COTIZACION COLIMA , COLIMA

16-Jan-23

ATENCION:
SR. CARLOS LARIOS GONZALEZ
EQUIPAMIENTO POZO COFRADIA DE SUCHITLAN

EQUIPO DE BOMBEO, CONTROL Y DESCCARGA CON MEDIDOR


CANTIDAD UNIDAD CONCEPTO P UNITARIO TOTAL
BOMBEO 440 VOLTS
1 PZA BOMBA SUMERGIBLE MARCA LUBI MODELO $47,650.00 $47,650.00
W30/10 PARA UN GASTO DE 9 LPS Y UNA CARGA
DINAMICA TOTAL DE 125 MTS EN ACERO INOX
304 TROQUELADA ACOPLADA A MOTOR DE 20 HP
440 VOLTS ROBOBINABLE CON CARCASA DE
ACERO IMOXIDABLE F.S. 1.15
17 TMOS TUBO PARA COLUMNA DE 3" X 6MTS ACERO $2,550.00 $43,350.00
CEDULA 40 CON ROSCA Y COPLE
110 MTS CABLE SUMERGIBLE 3 X 8 $135.00 $14,850.00
1 PZA CABEZAL DE DESCARGA DE 3" BRIDADO EN ACERO $3,000.00 $3,000.00
1 LOTE INSTALACIO DE EQUIPO DE BOMBEO Y ARMADO $5,500.00 $5,500.00
DE DESCARGA
EQUIPO DE CONTROL
1 PZA ARRANCADOR A TENCION SUAVE MARCA WEG $27,500.00 $27,500.00
DE 20HP/440 VOLTS
TREN DE DESCARGA
1 PZA TUBO DE ACERO BRIDADO DE 3" X .50 MTS CON $2,800.00 $2,800.00
VALVULA DE AIRE
1 PZA MEDIDOR DE FLUJO DE 3" BRIDADO TIPO PALETA $7,800.00 $7,800.00

OBSERVACIONES:
SI REQUIERE FACTURA PRECIO MAS IVA
CONDICIONES DE PAGO: 70% AL AUTORIZAR
30% AL TERMINAR SUBTOTAL $47,650.00
IVA $7,624.00
TOTAL $55,274.00
COTIZACION COLIMA , COLIMA
16-Jan-23

ATENCION:
SR. CARLOS LARIOS GONZALEZ
ELECTRIFICACION POZO COFRADIA DE SUCHITLAN

ELECTRIFICACION A MEDIA TENCION 3F-4H CON SUBESTACION DE 30KVA/440 NORMA J


CANTIDAD UNIDAD CONCEPTO P UNITARIO TOTAL
1 PZA POSTE DE CONCRETO 12-750 $ 11,800.00 $ 11,800.00
2 PZAS ESTRUCTURA RS3N $6,500.00 $ 13,000.00
65 KGS SUMINISTRO Y COLOCACION DE CABLE ACSR 1/0 $185.00 $ 12,025.00
1 LOTE HERRAJES, AISLADORES PARA AÑADIR 3ER HILO $6,500.00 $ 6,500.00
1 LOTE ACOMETIDA PARA 440 VOLTS 3F -4H TIERRA $9,000.00 $9,000.00
CALIBRE 6,8
1 LOTE ESTRUCTURA 1TR3B $15,500.00 $15,500.00
1 LOTE MURETE DE MEDICION PARA BASE 13200 CON ALU. $8,000.00 $8,000.00
1 LOTE SUMINISTRO Y COLOCACION DE TRANFORMADOR $47,000.00 $47,000.00
TIPO POSTE DE 30KVA 13200/440-225 NORMA J
MARCA CONTINENTAL
1 LOTE SUMINISTRO Y COLOCACION DE SITEMA DE TIERRA $3,600.00 $3,600.00
FISICA PARA TRASFORMADOR
PAGO DE TRAMITES
1 LOTE PAGO VERIFICACION (UVIES) $9,000.00 $9,000.00
1 LOTE APROBACION, SUPERVICION Y CONEXIÓN $6,500.00 $6,500.00
1 LOTE PAGO DE MEDIDOR $8,300.00 $8,300.00

OBSERVACIONES:
SI REQUIERE FACTURA PRECIO MAS IVA
CONDICIONES DE PAGO: 70% AL AUTORIZAR
30% AL TERMINAR SUBTOTAL $150,225.00
IVA $24,036.00
TOTAL $174,261.00
COTIZACION COLIMA , COLIMA
16-Jan-23

