Programa aproximada de los edificio y Cuartos DESIGN / BUILDER

UTILITY BUILDINGS
1 Paint Storage 7 Burn off Room 13 Cold Storage 19 Wood Material Storage - 1 25 Deep well area
2 Compressor Room - PA 8 Waste sludge - Recycle box storage 14 Compactor 20 Wood Material Storage - 2 26 Gas station
Hazama Ando Corporation
3 Electrical Room - PA 9 Gas tank & Mixture 15 Machine Maintenance Building 21 Wood Material Storage - 3 Paseo de la Altiplanicie #11 Int.5
Col.Villas de Irapuato
C.P. 36670, Irapuato, Guanajuato
4 Dom. Water Pump RM & Tank - FF Pump RM & Tank. 10 Compressor Room & Electrical Room - WE & FAB 16 Compressor Room & Electrical Room - AS 22 FRP Factory Building Ph. (462) 104 5067

5 Waste Water Treatmen Plant 11 E-COAT Chiller foundation2 11.1 PLASTIC PAINT Chiller foundation 17 Gasoline, Diesel & Engine Oil tanks 23 Electrical Room - FRP
6 Drum can storage 12 Extra-High Voltage Substation 18 Returnable Crate Maintenance Area 24 Guard House & Entrance

X1 X13 X23

PRIORIDAD!! 432000 PRIORIDAD!!


242000 190000
Cto.Electrico-PA Cto.Electrico-WE/Fab
Cto.UTY Cto.UTY 16/Oct. al 31/Oct. Terraceria.
26/Sep. al 15/Oct. Terraceria. 8 9
26/Sep. al 31/Oct. Terraceria. 26/Sep. al 31/Oct. Terraceria. 01/Nov. al 31/Ene. Trabajo AR
16/Oct. al 31/Dic. Trabajo AR
01/Nov. al 31/Ene. Trabajo AR 01/Nov. al 31/Ene. Trabajo AR 15/Ene. al 15/Abr. Trabajo MEP
01/Ene. al 31/Mar. Trabajo MEP
01/Feb. al 31/Mar. Trabajo MEP 01/Feb. al 15/Abr. Trabajo MEP 01/May. Inicio de Instalacion de maquina del cliente
16/Abr. Inicio de Instalacion de maquina del cliente 2
16/Abr. Inicio de Instalacion de maquina del cliente 01/May. Inicio de Instalacion de maquina del cliente WB-67 WB-67

46606
AASHTO 2004 (US) AASHTO 2004 (US) AASHWB-
TO 67
200
4 (US
)

CHEMICAL
STORAGE
6 10
SE MOVIERON LOS UTILITY PARA BAJAR EL AREA DE CONCRETO Y SE AGREGO GRAVA

1 3 2 5 7

AASHTO 2004 (US)

AASHTO 2004 (US)


WB-67 WB-67
ELECTRICAL COMPRESSOR
ROOM ROOM

11
EMPLOYEE EMERGENCY EMERGENCY
Y1

AASHTO 2004 (US)


EMERGENCY
EXIT EXIT

W.C.W.

W.C.M.
EXIT
ACCESS

WB-67
12
W.C.W.
SECURITY ROOM

W.C.M.

KITCHEN
(FUTURE)

SLD 1 : W1500 x H2200


CAFETERIA

FAB

SLD 1 : W1500 x H2200


TRAINING ROOM
PA area PA WE Fabrication Area AASHTO 2004 (US)
WB-67

80000
Area de Pintura
al 30/Nov. Trabajo AR Welding Area AASHTO 2004 (US)
WB-67

01/Nov. al 31/Ene. Trabajo MEP


AASHTO 2004 (US)
WB-67

QC ROOM

AASHTO 2004 (US)


WB-67

01/Feb. al 15/Mar. Colado de piso


EXISTING FACTORY
16/Abr. Inicio de instalacion de maquina del cliente
QA/QC

W.C.W. AASHTO 2004 (US)


WB-67

SECURITY
CONTROL FIRST AID
ROOM W.C.M. 2 WE/Fab area AASHTO 2004 (US)
WB-67

AASHTO 2004 (US)


11.1

WB-67
al 20/Oct. Terraceria
MAIN ACCESS AASHTO 2004 (US)
WB-67

AASHTO 2004 (US)


WB-67

al 31/Dic. Trabajo AR
PRIORIDAD!! Y5
MEETING ROOM

Wood Strage 1,2,3 , Guard house


PU

0±LF
01/Dic. al 28/Feb. Trabajo MEP WE
MEETING ROOM
AASHTO 2004 (US)
WB-67
MEETING ROOM MEETING ROOM

19/Sep. al 15/Oct. Terraceria


MEETING ROOM

01/Mar. al 31/May. Trabajo AR


MEETING ROOM

PW 01/Mar. al 15/Abr.Colado de piso Welding Area FAB


AASHTO 2004 (US)
WB-67

Almacen de partes
Fabrication Area
AASHTO 2004 (US)

