Está en la página 1de 19

Hormigón Armado I CIV 209

Ejemplo flexión y corte

Datos

kgf
f'c ≔ 250 ⋅ ――
2
cm
kgf
fy ≔ 5200 ⋅ ――
2
cm
kgf
Es ≔ 2000000 ⋅ ――
2
cm
Φp ≔ 16 ⋅ mm
Φe ≔ 6 ⋅ mm

rec ≔ 2 cm

tonnef
g1 ≔ 1.7 ―――
m
tonnef
q1 ≔ 0.6 ―――
m
tonnef
g2 ≔ 0.75 ―――
m

G ≔ 3.6 tonnef
Q ≔ 1.2 tonnef

tonnef tonnef tonnef


1.2 ⋅ g1 = 2.04 ――― 1.2 ⋅ g2 = 0.9 ――― 1.6 ⋅ q1 = 0.96 ――― 1.2 ⋅ G = 4.32 tonnef
m m m
tonnef
Pu ≔ 1.2 ⋅ G + 1.6 ⋅ Q = 6.24 tonnef Pu2 ≔ 1.2 ⋅ g2 = 0.9 ――― 1.6 ⋅ Q = 1.92 tonnef
m
tonnef
Pu1 ≔ 1.2 ⋅ g1 + 1.6 ⋅ q1 = 3 ―――
m

ESTADOS DE CARGA
Estado 1
Pu = 6.24 tonnef

tonnef tonnef
Pu1 = 3 ――― Pu1 = 3 ―――
m tonnef m
Pu2 = 0.9 ―――
m

Estado 2David Delgado Vasquez


Univ. Herland
Hormigón Armado I CIV 209

Estado 2

Pu = 6.24 tonnef
tonnef
Pu1 = 3 ―――
m
tonnef tonnef
Pu2 = 0.9 ――― 1.2 ⋅ g1 = 2.04 ―――
m m

Estado 3

1.2 ⋅ G = 4.32 tonnef


tonnef
Pu1 = 3 ―――
tonnef tonnef m
1.2 ⋅ g1 = 2.04 ――― 1.2 ⋅ g2 = 0.9 ―――
m m

Anchos efectivos Eje C

Tramo
Univ. 1-2 David Delgado Vasquez
Herland
Hormigón Armado I CIV 209

Tramo 1-2
bw ≔ 25 cm t ≔ 10 cm
be1 ≔ bw + 6 ⋅ t = 0.85 m

1
be2 ≔ bw + ―⋅ (4 m - bw) = 2.125 m
2
1.33
be3 ≔ bw + ――m = 0.361 m
12

be ≔ min (be1 , be2 , be3) = 0.361 m


Tramo 2-3
be1 ≔ bw + 6 t = 0.85 m

1
be2 ≔ bw + ―⋅ (4 m - bw) = 2.125 m
2
2.5 m
be3 ≔ bw + ―― = 0.458 m
12

be ≔ min (be1 , be2 , be3) = 0.458 m


Anchos efectivos Eje B

Tramo 1-2
be1 ≔ bw + 16 t = 1.85 m

1
be2 ≔ bw + ―⋅ (4 m - bw + 4 m - bw) = 4 m
2
3.91 m
be3 ≔ bw + ――― = 1.228 m
4

be ≔ min (be1 , be2 , be3) = 1.228 m


Diseño a flexión
Datos del Material

kgf kgf
f'c = 250 ―― fy = 5200 ――
2 2
cm cm
kgf
Φ ≔ 0.9 Es = 2000000 ――
2
Datos de la sección cm
h ≔ 40 ⋅ cm bw ≔ 20 cm
be ≔ 125 ⋅ cm t ≔ 10 cm
rec ≔ 2 ⋅ cm
Valores iniciales
Φp ≔ 16 ⋅ mm
Φe ≔ 6 ⋅ mm

Univ. Herland David Delgado Vasquez be = 125 cm


Hormigón Armado I CIV 209

be = 125 cm

t = 10 cm

h = 40 cm
h - t = 30 cm

bw = 20 cm
Cálculo de peralte efectivo "d"
1
d ≔ h - rec - Φe - ―⋅ Φp d = 36.6 cm
2

Cálculo del momento de transición "Muo"

⎛ t⎞
Muo ≔ Φ ⋅ 0.85 ⋅ f'c ⋅ be ⋅ t ⋅ ⎜d - ―⎟
⎝ 2⎠

Muo = 75.544 tonnef ⋅ m

En el caso de los momentos positivos la parte superior del nervio está en compresión, sin embargo, se logrará
verificar que a es menor a t, por lo que se usarán las ecuaciones paramétricas con b=be.

En el caso de los momentos negativos estos se obtendrán en la cara de la viga = 0,2/2= 0,1 m y la parte inferior del
nervio está en compresión, por lo que se usarán las ecuaciones paramétricas con b=bw.

