1.00 2.91
AV-14 52.23 0.15 0.50 1.00 1.00 3.92
AV-15 49.92 0.15 0.50 1.00 1.00 3.74
AV-16 39.02 0.15 0.50 1.00 1.00 2.93
AV-17 35.64 0.15 0.50 1.00 1.00 2.67
AV-18 26.05 0.15 0.50 1.00 1.00 1.95
AV-19 23.35 0.15 0.50 1.00 1.00 1.75
03.02 CONFORMACION MANUAL DE CAPA DE SUBBASE (HORMIG M3 12.48
AV-01 81.77 0.15 0.10 1.00 1.00 1.23
AV-02 53.89 0.15 0.10 1.00 1.00 0.81
AV-03 27.20 0.15 0.10 1.00 1.00 0.41
AV-04 30.00 0.15 0.10 1.00 1.00 0.45
AV-05 62.82 0.15 0.10 1.00 1.00 0.94
AV-06 62.52 0.15 0.10 1.00 1.00 0.94
AV-07 82.63 0.15 0.10 1.00 1.00 1.24
AV-08 34.71 0.15 0.10 1.00 1.00 0.52
AV-09 36.35 0.15 0.10 1.00 1.00 0.55
AV-10 27.17 0.15 0.10 1.00 1.00 0.41
AV-11 32.14 0.15 0.10 1.00 1.00 0.48
AV-12 35.50 0.15 0.10 1.00 1.00 0.53
AV-13 38.85 0.15 0.10 1.00 1.00 0.58
AV-14 52.23 0.15 0.10 1.00 1.00 0.78
AV-15 49.92 0.15 0.10 1.00 1.00 0.75
AV-16 39.02 0.15 0.10 1.00 1.00 0.59
AV-17 35.64 0.15 0.10 1.00 1.00 0.53
AV-18 26.05 0.15 0.10 1.00 1.00 0.39
AV-19 23.35 0.15 0.10 1.00 1.00 0.35
03.03 CONFORMACION MANUAL DE CAPA DE BASE (AFIRMADO) M3 12.48
AV-01 81.77 0.15 0.10 1.00 1.00 1.23
AV-02 53.89 0.15 0.10 1.00 1.00 0.81
AV-03 27.20 0.15 0.10 1.00 1.00 0.41
AV-04 30.00 0.15 0.10 1.00 1.00 0.45
AV-05 62.82 0.15 0.10 1.00 1.00 0.94
AV-06 62.52 0.15 0.10 1.00 1.00 0.94
AV-07 82.63 0.15 0.10 1.00 1.00 1.24
AV-08 34.71 0.15 0.10 1.00 1.00 0.52
AV-09 36.35 0.15 0.10 1.00 1.00 0.55
AV-10 27.17 0.15 0.10 1.00 1.00 0.41
AV-11 32.14 0.15 0.10 1.00 1.00 0.48
AV-12 35.50 0.15 0.10 1.00 1.00 0.53
AV-13 38.85 0.15 0.10 1.00 1.00 0.58
AV-14 52.23 0.15 0.10 1.00 1.00 0.78
AV-15 49.92 0.15 0.10 1.00 1.00 0.75
AV-16 39.02 0.15 0.10 1.00 1.00 0.59
AV-17 35.64 0.15 0.10 1.00 1.00 0.53
AV-18 26.05 0.15 0.10 1.00 1.00 0.39
AV-19 23.35 0.15 0.10 1.00 1.00 0.35
03.04 ACARREO DE MATERIAL EXCEDENTE (MANUAL) HASTA 50 M3 37.58
AV-01 81.77 0.15 0.50 1.00 1.00 1.25 7.67
AV-02 53.89 0.15 0.50 1.00 1.00 1.25 5.05
AV-03 27.20 0.15 0.50 1.00 1.00 1.25 2.55
AV-04 30.00 0.15 0.50 1.00 1.00 1.25 2.81
AV-05 62.82 0.15 0.50 1.00 1.00 1.25 5.89
AV-06 62.52 0.15 0.50 1.00 1.00 1.25 5.86
AV-07 82.63 0.15 0.50 1.00 1.00 1.25 7.75
AV-08 34.71 0.15 0.50 1.00 1.00 1.25 3.25 3.25
AV-09 36.35 0.15 0.50 1.00 1.00 1.25
AV-10 27.17 0.15 0.50 1.00 1.00 1.25
AV-11 32.14 0.15 0.50 1.00 1.00 1.25
AV-12 35.50 0.15 0.50 1.00 1.00 1.25
AV-13 38.85 0.15 0.50 1.00 1.00 1.25
AV-14 52.23 0.15 0.50 1.00 1.00 1.25
AV-15 49.92 0.15 0.50 1.00 1.00 1.25
AV-16 39.02 0.15 0.50 1.00 1.00 1.25
AV-17 35.64 0.15 0.50 1.00 1.00 1.25
AV-18 26.05 0.15 0.50 1.00 1.00 1.25 2.44
AV-19 23.35 0.15 0.50 1.00 1.00 1.25 2.19
03.05 ELIMIN. DESMONTE (CARG+V) D=5KM M3 77.98
AV-01 81.77 0.15 0.50 1.00 1.00 1.25 7.67
AV-02 53.89 0.15 0.50 1.00 1.00 1.25 5.05
AV-03 27.20 0.15 0.50 1.00 1.00 1.25 2.55
AV-04 30.00 0.15 0.50 1.00 1.00 1.25 2.81
AV-05 62.82 0.15 0.50 1.00 1.00 1.25 5.89
AV-06 62.52 0.15 0.50 1.00 1.00 1.25 5.86
AV-07 82.63 0.15 0.50 1.00 1.00 1.25 7.75
AV-08 34.71 0.15 0.50 1.00 1.00 1.25 3.25
AV-09 36.35 0.15 0.50 1.00 1.00 1.25 3.41
AV-10 27.17 0.15 0.50 1.00 1.00 1.25 2.55
AV-11 32.14 0.15 0.50 1.00 1.00 1.25 3.01
AV-12 35.50 0.15 0.50 1.00 1.00 1.25 3.33
AV-13 38.85 0.15 0.50 1.00 1.00 1.25 3.64
AV-14 52.23 0.15 0.50 1.00 1.00 1.25 4.90
AV-15 49.92 0.15 0.50 1.00 1.00 1.25 4.68
AV-16 39.02 0.15 0.50 1.00 1.00 1.25 3.66
AV-17 35.64 0.15 0.50 1.00 1.00 1.25 3.34
AV-18 26.05 0.15 0.50 1.00 1.00 1.25 2.44
AV-19 23.35 0.15 0.50 1.00 1.00 1.25 2.19
03.06 ENCOFRADO Y DESENCOFRADO DE SARDINEL PERALTAD M2 582.24
AV-01 81.77 0.35 1.00 2.00 57.24
AV-02 53.89 0.35 1.00 2.00 37.72
AV-03 27.20 0.35 1.00 2.00 19.04
AV-04 30.00 0.35 1.00 2.00 21.00
AV-05 62.82 0.35 1.00 2.00 43.97
AV-06 62.52 0.35 1.00 2.00 43.76
AV-07 82.63 0.35 1.00 2.00 57.84
AV-08 34.71 0.35 1.00 2.00 24.30
AV-09 36.35 0.35 1.00 2.00 25.45
AV-10 27.17 0.35 1.00 2.00 19.02
AV-11 32.14 0.35 1.00 2.00 22.50
AV-12 35.50 0.35 1.00 2.00 24.85
AV-13 38.85 0.35 1.00 2.00 27.20
AV-14 52.23 0.35 1.00 2.00 36.56
AV-15 49.92 0.35 1.00 2.00 34.94
AV-16 39.02 0.35 1.00 2.00 27.31
AV-17 35.64 0.35 1.00 2.00 24.95
AV-18 26.05 0.35 1.00 2.00 18.24
AV-19 23.35 0.35 1.00 2.00 16.35
03.07 ACERO ESTRUCTURAL FY=4200 KG/CM2 PARA SARDINEL KG 1555.42
Ø3/8'' Acero Longitudinal 831.76 1.00 2.00 0.56 931.57
Ø1/4'' Acero Transversal 0.60 1.00 4159.00 0.25 623.85
03.08 CONCRETO F´C=210 KG/CM2 PARA SARDINEL M3 74.86
AV-01 81.77 0.15 0.60 1.00 1.00 7.36
AV-02 53.89 0.15 0.60 1.00 1.00 4.85
AV-03 27.20 0.15 0.60 1.00 1.00 2.45
