ADICIONAL N°01
ITEM PARQUE
ADICIONAL DEDUCTIVO ADICIO -DEDUC
1 PARQUE: JUAN VELAZCO ALVARADO MZ W (RECTANGULO) 157,451.49 66,068.65 91,382.84
2 PARQUE: JUAN VELAZCO ALVARADO MZ V LOTE 1 (TRIANGULO) 15,450.31 10,233.75 5,216.56
3 PARQUE: VILLA CONTINENTAL MZ M LOTE 1 15,467.74 4,502.12 10,965.62
4 PARQUE: LAS TERRAZAS (TRAPECIO) 75,978.72 88,017.43 -12,038.71
5 PARQUE: LAS TERRAZAS (RECTANGULAR) 85,753.90 93,735.00 -7,981.10
6 PARQUE : A.H.JOSE OLAYA ZONA A MZ S LOTE 1 0.00 0.00 0.00
7 PARQUE: LA EXPLANADA MZ G 33,878.03 23,003.71 10,874.32
8 PARQUE : EL ROSARIO 4,859.92 9,283.80 -4,423.88
9 PARQUE: BOULEVAR 0.00 0.00 0.00
COSTO DIRECTO 388,840.11 294,844.46 93,995.65
GASTOS GENERALES 10.00% 38,884.01 29,484.45 9,399.56
UTILIDAD 7.00% 27,218.81 20,639.11 6,579.70
SUB TOTAL 454,942.93 344,968.02 109,974.91
SUB TOTAL CORREGIDO (VALOR. BRUTA) 1.00 454,942.93 344,968.02 109,974.91
IGV 18% 18.00% 81,889.73 62,094.24 19,795.48
TOTAL ADICIONAL N°01 536,832.66 407,062.26 129,770.39
ADICIONAL DE OBRA N°01
MEJORAMIENTO DE LOS SERVICIOS DE 14 AREAS RECREATIVAS EN EL DISTRITO DE CAYMA PROVINCIA
AREQUIPA DEPARTAMENTO AREQUIPA.
MUNICIPALIDAD DISTRITAL DE CAYMA
PRESUPUESTO REFERENCIAL
ITEM PARTIDA METRAD P.UNITAR
UND. P.PARCIAL
O IO
01 PARQUE:JUANVELAZCOALVARADOMZW(RECTANGULO) 157,451.49
01.01 MUROS DE CONTENCION PERIMETRICO
01.01.01 ESTRUCTURAS
01.01.01.01 OBRAS DE CONCRETO SIMPLE
01.01.01.01.01 SOLADOS
01.01.01.01.01.01 SOLADO DE CONCRETO E=2" 1:12 CEM/HORM M2 94.79 25.60 2,426.64
01.01.01.02 OBRAS DE CONCRETO ARMADO
01.01.01.02.01 ZAPATAS
01.01.01.02.01.01 ZAPATAS, CONCRETO PREMEZCLADO F´C=210KG/CM2 M3 66.19 428.04 28,331.97
01.01.01.02.01.02 ZAPATAS, ACERO fy=4200 kg/cm2 KG 2,999.42 6.01 18,026.51
01.01.01.02.02 MURO DE CONTENCION
MUROS DE CONTENC, CONCRETO PREMEZCLADO 210
01.01.01.02.02.01
kg/cm2
M3 62.72 442.23 27,736.67
01.01.01.02.02.02 MUROS DE CONTENC, ENCOF. Y DESENCOFRADO. M2 448.87 59.77 26,828.96
01.01.01.02.02.03 MUROS DE CONTENC, ACERO Fy=4200 kg/cm2 KG 3,391.82 6.01 20,384.84
01.02 MUROS DE CONTENCION PERIMETRICO
01.02.01 ESTRUCTURAS
01.02.01.01 MOVIMIENTO DE TIERRAS
01.02.01.01.01 EXCAVACION DE TERRENO NATURAL C/MAQUINA M3 142.19 28.20 4,009.76
01.02.01.01.02 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO M3 146.48 37.15 5,441.73
01.02.01.02 OBRAS DE CONCRETO SIMPLE
01.02.01.02.01 CIMIENTOS CORRIDOS
01.02.01.02.01.01 CIMIENTOS CORRIDOS 1:10+30% P.G. M3 14.52 299.42 4,347.58
01.02.01.03 OBRAS DE CONCRETO ARMADO
01.02.01.03.01 SOBRECIMIENTO REFORZADO
01.02.01.03.01.01 CONCRETO F'C=175 KG/CM2 M3 7.99 397.20 3,173.63
01.02.01.03.01.02 SOBRECIMIENTO REORZADO, ENCOF. Y DESENCOFRADO. M2 79.86 68.94 5,505.55
01.02.01.03.01.03 MUROS DE CONTENC, ACERO Fy=4200 kg/cm2 KG 276.79 6.01 1,663.51