TRAMO 1-2
Momento positivo
Mu ≔ 8.37 tonnef ⋅ m
Datos de la sección
h ≔ 40 ⋅ cm bw ≔ 20 cm
be ≔ 125 ⋅ cm t ≔ 10 cm
rec ≔ 2 ⋅ cm

Valores
Univ. Herland iniciales
David Delgado Vasquez
Hormigón Armado I CIV 209

Valores iniciales
Φp ≔ 16 ⋅ mm
Φe ≔ 6 ⋅ mm
1
d ≔ h - rec - Φe - ―⋅ Φp d = 36.6 cm
2

Condición ≔ if Mu ≤ Muo | = “a<t Sección rectangular con b=be”


‖ |
‖ “a<t Sección rectangular con b=be” |
else |
‖ |
‖ “a>t Sección T propiamente dicha” ||

POR EL MÉTODO DE LAS ECUACIONES PARAMÉTRICAS


Parámetros a max, μ max, ω max para garantizar una falla dúctil
Calculo de a max:
amax = β1 ⋅ cmax
Donde β 1:
β1 ≔ 0.85 kgf
para f'c ≤ 280 ――
Luego c max: cm
2

⎛ 0.003 ⎞
cmax ≔ ⎜―――― ⎟⋅d cmax = 12.767 cm
fy ⎟
⎜ 0.006 + ―
⎜⎝ Es ⎟⎠
Por ultimo a max
amax ≔ β1 ⋅ cmax amax = 10.852 cm

Cálculo de ω max:
⎛ 0.85 ⎞
ωmax ≔ amax ⋅ ⎜―― ⎟ ωmax = 0.252
⎝ d ⎠

Cálculo de μ max: 2
ωmax
μmax ≔ ωmax - ――― μmax = 0.215
1.7
Cálculo de los parámetros μ , ω para una sección rectangular
Cálculo de μ
Mu
μ ≔ ――――― μ = 0.022
2
Φ ⋅ f'c ⋅ be ⋅ d
‖ | | = “CUMPLE, SECCION SIMPLE”
Condicion ≔ ‖ if μ < μmax
‖ ||
‖ ‖ “CUMPLE, SECCION SIMPLE” ||
‖ ||
‖ else
‖ ||
‖ “NO CUMPLE, SECCIÓN DOBLEMENTE ARMADA” || |
‖ ‖ |
Cálculo de ω
ω ≔ 0.85 - ‾‾‾‾‾‾‾‾‾‾‾
2
0.85 - 1.7 ⋅ μ ω = 0.023

Cálculo del acero "As"

be ⋅ d ⋅ f'c 2
As ≔ ω ⋅ ――― As = 4.952 cm
fy

Disposición del acero


Se asumirá: n1 ≔ 2 n2 ≔ 1

Φ1 ≔ 16 mm Φ2 ≔ 12 mm

2 π 2 π 2
Asd ≔ n1 ―⋅ Φ1 + n2 ―⋅ Φ2 = 5.15 cm
Univ. Herland David Delgado Vasquez
4 4
Hormigón Armado I CIV 209
π 2 π 2 2
Asd ≔ n1 ―⋅ Φ1 + n2 ―⋅ Φ2 = 5.15 cm
4 4
Porcentaje de variación
Asd - As
Variación ≔ ―――⋅ 100 = 4.041 % OK
As

Separación horizontal
bw - 2 ⋅ rec - 2 ⋅ Φe - n1 ⋅ Φ1 - n2 ⋅ Φ2
Sh ≔ ―――――――――――= 5.2 cm
n1 + n2 - 1

APOYO 1
Momento negativo (en la cara de la columna)
Mu ≔ 4.92 tonnef ⋅ m
Datos de la sección
h ≔ 40 ⋅ cm bw ≔ 20 cm
b ≔ 20 ⋅ cm t ≔ 10 cm
rec ≔ 2 ⋅ cm
Valores iniciales
Φp ≔ 16 ⋅ mm
Φe ≔ 6 ⋅ mm
1
d ≔ h - rec - Φe - ―⋅ Φp d = 36.6 cm
2

POR EL MÉTODO DE LAS ECUACIONES PARAMÉTRICAS


Cálculo de los parámetros μ , ω para una sección rectangular
Cálculo de μ
Mu
μ ≔ ―――― μ = 0.082
2
Φ ⋅ f'c ⋅ b ⋅ d
‖ | | = “CUMPLE, SECCION SIMPLE”
Condicion ≔ ‖ if μ < μmax
‖ ||
‖ ‖ “CUMPLE, SECCION SIMPLE” ||
‖ ||
‖ else ||
‖ ‖ “NO CUMPLE, SECCIÓN DOBLEMENTE ARMADA” | |
‖ ‖ ||
Cálculo de ω
ω ≔ 0.85 - ‾‾‾‾‾‾‾‾‾‾‾
2
0.85 - 1.7 ⋅ μ ω = 0.086