AV-04 30.00 0.15 0.60 1.00 1.00 2.70
AV-05 62.82 0.15 0.60 1.00 1.00 5.65
AV-06 62.52 0.15 0.60 1.00 1.00 5.63
AV-07 82.63 0.15 0.60 1.00 1.00 7.44
AV-08 34.71 0.15 0.60 1.00 1.00 3.12
AV-09 36.35 0.15 0.60 1.00 1.00 3.27
AV-10 27.17 0.15 0.60 1.00 1.00 2.45
AV-11 32.14 0.15 0.60 1.00 1.00 2.89
AV-12 35.50 0.15 0.60 1.00 1.00 3.20
AV-13 38.85 0.15 0.60 1.00 1.00 3.50
AV-14 52.23 0.15 0.60 1.00 1.00 4.70
AV-15 49.92 0.15 0.60 1.00 1.00 4.49
AV-16 39.02 0.15 0.60 1.00 1.00 3.51
AV-17 35.64 0.15 0.60 1.00 1.00 3.21
AV-18 26.05 0.15 0.60 1.00 1.00 2.34
AV-19 23.35 0.15 0.60 1.00 1.00 2.10
03.09 JUNTAS ASFÁLTICAS M 42.00
AV-01 0.15 1.00 27.00 4.05
AV-02 0.15 1.00 18.00 2.70
AV-03 0.15 1.00 10.00 1.50
AV-04 0.15 1.00 10.00 1.50
AV-05 0.15 1.00 21.00 3.15
AV-06 0.15 1.00 21.00 3.15
AV-07 0.15 1.00 28.00 4.20
AV-08 0.15 1.00 12.00 1.80
AV-09 0.15 1.00 12.00 1.80
AV-10 0.15 1.00 9.00 1.35
AV-11 0.15 1.00 11.00 1.65
AV-12 0.15 1.00 12.00 1.80
AV-13 0.15 1.00 13.00 1.95
AV-14 0.15 1.00 17.00 2.55
AV-15 0.15 1.00 17.00 2.55
AV-16 0.15 1.00 13.00 1.95
AV-17 0.15 1.00 12.00 1.80
AV-18 0.15 1.00 9.00 1.35
AV-19 0.15 1.00 8.00 1.20
03.10 CURADO DE CONCRETO CON ADITIVO M2 374.29
AV-01 81.77 0.45 1.00 1.00 36.80
AV-02 53.89 0.45 1.00 1.00 24.25
AV-03 27.20 0.45 1.00 1.00 12.24
AV-04 30.00 0.45 1.00 1.00 13.50
AV-05 62.82 0.45 1.00 1.00 28.27
AV-06 62.52 0.45 1.00 1.00 28.13
AV-07 82.63 0.45 1.00 1.00 37.18
AV-08 34.71 0.45 1.00 1.00 15.62
AV-09 36.35 0.45 1.00 1.00 16.36
AV-10 27.17 0.45 1.00 1.00 12.23
AV-11 32.14 0.45 1.00 1.00 14.46
AV-12 35.50 0.45 1.00 1.00 15.98
AV-13 38.85 0.45 1.00 1.00 17.48
AV-14 52.23 0.45 1.00 1.00 23.50
AV-15 49.92 0.45 1.00 1.00 22.46
AV-16 39.02 0.45 1.00 1.00 17.56
AV-17 35.64 0.45 1.00 1.00 16.04
AV-18 26.05 0.45 1.00 1.00 11.72
AV-19 23.35 0.45 1.00 1.00 10.51
03.11 TARRAJEO DE SARDINEL C:A 1:4 M2 374.29
AV-01 81.77 0.45 1.00 1.00 36.80
AV-02 53.89 0.45 1.00 1.00 24.25
AV-03 27.20 0.45 1.00 1.00 12.24
AV-04 30.00 0.45 1.00 1.00 13.50
AV-05 62.82 0.45 1.00 1.00 28.27
AV-06 62.52 0.45 1.00 1.00 28.13
AV-07 82.63 0.45 1.00 1.00 37.18
AV-08 34.71 0.45 1.00 1.00 15.62
AV-09 36.35 0.45 1.00 1.00 16.36
AV-10 27.17 0.45 1.00 1.00 12.23
AV-11 32.14 0.45 1.00 1.00 14.46
AV-12 35.50 0.45 1.00 1.00 15.98
AV-13 38.85 0.45 1.00 1.00 17.48
AV-14 52.23 0.45 1.00 1.00 23.50
AV-15 49.92 0.45 1.00 1.00 22.46
AV-16 39.02 0.45 1.00 1.00 17.56
AV-17 35.64 0.45 1.00 1.00 16.04
AV-18 26.05 0.45 1.00 1.00 11.72
AV-19 23.35 0.45 1.00 1.00 10.51
03.12 PINTADO DE SARDINELES M2 374.29
AV-01 81.77 0.45 1.00 1.00 36.80
AV-02 53.89 0.45 1.00 1.00 24.25
AV-03 27.20 0.45 1.00 1.00 12.24
AV-04 30.00 0.45 1.00 1.00 13.50
AV-05 62.82 0.45 1.00 1.00 28.27
AV-06 62.52 0.45 1.00 1.00 28.13
AV-07 82.63 0.45 1.00 1.00 37.18
AV-08 34.71 0.45 1.00 1.00 15.62
AV-09 36.35 0.45 1.00 1.00 16.36
AV-10 27.17 0.45 1.00 1.00 12.23
AV-11 32.14 0.45 1.00 1.00 14.46
AV-12 35.50 0.45 1.00 1.00 15.98
AV-13 38.85 0.45 1.00 1.00 17.48
AV-14 52.23 0.45 1.00 1.00 23.50
AV-15 49.92 0.45 1.00 1.00 22.46
AV-16 39.02 0.45 1.00 1.00 17.56
AV-17 35.64 0.45 1.00 1.00 16.04
AV-18 26.05 0.45 1.00 1.00 11.72
AV-19 23.35 0.45 1.00 1.00 10.51
04 JARDINERAS
04.01 EXCAVACION MANUAL DE ZANJA P/JARDINERAS M3 41.58
JARDINERA-01 20.12 0.50 0.70 1.00 1.00 7.04
JARDINERA-02 5.00 0.50 0.70 1.00 1.00 1.75
JARDINERA-03 5.00 0.50 0.70 1.00 1.00 1.75
JARDINERA-04 5.00 0.50 0.70 1.00 1.00 1.75
JARDINERA-05 5.00 0.50 0.70 1.00 1.00 1.75
JARDINERA-06 5.00 0.50 0.70 1.00 1.00 1.75
JARDINERA-07 5.00 0.50 0.70 1.00 1.00 1.75
JARDINERA-08 5.00 0.50 0.70 1.00 1.00 1.75
JARDINERA-09 5.00 0.50 0.70 1.00 1.00 1.75
JARDINERA-10 20.12 0.50 0.70 1.00 1.00 7.04
JARDINERA-11 19.28 0.50 0.70 1.00 1.00 6.75
JARDINERA-12 19.28 0.50 0.70 1.00 1.00 6.75
04.02 CONFORMACION MANUAL DE CAPA DE SUBBASE (HORMIGON M3 5.94
JARDINERA-01 20.12 0.50 0.10 1.00 1.00 1.01
JARDINERA-02 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-03 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-04 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-05 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-06 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-07 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-08 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-09 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-10 20.12 0.50 0.10 1.00 1.00 1.01
JARDINERA-11 19.28 0.50 0.10 1.00 1.00 0.96
JARDINERA-12 19.28 0.50 0.10 1.00 1.00 0.96
04.03 CONFORMACION MANUAL DE CAPA DE BASE (AFIRMADO) ES M3 5.94