ATENCION:
SR. CARLOS LARIOS GONZALEZ
EQUIPAMIENTO POZO COFRADIA DE SUCHITLAN

EQUIPO DE BOMBEO, CONTROL Y DESCCARGA CON MEDIDOR


CANTIDAD UNIDAD CONCEPTO P UNITARIO TOTAL
BOMBEO 220 VOLTS
1 PZA BOMBA SUMERGIBLE MARCA LUBI MODELO $49,650.00 $49,650.00
W30/10 PARA UN GASTO DE 9 LPS Y UNA CARGA
DINAMICA TOTAL DE 125 MTS EN ACERO INOX
304 TROQUELADA ACOPLADA A MOTOR DE 20 HP
220 VOLTS ROBOBINABLE CON CARCASA DE
ACERO IMOXIDABLE F.S. 1.15
17 TMOS TUBO PARA COLUMNA DE 3" X 6MTS ACERO $2,550.00 $43,350.00
CEDULA 40 CON ROSCA Y COPLE
110 MTS CABLE SUMERGIBLE 3 X 8 $245.00 $26,950.00
1 PZA CABEZAL DE DESCARGA DE 3" BRIDADO EN ACERO $3,000.00 $3,000.00
1 LOTE INSTALACIO DE EQUIPO DE BOMBEO Y ARMADO $5,500.00 $5,500.00
DE DESCARGA
EQUIPO DE CONTROL
1 PZA ARRANCADOR A TENCION SUAVE MARCA WEG $31,000.00 $31,000.00
DE 20HP/440 VOLTS
TREN DE DESCARGA
1 PZA TUBO DE ACERO BRIDADO DE 3" X .50 MTS CON $2,800.00 $2,800.00
VALVULA DE AIRE
1 PZA MEDIDOR DE FLUJO DE 3" BRIDADO TIPO PALETA $7,800.00 $7,800.00

OBSERVACIONES:
SI REQUIERE FACTURA PRECIO MAS IVA
CONDICIONES DE PAGO: 70% AL AUTORIZAR
30% AL TERMINAR SUBTOTAL $49,650.00
IVA $7,944.00
TOTAL $57,594.00
COTIZACION COLIMA , COLIMA
16-Jan-23

ATENCION:
SR. CARLOS LARIOS GONZALEZ
ELECTRIFICACION POZO COFRADIA DE SUCHITLAN

ELECTRIFICACION A MEDIA TENCION 3F-4H CON SUBESTACION DE 30KVA/220 NORMA K


CANTIDAD UNIDAD CONCEPTO P UNITARIO TOTAL
65 KGS SUMINISTRO Y COLOCACION DE CABLE ACSR 1/0 $185.00 $ 12,025.00
1 LOTE HERRAJES, AISLADORES PARA AÑADIR 3ER HILO $6,500.00 $ 6,500.00
1 LOTE ACOMETIDA PARA 220 VOLTS 3F -4H TIERRA $11,000.00 $11,000.00
CALIBRE 6,8
1 LOTE ESTRUCTURA 1TR3B $15,500.00 $15,500.00
1 LOTE MURETE DE MEDICION PARA BASE 13200 CON ALU. $8,000.00 $8,000.00
1 LOTE SUMINISTRO Y COLOCACION DE TRANFORMADOR $54,000.00 $54,000.00
TIPO POSTE DE 30KVA 13200/220-127 NORMA K
MARCA IG
1 LOTE SUMINISTRO Y COLOCACION DE SITEMA DE TIERRA $3,600.00 $3,600.00
FISICA PARA TRASFORMADOR
PAGO DE TRAMITES
1 LOTE PAGO VERIFICACION (UVIES) $9,000.00 $9,000.00
1 LOTE APROBACION, SUPERVICION Y CONEXIÓN $6,500.00 $6,500.00
1 LOTE PAGO DE MEDIDOR $8,300.00 $8,300.00

OBSERVACIONES:
SI REQUIERE FACTURA PRECIO MAS IVA
CONDICIONES DE PAGO: 70% AL AUTORIZAR
30% AL TERMINAR SUBTOTAL $134,425.00
IVA $21,508.00
TOTAL $155,933.00