Cálculo del acero "As"


b ⋅ d ⋅ f'c 2
As ≔ ω ⋅ ――― As = 3.025 cm
fy

Disposición del acero


Se asumirá: n1 ≔ 2 n2 ≔ 1
Φ1 ≔ 12 mm Φ2 ≔ 10 mm

π π
Asd ≔ n1 ―⋅ Φ1 2 + n2 ―⋅ Φ2 2 = 3.05 cm 2
4 4
Porcentaje de variación
Asd - As
Variación ≔ ―――⋅ 100 = 0.727 % OK
As

Separación horizontal
bw - 2 ⋅ rec - 2 ⋅ Φe - n1 ⋅ Φ1 - n2 ⋅ Φ2
Sh ≔ ―――――――――――= 5.7 cm
n1 + n2 - 1

APOYO 2
Momento negativo (en la cara de la columna)
Mu ≔ 6.69 tonnef ⋅ m
Datos de la sección
h ≔ 40 ⋅ cm bw ≔ 20 cm
Univ. Herlandb ≔ 20 ⋅ cm
David Delgado Vasquez t ≔ 10 cm
Hormigón Armado I CIV 209
h ≔ 40 ⋅ cm bw ≔ 20 cm
b ≔ 20 ⋅ cm t ≔ 10 cm
rec ≔ 2 ⋅ cm
Valores iniciales
Φp ≔ 16 ⋅ mm
Φe ≔ 6 ⋅ mm
1
d ≔ h - rec - Φe - ―⋅ Φp d = 36.6 cm
2
Cálculo de μ
Mu
μ ≔ ―――― μ = 0.111
2
Φ ⋅ f'c ⋅ b ⋅ d
‖ | | = “CUMPLE, SECCION SIMPLE”
Condicion ≔ ‖ if μ < μmax
‖ ||
‖ ‖ “CUMPLE, SECCION SIMPLE” ||
‖ ||
‖ else
‖ ||
‖ “NO CUMPLE, SECCIÓN DOBLEMENTE ARMADA” || |
‖ ‖ |
Cálculo de ω
ω ≔ 0.85 - ‾‾‾‾‾‾‾‾‾‾‾
2
0.85 - 1.7 ⋅ μ ω = 0.119

Cálculo del acero "As"


b ⋅ d ⋅ f'c 2
As ≔ ω ⋅ ――― As = 4.201 cm
fy

Disposición del acero


Se asumirá: n1 ≔ 2 n2 ≔ 1
Φ1 ≔ 12 mm Φ2 ≔ 16 mm

π 2 π 2 2
Asd ≔ n1 ―⋅ Φ1 + n2 ―⋅ Φ2 = 4.27 cm
4 4
Porcentaje de variación
Asd - As
Variación ≔ ―――⋅ 100 = 1.712 % OK
As

Separación horizontal
bw - 2 ⋅ rec - 2 ⋅ Φe - n1 ⋅ Φ1 - n2 ⋅ Φ2
Sh ≔ ―――――――――――= 5.4 cm
n1 + n2 - 1

Tramo 2-3
be1 ≔ bw + 16 t = 1.8 m bw = 0.2 m

1
be2 ≔ bw + ―⋅ (4 m - bw + 4 m - bw) = 4 m
2
2.5 m
be3 ≔ bw + ―― = 0.825 m
4

be ≔ min (be1 , be2 , be3) = 0.825 m

Diseño a flexión
Datos del Material
kgf kgf
f'c = 250 ―― fy = 5200 ――
2 2
cm cm
kgf
Φ ≔ 0.9 Es ≔ 2000000 ⋅ ――
2
Datos de la sección cm
h ≔ 30 ⋅ cm bw ≔ 20 cm
be ≔ 87.5 ⋅ cm t ≔ 10 cm
rec ≔ 2 ⋅ cm

Univ. HerlandValores
David iniciales
Delgado Vasquez
Hormigón Armado I CIV 209

Valores iniciales
Φp ≔ 16 ⋅ mm
Φe ≔ 6 ⋅ mm be = 87.5 cm

t = 10 cm

h = 30 cm
h - t = 20 cm

bw = 20 cm
Cálculo de peralte efectivo "d"

1
d ≔ h - rec - Φe - ―⋅ Φp d = 26.6 cm
2

Cálculo del momento de transición "Muo"


⎛ t⎞
Muo ≔ Φ ⋅ 0.85 ⋅ f'c ⋅ be ⋅ t ⋅ ⎜d - ―⎟
⎝ 2⎠

Muo = 36.146 tonnef ⋅ m


TRAMO 2-3
Momento positivo
Mu ≔ 2.21 tonnef ⋅ m
Datos de la sección
h ≔ 30 ⋅ cm bw ≔ 20 cm
be ≔ 87.5 ⋅ cm t ≔ 10 cm
rec ≔ 2 ⋅ cm
Valores iniciales
Φp ≔ 16 ⋅ mm
Φe ≔ 6 ⋅ mm
1
d ≔ h - rec - Φe - ―⋅ Φp d = 26.6 cm
2

Condición ≔ if Mu ≤ Muo | = “a<t Sección rectangular con b=be”