JARDINERA-01 20.12 0.50 0.10 1.00 1.00 1.01
JARDINERA-02 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-03 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-04 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-05 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-06 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-07 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-08 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-09 5.00 0.50 0.10 1.00 1.00 0.25
JARDINERA-10 20.12 0.50 0.10 1.00 1.00 1.01
JARDINERA-11 19.28 0.50 0.10 1.00 1.00 0.96
JARDINERA-12 19.28 0.50 0.10 1.00 1.00 0.96
04.04 ELIMIN. DESMONTE (CARG+V) D=5KM M3 52.00
JARDINERA-01 20.12 0.50 0.70 1.00 1.00 1.25 8.80
JARDINERA-02 5.00 0.50 0.70 1.00 1.00 1.25 2.19
JARDINERA-03 5.00 0.50 0.70 1.00 1.00 1.25 2.19
JARDINERA-04 5.00 0.50 0.70 1.00 1.00 1.25 2.19
JARDINERA-05 5.00 0.50 0.70 1.00 1.00 1.25 2.19
JARDINERA-06 5.00 0.50 0.70 1.00 1.00 1.25 2.19
JARDINERA-07 5.00 0.50 0.70 1.00 1.00 1.25 2.19
JARDINERA-08 5.00 0.50 0.70 1.00 1.00 1.25 2.19
JARDINERA-09 5.00 0.50 0.70 1.00 1.00 1.25 2.19
JARDINERA-10 20.12 0.50 0.70 1.00 1.00 1.25 8.80
JARDINERA-11 19.28 0.50 0.70 1.00 1.00 1.25 8.44
JARDINERA-12 19.28 0.50 0.70 1.00 1.00 1.25 8.44
04.05 CONCRETO CICLOPEO C:H 1:10+30% PG PREPARACIÓN C/ M3 29.26
JARDINERA-01 19.75 0.50 0.50 1.00 1.00 4.94
JARDINERA-02 5.00 0.50 0.50 1.00 1.00 1.25
JARDINERA-03 5.00 0.50 0.50 1.00 1.00 1.25
JARDINERA-04 5.00 0.50 0.50 1.00 1.00 1.25
JARDINERA-05 5.00 0.50 0.50 1.00 1.00 1.25
JARDINERA-06 5.00 0.50 0.50 1.00 1.00 1.25
JARDINERA-07 5.00 0.50 0.50 1.00 1.00 1.25
JARDINERA-08 5.00 0.50 0.50 1.00 1.00 1.25
JARDINERA-09 5.00 0.50 0.50 1.00 1.00 1.25
JARDINERA-10 19.75 0.50 0.50 1.00 1.00 4.94
JARDINERA-11 18.75 0.50 0.50 1.00 1.00 4.69
JARDINERA-12 18.75 0.50 0.50 1.00 1.00 4.69
04.06 ENCOFRADO Y DESENCOFRADO DE JARDINERA M2 280.80
JARDINERA-01 19.75 1.20 1.00 2.00 47.40
JARDINERA-02 5.00 1.20 1.00 2.00 12.00
JARDINERA-03 5.00 1.20 1.00 2.00 12.00
JARDINERA-04 5.00 1.20 1.00 2.00 12.00
JARDINERA-05 5.00 1.20 1.00 2.00 12.00
JARDINERA-06 5.00 1.20 1.00 2.00 12.00
JARDINERA-07 5.00 1.20 1.00 2.00 12.00
JARDINERA-08 5.00 1.20 1.00 2.00 12.00
JARDINERA-09 5.00 1.20 1.00 2.00 12.00
JARDINERA-10 19.75 1.20 1.00 2.00 47.40
JARDINERA-11 18.75 1.20 1.00 2.00 45.00
JARDINERA-12 18.75 1.20 1.00 2.00 45.00
04.07 ACERO ESTRUCTURAL FY=4200 KG/CM2 PARA JARDINERA KG 904.64
JARDINERA-1
Ø3/8'' Acero Longitudinal 19.75 2.00 6.00 0.56 132.72
Ø3/8'' Acero Transversal 1.50 2.00 99.00 0.56 166.32
JARDINERA-2
Ø3/8'' Acero Longitudinal 5.00 8.00 6.00 0.56 134.40
Ø3/8'' Acero Transversal 1.50 8.00 25.00 0.56 168.00
JARDINERA-3
Ø3/8'' Acero Longitudinal 18.77 2.00 6.00 0.56 126.13
Ø3/8'' Acero Transversal 1.70 2.00 93.00 0.56 177.07
04.08 CONCRETO F´C=210 KG/CM2 PARA JARDINERA M3 21.08
JARDINERA-01 19.75 0.15 1.20 1.00 1.00 3.56
JARDINERA-02 5.00 0.15 1.20 1.00 1.00 0.90
JARDINERA-03 5.00 0.15 1.20 1.00 1.00 0.90
JARDINERA-04 5.00 0.15 1.20 1.00 1.00 0.90
JARDINERA-05 5.00 0.15 1.20 1.00 1.00 0.90
JARDINERA-06 5.00 0.15 1.20 1.00 1.00 0.90
JARDINERA-07 5.00 0.15 1.20 1.00 1.00 0.90
JARDINERA-08 5.00 0.15 1.20 1.00 1.00 0.90
JARDINERA-09 5.00 0.15 1.20 1.00 1.00 0.90
JARDINERA-10 19.75 0.15 1.20 1.00 1.00 3.56
JARDINERA-11 18.75 0.15 1.20 1.00 1.00 3.38
JARDINERA-12 18.75 0.15 1.20 1.00 1.00 3.38
04.09 CURADO DE CONCRETO CON ADITIVO M2 193.06
JARDINERA-01 19.75 1.65 1.00 1.00 32.59
JARDINERA-02 5.00 1.65 1.00 1.00 8.25
JARDINERA-03 5.00 1.65 1.00 1.00 8.25
JARDINERA-04 5.00 1.65 1.00 1.00 8.25
JARDINERA-05 5.00 1.65 1.00 1.00 8.25
JARDINERA-06 5.00 1.65 1.00 1.00 8.25
JARDINERA-07 5.00 1.65 1.00 1.00 8.25
JARDINERA-08 5.00 1.65 1.00 1.00 8.25
JARDINERA-09 5.00 1.65 1.00 1.00 8.25
JARDINERA-10 19.75 1.65 1.00 1.00 32.59
JARDINERA-11 18.75 1.65 1.00 1.00 30.94
JARDINERA-12 18.75 1.65 1.00 1.00 30.94
04.10 TARRAJEO CON IMPERMEABILIZANTE EN JARDINERA M2 175.52
JARDINERA-01 19.75 1.50 1.00 1.00 29.63
JARDINERA-02 5.00 1.50 1.00 1.00 7.50
JARDINERA-03 5.00 1.50 1.00 1.00 7.50
JARDINERA-04 5.00 1.50 1.00 1.00 7.50
JARDINERA-05 5.00 1.50 1.00 1.00 7.50
JARDINERA-06 5.00 1.50 1.00 1.00 7.50
JARDINERA-07 5.00 1.50 1.00 1.00 7.50
JARDINERA-08 5.00 1.50 1.00 1.00 7.50
JARDINERA-09 5.00 1.50 1.00 1.00 7.50
JARDINERA-10 19.75 1.50 1.00 1.00 29.63
JARDINERA-11 18.75 1.50 1.00 1.00 28.13
JARDINERA-12 18.75 1.50 1.00 1.00 28.13
04.11 REVESTIMIENTO CON LAJA LAJA E=0.05M , MEZCLA E=0.02M, M2 175.52