01.03 ARQUITECTURA
01.03.01 REVOQUES Y ENLUCIDOS
01.03.01.01 TARRAJEO EN MURO DE CONCRETO: EXTERIORES M2 59.73 29.98 1,790.71
01.03.02 PINTURAS
01.03.02.01 PINTURA LATEX EN MUROS EXTERIORES M2 59.73 28.83 1,722.02
01.04 VEREDAS EXTERNAS
01.04.01 ESTRUCTURAS
01.04.01.01 TRABAJOS PRELIMINARES
01.04.01.01.01 DEMOLICION DE PISO DE VEREDA M3 10.77 23.70 255.25
01.04.01.01.03 ELIMINACION DE MATERIAL DE DEMOLICION M3 14.00 32.64 456.96
01.04.01.02 OBRAS DE CONCRETO SIMPLE
01.04.01.02.01 CONCRETO F'C=175 KG/CM2 M3 10.77 397.20 4,277.84
01.04.01.02.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 18.00 59.52 1,071.36
02 PARQUE: JUAN VELAZCO ALVARADO MZ V LOTE 1 (TRIANGULO) 15,450.31
02.01 MURO DE CONTENCION PERIMETRICO
02.01.01 ESTRUCTURAS
02.01.01.01 MOVIMIENTO DE TIERRAS
02.01.01.01.01 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO M3 165.00 37.15 6,129.75
02.01.01.02 OBRAS DE CONCRETO ARMADO
02.01.01.02.01 ZAPATAS
04.02.01.01.01 PISO DE CONCRETO PULIDO PARA CIRCULACION PRINCIPAL M2 181.50 49.98 9,071.37
04.02.01.01.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 34.77 59.52 2,069.51
04.03 AREA VERDE
04.03.01 EXCAVACION DE TERRENO NATURAL C/MAQUINA M3 168.29 28.20 4,745.78
04.03.01.01 ELIMINACION MATERIAL EXCEDENTE C/MAQUINA M3 201.95 32.81 6,625.98
04.03.01.02 TIERRA DE CHACRA (E=0.15 M) M2 1,121.95 22.48 25,221.44
04.03.01.03 SEMBRADO DE GRASS NATURAL M2 1,121.95 21.21 23,796.56
05 PARQUE: LAS TERRAZAS (RECTANGULAR) 85,753.90
05.01 AREA CAMINERAS
05.01.01 ESTRUCTURAS
05.01.01.01 TRABAJOS PRELIMINARES
05.01.01.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 273.86 2.31 632.62
05.01.01.01.02 LIMPIEZA DEL TERRENO MANUAL M2 273.86 2.08 569.63
05.01.01.02 MOVIMIENTO DE TIERRAS
05.01.01.02.01 EXCAVACION DE TERRENO NATURAL C/MAQUINA M3 54.77 28.20 1,544.51
05.01.01.02.02 PERFILADO Y NIVELACION M2 273.86 5.53 1,514.45
05.01.01.02.03 ELIMINACION MASIVA DE MATERIAL C/MAQUINA M3 65.73 32.81 2,156.60
05.02 ARQUITECTURA Y ACABADOS
05.02.01 PISOS Y PAVIMENTOS
05.02.01.01 CIRCULACION DE PARQUE
05.02.01.01.01 PISO DE CONCRETO PULIDO PARA CIRCULACION PRINCIPAL M2 273.86 49.98 13,687.52
05.02.01.01.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 43.99 59.52 2,618.28
05.03 AREA VERDE
05.03.01.01 EXCAVACION DE TERRENO NATURAL C/MAQUINA M3 175.66 28.20 4,953.61
05.03.01.02 ELIMINACION MASIVA DE MATERIAL C/MAQUINA M3 210.78 32.81 6,915.69
05.03.01.03 TIERRA DE CHACRA (E=0.15 M) M2 1,171.00 22.48 26,324.08
05.03.01.04 SEMBRADO DE GRASS NATURAL M2 1,171.00 21.21 24,836.91
08.04.02.04.01 PISO DE CONCRETO PULIDO PARA CIRCULACION PRINCIPAL M2 85.48 49.98 4,272.29
MEDIDAS
ITEM PARTIDA DESCRIPCION UBICACIÓN CANT. PARCIAL TOTAL UND.