‖ |
‖ “a<t Sección rectangular con b=be” |
else |
‖ |
‖ “a>t Sección T propiamente dicha” ||

POR EL MÉTODO DE LAS ECUACIONES PARAMÉTRICAS


Parámetros a max, μ max, ω max para garantizar una falla dúctil
Calculo de a max:
amax = β1 ⋅ cmax
Donde β 1:
β1 ≔ 0.85 kgf
para f'c ≤ 280 ――
Luego c max: cm
2

⎛ 0.003 ⎞
cmax ≔ ⎜―――― ⎟⋅d cmax = 9.279 cm
fy ⎟
⎜ 0.006 + ―
⎜⎝ Es ⎟⎠
Por ultimo a max
amax ≔ β1 ⋅ cmax amax = 7.887 cm
Cálculo de
Univ. Herland ω max:
David Delgado Vasquez
Hormigón Armado I CIV 209
amax ≔ β1 ⋅ cmax amax = 7.887 cm
Cálculo de ω max:
⎛ 0.85 ⎞
ωmax ≔ amax ⋅ ⎜―― ⎟ ωmax = 0.252
⎝ d ⎠

Cálculo de μ max: 2
ωmax
μmax ≔ ωmax - ――― μmax = 0.215
1.7
Cálculo de μ
Mu
μ ≔ ――――― μ = 0.016
2
Φ ⋅ f'c ⋅ be ⋅ d
‖ | | = “CUMPLE, SECCION SIMPLE”
Condicion ≔ ‖ if μ < μmax
‖ ||
‖ ‖ “CUMPLE, SECCION SIMPLE” ||
‖ ||
‖ else ||
‖ ‖ “NO CUMPLE, SECCIÓN DOBLEMENTE ARMADA” | |
‖ ‖ ||
Cálculo de ω
ω ≔ 0.85 - ‾‾‾‾‾‾‾‾‾‾‾
2
0.85 - 1.7 ⋅ μ ω = 0.016

Cálculo del acero "As"


be ⋅ d ⋅ f'c 2
As ≔ ω ⋅ ――― As = 1.792 cm
fy

Disposición del acero


Se asumirá: n1 ≔ 2 n2 ≔ 0
Φ1 ≔ 12 mm Φ2 ≔ 12 mm

π 2 π 2 2
Asd ≔ n1 ―⋅ Φ1 + n2 ―⋅ Φ2 = 2.26 cm
4 4

Porcentaje de variación
Asd - As
Variación ≔ ―――⋅ 100 = 26.214 % OK
As

Separación horizontal
bw - 2 ⋅ rec - 2 ⋅ Φe - n1 ⋅ Φ1 - n2 ⋅ Φ2
Sh ≔ ―――――――――――= 12.4 cm
n1 + n2 - 1

APOYO 2
Momento negativo (en la cara de la columna)
Mu ≔ 4.86 tonnef ⋅ m
Datos de la sección
h ≔ 30 ⋅ cm bw ≔ 20 cm
b ≔ 20 ⋅ cm t ≔ 10 cm
rec ≔ 2 ⋅ cm
Valores iniciales
Φp ≔ 16 ⋅ mm
Φe ≔ 6 ⋅ mm
1
d ≔ h - rec - Φe - ―⋅ Φp d = 26.6 cm
2
Cálculo de μ
Mu
μ ≔ ―――― μ = 0.153
2
Φ ⋅ f'c ⋅ b ⋅ d
‖ | | = “CUMPLE, SECCION SIMPLE”
Condicion ≔ ‖ if μ < μmax
‖ ||
‖ ‖ “CUMPLE, SECCION SIMPLE” ||
‖ ||
‖ else ||
‖ ‖ “NO CUMPLE, SECCIÓN DOBLEMENTE ARMADA” | |
‖ ‖ ||
Cálculo de ω
Univ. Herland David Delgado Vasquez
‖ ‖‖ “CUMPLE, SECCION SIMPLE” ||
‖ ||
‖ else
Hormigón Armado I‖ ‖ || CIV 209
“NO CUMPLE, SECCIÓN DOBLEMENTE ARMADA” || |
‖ ‖ |
Cálculo de ω
ω ≔ 0.85 - ‾‾‾‾‾‾‾‾‾‾‾
2
0.85 - 1.7 ⋅ μ ω = 0.17

Cálculo del acero "As"


b ⋅ d ⋅ f'c 2
As ≔ ω ⋅ ――― As = 4.336 cm
fy

Disposición del acero


Se asumirá: n1 ≔ 2 n2 ≔ 1
Φ1 ≔ 12 mm Φ2 ≔ 16 mm

π π
Asd ≔ n1 ―⋅ Φ1 2 + n2 ―⋅ Φ2 2 = 4.27 cm 2
4 4
Porcentaje de variación
Asd - As
Variación ≔ ―――⋅ 100 = -1.474 % OK
As