JARDINERA-01 19.75 1.50 1.00 1.00 29.63
JARDINERA-02 5.00 1.50 1.00 1.00 7.50
JARDINERA-03 5.00 1.50 1.00 1.00 7.50
JARDINERA-04 5.00 1.50 1.00 1.00 7.50
JARDINERA-05 5.00 1.50 1.00 1.00 7.50
JARDINERA-06 5.00 1.50 1.00 1.00 7.50
JARDINERA-07 5.00 1.50 1.00 1.00 7.50
JARDINERA-08 5.00 1.50 1.00 1.00 7.50
JARDINERA-09 5.00 1.50 1.00 1.00 7.50
JARDINERA-10 19.75 1.50 1.00 1.00 29.63
JARDINERA-11 18.75 1.50 1.00 1.00 28.13
JARDINERA-12 18.75 1.50 1.00 1.00 28.13
05 VEREDAS Y RAMPAS
05.01 MOVIMIENTO DE TIERRAS
05.01.01 EXCAVACION MANUAL A NIVEL DE SUB RASANTE PAR M3 279.84
Descanso 0.20 1.44 8.00 2.30
Vereda-1 0.20 144.45 1.00 28.89
Vereda-2 0.20 18.98 1.00 3.80
Vereda-3 0.20 18.89 1.00 3.78
Vereda-4 0.20 3.67 1.00 0.73
Vereda-5 0.20 18.82 1.00 3.76
Vereda-6 0.20 19.52 1.00 3.90
Vereda-7 0.20 14.60 1.00 2.92
Vereda-8 0.20 22.60 1.00 4.52
Vereda-9 0.20 10.81 1.00 2.16
Vereda-10 0.20 18.22 1.00 3.64
Vereda-11 0.20 18.20 1.00 3.64
Vereda-12 0.20 19.20 1.00 3.84
Vereda-13 0.20 16.08 1.00 3.22
Vereda-14 0.20 12.86 1.00 2.57
Vereda-15 0.20 11.89 1.00 2.38
Vereda-16 0.20 16.46 1.00 3.29
Vereda-17 0.20 10.29 1.00 2.06
Vereda-18 0.20 21.28 1.00 4.26
Vereda-19 0.20 18.20 1.00 3.64
Vereda-20 0.20 9.19 1.00 1.84
Vereda-21 0.20 8.51 1.00 1.70
Vereda-22 0.20 11.77 1.00 2.35
Vereda-23 0.20 69.03 1.00 13.81
Vereda-24 0.20 69.15 1.00 13.83
Vereda-25 0.20 97.78 1.00 19.56
Area de descanso-1 0.20 60.43 1.00 12.09
Area de descanso-2 0.20 94.77 1.00 18.95
Area de descanso-3 0.20 91.60 1.00 18.32
Area de descanso-4 0.20 60.42 1.00 12.08
Area de descanso-5 0.20 91.07 1.00 18.21
Area de descanso-6 0.20 73.57 1.00 14.71
Area de descanso-7 0.20 69.09 1.00 13.82
Area de descanso-8 0.20 95.96 1.00 19.19
Rampas 1.20 1.20 0.20 30.00 8.64
2.00 1.20 0.20 3.00 1.44
05.01.02 REFINE, NIVELACION Y COMPATACION C/EQUIPO EN P M2 1399.28
Descanso 1.44 8.00 11.52
Vereda-1 144.45 1.00 144.45
Vereda-2 18.98 1.00 18.98
Vereda-3 18.89 1.00 18.89
Vereda-4 3.67 1.00 3.67
Vereda-5 18.82 1.00 18.82
Vereda-6 19.52 1.00 19.52
Vereda-7 14.60 1.00 14.60
Vereda-8 22.60 1.00 22.60
Vereda-9 10.81 1.00 10.81
Vereda-10 18.22 1.00 18.22
Vereda-11 18.20 1.00 18.20
Vereda-12 19.20 1.00 19.20
Vereda-13 16.08 1.00 16.08
Vereda-14 12.86 1.00 12.86
Vereda-15 11.89 1.00 11.89
Vereda-16 16.46 1.00 16.46
Vereda-17 10.29 1.00 10.29
Vereda-18 21.28 1.00 21.28
Vereda-19 18.20 1.00 18.20
Vereda-20 9.19 1.00 9.19
Vereda-21 8.51 1.00 8.51
Vereda-22 11.77 1.00 11.77
Vereda-23 69.03 1.00 69.03
Vereda-24 69.15 1.00 69.15
Vereda-25 97.78 1.00 97.78
Area de descanso-1 60.43 1.00 60.43
Area de descanso-2 94.77 1.00 94.77
Area de descanso-3 91.60 1.00 91.60
Area de descanso-4 60.42 1.00 60.42
Area de descanso-5 91.07 1.00 91.07
Area de descanso-6 73.57 1.00 73.57
Area de descanso-7 69.09 1.00 69.09
Area de descanso-8 95.96 1.00 95.96
Rampas 1.20 1.20 30.00 43.20
2.00 1.20 3.00 7.20
05.01.03 CONFORMACION MANUAL DE CAPA DE SUBBASE (HORM M3 139.96
Descanso 0.10 1.44 8.00 1.15
Vereda-1 0.10 144.45 1.00 14.45
Vereda-2 0.10 18.98 1.00 1.90
Vereda-3 0.10 18.89 1.00 1.89
Vereda-4 0.10 3.67 1.00 0.37
Vereda-5 0.10 18.82 1.00 1.88
Vereda-6 0.10 19.52 1.00 1.95
Vereda-7 0.10 14.60 1.00 1.46
Vereda-8 0.10 22.60 1.00 2.26
Vereda-9 0.10 10.81 1.00 1.08
Vereda-10 0.10 18.22 1.00 1.82
Vereda-11 0.10 18.20 1.00 1.82
Vereda-12 0.10 19.20 1.00 1.92
Vereda-13 0.10 16.08 1.00 1.61
Vereda-14 0.10 12.86 1.00 1.29
Vereda-15 0.10 11.89 1.00 1.19
Vereda-16 0.10 16.46 1.00 1.65
Vereda-17 0.10 10.29 1.00 1.03
Vereda-18 0.10 21.28 1.00 2.13
Vereda-19 0.10 18.20 1.00 1.82
Vereda-20 0.10 9.19 1.00 0.92
Vereda-21 0.10 8.51 1.00 0.85
Vereda-22 0.10 11.77 1.00 1.18
Vereda-23 0.10 69.03 1.00 6.90
Vereda-24 0.10 69.15 1.00 6.92
Vereda-25 0.10 97.78 1.00 9.78
Area de descanso-1 0.10 60.43 1.00 6.04
Area de descanso-2 0.10 94.77 1.00 9.48
Area de descanso-3 0.10 91.60 1.00 9.16
Area de descanso-4 0.10 60.42 1.00 6.04
Area de descanso-5 0.10 91.07 1.00 9.11
Area de descanso-6 0.10 73.57 1.00 7.36
Area de descanso-7 0.10 69.09 1.00 6.91
Area de descanso-8 0.10 95.96 1.00 9.60
Rampas 1.20 1.20 0.10 30.00 4.32
2.00 1.20 0.10 3.00 0.72
05.01.04 CONFORMACION MANUAL DE CAPA DE BASE (AFIRMAD M3 139.96
Descanso 0.10 1.44 8.00 1.15
Vereda-1 0.10 144.45 1.00 14.45
Vereda-2 0.10 18.98 1.00 1.90
Vereda-3 0.10 18.89 1.00 1.89
Vereda-4 0.10 3.67 1.00 0.37
Vereda-5 0.10 18.82 1.00 1.88
Vereda-6 0.10 19.52 1.00 1.95
Vereda-7 0.10 14.60 1.00 1.46
Vereda-8 0.10 22.60 1.00 2.26