LARGO ANCHO ALTO
01 PARQUE:JUANVELAZCOALVARADOMZW(RECTANGULO)
36.30 M3
EXCAVACION DE TERRENO NATURAL
04.01.01.02.01
C/MAQUINA
Vereda interior 1 Area 181.5 0.2 36.30
04.01.01.02.02 PERFILADO Y NIVELACION CAD 181.50 M2
Vereda interior 1 Area 181.5 181.50
CAD
43.56 M3
ELIMINACION MATERIAL EXCEDENTE
04.01.01.02.03
C/MAQUINA
VOLE RET. 1 36.30 1.2 43.56
04.02 ARQUITECTURA
04.02.01 PISOS Y PAVIMENTOS
04.02.01.01 CIRCULACION DE PARQUE
181.50 M2
PISO DE CONCRETO PULIDO PARA
04.02.01.01.01
CIRCULACION PRINCIPAL
Vereda interior 1 Area 181.5 181.50
CAD
34.77 M2
ENCOFRADO Y DESENCOFRADO DE
04.02.01.01.02
VEREDAS
CORTE 1-1 95.55 0.25 23.89
CORTE 2-2 43.54 0.25 10.89
04.03 AREA VERDE
168.29 M3
EXCAVACION DE TERRENO NATURAL
04.03.01
C/MAQUINA
Vereda interior 1 Area 1121.95 0.15 168.29
CAD
04.03.01.01
ELIMINACION MATERIAL EXCEDENTE 201.95 M3
C/MAQUINA
VOLE RET. 1 168.29 1.2 201.95
04.03.01.02 TIERRA DE CHACRA (E=0.10 M) 1,121.95 M2
Vereda interior 1 Area 1121.95 1,121.95
04.03.01.03 SEMBRADO DE GRASS NATURAL CAD 1,121.95 M2
Vereda interior 1 Area 1121.95 1,121.95
CAD
05 PARQUE: LAS TERRAZAS (RECTANGULAR)
05.01 AREA DE CAMINERIAS
05.01.01 ESTRUCTURAS
05.01.01.01 TRABAJOS PRELIMINARES
05.01.01.01.01 LIMPIEZA DEL TERRENO MANUAL 273.86 M2
AREA CAD 1 273.86 273.86
05.01.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR 273.86 M2
AREA CAD 1 273.86 273.86
05.01.01.02 MOVIMIENTO DE TIERRAS
54.77 M3
EXCAVACION DE TERRENO NATURAL
05.01.01.02.01
C/MAQUINA
1 273.86 0.2 54.77
05.01.01.02.02 PERFILADO Y NIVELACION 273.86 M2
1 273.86 273.86
05.01.01.02.03
ELIMINACION MATERIAL EXCEDENTE 65.73 M3
C/MAQUINA
VOL. RET. 1 54.77 1.2 65.73
05.02 ARQUITECTURA
05.02.01 PISOS Y PAVIMENTOS
05.02.01.01 CIRCULACION DE PARQUE
05.02.01.01.01
PISO DE CONCRETO PULIDO PARA 273.86 M2
CIRCULACION PRINCIPAL
Corte 3-3 1 44.53 1.3 57.89
Corte 2-2 1 32.39 1.3 42.11
1 20.23 1.3 26.30
1 23.29 1.3 30.28
Corte 1-1 1 36.651 3.2 117.28
05.02.01.01.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS 43.99 M2
06 PARQUE: LA EXPLANADA MZ G
06.01 AREA DE CAMINERIAS
06.01.01 ARQUITECTURA
06.01.01.01 PISOS Y PAVIMENTOS
PISO DE ADOQUIN DE CONCRETO 8 x
06.01.01.01.02
10 x 20 cm.