Separación horizontal
bw - 2 ⋅ rec - 2 ⋅ Φe - n1 ⋅ Φ1 - n2 ⋅ Φ2
Sh ≔ ―――――――――――= 5.4 cm
n1 + n2 - 1
APOYO 3
Momento negativo (en la cara de la columna)
Mu ≔ 1.8 tonnef ⋅ m
Datos de la sección
h ≔ 30 ⋅ cm bw ≔ 20 cm
b ≔ 20 ⋅ cm t ≔ 10 cm
rec ≔ 2 ⋅ cm
Valores iniciales
Φp ≔ 16 ⋅ mm
Φe ≔ 6 ⋅ mm
1
d ≔ h - rec - Φe - ―⋅ Φp d = 26.6 cm
2
Cálculo de μ
Mu
μ ≔ ―――― μ = 0.057
2
Φ ⋅ f'c ⋅ b ⋅ d
‖ | | = “CUMPLE, SECCION SIMPLE”
Condicion ≔ ‖ if μ < μmax
‖ ||
‖ ‖ “CUMPLE, SECCION SIMPLE” ||
‖ ||
‖ else ||
‖ ‖ “NO CUMPLE, SECCIÓN DOBLEMENTE ARMADA” | |
‖ ‖ ||
Cálculo de ω
ω ≔ 0.85 - ‾‾‾‾‾‾‾‾‾‾‾
2
0.85 - 1.7 ⋅ μ ω = 0.059

Cálculo del acero "As"


b ⋅ d ⋅ f'c 2
As ≔ ω ⋅ ――― As = 1.497 cm
fy

kgf
14 ――
2
cm 2
Asmin ≔ ―――⋅ b ⋅ d = 1.432 cm
fy

Disposición del acero


Se asumirá: n1 ≔ 2 n2 ≔ 0
Φ1 ≔ 10 mm Φ2 ≔ 10 mm

π π
Asd ≔ n1 ―⋅ Φ1 2 + n2 ―⋅ Φ2 2 = 1.57 cm 2
Univ. Herland David Delgado Vasquez
4 4
Hormigón Armado I CIV 209
π π
Asd ≔ n1 ―⋅ Φ1 2 + n2 ―⋅ Φ2 2 = 1.57 cm 2
4 4

Porcentaje de variación
Asd - As
Variación ≔ ―――⋅ 100 = 4.895 % OK
As

Separación horizontal
bw - 2 ⋅ rec - 2 ⋅ Φe - n1 ⋅ Φ1 - n2 ⋅ Φ2
Sh ≔ ―――――――――――= 12.8 cm
n1 + n2 - 1

DISEÑO
Univ. A CORTE
Herland TRAMO
David Delgado 1-2
Vasquez
Hormigón Armado I CIV 209

DISEÑO A CORTE TRAMO 1-2

kgf kgf
ϕ ≔ 0.75 fy = 5200 ―― f'c = 250 ―― c ≔ 0.25 m rec = 2 cm Φe = 6 mm
2 2
cm cm
h ≔ 40 cm bw ≔ 20 cm Φp = 16 mm

kgf | kgf
fy ≔ if fy ≤ 4200 ―― = 4200 ――
2 | 2
cm | cm
‖ fy |
‖ |
else |
‖ kgf |
‖ 4200 ―― |
2

‖ cm ||

1
d ≔ h - rec - ―⋅ Φp - Φe = 36.6 cm
2
CORTANTE CRITICO
c
D ≔ ―+ d = 0.491 m
2

Vu ≔ 8.76 tonnef

CONTRIBUCIÓN DEL HORMIGÓN AL CORTE


‾‾‾‾‾‾‾
cm
2
kgf
Vc ≔ 0.53 ⋅ f'c ⋅ ――⋅ bw ⋅ d ⋅ ―― = 6.134 tonnef Av ≥ Avmin
kgf cm
2

ϕVc ≔ ϕ ⋅ Vc = 4.601 tonnef


Condicion ≔ if Vu > ϕVc | = “Necesita estribos”
‖ |
‖ “Necesita estribos” |
else |
‖ |
‖ “Estribos Mínimos” ||

CONTRIBUCIÓN DEL ACERO


Vu = ϕ (Vc + Vs)

Vu
Vs ≔ ― - Vc = 5.546 tonnef
ϕ

Vsmax ≔ 4 Vc = 24.537 tonnef


Condicion ≔ if Vs ≤ Vsmax | = “Ok”
‖ |
‖ “Ok” |
else |
‖ |
‖ “No cumple” ||

Separación mínima Smin ≔ 10 cm


Separación máxima
Smaxv ≔ if Vs ≤ 2 Vc | = 18.3 cm
‖ |
d |
‖ if ― > 60 cm| |
‖ 2 |
||
‖ ‖ |
‖ ‖ 60 cm ||
|
‖ else ||
‖ ‖
Univ. Herland David Delgado Vasquez ‖ ‖― d ||
||
‖ ‖ 2 || |
‖ ‖
‖ |
d
‖ if ― > 60 cm| |
‖ 2 |
Hormigón Armado I || CIV 209
‖ ‖ |
‖ ‖ 60 cm ||
|
‖ else ||
‖ ‖ ||
‖ ‖― d
||
‖ ‖ 2 || |
‖ ‖
else |
‖ |
d ||
‖ if ― > 30 cm| |
‖ 4 ||
‖ ‖ ||
‖ ‖ 30 cm
||
‖ else ||
‖ ‖ ||
‖ ‖― d
||
‖ ‖ 4 || |
‖ ‖ |