WB-67
13

205200
16/Oct. al 31/Dic. Trabajo AR 01/Jun. al 31/Ago. Acabado AR y MEP 01/May. Inicio de Instalacion de maquina del cliente
AS area
AASHTO 2004 (US)
WB-67

01/Ene. al 15/Mar. Trabajo MEP


OPEN OFFICE

01/Sep. al 29/Sep. Inspeccion y Detalle


al 30/Oct. Terraceria

AASHTO 2004 (US)


AASHTO 2004 (US)

30/Sep. Entrega de la area 20 NEW FACTORY

WB-67
WB-67

01/Abr. Inicio de Instalacion de maquina del cliente

76000
19 21 al 31/Ene. Trabajo AR AASHTO 2004 (US)
WB-67

ARCHIVE SERVER
ROOM AASHTO 2004 (US)

01/Ene al 31/Mar. Trabajo MEP


WB-67

TANK OF
GASOLINE AND OIL
6000 AS(SXS) AASHTO 2004 (US)
WB-67
463.69
461.05

01/Abr. al 09/May. Inicio de Colado de piso Area de Ensamblado (SXS)

AASHTO 2004 (US)


WB-67

10/May. al 09/Jun. Inspeccion y Detalle AS(SXS) WB-67


AASHTO 2004 (US)

AASHTO 2004 (US)


WB-67

Area de Ensamblado (SXS)

21096 10/Jun. Inicio de Instalacion de maquina del cliente AASHTO 2004 (US)
WB-67
461.13

463.78

10 23
25
Y9
44 CAR PARKING SPACES

X
18
PW area , MM , WEF
34 al 14/Oct. Terraceria
463.88
461.21

26
22 15/Oct. al 31/Mar. Trabajo AR

49200
PW MEP
01/Mar. al 31/May. Trabajo Almacen de partes
WAREHOUSE EXPANSION AREA (FUTURE)
463.98
461.30

01/Jun. al 31/Jun. Coaldo de piso


01/Jul. al 30/Jul. Inspeccion y Detalle
01/Ago. Inicio de Instalacion de maquina del cliente
Y12
464.08
461.38

FL+12,240

FL+8,640
UP

FL±0
AASHTO 2004 (US)

AASHTO 2004 (US)


tank 1,000gal

Gasoline tank
Diesel tank

Engine oil
500gal

1,000gal
WB-67

WB-67
24
464.18
461.46

AASHTO 2004 (US) AASHTO 2004 (US)


WB-67 WB-67
464.28
461.54

FRP Building Cto.UTY


4 17 16 15 PRIORIDAD!!
14
464.38
461.62

al 30/Nov. Trabajo AR 01/Nov. al 30/Nov. Terraceria.

KMX NEW PLANT PROJECT


01/Dic. al 15/Feb. Trabajo MEP 01/Dic. al 14/Feb. Trabajo AR Cto.Electrico-AS
15/Feb. al 28/Feb Colado de piso 15/Feb. al 20/May. Trabajo MEP 01/Nov. al 30/Nov. Terraceria.
464.49
461.70

01/Abr. Inicio de Instalacion de maquina del cliente 20/May. al 09/Jun. Inspeccion y Detalle. 01/Dic. al 14/Feb. Trabajo AR
50 10/Jun. Inicio de Instalacion de maquina del cliente 15/Feb. al 19/May. Trabajo MEP
20/May. al 09/Jun. Inspeccion y Detalle.
464.59
461.79

PROPERTY LINE
10/Jun. Inicio de Instalacion de maquina del cliente

LOCATION: INTERPUERTO, SALINAS VICTORIA, NUEVO LEON.


464.69
461.87

318 CAR PARKING SPACES

GENERAL SITE PLAN


464.79
461.95

87 87
464.89
462.03

50
464.99
462.11

DRAWING TITLE :

PROJECT NAME :
PROPERTY LINE
465.09
462.19

465.19
462.27

REVISION :
REV. 1 - 2022.06.14
465.29
462.36

REV. 2 - 2022.08.09
44
465.39
462.44

465.49
462.52

465.59
462.60

ISSUE FOR :
465.69

PLAN TRUE DATE : 2022.06.20


PROPERTY LINE NORTH NORTH SHEET NUMBER :

1 SITE PLAN A2-01


REF. SCALE: 1/1400 @ ANSI D