Vereda-9 0.10 10.81 1.00 1.08
Vereda-10 0.10 18.22 1.00 1.82
Vereda-11 0.10 18.20 1.00 1.82
Vereda-12 0.10 19.20 1.00 1.92
Vereda-13 0.10 16.08 1.00 1.61
Vereda-14 0.10 12.86 1.00 1.29
Vereda-15 0.10 11.89 1.00 1.19
Vereda-16 0.10 16.46 1.00 1.65
Vereda-17 0.10 10.29 1.00 1.03
Vereda-18 0.10 21.28 1.00 2.13
Vereda-19 0.10 18.20 1.00 1.82
Vereda-20 0.10 9.19 1.00 0.92
Vereda-21 0.10 8.51 1.00 0.85
Vereda-22 0.10 11.77 1.00 1.18
Vereda-23 0.10 69.03 1.00 6.90
Vereda-24 0.10 69.15 1.00 6.92
Vereda-25 0.10 97.78 1.00 9.78
Area de descanso-1 0.10 60.43 1.00 6.04
Area de descanso-2 0.10 94.77 1.00 9.48
Area de descanso-3 0.10 91.60 1.00 9.16
Area de descanso-4 0.10 60.42 1.00 6.04
Area de descanso-5 0.10 91.07 1.00 9.11
Area de descanso-6 0.10 73.57 1.00 7.36
Area de descanso-7 0.10 69.09 1.00 6.91
Area de descanso-8 0.10 95.96 1.00 9.60
Rampas 1.20 1.20 0.10 30.00 4.32
2.00 1.20 0.10 3.00 0.72
05.01.05 EXCAVACION MANUAL PARA UÑAS DE VEREDAS M3 16.49
Area -1 295.00 0.15 0.20 1.00 8.85
Area-2 254.75 0.15 0.20 1.00 7.64
05.01.06 ACARREO DE MATERIAL EXCEDENTE (MANUAL) HASTA M3 370.46
Descanso 0.20 1.44 8.00 1.25 2.88
Vereda-1 0.20 144.45 1.00 1.25 36.11
Vereda-2 0.20 18.98 1.00 1.25 4.75
Vereda-3 0.20 18.89 1.00 1.25 4.72
Vereda-4 0.20 3.67 1.00 1.25 0.92
Vereda-5 0.20 18.82 1.00 1.25 4.71
Vereda-6 0.20 19.52 1.00 1.25 4.88
Vereda-7 0.20 14.60 1.00 1.25 3.65
Vereda-8 0.20 22.60 1.00 1.25 5.65
Vereda-9 0.20 10.81 1.00 1.25 2.70
Vereda-10 0.20 18.22 1.00 1.25 4.56
Vereda-11 0.20 18.20 1.00 1.25 4.55
Vereda-12 0.20 19.20 1.00 1.25 4.80
Vereda-13 0.20 16.08 1.00 1.25 4.02
Vereda-14 0.20 12.86 1.00 1.25 3.22
Vereda-15 0.20 11.89 1.00 1.25 2.97
Vereda-16 0.20 16.46 1.00 1.25 4.12
Vereda-17 0.20 10.29 1.00 1.25 2.57
Vereda-18 0.20 21.28 1.00 1.25 5.32
Vereda-19 0.20 18.20 1.00 1.25 4.55
Vereda-20 0.20 9.19 1.00 1.25 2.30
Vereda-21 0.20 8.51 1.00 1.25 2.13
Vereda-22 0.20 11.77 1.00 1.25 2.94
Vereda-23 0.20 69.03 1.00 1.25 17.26
Vereda-24 0.20 69.15 1.00 1.25 17.29
Vereda-25 0.20 97.78 1.00 1.25 24.45
Area de descanso-1 0.20 60.43 1.00 1.25 15.11
Area de descanso-2 0.20 94.77 1.00 1.25 23.69
Area de descanso-3 0.20 91.60 1.00 1.25 22.90
Area de descanso-4 0.20 60.42 1.00 1.25 15.11
Area de descanso-5 0.20 91.07 1.00 1.25 22.77
Area de descanso-6 0.20 73.57 1.00 1.25 18.39
Area de descanso-7 0.20 69.09 1.00 1.25 17.27
Area de descanso-8 0.20 95.96 1.00 1.25 23.99
Rampas 1.20 1.20 0.20 30.00 1.25 10.80
2.00 1.20 0.20 3.00 1.25 1.80
Area -1 295.00 0.15 0.20 1.00 1.25 11.06
Area-2 254.75 0.15 0.20 1.00 1.25 9.55
05.01.07 ELIMIN. DESMONTE (CARG+V) D=5KM M3 370.46
Descanso 0.20 1.44 8.00 1.25 2.88
Vereda-1 0.20 144.45 1.00 1.25 36.11
Vereda-2 0.20 18.98 1.00 1.25 4.75
Vereda-3 0.20 18.89 1.00 1.25 4.72
Vereda-4 0.20 3.67 1.00 1.25 0.92
Vereda-5 0.20 18.82 1.00 1.25 4.71
Vereda-6 0.20 19.52 1.00 1.25 4.88
Vereda-7 0.20 14.60 1.00 1.25 3.65
Vereda-8 0.20 22.60 1.00 1.25 5.65
Vereda-9 0.20 10.81 1.00 1.25 2.70
Vereda-10 0.20 18.22 1.00 1.25 4.56
Vereda-11 0.20 18.20 1.00 1.25 4.55
Vereda-12 0.20 19.20 1.00 1.25 4.80
Vereda-13 0.20 16.08 1.00 1.25 4.02
Vereda-14 0.20 12.86 1.00 1.25 3.22
Vereda-15 0.20 11.89 1.00 1.25 2.97
Vereda-16 0.20 16.46 1.00 1.25 4.12
Vereda-17 0.20 10.29 1.00 1.25 2.57
Vereda-18 0.20 21.28 1.00 1.25 5.32
Vereda-19 0.20 18.20 1.00 1.25 4.55
Vereda-20 0.20 9.19 1.00 1.25 2.30
Vereda-21 0.20 8.51 1.00 1.25 2.13
Vereda-22 0.20 11.77 1.00 1.25 2.94
Vereda-23 0.20 69.03 1.00 1.25 17.26
Vereda-24 0.20 69.15 1.00 1.25 17.29
Vereda-25 0.20 97.78 1.00 1.25 24.45
Area de descanso-1 0.20 60.43 1.00 1.25 15.11
Area de descanso-2 0.20 94.77 1.00 1.25 23.69
Area de descanso-3 0.20 91.60 1.00 1.25 22.90
Area de descanso-4 0.20 60.42 1.00 1.25 15.11
Area de descanso-5 0.20 91.07 1.00 1.25 22.77
Area de descanso-6 0.20 73.57 1.00 1.25 18.39
Area de descanso-7 0.20 69.09 1.00 1.25 17.27
Area de descanso-8 0.20 95.96 1.00 1.25 23.99
Rampas 1.20 1.20 0.20 30.00 1.25 10.80
2.00 1.20 0.20 3.00 1.25 1.80
Area -1 295.00 0.15 0.20 1.00 1.25 11.06
Area-2 254.75 0.15 0.20 1.00 1.25 9.55
05.02 CONCRETO SIMPLE
05.02.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS Y RAMPA M2 78.03
Veredas 247.95 0.20 1.00 1.00 49.59
Vereda-1 1.80 0.10 1.00 27.00 4.86
Vereda-2 1.70 0.10 1.00 4.00 0.68
Vereda-3 1.70 0.10 1.00 4.00 0.68
Vereda-4 1.85 0.10 1.00 2.00 0.37
Vereda-5 2.00 0.10 1.00 4.00 0.80
Vereda-6 2.00 0.10 1.00 4.00 0.80
Vereda-7 2.00 0.10 1.00 3.00 0.60
Vereda-8 2.00 0.10 1.00 4.00 0.80
Vereda-9 1.85 0.10 1.00 3.00 0.56