Smax ≔ 18 cm
SEPARACIÓN DE ESTRIBOS
Φe = 6 mm
2
Φe 2
Av ≔ 2 ⋅ π ⋅ ―― = 0.565 cm
4
d ⋅ Av ⋅ fy
Vs = ―――
S
fy
Sv ≔ d ⋅ Av ⋅ ―= 15.674 cm
Vs

S ≔ if Sv < Smin | = 15.674 cm


‖ |
‖ “Aumentar Diametro” |
else if Sv > Smax |
‖ |
‖ Smax |
else |
‖ |
‖ Sv ||

S = 15.674 cm Φe = 6 mm

S ≔ 15 ⋅ cm

CONTRIBUCIÓN DEL HORMIGÓN AL CORTE Av < Avmin


λ≔1 Hormigón normal

‾‾‾‾‾‾‾‾‾‾‾
2 |
λs ≔ if ――――― ≥ 1| = 0.901
d |
1 + 0.04 ⋅ ―― |
cm |
‖ |
‖1
|
else |
‖ |
‖ ‾‾‾‾‾‾‾‾‾‾‾
――――― |
2
‖ d |
‖ 1 + 0.04 ⋅ ―― |
‖‖ cm |
Acero en tracción
nt1 ≔ 2 nt2 ≔ 1
Φt1 ≔ 16 mm Φt2 ≔ 12 mm

π 2 π 2 2
As ≔ nt1 ―⋅ Φt1 + nt2 ―⋅ Φt2 = 5.152 cm
As 4 4
δw ≔ ――= 0.007
bw ⋅ d
1
― ‾‾‾‾‾‾‾
cm
2
kgf
3
Vc' ≔ 2.1 ⋅ λ ⋅ λs ⋅ δw ⋅ f'c ⋅ ――⋅ bw ⋅ d ⋅ ―― = 4.197 tonnef
kgf cm
2

ϕ ⋅ Vc' = 3.147
Univ. Herland David Delgado tonnef
Vasquez
Hormigón Armado I CIV 209

ϕ ⋅ Vc' = 3.147 tonnef


Separación de estribos con Avmin

S
Avmin ≔ 3.5 ⋅ b ⋅ ―
fy

Avmin ⋅ kgf 2
Avmin ≔ ―――― = 0.25 cm
2
cm
Condicion ≔ if Avmin ≤ Av | = “CUMPLE”
‖ |
‖ “CUMPLE” |
else |
‖ |
‖ “NO CUMPLE” ||
2
cm
fy ⋅ ――
kgf
S2 ≔ ―――⋅ Av = 33.929 cm
3.5 ⋅ bw

S2 ≔ if S2 ≤ 0.85 ⋅ d| = 31.11 cm
‖ S2 |
‖ |
else |
‖ 0.85 ⋅ d |
‖ |

No mayor a 30cm S2 ≔ 30 cm

LADO DERECHO

Vu ≔ 5.27 tonnef

CONTRIBUCIÓN DEL HORMIGÓN AL CORTE Av ≥ Avmin


Vc = 6.134 tonnef

ϕVc ≔ ϕ ⋅ Vc = 4.601 tonnef

Condicion ≔ if Vu > ϕVc | = “Necesita estribos”


‖ |
‖ “Necesita estribos” |
else |
‖ |
‖ “Estribos Mínimos” ||

CONTRIBUCIÓN DEL ACERO


Vu = ϕ (Vc + Vs)

Vu
Vs ≔ ― - Vc = 0.892 tonnef
ϕ

Vsmax ≔ 4 Vc = 24.537 tonnef

Condicion ≔ if Vs ≤ Vsmax | = “Ok”


‖ |
‖ “Ok” |
else |
Univ. Herland David Delgado Vasquez ‖ |
‖ “No cumple” ||
Hormigón Armado I Condicion ≔ if Vs ≤ Vsmax | = “Ok” CIV 209
‖ |
‖ “Ok” |
else |
‖ |
‖ “No cumple” ||

Separación mínima Smin ≔ 10 cm


Separación máxima
Smaxv ≔ if Vs ≤ 2 Vc | = 18.3 cm
‖ |
d |
‖ if ― > 60 cm| |
‖ 2 |
||
‖ ‖ |
‖ ‖ 60 cm ||
|
‖ else ||
‖ ‖ ||
‖ ‖― d
||
‖ ‖ 2 || |
‖ ‖
else |
‖ |
d ||
‖ if ― > 30 cm| |
‖ 4 ||
‖ ‖ ||
‖ ‖ 30 cm
||
‖ else ||
‖ ‖ ||
‖ ‖― d
||
‖ ‖ 4
‖ ‖ || ||

