Documentos de Académico
Documentos de Profesional
Documentos de Cultura
30
Nivel de Relleno
.15
.25
Ø 5/8" @ 0.175
Ø 1/2" @ 0.30
.25
Ø 1/2" @ 0.25 Ø 1/2" @ 0.25
.25
Encofrado caravista
.25
2.50
.25
.25
.175.175.175.175.175.175.175.175
.25
4.00
Ø 1/2" @ 0.30
.25
Ø 5/8" @ 0.175 .30 .30 .30 .30
4.39
4.39
Ø 5/8" @ 0.175
Concreto 210 Kg/Cm2
.25
Nivel de Terreno
.175.175.175.175.175.175.175
.25
.25
Encofrado caravista Ø 1/2" @ 0.25 Ø 1/2" @ 0.25
.25
1.50
1.33
.25
H/3
Df = 2.00
.25
1.50 1.50
.05 .25
Concreto 210 Kg/Cm2
.50
.50
ESCALA 1 : 25
.30
Nivel de Relleno
TUBERIA DE 4"
.84
PERFORADA
RELLENO CON DRENAJE
TUBERIA DE 2" PARA LONGITUDINAL
MATERIAL PROPIO
4.00 DRENAJE
4.00
ZAPATA
EXTERIOR
4.50
.84
Nivel de Terreno
VISTA EN 3D DE MURO DE CONTENCIÓN
ESCALA S/E
4.00
Encofrado caravista
TUBERIA DE 4"
PERFORADA
1.50
.80
Concreto 210 Kg/Cm2 .90
.50
.50
2
MADERA DE 3" X 4'' 2.3
SOLADO e=10cm
SISTEMA DE PROYECCION
CARTOGRAFICA:
DATUM: ZONA UTM: MUROS - MURO TIPO I M-01
UTM WGS84 18 Sur