Vereda-10 1.70 0.10 1.00 4.00 0.68
Vereda-11 1.70 0.10 1.00 4.00 0.68
Vereda-12 1.70 0.10 1.00 4.00 0.68
Vereda-13 1.70 0.10 1.00 3.00 0.51
Vereda-14 2.00 0.10 1.00 3.00 0.60
Vereda-15 2.00 0.10 1.00 3.00 0.60
Vereda-16 2.00 0.10 1.00 3.00 0.60
Vereda-17 3.00 0.10 1.00 2.00 0.60
Vereda-18 1.70 0.10 1.00 4.00 0.68
Vereda-19 1.70 0.10 1.00 3.00 0.51
Vereda-20 2.00 0.10 1.00 2.00 0.40
Vereda-21 2.00 0.10 1.00 2.00 0.40
Vereda-22 2.00 0.10 1.00 2.00 0.40
Vereda-23 1.50 0.10 1.00 23.00 3.45
Vereda-24 1.50 0.10 1.00 21.00 3.15
Vereda-25 1.50 0.10 1.00 29.00 4.35
05.02.02 CONCRETO FC= 175 KG/CM2 C/MEZCLADORA PARA UÑ M3 16.49
Area -1 295.00 0.15 0.20 1.00 8.85
Area-2 254.75 0.15 0.20 1.00 7.64
05.02.03 CONCRETO FC= 175 KG/CM2 C/MEZCLADORA PARA V M2 1399.28
Descanso 1.44 8.00 11.52
Vereda-1 144.45 1.00 144.45
Vereda-2 18.98 1.00 18.98
Vereda-3 18.89 1.00 18.89
Vereda-4 3.67 1.00 3.67
Vereda-5 18.82 1.00 18.82
Vereda-6 19.52 1.00 19.52
Vereda-7 14.60 1.00 14.60
Vereda-8 22.60 1.00 22.60
Vereda-9 10.81 1.00 10.81
Vereda-10 18.22 1.00 18.22
Vereda-11 18.20 1.00 18.20
Vereda-12 19.20 1.00 19.20
Vereda-13 16.08 1.00 16.08
Vereda-14 12.86 1.00 12.86
Vereda-15 11.89 1.00 11.89
Vereda-16 16.46 1.00 16.46
Vereda-17 10.29 1.00 10.29
Vereda-18 21.28 1.00 21.28
Vereda-19 18.20 1.00 18.20
Vereda-20 9.19 1.00 9.19
Vereda-21 8.51 1.00 8.51
Vereda-22 11.77 1.00 11.77
Vereda-23 69.03 1.00 69.03
Vereda-24 69.15 1.00 69.15
Vereda-25 97.78 1.00 97.78
Area de descanso-1 60.43 1.00 60.43
Area de descanso-2 94.77 1.00 94.77
Area de descanso-3 91.60 1.00 91.60
Area de descanso-4 60.42 1.00 60.42
Area de descanso-5 91.07 1.00 91.07
Area de descanso-6 73.57 1.00 73.57
Area de descanso-7 69.09 1.00 69.09
Area de descanso-8 95.96 1.00 95.96
Rampas 1.20 1.20 30.00 43.20
2.00 1.20 3.00 7.20
05.02.04 CURADO DE CONCRETO CON ADITIVO M2 1399.28
Descanso 1.44 8.00 11.52
Vereda-1 144.45 1.00 144.45
Vereda-2 18.98 1.00 18.98
Vereda-3 18.89 1.00 18.89
Vereda-4 3.67 1.00 3.67
Vereda-5 18.82 1.00 18.82
Vereda-6 19.52 1.00 19.52
Vereda-7 14.60 1.00 14.60
Vereda-8 22.60 1.00 22.60
Vereda-9 10.81 1.00 10.81
Vereda-10 18.22 1.00 18.22
Vereda-11 18.20 1.00 18.20
Vereda-12 19.20 1.00 19.20
Vereda-13 16.08 1.00 16.08
Vereda-14 12.86 1.00 12.86
Vereda-15 11.89 1.00 11.89
Vereda-16 16.46 1.00 16.46
Vereda-17 10.29 1.00 10.29
Vereda-18 21.28 1.00 21.28
Vereda-19 18.20 1.00 18.20
Vereda-20 9.19 1.00 9.19
Vereda-21 8.51 1.00 8.51
Vereda-22 11.77 1.00 11.77
Vereda-23 69.03 1.00 69.03
Vereda-24 69.15 1.00 69.15
Vereda-25 97.78 1.00 97.78
Area de descanso-1 60.43 1.00 60.43
Area de descanso-2 94.77 1.00 94.77
Area de descanso-3 91.60 1.00 91.60
Area de descanso-4 60.42 1.00 60.42
Area de descanso-5 91.07 1.00 91.07
Area de descanso-6 73.57 1.00 73.57
Area de descanso-7 69.09 1.00 69.09
Area de descanso-8 95.96 1.00 95.96
Rampas 1.20 1.20 30.00 43.20
2.00 1.20 3.00 7.20
05.02.05 JUNTAS ASFÁLTICAS M 284.35
Vereda-1 1.80 1.00 27.00 48.60
Vereda-2 1.70 1.00 4.00 6.80
Vereda-3 1.70 1.00 4.00 6.80
Vereda-4 1.85 1.00 2.00 3.70
Vereda-5 2.00 1.00 4.00 8.00
Vereda-6 2.00 1.00 4.00 8.00
Vereda-7 2.00 1.00 3.00 6.00
Vereda-8 2.00 1.00 4.00 8.00
Vereda-9 1.85 1.00 3.00 5.55
Vereda-10 1.70 1.00 4.00 6.80
Vereda-11 1.70 1.00 4.00 6.80
Vereda-12 1.70 1.00 4.00 6.80
Vereda-13 1.70 1.00 3.00 5.10
Vereda-14 2.00 1.00 3.00 6.00
Vereda-15 2.00 1.00 3.00 6.00
Vereda-16 2.00 1.00 3.00 6.00
Vereda-17 3.00 1.00 2.00 6.00
Vereda-18 1.70 1.00 4.00 6.80
Vereda-19 1.70 1.00 3.00 5.10
Vereda-20 2.00 1.00 2.00 4.00
Vereda-21 2.00 1.00 2.00 4.00
Vereda-22 2.00 1.00 2.00 4.00
Vereda-23 1.50 1.00 23.00 34.50
Vereda-24 1.50 1.00 21.00 31.50
Vereda-25 1.50 1.00 29.00 43.50
05.02.06 CONTRAPISOS DE 48 mm. M2 636.91
Area de Descanso-1 60.43 1.00 1.00 60.43
Area de descanso-2 94.77 1.00 1.00 94.77
Area de descanso-3 91.60 1.00 1.00 91.60
Area de descanso-4 60.42 1.00 1.00 60.42
Area de descanso-5 91.07 1.00 1.00 91.07
Area de descanso-6 73.57 1.00 1.00 73.57
Area de descanso-7 69.09 1.00 1.00 69.09
Area de descanso-8 95.96 1.00 1.00 95.96
05.02.07 PISO DE TERRAZO COLOR OSCURO M2 636.91
Area de Descanso-1 60.43 1.00 1.00 60.43
Area de descanso-2 94.77 1.00 1.00 94.77
Area de descanso-3 91.60 1.00 1.00 91.60
Area de descanso-4 60.42 1.00 1.00 60.42
Area de descanso-5 91.07 1.00 1.00 91.07
Area de descanso-6 73.57 1.00 1.00 73.57
Area de descanso-7 69.09 1.00 1.00 69.09
Area de descanso-8 95.96 1.00 1.00 95.96
06 BANCAS Y COBERTURAS