Smax ≔ 18 cm
SEPARACIÓN DE ESTRIBOS
Φe = 6 mm 2
Φe 2
Av ≔ 2 ⋅ π ⋅ ―― = 0.565 cm
4
d ⋅ Av ⋅ fy
Vs = ―――
S
fy
Sv ≔ d ⋅ Av ⋅ ―= 97.399 cm
Vs

S ≔ if Sv < Smin | = 18 cm
‖ |
‖ “Aumentar Diametro” |
else if Sv > Smax |
‖ |
‖ Smax |
else |
‖ |
‖ Sv ||
S = 18 cm Φe = 6 mm

S ≔ 18 ⋅ cm

Cortante resistente con Φ6c /18cm Smax = 0.18 m

d ⋅ Av ⋅ fy
Vs ≔ ―――= 4.829 tonnef Vc = 6.134 tonnef
Smax

Vu' ≔ ϕ ⋅ (Vs + Vc) = 8.223 tonnef

DISEÑO A CORTE TRAMO 2-3

kgf kgf
ϕ ≔ 0.75 fy = 4200 ―― f'c = 250 ―― c ≔ 0.25 m rec = 2 cm Φe = 6 mm
2 2
cm cm
h ≔ 30 cm bw ≔ 20 cm Φp = 16 mm

kgf | kgf
fy ≔ if fy ≤ 4200 ―― = 4200 ――
2 | 2
cm | cm
‖ fy |
‖ |
else |
Univ. Herland David Delgado ‖ Vasquez
kgf |
‖ 4200 ―― |
kgf kgf
fy ≔ if fy ≤ 4200 ―― = 4200 ――
2 | 2
cm | cm
Hormigón Armado I ‖ fy CIV 209
|
‖ |
else |
‖ kgf |
‖ 4200 ―― |
2

‖ cm ||

1
d ≔ h - rec - ―⋅ Φp - Φe = 26.6 cm
2

CORTANTE CRITICO
c
D ≔ ―+ d = 0.391 m
2

Vu ≔ 5.67 tonnef

CONTRIBUCIÓN DEL HORMIGÓN AL CORTE


‾‾‾‾‾‾‾
cm
2
kgf
Vc ≔ 0.53 ⋅ f'c ⋅ ――⋅ bw ⋅ d ⋅ ―― = 4.458 tonnef Av ≥ Avmin
kgf cm
2

ϕVc ≔ ϕ ⋅ Vc = 3.344 tonnef


Condicion ≔ if Vu > ϕVc | = “Necesita estribos”
‖ |
‖ “Necesita estribos” |
else |
‖ |
‖ “Estribos Mínimos” ||

CONTRIBUCIÓN DEL ACERO


Vu = ϕ (Vc + Vs)

Vu
Vs ≔ ― - Vc = 3.102 tonnef
ϕ

Vsmax ≔ 4 Vc = 17.833 tonnef


Condicion ≔ if Vs ≤ Vsmax | = “Ok”
‖ |
‖ “Ok” |
else |
‖ |
‖ “No cumple” ||

Separación mínima Smin ≔ 10 cm


Separación máxima
Smaxv ≔ if Vs ≤ 2 Vc | = 13.3 cm
‖ |
d ||
‖ if ―> 60 cm|
‖ 2 |
||
‖ ‖ ||
‖ ‖ 60 cm ||
‖ else ||
‖ ‖ ||
‖ ‖― d
||
‖ ‖ 2 || |
‖ ‖
else |
‖ |
d ||
‖ if ― > 30 cm| |
‖ 4 ||
‖ ‖ ||
‖ ‖ 30 cm ||
‖ else ||
‖ ‖ ||
‖ ‖― d
||
‖ ‖ 4 || |
‖ ‖ |
Univ. Herland David Delgado Vasquez
||
‖ ‖ 30 cm ||
‖ else ||
Hormigón Armado I ‖ ‖ || CIV 209
‖ ‖― d
||
‖ ‖ 4 || |
‖ ‖ |

Smax ≔ 13 cm
SEPARACIÓN DE ESTRIBOS
Φe = 6 mm 2
Φe 2
Av ≔ 2 ⋅ π ⋅ ―― = 0.565 cm
4
d ⋅ Av ⋅ fy
Vs = ―――
S
fy
Sv ≔ d ⋅ Av ⋅ ―= 20.367 cm
Vs

S ≔ if Sv < Smin | = 13 cm
‖ |
‖ “Aumentar Diametro” |
else if Sv > Smax |
‖ |
‖ Smax |
else |
‖ |
‖ Sv ||

