UTILITY BUILDINGS
1 Paint Storage 7 Burn off Room 13 Cold Storage 19 Wood Material Storage - 1 25 Deep well area
2 Compressor Room - PA 8 Waste sludge - Recycle box storage 14 Compactor 20 Wood Material Storage - 2 26 Gas station
Hazama Ando Corporation
3 Electrical Room - PA 9 Gas tank & Mixture 15 Machine Maintenance Building 21 Wood Material Storage - 3 Paseo de la Altiplanicie #11 Int.5
Col.Villas de Irapuato
C.P. 36670, Irapuato, Guanajuato
4 Dom. Water Pump RM & Tank - FF Pump RM & Tank. 10 Compressor Room & Electrical Room - WE & FAB 16 Compressor Room & Electrical Room - AS 22 FRP Factory Building Ph. (462) 104 5067
5 Waste Water Treatmen Plant 11 E-COAT Chiller foundation2 11.1 PLASTIC PAINT Chiller foundation 17 Gasoline, Diesel & Engine Oil tanks 23 Electrical Room - FRP
6 Drum can storage 12 Extra-High Voltage Substation 18 Returnable Crate Maintenance Area 24 Guard House & Entrance
X1 X13 X23
46606
AASHTO 2004 (US) AASHTO 2004 (US) AASHWB-
TO 67
200
4 (US
)
CHEMICAL
STORAGE
6 10
SE MOVIERON LOS UTILITY PARA BAJAR EL AREA DE CONCRETO Y SE AGREGO GRAVA
1 3 2 5 7
11
EMPLOYEE EMERGENCY EMERGENCY
Y1
W.C.W.
W.C.M.
EXIT
ACCESS
WB-67
12
W.C.W.
SECURITY ROOM
W.C.M.
KITCHEN
(FUTURE)
FAB
80000
Area de Pintura
al 30/Nov. Trabajo AR Welding Area AASHTO 2004 (US)
WB-67
QC ROOM
SECURITY
CONTROL FIRST AID
ROOM W.C.M. 2 WE/Fab area AASHTO 2004 (US)
WB-67
WB-67
al 20/Oct. Terraceria
MAIN ACCESS AASHTO 2004 (US)
WB-67
al 31/Dic. Trabajo AR
PRIORIDAD!! Y5
MEETING ROOM
0±LF
01/Dic. al 28/Feb. Trabajo MEP WE
MEETING ROOM
AASHTO 2004 (US)
WB-67
MEETING ROOM MEETING ROOM
Almacen de partes
Fabrication Area
AASHTO 2004 (US)
WB-67
13
205200
16/Oct. al 31/Dic. Trabajo AR 01/Jun. al 31/Ago. Acabado AR y MEP 01/May. Inicio de Instalacion de maquina del cliente
AS area
AASHTO 2004 (US)
WB-67
WB-67
WB-67
76000
19 21 al 31/Ene. Trabajo AR AASHTO 2004 (US)
WB-67
ARCHIVE SERVER
ROOM AASHTO 2004 (US)
TANK OF
GASOLINE AND OIL
6000 AS(SXS) AASHTO 2004 (US)
WB-67
463.69
461.05
21096 10/Jun. Inicio de Instalacion de maquina del cliente AASHTO 2004 (US)
WB-67
461.13
463.78
10 23
25
Y9
44 CAR PARKING SPACES
X
18
PW area , MM , WEF
34 al 14/Oct. Terraceria
463.88
461.21
26
22 15/Oct. al 31/Mar. Trabajo AR
49200
PW MEP
01/Mar. al 31/May. Trabajo Almacen de partes
WAREHOUSE EXPANSION AREA (FUTURE)
463.98
461.30
FL+12,240
FL+8,640
UP
FL±0
AASHTO 2004 (US)
Gasoline tank
Diesel tank
Engine oil
500gal
1,000gal
WB-67
WB-67
24
464.18
461.46
01/Abr. Inicio de Instalacion de maquina del cliente 20/May. al 09/Jun. Inspeccion y Detalle. 01/Dic. al 14/Feb. Trabajo AR
50 10/Jun. Inicio de Instalacion de maquina del cliente 15/Feb. al 19/May. Trabajo MEP
20/May. al 09/Jun. Inspeccion y Detalle.
464.59
461.79
PROPERTY LINE
10/Jun. Inicio de Instalacion de maquina del cliente
87 87
464.89
462.03
50
464.99
462.11
DRAWING TITLE :
PROJECT NAME :
PROPERTY LINE
465.09
462.19
465.19
462.27
REVISION :
REV. 1 - 2022.06.14
465.29
462.36
REV. 2 - 2022.08.09
44
465.39
462.44
465.49
462.52
465.59
462.60
ISSUE FOR :
465.69