06.01 EXCAVACION MANUAL DE ZANJA P/BANCAS Y COBERTURAS M3 0.50 0.50 0.70 32.00 2.00 11.20 11.20
06.02 CONFORMACION MANUAL DE CAPA DE SUBBASE (HORMIGO M3 0.50 0.50 32.00 2.00 16.00 16.00
06.03 CONFORMACION MANUAL DE CAPA DE BASE (AFIRMADO) E M3 0.50 0.50 32.00 2.00 16.00 16.00
06.04 ELIMIN. DESMONTE (CARG+V) D=5KM M3 0.50 0.50 0.70 32.00 2.00 1.25 14.00 14.00
06.05 CONCRETO FC= 175 KG/CM2 C/MEZCLADORA PARA DADOS M3 0.50 0.50 0.50 32.00 2.00 8.00 8.00
06.06 BANCAS TIPO 1 UNID 1.00 16.00 16.00 16.00
06.07 BANCAS TIPO 2 UNID 1.00 16.00 16.00 16.00
06.08 COBERTURA METALICA PARA BANCAS UNID 1.00 16.00 16.00 16.00
06.09 COBERTURA METALICA PARA BANCAS TIPO2 UNID 1.00 16.00 16.00 16.00
07 TANQUE CISTERNA
07.01 EXCAVACION MANUAL DE ZANJA P/T.C M3 3.00 2.00 2.70 2.00 1.00 32.40 32.40
07.02 CONFORMACION MANUAL DE CAPA DE SUBBASE (HORMIGON) M3 3.00 2.00 0.10 2.00 1.00 1.20 1.20
07.03 CONFORMACION MANUAL DE CAPA DE BASE (AFIRMADO) ESP M3 3.00 2.00 0.10 2.00 1.00 1.20 1.20
07.04 ELIMIN. DESMONTE (CARG+V) D=5KM M3 3.00 2.00 2.70 2.00 1.00 1.25 40.50 40.50
07.05 ENCOFRADO Y DESENCOFRADO DE T.C M2 68.00
PAREDES 2.70 2.50 2.00 2.00 27.00
1.70 2.50 2.00 2.00 17.00
TECHO 3.00 2.00 2.00 2.00 24.00
07.06 ACERO ESTRUCTURAL FY=4200 KG/CM2 PARA T.C KG 765.07
Ø1/2'' ACERO 10.30 2.00 13.00 0.99 265.12
Ø1/2'' ACERO 9.30 2.00 15.00 0.99 276.21
Ø1/2'' ACERO 11.30 2.00 10.00 0.99 223.74

07.07 CONCRETO F´C=210 KG/CM2 PARA T.C M3 10.20


PAREDES 2.70 0.15 2.50 2.00 2.00 4.05
1.70 0.15 2.50 2.00 2.00 2.55
TECHO 3.00 2.00 0.15 2.00 1.00 1.80
PISO 3.00 2.00 0.15 2.00 1.00 1.80
07.08 TARRAJEO CON IMPERMEABILIZANTE EN T.C M2 10.20
PAREDES 2.70 0.15 2.50 2.00 2.00 4.05
1.70 0.15 2.50 2.00 2.00 2.55
TECHO 3.00 2.00 0.15 2.00 1.00 1.80
PISO 3.00 2.00 0.15 2.00 1.00 1.80
07.09 TAPA METALICA DE 0.60 X 0.60 T.C Und 2.00 2.00 2.00
07.10 CASETA DE BOMBEO UNID 2.00 2.00 2.00
08 AREA RECREATIVA
08.01 EXCAVACION MANUAL A NIVEL DE SUB RASANTE PARA ARE M3 76.12
AREA 05 0.20 191.39 1.00 1.00 38.28
AREA 06 0.20 189.22 1.00 1.00 37.84
08.02 EXCAVACION MANUAL A NIVEL DE SUB RASANTE PARA DRE M3 11.00 0.15 0.30 1.00 4.00 1.98 1.98
08.03 CONFORMACION MANUAL DE CAPA DE SUBBASE (HORMIGON M3 38.06
AREA 05 0.10 191.39 1.00 1.00 19.14
AREA 06 0.10 189.22 1.00 1.00 18.92
08.04 CONFORMACION MANUAL DE CAPA DE BASE (AFIRMADO) ESP M3 38.06
AREA 05 0.10 191.39 1.00 1.00 19.14
AREA 06 0.10 189.22 1.00 1.00 18.92
08.05 CONFORMACION MANUAL DE CAPA DE CONFITILLO Ø3/4" P M3 11.00 0.15 0.25 1.00 4.00 1.65 1.65
08.06 ELIMIN. DESMONTE (CARG+V) D=5KM M3 85.59
AREA 05 0.20 191.39 1.00 1.00 38.28
AREA 06 0.20 189.22 1.00 1.00 1.25 47.31
08.07 SUMINISTRO E INSTALACION DE GEOMEMBRANA M2 380.61
AREA 05 191.39 1.00 1.00 191.39
AREA 06 189.22 1.00 1.00 189.22
08.08 SUMINISTRO E INSTALACION DE GRASS SINTETICO M2 380.61
AREA 05 191.39 1.00 1.00 191.39
AREA 06 189.22 1.00 1.00 189.22
08.09 SUMINISTRO E INSTALACION DE JUEGOS RECREATIVOS GLB 1.00 1.00 1.00
08.10 SUMINISTRO E INSTALACION DE PVC Ø4" CON AGUJEROS D M 11.00 1.00 4.00 44.00 44.00
09 AREA VERDE
09.01 EXCAVACION MANUAL A NIVEL DE SUB RASANTE PARA M3 365.23
Area Verde - 01 0.30 167.80 1.00 50.34
Area Verde - 02 0.30 80.51 1.00 24.15
Area Verde - 03 0.30 19.26 1.00 5.78
Area Verde - 04 0.30 21.94 1.00 6.58
Area Verde - 07 0.30 161.13 1.00 48.34
Area Verde - 08 0.30 61.30 1.00 18.39
Area Verde - 09 0.30 68.33 1.00 20.50
Area Verde - 10 0.30 29.05 1.00 8.72
Area Verde - 11 0.30 59.10 1.00 17.73
Area Verde - 12 0.30 53.71 1.00 16.11
Area Verde - 13 0.30 76.31 1.00 22.89
Area Verde - 14 0.30 128.02 1.00 38.41
Area Verde - 15 0.30 104.94 1.00 31.48
Area Verde - 16 0.30 73.08 1.00 21.92
Area Verde - 17 0.30 54.05 1.00 16.22
Area Verde - 18 0.30 36.22 1.00 10.87
Area Verde - 19 0.30 22.67 1.00 6.80
09.02 CONFORMACION MANUAL DE CAPA DE TIERRA AGRICOL E M3 422.55
Area Verde - 01 0.30 167.80 1.00 50.34
Area Verde - 02 0.30 80.51 1.00 24.15
Area Verde - 03 0.30 19.26 1.00 5.78
Area Verde - 04 0.30 21.94 1.00 6.58
Area Verde - 07 0.30 161.13 1.00 48.34
Area Verde - 08 0.30 61.30 1.00 18.39
Area Verde - 09 0.30 68.33 1.00 20.50
Area Verde - 10 0.30 29.05 1.00 8.72
Area Verde - 11 0.30 59.10 1.00 17.73
Area Verde - 12 0.30 53.71 1.00 16.11
Area Verde - 13 0.30 76.31 1.00 22.89
Area Verde - 14 0.30 128.02 1.00 38.41
Area Verde - 15 0.30 104.94 1.00 31.48
Area Verde - 16 0.30 73.08 1.00 21.92
Area Verde - 17 0.30 54.05 1.00 16.22
Area Verde - 18 0.30 36.22 1.00 10.87
Area Verde - 19 0.30 22.67 1.00 6.80
jardinera-01 0.80 16.27 1.00 13.02
jardinera-02 0.80 1.18 1.00 0.94