S = 13 cm Φe = 6 mm
S ≔ 13 ⋅ cm

CONTRIBUCIÓN DEL HORMIGÓN AL CORTE Av < Avmin


λ≔1 Hormigón normal

‾‾‾‾‾‾‾‾‾‾‾
2 |
λs ≔ if ――――― ≥ 1| = 0.984
d |
1 + 0.04 ⋅ ―― |
cm |
‖ |
‖1
|
else |
‖ |
‖ ‾‾‾‾‾‾‾‾‾‾‾
――――― |
2
‖ d |
‖ 1 + 0.04 ⋅ ―― |
‖‖ cm |
Acero en tracción
nt1 ≔ 2 nt2 ≔ 0
Φt1 ≔ 12 mm Φt2 ≔ 12 mm

π 2 π 2 2
As ≔ nt1 ―⋅ Φt1 + nt2 ―⋅ Φt2 = 2.262 cm
As 4 4
δw ≔ ――= 0.004
bw ⋅ d
1
― ‾‾‾‾‾‾‾
cm
2
kgf
3
Vc' ≔ 2.1 ⋅ λ ⋅ λs ⋅ δw ⋅ f'c ⋅ ――⋅ bw ⋅ d ⋅ ―― = 2.817 tonnef
kgf cm
2

ϕ ⋅ Vc' = 2.113 tonnef


Separación de estribos con Avmin

S
Avmin ≔ 3.5 ⋅ b ⋅ ―
fy

Avmin ⋅ kgf 2
Avmin ≔ ―――― = 0.217 cm
2
cm
Condicion ≔ if Avmin ≤ Av | = “CUMPLE”
‖ |
‖ “CUMPLE” |
else |
‖ |
‖ “NO CUMPLE” ||
Univ. Herland David Delgado Vasquez
Condicion ≔ if Avmin ≤ Av | = “CUMPLE”
‖ |
Hormigón Armado I ‖ “CUMPLE” | CIV 209
else |
‖ |
‖ “NO CUMPLE” ||
2
cm
fy ⋅ ――
kgf
S2 ≔ ―――⋅ Av = 33.929 cm
3.5 ⋅ bw

S2 ≔ if S2 ≤ 0.85 ⋅ d| = 22.61 cm
‖ S2 |
‖ |
else |
‖ 0.85 ⋅ d |
‖ |

No mayor a 30cm S2 ≔ 22 cm

LADO DERECHO

Vu ≔ 4.12 tonnef

CONTRIBUCIÓN DEL HORMIGÓN AL CORTE Av ≥ Avmin


Vc = 4.458 tonnef

ϕVc ≔ ϕ ⋅ Vc = 3.344 tonnef

Condicion ≔ if Vu > ϕVc | = “Necesita estribos”


‖ |
‖ “Necesita estribos” |
else |
‖ |
‖ “Estribos Mínimos” ||

CONTRIBUCIÓN DEL ACERO


Vu = ϕ (Vc + Vs)

Vu
Vs ≔ ― - Vc = 1.035 tonnef
ϕ

Vsmax ≔ 4 Vc = 17.833 tonnef

Condicion ≔ if Vs ≤ Vsmax | = “Ok”


‖ |
‖ “Ok” |
else |
‖ |
‖ “No cumple” ||

Separación mínima Smin ≔ 10 cm


Separación máxima
Smaxv ≔ if Vs ≤ 2 Vc | = 13.3 cm
‖ |
d ||
‖ if ―> 60 cm|
‖ 2 |
||
‖ ‖ ||
‖ ‖ 60 cm ||
‖ else ||
‖ ‖ ||
‖ ‖― d
||
‖ ‖ 2 || |
‖ ‖
else |
‖ |
Univ. Herland David Delgado Vasquez ‖ if ― d ||
> 30 cm| |
‖ 4 ||
‖ ‖
||
‖ ‖ ||
‖ ‖― d
||
Hormigón Armado I ‖ ‖ 2
‖ ‖
|| | CIV 209
else |
‖ |
d ||
‖ if ― > 30 cm| |
‖ 4 ||
‖ ‖ ||
‖ ‖ 30 cm ||
‖ else ||
‖ ‖ ||
‖ ‖― d
||
‖ ‖ 4 || |
‖ ‖ |

Smax ≔ 13 cm
SEPARACIÓN DE ESTRIBOS
Φe = 6 mm 2
Φe 2
Av ≔ 2 ⋅ π ⋅ ―― = 0.565 cm
4
d ⋅ Av ⋅ fy
Vs = ―――
S
fy
Sv ≔ d ⋅ Av ⋅ ―= 61.031 cm
Vs

S ≔ if Sv < Smin | = 13 cm
‖ |
‖ “Aumentar Diametro” |
else if Sv > Smax |
‖ |
‖ Smax |
else |
‖ |
‖ Sv ||
S = 13 cm Φe = 6 mm

S ≔ 13 ⋅ cm

Cortante resistente con Φ6c /13cm Smax = 0.13 m

d ⋅ Av ⋅ fy
Vs ≔ ―――= 4.86 tonnef Vc = 4.458 tonnef
Smax

Vu' ≔ ϕ ⋅ (Vs + Vc) = 6.988 tonnef

Univ. Herland David Delgado Vasquez