06.01.01.01.02.01 CAMA DE ARENA H=0.07m ADOQUIN GRIS 1 35.00 35.00 74.50 M2
ADOQUIN ROJO 1.00 39.50 39.50
133.55 M3
EXCAVACION DE TERRENO NATURAL
-
C/MAQUINA
Vereda interior 1 Area 445.16 0.3 133.55
CAD
-
ELIMINACION MATERIAL EXCEDENTE 160.26 M3
C/MAQUINA
VOLE RET. 1 133.55 1.2 160.26
06.02.03 TIERRA DE CHACRA (E=0.10 M) area 285.33 M2
AREA CAD 1.00 100.17 100.17
1.00 93.37 93.37
2.00 21.56 43.12
2.00 7.74 15.48
1.00 10.89 10.89
2.00 11.15 22.30
07.01.01.01.01
DEMOLICION DE CONCRETO 8.15 M3
EXISTENTE
PISO 1 11.56 6.95 0.1 8.03
ENTRADAS 1 1.97 0.6 0.1 0.12
ELIMINACION MATERIAL EXCEDENTE F. 10.60 M3
07.01.01.01.02
C/MAQUINA ESPONJ.
VOL EXCAV 1 8.15 1.3 10.60
07.01.02 ARQUITECTURA Y ACABADOS
07.01.02.01 PISOS Y PAVIMENTOS
07.01.02.01.01
PISO DE CONCRETO PULIDO PARA 85.48 M2
CIRCULACION PRINCIPAL
PISO 1 11.68 7.01 81.88
ENTRADAS 1 2 1.8 3.60
PLANILLA DE METRADOS DE ACERO: ZAPATAS - JVA RECTANGULO
ITEM NOMBRE DE PARTIDA UNIDAD TOTAL PESO (KG)
01.02.05 ACERO DE REFUERZO fy = 4200 kg/cm2 - COLUMNETAS KG
Longitud Total por Ø en metros lineales 0.00 0.00 0.00 0.00 1398.90 1689.05 0.00 0.00 (*)El dato
Peso en Kilogramos por metro lineal 0.22 0.40 0.56 0.888 0.994 1.55 2.24 3.97 presentado es
Peso Total por Ø en Kilogramos 0.00 0.00 0.00 0.00 1390.51 2621.41 0.00 0.00 referencial
4011.91
0 0 166.92 201.16 0 0
PLANILLA DE METRADOS DE ACERO: MURO DE CONTENCION - JVA RECTANGULO
ITEM NOMBRE DE PARTIDA UNIDAD TOTAL PESO (KG)
01.02.05 ACERO DE REFUERZO fy = 4200 kg/cm2 - COLUMNETAS KG
Longitud Total por Ø en metros lineales 0.00 0.00 3619.64 0.00 3279.37 0.00 0.00 0.00 (*)El dato
Peso en Kilogramos por metro lineal 0.22 0.40 0.56 0.888 0.994 1.55 2.24 3.97 presentado es
Peso Total por Ø en Kilogramos 0.00 0.00 2027.00 0.00 3259.70 0.00 0.00 0.00 referencial
5286.70
0 0 403 0 365 0 0 0
PLANILLA DE METRADOS DE ACERO: SOBRECIMIENTO ARMADO - JVA RECTANGULO
ITEM NOMBRE DE PARTIDA UNIDAD TOTAL PESO (KG)
01.02.05 ACERO DE REFUERZO fy = 4200 kg/cm2 - COLUMNETAS KG
Longitud Total por Ø en metros lineales 0.00 0.00 846.29 0.00 0.00 0.00 0.00 0.00 (*)El dato
Peso en Kilogramos por metro lineal 0.22 0.40 0.56 0.888 0.994 1.55 2.24 3.97 presentado es
Peso Total por Ø en Kilogramos 0.00 0.00 473.92 0.00 0.00 0.00 0.00 0.00 referencial
473.92
0 0 95 0 0 0 0 0
ALAMBRE 16 33.17