jardinera-03 0.80 1.18 1.00 0.94
jardinera-04 0.80 1.18 1.00 0.94
jardinera-05 0.80 1.18 1.00 0.94
jardinera-06 0.80 1.18 1.00 0.94
jardinera-07 0.80 1.18 1.00 0.94
jardinera-08 0.80 1.18 1.00 0.94
jardinera-09 0.80 1.18 1.00 0.94
jardinera-10 0.80 16.27 1.00 13.02
jardinera-11 0.80 14.85 1.00 11.88
jardinera-12 0.80 14.85 1.00 11.88
09.03 ELIMIN. DESMONTE (CARG+V) D=5KM M3 456.53
Area Verde - 01 0.30 167.80 1.00 1.25 62.93
Area Verde - 02 0.30 80.51 1.00 1.25 30.19
Area Verde - 03 0.30 19.26 1.00 1.25 7.22
Area Verde - 04 0.30 21.94 1.00 1.25 8.23
Area Verde - 07 0.30 161.13 1.00 1.25 60.42
Area Verde - 08 0.30 61.30 1.00 1.25 22.99
Area Verde - 09 0.30 68.33 1.00 1.25 25.62
Area Verde - 10 0.30 29.05 1.00 1.25 10.89
Area Verde - 11 0.30 59.10 1.00 1.25 22.16
Area Verde - 12 0.30 53.71 1.00 1.25 20.14
Area Verde - 13 0.30 76.31 1.00 1.25 28.62
Area Verde - 14 0.30 128.02 1.00 1.25 48.01
Area Verde - 15 0.30 104.94 1.00 1.25 39.35
Area Verde - 16 0.30 73.08 1.00 1.25 27.41
Area Verde - 17 0.30 54.05 1.00 1.25 20.27
Area Verde - 18 0.30 36.22 1.00 1.25 13.58
Area Verde - 19 0.30 22.67 1.00 1.25 8.50
09.04 SEMBRADO DE GRASS (INCLUYE SUMINISTRO Y SELECCIÓ M2 1289.10
Area Verde - 01 167.80 1.00 167.80
Area Verde - 02 80.51 1.00 80.51
Area Verde - 03 19.26 1.00 19.26
Area Verde - 04 21.94 1.00 21.94
Area Verde - 07 161.13 1.00 161.13
Area Verde - 08 61.30 1.00 61.30
Area Verde - 09 68.33 1.00 68.33
Area Verde - 10 29.05 1.00 29.05
Area Verde - 11 59.10 1.00 59.10
Area Verde - 12 53.71 1.00 53.71
Area Verde - 13 76.31 1.00 76.31
Area Verde - 14 128.02 1.00 128.02
Area Verde - 15 104.94 1.00 104.94
Area Verde - 16 73.08 1.00 73.08
Area Verde - 17 54.05 1.00 54.05
Area Verde - 18 36.22 1.00 36.22
Area Verde - 19 22.67 1.00 22.67
jardinera-01 16.27 1.00 16.27
jardinera-02 1.18 1.00 1.18
jardinera-03 1.18 1.00 1.18
jardinera-04 1.18 1.00 1.18
jardinera-05 1.18 1.00 1.18
jardinera-06 1.18 1.00 1.18
jardinera-07 1.18 1.00 1.18
jardinera-08 1.18 1.00 1.18
jardinera-09 1.18 1.00 1.18
jardinera-10 16.27 1.00 16.27
jardinera-11 14.85 1.00 14.85
jardinera-12 14.85 1.00 14.85
09.05 PLANTACIÓN PLANTAS ORNAMENTALES(INCLUYE SUMINI UND 1.00 50.00 50.00 50.00
10 INSTALACIONES SANITARIAS
10.01 TRAZO, NIVELACION Y REPLANTEO AGUA M 205.31 1.00 1.00 205.31 205.31
10.02 EXCAVACION MANUAL DE ZANJA PARA AGUA M 205.31 1.00 1.00 205.31 205.31
10.03 RELLENO PROTECTOR CON MAT. PROPIO ZARANDEADO H= M 205.31 1.00 1.00 205.31 205.31
10.04 SUMINISTRO E INSTALACION DE PVC Ø1/2" M 164.22 1.00 1.00 164.22 164.22
10.05 SUMINISTRO E INSTALACION DE PVC Ø3/4" M 41.09 1.00 1.00 41.09 41.09
10.06 CODO PVC SAP DE Ø 3/4" X 90º UND 4.00 1.00 1.00 4.00 4.00
10.07 CODO PVC SAP DE Ø 1/2" X 90º UND 20.00 1.00 1.00 20.00 20.00
10.08 TEE PVC Ø 1/2" X 1/2" UND 5.00 1.00 1.00 5.00 5.00
10.09 REDUCCION PVC A.F Ø 1 1/2" A Ø 3/4" UND 2.00 1.00 1.00 2.00 2.00
10.10 REDUCCION PVC A.F Ø 1" A Ø 3/4" UND 2.00 1.00 1.00 2.00 2.00
10.11 REDUCCION PVC A.F Ø 3/4" A Ø 1/2" UND 2.00 1.00 1.00 2.00 2.00
10.12 UNIÓN UNIVERSAL PVC P/AGUA FRÍA 1/2" UND 10.00 1.00 1.00 10.00 10.00
10.13 GRIFO DE BRONCE DE 1/2" UND 7.00 1.00 1.00 7.00 7.00
10.14 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" UND 7.00 1.00 1.00 7.00 7.00
10.15 VALVULAS DE COMPUERTA DE BRONCE DE 3/4" UND 4.00 1.00 1.00 4.00 4.00
10.16 VALVULA FLOTADORA DE 3/4" UND 2.00 1.00 1.00 2.00 2.00
10.17 CAJA PREFABRICADA DE CONCRETO UND 7.00 1.00 1.00 7.00 7.00
10.18 CONEXIÓN Y EMPALME A RED DE AGUA HASTA D=2" INCLU UND 2.00 2.00 2.00
11 INSTALACIONES ELECTRICAS
11.01 EXCAVACION MANUAL DE ZANJA PARA DADOS DE POSTES M3 0.80 0.80 0.80 1.00 51.00 26.11 26.11
11.02 ELIMIN. DESMONTE (CARG+V) D=5KM M3 0.80 0.80 0.80 1.00 51.00 1.25 32.64 32.64
11.03 DADOS CONCRETO FC= 175 KG/CM2 C/MEZCLADORA 0.80 X 0 UNID 1.00 51.00 51.00 51.00
11.04 ACERO ESTRUCTURAL FY=4200 KG/CM2 PARA BASE DE POS KG 163.97
Ø3/8'' 1.00 51.00 4.00 0.56 114.24
Ø1/4'' 1.30 51.00 3.00 0.25 49.73
11.05 SUMINISTRO E INSTALACION DE ELECTROBOMBA 1HP INC. UND 2.00 2.00 2.00
11.06 SUMINISTRO E INSTALACION DE PANEL SOLAR PARA ELEC UNID 2.00 2.00 2.00
11.07 SUMINISTRO E INSTALACION DE POSTE DE ALUMBRADO SO UND 51.00 51.00 51.00
12 VARIOS
12.01 MITIGACION AMBIENTAL GBL 1.00 1.00 1.00
12.02 PLACA RECORDATORIA GBL 1.00 1.00 1.00
12.03 TACHOS PARA BASURA UNID 6.00 6.00 6.00
12.04 LIMPIEZA FINAL DE OBRA M2 4208.29
TRAMO -01 86.50 28.15 2434.98
TRAMO-02 65.80 26.95 1773.31
12.05 FLETE TERREST GBL 1.00 1.00 1.00

También podría gustarte